Loading...
HomeMy WebLinkAboutPermit PL18-0025 - RAMADA INN TREE - TREE PERMITRAMADA INN TREE 0005800030 PARENT FILE PL18-0025 THIS FILE L18-0035 TREE PERMIT/SHORELINE LANDSCAPING DECLARATION , declare as follows: 1. I am the . owner or authorized agent of the owner of the property, or (circle one) landscape architect who prepared the approved landscape plan, or c) landscape contractor hired to install the approved plantings, responsible for executing the approved landscape plan for the property located at , Tukwila, Washington. (t2cI w , Jtf(1 2. The permits obtained for this project include: Building Permit D - Land Altering Permit MI - Design Review Permit L - �� (1-01)13 Other Permit 3. I certify that the landscaping shown on the approved landscaping plans for this property have been installed in conformance with those plans as documented in the Landscape Checklist. 4. I understand that changes to any of the following aspects of the approved landscape plan require a revision to the plans and approval by the City of Tukwila. a) Minimum number of trees, shrubs and ground cover; b) Location of required plantings or planting areas; c) Substitution of species required by permit conditions to mitigate environmental impacts; d) Compliance with the Tree Ordinance for sensitive areas. NOTE: If any of these items have been changed do not sign this Declaration until a revised landscape plan has been approved by the Tukwila Depaitinent of Community Development. I declare under penalty of perjury under the laws of the State of Washington that the preceding is true and correct. , Washington. LANDSCAPING CHECKLIST Checklist to accompany Landscaping Declaration: Yes/ No ❑ Size of installed plants is per approved plan. ❑ Spacing of installed plants is per approved plan. Al<, ❑ Approximate location of trees, shrubs and ground cover is per the approved plan. Note: if the size of the nursery pots of ground cover are increased and therefore fewer pots have been installed attach a description showing how the proposed changes meet Landscape Code standards. Substitutions The following species have been substituted after approval by the Department of Community Development. Number of Plants Approved Species Installed Species Size Department of permittingUil Critical Areas Mitigation C24 09/09/2015 Environmental Review Bond Quantity Worksheet Is-wks-sensareaBQ.xls 35030 SE Douglas SU, Suite 210 Is-wks-sensareaBO.pol King Count yr Snoqualmie, WA 98065-9266 206-296-6600 TTY Relay: 711 L Project Name: O'I^'v'aQ,o-�„IL,./ I I , Date: 7/1.jA� Prepared by: L/�G{7I4i �4tilN� Project Number: 17 y71y7 7 -�7 !i{I1 Fer 1 p Protect Description: _ liI.7�� rv( Location: 1,5101.../7,,t 4...ill Applicant: Zji 401- l Phone/..,5) Zy(p I V I2 ll PLANT MATERIALS (Includes tabor cost nor plant In.t,genon) 4, Type Unit Price Unit Quantity Description Cost PLANTS: Polled, 4' diameter, median $5.00 Each $ - PLANTS: Container, 1 gallon. medium soil $11.50 Each i $ _ 0 PLANTS: Container, Ell .... eduneeitr 0i•tZ 1" 110 •020,00' Eech I41' ,/ GOM i 7% (/ $ '�' PJr'!. - Q PLANTS: Con5•geA� 1JI t�Yi 9/;tD $26:6e Each 1 17G�I1%• Zl L'/'I/ $ 7 /1.6Q.- - 3 PLANTS: Seeding, by hand $0.50 SY PLANTS: Slips (willow. red -osier) $2.00 Each $ PLANTS: Stakes (willow) $2.00 Each $ . PLANTS: Slakes (willow) $2.00 Each $ PLANTS: Flats/plugs $2.00 Each $ . 'TOTAL $ 4$r' 7•7.SO.. - INSTALLATION COSTS ( LABOR, EQUIPMENT, & OVERHEAD) Type Unit Price Unit Cost B Compost vogehable, delivered and spread $37.88 CY I $ .5 7 ry, - - Decompacting56hardpan.medium, to6'depth . $1.57 CY $ - Dewmpacting tillhmdpan. medium, to 12' depth $1.57 CY $ Hydroseeding 30.51 SY $ _ Labor. general (landscaping other than plant installation) $40.00 HR $ _ o Leber. general (construction) $40.00 ( 9 HR $ 400.. Labor: Consultant supervising $55.00 HR $ . Labor: Consultant on -site redesign $95.00 HR $ - Renld of demmpad'eng madlmery & operator $70.00 HR $ _ Sand, coarse builder's, delivered and spread $42.00 CY $ _ Q Staking material (set per tree) $7.00 Each 4'' $ 1 /_ r�,_ Surveying, Tine 6 grade $250.00 HR 7 $ _ Surveying, Topographical $250.00 HR $ - oWaterig, 1' of water, 50' soaker lose $3.62 MSF Z70 I.-• n $ dJ 7 /• . - Irrigation -temporary $3,000.00 Acre $ . Irrigation -buried $4,500.00 Acre $ - Tirg teasel. disk harm. 20p trade, 0.6 deep $1.02 SY $ TOTAL $ I y12;7 - HABITAT STRUCTURES' ITEMS Unit Cost Unit Cost Fasdnas (willow) $ 2.00 Each $ - Logs. (cadent,wlroot wads. 16,24-dim. 30'long $1,000.00 Each $ . - Loss(ceder)do root weds, 16'24' diem., 30' $400.00 Each $ lops.wlo root rats, l6-44'dram,3$long $245.00 Each $ - Logs wlroot wads. 16'44'diem, 30' long $460.00 Each $ . Rocks, oreman $60.00 Each $ - Rocks. leoonan $120.00 Each $ Real wads 3163.00 Each $ Spawning gravel, type A $22.00 CY $ _ Weir - log 31,500.00 Each $ - Web- adjuslob(e $2,000.00 Each $ Woody debris, large $163.00 Each $ - Snags - erc(nrad ' $400.00 Each $ - Snags •on site $50.00 Each $ - Snags -imported $800.00 Each $ - • All costs indado delivery and Installation I TOTAL $ D - EROSION CONTROL ITEMS Unit Cost Unit Cost BadtU and Coslpactbnembankmenl $ 4.89 CY $ - Crushed surfacing. 1114-minus $30.00 CY $ - Ditching 37.03 CY $ - Fxcavetlon,bulk 34.00 CY $ - Fence. sill $1.60 LF $ - Jute Mash 31.26 SY $ - G Mulch. by hand, straw, 2' deep 31.27 SY .4�A I $ �� ' - p Mulch. by hand, wood chips. 2' deep 33.25 SY 10 $ 'o - Mulch, by machine, straw, 1' deep $0.32 SY $ - Piping, temporary, CPP, 6' $9.30 LF $ - Pipirg, temporary, CPP, 8' $14.00 LF $ - Pipirg, temporary, CPP. 12' $18.00 LF $ Plastlo covering, 6mm thick. sandbagged $2.00 SY $ - RO Rap, machine placed, dopes $33.98 CY $ - Rock Constr. Entrance 1005157i1' $3,003.50 Each $ - Rock Constr. Entrance 50k15k1' $1,500.00 Each $ - Sediment pond riser assembly $1,695.11 Each $ - Sediment trap, 5' high berm $15.57 LF $ . Sediment hp, S high berm wispi0 ey kid. 'Ow $59.60 LF $ . Sodding, 1' deep, level ground 35.24 SY $ - Sodding, 1-deep, sloped ground $6.48 SY $ - Straw bales. place and remove $600.00 TON $ - Reuling and disposal $20.00 CY $ - Tupsoil.deWeredandspraad $35.73 CY $ - ITOTAL $ °ID - 'irk/ I 027127 7/70,5A i /, I/1&/11 GENERAL ITEMS ITEMS Unit Cost Unit Cost Fencing. chain link, 6' high 518.89 LF $ Fencing, chain link, corner posts $111.17 Each $ Fencng, dram link, gate $277.63 Each $ - Fencing, split rak, 3' high (2-rail) $10.54 LF $ - Fencing. temporary (NGPE) $1.20 LF $ - Signs, sensitive area boundary ON. backing. post, install) $28.50 Each $ - 'TOTAL $ 0 - OTHER �� // ' 1701). (Construction Cost Subtotal) $ V-f� -Jr/1 - ITEMS Percentage of Construction Unit Cost Mobkiza0on 10% 1 $ 0 Contingency I5Q X 1 $ q ,641‘t, • —a8g6— (TOTAL $ OI) S 11.. - NOTE: proJacts with multip! permit requirements may be required to have AND MONITORING longer mon todne and maintenance terms. This will be evaluated on a case-by- MAINTENANCEcasa basis f r development pplicatlons. Mandating and maintance ranges may be assessed anywhere from 5 to 10 years. Maintenance, annual (by owner or consultant 1 Less than 1.000 aq.ff. and butler mitigation ononly$ 1.08 I�0 SF %, (3 X SF total for 3'annuel events; Includes monitoring), I^ N $ l! 0044 Lees Dan 1,000 sq.R with wetland or aquatic area mitigation $ 1.35 SF Ir/( I (3 X SF total for 3 annual events; Includes monitoring) $ Larger than 1,000 sq. fL but less than 5,000 sq.ft of buffer mitigation $ 180.00 EACH (4hr ©$45/11r) $ Largar than 1,000 sq. 0. but less Nan 5600 sq.ft of wetland or aquatic area mitigation $ 270.00 EACH (6hr (gt$45R1r) $ - Larger than 5,000 sq.1l but < 1 acre -buffer mitigation arriy $ 360.00 EACH (8 hrs (aZ 458tr) $ - Larger Man 5,000 mkt but < 1 acre with wetland or aquatic area mitigation $ 450.00 EACH (10 hrs © $451hr) $ - Larger than 1 acre but c 5 acres -buffer artd I or wetland or aquatic area mitigation $ 1,600.00 DAY (WEC crew) $ - Lager than 5 acres - buffer end / or wetland or aquatic area mitigation $ 2,000.00 DAY (1.25 X WEC crew) $ Monitoring, annual (by owner or consultant or Lager than 1,000 sq.R but lass than 5,000 wetland or buffer mitigation $ 720.00 EACH 1) (8 hrs ® 90/hr) /j / W $ ) y W Q0 l - Lagm Larger Man 5.000 eq.it but < 1 acwith wetland or aquatic area impacts $ 900.00 EACH 11 (10 hrs © $90/hr) $ - Larger than 1 acre but c 5 acres - buffer and 1 or wetland or aquatic area impacts $ 1,440.00 DAY (16 hrs © $90/hr) $ Lager Ihan5 eves - buffer and 1 or wetland or aquatic area impacts $ 2,160.00 DAY (24 hrs (gt $901hr) $ - TOTAL $ 41 owe - - Total II I11it.°° ft* 1/iMI RAMADA INN TREE 15901 WEST VALLEY HWY PL18-0025 L18-0035 SHORELINE TREE PERMIT City of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director August 29, 2018 NOTICE OF DECISION TO: Barbara Brunetti, Applicant Lauchlin Bethune, Landscape Architect This letter serves as a notice of decision and is issued pursuant to TMC 18.104.170 on the following project and permit approval. I. PROJECT INFORMATION Project File Number: L18-0035 Applicant: Barbara Brunetti, Ramada Inn Type of Permit: Shoreline Tree Permit Project Description: Request to approve removal (after the fact) of three trees over 20-inches in diameter in the shoreline jurisdiction and replace with 24 trees. Replacement trees include a mix of deciduous and coniferous trees. Location: 15901 West Valley Highway (parcel #0005800030) Associated Files: PL18-0025 (Project File), CE17-0393 (Code Enforcement File) Comprehensive Plan Tukwila Urban Center/Transit Oriented Development District (TUC-TOD) Designation/Zoning District: II. DECISION SEPA Determination: The City SEPA Responsible Official has previously determined that this application does not require a SEPA threshold determination because it is categorically exempt. Decision on Substantive Permit: The City Planning Supervisor has determined that the application for a Shoreline Tree Permit does comply with applicable City and State Code requirements and has approved the application with the following conditions: 1. Cost estimates on the bond worksheet shall be revised to include the full scope of maintenance and monitoring costs for each year of the 5-year maintenance and monitoring period. A bond Page 1 of 4 • • L18-0035: Ramada Inn Shoreline Tree Removal Staff Report and Notice of Decision August 29, 2018 or other financial assurance shall be submitted for 150% of the cost of the maintenance, monitoring and replacement planting costs in case of failure prior to the initial inspection and acceptance of the planting area. 2. Planting and maintenance shall be in accordance with best management practices for landscaping to ensure the vegetation's long-term health and survival per TMC 18.54.130.3.c(3) and as per the maintenance and monitoring plan submitted by the applicant. 3. Trees should be planted between October 15 and April 15th to ensure the best start for tree health and retention for the mitigation and monitoring period and beyond. The applicant shall contact the project planner Jaimie Reavis at Jaimie.ReavisPTukwilaWA.eov or (206)431-3659 to schedule an inspection by the City after planting. 4. All burlap, string, and wire basket shall be completely removed from the root ball and the roots examined for circling roots. Prune roots as necessary to ensure a healthy root system. 5. Three inches of compost should be placed on top of soil in planting area and incorporated (rototilled) to a depth of at least 10 inches. 6. Entire planting area should be mulched with 3-4 inches of medium bark or wood chips. Mulch should not be placed against the trunks of the trees — leave a 4-inch circle around the trunk free of mulch. 7. Trees should be watered weekly during the dry months (generally July -September or as necessary depending on conditions) for the first two growing seasons. 8. Applicant shall submit annual photos of all twenty-four (24) trees to the city's Urban Environmentalist to ensure proper maintenance and a 100% survival rate for five years following initial landscaping inspection. III. FINDINGS On December 8, 2017, a Tukwila Code Enforcement Officer observed three mature Cottonwood trees to have been partially removed. The upper portion of each of the trees was chopped, leaving behind tree stumps at least 20 feet in height. The size of the three trees, as measured by diameter -at -breast -height (DBH), were 56 inches DBH, 37 inches DBH, and 20 inches DBH. The three trees were located along the riverbank of the Green River, within the 200-foot Shoreline Management Area. Per TMC 18.44.080(B), removal of any significant tree or native vegetation in the Shoreline Jurisdiction requires a Shoreline Tree Removal and Vegetation Clearing Permit and is generally only allowed on sites undergoing development or redevelopment. A Shoreline Tree Removal and Vegetation Clearing Permit is required to be submitted prior to any tree removal or site clearing, but was submitted to the City on May 1, 2018, after the tree removal had already occurred. - Per the Tree Replacement Requirements of 18.44.080, eight replacement trees are required for each tree removed larger than 20 inches DBH. This project proposes 24 replacement trees in the same general area along the riverbank where the trees were removed. A mix of deciduous and evergreen tree species native to the Pacific Northwest are proposed, including Bigleaf Maple (Acer macrophyllum), Douglas Fir (Pseudotsuga menziesii), Oregon Ash (Fraxinus latifolia), and Western Red Cedar (Thuja plicata). A bond worksheet was submitted for the maintenance and monitoring period. The maintenance and monitoring period for this project will be for a period of five years beginning once the new trees have been installed and inspected by Department of Community Development staff. The maintenance and monitoring cost estimates on the bond worksheet do not include the full five-year period, nor do they Page 2 of 4 L18-0035: Ramada Inn Shoreline Tree Removal Staff Report and Notice of Decision August 29, 2018 match the scope of work for the maintenance and monitoring described on the project plans. As a condition of approval, cost estimates on the bond worksheet shall be revised to include the full scope of maintenance and monitoring each year over the full 5-year period. A bond or other financial assurance shall be submitted for 150% of the cost of the maintenance and monitoring prior to the initial inspection/acceptance of the planting area. The height of the tree stumps which have been left in place is tall for wildlife snags, and the height of these stumps has the potential to threaten the stability of the riverbank and/or the building if they are left as -is in their current condition. The City's recommendation is either full removal of the tree stumps, or additional cutting of the tree stumps to leave wildlife snags for habitat that are no taller than 10 feet. IV. YOUR APPEAL RIGHTS The Decision on this Permit Application is a Type 1 decision pursuant to Tukwila Municipal Code §18.104.010. Other land use applications related to this project may still be pending. One administrative appeal to the City Hearing Examiner of the Decision on the Permit itself is permitted. A party who is not satisfied with the outcome of the Hearing Examiner appeal process may file an appeal in King County Superior Court from the Hearing Examiner's decision. V. PROCEDURES AND TIME FOR APPEALING To appeal the Planning Supervisor's decision on the Permit Application, a written notice of appeal must be filed with the Department of Community Development within 14 days of the issuance of this Decision. The requirements for such appeals are set forth in Tukwila Municipal Code Ch. 18.116. All appeal materials shall be submitted to the Department of Community Development. Appeal materials MUST include: 1. The name of the appealing party. 2. The address and phone number of the appealing party; and if the appealing party is a corporation, association or other group, the address and phone number of a contact person authorized to receive notices on the appealing party's behalf. 3. A statement identifying the decision being appealed and the alleged errors in the decision, including any specific challenge to an MDNS. 4. The Notice of Appeal shall identify (a) the specific errors of fact or errors in application of the law in the decision being appealed; (b) the harm suffered or anticipated by the appellant, and (c) the relief sought. The scope of an appeal shall be limited to matters or issues raised in the Notice of Appeal. 5. Appeal fee per the current fee schedule, additional hourly charges may apply. In addition, all hearing examiner costs will be passed through to the appellant. Page 3 of 4 • • L18-0035: Ramada Inn Shoreline Tree Removal Staff Report and Notice of Decision August 29, 2018 VI. APPEAL HEARINGS PROCESS Any administrative appeal regarding the Permit shall be conducted as a closed record hearing before the Hearing Examiner based on the information presented to the Planning Supervisor who made the original decision. No new evidence or testimony will be permitted during the appeal hearing. Parties will be allowed to present oral argument based on the information presented to the Planning Supervisor before their decision was issued. The Hearing Examiner's decision on the appeal is the City's final decision. Any party wishing to challenge the Hearing Examiner's decision on this application must file an appeal pursuant to the procedures and time limitations set forth in RCW Ch. 36.70C. If no appeal of the Hearing Examiner's decision is properly filed in Superior Court within such time limit, the Decision on this permit will be final. VII. INSPECTION OF INFORMATION ON THE APPLICATION Project materials including the application, any staff reports, and other studies related to the permits are available for inspection at the Tukwila Department of Community Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington 98188 from Monday through Friday between 8:30 a.m. and 5:00 p.m. The project planner is Jaimie Reavis, who may be contacted at 206-431-3659 orlaimie.Reavis@TukwilaWA.gov for further information. Property owners affected by this decision may request a change in valuation for their property tax purposes. Contact the King County Assessor's Office for further information regarding property tax valuation changes. ii47iA-e.--e ,61-.,,_, Department of Community Development City of Tukwila Page 4 of 4 1(1-1-lifFe724' " Ore SITE SPECIFIC CONSTRUCTION NOTES 1. PLANTING PREPARATION. A. WEED WACK: Use metal weed Wacker to weed whack down all blackberry and weed vegetation within identified planting work scope. Remove any debris from site. B. PLANTING: Pocket plant proposed trees per Planting Detail using 50% Gro-Co from Sawdust Supply, Seattle, WA; and 50% on -site or imported topsoil. Stake trees per Planting Details. Remove tree stakes after one year C. PROTECT PLANT MATERIAL: Provide chicken wire cage and stakes to secure, one -foot from each proposed tree base, to protect trees from river beaver. D. MULCH: Provide mulch, 2" depth per Sawdust Supply, Seattle in 30" rings around trees Spread stray on all other exposed grades. E. WATERING: Spring of 2019 place soaker hose over root balls with garden hose connected to building hose bib with battery operated controller. 2. MAINTENANCE A. Provide monthly reviews of the trees and conduct maintenance to include weeding around the rootball, restaking or pruning. Work also includes verifying the irrigation system is working. 3. MONITORING. A. Owner to provide monitoring of plantings for 5-years. Annual site visits in the spring with letter report documenting the heath and condition of the trees including pictures. Letter reports to be submitted to the City of Tukwila annual for five years. • „ .'.. • 140( 1, I , I F1 Z I fit iI ate. M1 -1?-o3`i27 THE RAMADA TUKWILA 15901 WEST VALLEY HIGHWAY TUKWILA, WASHINGTON 98188 DATE: REVISED: 6/� �/l�G JOB/ 218124 // - 1 SCALE: 1"=10'-0" SHEET # COPYRIGHT LRBA 2018 L I . A I nr l' Lauchlin R. Bethune Associates, Inc. • Landscape Architecture & Planning, ASLA P.O. Box 1442 phone: (425) 432.9877 Maple Valley, Washington 98038 www. bethuneassociates.com PLANT MATERIAL LEGEND Abrev. trees: BLM DF OA WRC Common Name Botanical Name Size 01=- Bigleaf Maple Acer macrophyllum 2" calJB&B 2 Douglas Fir Pseudotsuga menziesii 6' hgt./B&•B 41 Oregon Ash Fraxinus latijolia 2" cal./B&B g Western Red Cedar Thuja plicate 6' hgt./B&B 4Fj PRUNE WITII LA APPROVAL :CT HE:WFIR STAKE DRIVEN TO REFUSAL (24' MIN.) SECURE TO TREE WITH NUNLORRODABLE WIRE ENCAANSED IN REINFORCED DULL OF COTRUBBER TREE SET POINT SET CROWN AT NURSERY HEIGHT 0- ABOVE TOPSOIL FINISH GRADE) FINISH GRADE 2- MULCH ROLL TOP IO OF BURLAP AWAY FROM BALL SCARIFY BOTTOM AND SIDES OF HOLE BACKFILL MATERIAL in NATIVE MATERIAL Ia TOPSOIL ORORO-CO PER SPECS), FIRMLY COMPACTED AND WATERED IN SCARIFY AND LOOSEN ROOT MASS ON CONTAINER MATERIAL NATIVE TREE PLANTING/STAKING N.T.S. iLI HEMIFIR STAKE DRIVEN TO REFUSAL (24' MIN.) SECURE TO TREE WITH NON{ORRODABLE WIRE ENCASED IN REINFORCED DULL GREEN 10 TR H AT POINT 1 GENERAL CONSTRUCTION NOTES I. All work performed shall conform to the City of Tukwila landscape requirements, codes and specifications. 2. Owner to secure all necessary permits for required work per Landscape Plan. 3. Locate, protect and avoid disruption of all above and below grade utilities and site features prior to construction. 4. Contractor is responsible for any resulting damages during construction. Call locate before you dig at 811. 5. Use metal weedwacker to weed wack down all blackberry and weed vegetation within identified planting workscope. Remove any debris from site. 6. SOILS: Pocket plant all proposed plant material with 50% Cro-Co, (Sawdust Supply, Seattle) and 50% on -site soils. Rake area smooth and mulch per specs, placing mulch on exposed subgrade and within cleared area. 7. MULCH: Upon completion installation of plant material, place 2" depth fine blend hem -fir mulch to all planting beds. Mulch from Sawdust Supply, Seattle. 8. Provide one (1) year warranty for all plant materials and workmanship. Slope all planting beds to drain. 9. Verify all quantities shown on the plant list and plans. If discrepancies exist between the graphic representation and the numeric totals, the graphic representation shall rule. 10. All plant materials to be specimen quality with full, symmetrical trunk and foliage, unless otherwise noted. 11. Insure proper drainage of all planting holes prior to installing plant materials. If planting holes do notdrain or if heavy clay soils are evident contact landscape architect. in' MULCH UNDER SHRUB SET CROWN AT NURSERY HEIGHT (2' ABOVE TOPSOIL FINISH GRADE) REMOVE In OF BURLAP ON B&B MATERIAL. 2 MULCH IN 4' DIAMETER RING AROUND PLANT HYDROSEED PER SPECS SCARIFY BOTTOM AND SIDES OF HOLE BACKFILL MATERIAL Ill NATIVE MATERIAL, 1/2 TOPSOIL OR GRO-CO PER SPECS.), FIRMLY COMPACTED AND WATERED IN SCARIFY AND LOOSEN ROOT MASS ON CONTAINER MATERIAL NATIVE CONIFER PLANTING DETAIL N.T.S. :e-1?-0174112 THE RAMADA TUKWILA 15901 WEST VALLEY HIGHWAY TUKWILA, WASHINGTON 98188 DATE: 4/i4/ ' REVISED: Fug?.r7'(a JOB# 218124 ?/�, �15 SCALE: 1"=10'-0" . SHEET # COPYRIGHT LRBA 2018 • • Lt.1 ?j of j Lauchlin R. Bethune Associates, Inc. • Landscape Archileclure'& Planning, ASLA P.O. Box 1442 • • phone: (425) 432-9877 Maple Valley, Washington 98038 www. bethuneassociates.com Department of Permitting Critical Areas Miti 9 ation C24 09/09/2015 L41 Envir IReview Bond Quantity Worksheet IIIIs-wks-sensareaBQ.xls 35030 S ouglas Su, Suite 210 Is-wks-sensareaBO.pdf King County, Snoqualmle, WA 98065-9266 206-296-6600 TTY Relay: 711 L Project Name: ifili rp `0/D. -rk..11.,.,,4 1i j/IDate: ,�6 Prepared by: 11‘.1L(7l {V`j i✓ Project Number: U% II 7 0)21 12 LProje�ct Description: 146 27p,.�.,�,,i_r Location: 1,510I - �74w'Y I1"� I Applican�t:11142115 Or..w'7' k`I'��f11^I ( Phone lA ) /1,0 It1t' ��i PLANT MATERIALS (Includes labor cost for plant Installation) 4 Type Unit Price Unit Quantity Description Cost PLANTS: Potted, 4' diameter, medium S5.00 Each $ - PLANTS: Container, 1 gallon, medium soil $11.50 Each t $ - rJ' PLANTS: Container, Pgellell-twedkrneeeil- 0Ijlt1 I", 420,00 • Each V4 cOpI I lk (/ $ 1i 1 qti. - - Q PLANTS: Conteiner,�• v11 G y7 $8G,B0 Each l/ 7II% Z'r Ti/'V $ 7 ZG,Gi,- - PLANTS: Seeding. by hand 50.50 SY / $ PLANTS: Slips (willow. red -osier) $2.00 Each $ PLANTS: Stakes (willow) $2.00 Each $ - PLANTS: Stakes (willow) $2.00 Each $ - PLANTS: Flats/pkgs $2.00 _ Each $ - 'TOTAL $ q / 17r20. - INSTALLATION COSTS ( LABOR, EQUIPMENT, 8 OVERHEAD) Type Unit Price L Unit Cost 1) Compost, vegetable, delivered and spread $37.88 CY 1 Cr $ '5 7 VJ ' - Decompacdng tiNhardpan, medium, to 6' depth . $1.57 CY , $ - Decampacting tr841ardpan, medium, to 12' depth $1.57 CY $ - ttydroseodIng $0.51 SY $ Labor, general (landscaping other than plan) installation) $40.00 HR $ - o Labor, general (construction) 540.00 19 HR $ 400. ' - Labor. Consultant. stpervising $55.00 HR $ - Labor. Consultant on -site redesign $95.00 HR $ - Rentel of decompacting machinery & operator $70.00 HR $ - Sand, coarse builder's. delivered and spread $42.00 CY $ - Q Staking material (set per tree) $7.00 Each ;el $ iI, - - Surveying, tine & grade $250.00 HR $ Surveying, topographical $250.00 HR $ - c Watoring,1' of water. 50' soaker hose $3.62 MSF ZTo W '7 E 61 % /. - Irrigation - tenpomry $3,000.00 Acre $ - Irrigation - buried $4,500.00 Acre $ - Tiling topsoil• disk harrow, 20np tractor. 4'-6' deep 31.02 SY $ - TOTAL $ I / 1 1. 17- HABITAT STRUCTURES' ITEMS Unit Cost Unit Cost Fasdnas (willow) $ 2.00 Each $ - Logs. (cede). sit root wads. l6'-24'dian. 30 long 51,000.00 Each $ . - Logs (cede) ado mot wads, 16'24' diem. 30' $400.00 Each $ - Logs. wro root wads. 16•-24• dim. 30' long $245.00 Each $ - Logs o/ root weds. 16,24' dints, 30' long $460.00 Each $ Rocks, one-man $60.00 Each $ - Rocks, two -man $120.00 Each $ - Root wads $163.00 Each $ Spawning gravel. type A $22.00 CY $ Weir - log $1,500.00 Each $ - Weir -adjustable $2,000.00 Each $ - Woody debris. Iage $163.00 Each $ Snags - anchored $400.00 Each $ - Snags - an site $50.00 Each $ - Snags - imported $800.00 Each $ - • As caste Include delivery and Installation 'TOTAL $ (7 - EROSION CONTROL ITEMS Unit Cost Unit Cost eackfill and Compaclionembankment $ 4.89 CY - $ - Crushed surfacing, 1 1/4' minus $30.00 CY $ Ditching $7.03 CY $ Excavation, bulk $4.00 CY $ - Fence, sill $1.60 LF $ - Jute Mesh $1.26 SY $ - A Mulch, by hand, stew, 2' deep SY �q T I $ I (J Mulch. Mulch. by hand, wood chips, 2'deep S3.25 SY I, $ .5 Mulch. by machine, stew, t' deep $0,32 SY $ - Piping, temporary, CPP, 6' $9.30 LF $ Piping, temporary. CPP, 8' $14.00 LF $ - P•ping, temporary, CPP,12' $18.00 LF $ • Piastre covering, 6mm thick, sandbagged $2.00 SY $ - Rip Rap, machine placed, slopes $33.98 CY $ - Rock Constr. Entrance 1007151,1' S3,000.00 Each $ - Rock Constr. Entrance 5015k1' $1,500.00 Each $ - Sediment pond riser assembly S1,695.11 Each $ Sediment trap. 5 high berm $15.57 LF $ SedonentSup. 9 NO berm wfspihey Ind, ,jeep $59.60 LF $ - Sodding. 1' deep, loyal ground $5.24 SY $ Sodding. 1' deep, sloped ground $6.48 SY $ - Straw bales, place and remove $600.00 TON 5 Hauting and disposal $20.00 CY $ - Topsoi delivered end spread $35.73 CY $ - 'TOTAL $ DIP - This !in- 61:-5 - 17 - 012127 7/ A D GENERAL ITEMS ITEMS Unit Cost Unit Cost Fencing, chain link. 6' high $18.89 LF $ - Fencing, chain link, comer posts S111.17 Each $ Fencing, chain link, gate S277.63 Each $ Fencing. split rag, 3' high (2-rait) $10.54 LF S • ' Fencing. temporary (NGPE) $1.20 LF $ - Signs, sensible area boundary (inc. backing, post. install) $28.50 Each $ - I TOTAL $ O- OTHER y 'j., y I� y - (Construction Cost Subtotal) $ t 70 /. ITEMS Percentage of Construction Unit Cost Mobilization 10% 1 $ Contingency 150 X 6% 1 /0 $ - (,1 1 , :/ 41It • - —$— `TOTAL $ 61t611 - NOTE: projects with multlpl permit requirements may be required to have MAINTENANCE AND MONITORING longer mop tonne end main silence terms. This will be evaluated on a case -by - case basis f r development pplications. Monitoring and maintance ranges may be assessed anywhere from 5 to 10 yams. Maintenance, annual (by ownvar consultant) Less than 1,000 sq.fl. and buffer mitigation only $ 1.08 SF 7,40 (3 X SF total for Yannual events; Includes monitoring), �1f �nf $ 4(.A/.' Less than 1,000 aq.f. with wetland or aquatic area mitigation $ 1.35 SF (3 X SF total for 3 annual events; Includes monitoring) $ Larger Nan 1,000 sq. ft but less than 5,000 aq.il of buffer mitigation $ 180.00 EACH (4hr @S4581r) $ - Lager than 1,000 sq. It. hiltless than 5,000 eq.IL of wetland or aquatic area mitigation $ 270.00 EACH (6hr(gl$458u) $ - Lager than 5.000 sq.L but < 1 acre -buffer mitigation only $ 360.00 EACH (8 hrs @j 45/hr) $ • Larger than 5,000 sq.lL but < 1 acm with wetland or aquatic area mitigation $ 450.00 EACH (10 hrs ® $45/ hr) $ • Lager than 1 acre but < 5 acres - buffer and / or wetland or aquatic area mitigation $ 1,600.00 DAY (WEC crew) $ - Larger than 5 acres • buffer and / or wetland or aquatic area mitigation $ 2,000.00 DAY (1.25 X WEC crew) $ Monitoring, annual (by owner or consultant) 0 Lager than 1,000 sq.IL but less than 5,000 wetland or buffer mitigation $ 720.00 EACH (8 his @ 90/hr) $ • Lager than 5,000 aq.ff. but < 1 acre with wetland or aquatic area ingests $ 900.00 EACH (10 hrs © $90/hr) $ - Lager Nan 1 acre but < 5 eves - buffer and I or wetland or aquatic area impacts $ 1,440.00 DAY (16 hrs (§) $90/hr) $ Lager Ihan5 acres - buffer and/ or wetland or aquatic area impacts $ 2,160.00 DAY (24 hrs © $90/hr) $ TOTAL $ 11171,(1e. - v Total 10, ��� 8/31/2918 Re: Fw: Ramada Inn Tull/la Re: Fw: Ramada Inn Tukwila - Jaimie Reavis • Jaimie Reavis Thu 8/30/2018 2:06 PM To: Barbara Brunetti <b.brunetti@yahoo.com>; Hi Barbara, There's nothing that needs to be done right now. We have the recommendation in the staff report to cut the trees that were originally cut down to a lower height (maximum 10 feet) to prevent them from causing damage. We also have the condition that the bond be revised and submitted prior to final inspection of the plantings. These two items can be addressed as soon as you're able to get to them. Thank you, Jaimie Jaimie Reavis Senior Planner l City of Tukwila 6300 Southcenter Blvd, Suite 100 (Tukwila, WA 98188 ph: (206) 431-3659 Jaimie.Reavis@TukwilaWA.gov I www.tukwilawa.gov The City of opportunity, the community of choice. From: Barbara Brunetti <b.brunetti@yahoo.com> Sent: Thursday, August 30, 2018 1:01:10 PM To: Jaimie Reavis Subject: Re: Fw: Ramada Inn Tukwila Yes thank you , we will touch base after we both get back from our trips. Is there anything else I need to address right now? Thanks for your help! Barb On Thu, 8/30/18, Jaimie Reavis <Jaimie.Reavis@TukwilaWA.gov> wrote: Subject: Fw: Ramada Inn Tukwila To: "Barbara Brunetti" <b.brunetti@yahoo.com> Date: Thursday, August 30, 2018, 12:55 PM https://outlook.office365.com/owa/?viewmodel=ReadMessageltem&Item I D=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLW USYzBkNjVhZDIOYwBG... 1/5 8/31/2018 • Re: Fw: Ramada Inn Tukwila - Jaimie eavis Hi Barbara, Attached here is the staff report and the attachments. Hopefully they're easier for you to print out as separate documents. Thank you, Jaimie Jaimie Reavis Senior PlannerICity of Tukwila 6300 Southcenter Blvd, Suite 100ITukwila, WA 98188 ph: (206) 431-3659 Jaimie.Reavis@TukwilaWA.gov www.tukwilawa.gov https://outlook.office365.com/owa/?viewmodel=ReadMessageltem&Item I D=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLWUSYzBkNjVhZDIOYwBG... 2/5 8/31/2018 The City of opportunity, the commun• of choice. Re: Fw: Ramada Inn Tukwila - Jaimie Reavis • From: Jaimie Reavis Sent: Wednesday, August 29, 2018 2:00 PM To: Barbara Brunetti Cc: Lauchlin R. Bethune Subject: Re: Ramada Inn Tukwila Hi Barbara, Thank you for checking in on the status. My staff report is currently under review. I expect the permit to be issued with conditions by the end of this week. Please contact me if you have further questions. Jaimie https://outlook.office365.com/owa/?viewmodel=ReadMessageltemBltem I D=AAMkADcwOTdiODIILTVIMjEtN DQwMi04MjJmLWUSYzBkNjVhZD IOYwBG... 3/5 8/31/2018 Jaimie Reavis Senior PlannerICity of Tukwila • 6300 Southcenter Blvd, Suite 100lTukwila, WA 98188 ph: (206) 431-3659 Jaimie.Reavis@TukwilaWA.gov www.tukwilawa.gov The City of opportunity, the community of choice. From: Barbara Brunetti <b.brunetti@yahoo.com> Sent: Wednesday, August 29, 2018 11:11:18 AM To: Jaimie Reavis Cc: Lauchlin R. Bethune Subject: Ramada Inn Tukwila Hi Jaimie, Re: Fw: Ramada Inn Tukwila - Jaili mi eavis I just wanted to touch base with you today for an update regarding our permit, I brought the paperwork over in April and mailed a check in the amount of $116.55 Check number https://outlook.office365.com/owa/?viewmodel=ReadMessageltemBltemID=AAMkADcwOTdiODIILTVIMjEtN DQwMi04MjJmLW USYzBkNjVhZD IOYwBG... 4/5 8/31/2018 4847 which has been cashed. I knowehave some plans in for review. Can you give me an approximate idea when this portion of our permit process will be completed. Just wanted to follow up. Thank you for your assistance. Thanks Barbara Brunetti GM Ramada Inn Tukwila CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. Re: Fw: Ramada Inn Tukwila - Jaimie Reavis • CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. https://outlook.office365.com/owa/?viewmodel=ReadMessageltem&Item I D=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLWUSYzBkNjVhZDIOYwBG... 5/5 8/31/2018 Re: The Ramada Tukwila - Jaimie Reavis Re: The Ramada Tukwill • Lauchlin R. Bethune <Iauch@bethuneassociates.com> Wed 8/1/2018 3:14 PM To:Jaimie Reavis <Jaimie.Reavis@TukwilaWA.gov>; Andrea Cummins <Andrea.Cummins@TukwilaWA.gov>; Barbara Brunetti <b.brunetti@yahoo.com>; Thanks. Lauch Lauchlin Bethune President/Landscape Architect, ASLA Lauchlin R. Bethune Associates, Inc. P.O. Box 1442 Maple Valley, Washington 98038 (425) 432-9877 email: lauch@bethuneassociates.com web page: bethuneassociates.com Check out our new web page On 8/1/2018 2:59 PM, Jaimie Reavis wrote: Lauchlin, I did receive the revisedia2materials. Thank you for your resubmittal. I have a couple of projects I'm reviewing ahead of this one, and expect to work on this project over the next couple of weeks. I'll let you know if I have any questions or need additional information. Thank you, Jaimieie%2 Jaimie Reavis Senior Planner 'City of Tukwila 6300 Southcenter Blvd, Suite 100lTukwila, WA 98188 ph: (206) 431-3659 Jaimie.Reavis@TukwilaWA.gov I www.tukwilawa.gov IV'/2 The City of opportunity, the community of choice. From: Lauchlin R. Bethune <lauch@bethuneassociates.com> Sent: Wednesday, August 1, 2018 9:41:46 AM To: Jaimie Reavis; Andrea Cummins; Barbara Brunetti Subject: Re: The Ramada Tukwila 'i a %2 Jaimie, https://outlook.office365.com/owa/?viewmodel=ReadMessageltemBltemID=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLW USYzBkNjVhZD IOYwBG... 1/2 8/31/2018 Re: The Ramada Tukwila - Jaimie vis Checking in with you to make a you received this. Please confirm and give me an update. Thanks, Lauchlin Lauchlin Bethune President/Landscape Architect, ASLA Lauchlin R. Bethune Associates, Inc. P.O. Box 1442 Maple Valley, Washingtonie%:98038 (425) 432-9877 email: lauch@bethuneassociates.com web page: bethuneassociates.com Check out our new web page On 7/27/2018 12:31 PM, Lauchlin R. Bethune wrote: > Jaimie, Andrea and Barb, > Attached is the Revised Tree Replacement Plan and Bond Form. > The Tree Replacement Plan and Bond Form have been revised per Carol > Lumb's email of May 15, 2018 with Revised Date of 7/27/18. > Please let me know if you have any questions. > Lauchlin CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. https://outlook.office365.com/owa/?viewmodel=ReadMessageltem&Item) D=AAMIcADcwOTdiODIILTVIMjEtNDQwMi04MjJmLWUSYzBkNjVhZDIOYwBG... 2/2 i8/31/2O1.8 Re: Ramada Inn shoreline tree planting in Tukwila - Jaimie Reavis Re: Ramada Inn shorelil tree planting in Tukwila Lauchlin R. Bethune <lauch@bethuneassociates.com> Thu 7/26/2018 2:10 PM To:Jaimie Reavis <Jaimie.Reavis@TukwilaWA.gov>; Thank you Lauchlin Bethune President/Landscape Architect, ASLA Lauchlin R. Bethune Associates, Inc. P.O. Box 1442 Maple Valley, Washington 98038 (425) 432-9877 email: lauch@bethuneassociates.com web page: bethuneassociates.com Check out our new web page On 7/26/2018 11:41 AM, Jaimie Reavis wrote: Lauchlin, Attached is the bond form we discussed yesterday, whichiJ%Zyou'll need to fill out for this project. Thank you, Jaimie Jaimie Reavis Senior Planner !City of Tukwila 6300 Southcenter Blvd, Suite loolTukwila, WA 98188 ph: (206) 431-3659 Jaimie.Reavis@TukwilaWA.gov I www.tukwilawa.gov IVA The City of opportunity, the community of choice. From: Lauchlin R. Bethune <lauch@bethuneassociates.com> Sent: Monday, July 23, 2018 9:13:30 AM To: Jaimie Reavis Subject: Re: Ramada Inn shoreline tree planting in Tukwila Jaimie, I look forward to meeting you. I wanted to give you a little background on this project. https://outlook.off'ice365.com/owa/?viewmodel=ReadMessageltem&ItemID=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLWUSYzBkNjVhZDIOYwBG... 1/6 8/31/2018 Re: Ramada Inn shoreline tree planting in Tukwi - Jaimie Reavis l Barb, the 70 year old mans of 5 years at the Ramada Inn asked h ndscaper if they knew some one who could prune the two California Black Poplar trees so they were not hanging over the building. There is a wide asphalt fire lane running along the back of the building between the trees and the building. Cultural miscommunication happened and the trees were pruned more than they should have been. They should have asked permission to prune the trees in the river buffer and they did not. Code violation issued a red tag and they cleaned up the downed branches, however the majority of the trees are still remaining and and in good health. Carol and Andrea wanted us to cut the trees down and grind the stumps. I did not want to cut the trees down because they would come up as suckers and ruin the fire lane requiring repaving of the fire lane and a huge costs to Ramada. We wanted to have a meeting on Wed to review the trees, they have recovered very nicely. CA The pruning completed earlier is no more than the damage a storm would have done to these trees. We would like a reassessment of the need to replace these trees. Couple of additional things.'i.% I am not sure we can even work in the shoreline with out a Federal Shorelines Permit. Second Barb is very worried she will be fired if she has to go to corporate for the cost of all this work. I do not think the pruning of these trees should cost her a job and her retirement. Please keep an open mind when we meet on Wed. It doesn't matter to me, I am not on the hook for this, I just hate to see personal consequences beyond the actual damage done when the trees have recovered to 99%. Please call me if you want to discuss further. Thanks, Lauchlin Lauchlin Bethune President/Landscape Architect, ASLA Lauchlin R. Bethune Associates, Inc. P.O. Box 1442 Maple Valley, Washington 98038 (425) 432-9877 email: lauch@bethuneassociates.com web page: bethuneassociates.com Check out our new web page On 7/19/2018 2:44 PM, Jaimie Reavis wrote: That works for me as well. We'll see you next Wed., 7/25 onsite. Jaimie https://outlook.office365.com/owa/?viewmodel=ReadMessageltem&Item I D=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLWUSYzBkNjVhZDIOYwBG... 2/6 8/31/2016 Re: Ramada Inn shoreline tree planting in Tukwila - Jaimie Reavis Jaimie Reavis Senior Planner 'City of Tukwila 6300 Southcenter Blvd, Suite 100 I Tukwila, WA 98188 ph: (206) 431-3659 Jaimie.Reavis@TukwilaWA.gov I www.tukwilawa.gov IVA The City of opportunity, the community of choice. From: Andrea Cummins Sent: Wednesday, July 18, 2018 11:12:40 AM To: Lauchlin R. Bethune Cc: Barbara Brunetti; Jaimie Reavis Subject: RE: Ramada Inn shoreline tree planting in Tukwila I t'/z That works for me. Andrea From: Lauchlin R. Bethune <Iauch@bethuneassociates.com> Sent: Wednesday, July 18, 2018 9:11 AM To: Andrea Cummins <Andrea.Cummins@TukwilaWA.gov> Cc: Barbara Brunetti <b.brunetti@yahoo.com>; Jaimie Reavis <Jaimie.Reavis@TukwilaWA.gov> Subject: Re: Ramada Inn shoreline tree planting in Tukwila 'iZ%Z Andrea, Jaimie and Barb, Hoe about Wed 7/25 at 11:00. Does that work for everyone? Thanks, Lauch Lauchlin Bethune President/Landscape Architect, ASLA Lauchlin R. Bethune Associates, Inc. P.O. Box 14421 j. Maple Valley, Washingtonit% 98038 (425) 432-9877 i% email: lauch@bethuneassociates.com web page: bethuneassociates.com https://outlook.office365.com/owa/?viewmodel=Read Message ltem8ltem I D=AAMkADcwOTd iODII LTVI Mj EtN DQwM iO4MjJ m LW USYzB kNjVhZD IOYwBG ... 3/6 8/31/2018 • Re: Ramada Inn shoreline tree planting in Tukw-Jaimie Reavis Check out our new web page On 7/18/2018 8:58 AM, Andrea Cummins wrote: Hi Lauchlin, Sorry for the delay, we are a bit up to our ears here. 'it% Anyway, Jaimie Reavis is the new planner on your application and we are happy to meet you onsite in the next week or so. I donTz%t know what your availability is, so I will just throw a few dates/times out and you can let me know what works. ia1/2 How about next Tuesday (7/24), anytime between 10:30 and noon, or 1:30 to 2:30? Wednesday (7/25) between 11 and noon, or next Thursday (7/26) 'ic%:we could do anytime after 2pm as well. If those times wonieAt work, please suggest others and I will check calendars. Generally, Tuesday, Wednesday or Thursdays are best. it% Again, thanks for your patience! .IG1 Andrea i�% it% Andrea Cummins Urban Environmental Specialist, City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WATd% 98188 andrea.cummins@tukwilawa.gov 206.431.3663 i .1/ 'iZ% 'iZ% From: Lauchlin R. Bethune <lauch@bethuneassociates.com> Sent: Monday, July 9, 2018 8:22 AM To: Andrea Cummins <Andrea.Cummins@TukwilaWA.gov> Cc: Minnie Dhaliwal<Minnie.Dhaliwal@TukwilaWA.gov>; Barbara Brunetti <b.brunet @.yahoo.com> Subject: Re: Ramada Inn shoreline tree planting in Tukwila ia% Hi Andrea, We would like to schedule a meeting on -site with the new planner as soon as possible. Please let us know who that will be and when they are available to meet. Thanks, Lauchlin Lauchlin Bethune https://outlook.office365.com/owa/?viewmodel=ReadMessageltem&Iteml D=AAMkADcwOTdiODIILTVIMjEtN DQwMi04MjJmLW USYzBkNjVhZDIOYM3G... 4/6 8/31/201'8 Re: Ramada Inn shoreline tree planting in Tukwila - Jaimie Reavis • President/Lan/ape Architect, ASLA it% Lauchlin R. Bethune Associates, Inc. P.O. Box 1442i,% Maple Valley, Washingtonit% 98038 (425) 432-9877 l e/2 email: lauch@bethuneassociates.com web page: bethuneassociates.com iz% Check out our new web page On 7/5/2018 10:24 AM, Andrea Cummins wrote: Hi Lauchlin,i!/z ie/z I was told by my colleague Jim Toole that you called'ie/2 on Tuesdayic,/zregarding the permit application for tree removal/replacement in the shoreline behind the Ramada in off W. Valley Hwy. Carol Lumb, the planner for this permit has retired, so I will be the contact until a new planner is assigned. I believe that Carol sent out a correction request via email (I have attached it above)'iz%prior to her departure and the permit is waiting for response from you/Barbara before it will move forward. Please let me know what I can help you with. I will be out of the office until next Tuesday, but am happy to help out at that time.it.% Ie/z Cheers! IZ/2 Andrea i ./2 CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. https://outlook.office365.com/owa/?viewmodel=ReadMessageltemBltemID=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLW USYzBkNjVhZDIOYwBG... 5/6 8/31/2018 Re: Ramada Inn shoreline tree planting in Tukvyy' - Jaimie Reavis r CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. https://outlook.office365.com/owa/?viewmodel=ReadMessageltemBltemID=AAMkADcwOTdiODIILTVIMjEtNDQwMi04MjJmLW USYzBkNjVhZDIOYwBG... 6/6 • CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 FAX (206) 431-3665 SHORELINE TREE REMOVAL AND VEGETATION CLEARING PERMIT APPLICATION FOR STAFF USE ONLY Permits Plus Type. P-TREE Planner: 6(i v" 1, i s File Number: UV — - Application Complete Date: Project File Number: -00" t Application Incomplete Date: Other File Numbers: NAME OF PROJECT/DEVELOPMENT: 3ryt. / BRIEF D • IPTION OF WORK TO BE DONE: _) /Gr-e-e-- pZ �f �j"a.l�C- .i / t d 'e,(% /•G * / .' - vs.`_ LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. /S9a/ Me s % d e- cfAs 7 LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement). a'. ?o— 0034-07/ DEVELOPMENT COORDINATOR : The individual who: • has decision making authority on behalf of the owner/applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City to whom all notices and reports will be sent. Name: //LC /t E--‘6 Address: (5' / blity % (�,G ca), /c,- O i Phone: fiats-- ad. !o - lr--/ Z FAX: Yo S - ?Sr- E-mail: `j. kcc.4r,- i Ct �� ` _ . g_.'v ivy Signature: Date: 9// 7//K RECTENED I.iAY 01 2013 W:\@SHAREPOINT FOLDER RESTRUCTURE\Reference\APPLICATIONS - Land Use Apps & Handouts\CURRENT LAND USE dPPL ig 4 \Shoreline Tree and Veg Clearing Permit.docx eve o I Check items submitted with application Information Req d. May be waived in unusual cases, upon approval of both Public Works and Planning - LANDSCAPE PLAN: 11. (a) Landscape planting plan by a Washington State licensed landscape architect, approved biologist (qualified and with experience in fisheries habitat management, wetland management, shoreline restoration, native plant restoration) or ISA-certified arborist. Maximum size 24" x 36". (b) All existing significant trees and vegetation to be retained including diameter, species name and location. Proposed tree protection measures in accordance with TMC 18.44.080.B.10. (c) Proposed replacement trees/vegetation, including diameter, species name, spacing, size and location per TMC 18.44.080 B.4 and 18.44.080 C. Note: all plants must be native species. (d) Sensitive area mitigation plan for any vegetation removal in a sensitive area (wetlands, watercourses and/or steep slopes) per TMC 18.44.090 L. (e) Any other measures proposed to restore the shoreline environmental and aesthetic benefits previously provided by on -site vegetation, including placement of large logs from the tree removal in the shoreline buffer area. (f) Identify methods to be utilized to remove invasive vegetation (note that special permission is required for use of herbicides), plans for soil amendment and soil preparation, mulching, irrigation and long-term maintenance of new plantings. Note that the owner is required to maintain the new vegetation for the life of the project, which includes watering until the plants are established and replacing dead plants. Irrigation for buffer plantings is required for at least two dry seasons or until plants are established. An irrigation plan is to be included as part of the planting plan. W:\@SHAREPOINT FOLDER RESTRUCTUREkReference\APPLICATIONS - Land Use Apps & Handouts\CURRENT LAND USE APPLICATIONS\Shoreline Tree and Veg Clearing Permit.docx 110 CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 AFFIDAVIT OF OWNERSHIP AND HOLD HARMLESS PERMISSION TO ENTER PROPERTY STATE OF WASHINGTON ss COUNTY OF KING The undersigned being duly sworn and upon oath states as follows: 1. 1 am the current owner of the property which is the subject of this application. 2. All statements contained in the applications have been prepared by me or my agents and are true and correct to the best of my knowledge. 3. The application is being submitted with my knowledge and consent. 4. Owner grants the City, its employees, agents, engineers contractors or Cott�heer representatives the right to enter upon Owner's real property, located at /S'9O/ �4'/- Oa/h,e7 /71 Jorfor the purpose of application review, for the limited time necessary to complete that purpose. !! 5. Owner agrees to hold the City harmless for any loss or damage to persons or property occurring on the private property during the City's entry upon the property, unless the loss or damage is the result of the sole negligence of the City. 6. Non -responsiveness to a City information request for ninety (90) or more days, shall be cause to cancel the application(s) without refund of fees. EXECUTED at IA— (city), li(%/(state), on A, Z Z , 20 /G �e rA"u.rte 71/4, . (Print Name) /S, O / ia7 7 /,‘z,07 (Address) fear- a a. 6 - /0E-/ 2— (Phone Number) On this day personally appeared before me 12)ot'I -Your rtkv,.12i71 to me known to be the individual who executed the foregoing instrument and acknowledged that he/she signed the same as his/her voluntary act and deed for the uses and purposes mentioned therein. SUBSCRIBED AND SWORN TO BEFORE ME ON T ; S DAY OF N A-6‘-`rG , 20 l C/ N 1 TARY P BLIC in mil for the State of Washington I residing at 14.—‘1,,9k 1 HANNAH TEISTA q P Notary Public My Commission expires on —t'Q t ' State of Washington MAY 01 2018 M Appointment ppointment Expires i i 1 Feb 16, 2021arierwsimapqrawmpgrimpooft Community Development Ramada Inn- Tree Replacement Plan - Parcel 0005800030 The add Ineicn mdrdetloninamaMt a en Cpeptedby King Coumy tta/tean a a•lay d tw cn inchs lutltct 4 wnga Wmout trace Wnp Caul./ makes M mpeunlaau Orwnanea, aplea plarlpled. anle sapncy. Carniadenelli. Meleet. a tales to the use d such ubrmeton ins documerf a n l ueended 1pr uae a a auvey podud Km County OW nd De fade BAY Genera specta ndrect mooerp, n coreuWanea Canapes includrg. bu M lmrtetl to lost r everua 0r bat P.A. usjing from me nee a mwee lath ldormlon canarod on the ma Any e.ae d Ins map 0r n/ormaonuntns map is mdlbnbd eeceol try anman permasrnn d Wrg l;ouMy Date. 3/211201e Notes X -1-/'t s r'y° kt. e e" t om Tree Establishment Plan Cooperator: Ramada Inn —Barbara Brunetti— 15901 West Valley Highway Tukwila, WA Date: 3/21/2018 Land Use: Planned Land use Treatment/Conservation Practices (See Specification Sheets section for details) Amount mo/yr 3 circles --8 feet in di- ameter Summer 2018 Site Preparation - Mow blackberry within a 4 foot radius around area to be plant- ed. In an ideal situation, the blackberry roots are dug out or re -growth of blackberry receives herbicide treatment (active ingredient glyphosate) on foliage in the early fall (September). If drift of chemical may reach surface water, then herbicide should be aquatic approved, applied by a licensed applicator. See attached Best Manage- ment Practice for blackberry by King County Noxious Weeds. October— April 2018 2019 Planting— Plant 1 tree within each prepared area. Recommended species are Douglas Fir (Pseudotsuga menziesii) or Shore Pine (Pinus contorta). Protect each tree with a plastic tree protector that has been staked to the ground. One option is pro - tex pro-gro tubes staked with 3 foot bamboo stakes. Please note: If a tree is planted outside the recommended planting season, irrigation may need to be implemented in order to ensure survival of the tree. Each Tree Summers 2019-2021 Maintenance —Mow a 4 foot radius around each tree for a minimum of three sum- mers. Monitor tree protectors and re -install as needed. The tree should have more than 50% of it's height above the height of the blackberry before mowing can cease. Once mowing has ceased, remove the tree protector. The owner/operator is responsible for obtaining all permits, right of ways, and/or easements that are needed to imple- ment this plan. The owner/operator is responsible for contacting utilities and assuring the work does not harm their facilities. The owner/operator is responsible for compliance with all federal, state, and local laws, ordinances, codes, and regulations. Please note: this plan is not a full restoration plan, but a plan to establish replacement trees after re- moving hazard trees. This plan is not eligible for funding through King CD programs. King County Department of Permitting and Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 206-296-6600 TTY Relay: 711 www.kingcounty.gov L04 Web date: 05/20/2016 Landscape Bond Quantity Worksheet Form For alternate formats, call 206-296-6600 Project Name: The Ramada Tukwila Permitting Project #: CE 17-0393 Address: 15901 West Valley Highway, Tukwila, Washington 98188 Prepared By: Lauchlin Bethune, LA Phone: 425 432 9877 Bonds are based upon required landscaping and will be posted for performance and/or maintenance. Required landscaping includes perimeter landscaping, surface parking area landscaping, (KCC 21A.16) and any landscaping required by SEPA environmental review. The maintenance period is for the life of the project, however, after posting for maintenance, the performance bond will be reduced to 30% of the total performance bond price including contingency, or other amount as warranted by site specific or current market considerations at the discretion of the department ($1,000.00 minimum). Bonds will be held for a minimum two year period. Upon re - inspection of the site at the end of the monitoring period, the bond will be released if the site has been properly maintained (KCC 21A.16.180). If the project has not been maintained and there are dead trees, shrubs, ground cover, or other deficiencies noted in the required landscaping, the bond will be held until the deficiencies are corrected. UNIT PRICE UNIT TYPE QUANTITY PRICE SOD LAWN AREAS $500.00 MSF (1000 SQ. FT) 0 0.00 HYDROSEEDING $50.00 MSF (1000 SQ. FT) 0 0.00 SOIL PREPARATION A. TOPSOIL (6 INCHES DEEP) $25.00 CY (CUBIC YARD) 12 300.00 B. MULCH (2 INCHES DEEP) $4.00 SY (SQUARE YARD) 24 96.00 C. PEAT MOSS (TWO INCHES DEEP) $2.30 SY (SQUARE YARD) 0 0.00 D. COMPOST (3 INCHES DEEP & TILLING $26.00 SY (SQUARE YARD) 0 0.00 E. FERTILIZER $6.67 CY (CUBIC YARD) 0 0.00 PLANT MATERIALS A. DECIDUOUS TREES 1.75 - 2.00" CALIPER (minimum height 10') PERIMETER & PARKING AREAS $250.00 EACH COST & LABOR 9 2,250.00 1.5 - 1.75" CALIPER INTERIOR LANDSCAPING OR OTHER REQUIRED LANDSCAPING $225.00 EACH COST & LABOR 0 0.00 B. EVERGREEN TREES FIVE (5) FEET OR ABOVE $150.00 EACH COST & LABOR 15 2,250.00 C. SHRUBS $35.00 EACH COST & LABOR 0 0.00 D. GROUND COVER $4.00 EACH COST & LABOR 0 0.00 SUB TOTAL BOND AMOUNT BOND AMOUNT $ SUB TOTAL: 4,896.00 058e4373-f57c-457a-bcfe-0903240ba62c b-wks-landscapebq.pdf L04 : 05/20/2016 Page 1 of 2 • L04 Web date: : 05/20/2016 UNIT PRICE UNIT TYPE QUANTITY PRICE MISCELLANEOUS TREE STAKES $2.65 EACH PER STAKE & LABOR 48 128.00 FENCING: SOLID WOOD CEDAR $28.50 LINEAR FOOT INCLUDES LABOR 0 0.00 BERMING $17.50 LINEAR FOOT INCLUDES LABOR 0 0.00 IRRIGATION 80¢ SQUARE FOOT 0 0.00 RELOCATING TREES ON SITE 36" BALL $260.00 EACH 0 0.00 60" BALL $920.00 EACH 0 0.00 RELOCATING SHRUBS ON SITE 12" BALL $26.00 EACH 0 0.00 24" BALL $33.00 EACH 0 0.00 ADDITIONAL ITEMS: Onsite recreation facilities 0 0.00 SUB TOTAL BOND AMOUNT Add 30% of the Bond Sub -Total for Contingency in accordance with KCC 27A.30.020 TOTAL BOND PRICE * BOND SUB TOTAL: $ 5,024.00 30 % CONTINGENCY: $ 1,507.00 TOTAL BOND PRICE: $ 6,531.00 * NOTE: Permit inspection fees, in addition to the bond price, are required for monitoring the performance and maintenance of required landscaping. 058e4373-f57c-457a-bcfe-0903240ba62c b-wks-landscapebq.pdf L04 : 05/20/2016 Page 2 of 2 j‘t.1,141 • OP * 7?-70 vi • 1-9/isri-sop)-1 rpt,t-riN41.471 • • 4ic • • V • •.:.; • _ • /tiv-r4eLl eve, Ltd't-t irto-vmpl (4m.11O- [Ay I or. 1 N • I ri.A. <WM.. :ro 3tib \ 44 I-111 I-111 —I, loofp 2 tAI \\N„ ,s`.0 , 0•• yz,o • ; \. • itz-twicto4r=0 „5-. wof 7.7g 1 REct7.1 MAY 01 2018 • • • 1/4---g1.10A • A,/ e/r' ' 1DQ1,117 THE RAMADA TUKWILA 15901 WEST VALLEY HIGHWAY TUKWILA, WASHINGTON 98188 DATE: /1,6 REVISED: J013# 218124 I SCALE: 1"--10'44" • SHEET # COPYRIGHT LRBA 2018 •• L.1.P 1 0_ F: Lauchlin R. Bethune Associates, Inc. • Landscape Architectiire.killanning, ASLA P.O. Box 1442 " • phone: (425) 432-9877 Maple Valley, Washington 98038 www. bethuneassociates.coyn Community Development PLANT MATERIAL LEGEND Abrev. Common Name Botanical Nanze trees: BLM DF OA WRC Bigleaf Maple Douglas Fir Oregon Ash Western Red Cedar SITE SPECIFIC NOTES Acer macrophyllum Pseudotsug a menziesii Fraxinus latifolia Thuja plicata Size 2" cal./B&B 6' hgt./B&B 2" cal./B&B 6' hgt./B&B 1. PLANTING PREPARATION. A. WEED WACK: Use metal weedwacker to weed wack down all blackberry and weed vegetation within identified planting workscope. Remove any debris from site. B. PLANTING: Pocket plant proposed trees per Planting Detail using 50% Gro-Co from Sawdust Supply, Seattle,WA; and 50% on -site soils. Stake trees per Planting Details. C. PROTECT PLANT MATERIAL: Provide chicken wire cage and stakes to secure, one -foot from each proposed treebase, to protect trees from native wildlife. D. MULCH: Provide mulch, 2" depth per Sawdust Supply, Seattle within work scope. 2. MONITORING. A. Owner to provide monitoring of area for 5-years for "Completion & Installation Approval" from City of Tukwila. B. Owner to provide written review every year and submit written report to City of Tukwila. 0 EC. � fi E � �„ �{ a �„ r1= .-II-11-11 Iice_ PRUNE WITH LA APPROVAL Jo ,11 repri n 2"X2" HEM/FIR STAKE DRIVEN TO REFUSAL (24" MIN.) SECURE TO TREE WITH NON-CORRODABLE WIRE ENCASED IN REINFORCED DULL OF CONTACT TO TREE.AT POINT SET CROWN AT NURSERY HEIGHT (2" ABOVE TOPSOIL FINISH GRADE) FINISH GRADE 2" MULCH ROLL TOP 1/3 OF BURLAP AWAY FROM BALL SCARIFY BOTTOM AND SIDES OF HOLE BACKFILL MATERIAL (1/2 NATIVE MATERIAL, 1/2 TOPSOIL OR GRO-CO PER SPECS.), FIRMLY COMPACTED AND WATERED IN SCARIFY AND LOOSEN ROOT MASS ON CONTAINER MATERIAL ATWE TREE PLANTING/STAKING t4AY 01 2018 Community Development N.T.S. 2"X2" HEM/FIR STAKE DRIVEN TO REFUSAL (24" MIN.) SECURE TO TREE WITH NON-CORRODABLE WIRE ENCASED IN REINFORCED DULL OR ECONRUBBER TTOE -AT POINT F GENERAL CONSTRUCTION NOTES ,.T 1 11=lk 1. 11 4. ' II -11I �i11�11=11=11-II=11 �� II 1. All work performed shall conform to the City of Tukwila landscape requirements, codes and specifications. 2. . Owner to secure all necessary permits for required work per Landscape Plan. 3. Locate, protect and avoid disruption of all above and below grade utilities and site features prior to construction. 4. Contractor is responsible for any resulting damages during construction. Call locate before you dig at 811. 5. Use metal weedwacker to weed wack down all blackberry and weed vegetation within identified planting workscope. Remove any debris from site. 6. SOILS: Pocket plant all proposed plant material with 50% Gro-Co, (Sawdust Supply, Seattle) and 50% on -site soils. Rake area smooth and mulch per specs, placing mulch on exposed subgrade and within cleared area. 7. MULCH: Upon completion installation of plant material, place 2" depth fine blend hem -fir mulch to all planting beds. Mulch from Sawdust Supply, Seattle. 8. Provide one (1) year warranty for all plant materials and workmanship. Slope all planting beds to drain. 9. Verify all quantities shown on the plant list and plans. If discrepancies exist between the graphic representation and the numeric totals, the graphic representation shall rule. 10. All plant materials to be specimen quality with full, symmetrical trunk and foliage, unless otherwise noted. 11. Insure proper drainage of all planting holes prior to installing plant materials. If planting holes do notdrain or if heavy clay soils are evident contact landscape architect. -41.1243 1491rri r2- 1/2" MULCH UNDER SHRUB SET CROWN AT NURSERY HEIGHT (2" ABOVE TOPSOIL FINISH GRADE) REMOVE 1/3 OF BURLAP ON B&B MATERIAL 2 MULCH IN 4' DIAMETER RING AROUND PLANT HYDROSEED PER SPECS SCARIFY BOTTOM AND SIDES OF HOLE BACKFILL MATERIAL (1/2 NATIVE RISPECS-CO .) FIRTMLYOCOMPAIL OR CTOED AND WATERED IN SCARIFY AND LOOSEN ROOT MASS ON CONTAINER MATERIAL NATIVE CONIFER PLANTING DETAIL N.T.S. feMADA TUKWILA THE 15901 WEST VALLEY HIGHWAY TUIKWILA, WASHINGTON 98188 DATE: - f4A6 REVISED: JOB# 218124 •• SCALE: O COPYRIGHT LRBA SHEET # 2018 Lauchlin R. Bethune Associates, Inc. , ■ Landscape Architecture .&Planning, ASLA P.O. Box 1442 _ jphone: (425) 432-9877 Maple Valley, Washington 98038 www. bethuneassociates.com City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director November 7, 2018 Mr. Lauchlin Bethune P.O. Box 1442 Maple Valley, WA 98038 Re: City of Tukwila File Numbers L18-0035, PL18-0025, and CE17-0393 Dear Mr. Bethune, Thank you for your submittal of an arborist report and request letter regarding the 3 cottonwood trees that were pruned/topped along the shoreline behind the Ramada Inn in response to our meeting on October 4, 2018. While we agree with the arborist that additional pruning should be conducted to create a more stable crown and Tess potentially hazardous limbs, this act does not address the mitigation required by City and State code for vegetation removal in a Shoreline buffer (see code references below). Topping the existing trees has resulted in shortening their long-term viability. Retaining and pruning the existing trees may add some canopy in the short term but will not lead to their long-term recovery. While it may be easier and more cost effective to leave the existing tree trunks in place, tree replacement is required for trees that have been topped. • Per TMC 18.44.080.B.9: Topping of trees is prohibited unless absolutely necessary to protect overhead utility lines. Topping of trees will be regulated as removal and tree replacement will be required. • Per TMC 18.44.6.4, the replacement requirement for a tree of 20 inches or more in diameter is 8 trees, therefore 24 trees are required as replacement. • Per TMC 18.44.080.L.5(c): Monitoring of buffer alterations shall be required for three to five years. All other alterations shall be monitored for minimum of 5 years. Standard practice in Tukwila for shoreline vegetation monitoring is 5 years. In areas with heavy invasive species pressure, this is especially important. We also agree with the arborist that planting under the damaged trees will be difficult, however on your permitted landscape plan, most of the trees are proposed to be planted outside of the dripline of the trees. Adjustments can be made (vertically up and down the slope) if necessary, during planting to facilitate planting of new trees away from existing roots. A mixture of coniferous and deciduous trees is recommended due to the difference in growth rates, tolerance to drought, and overall ecological benefit. Conifers, while ultimately desired along the river, grow much more slowly and are more difficult to establish in areas with invasive pressure and drought concerns. Experience in restoration projects in the area has shown more need for replacement of conifers on these projects then for deciduous species. The restoration site across from your project site is a good example - substantially more conifers will be replaced after Year 1 than will deciduous plants. The Notice of Decision for this project was issued in August 2018, and included the appeal rights, procedures and time for appealing the decision. No appeal was received in response to the Notice of Decision, and the request submitted does not meet the City's requirements for tree protection, retention, and replacement within Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov Ramada Inn Tree Permit Request November 7, 2018 Page 2 the shoreline area adopted in 2011. Requirements including tree topping prohibition, tree replacement ratios, and monitoring and maintenance periods apply for to all properties along the shoreline when trees are proposed to be removed from the shoreline area — prior to any tree removals. The City's general tree regulations were updated in April 2018. Under the new regulations, removal or damage of trees(s) without applying for and obtaining required City approval is submitted to a fine of $1,000 per tree, or up to three times the marketable value of each tree removed or damaged, as determined by the Qualified Tree Professional (whichever is greater). Fines and replacement plantings are now required for tree removal which occurs prior to City approval. In your case, fines have not been assessed to date for tree removals prior to obtaining permits. We would like to have the required tree replacement occur as soon as possible, before the planting window closes as temperatures drop. Thank you for your attention to this, to restore the shoreline area and resolve the code violations that remain active until the tree planting occurs and receives a final inspection by Tukwila staff. .Please contact project planner Jaimie Reavis at Jaimie.Reavis@TukwilaWA.gov or (206) 431-3659 with any questions, and to schedule an inspection once the replacement plantings have been installed. Sincerely, ack Pace Director, Department of Community Development Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov Jack Pace From: Barbara Brunetti <b.brunetti@yahoo.com> Sent: Monday, November 12, 2018 3:29 PM To: Jack Pace Subject: Modification Proposal Good Afternoon Jack, I doubt you are in the office today as it is a Holiday, I left a message for you last week regarding our modification proposal for the "The Ramada Inn" and wondered if you have had an opportunity to take a look at it along with the report from the Horticulturalist. Please let me know if you reviewed the proposal and your decision if you have one as of yet. I appreciate your time and consideration. As I told you this has been very stressful for me. Respectfully Barbara J Brunetti General Manager Ramada Inn Tukwila CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. Lauchlin R. Bethune Associates, Inc. • Landscape Architecture & Planning, ASLA October 23, 2018 Mr. Jack Pace Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, Washington 98188 RE: Ramada Inn 15901 West Valley Highway Tukwila, Washington City of Tukwila File Number #L18-0035, PL18-0025 & CE17-0393 Dear Mr. Pace. Received OCT 26 2018 Community Development. Thank you for meeting with Barbara Brunetti, Ramada Inn, and myself to review the conditions of the Notice of Decision regarding the unauthorized pruning of the California Black Poplar/Populas trichocarpa trees on the outer edge of the stream buffer at the Ramada Inn at 15901 West Valley Highway, Tukwila, Washington. The Ramada Inn regrets attempting to prune these trees away from the building resulting in unauthorized pruning of the three the California Black Poplar/Populas trichocarpa by an uninformed, unregistered Tree Pruning Contractor. Based on the on -site conditions, recovery or the California Black Poplar/Populas trichocarpa trees and recommendations from state certified arborist Bryce Landrud, Thundering Oak, we are requesting modification to the approved Notice of Decision of August 29, 2018. Based on the recovery of the California Black Poplar/Populas trichocarpa and the 'attached 'review by arborist Bryce Landrud we request retaining the existing trees with a pruning program as outlined by Bryce(attached), reduction of the replacement trees, reduction of the maintenance period and reduction of the monitoring program. We are requesting the incorporation of the pruning program by Thundering Oak as part of the maintenance program. Specifically the conditions of the Notice of Decision requires 24 replacement trees, 5 years of maintenance and monitoring and a bond for 150% of the cost of tree installation, maintenance and monitoring. We request modification to the Notice of Decision as follows: Replacement trees: Notice of Dec.:si^. 24 replacement trees Maintenance: Notice of Decision 5 years of maintenance Monitoring: Notice of Decision 5 years of monitoring Modification Request 6 replacement conifer trees Modification Request 2 years of maintenance and inclusion of the pruning program recommended by Arborist Bryce Landrud Modification Request 2 years of monitoring Based on the recommendation of Arborist Bryce Landrud, and with the proper pruning or the Co.iifornia Black Poplar/Populas trichocarpa. the trees will recover and become a stronger short and king term resource than removing the trees and replanting. Retaining and pruning the existing trees and adding six conifer replacement trees will baiui,ee rectify the issue of the previous pruning in a much shorter time period. Based on Mr. Landrud's evaluation of retaining and structurally pruning the trees the actionproposed will replace the resource much quicker than the 20-30 years he estimates the replacement trees will take to evolve. Retaining the existing trees with structural pruning will replace what was lost by the initial unauthorized pruning of the trees. P.O. Box .1442 • Maple Valley, Washington 98038 • (425) 432-9877 • webpage: bethuneassociates.com RE: Ramada Inn Notice of Decision City of Tukwila File Number #L18-0035, PL 18-0025 & CE 17-0393 Lauchlin R. Bethune Associates, Inc. October 23, 2018 Retaining these trees will also reduce the impact to the asphalt fire lane from suckering of the roots resulting in repaving the fire lane. We request modification to the Notice of Decision based on retaining the trees with incorporation of the pruning program, two years of maintenance and two years of monitoring. We also acknowledge a mistake was made by unauthorized pruning and we believe six conifer trees should be planted to provide a long term resource for the riverbank. The incorporation of the modification request will provide an overall stronger resource for the river, better short and long term habitat, less impact to the buffer for construction and protection of the fire lane. Please review our request and let me know if you have any question. We appreciate you working with us on this unfortunate accidental pruning and reasonable compensation resulting in a stronger short and long term resource for the river. If you have any questions or need any additional information please let me know. Sincerely, Lauchlin R l:ethune Associates, Inc. Lauchlin Bethune, ASLA President Enc: Letter of 10/17/18 from Bryce Landrud, Thundering Oak Quote for Pruning Program, Thundering Oak 10/17/18 Resume Bryce Landrud, Thundering Oak CC: Barbara Brunetti, Ramada Inn file: I b/ge n218124 j p 2 Thundering Oak ENTERPRISES October 17, 2018 Laughlin Bethune Bethune & Associates P.O. Box 1442 Maple Valley, Wa. 98038 Re: Ramada Inn at 15901 West Valley Hwy., Tukwila (Trees) P.O. Box 1 847 AUBURN, WA 98071-1847 OFFICE 253-288-TREE (8733) FAX: 253.939.51 26 WWW.THUNDERINGOAK.COM Dear Lauch, I visited the Ramada Inn site recently and examined the poplars as per your request. These trees (3 in all) that were topped off between 20 and 30 feet high last year have all re -sprouted heavily and appear to be growing rapidly. The new shoot growth is between 2 and 4 feet long, and is relatively consistent among and between the three affected trees. Due to the specific location, size and growth attributes of these trees, it makes the most sense at present to leave the trees in place, perform periodic pruning to assist future development and symmetry, and save new plantings for areas likely to be unaffected by the very large surface root mass these individuals possess. The reasoning for this course of action includes the following points: Within a year or two the only evidence of the topping activity will be in the winter when the stems are bare. The new branches, limbs and tops will look natural, provide shade to the river faster, and consists of native species. The stems and stumps are too large (>36") to safely and `gently' remove without further slope or riverbank damage. The existing root system occupies most if not all of the first 18" of the soil profile from the center of the stem out at least 15 to 20 feet. Planting anything in this zone would require power equipment and would require excavating at least the upper 12" of the soil to remove roots and enable digging. Simply cutting the trees off at the stump would result in the same type of growth that is currently happening at the upper stem cuts; rapid shoot growth that could exceed 4' per year. This would likely be coupled with new shoots sprouting from numerous surface roots in an effort to replace foliar mass. Though pointless and erroneous tree topping is harmful, unsightly and often seriously damaging to trees, the best methods of remediation sometimes require the use of the same plants that were damaged. In this case, replacement of these three trees would require an enormous and costly effort that would involve many plants, trees, landscape features and hardscape items that have nothing to do with the trees themselves. The final result would likely be a few extra trees in number that would take 20-30 years to fully `replace' the 3 poplars. R ctfully su itted, Bryce I.S.A. Certified Arborist #PN0232 Thundering Oak ENT ERP.RISI.S PO Box 1847 Auburn, WA 98071 www.thunderinRoak.com 253.288.TREE (8733) FAX: 253.838.2534 CUSTOMER NAME: BETHUNE AND ASSOCIATES ADDRESS: CITY: TELEPHONE: EMAIL: Zip: QUOTATION (yes, you can quote us on this) Start Finish Foreman Crew RAMADA INN, 15901 WEST JOB LOCATION: VALLEY HWY. S. TUKWILA CELL/BUSINESS PHONE: ,DATE' .ESTIMATOR DATE APPROVED P.O./REFERENCE # - ' . CONTACT" i • 1 10/17/18 Bryce Landrud LAUCHLIN B. .SPECIES/TYPE LOCATION . WHAT WE'RE GOING TO DO REMOVE , ,. STUMP ,. AMOUNT i , 3 POPLARS BETWEEN FIRE LANE AND RIVER Perform crown thinning operations on previously topped trees to select dominant tops and improve branch spacing. Remove low sprouts below 10 feet high. Clean up everything. 1200.00 WHAT DO YOU WANT US TO DO? NO CLEAN UP HAUL BRUSH CUT WOOD INTO 18" ROUNDS & LEAVE ON SITE (TO HAUL OR NOT TO HAUL?) yes HAUL BRUSH AND WOOD (YEP, WE CAN DO THAT TOO) HAUL STUMP CHIPS OTHER LEGAL MUMBO JUMBO • YOU GIVE US PERMISSION TO ACCESS YOUR PROPERTY • PAYMENT DUE UPON COMPLETION OF WORK • WE ARE NOT RESPONSIBLE FOR DAMAGE TO UNDERGROUND PROPERTY UNLESS PREVIOUSLY DISCLOSED WE GET (SUBTOTAL) GOVT GETS TOTAL AMOUNT DUE 1200.00 THESE AMAZING PRICES ARE YOURS FOR 30 DAYS ONLY. GREAT DAYS ARE AVAILABLE ANYTIME!! Bryce Landrud WE SCRIBBLE HERE YOU SCRIBBLE HERE THANK YOU FOR YOUR BUSINESS! Thundering Oak LNTERPRISES October 17, 2018 BRYCE LANDRUD Curriculum vitae P.O. Box 1 847 AUBURN, WA 98071-1847 OFFICE 253-288-TREE (8733) FAX: 253.863.1743 WWW.THUNDERINGOAK.COM General Manager of Thundering Oak Enterprises, Inc., an arboriculture/tree care service firm. B.S. Forest Management WSU 1979. Practicing arboriculture since 1979. - Pruning, planting, transplanting, cabling & bracing Northwest trees since 1980. Certified Arborist (#PN0232) since 1993. Performed and documented over 100 tree/plant appraisals since 1993. President of the Pacific Northwest Chapter of the International Society of Arboriculture (PNW-ISA). 10/2010 — 9/2012. - Board member PNW-ISA 2004 — 2010. Former board member of the Western Washington Golf Course Superintendents Assn. (WWGCSA). - Current Pacific Northwest Chapter I.S.A. Tree Climbing Championship Coordinator Current Chair of City of Auburn's Urban Tree Board. - Member of Tacoma Street Tree Ordinance Revision Committee (STORC) 2008-2009. - Located in Auburn, Washington. 253.288.8733 253.261.2094 cell Bryce@thunderingoak.com Thundering Oak ENTERPRISES October 17, 2018 Thundering Oak Enterprises, Inc. founded 2005 Bryce Landrud, General Manager; Certified Arborist #PN0232 P.O. Box 1847 Au BURN, WA 98071-1 847 OFFICE 253-288-TREE (8733) FAX: 253.939.5126 WWW.THUNDERINGOAK.COM Service Domains: - Large tree pruning and safety trimming. Large and small tree removal. - Ornamental tree pruning and thinning. Landscape shrub trimming, including renovation and hedge trimming. Arboricultural consulting, including tree risk (hazard) assessment and value appraisal. Stump grinding and root pruning. Specialized management plans, such as multiple -building clearance trimming or R.O.W. pruning to meet road/sidewalk standards. Existing Municipal Clients: - Federal Way School District Federal Way Parks annual maintenance contract. - City of Tacoma. City of Puyallup. - City of Auburn. City of Renton. City of Olympia. - Kent School District. Enumclaw School District. City of Normandy Park - Auburn Parks Auburn School District Existing Commercial Clients: South Hill Mall - Commons Mall Numerous Business Parks Olympic Landscape - SS Landscape Green Effects Numerous Property Management Companies, including Windermere, Bell -Anderson, JSH, Coldwell Banker Bain, Kidder Matthews Previous company — Arborscan Tree Conservation founded by Mr. Landrud in 1984 and managed until 2005.