HomeMy WebLinkAboutTIS 2025-10-27 Item 1A - Final Acceptance - 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B with Iron HorseThomas McLeod, Mayor
Public Works Department - Jen Tetatzin, PE, PMP - Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Jen Tetatzin, Public Works Director
BY: David Baus, Project Manager
CC: Mayor Tom McLeod
DATE: October 27, 2025
SUBJECT: 2023 Central Business District Sanitary Sewer Rehabilitation Project
Project #80040201, Contract No. 25-036
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of insurance, retainage, and performance bond.
BACKGROUND
The Notice to Proceed for Contract No. 25-026 with Iron Horse, of Fairview, Oregon, was issued on
January 26, 2025, for the 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B
project. Project included installation of approximately 7,960 linear feet of ultraviolet -cured cured -in -
place pipe (CIPP) to rehabilitate existing sewer main within the central business district.
ANALYSIS
Construction was Physically Complete on March 4, 2025. The budget for the CIPP project was
$1,339,083.18 including a contingency of 15%. No formal Change Orders were executed for the work
since all changes fit within existing bid items or were performed under allowable Force Account items.
Construction Contract Amount
Total Amount to be Paid
$1,339,083.18
$1,332,289.27
RECOMMENDATION
Council is being asked to formally accept the project as complete and authorize the release of the
insurance, retainage, and performance bonds, subject to standard claim and lien release procedures, for
the 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B construction contract with
Iron Horse in the final amount of $1,332,289.27 and consider this item on the Consent Agenda at the
November 3, 2025 Regular Meeting.
ATTACHM ENT
CBD CIPP Project Sites Map
Post construction pictures
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
von
a
of
190a
City of Tukwila
Public Works Department - Jen Tetatzin, PE, PMP - Director
it
9f
iodratti
r000000rr,
/%/ %inf6l'.w�uuli�
2023 CBD CIPP Project Sites
Thomas McLeod, Mayor
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
2
iu u'q'u1o1drlll II6u i 1di;mm;il
City of Tukwila
Thomas McLeod, Mayor
Public Works Department - Jen Tetatzin, PE, PMP - Director
rifPR ion x 0
Inclement weather did not after lining
Inserting lining into sewer main
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
3
City of Tukwila
Public Works Department - Jen TeUzm PE, PMP - DirectA
2
»
Thomas McLeod, Mayor
� � }
v : \ /1111111 )
\
Command central, controlling the speed o UV train
A section of cured liner was cut from the manhole and sent to a QA
laboratory to confirm it had reached the req%rd strength