HomeMy WebLinkAboutTIS 2025-10-27 COMPLETE AGENDA PACKETCity of Tukwila Transportation & Infrastructure Safety Committee O Mohamed Abdi, Chair O Hannah Hedrick O Joe Torres Camacho AGENDA MONDAY, OCTOBER 27, 2025 — 5:30 PM Distribution: M. Abdi H. Hedrick J. Camacho Mayor McLeod M. Wine A. Youn L. Humphrey ON -SITE PRESENCE: TUKWILA CITY HALL COUNCIL CONFERENCE Room 6200 SOUTHCENTER BOULEVARD REMOTE PARTICIPATION FOR THE PUBLIC: 1-253-292-9750, ACCESS CODE: 252508487# Click here to: Jooiini IIMIlic ro4sa.)i'ti: II earns II'iIleetiaiinig For Technical Support: 1-206-433-7155 Item Recommended Action Page 1. BUSINESS AGENDA a. Project Closeout: 2023 Central Business District (CBD) a. Forward to 11/3 Regular Pg.1 Sanitary Sewer Rehabilitation CIPP Project Consent Agenda David Baus, Project Manager b. Contract Amendment with Psomas for Stormwater Outfalls b. Forward to 11/3 Regular Pg.5 Water Quality Retrofit Program Consent Agenda Josh Hopkins, Surface Water Project Manager c. Grant Acceptance: King County Cooperative Watershed c. Forward to 11/3 Regular Pg.19 Management Grant for Chinook Wind Extension Project Consent Agenda Catrien de Boer, Public Works Analyst d. Grant Acceptance: WSDOT Safe Routes to School Grant for 46th Ave S d. Forward to 11/3 Regular Consent Agenda Pg.23 Catrien de Boer, Public Works Analyst e. Grant Acceptance: Dept of Ecology Stormwater Capacity e. Forward to 11/3 Regular Pg.27 Grant for NPDES Permit Implementation Consent Agenda Catrien de Boer, Public Works Analyst 2. MISCELLANEOUS Next Scheduled Meeting: November24, 2025 15 The City of Tukwila strives to accommodate individuals with disabilities. Please contact the City Clerk's Office at 206-433-1800 (TukwilaCityClerk©TukwilaWA.gov) for assistance. Thomas McLeod, Mayor Public Works Department - Jen Tetatzin, PE, PMP - Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Jen Tetatzin, Public Works Director BY: David Baus, Project Manager CC: Mayor Tom McLeod DATE: October 27, 2025 SUBJECT: 2023 Central Business District Sanitary Sewer Rehabilitation Project Project #80040201, Contract No. 25-036 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of insurance, retainage, and performance bond. BACKGROUND The Notice to Proceed for Contract No. 25-026 with Iron Horse, of Fairview, Oregon, was issued on January 26, 2025, for the 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B project. Project included installation of approximately 7,960 linear feet of ultraviolet -cured cured -in - place pipe (CIPP) to rehabilitate existing sewer main within the central business district. ANALYSIS Construction was Physically Complete on March 4, 2025. The budget for the CIPP project was $1,339,083.18 including a contingency of 15%. No formal Change Orders were executed for the work since all changes fit within existing bid items or were performed under allowable Force Account items. Construction Contract Amount Total Amount to be Paid $1,339,083.18 $1,332,289.27 RECOMMENDATION Council is being asked to formally accept the project as complete and authorize the release of the insurance, retainage, and performance bonds, subject to standard claim and lien release procedures, for the 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B construction contract with Iron Horse in the final amount of $1,332,289.27 and consider this item on the Consent Agenda at the November 3, 2025 Regular Meeting. ATTACHM ENT CBD CIPP Project Sites Map Post construction pictures Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov von a of 190a City of Tukwila Public Works Department - Jen Tetatzin, PE, PMP - Director it 9f iodratti r000000rr, /%/ %inf6l'.w�uuli� 2023 CBD CIPP Project Sites Thomas McLeod, Mayor Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 2 iu u'q'u1o1drlll II6u i 1di;mm;il City of Tukwila Thomas McLeod, Mayor Public Works Department - Jen Tetatzin, PE, PMP - Director rifPR ion x 0 Inclement weather did not after lining Inserting lining into sewer main Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 3 City of Tukwila Public Works Department - Jen TeUzm PE, PMP - DirectA 2 » Thomas McLeod, Mayor � � } v : \ /1111111 ) \ Command central, controlling the speed o UV train A section of cured liner was cut from the manhole and sent to a QA laboratory to confirm it had reached the req%rd strength Tukwila City Holl.60 Southcenter Boulevard .TuAwl WA 98188 • 206g3 280• W lair=+Aw aW.gv 4 Public Works Department - Jen Tetatzin, PE, PMP - Director TO: FROM: BY: CC: DATE: SUBJECT: Thomas McLeod, Mayor INFORMATIONAL MEMORANDUM Transportation and Infrastructure Services Committee Jen Tetatzin, Public Works Director Josh Hopkins, Surface Water Project Manager Mike Perfetti October 24, 2025 Surface Water Fund — Stormwater Outfalls Water Quality Retrofit Program Project No. 91241202 Contract 22-134, Amendment No. 3 ISSUE Request approval for Amendment No 3. to Contract 22-134 in the amount of $98,268. BACKGROUND The goal of the Stormwater Outfall Water Quality Retrofit program is to improve the water quality of stormwater discharges to the Green-Duwamish River from city roads. This project will retrofit four city street discharge points out of eight that were prioritized by City staff. In a prior contract, Psomas analyzed and ranked these eight discharge points based on seven criteria and also developed designs for these four priority sites to 90% Plans. The first two sites were constructed in the fall of 2024 and summer of 2025, one on Interurban Avenue S and the other on Tukwila International Blvd. The first contract amendment was a time extension only, and the second amendment added final design and construction management funding for the next two sites to be built in 2026, one on East Marginal Way and the other on Fort Dent Way. DISCUSSION Amendment No. 3 includes additional funding for construction management services ($56,268) for the first two sites and funding for utility potholing ($42,000) for next two sites. FINANCIAL IMPACT This amendment totals $98,268, 85% is reimbursable through two Department of Ecology (DOE) Stormwater Financial Assistance Program grants. The first DOE grant (WQC-2023-Tukwil-00073) will fund the construction management services ($56,268), and the second DOE grant (WQC-2025-Tukwil- 00039) will fund the utility potholing ($42,000) for the second two sites. Budgeted CIP Surface Water revenue in the amount of $63,171.15 will cover the required 15% match for both grants. Contract Grants CIP Funds $198,827.00 $198,827.00 Psomas Contract 22-134 Design & CM (1st two sites) Amend. No. 1 - Time Extension Amend. No. 2 - Design & CM (2nd two sites) Amend. No. 3 — Add'I CM & Design Costs (1st and 2nd sites) Subtotal: Total: $322,873.00 $274,442.05 $48,430.95 $98,268.00 $83,527.80 $14,740.20 $619,968.00 $556,796.85 $63,171.15 $619,968.00 $619,968.00 RECOMMENDATION Council is being asked to approve Amendment No. 3 to Contract 22-134 with Psomas Inc, in the amount of $98,268 for additional construction management services and final design costs and to consider this item on the Consent Agenda on November 3, 2025, Regular Meeting. ATTACHMENTS: CIP, WQ Retrofit Amend No.3 Cost Breakdown, Amend No.3 Signed 5 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2025 to 2030 PROJECT: Stormwater Water Quality Retrofit Program Project# 91241202 Project Manager Joshua Hopkins Department Surface Water DESCRIPTION: Plan, design, and install water quality treatment and other stormwater conveyance improvements at targeted drainage locations. JUSTIFICATION: Most surface water is discharged directly to receiving water bodies untreated. STATUS: Water quality retrofit has been added to CIP projects since 2015. MAINTENANCE IMPACT: N/A COMMENT: Combine with other CIP projects for design and construction, where feasible. FINANCIAL (in thousands) 2025 2026 2027 2028 2029 2030 Beyond TOTAL Project Costs Project Mgmt (Staff Time/Cost) Design Construction Mgmt. Construction $ 25 $ 100 $ 100 $ 400 $ 25 $ 300 $ 300 $ 1,410 $ 25 $ 100 $ 25 $ 400 $ 1,800 $ 25 $ 100 $ 25 $ - $ 400 $ 1,800 $ 25 $ 20 $ 15 $ 80 $ 175 $ 620 $ 1,215 $ 5,490 Total Project Costs $ 625 $ 2,035 $ 125 $ 2,225 $ 125 $ 2,225 $ 140 $ 7,500 Project Funding Awarded Grant Proposed Grant Utility Revenues $ 125 $ 425 $ 75 $ 1,410 $ 300 $ 325 125 $ - $ 1,530 $ 695 $ 125 $ - $ 1,530 $ 695 $ 140 $ 1,535 $ 3,785 $ 2,180 Total Project Funding $ 625 $ 2,035 $ 125 $ 2,225 $ 125 $ 2,225 $ 140 $ 7,500 6 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 22-134(c) CONTRACT FOR SERVICES Amendment # 3 Between the City of Tukwila and KPG Psomas, Inc That portion of Contract No. 22-134 between the City of Tukwila and KPG Psomas Inc. for the Stormwater Outfalls Water Quality Retrofit Project is hereby amended as follows: Section 2 Scope of Services: The following language shall be added to the end of the existing Section 2: In addition, work under this contract shall include reimbursement for services, direct expenses, and costs associated with the additional contract scope of services as described in Exhibit A-5, attached. Section 4 Payment: Section 4A is hereby amended to read as follows: Payment for the work provided by the Consultant shall be made as provided on Exhibits "B- 1" and "B-2," provided that the total amount of payment to the Consultant for that work shall not exceed $198, 827.00 without express written modification of the Agreement signed by the City. Payment for the work provided by the Consultant shall be made as provided on Exhibit B-3 and B-4 attached hereto, provided that the total amount of payment to the Consultant for that work shall not exceed $322, 873 without express written modification of the Agreement signed by the City. Payment for the work provided by the Consultant shall be made as provided on Exhibit B-5 attached hereto, provided that the total amount of payment to the Consultant for that work shall not exceed $98,268 without express written modification of the Agreement signed by the City. The maximum amount payable under this contract as amended inclusive of all fees and other costs shall not exceed $619,698 without express written modifications of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of , 20 CA Reviewed May 2020 Page 1 of 2 7 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 ** City signatures to be obtained by City Clerk's Staff ONLY. ** CITY OF TUKWILA Thomas McLeod, Mayor ATTEST/AUTHENTICATED: Andy Youn-Barnett, City Clerk APPROVED AS TO FORM: Office of the City Attorney Agreement Number: 22-134(c) ** Contractor signature to be obtained by sponsor staff. ** CONTRACTOR: By: Printed Name: Terry Wright Title: Vice President 8 CA Reviewed May 2020 Page 2 of 2 EXHIBIT A-5 Construction Management Services Scope of Work City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Services Supplement Psomas Project Number: 9TUK010300 June 19, 2025 Psomas is providing construction management services for the construction contract to complete the City of Tukwila Stormwater Outfall Water Quality Retrofit Project. The City of Tukwila has been selected to receive funding through DOE Agreement No. WQC-2023-Tukwil-00073 ("Grant Agreement") in the State Fiscal Year 2023 (SFY23) Funding Cycle. The work includes: Site 1: Tukwila International Blvd at SR 599 Off -Ramp Install two new modular wetland units, storm conveyance pipe, and restoration of gore area to treat stormwater runoff before it outfalls to Riverton Creek. Site 2: Interurban Ave S at 58th Ave S Install new modular wetland unit, storm conveyance pipe, and street trench restoration to treat stormwater runoff before it outfalls to the Duwamish River. This location will also be replacing existing signalized intersection loops with permanent video detection. A detailed scope follows: I. INTRODUCTION Shortly before construction began for the project it was discovered there were additional requirements for completing the work at the SR 599 Off -Ramp due to the work being in WSDOT Limited Access Right -of - Way. The Contractor intended to start work at this site, but had to shift work to the Interurban site until the requirements of WSDOT were met. This caused a delay in the project starting and forced the project into splitting the work into two construction seasons. A complete list of items that extended the project scope and time to completion are as follows: • Unexpected WSDOT coordination caused scope and time increases o Structures installed within the WSDOT ROW had to be stamped by the Materials Lab, requiring additional coordination time. o The 35 working days were split between Fall 2024 and Spring 2025 creating additional time administrative items required by the Contract. o WSDOT coordination continued through the winter months to resolve their requirements for the WQ vault yet to be installed within their limited access right-of-way. o Certified payroll tracking continued through the suspension period. City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Management Services Page 1 of 7 Psomas June 19, 2025 9 EXHIBIT A-5 • The Contractor's vault supplier had delays in shipping the items to site. This forced the Contractor to pave on two days instead of one for the Interurban site. Increasing the amount of testing required. • New crushed rock and HMA materials were submitted for the work to be completed in the spring, which required additional conformance testing. • An unmarked conduit was discovered running through a section of the project. There were four non -working days associated with this discovery as the Contractor lost efficiency and was working on non -critical items during this time. • Additional non -working days were granted for weather. Some work continued on these days but was inefficient. General Assumptions: • There are 15 working days remaining in the Contract. Work is expected to wrap up within this time, except for punchlist items. • Coordination with WSDOT will continue as work progresses within their ROW. • The proposed project team will include a part time Resident Engineer (10 hours a week), one full time Construction Inspector, a part time Documentation Specialist (20 hours a week), and one part time Project Engineer from Psomas's design team to review submittals and interpret Contractor inquiries, as needed. The team also includes a sub -consultant to provide services for materials testing and construction site observation to satisfy Tukwila Municipal Codes for work within certain soil classifications. • Consultant will coordinate during audits or traffic control operations related to project impacts and help the City to complete any other required correspondence with outside agencies. • Psomas design engineers will be available during construction to answer questions and review RAM's, shop drawings, and answer RFI's. • Consultant services will be performed in accordance with the WSDOT Construction Manual, Contract plans & special provisions, and City of Tukwila engineering standards. • The franchise Utilities will provide field inspection for all work surrounding the construction or relocation of their utility systems if necessary. • Coordination of construction with franchise utilities, if any, will be done by City Contractor. Consultant will help facilitate coordination between utilities and Contractor as needed or requested by City. City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Management Services Page 2 of 7 Psomas June 19, 2025 10 EXHIBIT A-5 II. SCOPE OF WORK The objective and purpose of this Construction Management Services Agreement is for the Consultant to successfully deliver the construction of the Project to the City by ensuring that the improvements are constructed in accordance with the approved Plans and Specifications, as may be amended or revised, that all of the required Project documentation is accounted for, and ultimately that the City of Tukwila receives a successful review by any outside agency including state audits at the end of the Project. TASK 1— CONSTRUCTION SERVICES — OFFICE 1.1 Construction Management Office Support: Original documentation will be housed at the Consultant's office and filed in accordance with standard filing protocol. Document Control will consist of the following: a. Project Coordination: Liaison with City, construction Contractor, engineer, utilities and property owners on a regular basis to discuss project issues and status. b. Plan Interpretations: Provide technical interpretations of the drawings, specifications, and Contract Documents, and evaluate requested deviations from the approved design or specifications. Coordinate with City for resolution of issues involving scope, schedule, and/or budget changes. c. Submittals: Consultant shall take lead on submittal reviews/ approvals. Consultant shall coordinate review process for shop drawings, samples, traffic control plans, test reports, and other submittals from the Contractor for compliance with the contract documents. Submittals shall be logged and tracked by Consultant. d. Requests for Information (RFI): Consultant shall review and respond to RFI's. RFI's shall be logged and tracked by Consultant. e. Weekly Meetings: Consultant will lead weekly meetings. Consultant will prepare agenda for City review and distribute meeting minutes to attendees. Outstanding issues to be tracked on a weekly basis. Weekly Statement of Working Days will be reviewed/accepted by Contractor during the Weekly Meeting. f. Change Orders: The Consultant will develop change orders and the Consultant will provide technical assistance to negotiate change orders, and assist in resolution of disputes which may occur during the course of the project. The City will approve all change orders before being fully executed. Each change order will be executed in accordance with WSDOT Standard Specifications. g. Field Work Directives: The Consultant will prepare field work directives as necessary to keep the Contractor on schedule. City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Management Services Page 3 of 7 Psomas June 19, 2025 11 EXHIBIT A-5 h. Force Account: The Consultant will track Contractor force account labor, equipment and materials. All force account calculations will be verified by the City and double checked by the Consultant. The City shall have final authority to approve any Force Account work prior to agreement with the Contractor. J. Schedule Review: Consultant shall perform review of initial Contractor provided CPM for conformance with the Contract Documents. Any discrepancies, conflicts or unreasonable work durations will be brought to the attention of the Contactor and City. Consultant will provide one (1) intermediate review of Contractor's updated schedule and compare with field -observed progress and duration of the project. Monthly Pay Requests: Consultant shall prepare monthly requests for Contractor payment based on field note records prepared by Consultant field inspector in accordance with contract documents. k. Weekly Statement of Working Days: Consultant shall prepare, and issue weekly statement of working day report each week to the Contractor and City for review and approval. Weekly statement of working days will be based on field inspection reports provided by Consultant. 1. Subcontractor Documentation: Process / approve all required subcontractor documentation. Request to Sublets will be verified and logged. This includes checking System Award Management System (SAMS), verifying business licensing, reviewing insurance documentation, verifying city business licensing, Intent to Pay Prevailing Wage and Affidavit of Wages Paid. All subcontractor documentation will be logged into Psomas's subcontractor logs. 1.2 Construction Management Field Paperwork: Consultant shall review and assist with processing of field paperwork from the Inspector and Contractor for tracking and documentation. 1.3 Certified Payroll: The Consultant will process and check the Contractor and Subcontractor's certified payroll per State Prevailing Wage Requirements. Tracking of payroll shall consist of recording each payroll received from the Prime and Subcontractors and checking pay rates against Contract requirements. Any discrepancies will be brought to the Contractor and City. 1.4 Utility Coordination: The Consultant will facilitate ongoing communications and coordination between the Contractor and City and/or Franchise utilities who may have infrastructure within the project limits. This includes JUT conversions, relocations due to foreseen or unforeseen conflicts, scheduled outages for tie-ins, etc. 1.5 Department of Ecology (DOE) Grant Requirements: The Consultant shall prepare, and issue to the City for submittal to the Department of Ecology (DOE) the Construction Management and Construction Scope of Work within the Grant Agreement. The expected deliverables are noted below. The City will be responsible to upload deliverables to EAGL and notify Ecology with upload is complete. Deliverables: City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Management Services Page 4 of 7 Psomas June 19, 2025 12 EXHIBIT A-5 • Approved Submittals and Submittal log • Responded RFIs and RFI Log • Weekly Meeting minutes • Fully -executed Change Orders and Field Work Directives, with Change Management Log • Force Account Documentation and Tracking Log • Fully -executed Monthly Progress Payments • Subcontractor Packets • Weekly Statements of Working Days • Certified Payroll Tracking Log (hard copy binder not included) • Contractor -generated As-builts, if required by Contract • All other project documentation generated during the course of project construction duration. TASK 2 — CONSTRUCTION SERVICES - FIELD 2.1 Construction Observation: The Consultant will provide one (1) inspector during construction activities and other tasks necessary to monitor the progress of the work. The Inspector will ensure that the daily inspection reports and working days reporting are completed in a timely manner and contain sufficient information to assess whether the work is being conducted in compliance with the Contract Documents per City and WSDOT standards. Consultant will make IDR's available to the City by Friday of the same work week upon request. The Inspector may perform the following duties as a matter of his daily activities: i. Observe technical conduct of the construction, including providing day-to-day contact with construction contractor, City, utilities, and other stakeholders, and monitor for adherence to the Contract Documents. The Consultant's personnel will act in accordance with Sections 1-05.1 and 1-05.2 of the WSDOT Standard Specifications. ii. Observe material, workmanship, and construction areas for compliance with the Contract Documents and applicable codes, and notify construction contractor of noncompliance. Advise the City of any non -conforming work observed. iii. Document all material delivered to the job site in accordance with the Contract Documents. iv. Prepare daily inspection reports, recording the construction contractor's operations as actually observed by the Consultant; includes quantities of work placed that day, contractor's equipment and crews, and other pertinent information. City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Management Services Page 5 of 7 Psomas June 19, 2025 13 EXHIBIT A-5 v. Interpret Contract Documents in coordination with the City, Contractor, and Psomas. vi. Resolve questions which may arise as to the quality and acceptability of material furnished, work performed, and rate of progress of work performed by the construction contractor. vii. Support the Contractor's communication and responsibilities to answer questions from property owners and the general public as needed. viii. Monitor compliance of approved permits per the project specifications, if applicable. ix. Prepare field records and documents to ensure the Project is administered in accordance with the plans and specifications. x. Collect and calculate delivery tickets and scaleman's daily reports of aggregate. All tickets will be initialed with correct bid item and stationing identified (Construction Manual 10- 2). xi. Attend and actively participate in regular on -site weekly construction meetings. xii. Take digital photographs during the course of construction, and record locations. Assumptions: • Consultant will provide observation services for the days/hours that the contractor's personnel are on -site. • Assumption is Client's Contractor shall work normal 40-hour work weeks. For this project the "normal" work week may occur at night. Psomas does not differentiate day shift from night shift. However, if the City's Contractor works a double shift (both day and night) within a single 24-hour period this will constitute two working days. Consultant's hours for inspection are based on one shift for number of working days allowed per Contract. • The Consultant's monitoring of the construction contractor's activities is to ascertain whether they are performing the work in accordance with the Contract Documents; in case of noncompliance, Consultant will reject non -conforming work, and pursue the other remedies in the interests of the client, as detailed in the Contract Documents. 2.2 Material Testing — Coordination & Tracking: The inspector shall coordinate with the Contractor and the material testing firm to schedule testing of materials in the field to ensure they meet specifications per contract requirements. The cost for this effort is included in Task 3.1. 2.3 Construction Inspection Nights: Night work is anticipated for this scope of work. Deliverables: • Daily Construction Reports with project photos. • Field Note Records for all field -measurable pay items. • Review material test reports for compliance. City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Management Services Psomas Page 6 of 7 June 19, 2025 14 EXHIBIT A-5 TASK 3— SUBCONSULTANTS 3.1 Material Testing: HWA Material Testing will be retained as Psomas's subconsultant to provide material testing and construction observation services. All testing will be done in accordance with LAG Manual and WSDOT Construction Manual, or at a desired reduced frequency as -directed by City project manager. TASK 4 — ADDITIONAL SERVICES 4.1 Management Reserve: Additional services requested by the City will be performed only when authorized by the City. Authorization to perform additional services will be in writing, specifying the work to be performed, and basis of payment. Items such as Community Outreach (except as completed on a day-to-day basis by the inspector and resident engineer as described in task 2.1 — vii), Public Meetings, Ribbon Cutting Ceremony, claims analysis, surveying, services during shutdown periods of non -working days, and services for extended working days are examples of possible additional services. This fee is based 35 working day contract, with 10 additional reduced -effort days for startup and 20 additional reduced -effort days for closeout, for a total of 65 days / 13 weeks, 8-hour days, additional extension of days will be approximately $1,080.00 per day for one person. (8 hours x $367.00 = $2,936.00) City of Tukwila Stormwater Outfall Water Quality Retrofit Project Construction Management Services Psomas Page 7 of 7 June 19, 2025 15 PSOMAS EXHIBIT B-5 PRIME CONSULTANT COST COMPUTATIONS Client: Project Name: Psomas Project Number: Supplement to Closeout Remaining Scope Date: City of Tukwila WQ Retrofit 9TU K010300 6/27/2025 Task No, Task Description Labor Hour Estimate Total Hours and Labor Cost Computations by Task — •� m o w to _ •� m ii o a = .a tu a m v p c c cg o U c— c� 00 U 0 o y U a u .71 E a oy c a 0 Y U a E w o Q- c N a a R `o s c 0 "'} N E 207 198 159 207 119 121 160 146 116 Hours Totals Task 1 - MANAGEMENT / COORDINATION / ADMINISTRATION 1.1 Project Management and Administrative Services 0 $ - 1.2 Prepare, review and submit monthly expenditures 2 2 2 6 $ 1,060.00 Task Total 2 0 0 2 0 0 0 0 2 6 $ 1,060.00 Task 2 - Administrative Services up to Contractor Notice to Proceed (NTP) 2.1 Administrative Services up to Contractor Notice to Proceed 0 $ - 2.2 PreCon Photos 0 $ - 2.3 Review Plans and Specs 0 $ - 2.4 Prepare Hard and Electronic Files 0 $ - 2.5 Prepare ROM 0 $ - 2.6 Prepare PreCon Agenda 0 $ - 2.7 Prepare Templates 0 $ - 2.8 Utility Coordination 0 $ - Task Total 0 0 0 0 0 0 0 0 0 0 $ - Task 3 - Provide Field Inspection for Each of the Project's Working Days 3.1 Construction Inspection 0 $ - 3.2 Weekly Construction Meetings 0 $ - 3.3 Construction Inspection Nights (10 hours a night 15 Nights) 150 150 $ 17,850.00 Task Total 0 0 0 0 150 0 0 0 0 150 $ 17,850.00 Task 4 - Construction Services - OFFICE: NTP to Project Closeout. 4.1 Construction Management Office Support 6 8 30 60 1 105 $ 18,752.00 4.2 Construction Management Field Paperwork 0 $ - 4.3 Certified Payroll Tracking 15 15 $ 1,815.00 4.4 Utility Coordination 0 $ - 4.5 DOE Grant Requirements 16 40 4 60 $ 11,816.00 Task Total 6 8 0 30 0 15 60 0 1 180 $ 32,383.00 PSOMAS Task 5 - Project Closeout (4 Weeks) 5.1 Closeout Office Support 0 $ - 5.2 Closeout Inspection & Punchlist 0 $ - 5.3 Certified Payroll Closeout 0 $ - 5.4 Prepare Documentation to Deliver to City 0 $ - Task Total 0 0 0 0 0 0 0 0 0 0 $ - Task 6 - Materials Testing 6.1 'Subcontract with HWA Material Tester (LS Estimate) 0 $ - Task Total 0 0 0 0 0 0 0 0 0 0 $ - Total Labor Hours and Fee 1,656 1,584 0 6,624 '17,850 1,815 9,600 0 348 ; 336 $ 51,293 00 Subconsultants Task 6.1 - HWA Material Testing $ 4,500.00 Subtotal $ 4,500.00 Administrative Charge (5%) $ 225.00 Total Subconsultant Expense $ 4,725.00 Reimbursable Direct Non -Salary Costs Mileage at current IRS rate $ 250.00 Reproduction Allowance $ - 2025 Fort Dent and EMW Potholing $ 42,000.00 Total Reimbursable Expense $ 42,250.00 Management Reserve $ - Total Estimated Budget $ 98,268' 00 18 Thomas McLeod, Mayor Public Works Department - Jen Tetatzin, PE, PMP - Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Jen Tetatzin, Public Works Director BY: Catrien de Boer, Public Works Analyst CC: Mayor McLeod DATE: October 24, 2025 SUBJECT: Surface Water Fund — Chinook Wind Extension Project No. 92341202 - 2025 Cooperative Watershed Management Grant ISSUE Accept a 2025 King County Flood Control District (FCD) Cooperative Watershed Management (CWM) Grant for $618,324 to fund the final design and construction of the Chinook Wind Extension project. BACKGROUND In February 2025, staff applied to the CWM grant program to fund the final design and construction of the Chinook Wind Extension project. The CWM grants are intended to recover ESA -listed salmon species and restore watershed ecosystems. DISCUSSION In August 2025, City staff received notification of a $618,324 award for Chinook Wind Extension final design and construction. This project seeks to complete the "missing link" public access trail between the recently completed Chinook Wind Mitigation Site and Duwamish Gardens. This project will also create complimentary off -channel habitat that will be utilized by juvenile Chinook, contributing to species recovery efforts. FISCAL IMPACT The City will receive $618,324 from the CWM program. No local match is required. The City also was awarded a $1,000,000 grant from the King County Parks Open Space -River Corridors program to supplement this CWM funding for Construction and Construction Management. The total cost for the Chinook Wind Extension project has increased in part because the project was separated from the larger Public Works Shops project. This separation requires additional coordination with King County and other stakeholders, resulting in more staff and consultant time during the design phase before the project can advance to construction. Project Budget Phase 2025 CWM Grant $ 618,324.00 Final Design & Construction King County Parks OSRC Grant $1,000,000.00 Construction & Construction Mgmt Total $1,618,324.00 RECOMMENDATION Council is being asked to accept a 2025 Cooperative Watershed Management grant award for the Chinook Wind Extension project in the amount of $618,324 and consider this item on the Consent Agenda at the November 3rd, 2025 Regular Council Meeting. Attachments: 2025-2030 CIP Page Vicinity Map Duwamish Gardens Habitat Enhancement Options 19 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2025 to 2030 PROJECT: Chinook Wind Extension Project# 92341202 Project Manager Mike Perfetti Department Surface Water DESCRIPTION: JUSTIFICATION: Following the Public Works Facility Preferred Master Ran (2019) and the Duwamish Gardens Opportunities for Expansion Concept Plan (2013), this project will develop connecting shoreline habitat and the 'missing trail link' between Duwamish Gardens and Chinook Wind within recently acquired City property. This is a Tier 1 project in the WRIA 9 Salmon Recovery Plan, fulfilling a core recovery strategy of restoring, protecting and enhancing estuary habitat in the Duwamish River. The trail connection has been discussed in the community for many years and is anticipated to be part of larger, popular shoreline trail. STATUS: The project is currently at 50% design, MAINTENANCE IMPACT: COMMENT: FINANCIAL (in thousands) This is a work in progress. The Green Infrastructure Program Proposal is intended, in part, to address maintenance needs for PW-initiated habitat restoration projects and helping to alleviate pressure on Parks' given resource constraints. Note that vegetation management maintenance needs decrease over time as planted vegetation matures. 3 years is considered a rule of thumb for plant establishment. This grant funded project is being implemented as part of the PW Shops Ph 2 project. There are expectations by the granting agency that the project will be constructed. It is the middle link of the Duwamish Gardens/Chinook Wind trail and "blue belt" aquatic restoration corridor. 2025 2026 2027 2028 2029 2030 Beyond TOTAL Project Costs Project Mgmt (Staff Time/Cost) Design Construction Mgmt. Construction Contingency $ 10 $ 50 $ 200 $ 1,000 $ 25 $ 10 $ 50 $ 200 $ 1,000 $ 25 Total Project Costs $ 1,285 $ $ 1,285 Project Funding Proposed Grant Utility Revenues $ 1,000 $ 285 $ 1,000 $ 285 Total Project Funding $ 1,285 $ 1,285 20 King County iMap d 92 2 I 11 61 tlt Chinook Wind 613 2,5 112th St ( MO: M1,1) 13 4 oo, "11:00.4 oo, •oo• oo, toloo 11180 Project Site Duvvani18'h Garderis Duwamish River The information included on this map has been compiled by King County staff from a variety of sources and is subject to melange without notice. King County makes no representations or warraities, express or implied, as to accuracy, completeness, trneliness, or Opts to the use of such infoimaticn. Tiffs cbcum,ent is not intended for use as a survey product King County shAl rot be liable for any general, special, indirect, inddental, or consequential damages including, but nit irrited to, bst revenues or bst profit resulting from the use or misuse cif the infonnatbn contained on this map. Any sale of ths map or inforrnaticn on this map is prohibited except by written permissicn of Kirg County. 3414 \, 341.5 116213 6,o 1„ 10.30 1 030 ij V King Co2rity Date: 3/15/2023 Notes: N N OPPORTUNITIES FOR EXPANDED HABITAT ENHANCEMENT MAY 16, 2013 DMAMISH GARDENS Thomas McLeod, Mayor Public Works Department - Jen Tetatzin, PE, PMP - Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Jen Tetatzin, Public Works Director BY: Catrien de Boer, Public Works Analyst CC: Mayor McLeod DATE: October 24, 2025 SUBJECT: Residential Streets Fund — 46th Ave S Safe Routes to School Project No. 91710301 - WSDOT Safe Routes to School Grant ISSUE Accept a WSDOT Safe Routes to School (SRTS) Grant for the design of the 46th Ave S Safe Routes to School project in the amount of $610,000. BACKGROUND In June 2024, Staff applied to the SRTS program to fund community outreach and design phases of the project. The purpose of the SRTS program is to improve safety and mobility for children by enabling and encouraging them to walk and bicycle to school. DISCUSSION In August 2025, City staff were notified of a $610,000 award. This project is intended to improve active transportation and safety for students at Thorndyke Elementary, Showalter Middle, and Foster High Schools. The study area is 46th Ave S from S 150th St to S 144th St, with the goal of providing a safer walking path. Project activities include community engagement, land/geotechnical survey, traffic engineering studies, permitting, preliminary engineering, and right-of-way acquisition, if necessary. The design phase budget has increased above the CIP amount primarily because the original estimate is outdated and did not reflect current conditions or the full scope of work now anticipated. As we evaluated the project in preparation for the federal grant application, we identified that some right-of-way acquisition will likely be needed, which adds to the design cost. In addition, federally funded projects require additional documentation, review, and coordination, which increase consultant and staff costs. We have also included a budget for community outreach and engagement to ensure robust public involvement throughout project development. FISCAL IMPACT The City will receive $610,000 from the SRTS program. No local match is required. Funding from this program is limited to projects within two miles of primary, middle, and high schools. The updated design budget covers work planned for both 2026 and 2027. Phase Project Budget Source Outreach $50,000 Safe Routes to School Design and Permitting $475,000 Safe Routes to School Right of Way $85,000 Safe Routes to School Total $610,000 23 Residential Streets Fund — 46th Ave S Safe Routes to School Project No. 91710301 - WSDOT Safe Routes to School Grant October 24, 2025 Page 2 RECOMMENDATION Council is being asked to accept a WSDOT Safe Routes to School grant award for design of the 46th Ave S Safe Routes to School project in the amount of $610,000 and consider this item on the Consent Agenda at the November 3rd, 2025 Regular Council Meeting. Attachments: 2025-2030 CIP Page Proposed Project Location Map Https://Tukwilawa.Sharepoint.Corn/Sites/Publicworks/Engineering/PW Drop Box/O1 TIC Agenda/2025 Agenda Iterns/TIC 10-27-25/E. Accept WSDOT Safe Routes To School Grant - 46th Ave S/Info Memo WSDOT Safe Routes To School Grant For 46th Ave.Docx 24 PROJECT: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2025 to 2030 46th Ave S Safe Routes to School Project Manager Cyndy Knighton Install curb, gutter, and sidewalk on the west side of 46th Avenue South. Install a curb bulb -out at DESCRIPTION the southeastern corner of 46th Ave S and S 144th St and a raised crosswalk on S 144th St with pedestrian -activated flashing beacons. Enhance safety for students walking to Foster High School and Showalter Middle School and encourages JUSTIFICATION: transportation choices for the neighborhood. Project# 91710301 STATUS: MAINTENANCE IMPACT: COMMENT: Department Residential Streets RRFB at 46th Ave S & S 144th St Intersection in 2019 as part of the Neighborhood Traffic Calming Program. Nominal maintenance increase in costs related to maintaining sidewalks and slightly widened pavement. If additional lighting is added, nominal maintenance increase in maintenance needs. Safe Routes to School grant submitted in April 2018, but unsuccessful. Apply for SRTS grant for design in 2024 and in 2026 for construction, FINANCIAL (in thousands) 2025 2026 2027 2028 2029 2030 Beyond TOTAL Project Costs Project Mgmt (Staff Time/Cost) Design Land (R/W) Construction Mgmt. Construction Contingency $ 13 $ $ $ 279 $ 1,584 $ 207 $ 26 $ 250 $ 75 $ 279 $ 1,584 $ 207 Total Project Costs Project Funding Proposed Grant Fund Balance $ 13 $ 338 $ 235 $ 103 $ 2,083 $ 1,660 $ 410 $ 2,421 $ 1,895 $ 526 Total Project Funding $ 13 $ 338 $ 2,070 $ 2,421 25 N a) 46th Ave S, Safe Routes to School City of Tukwila Proposed Project Location 46th Ave S from S 144th St to S 150th St Thomas McLeod, Mayor Public Works Department - Jen Tetatzin, PE, PMP - Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Jen Tetatzin, Public Works Director BY: Catrien de Boer, Public Works Analyst CC: Mayor McLeod DATE: October 24, 2025 SUBJECT: Surface Water Fund — NPDES Permit Implementation Project No. 99341210 2025-2027 Department of Ecology Stormwater Capacity Grant ISSUE Accept a Washington State Department of Ecology (DOE) Stormwater Capacity grant award for $130,000 to support National Pollutant Discharge Elimination System (NPDES) program activities and supplies necessary for permit implementation. BACKGROUND In August 2025, Staff applied to the Capacity program to fund activities that improve water quality by reducing stormwater pollutants discharged into the Municipal Separate Storm Sewer System (MS4), the Green/Duwamish River, and the Puget Sound. This is a non-competitive grant awarded to Phase I and Phase II NPDES municipal permittees and is awarded biennially. DISCUSSION In September 2025, City staff were notified that we received the full grant award of $130,000. The City has historically used this funding to support public outreach campaigns, education, staff training, identification and removal of illicit stormwater discharges, and equipment costs. The period of performance for this award is July 1, 2025 — March 31, 2027. FISCAL IMPACT The City was awarded a $130,000 grant from the DOE with no local City matching funds required. DOE Grant Award Total Project Budget $130,000.00 $130,000.00 RECOMMENDATION Council is being asked to accept a DOE Stormwater Capacity program grant for NPDES permit activities in the amount of $130,000 and consider this item on the Consent Agenda at the November 3, 2025 Regular Meeting. Attachments: 2025-2030 CIP Page 27 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2025 to 2030 1,/1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 PROJECT: Project Manager Russell Betteridge DESCRIPTION: JUSTIFICATION: NPDES Program Project # 99341210 Department Surface Water Provide programmatic implementation support of the State DOE Phase II Western Washington NPDES permit. Th e Annual Surface Water Management Plan specifies a NPDES reporting and action plan for City compliance. The services/supplies funds will also include any illicit discharge (spill cleanup) costs that may occur in the City's right-of-way. State Mandated Permit "National Pollutant Discharge Elimination System (NPDES) Phase ll Western Washington", Federal Clean Water Act and Additional State Waste Discharge Permit RCW 90.48. NPDES requirements are ongoing with new permit requirements every 5 years (2024-2029). Requirements cover all divisions of the city including Public Works, Golf/Parks, Police, Planning, and Facilities. Costs shown include emergency supplies, testing equipment, Lab testing fees, and annual consultant support. Added requirements require changes to conform with NEW requirements, e.g. New Inspection and street sweeping requirements will require more staff time to complete and document as well as new equipment and supplies. STATUS: Currently Compliant with new permit updates in the planning phase. MAINTENANCE IMPACT: COMMENT: FINANCIAL (in thousands) The City is typically granted Capacity Grant funds to cover much of the coordination expenses and some of the additional expenses. Each division should track costs incurred to manage pollution such as spill kits, staff time for surface water pollution prevention inspections on qualifying city facilities and during field operations within the jurisdiction. This cost is not accounted for in the impact cost above. In addition to the NPDES permit, there are specific actions undertaken to assist in the Lower Duwamish Superfund compliance effort, such as source control inspections, PCB investigations and discharge responses. 2025 2026 2027 2028 2029 2030 Beyond TOTAL Project Costs Project Mgmt (Staff Time/Cost) Design Planning $ 72 $ 200 $ 72 $ 72 $ - $ 72 $ 72 $ - $ 72 $ 72 $ - $ 72 $ 72 $ - $ 72 $ 72 $ - $ 72 $ 86 $ 86 $ 518 $ 200 $ 518 Total Project Costs $ 344 $ 144 $ 144 $ 144 $ 144 $ 144 $ 172 $ 1,236 Project Funding Proposed Grant Utility Revenues $ 279 $ 130 $ 79 $ 79 $ 130 $ 79 $ 79 $ 130 $ 79 $ 79 $ 390 $ 753 Total Project Funding $ 279 $ 209 $ 79 $ 209 $ 79 $ 209 $ 79 $ 1,143 28