Loading...
HomeMy WebLinkAboutPermit PL18-0099 - REZONE WEST HALF 7345600766 - SEPAREZONE WEST HALF 7345600766 7345600766 PARENT FILE PL18-0099 THIS FILE E18-0016 SEPA/CHECKLIST City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director Final Staff Evaluation - Environmental Checklist File No: E18-0016 I. Summary of Proposed Action The proposal is a change to the Comprehensive Plan's Land Use Map and the Zoning Map from Low Density Residential to Commercial Light Industrial. II. General Information Project Name: Metro Training Facility Rezone Applicant: Gillian Zacharias, King County Metro Location: 12677 East Marginal Way S, APN 7345600766 Comp Plan Designation /Zoning: Split -zone: Commercial/Light Industrial (C/LI), Low Density Residential (LDR) The following information was considered as part of review of this application. 1. SEPA Checklist dated December 14, 2018 2. Endangered Species Act Screening Checklist dated December 5, 2018 3. Project and Decision Criteria Narrative provided December 13, 2018 III. Background/Proposal This application is part of the 2018-2019 annual docket for amendment of the Comprehensive Plan. The non -project proposal is a quasi-judicial change to the land use designation on the Tukwila Comprehensive Plan and Zoning Code maps for a 71,440 square foot lot from split -zoned Commercial/Light Industrial (C/LI) and Low Density Residential (LDR) to Commercial/Light Industrial. The subject site contains environmentally sensitive areas: Watercourse Type 2 stream in pipe, 100' buffer. IV. Review of the Environmental Checklist The following is a summary of the elements contained within the Environmental Checklist submitted for the proposed project. The numbers in the staff evaluation correspond to the numbers in the Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov Environmental Checklist. If staff concurs with the applicant's response, this is so stated. If the response to an item in the checklist is found to be inadequate or clarification is needed, there is additional staff comment and evaluation. A. Background: 1.-7. Concur with checklist 8. According to the Washington Department of Ecology's Toxic Cleanup Sites inventory, the following site contains the following issues: "Soil containing residual lead and possibly petroleum hydrocarbons at concentrations exceeding Method A cleanup levels remain in localized areas. The residual lead in soil is believed to be associated with fill placed prior to Site development, not with the petroleum hydrocarbon release. The absence of benzene and lead in water samples collected in 2002 indicates the residual benzene and lead in soil have not impacted Site groundwater and pose no threat to human health or the environment, according to the consultant. Groundwater chemistry analytical data show that Site cleanup using groundwater extraction subsequent to the removal of petroleum -impacted soil was effective at removing residual hydrocarbons from groundwater, according to Camp Dresser & McKee Inc. (CDM), the environmental consultant. CDM indicated that remedial activities conducted at the Site have met the intent of the Model Toxic Control Act and, therefore, no further action is necessary for groundwater." Ecology issued a `No Further Action' (NFA) letter March 11, 2005 after a restrictive covenant was recorded with the county. 9-12. Concur with checklist B. Environmental Elements: 1. Earth: a—d Concur with checklist e This is a non -project proposal for a rezone of the subject property. A condition for approval of the rezone itself may include daylighting or improvement of the stream onsite which could potentially require grading and fill. If the proposal is approved, any new commercial/industrial use would be required to meet the environmental standards in place at the time of construction. A separate SEPA determination shall be provided during project proposal. f-h Concur with checklist 2. Air: a Applicant did not respond to "after" impacts. Emissions from project may increase due to increased intensity of use from LDR to C/LI. Employee and business traffic will likely affect air emissions in area. However, the current non -conforming use of the site as a truck terminal likely produces a greater amount of emissions within the area, and the removal of truck parking within the stream buffer area as a result of the site's non -conforming status being lost will reduce the amount of area available for vehicular use. b -c Concur with checklist E18-0016 Staff Report 2 3. Water: a (1-6) Concur with checklist b (1)-(2) Concur with checklist c (1)—(3) Concur with checklist d Surface water design and construction of any future project shall be per the King County Surface Water Design Manual as adopted by the City of Tukwila. All impacts associated with drainage will be mitigated as part of the construction permit. Low Impact Development standards have been adopted by the City of Tukwila and include such facilities as rain gardens, bio-retention, pervious pavement, etc. Best Management Practices must be followed to ensure that no construction debris enters stream. All impacts related to construction debris will be mitigated as part of the construction permit. 4. Plants: a-b Concur with checklist c All of Tukwila is mapped as threatened, accessible by the Washington Department of Fish & Wildlife Salmonscape. d Low Impact Development standards have been adopted by the City of Tukwila and include such facilities as rain gardens, bio-retention, pervious pavement, etc. Any new landscaping in permit will need to meet the requirements of Tukwila's Landscaping and Environmentally Sensitive Areas Ordinances. e Concur with checklist 5. Animals: a-b See comment below in ESA Screening Checklist c-e Concur with checklist 6. Energy and Natural Resources: a-c Concur with checklist 7. Environmental Health: a (1) Ecology issued a 'No Further Action' (NFA) letter March 11, 2005 after a restrictive covenant was recorded with the county. See comment for Background, (8), above. a (2)-(5) Concur with checklist b (1) Concur with checklist b (2) Any future construction project shall be subject to the City's noise ordinance and any construction related noise shall be subject to those regulations. Compliance with applicable local, state and federal noise regulations will mitigate any potential adverse noise impacts associated with the project. Any new uses allowed under C/LI zoning will generate additional vehicular traffic that will increase noise in immediate area. However, these will likely be significantly lower than the non -conforming truck terminal use currently permitted on the property. b (3) Concur with checklist 8. Land and Shoreline Use: E18-0016 Staff Report 3 a - c Concur with checklist d If the proposal is approved, any new commercial/industrial use would be required to meet the environmental standards in place at the time of construction. Current watercourse standards would require that any new use be setback out of the buffer unless a buffer reduction were approved. e-f Concur with checklist g - h The site does not contain a shoreline. i-m Concur with checklist 9. Housing: a-c Concur with checklist 10. Aesthetics: a- Concur with checklist b Development on a commercial light industrial site would require screening of related development from LDR zoned property on west. c. Concur with checklist 11. Light and Glare: a - d This is a non -project proposal and light and glare impacts from a future development project are not known. 12. Recreation: a—c Concur with checklist 13. Historic and Cultural Preservation: a-d Concur with checklist 14. Transportation: a-c Concur with checklist d Commercial development is typically required to make frontage improvements. This is a non -project proposal. Any future project would meet City of Tukwila parking standards. e-f This is a non -project proposal and number of trips cannot be quantified at this time. g-h Concur with checklist 15. Public Services: a-b Concur with checklist 16. Utilities: a-b Concur with checklist D. Supplemental for Non -Project Proposals E18-0016 Staff Report 4 1. The change in zoning from Low Density Residential to Commercial / Light Industrial would likely increase the number of vehicular trips and therefore emissions to air. However, these impacts will likely be significantly lower than the non -conforming truck terminal use currently permitted on the property. 2. Concur with checklist. Future development projects could include site designs that strive to preserve significant vegetation and incorporate native plants into the site's landscape plan, especially within the stream buffers along the western portion of the site. 3. Concur with checklist 4. The location of the watercourse makes "no impact" impossible. The existing condition is very disturbed. Redevelopment of the site as a commercial or light industrial use would require any development/use to be located outside of the stream buffer areas, or require administrative approval for a buffer reduction that automatically requires restoration work adjacent to the watercourse. The existing condition of a truck parking area built over the watercourse would be improved if the parking area is removed and the western portion of the site restored as a natural area for the watercourse. 5. The proposal could affect future land use in that other like properties would request a change in land use designation because of similar changed conditions. The redesignation/rezone of the site has the potential to justify the redesignation/rezone of other parcels in the vicinity or with similar environments. 6. Concur with checklist. 7. Concur with checklist, staff does not think that the proposed redesignation/rezone conflict with local, state or federal laws for the protection of the environment. IV. Review of Endangered Species Act Screening Checklist Question 1-4. Agree Question 5. Agree Question 6. Agree; however, Coho salmon, resident trout and other nonanadramous fish are potentially present per the City of Tukwila's 2013 Surface Water Comprehensive Plan. Part B - Project Specifics Part C - Project Specifics Water Quality Part D - Project Specifics: Flow Alteration and Fish Migration Part E - Project Specifies: Vegetation The above questions are not applicable. This request is a non -project action that does not involve construction. The request is for a change in the land use designation and zoning for the site. V. Public Comments E18-0016 Staff Report 5 Notice was sent to property owners and tenants within 500' of the site and agencies with jurisdiction. A Type 5 public meeting was held and three property owners attended. One residential property owner requested that a greater noise and visual buffer be provided on the west side of the property, to limit hours of operations to reasonable hours, to reduce the amount of visual impairment at the southeast corner of the lot for drivers pulling on to E Marginal Way S, and to limit street parking to 5 hours a day. Two residential property owners expressed concern via email about the past contamination of the site and potential impacts to the stream, as well the need for vegetated buffering around the site especially along the western portion adjacent to neighboring homes. They also expressed a desire to see the stream improved for fish habitat. No comments were received from the other agencies regarding the non -project proposal. VI. Conclusion The City Engineer has the authority and responsibility to direct traffic onto appropriate streets in the City. Chapter 11 of the Tukwila Municipal Code is enacted to regulate the use of the public right of way in the interest of public health, safety, and the protection of public infrastructure. Any potential need to modify street parking standards in the area as a result of future development will be analyzed as part of a project proposal through a future land use and/or development permit. Tukwila Title 18 requires that "On properties being developed or re -developed, or when stream crossings in public or private rights -of -way are being replaced, existing culverts that carry fish - bearing watercourses or those that could bear fish (based on the criteria in WAC 222-16-031, Washington Forest Practices Rules and Regulations), shall be upgraded to meet the standards in the WDFW manual "Design of Road Culverts for Fish Passage" (2003 or as updated) if technically feasible." King County Metro is exploring the technical feasibility of improving the stream culvert and restoring the stream buffer area as part of their comprehensive plan amendment proposal; any such requirement will be activated as part of a future development permit. Any development of the site will require additional analysis. This DNS is based on impacts identified within the environmental checklist, attachments, and the above "Final Staff Evaluation for Application No. E18-0016", and is supported by plans, policies, and regulations formally adopted by city of Tukwila for the exercise of substantive authority under SEPA to approve, condition, or deny proposed actions. The proposal can be found to not have a probable significant adverse impact on the environment and pursuant to WAC 197-11-340, a Determination of Nonsignificance (DNS) can be issued for this project. Prepared by: Max Baker, Assistant Planner Date: April 23, 2019 E18-0016 Staff Report 6 City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director File Numbers: Applied: Issue Date: Applicant: Lead Agency: DETERMINATION OF NON -SIGNIFICANCE (DNS) E18-0016 December 13, 2018 April 23, 2019 Gillian Zacharias City of Tukwila Description of Proposal: To change the Comprehensive Plan's Land Use Map and the Zoning Map from split -zone Commercial Light Industrial (C/LI) and Low Density Residential (LDR) to Commercial Light Industrial. Address: Parcel Numbers: 7345600766 12677 East Marginal Way S This notice is to confirm the decision reached by Tukwila's SEPA Official to issue a Determination of Non -significance (DNS) for the above project based on the environmental checklist and the underlying permit application. The City has determined that the proposal does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21c.030(2) (c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Project materials including the application, any staff reports, and other studies related to the permits are available Monday through Friday 8:30 a.m. - 5:00 p.m. for inspection at Tukwila Department of Community Development 6300 Southcenter Blvd., Suite 100, Tukwila, WA 98188. The project planner is Max Baker, who may be contacted at (206) 431-3683 for further information. Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov King County Metro Rezone — 2018-2019 Comprehensive Plan Amendment Docket April 23, 2019 Page 2 This DNS is issued under WAC 197-11-340(2). Comments must be submitted by May 6, 2019. The lead agency will not act on this proposal for 14 days from the date below. ----- -419 Jack Pe, Responsible Official City of kwila 6300 Southcenter Blvd. Tukwila, WA 98188 (206) 431-3670 #4IARDate The decision is appealable to the Superior Court pursuant to the Judicial Review of Land Use Decisions, Revised Code of Washington (RCW 36.70C). Any appeal shall be linked to a specific governmental action. The State Environmental Policy Act is not intended to create a cause of action unrelated to a specific governmental action. Appeals of environmental determinations shall be commenced within the time period to appeal the governmental action that is subject to environmental review. (RCW 43.21C.075) Copy: Gillian Zacharias, King County Metro Anne Dimond Tim O'Connor Brian Kennedy State Department of Ecology, SEPA Division King County Assessor Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov Dec 1018 08:45a TG ' —6974838 EXHIBIT C p,1 Dec 04 2018 3:28PM HP Fax STATE .'WSi 1NGTO?<' • eouNry F XTNG Page 1 Cr[' Z ;I Marc? . olootrott megrasacataritrogoomorma :PE RMISSIONTO; RIMIX MUMMY SS tho wad fmd.bcinzr difr- wtra• A nit tea> lli ' • • ib, xllI$.: cEtta:nrlIIieapilitatio finrebavitip t ',z� anti. iteie etlia e0/1fi R1c '' •31 ?b a. •,ication:is beingsoxofttc4 Fith?+t lsnlwleagv gadroacttvt+. . 4rrO. lre elta,C iP o..'..0. p: te♦ ;x attctt. r z iceisM#u u e teat ..; ..: �: :rotate/ . { ;}- t.'Z .f r\ " t�igal Gaae4thSWAtrtheelimlteat'lmi� e. tlyttFoo e[mdlafpe .--.1 • , ads [a 61d thi<tty harlsticaa; 3Ds Wow dismalalpotacca ortfaaspozbkiwataAgoi the . l Zia i i pahi[venesx.te iaorma1lsn *Nast Csnlidlet �4�r,ekatl B'etga**4647attaatititti with reGugdoifem. d U•� nct7D cd<r), il{-1.tztei: on. D 0. 8 tin n u 0.A • Oa 0)7 trdr4 at u1' amiciaaed bofftra ar a� OtssAbgvistt.va*it' 10.4,00ciiiss dit;iitic t ed thtie'fn.. ineknown te the like-Tadhillarl vela —v.. dtatt • SL8SCRj9fl AND. SVWORN TO BE4c*EMEON'TEO ABIENNE ROSCI-HE1 V NOTARY PUBLIC STATE OFWASf✓tNGTON CO.^. 'AHSSION JANUARY 29,.2020 DAY Of 1 c/i aCiilantIli.. Bait aihar�nar mrattfagi at Sri// m r .. I/ o. NifY iDr alias on:rxpicop ttq 197• • c -! OG • .RECEt V • . DEC 13 20 Gomm anent Develop Name (resorted) ANTHONY C and EVELYN U JACKSON BERNARD and MENDI S ROBERTS JAMES W and YVONNE C GRAVES CARLOS and VERONICA RASMUSSEN TUKWILA SCHOOL DISTR #406 XIULAN LIN VUI NGUYEN UTILITIES SERVICE CO INC TUKWILA RENEWAL LLC KENNETH LIU and MONICA CHEATH MARTHA STREBINGER TUKWILA RENEWAL LLC ROBERT STAUDACHER TUKWILA RENEWAL LLC BONITA and GARDON ARMSTRONG DAVID LAM TRI NGUYEN CLINTON RICHARD JONES WING-HO KONG XIAN OUYANG JACK and REGINA TUCCI LARRY D HALL ALICE R SMITH JACKIE DEMPERE MICHAEL and LISA BRENNER D BOSTEDER ALAN JAMES and TOMOMI RAUNIG BAO YU LIANG LILIAN K and DEXTER CHAMBERS RANDY L and KATHY JENSEN RONDA BRACKEN SEAN P WILLMORE VIRGINIA M WHITEZEL GREGORY I EGASHIRA SUFIAN and ABEER HAMAD TENANT UNIT 110 TENANT UNIT 100 TENANT UNIT 101 TENANT UNIT 201 Mailing Address 3803 S 128TH ST 3807 S 128TH ST 3809 S 128TH ST 3805 S 128TH ST 3825 S 128TH ST 12909 EAST MARGINAL WAY S 3850 S 126TH ST 12608 EAST MARGINAL WAY S 4036 S 128TH ST 12608 40TH AVE S 12604 40TH AVE S 910 MARKET ST 4020 S 128TH ST 910 MARKET ST 4015 S 126TH ST 4021 S 126TH ST 4027 S 126TH ST 4035 S 126TH ST 12623 42ND AVE S 4044 S 128TH ST 4049 S 128TH ST 12902 EAST MARGINAL WAY S 4102 S 130TH ST 4033 S 128TH ST 4027 S 128TH ST 12822 EAST MARGINAL WAY S 12812 EAST MARGINAL WAY S 12800 EAST MARGINAL WAY S 4037 S 128TH ST 4106 S 130TH ST 4020 S 130TH ST 4026 S 130TH ST 4021 S 128TH ST 4016 S 130TH ST 4055 S 130TH ST 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S City, St, Zip TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 KIRKLAND, WA 98033 TUKWILA, WA 98168 KIRKLAND, WA 98033 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TENANT UNIT 202 TENANT UNIT 301 TENANT UNIT 302 SAFIAN and ABEER HAMAD CHAMPA ASSOCIATION INC KHIEM and THANH-HIEN T NGUYEN CHERYL BOLTON BRIAN P KENNEDY MARK and PAIGE BAUMGARTEN DENNIS M and YVONNE L DUNNE ISAAC S CAPELOUTO TRUST GENE JULIUS JR and GENE J ROSSO GENE JULIUS JR and GENE J ROSSO GENE J and ROBERTA LROSSO GENE JULIUS JR and GENE J ROSSO INTERNATIONAL GATEWAY EAST MARGINAL ISLAND PROPERTIES TENANT UNIT 210 TENANT UNIT 110 TENANT UNIT 200 TENANT UNIT 100 ERITREAN KIDISTI MARIAM ORT BLUE NILE HOLDINGS LLC BRIE R CAMPBELL TENANT UNIT A TENANT UNIT B TENANT UNIT C TENANT UNIT D BRIE CAMPBELL JONATHAN and BRIE GRABILL TINA M CARBONATTO THOMAS RL BEUSLINCH WILMA M PATAPOFF TUKWILA CITY OF DARRELL LEE QUEALEY JEFFREY M WONG ANNE M and SEAN C DIMOND BLUE NILE HOLDINGS LLC JAMES LIONEL and BRUCKER TOCHER DIANA M DOOPER 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 4010 S 130TH ST 6304 47TH AVE S 4041 S 128TH ST 12822 37TH AVE S 12802 37TH AVE S 12830 37TH AVE S 12812 37TH AVE S 12449 EAST MARGINAL WAY S EAST MARGINAL WAY S 12521 EAST MARGINAL WAY S 12539 EAST MARGINAL WAY S 3732 S 126TH ST 3716 S 126TH ST 2514 LAKE PARK DR S 12601 EAST MARGINAL WAY S 12601 EAST MARGINAL WAY S 12601 EAST MARGINAL WAY S 12601 EAST MARGINAL WAY S 12607 EAST MARGINAL WAY S 12633 EAST MARGINAL WAY S 3725 S 126TH ST 3725 S 126TH ST 3725 S 126TH ST 3725 S 126TH ST 3727 S 126TH ST 3723 S 126TH ST 3721 S 126TH ST 3717 S 126TH ST 3709 S 126TH ST 3703 S 126TH ST 6200 SOUTHCENTER BLVD 3714 S 128TH ST 3720 S 128TH ST 3726 S 128TH ST 12677 EAST MARGINAL WAY S 3535 S 126TH ST 3525 S 126TH ST TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 SEATTLE, WA 98118 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 SEATTLE, WA 98144 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98188 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 THOMAS J BALZARINI JOHN A KURTTI CHERYL M COSTELLO PHILLIP A HIBBS CURTIS ALLEN CLEAVELAND JULIAN SANCHEZ SHAWN D and KALYANA EVELYN TIM CLINGMAN HELEN HANG NGUYEN SHEILA ANN and JORD BUTTERFIELD SHEILAANN and JORD BUTTERFIELD TONY ALVARADO JUAN DELREAL ELIZABETH DE PALMA JASMINE QUIROZ DAVID and MEGAN J WYBLE R SCHNEEBELI XIULAN LIN CHAMNONG SAENGPRASEUTH SOMSACK SAENGPRASEUTH RUTHANN L DUCKERING KELVIN and LI FAYE WONG ORLANDO R PALOMA LOWELL and GLENNA JOHSON BILL D NGUYEN DAVID V LAM KHA and CHRISTY TRAN HOANG STELLA THAO and DUC-THAN NGUYEN BOPHARY and HUNG DU CAM TU THI NGUYEN THU T and RUSSEL A WENDE BILL D NGUYEN 12611 37TH AVE S 12615 37TH AVE S 12621 37TH AVE S 12633 37TH AVE S 3717 S 128TH ST 3712 S 130TH ST 3716 S 130TH ST 3720 S 130TH ST 3802 S 130TH ST 3808 S 130TH ST 3810 S 130TH ST 3816 S 130TH ST 3820 S 130TH ST 3826 S 130TH ST 3832 S 130TH ST 3836 S 130TH ST 12923 EAST MARGINAL WAY S 1432 MONTEREY AVE NE 3525 S 128TH ST 3531 S 128TH ST 12829 37TH AVE S 12815 37TH AVE S 12817 37TH AVE S 12835 37TH AVE S 1366 BENT DR 4002 S 126TH ST 4006 S 126TH ST 4012 S 126TH ST 4018 S 126TH ST 4024 S 126TH ST 4028 S 126TH ST 1366 BENT DR TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA- 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 CAMPBELL, CA 95008 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 CAMPBELL, CA 95008 • • • • City of Tukwila SEPA Review - Rezone West Half of Parcel 7345600766 from LDR to C/LI - Properties w/in 500 feet 7340600 602 23049082 2063100004 063600020 h20-6Q9o:3.51 i 20636000361 20536°0020 I206 36000u,i 7340600621 '7 45600 1;5 �7340600620 73 t560012C?I 7C4 #560C?,.? 7 cJ] 7359600310 ti feN .10 735 600355 ,359600375 735?6003 735960039.� - FT, 600160 7359600175 /359600180 7359600/90 99 5'- 600623 7 340600622 3 1 rt 0 0 0 1 J CO ZO 10 T `*t- ty: to . r.. 7345600850 7345600.385 1 735960�J28.5 r 7359 60 00107 735i 6002807359600 '05 7357600270 73`ii9600265 7.359600250 7359600240 735960015. 735.96(014,. 735960014C. 7359600135 7359600 730 7359660 : 25 7,3,E 7:3.5 a r31 /.001J46 734 73596000 5 17-3196001095 7359600235 7359'000 5 735960012.5I 73596000757340600. ----- r 59600?3 I I 7359600110 j r 3596.00740.7,3546UC?760i ,� ? 7"�96C ?.51r, 07f1i 9600'- 735% 1r�765 7...J:If.r:!061iJ 7' 2J �. _ r I-L-1_ 1 7340 f!u -1 5600: 456005 734060066'4 734.56007,�1 2384200 ) 340 73406008'12'74-f060082r_7.17#1Ei0(, —51 �' , 1- ,---'7 32-f0005r)73,r�)8C?080?734r1 �08f il19:20800005 7' �r 600821 1' i 73-�}J6Un8-1.;,z, I •--.�!3-J?t 002,: ;� 19 -r Z T •. ,r 7.3' 4._0_.5 7 t; 0 r n King� �l I � t . � _ �_,-rY 1. ;-f�. ter. �?822 Cbvn q��qq,, s ssar�s Offiee The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 12/14/2018 I l� II III; II ' 734060/080 599 Cli Lt 73406006 8-- 7340600667 73 f560100 7, r 4-F0600,7417345601075 73I 06007 57.3406h0742 7 f,i?'. 7 f? I 1040600720 0 734 56 0 1045' 7 3406 a 0 ,* 73406008-{5 evela srhe r. �-f.SF,�JI,C.S� rint G I - Commun Center 01 79003 239 102304tHYDR 7 34 20 7 345601090 A. t ti 1 7^ t4�)2.1Gp`J5 `t King Co y S-Ceet6f, Xi CouI. nty-Kmgacoliptq_sA,�ses.96.5j0mde, Ring County GIS Center JO00003r,000f8 rid 014 0 7 0 :r r Cr. c� L41 King County SEPA Environmental RevievRezone West Half of Parcel 7345766 LDR to C/LI - Vicinity Map h e r n s 120tn St L'1 Vorth eaTac Park 133rt1 7 Lat (tna _, st 24th Ave S II1151-is11 Tukwila S 11.St,, St S 11 fj r` �qt. � a Z. H l l l to±' 5. Ow r ri 4 1 51320 St titr�}s1tti J 13Bth 5t .c6T3C' Fc t t,iC' '3 a t-rt ? T3 S 142no St SeaTac E:1 VC rt if) L fy, t 4 l.t IL, Lf 1,4 th_t - 1 148th at 5+71th h`,t 4C0thAve S �auIhg,v Itt S aAv pur S Bat ruC,r at 3 Li" ii 4r 7" T _ lic Ilt(_'\V11 S 12 4t tl St Tuko:11.4 n,+„unity ,,ot. 13 3rct.` 1 d. or ,S ' ' Al _,_,o .1t] 3 S 1 i ,f1'fI I- ,II _ 4� ._• 1 `14thrSt ul 1; Foster Golf Links �J u • -? COmiM;n f,y, Develc. r r;} King Courjty As se ii O!ttioe(( IrfgC�o� ty GIS Center Kitig County, K ing county Assess or's-&ffice. fi�1gn'ur�ty�.(�I� Center The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or w arranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. King County Date 12/14/2018 City of Tukwila Endangered Species Act Screening Checklist Date: 12/5/2018 Applicant Name: King County Department of Transportation- Metro Transit Division (Attn: Ana Burns -Johnson) Street Address: King Street Center, 201 S. Jackson St. Rm 210 (KSC-TR-0210) City, State, Zip: Seattle, WA 98104 Telephone: 206-477-3065 DIRECTIONS: This Screening Checklist has been designed to evaluate the potential for your project to result in adverse effects to salmonids - Chinook, Coho, Cutthroat trout or char - as defined by Section 9 of the Endangered Species Act (ESA). If potential effects are identified, the project may need further evaluation. Please review and answer each question carefully. Consider all phases of your project including, but not limited to, construction, normal operation, potential emergency operation, and ongoing and scheduled maintenance. To answer these questions, you may need to refer to site plans, grading and drainage plans, critical areas studies, or other documents you have prepared for your project. The City will evaluate your responses to determine if additional action is indicated. RECEWED DEC 1.3 2018 Community Development W:\APPLICATIONS - Land Use Apps & Handouts\CURRENT LAND USE APPLICATIONS\SEPA Environmental Review Application FINAL 5-9-I6.doc r• If ESA listed species are present or ever were present in the watershed where your project will be located, your project has the potential to affect them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. For more information on potential salmonid presence in your project area contact the Washington Department of Fish and Wildlife Habitat Biologist for your region, Washington Department of Fish and Wildlife or use the SalmonScape tool, WDFW SalmonScape. 1. Are ESA listed salmonids currently present in the watershed within which your project will be located? YesW No0 Please describe. The project is located within the Riverton Creek sub -basin of the Duwamish River watershed. Duwamish River is mapped as critical habitat for ESA -listed Puget Sound steelhead (Oncorhynchus mykiss) and Puget Sound chinook (Oncorhynchus tshawytscha). Both fish species are listed as Threatened. Riverton Creek is not mapped as critical habitat for any ESA -listed species. Puget Sound chinook and Puget Sound steelhead are modeled for Riverton Creek per WDFW's SalmonScape but their presence has not been documented. 2. Has there ever been an ESA listed salmonid stock present in this watershed? Yesn Non Uncertainty Please describe. See Question #1. If you answered "yes" to either of the above questions you should complete the remainder of this checklist. W:\APPLICATIONS - Land Use Apps & Handouts\CURR.ENT LAND USE APPLICATIONS\SERA Environmental Review Application FINAL 5-9-I6.doc • f Tukwila ESA Screening Checklist Part A - PROJECT SPECIFICS: Project and Vicinity I. Name of watershed: Riverton Creek sub -basin of Duwamish River (WRIA-9) 2. Name of nearest water body: Riverton Creek (East Branch) 3. What is the distance from this project to the nearest body of water? On site. 4. What is the current land use between the project and the potentially affected water body (parking lots, farmland, etc)? Gravel and paved parking lots, single-family residential, and street corridors. 5. Is the project above a: • Natural permanent barrier (waterfall) Yesn NoJ • Natural temporary barrier (beaver pond) Yes' I NoD✓ • Man-made barrier (culvert, dam) Yes' NoD • Other (explain): Riverton Creek flows through an approximately 160-foot long culvert in the NW corner of the site. The stream flows through an underground culvert for approximately 2,535 feet north along E Marginal Way S downstream and north of the site. Both of these culverts are likely partial fish passage barriers at a minimum; however, these potential barriers have not been documented by WDFW at this time. 6. If answered Yes in #5, are there any resident salmonid populations above the blockage? Yesfl Non Don't known There is no documented presence of resident salmonid species in the portion of the east branch of Riverton Creek upstream of the site. The east branch is not mapped by WDFW on SalmonScape generally past SR 599. Presence of anadromous salmonids is not likely due to passage barriers downstream. \\citystore\City Common\Tcri - DCD\Kirby\SEPA to fix SEPA Environmental Review Application FINAL 5-9-16.docx W:\APPLICATIONS - Land Ilse Apps & Handouts\CURRENT LAND USE APPLICATIONS\SEPA Environmental Review Application FINAL 5-9-16.doc C ,f Tukwila ESA Screening Checklist Part B - Project Specifics: Grading and Land Alteration 1. Does the project involve grading or land alteration of any kind? Yes No 0 If your project DOES NOT involve grading please skip to Part C. 2. Will the project involve the modification of a watercourse bank between Ordinary High Water (OHW) and the top of the bank? If yes, which water course? This includes any grading on any slope leading to a river or stream, but does not require work below OHW. Yes No 3. Will the project involve the modification of a watercourse bank or bottom below OHW? If yes, please explain. Yes n No n 4. Could the construction, operation, or maintenance of equipment for the project result in sediment transport off site or increased rates of erosion and/or sedimentation in watercourses? If no, please explain. Most projects involving grading have the potential to result in increased erosion and/or sedimentation as a result of land disturbance. Yes=_No f 5. If the project involves grading, have you prepared a Temporary Erosion and Sedimentation Control Plan? Yes No n If no, are you exempt under TMC 16.54.90? Yes No n 6. Will the project result in new impervious services? Include all hard surface are such as rooftops, asphalt or concrete pavm , compacted surfaces, etc. Yes No 7. What percent of the project will be impervious surface (including pavement & roof area)? W:\APPLICATIONS - Land Use Apps & Handouts\CURRENT LAND USE APPLICATIONS\SEPA Environmental Review Application FINAL 5-9-16.doc C _ f Tukwila ESA Screening Checklist Part C — Project Specifics: Water Quality 1. Will the project generate stormwater from the creation of impervious surfaces that will not be infiltrated on site? Please explain. For the purpose of this analysis, infiltration includes the use of a stormwater treatment and management system intended to contain all stormwater on site by allowing it to seep into the ground Yes No The proposed rezone of the site is a nonproject action. 2. Will the project result in the processing or handling, storage, or treatment of hazardous substances? This does not include fuel properly stored in a vehicle fuel tank, but does include fuel or other chemicals stored on -site during construction. YesilNo 3. Will the project require long-term or re -occurring maintenance requiring the use of fertilizers, pesticides, or other chemicals? This may include landscape maintenance, bridge or parking lot cleaning, ice removal/melt, repeated chemical vegetation clearing, etc. Yes No FA 4. Will turbidity be increased during construction or operation of the project? Please explain any measures to be taken to ensure turbidity is not increased. Construction near the water or below OHW often will increase turbidity, both on -site and downstream. Yes No 1. 5. Will the project either reduce or increase shade along or over a water body? Removal of trees/vegetation or the building of over -water structures (docks or floats) will often result in a change to shade. Yes 0 No 0 6. Will the project require debris removal from below OHW of a water course? Debris includes, but is not limited to, fallen trees, logs, shrubs, rocks, piles, riprap, submerged metal, broken concrete, pipes, or other construction material. Yes No W:\APPLICATIONS - Land Usc Apps & Handouts\CURRENT LAND USE APPLICATIONS \SERA Environmenta) Review Application FINAL 5-9-I6.doc C , f Tukwila ESA Screening Checklist Part D — Project Specifics: Flow Alterations and Fish Migration 1. Will the project involve the direct alteration of the channel or bed of a water course? This includes both tempora and permanent modifications. If yes, please explain. Yes INo ✓ The proposed rezone of the site is a nonproject action. 2. Will the project involve any physical alteration to a wetland which is connected to a water course? Few wetlands are isolated most contain either surface or subsurface connection to a flowing water course. Yes 0 No ✓ 3. Will water be rerouted, either temporarily or permanently as a result of the project? if yes, please explain. Yes n No 0 4. Will a culvert be installed or removed as part of this project? Yes No 5. Will the project require withdrawal of surface water? If yes, please include amount and name or water body. Yes n No 0 6. Will the project result in the withdrawal, injection, or interception or groundwater? Examples of projects that might affect groundwater include, but are not limited to, construction of a new well, changes in withdrawal from an existing well, projects involving prolonged dewatering, installation of French drains, swales, or sewer lines. Projects that require a geotechnical report ursuant to TMC 18.45.060 should answer Yes. Yes U No II 7. Will topography changes on the site affect the duration/direction of surface runoff flows? If yes, please describe chan es. Yes n No I✓n 8. Will the project include bank stabilization? If yes, explain. Bank stabilization includes, but is not limited to, riprap, rock, logs, soil, vegetated revetments, concrete structures, or similar. Yes No 9. Will there be retention or detention ponds? If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? Yes NoJ 10. Will the project involve any reduction of the floodplain or floodway by filling or other partial blockage of flows? If yes, how will the loss of flood storage be mitigated by your project? Yes No� 11. Will project include the construction of a new wetland or waterway that is connected by surface flow to an existing waterway that contains salmonids? Yes Non WAAPPLICATIONS - I.and Use Apps & Handouts\CURRENT LAND USE APPLICATIONS\SEPA Environmental Review Application FINAL 5-9-I6.doc C , .(Tukwila ESA Screening Checklist Part E — Project Specifics: Vegetation 1. Will the project involve the removal of any vegetation? If yes, please describe existing conditions and the amount and type of vegetation to be removed. Yes I I No ✓ I The proposed rezone of the site is a nonproject action. The property is bordered by coniferous trees, lawns, and upland vegetation such as Himalayan blackberry (Rubus armeniacus) and field horsetail (Equisetum arvense). 2. Will the project involve the removal of any vegetation within 200 feet of OH W of a water course? If yes, please describe type, size, method, and amount of vegetation to be removed. A tree is defined by TMC 18.06.895 as any self-supporting woody plant, generally characterized by one main trunk, with a potential diameter of 2inches or more at breast height and a minimum height of 10 feet. Yes ❑ No n 3. If ve etation is to be removed, do you plan to mitigate by replanting? Please explain. Yes No IT Proposed action is the rezoning of the parcel. No vegetation will be removed. W:\APPLICATIONS - Land Use Apps & I landouts\CURRENT LAND USE APPLICATIONS\SEPA Environmental Review Application FINAL 5-9-16.doc SEPA ENVIRONMENTAL CHECKLIST Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision - making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of checklist for nonproject proposals: For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non -projects) questions in Part B - Environmental Elements —that do not contribute meaningfully to the analysis of the proposal. A. Background FHELPl 1. Name of proposed project, if applicable: Rezone of West Half of Parcel #7345600766 from LDR to C/LI. RECEIVED DEC 1.3 2018 Community Development Blue Nile Property Rezone SEPA Checklist December 14, 2018 1 2. Name of applicant: King County Metro Transit (Metro) 3. Address and phone number of applicant and contact person: Gillian Zacharias, Senior Environmental Planner, 206-477-7915 King County Metro Transit 201 South Jackson Street, 4th Floor MS KSC-TR-0431 Seattle, WA 98104-3856 4. Date checklist prepared: December 10, 2018 5. Agency requesting checklist: City of Tukwila 6. Proposed timing or schedule (including phasing, if applicable): Spring 2019 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. If efforts to rezone the parcel are successful, Metro plans to remodel the existing office/warehouse building for office and training purposes. Additional structures would be needed to fully utilize the site for Metro's needs. Metro has developed a conceptual plan for illustrative purposes to support the rezone. If the rezone is approved, Metro would look at expanding the structures to accommodate future training and office uses, and develop a site plan with proposed improvements as part of an application for Design Review. A separate SEPA checklist covering that development would be prepared to support the Design Review application. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Metro has identified sensitive areas on and adjacent to the subject parcel. A reconnaissance -level critical areas study has been completed and submitted as part of the application for a comprehensive plan and zoning map change (included in the rezone application packet as Exhibit G). The subject parcel underwent extensive soil and groundwater cleanup activities between 1999 and 2002 to remediate contamination resulting from a leaking underground storage tank (LUST). The Department of Ecology published its most recent review of post -cleanup site conditions at the subject parcel during 2016 (Washington Dept. of Ecology, Periodic Review Becker Trucking, aka C and D Wells Property, Facility Site ID#: 99622738, November 2016.) Blue Nile Property Rezone SEPA Checklist December 14, 2018 2 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None known. 10. List any government approvals or permits that will be needed for your proposal, if known. This SEPA Checklist supports a request for amending the City of Tukwila Comprehensive Plan and Zoning Map. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) Metro is requesting a map change to rezone the.western portion of a split -zoned property (parcel no. 07345600766) from Low Density Residential (LDR) to Commercial/Light Industrial (C/LI) consistent with the zoning on the eastern portion of the property. The LDR zone allows single- family residential development and related accessory uses. The C/LI zone allows commercial and light industrial uses such as offices and light manufacturing. The subject property is approximately 71,440 square feet in size. Metro intends to use the site for construction office employees and mechanic training activities for transit employees. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The subject parcel is located at 12677 East Marginal Way South within the City of Tukwila. The legal description is: LOTS 18-25, BLOCK 9, RIVERTON, A REPLAT OF PART OF RIVERSIDE INTERURBAN TRACTS, ACCORDING TO PLAT RECORDED IN VOLUME 13 OF PLATS AT PAGE 36, IN KING COUNTY, WASHINGTON. B. Environmental Elements [HELP1 a. Earth Jhelpl a. General description of the site: (circle one): Flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? The subject parcel is flat. Any slope on the site would be less than 3%. Blue Nile Property Rezone SEPA Checklist December 14, 2018 3 c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of Tong -term commercial significance and whether the proposal results in removing any of these soils. Soils on the property have been excavated as part of an environmental remediation project in 1999 (see question 7, below). Non-native fill was placed in the excavation. Native soils that remain include fine alluvial silt and silty sand. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. None known. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. The proposal is a non -project action. No filling, excavation, or grading will occur under the proposed action. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. The proposal is a non -project action. No project -specific work is proposed. No erosion will result from the proposal. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? The subject parcel is currently 90% covered with impervious surfaces. The proposal is a non - project action and will not modify the percentage of impervious surfaces on the site. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: None proposed. The proposal is a non -project action. No filling, excavation, or grading will occur under the rezone request. 2. Air Jhelpj a. What types of emissions to the air would result from the proposal during construction .operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. The proposal is a non -project action. No emissions to air will occur. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. None known. c. Proposed measures to reduce or control emissions or other impacts to air, if any: None proposed. The proposal is a non -project action. No air emissions will occur. g. Blue Nile Property Rezone SEPA Checklist December 14, 2018 4 3. Water 'help] a. Surface Water: Jhelpj 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. A stream, the east branch of Riverton Creek, is located in the northwest portion of the site and mapped by the City as a Type II watercourse. The water course is currently within a culvert pipe along the west and north boundaries of the property, except where it daylights for approximately 25 feet. Please see the Critical Areas Assessment Memo by Otak, dated December 12, 2018 (included in the rezone application packet as Exhibit G). Riverton Creek's east branch is mapped as an open channel west and north of the project site boundaries. Riverton Creek flows into the Duwamish River and into Puget Sound. No other wetlands or watercourses are mapped on or near the project site by King County, USFWS, DNR or WDFW. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach, available plans. The rezone proposal is a non -project action. No work over, in, or adjacent to Riverton Creek will occur as a result of the rezone proposal. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. The rezone proposal is a non -project action. No fill or dredging in surface waters or wetlands will occur. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. The rezone proposal is a non -project action. No surface water withdrawals or diversions will occur. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. The subject parcel is located outside any mapped 100-year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. The rezone proposal is a non -project action. No discharges of waste materials to surface waters will occur. Blue Nile Property Rezone SEPA Checklist December 14, 2018 5 b. Ground Water: Jhelpj 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. The rezone proposal is a non -project action. The site is served by public water and sewer. No groundwater withdrawals or discharges will occur. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals ... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. The rezone proposal is a non -project action. The site is served by public water and sewer. No discharges into the ground will occur. c. Water runoff (including stormwater): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Existing sources of runoff are roofs and pavement. The rezone proposal is a non -project action. No alteration to existing runoff control or management will occur. 2) Could waste materials enter ground or surface waters? If so, generally describe. The rezone proposal is a non -project action. Waste materials will not enter ground of surface waters as a result of this action. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. The rezone proposal is a non -project action. The proposal will not alter or affect drainage patterns in the vicinity of the site. 4) Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: None proposed. Blue Nile Property Rezone SEPA Checklist December 14, 2018 6 4. Plants jhelpj a. Check the types of vegetation found on the site: X_deciduous tree: alder, maple, aspen, other _X_evergreen tree: fir, cedar, pine, other X_shrubs _X_grass pasture crop or grain Orchards, vineyards or other permanent crops. wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? The rezone proposal is a non -project action. No vegetation will be removed or altered. c. List threatened and endangered species known to be on or near the site. No threatened or endangered plant species are known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: The rezone proposal is a non -project action. All vegetation currently on the parcel will be maintained. e. List all noxious weeds and invasive species known to be on or near the site. • Himalayan Blackberry • Creeping Buttercup (Ranuculus spectabilis) 5. Animals jhelpj a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other -sculpin b. List any threatened and endangered species known to be on or near the site. No known threatened or endangered species are known to be on or near the site. Blue Nile Property Rezone;SEPA Checklist December 14, 2018 7 c. Is the site part of a migration route? If so, explain. The project vicinity is within the Pacific Flyway, an avian migratory corridor consisting of the western coastal areas of South, Central, and North America. Because of the urbanized nature of the project site, there are no existing native terrestrial migratory corridors. d. Proposed measures to preserve or enhance wildlife, if any: Because the proposed non -project action will have no effect on wildlife in the vicinity of the subject parcel, no measures to preserve or enhance wildlife are proposed. e. List any invasive animal species known to be on or near the site. None known 6. Energy and Natural Resources 'help] a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. The rezone proposal is a non -project action. No energy is needed. Future full build out of the site of the site for commercial or industrial uses is likely to result in greater energy use than a residential use. However, future construction of a single family residential use on the site seems unlikely given the adjacent Tight industrial uses allowed. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. The rezone proposal is a non -project action. There will not be any effects on solar use by adjacent properties because stream buffers and other development standards are likely to prevent future permitted uses from being built close to, or high enough to interfere with the use of solar power by adjacent uses. c. What kinds of energy conservation features are included in the plans of this? List other proposed measures to reduce or control energy impacts, if any: None proposed. 7. Environmental Health Jhelp] a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. This rezone proposal is a non -project action. Existing contamination from leaking underground storage tanks was remediated in 1999 and is reviewed periodically. The most recent 2016 monitoring report concluded that there is no risk to human or environmental health by ingestion or contact. No site disturbance will occur as a result of the proposal. Blue Nile Property Rezone SEPA Checklist December 14, 2018 8 1) Describe any known or possible contamination at the site from present or past uses. Leaking underground storage tanks were remediated under the Model Toxics Control Act and the Voluntary Cleanup Program (codified in Chapter 173-340 WAC). Contamination from petroleum hydrocarbons, petroleum hydrocarbon constituents, and lead were found exceeding Method A cleanup levels. Contaminated soils were excavated where feasible and a groundwater treatment system was installed. Soils containing residual petroleum hydrocarbons and/or lead remain in localized areas. Monitoring reports conclude that there is no risk to human health or the environment. A restrictive covenant is recorded on the property to restrict activities that could cause ground disturbance. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. This rezone proposal is a non -project action. No existing hazardous chemicals or conditions might affect the proposal. Existing underground storage tanks are present on -site. Localized contamination is anticipated to exist as a result of past activities. There are no known underground transmission lines on this site. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. This rezone proposal is a non -project action. Toxic or hazardous chemicals will not be stored, used, or produced as a result of this proposal. 4) Describe special emergency services that might be required. This rezone proposal is a non -project action. Emergency services are not required. 5) Proposed measures to reduce or control environmental health hazards, if any: Because the proposed non -project action will not directly cause environmental health hazards, no measures to reduce or control environmental health hazards are proposed. Significant remediation was completed in 1999 and continues to be monitored. The Department of Ecology's most recent monitoring report concludes there is no risk to human health or the environment by ingestion or contact. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? The rezone proposal is a non -project action. No noise in the area will affect the proposal. 2) What types and levels of noise would be created by or associated with the project on a short- term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Blue Nile Property Rezone SEPA Checklist December 14, 2018 9 The rezone proposal is a non -project action. No additional noise will be directly created from the proposal. 3) Proposed measures to reduce or control noise impacts, if any: Since the proposed non -project action will not directly result in additional noise, no measures to reduce or control noise impacts are proposed. 8. Land and Shoreline Use Jhelpj a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. The existing use of the subject parcel is classified as a truck terminal use with associated warehouse and office use. The site has been in continual operation as a trucking facility since before annexation into the City of Tukwila in 1989. The current improvements were developed in 1975 (City of Tukwila, 2016 Zoning verification Letter to Asmamaw Mijena, Blue Nile Turcking, LLC from Jack Pace, City of Tukwila). The rezone proposal is a non -project action and would result in rezoning the western half of the subject property consistent with the eastern half and would not immediately affect any adjacent properties. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? The history of site use prior to development as a truck terminal is unknown. 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: There are no working farms or forest lands within the vicinity of the subject parcel. c. Describe any structures on the site. Structures on the subject parcel include an office/warehouse structure and a vehicle repair shop. d. Will any structures be demolished? If so, what? The rezone proposal is a non -project action. No structures will be demolished resulting from this action. e. What is the current zoning classification of the site? The subject parcel (no. 07345600766) is split -zoned. The western portion of the parcel is zoned Low Density Residential (LDR) and the eastern portion is zoned Commercial/Light Industrial (C/LI). f. What is the current comprehensive plan designation of the site? Blue Nile Property Rezone SEPA Checklist December 14, 2018 10 The western half of the parcel is designated Low -Density Residential (LDR) and the eastern half is designated Commercial Light Industrial (C/LI). g. If applicable, what is the current shoreline master program designation of the site? The subject parcel is not located within the 200-foot shoreline jurisdiction. h. Has any part of the site been classified as a critical area by the city or county? If so, specify. A portion of the east fork of Riverton Creek crosses under the northwest corner of the subject parcel within an underground pipe. This segment of the creek is designated as a Type 2 Stream in Pipe by the City of Tukwila. i. Approximately how many people would reside or work in the completed project? The rezone proposal is a non -project action. No change in the current occupation of the site is proposed. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The proposed non -project action would be consistent with the existing land use in the neighborhood in which parcels fronting on East Marginal Way have a Commercial/Light Industrial zoning classification. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance, if any: None. 9. Housing Jhelpl a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. The rezone proposal is a non -project action. No housing is proposed. Housing is not a permitted use in the C/LI zoning district. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. Blue Nile Property Rezone SEPA Checklist December 14, 2018 11 The rezone proposal is a non -project action. The site is developed as a trucking terminal with a warehouse and office space. No housing would be eliminated. c. Proposed measures to reduce or control housing impacts, if any: None. 10. Aesthetics jhelpl a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The rezone proposal is a non -project action. No structures are proposed. The C/LI district would allow structures up to four stories or 45 feet in height (subject to design review), while the existing residential zone would allow 30 feet in height. b. What views in the immediate vicinity would be altered or obstructed? The rezone proposal is a non -project action. No views would be altered or obstructed. d. Proposed measures to reduce or control aesthetic impacts, if any: None proposed. 11. Light and Glare jhelpl a. What type of light or glare will the proposal produce? What time of day would it mainly occur? The rezone proposal is a non -project action and will not result in Tight or glare. b. Could light or glare from the finished project be a safety hazard or interfere with views? The rezone proposal is a non -project action and will not result in light or glare. The proposal will not create safety hazards or interfere with views. c. What existing off -site sources of light or glare may affect your proposal? Off -site sources of Tight or glare would not affect the rezone proposal. d. Proposed measures to reduce or control light and glare impacts, if any: None. 12. Recreation jhelpl a. What designated and informal recreational opportunities are in the immediate vicinity? Bike lanes are located on East Marginal Way South, adjacent to the subject parcel. Riverton Park is located approximately 1,100 feet south of the subject parcel. Blue Nile Property Rezone SEPA Checklist December 14, 2018 12 • b. Would the proposed project displace any existing recreational uses? If so, describe. The proposed non -project action will not displace any existing recreational uses. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None. 13. Historic and cultural preservation f helpj a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically describe. There are no buildings, structures, or sites on or in the immediate vicinity of the site that are over 45 years old. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. Cultural Resources in the Project Vicinity KING 7041 is the ethnographically recorded placename sEelac for the hill that formerly existed adjacent to the subject property. The placename is associated with the mythological story of the North Wind and is translated by Waterman (1922) as "dirty face." The hill was entirely removed by quarrying in the historic period. There are no other recorded, reported or suspected cultural resources in the project vicinity. Cultural Resources within 1/ Mile of the Project 45-KI-431 is the Allentown Shellmidden Site. This large prehistoric site is located across the river from the project and is dated to 500 years ago. 45-KI-703 is the Duwamish Gardens Site. This large prehistoric site is dated to between 900 and 500 years ago. There are no other recorded, reported or suspected cultural resources within 'A mile of the project (Minichillo, 2018 Cultural Resources Screening — Blue Nile Holdings) c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. A cultural resources screening was conducted by Mr. Tom Minichillo, PhD, King County Department of Transportation Archaeologist. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. The rezone proposal is a non -project action. Impacts to cultural and historic resources are not anticipated and no mitigation measures are proposed. Blue Nile Property Rezone SEPA Checklist December 14, 2018 13 14. Transportation jhelol a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. The subject parcel is bounded on the east by East Marginal Way South and on the south by South 128th Street. The subject parcel is accessed by either roadway. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? The subject parcel is served by King County Metro Transit route 154. A southbound stop is located adjacent to the subject parcel on East Marginal Way South. A northbound stop is located across the street from the subject parcel. c. How many additional parking spaces would the completed project or non -project proposal have? How many would the project or proposal eliminate? The rezone proposal is a non -project action. No changes to parking are proposed. d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). The rezone proposal is a non -project action. New or improvements to existing transportation facilities are not needed. e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. The non -project rezone proposal will not use water, air, or rail transportation. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? None g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No. h. Proposed measures to reduce or control transportation impacts, if any: None proposed. Blue Nile Property Rezone SEPA Checklist December 14, 2018 14 15. Public Services jhelpl a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. The rezone proposal is a non -project action. There will be no increased need for public services. b. Proposed measures to reduce or control direct impacts on public services, if any. None proposed. 16. Utilities fhelpl a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. The rezone proposal is a non -project action. Utilities are not required. C. Signature [HELP] The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: %� �i lCiilC47 Name of signee a/C-I-1PrfJ C iTI14 e I S oo _ CB Position and Agency/Organizattion'OA • AVif((l Vflt�774L /94414/Is� i rlQ �+ Date Submitted: N i( / t v2 o / 0 Blue Nile Property Rezone SEPA Checklist December 14, 2018 15 D. Supplemental sheet for nonproject actions JHELPI (IT IS NOT NECESSARY to use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? The proposed change to the City of Tukwila Comprehensive Plan and Zoning Map for the subject parcel will not result in increasing discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise. The rezone could potentially incentivize redevelopment of the property that would lead to a change in use from a trucking terminal to a different commercial or light industrial use. Several of the land uses that are allowed under the Commercial/Light Industrial Land Use Designation would potentially be equally or more impactful to the adjacent Low Density Residential neighborhood than the current use, would be subject to Tukwila Municipal Code 18.64, Conditional Use Permits. Additionally, environmentally sensitive areas restrictions placed on any redevelopment will result in a greater separation between site activities, adjacent landowners and sensitive areas. Given code restrictions , the need for administrative review, and the size, location,and characteristics of the property, it is anticipated that any changes in use would not increase discharges to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise. Metro would propose a change of use for the property, subject to a separate SEPA and land use review that would involve remodeling the existing office/warehouse structure and possibly adding additional office space to accommodate future training and office uses. These changes to the site use would likely reduce the likelihood of discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise. Proposed measures to avoid or reduce such increases are: None required or needed. The Tukwila Municipal Code requires performance standards for the Commercial/Light Industrial zone, including: adherence to standards adopted by the Puget Sound Air Pollution Control Agency for odor, dust, smoke, and airborn pollutants; noise standards adopted in Chapter 8.22 TMC; and State and Federal standards for water quality and hazardous materials. Production, storage, or release of toxic or hazardous substances is not allowed in the C/LI zone. The City of Tukwila adopted the 2016 King County Surface Water Design Manual, which requires any new development to comply with specific stormwater detention and treatment requirements. Review under the State Environmental Policy Act for project -specific actions provides substantive authority to mitigate potential adverse environmental impacts. 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Blue Nile Property Rezone SEPA Checklist December 14, 2018 16 The proposed non -project action will not affect plants, animals, fish, or marine life. The proposal will not lead to any future development that will adversely affect plants, animals, fish, or marine life. Any change in land use at the site would require compliance with Tukwila Municipal Code 18.45 which will impose stream buffers and setback requirements, currently 100 feet plus 15 feet, respectively. It is likely that stream buffer requirements could increase in the near future. This will limit the amount of developable land on the subject parcel and create a vegetated buffer between future land uses on the site and the adjacent residential neighborhood. Proposed measures to protect or conserve plants, animals, fish, or marine life are: None required or needed. The site is almost entirely paved. The C/LI zone requires any development project to provide landscaping around the perimeter of the site that will improve conditions for plants, animals, fish, and/or marine life. 3. How would the proposal be likely to deplete energy or natural resources? The proposed non -project action will not deplete energy or natural resources. The proposal will not lead to any future development that will deplete energy or natural resources above and beyond other conventional commercial or light industrial development. Proposed measures to protect or conserve energy and natural resources are: None required or needed. 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? The proposed non -project action will not affect environmentally sensitive areas or areas designated for governmental protection. The project site is currently used for commercial/light industrial purposes, and rezoning the western portion of parcel no. 07345600766 would have no noticeable effects to the existing low functioning water course and wetland/stream buffers on site or adjacent to this area. Proposed measures to protect such resources or to avoid or reduce impacts are: None required or needed. The City of Tukwila has adopted a Critical Areas Ordinance codified as Chapter 18.45 TMC. The CAO addresses development in or near environmentally sensitive areas. The only environmentally sensitive area present is the east fork of Riverton Creek, which is undergrounded in a pipe. No other sensitive areas or cultural resources are mapped on or in the immediate vicinity of the site. 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? The proposed non -project action will not affect the existing land use. The proposal may incentivize redevelopment of the parcel that could lead to a change in use from a trucking terminal to a different commercial or light industrial land use. If redevelopment were proposed with the zone change, the Blue Nile Property Rezone SEPA Checklist December 14, 2018 17 development would be subject to current standards, which the existing development appears to not meet. Therefore there would be a net benefit. This is consistent with the requested comprehensive plan and zoning map amendment. The subject property is not located within the 200-foot shoreline jurisdiction. Proposed measures to avoid or reduce shoreline and land use impacts are: None required or needed. Any change in land use would be consistent with the C/LI zoning designation, and consistent with the character of the property and its urbanized context. 6. How would the proposal be likely to increase demands on transportation or public services and utilities? The proposed non -project action will not directly increase demands on transportation or public services and utilities. The proposal may incentivize redevelopment of the property at some point in the future. For uses explicitly allowed in the C/LI zone, no additional studies related to transportation or public services and utilities are needed. Uses requiring a conditional use permit or similar land use entitlement will be required to provide studies such as a transportation impact analysis at the time of permitting. Such studies would determine if there are increased demands on transportation or public services and utilities. Proposed measures to reduce or respond to such demand(s) are: None required or needed. Demands for transportation or public services and utilities are anticipated to remain the same under any redevelopment scenario involve uses permitted outright in the C/LI zone. Any uses allowed with a conditional use permit or similar land use entitlement would have increased demands on transportation or public services and utilities evaluated and addressed during permit review. 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. This proposal will not conflict with any known local, state, or federal laws or requirements for the protection of the environment. Blue Nile Property Rezone SEPA Checklist December 14, 2018 18 Otak Technical Memorandum To: Gillian Zacharias and Tom Paine, King County Metro Transit From: Jeff Gray, Senior Wetland Biologist Stephanie Modjeski, Biologist Copies: Otak: Chad Weiser, Cristina Haworth Date: December 10, 2018 Subject: Critical Areas Assessment and Proposed Rezoning Review: 12677 E Marginal Way S Project NO.: 32870.E Introduction King County's Department of Transportation (Metro Transit) requested Otak, Inc. (Otak) to identify and characterize critical areas at 12677 E Marginal Way S (Parcels #7345600766 and #73456100685) to support the potential acquisition of the properties. Metro Transit is also planning to submit a rezoning request to the City of Tukwila for parcel #7345600766. This technical memorandum presents the findings of the reconnaissance level critical areas study and Tukwila Municipal Code (TMC) review. The environmental impacts of the proposed rezoning are also assessed to support the State Environmental Policy Act (SEPA) compliance process for the non -project action by the City of Tukwila. Critical areas reviewed for this memorandum include wetlands, watercourses, and fish and wildlife habitat conservation areas (FWHCAs) as regulated by TMC Chapter 18.45 (Environmentally Sensitive Areas). The two parcels, herein referred to as the project site, are located at the corner of S 128th Street and E Marginal Way in the City of Tukwila, King County, Washington (Figure 1 — Vicinity Map). Otak biologists completed a field survey to identify and characterize critical areas and their buffers on the project site on November 29, 2018. Site photographs and figures are included with this memorandum. Methods Methods to complete the reconnaissance level critical areas assessment included reviewing published environmental documentation and completing a field visit to investigate the presence and extent of watercourses, wetlands, FWHCAs, and associated buffers on site. The presence of wetlands was investigated using the three -parameter approach detailed in the Corps of Engineers Wetlands Delineation Manual (USACE 1987) and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region (Version 2.0) (USACE 2010). Wetland boundaries were estimated for the purpose of the reconnaissance -level field survey. Wetland habitats were classified according to the Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, et al. 1979), and the hydrogeomorphic (HGM) wetland classification as adopted by Hruby (2004). Wetland functions were rated using the 2004 Washington State Wetland Rating System for Western Washington (Hruby 2004), and preliminary wetland buffer widths were determined by wetland rating per TMC 18.45.080 (Wetlands Designations, Ratings and Buffers).Ae,9 i �i DEC Gommument Develop k1project1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum_2018-1210.docx 2731 Wetmore Avenue, Suite 300 Everett, WA 98201 • Phone (425)493-5221 otak.com Page 2 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 Watercourses were identified based on indicators of flowing water and an ordinary high-water mark (OHWM), and classified according to TMC 18.45.100 (Watercourses Designations, Ratings and Buffers). Identification of OHWM was based on the evaluation of stream physical characteristics, such as: the natural line impressed on the bank, change in sediment and vegetation characteristics, wracking, erosion/scour, and silt deposits. The presence of FWHCAs in or near the project site was assessed by visual observation during the field visit in combination with reviewing available published information. Background Review Background information reviewed prior to completing the site investigation included the following resources: • City of Tukwila Comprehensive Plan & Zoning Map (City of Tukwila 2015) • City of Tukwila Sensitive Areas Map (City of Tukwila 2015a) • King County iMap (King County 2018) • U.S. Fish and Wildlife (USFWS) —National Wetland Inventory (NWI) (USFWS 2018) • Washington Department of Natural Resources (DNR) — Forest Practices Application Mapping Tool (WDNR 2018) • WDFW — Priority Habitats and Species (PHS) on the Web (WDFW 2018) • Washington Department of Fish and Wildlife (WDFW) — SalmonScape (WDFW 2018a) The City of Tukwila Sensitive Areas Map (attached) identifies one Type 2 stream within the project site, herein referred to as the east branch of Riverton Creek. The east branch of Riverton Creek is mapped as an open channel west and north of the project site boundaries and piped on site. The stream is piped downstream of the project site along E Marginal Way S from approximately S 126th Street to State Route (SR) 599. Type 2 streams are defined as Type F (fish) watercourses per TMC 18.45.100 and have a 100-foot-wide buffer. 100-foot-wide stream buffers are shown extending from the open portions of the stream channel onto the project site. No other wetlands or watercourses are mapped on or near the project site by King County, USFWS, WDNR or WDFW. WDNR and WDFW map the east branch of Riverton Creek up to SR 599 north of S 120th Place, but no watercourse is shown south of that intersection. WDNR types the east branch of Riverton Creek as a Type N (non -fish) watercourse. The west branch of Riverton Creek is shown flowing parallel to SR 99 approximately 1,000 feet west of the project site. The west branch of Riverton Creek is Type F (fish) per WDNR and a Type 2 watercourse per the City of Tukwila's Sensitive Areas Map. Per the City's Sensitive Areas Map, no FWHCAs are mapped on or within the vicinity of the project site. No areas of geologic instability or abandoned coal mines, two additional types of regulated environmentally sensitive areas, are mapped on the project site as well. Findings Site Description The project site is located within amongst residential and commercial properties. Single-family residential neighborhoods are generally located west of the project site, and commercial properties are located to the north and south along E Marginal Way S. The two parcels combined are approximately 1.85 acres in size and currently used to store small motor vehicles and semi -truck trailers in a partially paved storage yard operated by the Blue Nile Trucking. Commercial buildings are in the southeast corner. The western and northern edges of the project site are bordered by coniferous trees with herbaceous plants in the understory and a chain -link fence. Patches of invasive, non-native Himalayan blackberry (Rubus armeniacus) are also located along the fence lines. In general, k:lproject1328001328701projectdocs132870b bluenile_criticalareaslca memoltechnical memorandum_2018-1210.docx Page 3 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 the western half of the storage yard is gravel and the eastern half is paved. A catch basin is present within the gravel lot in the northwest corner of Parcel #7345600766 that provides access to a piped stream underground. Watercourses The east branch of Riverton Creek was identified on the project site. The stream emanates from a culvert immediately west of the chain -link fence bordering the western edge of parcel #7345600766. The stream has an approximately 7-foot wide bank full width and flows for approximately 25 feet through a rock -lined channel before entering a 36-inch corrugated metal pipe culvert at the edge of the gravel storage yard. Concrete chunks and other debris was observed in the channel. The stream is piped approximately 135 feet to the northeast beneath the gravel lot and turns north for approximately 60 feet before discharging at the northern edge of the property into an open channel. The east branch of Riverton Creek is a Type 2 (fish) watercourse per TMC 18.45.100 (Watercourse Designations, Ratings, and Buffers). Open, Type 2 watercourses have a standard 100-foot-wide buffer per TMC 18.45.100.C. The TMC does not state explicitly whether piped portions of streams have standard buffers or not, but the piped stream on site does not appear to have a standard buffer width per the City's Sensitive Areas Map. All commercial and industrial buildings are required to have a 15-foot set -back and all other development shall have a 10-foot set -back from the buffer's edge. Buffer conditions are degraded and low functioning due to the existing gravel and paved lot and minimal vegetation cover. The stream buffer overlaps the gravel lot as shown on Figure 2 (Critical Areas). Per DNR's typing methodology, watercourses with perennial flows that have defined channel two feet or greater within the bank full width and have a gradient of 16 percent or less are considered Type F streams unless the stream has been proven not to contain fish using methods described in Forest Practices Board Manual Section 13. Due to the perennially flowing water, channel characteristics, and approximate three percent grade downstream of 37th Avenue South and through the project site, the east branch of Riverton Creek is classified a Type 2 (Fish) watercourse. Wetlands Two riverine wetlands (Wetlands A and B) were identified off -site along the east branch of Riverton Creek. Estimated wetland boundaries are shown on Figure 2 (Critical Areas). Wetland A is located north of the subject property between the northern property edge and S 126th Street and is situated between residential and commercial land uses. Wetland A is classified as palustrine forested habitat under the Cowardin classification system, and as riverine under the HGM system as adopted by Hruby (2004). Dominant vegetation in Wetland A includes black cottonwood (Populus balsamifera spp. trichocarpa), Pacific willow (Salix lucida), Sitka willow (Salix sitchensis), salmonberry (Rubus spectabilis), and creeping buttercup (Ranunculus repens). Wetland B is located west of the subject property within the back yard of the abutting residential property. Wetland B is classified as palustrine emergent habitat under the Coward classification system, and as riverine under the HGM system as adopted by Hruby (2004). Dominant vegetation in Wetland B includes broadleaved cattail (Typha latifolia) and creeping buttercup. Wetlands A and B were preliminarily classified as Category III wetlands. Both wetlands have a standard buffer width of 80 feet per TMC 18.45.080.D. Wetland buffers on the subject property are superseded by the 100-foot- wide stream buffer as shown on Figure 2 (Critical Areas). k1project1328001328701projectdocs132870b bluenile_criticalareaslca memoltechnical memorandum_2018-1210.docx Page 4 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 Proposed Zoning Changes and Code Review The following section includes an assessment of the potential environmental impacts of the proposed rezoning relative to TMC Chapter 18.45 (Environmentally Sensitive Areas). This assessment is intended to support the SEPA compliance process for the proposed rezoning. An Endangered Species Act Screening Checklist is also enclosed with this memorandum and is expected to accompany the non -project action SEPA checklist for the proposed rezoning. Proposed Rezoning Parcel #7345600685 and the eastern half of Parcel #7345600766 is zoned Commercial Light Industrial (CLI). The western half of parcel #7345600766 is zoned Low Density Residential (Figure 3 — Existing Zoning). Metro Transit proposes to re -zone Parcel #7345600766 entirely as CLI for consistency with the existing and proposed future land use. Environmental Impacts and Redevelopment Opportunities Redevelopment with either residential or commercial/light industrial uses could create substantial opportunities for environmental improvements and enhancements of ecological functions that are currently degraded. The project site is currently used for commercial/light industrial purposes, and re -zoning the western portion of parcel #7345600766 would have no noticeable effects to the existing low functioning watercourse and wetland/stream buffers on site or adjacent to this area due to the existing legal, non -conforming use. Under new development proposals, existing legal and nonconforming land uses within the current wetland/stream buffer areas could be removed, and new developments would be required to conform to the provisions of TMC Chapter 18.45 (Environmentally Sensitive Areas) that limit or do not allow development within critical areas or critical area buffers. For example, standard watercourse buffers may be reduced only where the buffer is significantly degraded due to existing development within the prescribed buffer, provided that the existing buffer is enhanced in accordance with an approved buffer enhancement plan (TMC 18.45.100.E). The standard buffer width cannot be reduced by more than 50 percent under any land use proposal. Per TMC 18.45.100.E, any buffer reduction proposal must demonstrate that it will not result in direct, indirect or long-term adverse impacts to watercourses, and that an on - site buffer enhancement plan is prepared. Due to the currently degraded buffer conditions on site, a buffer reduction request would likely be justified and approved under any future development proposal. Allowed development or other activities within critical areas and critical area buffers —and any potential exemptions for such alterations —would pertain to both LDR and CLI zoned lands. The City of Tukwila's environmentally sensitive areas code will pertain to all zoning areas and does not differ between LDR and CLI land uses. Redevelopment may provide opportunities for mitigation and/or wetland and stream buffer enhancement in the disturbed buffer areas using best available science, with an anticipated improvement of ecological functions provided by the critical area and its buffer. Any proposed development plan within watercourse buffers would need to include a buffer mitigation plan per TMC 18.45.110 (Watercourse Alterations and Mitigation) and buffers would need to be restored to an enhanced state (TMC 18.45.110.D.2). Because all land uses and proposed development must comply with the City of Tukwila's environmentally sensitive areas code, significant impacts to environmentally sensitive areas and their buffers are not expected to result from the proposed zoning change. k:Iproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum_2018-1210.docx Page 5 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 References City of Tukwila (City). 2015. Comprehensive Plan & Zoning Map. Available online at http://www.tukwilawa.qov/wp-content/uploads/Comp-Plan Zoninq-Map.pdf. -2015a. Sensitive Areas Map. Available online at http://www.tukwilawa.qov/wp-content/uploads/2015/11 /Sensitive-Areas-Map.pdf. Cowardin, L.M., V. Carter, F. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deepwater habitats of the United States. FWS/OBS-70/31. 131 pp. Washington, D.C: U.S. Fish & Wildlife Service, Office of Biological Services. Hruby, T. 2004. Washington State wetland rating system for western Washington — Revised. Washington State Department of Ecology Publication # 04-06-025. Olympia, Washington. King County. 2018. GIS Center: King County iMap Interactive Mapping Tool. Available online at https://www.kingcounty.qov/services/qis/Maps/imap.aspx. U.S. Army Corps of Engineers (USACE). 1987. Corps of Engineers Wetland Delineation Manual. Technical Report. Y-87-1. Vicksburg, Mississippi: U.S. Army Corps of Engineers Environmental Laboratory. -2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region, Version 2.0, ed. J.S. Wakeley, R.W. Lichvar, and C.V. Noble. ERDC/EL TR- 10-3. Vicksburg, Mississippi: U.S. Army Engineer Research and Development Center. U.S. Fish and Wildlife Service (USFWS). 2018. National Wetlands Inventory website. U.S. Department of the Interior, Washington D.C. Available online at http://www.fws.qov/wetlands. Washington Department of Fish and Wildlife (WDFW). 2018. PHS on the Web. Available online at http://apps.wdfw.wa.qov/phsontheweb/. -2018a. SalmonScape. Available online at http://apps.wdfw.wa.gov/salmonscape/. Washington Department of Natural Resources (WDNR). 2018. Forest Practices Application Mapping Tool. Available online at https://fortress.wa.qov/dnr/protectiongis/fpamt/default.aspx. Enclosures: • Figures: 1 (Vicinity Map), 2 (Critical Areas), 3 (Existing Zoning) • City of Tukwila Sensitive Areas Map • City of Tukwila Endangered Species Act Screening Checklist k:lproject1328001328701projectdocs132870b bluenile_criticalareaslca memoltechnical memorandum_2018-1210.docx Otak Site Photographs East branch of Riverton Creek emanates from a culvert along the western boundary of parcel #7345600766 and flows northwest for approximately 25 feet before flowing underground through a 36-inch corrugated metal pipe (see Photo 2) and discharging into an open channel north of the northern boundary of parcel #7345600685. k:Iproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum_2018-1210.docx 2731 Wetmore Avenue, Suite 300 Everett, WA 98201 • Phone (425)493-5221 otak.com Page 7 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 2. East branch Riverton Creek enters a 36-inch wide corrugated metal pipe culvert beneath the gravel lot near the western property boundary of parcel #7345600766. 3. View of the east branch of Riverton Creek where it discharges off -property north of parcel #73456000685. kAproject1328001328701projectdocs132870b bluenile_criticalareaslca memoltechnical memorandum_2018-1210.docx Critical Areas Assessment and Proposed Rezoning Review Page 8 December 10, 2018 4. Typical buffer conditions within the gravel lot in the northwest corner of the project site View south west. 5. View of general site conditions in the storage yard and the separation of gravel and asphalt cover. View east. k:lproject1328001328701projectdocs132870b bluenile_criticalareaslca memoltechnical memorandum_2018-1210.Jocx • 35th Are b S 1241h St S 126th S1 1 ridur 3r 41 FIGURE 1 VICINITY MAP BLUE NILE TRUCKING, LLC 12677 E MARGINAL WAY S TUKWILA, WASHINGTON 4 Q PROJECT LOCATION S 1?tith St S 130th St n c m vt a as 5 3 Q O a i t S n 4 4 titer Ct .4' 1 c 1 N -rmrtrm _,,4 v 6 114,A S� LEGEND Project Boundary Parcels FEE L' 500 1,000 Otak K:IPROJECT'328001328701CADDIGIS\MXDS\ENVI RONME NTAL_VICI N ITYMAP.MXD DATE: 12/5/2018 • • Roadside Die& FIGURE 2 CRITICAL AREAS O Project Boundary Type 2 Stream -Estimated Wetland Buffer (80ft) Stream Type BLUE NILE TRUCKING, LLC Wetland -Estimated - Open 12677 E MARGINAL WAY S Piped TUKWILA, WASHINGTON Stream Buffer (100ft) Legend Parcel#7345600685 --- Edge of Pavement Parcels Direction of Flow 100 FEET 200 Otak K:IPRCJECN280Q7a701CALDIpaMXDSEMANCNMEMu CAS2.MX0 • • •• 411W41111= cc 1....cda Zgair1111.11, - • - ) 4 .4 4 FIGURE 3 EXISTING ZONING BLUE NILE TRUCKING, LLC 12677 E MARGINAL WAY S TUKWILA, WASHINGTON Parcel #7345600te S 123th Street '440- nuo,t10- Legend =I Project Boundary Zoning Type Parcels Commercial Light Industrial Low Density Residential Neighborhood Commercial Center Feet 50 100 200 Otak KiPROJECT1328001328701CADD1GIS1MXDSZONING1AAPMX0 • • City of Tukwila Sensitive Areas Map Legend ..: Tukwila City Limits • Potential Watercourse Daylighting Sites Type 2 Stream — Type 2 Stream in Pipe Type 3 Stream Type 3 Stream in Pipe - Type 4 Stream — Type 4 Stream in Pipe Type 2 Watercourse Buffer (100') Type 3 Watercourse Buffer (80') n Type 4 Watercourse Buffer (50') III Potential Wetlands • Category I & I1 Wetland Category HI Wetland Category IV Wetland E Category I & II Wetland Buffer (100) [ 1 Category III Wetland Buffer (80') Category IV Wetland Buffer (50') Slope Classifications 2 Landslide potential is moderate: slope is betaken and 4 % and underetin by 'Wearer" pemmablr sods Landslide pohnaal es h,: slope Is batmen t5% Ind W % end 3 nderam by relatively renanwrneable soils or by bedrock: also incedn all area sloping more than tpA. III Landslide Walla' is ten/ high: includes s'oping areas with mappable 4 none, of groundwater seepage and canning mappable landslide eepasitsregardess of ,tape. • Approsiman Iocatmes of coal males from Waldron. 1961 0 >n :ts« - REVISIONS if 15' SIDE SETBACK SO j 25° FRONT SETBACK cl‘' 0 \ DEC `' STORM DRAIN OFFICE �� EASEMENT Comm intt Develo EnF / -- t„ % \ '7i7 0 �^^ / 0- W -j OFFICE . \ 0 41Z King County TRANSIT CAPITAL PROGRAMS 3RAM MGR: DRAWN JEFF ARBUCKLE \ 1 • G .03 TRAINING BAY \ 'Sii PERIMETER FENCE o \ \ OFFICESPACE PROGRAM OPERATIONAL CAPACITY GROWTH AREA SOUTH CAMPUS TRLE: 12677 E MARGINAL WAY S CONCEPTUAL PLAN WAREHOUSE / :::: �:> 0 25' FRONT SETBACK 15' STREAM SETBACK PARCEL LINE 100' STREAM BUFFER EXAMPLE 1 677 OF E. MARGINAL POTENTIAL WAY USE S. & LAYOUT N SC-BN-CP-IA o ,. SCALE: Y3z TO 1' SCALE CHECK o 4. f;,� �• T 11111 y_"atial 1". it lr STO DRAIN -10 Mink O F" CE WAREHOUSE ..Ei N NG BAY 15' STREAM SETBACK 25' FRONT SETBACK 100' STREAM BUFFER 12677 E. MARGINAL WAY S. EXAMPLE OF POTENTIAL USE & LAYOUT BACK Z O co PARCEL LINE N 0 G,SCAL.E• TO 1' c co co a 3 O co R1Ly+..B: P I ..yfR R� EEC 13 Cammun Devel)pme i SC-BN-CP-1 B SCALE CHICK 018 ry nt Form WA-5 (6/76) File No.: NCS-786933-WA1 Commitment Face Page COMMITMENT FOR TITLE INSURANCE Issued by FIRST AMERICAN TITLE INSURANCE COMPANY First American Title Insurance Company, herein called the Company, for valuable consideration, hereby commits to issue its policy or policies of title insurance, as identified in Schedule A, in favor of the proposed Insured named in Schedule A, as owner or mortgagor of the estate or interest covered hereby in the land described or referred to in Schedule A, upon payment of the premiums and charges therefor; all subject to the provisions of Schedules A and B and to the Conditions and Stipulations hereof. This Commitment shall be effective only when the identity of the proposed Insured and the amount of the policy or policies committed for have been inserted in Schedule A hereof by the Company, either at the time of the issuance of the Commitment or by subsequent endorsement. This Commitment if preliminary to the issuance of such policy or policies of title insurance and all liability and obligations hereunder shall cease and terminate six (6) months after the effective date hereof or when the policy or policies committed for shall issue, whichever first occurs, provided that the failure to issue such policy or policies is not the fault of the Company. This Commitment shall not be valid or binding until countersigned by an authorized officer or agent. IN WITNESS WHEREOF, the Company has caused this commitment to be signed, to become valid when countersigned by an authorized officer or agent of the Company, all in accordance with its By - Laws. This Commitment is effective as of the date shown in Schedule A as "Effective Date." First American Title Insurance Company Dennis J. Gilmore President p{! fittAfv6.-nv Jeffrey S. Robinson Secretary RECEIVED OCT 2 9 2018 TUKWILA PUBLIC WORKS oti 12 "" Gonlrr'un\ry t Deve\oPme First American Title Insurance Company Form WA-5 (6/76) Commitment File No.: NCS-786933-WA1 Page No. 1 $t �NJF,k/ �P C.,4 �_ •b First American Title Insurance Company National Commercial Services 920 Fifth Avenue, Suite 1200, Seattle, WA 98104 (206)728-0400 - (800)526-7544 FAX (206)448-6348 Laura Lau Moniqueje Schmitt -Johnson (206)615-3017 (206)615-3141 Ilau@firstam.com mschmitt-Johnson@firstam.com Lavonne Bowman (206)615-3269 lavbowman@firstam.com To: King County Dept. of Transportation Metro Transit Division 500 Fourth Ave Room 830 Seattle , WA 98104 Attn: Rand Juliano REPORT NO. 9 SCHEDULE A 1. Commitment Date: September 11, 2018 at 7:30 A.M. 2. Policy or Policies to be issued: • ALTA Extended Loan Policy Proposed Insured: To follow File No.: NCS-786933-WA1 Your Ref No.: 12400 East Marginal Way South AMOUNT PREMIUM TAX $ To follow $ $ 3. The estate or interest in the land described on Page 2 herein is Fee Simple, and title thereto is at the effective date hereof vested in: King County, a home -rule charter county and political subdivision of the State of Washington 4. The land referred to in this Commitment is described as follows: The land referred to in this report is described in Exhibit "A" attached hereto. First American Title Insurance Company Form WA-5 (6/76) Commitment EXHIBIT 'A' LEGAL DESCRIPTION: File No.: NCS-786933-WA1 Page No. 2 THAT PORTION OF TRACTS 21, 22, 31 AND 32 OF RIVERSIDE INTERURBAN TRACTS, ACCORDING TO PLAT RECORDED IN VOLUME 10 OF PLATS AT PAGE 74, IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT A POINT ON THE WESTERLY MARGIN OF PRIMARY STATE HIGHWAY NO. 1, FOSTER INTERCHANGE TO SOUTH 118TH STREET, AS CONDEMNED UNDER SUPERIOR COURT CAUSE NO. 646846, THAT BEARS SOUTH 04°33'59" EAST 165.03 FEET DISTANT FROM THE POINT OF CURVATURE OF THE WEST MARGIN, HIGHWAY ENGINEERS STATION 76+05.30, SAID POINT ALSO BEING THE SOUTHEAST CORNER OF THAT CERTAIN TRACT OF LAND AS DESCRIBED IN OPTION AGREEMENT RECORDED UNDER RECORDING NO. 7506090402; THENCE SOUTH 04°33'59" EAST ALONG SAID MARGIN 615.17 FEET TO A POINT LYING 110 FEET WESTERLY OF AND OPPOSITE ENGINEER'S STATION 68+25; THENCE SOUTH 58°17'25" WEST 230.32 FEET; THENCE SOUTH 21°32'52" EAST 36.80 FEET TO THE SOUTH LINE OF TRACT 32 OF THE RIVERSIDE INTERURBAN TRACTS; THENCE NORTH 89°17'24" WEST 476.97 FEET ALONG THE SOUTH LINE OF TRACTS 31 AND 32 TO THE EASTERLY MARGIN OF EAST MARGINAL WAY AS ESTABLISHED BY WARRANTY DEED FOUND IN KING COUNTY RECORDS, KING COUNTY RECORDING NO. 7412090465; THENCE NORTH 18°38'24" WEST 12.65 FEET ALONG SAID EASTERLY MARGIN; THENCE NORTH 12°54'24" WEST 443.48 FEET ALONG SAID EASTERLY MARGIN; THENCE NORTH 10°07'24" WEST 333.78 FEET ALONG SAID EASTERLY MARGIN TO THE SOUTHWEST CORNER OF OPTION AGREEMENT RECORDED UNDER RECORDING NO. 7506090402; THENCE SOUTH 89°17'24" EAST PARALLEL TO THE SOUTH LINE OF TRACTS 31 AND 32 OF RIVERSIDE INTERURBAN TRAC IS A DISTANCE OF 774.30 FEET TO THE POINT OF BEGINNING. First American Title Insurance Company Form WA-5 (6/76) Commitment File No.: NCS-786933-WA1 Page No. 3 SCHEDULE B - SECTION 1 REQUIREMENTS The following are the Requirements to be complied with: Item (A) Payment to or for the account of the Grantors or Mortgagors of the full consideration for the estate or interest to be insured. Item (B) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record. Item (C) Pay us the premiums, fees and charges for the policy. Item (D) You must tell us in writing the name of anyone not referred to in this Commitment who will get an interest in the land or who will make a loan on the land. We may then make additional requirements or exceptions SCHEDULE B - SECTION 2 GENERAL EXCEPTIONS The Policy or Policies to be issued will contain Exceptions to the following unless the same are disposed of to the satisfaction of the Company. A. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. B. Any facts, rights, interest, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of person in possession thereof. C. Easements, claims of easement or encumbrances which are not shown by the public records. D. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. E. (1) Unpatented mining daims; (2) reservations or exceptions in patents or in acts authorizing the issuance thereof; (3) Water rights, claims or title to water; whether or not the matters excepted under (1), (2) or (3) are shown by the public records; (4) Indian Tribal Codes or Regulations, Indian Treaty or Aboriginal Rights, including easements or equitable servitudes. F. Any lien, or right to a lien, for services, labor, materials or medical assistance heretofore or hereafter furnished, imposed by law and not shown by the public records. G. Any service, installation, connection, maintenance, construction, tap or reimbursement charges/costs for sewer, water, garbage or electricity. H. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for value the estate or interest or mortgages thereon covered by this Commitment. First American Title Insurance Company Form WA-5 (6/76) File No.: NCS-786933-WA1 Commitment Page No. 4 SCHEDULE B - SECTION 2 (continued) SPECIAL EXCEPTIONS 1. Lien of the Real Estate Excise Sales Tax and Surcharge upon any sale of said premises, if unpaid. As of the date herein, the excise tax rate for the City of Tukwila is at 1.78%. Levy/Area Code: 2413 For all transactions recorded on or after July 1, 2005: • A fee of $10.00 will be charged on all exempt transactions; • A fee of $5.00 will be charged on all taxable transactions in addition to the excise tax due. 2. General Taxes for the year 2018 Tax Account No.: Amount Billed: Amount Paid: Amount Due: Assessed Land Value: Assessed Improvement Value: • 734060-0480-00 $ 149,091.33 $ 149,083.72 $ 7.61 $ 0.00 $ 0.00 NOTE: Pursuant to recent change in ownership, taxes are currently shown as exempt. 3. Potential charges, for the King County Sewage Treatment Capacity Charge, as authorized under RCW 35.58 and King County Code 28.84.050. Said charges could apply for any property that connected to the King County Sewer Service area on or after February 1, 1990. Note: Properties located in Snohomish County and Pierce County may be subject to the King County Sewage Treatment Capacity Charges. To verify charges contact: (206) 296-1450 or Ca pCha rgeEscrow@ ki ng cou nty. gov. 4. Condemnation in King County Superior Court by the State of Washington, of rights of access to state highway and of light, view and air by decree entered April 14, 1966, Cause No. 646846. 5. Easement, including terms and provisions contained therein: Recording Information: July 26, 1972 as Recording No. 7207260478 In Favor of: The City of Seattle For: Guy wires and anchors for utilities 6. Conditions and restrictions contained in Ordinance No. 1138, a copy of which was recorded February 21, 1980 as Recording No. 8002210461. 7. The terms and provisions contained in the document entitled "Agreement Between Group Health Cooperative of Puget Sound and the City of Tukwila Relating to Property Owner's Encroachment into City Right of Way" recorded October 3, 2000 as Recording No. 20001003000482 of Official Records. First American Title Insurance Company Form WA-5 (6/76) Commitment File No.: NCS-786933-WA1 Page No. 5 8. Easement, including terms and provisions contained therein: Recording Information: April 30, 2002 as Recording No. 20020430000157 In Favor of: The City of Tukwila For: Traffic signal loops, poles, mast arms and cabinets 9. Easement, including terms and provisions contained therein: Recording Information: September 17, 2004 as Recording No. 20040917001746 In Favor of: Central Puget Sound Regional Transit Authority For: Light rail system 10. The terms and provisions contained in the document entitled "Shared Access Easement and Maintenance Agreement" recorded September 17, 2004 as Recording No. 20040917001748 of Official Records. 11. Easement, including terms and provisions contained therein: Recording Information: November 1, 2004 as Recording No. 20041101000177 In Favor of: Central Puget Sound Regional Transit Authority For: Light rail system 12. This item has been intentionally deleted. 13. This item has been intentionally deleted. 14. This item has been intentionally deleted. 15. This item has been intentionally deleted. 16. This item has been intentionally deleted. 17. This item has been intentionally deleted. 18. Prior to issuance of an extended coverage policy, the Company will require an Owner's Affidavit be completed and submitted to the Company for approval prior to closing. The Company reserves the right to make any additional requirement as warranted. 19. Matters of extended owner/purchaser coverage which are dependent upon an inspection and an ALTA survey of the property for determination of insurability. Please submit a copy of the ALTA Survey at your earliest convenience for review. Our inspection will be held pending our review of the ALTA Survey and the result of said inspection will be furnished by supplemental report. 20. Unrecorded leaseholds, if any, rights of vendors and security agreement on personal property and rights of tenants, and secured parties to remove trade fixtures at the expiration of the term. 21. This item has been intentionally deleted. First American Title Insurance Company Form WA-5 (6/76) Commitment File No.: NCS-786933-WA1 Page No. 6 INFORMATIONAL NOTES A. Effective January 1, 1997, and pursuant to amendment of Washington State Statutes relating to standardization of recorded documents, the following format and content requirements must be met. Failure to comply may result in rejection of the document by the recorder. B. Any sketch attached hereto is done so as a courtesy only and is not part of any title commitment or policy. It is furnished solely for the purpose of assisting in locating the premises and First American expressly disclaims any liability which may result from reliance made upon it. C. The description can be abbreviated as suggested below if necessary to meet standardization requirements. The full text of the description must appear in the document(s) to be insured. Ptn Lots 21, 22, 31, & 32, Riverside Interurban Tracts, Vol. 10, pq. 74 APN: 734060-0480-00 Property Address: 12400 East Marginal Way South, Tukwila, WA 98168 D. A fee will be charged upon the cancellation of this Commitment pursuant to the Washington State Insurance Code and the filed Rate Schedule of the Company. END OF SCHEDULE B F/rst American Title Insurance Company Form WA-5 (6/76) Commitment First American Title Insurance Company National Commercial Services COMMITMENT Conditions and Stipulations File No.: NCS-786933-WA1 Page No. 7 1. The term "mortgage" when used herein shall include deed of trust, trust deed, or other security instrument. 2. If the proposed Insured has or acquires actual knowledge of a defect, lien, encumbrance, adverse claim or other matter affecting the estate or interest or mortgage thereon covered by this Commitment, other than those shown in Schedule B hereof, and shall fail to disdose such knowledge to the Company in writing, the Company shall be relieved from liability for any loss or damage resulting from any act or reliance hereon to the extent the Company is prejudiced by failure to so disclose such knowledge. If the proposed Insured shall disclosure such knowledge to the Company, or if the Company otherwise acquires actual knowledge of any such defect, lien, encumbrance, adverse claim or other matter, the Company at its option, may amend Schedule B of this Commitment accordingly, but such amendment shall not relieve the Company from liability previously incurred pursuant to paragraph 3 of these Conditions and Stipulations. 3. Liability of the Company under this Commitment shall be only to the named proposed Insured and such parties included under the definition of Insured in the form of Policy or Policies committed for, and only for actual loss incurred in reliance hereon in undertaking in good faith (a) to comply with the requirements hereof, or (b) to eliminate exceptions shown in Schedule B, or (c) to acquire or create the estate or interest or mortgage thereon covered by this Commitment. In no event shall such liability exceed the amount stated in Schedule A for the Policy or Policies committed for and such liability is subject to the Insuring provisions, exclusion from coverage, and the Conditions and Stipulations of the form of Policy or Policies committed for in favor of the proposed Insured which are hereby incorporated by references, and are made a part of this Commitment except as expressly modified herein. 4. Any claim of loss or damage, whether or not based on negligence, and which arises out of the status of the title to the estate or interest or the lien of the Insured mortgage covered hereby or any action asserting such claim, shall be restricted to the provisions and Conditions and Stipulations of this Commitment. First American Title Insurance Company . Form WA-5 (6/76) File No.: NCS-786933-WA1 Commitment Page No. 8 The First American Corporation First American Title Insurance Company National Commercial Services PRIVACY POLICY We Are Committed to Safeguarding Customer Information In order to better serve your needs now and in the future, we may ask you to provide us with certain information. We understand that you may be concerned about what we will do with such information particularly any personal or financial information. We agree that you have a right to know how we will utilize the personal information you provide to us. Therefore, together with our parent company, The First American Corporation, we have adopted this Privacy Policy to govern the use and handling of your personal information. Applicability This Privacy Policy govems our use of the information which you provide to us. It does not govern the manner in which we may use information we have obtained from any other source, such as information obtained from a public record or from another person or entity. First American has also adopted broader guidelines that govern our use of personal information regardless of its source. First American calls these guidelines its Fair Information Values, a copy of which can be found on our website at www.firstam.com. Types of Information Depending upon which of our services you are utilizing, the types of nonpublic personal information that we may collect indude: • Information we receive from you on applications, forms and in other communications to us, whether in writing, in person, by telephone or any other means; • Information about your transactions with us, our affiliated companies, or others; and• • Information we receive from a consumer reporting agency. Use of Information We request information from you for our own legitimate business purposes and not for the benefit of any nonaffiliated party. Therefore, we will not release your information to nonaffiliated parties except: (1) as necessary for us to provide the product or service you have requested of us; or (2) as permitted by law. We may, however, store such information indefinitely, including the period after which any customer relationship has ceased. Such information may be used for any internal purpose, such as quality control efforts or customer analysis. We may also provide all of the types of nonpublic personal information listed above to one or more of our affiliated companies. Such affiliated companies include financial service providers, such as title insurers, property and casualty insurers, and trust and investment advisory companies, or companies involved in real estate services, such as appraisal companies, home warranty companies, and escrow companies. Furthermore, we may also provide all the information we collect, as described above, to companies that perform marketing services on our behalf, on behalf of our affiliated companies, or to other financial institutions with whom we or our affiliated companies have joint marketing agreements. Former Customers Even if you are no longer our customer, our Privacy Policy will continue to apply to you. Confidentiality and Security We will use our best efforts to ensure that no unauthorized parties have access to any of your information. We restrict access to nonpublic personal information about you to those individuals and entities who need to know that information to provide products or services to you. We will use our best efforts to train and oversee our employees and agents to ensure that your information will be handled responsibly and in accordance with this Privacy Policy and First American's Fair Information Values. We currently maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. c 2001 The First American Corporation - All Rights Reserved First American Title Insurance Company Instrument Number: 20180504000438 Document:WD Rec: $79.00 Page-1 u Record Date:5/4/2018 11:14 AM King County, WA When Recorded Return to: Andrew Marcuse 20180504000438 WARRANTY DEED ' 5/4/2018 11:14 AM KING COUNTY, WA Rec: $79.00 Senior Deputy Prosecuting Attorney E2928390 King County Prosecuting Attorney's Office — Civil Dig EXCISE TAX AFFIDAVITS 516 Third Ave, Suite W400 5/4/2018 11:14 AM KING COUNTY. WA Seattle, WA 98104 Tex Amount:$10.00 Document Title: Special Warranty Deed 1 ST AM 0 Related Does: N/A Grantor: Bank of China. New York Branch Grantee: King County Ab. Legal: Ptn Tracts 21, 22, 31 and 32, Riverside Interurban Tracts, Vol. 10, Pg. 74 Tax Parcel No.: 734060-0480 SPECIAL WARRANTY DEED • Under threat of condemnation, and for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, BANK OF CHINA, NEW YORK BRANCH, individually and as agent for The Bank of East Asia, Limited. New York Branch ("Grantor"), does hereby bargain, grant, sell, and convey to KING COUNTY, a home -rule charter county and political subdivision of the State of Washington ("Grantee"), all of Grantor's right, title and interest in and to that certain plot, piecc or parcel of land, with the buildings and improvements thereon erected, situate, lying and being in King County, City of Tukwila and State of Washington, as more particularly described on EXHIBIT A, attached hereto and incorporated herein by this reference (collectively, the "Property"). TOGETHER with all of the Grantor's tenements, hereditaments, easements and rights appurtenant to the Property including, but not limited to. all of the Grantor's right, title and interest in and to streets, alleys or other public ways adjacent to the Property, easements for public utilities, all sewers and service drainage easements, all rights of connection to the sewers and all rights of ingress and egress and all approved leases, licenses, government approvals and permits affecting the Property. SUBJECT TO those certain permitted exceptions set forth on EXHIBIT B attached hereto and incorporated herein by this reference. GRANTOR, for itself and its successors in interest, hereby expressly limits the covenants of this Deed to those stated herein, and excludes all covenants arising or to arise by statutory or other effect. 103533818.DOCX; I Instrument Number: 20180504000438 Document:WD Rec: $79.00 Page-2 o Record Date:5/4/2018 11:14 AM King County, WA 1. Grantor covenants that Grantor is seized of an indefeasible estate in fee simple. 2. Grantor covenants that the Property is free from encumbrances, done or suffered by the Grantor, except as set forth on Exhibit B attached hereto. 3. Grantor covenants that, against all persons lawfully claiming or to claim by, through, or under Grantor, but not otherwise, Grantor will forever warrant and defend the above -described real estate. [Signature Page Follows] (03533818.DOCX; I I Instrument Number: 20180504000438 Document:WD Rec: $79.00 Page-3 i Record Date:5/4/2018 11:14 AM King County, WA EXECUTED as of this q day of Mai,l , 2018. GRANTOR: BANK OF CHINA, NEW YORK BRANCH, individually and as agent for The Bank of East Asia, Limited, New York ' ch at 11W By Name/Title: STATE OF NEW YORK Raymond L also Authorized Signatory Bank of china. New York Branch COUNTY OF On this day ersonally appeared before me J �`� D known to me to be the t j3,(.,41 c of the rantor tha executed the foregoing instrument, and acknowledged such instrument is be [his/her) free and voluntary act and deed for the uses and purposes therein mentioned, and on oath stated that [he/she) was duly authorized to execute such instrument on behalf of the Grantor. GIVEN under my hand and official seal this 3t) day of ,gJ1,.LQ , 2018. Notary Public in and for the State of N0WIk1 `atlk Residing in lid% My commission expires: o�p1D 14.5 {035338 I 8.DOCX; I } Instrument Number: 20180504000438 Document:WD Rec: $79.00 Page-4 o Record Date:5/4/2018 11:14 AM Kine County. WA EXHIBIT A TO SPECIAL WARRANTY DEED Legal Description THAT PORTION OF TRACTS 21, 22, 31 AND 32 OF RIVERSIDE INTERURBAN TRACTS, ACCORDING TO PLAT RECORDED IN VOLUME 10 OF PLATS AT PAGE 74, IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY MARGIN OF PRIMARY STATE HIGHWAY NO. I, FOSTER INTERCHANGE TO SOUTH 118TH STREET, AS CONDEMNED UNDER SUPERIOR COURT CAUSE NO. 646846, THAT BEARS SOUTH 04°33'59" EAST 165.03 FEET DISTANT FROM THE POINT OF CURVATURE OF THE WEST MARGIN, HIGHWAY ENGINEERS STATION 76+05.30, SAID POINT ALSO BEING THE SOUTHEAST CORNER OF THAT CERTAIN TRACT OF LAND AS DESCRIBED IN OPTION AGREEMENT RECORDED JUNE 09, 1975 UNDER RECORDING NO. 7506090402; THENCE SOUTH 04°33'59" EAST ALONG SAID MARGIN 615.17 FEET TO A POINT LYING 110 FEET WESTERLY OF AND OPPOSITE ENGINEER'S STATION 68+25; THENCE SOUTH 58°17'25" WEST230.32 FEET; THENCE SOUTH 21°32'52" EAST 36.80 FEET TO THE SOUTH LINE OF TRACT 32 OF THE RIVERSIDE INTERURBAN TRACTS; THENCE NORTH 89°17'24" WEST 476.97 FEET ALONG THE SOUTH LINE OF TRACTS 31 AND 32 TO THE EASTERLY MARGIN OF EAST MARGINAL WAY AS ESTABLISHED BY WARRANTY DEED FOUND IN KING COUNTY RECORDED DECEMBER 09, 1974, RECORDING NO. 7412090465; THENCE NORTH 18°38'24" WEST 12.65 FEET ALONG SAID EASTERLY MARGIN; THENCE NORTH 12°54'24" WEST 443.48 FEET ALONG SAID EASTERLY MARGIN; THENCE NORTH 10°07'24" WEST 333.78 FEET ALONG SAID EASTERLY MARGIN TO THE SOUTHWEST CORNER OF OPTION AGREEMENT RECORDED JUNE 09, 1975 UNDER RECORDING NO. 7506090402; THENCE SOUTH 89°17'24" EAST PARALLEL TO THE SOUTH LINE OF TRACTS 31 AND 32 OF RIVERSIDE INTERURBAN TRACTS A DISTANCE OF 774.30 FEET TO THE POINT OF BEGINNING. {03533818.DOCX;1 Instrument Number: 20180504000438 Document:WD Rec: $79.00 Page-5 I Record Date:514/2018 11:14 AM King County, WA EXHIBIT B TO SPECIAL WARRANTY DEED Permitted Exceptions Potential charges, for the King County Sewage Treatment Capacity Charge, as authorized under RCW 35.58 and King County Code 28.84.050. Said charges could apply for any property that connected to the IGng County Sewer Service area on or after February 1, 1990. Condemnation in King County Superior Court by the State of Washington, of rights of access to state highway and of light, view and air by decree entered April 14, 1966, Cause No. 646846, and as approximately shown on that certain survey made by King County Dept of Transportation Road Services Division, Survey & Mapping, dated December 28, 2016, and designated Suvey Job No. 16070 (the "Survey"). Easement, including terms and provisions contained therein, and as approximately shown on the Survey. Recording Information: July 26, 1972 as Recording No. 7207260478 In Favor of: The City of Seattle For: Guy wires and anchors for utilities Conditions and restrictions contained in Ordinance No. 1138, a copy of which was recorded February 21, 1980 as Recording No. 8002210461. The terms and provisions contained in the document entided "Agreement Between Group Health Cooperative of Puget Sound and the City of Tukwila Relating to Property Owner's Encroachment into City Right of Way" recorded October 3, 2000 as Recording No. 20001003000482 of Official Records, and as approximately shown on the Survey. FlEgvintErg, including terms and provisions contained therein, and as approximat4yO �s gwDorft Survey. Recording Information: April 30, 2002 as Recording No. 20020430000157 In Favor of: The City of Tukwila For: Traffic signal loops, poles, mast arms and cabinets Easement, including terms and provisions contained therein, and as approximately shown on the Survey. Recording Information: September 17, 2004 as Recording No. 20040917001746 In Favor of: Central Puget Sound Regional Transit Authority For: light rail system (035338I8 DOCX;I ) Enstrument Number: 20180504000438 Document:WD Rec: $79.00 Page-6 o Record Date:5/4/2018 1.1.:14 AM King County, WA The terms, provisions and easement(s) contained in the document entitled "Shared Access Easement and Maintenance Agreement" recorded September 17, 2004 as Recording No. 20040917001748 of Official Records, and as approximately shown on the Survey. Easement, induding terms and provisions contained therein, and as approximately shown on the Survey. Recording Information: November 1, 2004 as Recording No. 20041101000177 In Favor of: Central Puget Sound Regional Transit Authority For: Light rail system Any facts, rights, interests or claims that may exist or arise by reason of the following matters disclosed by an ALTA/NSPS survey made by King County Dept. of Transportation Road Services Division, Survey & Mapping on December 28, 2016, designated Job Number 16070. (A) Fence meanders along the south property line of the subject property by an undisclosed distance; (B) Surveyor notes the sound transit easement for an elevated track guideway granted by recording No. 20041101000177 and listed in title report exception 11, affects the adjacent king county metro transit property to the north of the subject property site and doesn't encumber the subject site; (C) Slope area crosses the south property line onto lands of others by an undisclosed distance; (D) Slope area is noted on the south section of the subject property. 103533818.DOCX;1 IN THE SUPERIOR COURT OF THE STATE OF WASIiINGTON IN AND FOR RING COUNTY THE STATE OF WASHINGTON, ) VB. Petitioner, - NO/ 646846. STIPULATION AND,•ORDER SQUIRE INVESTMENT COMPANY, a • woBhIngton corporation; et al., '14MENDING DESCRIPTION Item No. J Respondents. IT IS HEREBY STIPULATED AND. AGREED by and between. the parties hereto that the description as to Item No-. 3 contained in the Petition and Order Adjudicating -Public Use be)amended'ta conform to Exhibit ."A" attached hereto and made a part hereof,and that an, order of the above named court be entered amending said description to•conform to this stipulation. DATED. this. ' " day of npri]. ` , 196.E JOHN J. O'CONNELL Attorney General. ie.• PAssistsnt Attorn General Attorneys for Petitioner-.; /7 .Guua i'• it SHORT, CRESSMAN a.CABLE Attorneys ORDER R D E R Thie matter coming on fur hearing bAsed on the forrfoing, stipulation, and the court being advised in the premises and con- sideringthe-records and files herein, now, therefore, IT IS ORDERED that the description as to Item No. 3 . contained -in the Petition and Order Adjudicating Public URe filed herein he, and hereby is amended to conform to Exhibit "A attached . hereto and 'made a part hereof. ,DONE. IN OPEN COURT this PA` day of Presented by: .JOHN- j. O'CONNELL .Attorney.General Approved as to form -end . Notice of Presentation waived': ta'oa� l SHORT, CRESSMAN a CABLE R T:L. HOLTZG N, Spectal Attorneys forIReapondante Assietent Afford y General `Attorneys -"for Petitioner. EIHIBIT ITEM NO. 3 PARCEL NO. 1-2941 INTERESTED PARTWAYNE C. SUWON, individually and as trustee..., and FLORENCE SUTTON, his wifer.EDNA L. TYSER, • ,cZnTT:THI7LT INC, a aniqotgOI• • • INPOIRTIga: That portion of tract 10 lying south of o linc running' aaat and west midway botwocn the north and south' boundary linos of said trnct in accordance with a • survoy.madc.by H. W. Rutherford; and North 25 feet , ALLiin Riverside Interurban TrCts, According to; . . • plat recorded in -volume 10 of plate, page 74, in K1.ivg.E0unty, Washington. • .The lands being herein condemned contailven arca of 43,760.sguara feet.radre or less, tho specific details concerning..all of whiCh-', may,be,Iound within'that certain map of:definite aoCationnoW:. of record and on file. in the Office•of;the Director Of' HighwaSra, at Olympia, Washington. bearing date of approval September 4, 1963, revised April 6, 19:55r and the center line. of which is also of record in Volume 3 of Highway Plats,,page..75.,...uGder:... Auditor's File No. 5717325, records of Ring County, Stae Of . • -PRINARY. STATE HIGHWAY NO. 1 (SR 99) FOSTER -INTERCHANGE- TO SOLT:i • IN THE SUPERIOR COURT OF THE STATE OF.WASHINGTON IN ANG FOR RING COUNTY :fGE.SiATE OF WASHINGTON, , Petitioner, .• pgDIRXINVESTMENT COMPANY,' a.WaeliteatOn corporation; No. 646846 STIPULATION FoR JUDGMENT ) AND DECREE OP APPROPRIATION f riem No. - •- 0> rtIsifEREHY STIPULATED A80c:A4EPPIbY and between-'.the-'1: Etate.trfifatihington. petitioner in the abOVe7entlod 00080 eCt.ing..by...and.through,John j. O'Connell, Attorney General. ond,•..' ,Holtzclaw,- SPeclul AsAisian-AtorneYdOnerAl',.failciA ...,.the.:reepoAdents. Wayno c. Sutton,-. individuallyand•ris ET66i44,' .,:nndplortnce 'Setton, hin wael EdnaLi Tyrer, -a Widow; end Waehington. Asphalt Co., Inc.. a Washfngton corporation, all epPeering by Short, Crruismnn 6 cable ihelr.attornoys';- as . . ' an:order adjudtcati.ng:pubIle use...Wen-enteiad t,11paPo-erititleci court in the'ebove.entitled.'Matier-ontheeth,.. 90tpher, .1965; and 7.• the.inictril in int‘rent.heicto,_ uulanne6int .to • tiie!antrY:.Of daid order have nlreed upon a settleMent.pf•thetT,. diffCrenceS herein for thu sum of.Twenry-uoven Thouuend Ten'apri 00/100thirDollara ($21.0111.001, Including -5100.00 coste. pursuant to•se-..ition 2. chapter 125. Laws of 1965, Ex., ions., -and atatokOky- coUrt coat:, pursUent CO 1104 4.84.170, whiCh.amount shall be 61.1 • and, complete compensation for the land taken and appropriated _herein, an 'acre particularly deecribed in the- petition and In "A",,1frolny Is, 76. 1, attached to the petit.lun now on file drain,now, therefore. ET;IS FURTHER STIrULATED AND AGREED between the'partiee hereto. that- the petitioner may forthwith cause to be entat'ed herein, i.: Judgment and Decree of Appropriation, appropriating fie •title -to the Stete•of Washington to the proporty an set • forth'l'n`thelpetitton end en deecribed in. Exhibit "A". 'being -Item No. )y:- attached to the petition In this platter nowon,file, • that a etd,:judgment arc. Decree of Appropriation shall contain-e. judgment-thet the'State of 'Washington shallpey to the treasurer of King"COUnty the sum of One Hundred Five-end.AS/10Othe Dollars 1r($105f135) In satisfaction of the lien• for• taxes. owing and.pey-' abl.e;: upon: -the lands being acquired hereby;. and' further- that the 5tatorityaehingtonshall pay into the regietryof the:court the feaid.evn. of.Twenty-s1x Thousand Nine Hundred.. Four: And- 15/10(ithe'- Dollere (S26;904'.15), including all stetutory.,coste, forthe. • benefit of all responder ie herein as their interests miy- appear.;. which;amdunt.-ehall be full and complete- compensation for the 'land.ao-taken andappropriatedherein, and, upon the' peyment:.of • said money into the registry'of the court,. the•State.'Of. wash ington shall be entitled tofull and complete poeneesion and uae of -said' property' and property rights no'epproprlated,:ex- cept thee In the event the ronpundontu herein shall Le or become the successful bidder or sub -bidder for- .paving of any portion of .that. -highway project -identified. by the petitioner an Primary 'State Highway No. 1 {SR 99), Foetur interchange to South lleth St., the. respondents shall have the right to use and occupy rent ,free those- port'ionc of the proporty herein deecribed located outside the area upon which such highway facility will be constructed to operate en asphalt plant, and, in such event, the. respondents shall remove all equipment and vacate said premi-ee eithinthirty (30) deya followinq.completion of. said ContraC.t•;or ■ub-contract. SfGNED.AND DATED 'this ./✓� •day; of April,: 1966.' _.. JOHN J.-O'CONNELL Attorney General Robert L. Holtzcl SpeClal A oetstant Attorne - peter - Attorneys for' Petitioner. j.otu4_ " SHORT, CRESSMAN 6. CABLE - Attorneye.'for Reepbadente. IN THE SUPEP.IOR COURT OF THE STATE OF WASHINGTON IN AND FOR KING COUNTY 'TIE STATE OF WASHINGTON. Petitioner, ) No. 646846: ) ve. JUDGMENT AND DECREE SQUIRSINVESTMENT COMPANY, I - a Washington corporation, et el.,) APPROPRIATION Respondents. ) Item No...3 • Thie.cause of action coming on duly end -regularly .'day before the above entitled court upon a written stipulation., for Judgment and decree of appropriation, the petitioner,'the. ;6tate`of Washington, appearing by John .1 O'Connell, Attorney General, and Robert-L. Holtzclaw, Special Asaietant-Attorniy General, and the respondents, Wayne'C. Sutton;_ individ uslly ,and as trustee,. and Florence button, hie wife, Edna I.:, Tyrer," a widow( and Washington Asphalt Co., Inc., a Washingtoncorpora tion, all appearing by Short,. Cressman, 6. Cable, their attorneys, and the Court being satisfied by proof -that all parties interested. in: the• lands, real estate, promises and other -property deecribed':. )1 in'the petition herein and as hereinafter specifically -eat forth,- N .0' have been, dilly and legally served with- notice of• thinproceeding-• •�a- N- as required by law; and after considering. the written stipulation --W :filed. hsreln concerning the lands: real estate, promlees and other y,- property sought to be appropriated end used by the State Of Wash-• ington, said petitioner, for the purpose of a -public road and • highway; and having found therefrom that the damages, including the value of the land appropriated, resulting. to all persons and parties interested therein by reasun,of such appropriation of • the. lends; real estate, premises and other property hereinafter described, are, in accordance with the findings -of the court, • :in -the sWn of Twenty-six Thousand Nino Hundred andno/100the ..Dollars.,($26,900,00), not• including costs, as.e proper. amount. and .,award to:be paid•by the petitioner herein, of,which total amount there- ie owing and payable for.taxes to• the treasurer of Ring •County the sum"of One -Hundred Five and B6/100ths Dollars ($):O5.g5),- now, thereupon, IT IS,HERERY ORDERED, ADJUDGED AND DECREED'That•com- •peneation.be made in money In the -sum of Twenty -six -Thousand. Nine. Hundred' and O0/100the Dollars ($26; 900. 001,.not• including boeta,..to all. owners, tenants, encumbrancera nd•.all other. persons interested therein, for the approprlstlon and use by ...said petitioner of, the following described lands; reel`eotate,. '.premises„and.other property in King County,'Waehington, to -wit, 11. 54 %r%2?3 • ITEM NO. 3 PARCEL NO. 1-2941 INTERESTED PARTIES; WAYNE C. SUlTON, individually and as trustee, and FLORENCE SUTTON, hie wife; EDNA L. TYRER, a widow; WASHINGTONASPHALT CO., INC., a Washington corporation. DE SCRI Px'zon : Thai portion of tract 18 lying south of a line running east and west midway between the northand south boundary linee'of said tract in accordance with a purvey made by H. W. Rutherford; and. North 25 feet of.tract 19; t ALL in Riverside Intarurbun Tracts, according to plat recorded in volume 10 of plate, page 74, in King County,'Washington. 'The,lande being.herein condemned contain an area of 43,750 square feet,more or lees, the specific details concerning all of which may be. found within that certain map of definite location now ' ofrecord and on file in the office.of the•Director of Highways -- at'Olympia, Washington, bearing date of approval September 4, .1967; 'revleed April 6, 1965; and the center line'of which is --s Teo of record in volume 3 of Highway Plats, page .75,'under • •,'Audiior's File No. 5717325. records of King County, State. of W'aehington. 711, Rini: iou'tty Tr,.,,,..,... r thorn r. r. ^uln :,uuli ,...t ...:..:.:.. ... L'L°F ._tazt.0 it, tee in ton thiu[,y_ D^Pat9 is i„• wnty PRIMARY STATE HIGHWAY NO. 1 (SR 99) FOSTER INTERCHANGE TO SOUTH 118th ST. eta 54 met1274 IT I6 FURTHER ORDERED, ADJUDGED AND DECREED That re- spondents are entitled to $10U.00 costs pursuant to section 2, chapter 125, Laws of 1965, Ex. Sass. IT IS FURTHER ORDERED, ADJUDGED AND DECREED That re- epondente Wayne C. Sutton, individually and as trustee, and Florence. Sutton, his wife; Edna L. Tyrer, a widow, .and Wash- Lngtdn Asphalt Co., Inc., a Washington. corporation, • sip entitled to their statutory court costs pursuant to RCW 4.84.170 In the eum Of, Ten and no/100the Dollars ($10.00). ' IT I6 FURTHER ORDERED, ADJUDGED AND DECREED That upon payment of the sum of one Hundred Five and 85/100ths. Dollars '(5105.85, to the treasurer of king County, andthe.further. pay- ment into the registry of the above entitled court of the sum. •of Trenty-elk Thousand Seven Hundred Ninety-four and 15/100the -.Dollars ($26,794.15), together with all statutory costs; heroin taxed' at one.Hundred Ten and no/100ths Dollars (5110,00),'the --petitioner, the State of Washington, shall.be and become the .,owner in feesimple of, the lands, real estate, premises and appurtenances and other property sought to be appropriated herein;. and shall be entitled to enter into poseeselon thereof and to take, hold,. own and at all timee thereafter uee and poseese the same, and that such payment shall be in full for the taking, condemnation and appropriation and use of the same, except that intheevent the respondents herein shall be or become the successful bidder or sub -bidder for paving of any portion of that highway project identified by the petitioner. as Primary StateHighwayNo. 1 (SR 99), Foster Interchange to South 118th St., the respondents shell have the right to use'and occupy runt free those portions of the property herein described located iei 5-1e1i27b-- outside the area upon which such highway facility will be con- structed to operate an asphalt plant, and, in such event, the respondents shall remove all equipment and vacate said premises within thirty (30) days following completion of said contract or sub -contract. IT IS FURTHER ORDERED, ADJUDGED AND DECREED That. upon payment of oiid award (lees taken) and costs into the registry of the court in this cause, the clerk thereof be, and 1■ hereby ordered and directed to satisfy said judgment and to hold such sum of money for distribution subject to the further order of this court. DONE IN OPEN COURT this ,�f•i .day Of April. 1966. Presented by: . JONN. J. O'CONNEI,I, •'Attorney General '..- Robbrt' L. llpltaclay Special ' Asnietant, Attorneyy((,,�Eeneral • • Attorneys fur Petitioner .i U 'D G Approved as to form and Notice of Preeentetion.waivedi_ 30- Short, Creasman6 Cable Attorney for Reepondente ID. '1.i1: '..I ;,-. Te:6 STATL 0? '. 'AS:;il:'JI'u:: AN TII1 STATL tit hAbil f.:JT•.h., 1 ) ' Qy Pet_tlhner. ) ,.,,. 4)6846 ... . 12 1 . wW--;%frPr !,icl) D)}^^;:t OF by SUiI II.f. INVEfITM:'N1 ,;JIiPANV, a washtngton_c:.)rp-)rat:•,n, ) APP?r:YRIATIOi: at al.. • :esoundcnts. I stun cu. 1 Thl r,. c:nuec :,f ,.:t,.,n lL.,.. r1:I ac:. 1egular Ly ;".;r before the abo::e entitled cc.urt, a,id a jury of -twelve persons • being •5u 17-+.npare lie,: ere: :;')o n. 1:•) •arcerta i.a. determine and' nsinrd the Cmmp%nsatlnn to 1x. ,a, ,,rvy to th.: ,where. tenants.; .nc`,: lnft:t'.r,, .,.I:: i.,'...�tl.,•t, u., :vl.;. 1'tr) estate, ;'r.:,;r i. t:c.•� an': i,thc •: ll prOrel tv as drrnage.:=, :f a::v, free thr cttabllannert. COoatrOc`i„n h - n mAJet.gnon,e ,f ot. ,f.: j,e , n .;I h.n ay 1, 1 1 t1 ,ut c ri-n) ,Late I - ,hway 0 1: the jury ,nt rn . 'Mt���pp In,r 1t,: e 1_C1: .1. 4,, 10:n .i ,' ). 1.'66:' the octtt:.:rltor: ing ty •»••te ... .n, • tt , -:e .nral.. . nd Robert (:. . . c•�r:C tii t:rt nt i•.�rnl_ ornr,yn. the re.spfhtv..,nt -.. e till ll!1„illi lr, ,10t1 �..: n'J L, u�.•... ..nabieo aril R,.ddull, Ntll.l.nron, t1,tncy7, .1n.1 the r<•_;.M)i;.;,:nl ,. r..c.l „n. rn.• :.1: unc„n L, I ?EEL 60Km thi, an] f.”.rth,r ,at;5Aci. :y 1! Aa.1 landt. rt.a7 ,ou'jht •t-ether Acct,s • .-"Piev.- An') .1 tnc p,,-.9e,ty -to the l',;ht . . , . acquired herein ta ,eid ref..,9oi,..ieht,., is a !Loy y hr-..!n7 : . rn thin act:un ' Atv! ha;f•.ng the. • a, behalf ,f rvS,n1c!wIts concel-ninz the Lands 17:al r,:tate. th C111,111-14th Valakf th, la" renilt i.nq t ll PerSon, larvi,. real L.,.‘tate, In other ?,,:yerty he,.cinal'tcy xn th, ofThr and hcreln; anf: J . 2 ';lapt.,1- Rai 60 tRW99a ..• r. ti paid herein at thc I oz t5 ,lepcalted intc thrregictry cnt it lcd Cwirt NOW THE/011Y- In ace,r,lan,e wit!, the ek:,J..,.ct the jury returiA and ente,,, ht,te. In. .1r,, 1.!,e ,r10. court b, Inc r11 I IV ad V l.fitNi IT Is tn.tnv DECREEb ;Mat Three Jundt,': iNventy,five tho!)sa,3 and no.1., Ci325.000-n01 is the ,arrOunt of compcnEation. together wUh all statutory CoetS, intere.t, to be paid tra.o the court heroin by . 'Petitir,her for fc owne.l., clant. enc,mbrancere, anti ot.11,7 per.onu 1.nterented thereiii f,A• the appropriatio1, aol usn. bj, sa pet1tIonerr, right -Jf 0 tn ,tatc roafl and hi4hwe.y the f011uwinv de0crIbe,1 teal estate. ?remities and other • ' property, together with i:Icludinq air, view and . • 11qht, •cf 'the abutt.rn9 property tc the right nt wAy being 0 In frosa'ia respon.icht, In Ul Ivy ,:ounty, ';4'03hington, to (MP U PL 60 MO oui • ITEM H0. / PARCELS 1-2939 C 1-2944 INTERESTED PARTIES' SQUIRE INVESTMENT COMPANY, a Washington Corporation; RIVERTON QUARRY DIVISION Cr PUGET S0UND BRIDGE AND DRYDOCK CO. DESCRIPTION: PARCEL "A" All. shot part of the following described Tract " " lying easterly of a line drawn • parallel with -end being 110 feet distant Wcstorly, when measured at r19ht angles end/or.rad;ally from the Tl Line Survey of Primary State Highway No. 1, Foster Inte change:... to South 110th Street, • PARCEL "8" All [hat part of said Tract "X" lying westerly of the above described Percel "A'I end -easterlyof aline described as follows: - - •Eegin at a 'Point•110-feat distant:easterly, when measured et.ri ghtangles from,•seid F• 1 Line'at i1•Ighw4Englneer! s Station-Fl 68+25; thence South•58.17'25"",Host-2j0;32 feet; . -thence -Sodth• 21. 33' 52" East 100 feet"to a point, and -the -end-of thislinedescription, TRACT "Xn Tracts 19, 20, 21, 22, 31, 32 and Riverside Stone Quarry, Riverside. Interurban Tracts, according to plat recorded in-y0lume 10 of Plats, Page 74, in King County, Washington; EXCEPT portion tonveyed'to State of Washington for Secondary State Highway No. 5-N;•. ALSO EXCEPTTHE North 25 feet of said Tract 19. - - 'AIRttEL "C" AI-f:thet pert of the following described Tract 'T" lying Westerly Of -a line deecrlbed. .ay;fol'lowe: - - - -Begin at-e:point 30 feet distant easterly, when measured et rightanglesfromtheE. -,Marginal Way. Center line Survey of said Primary State Highway No, I et HIghway.Englneer'S Station:EM'1. 10+00; thence. northwesterly 300.7'feot, more. or less, to a point 50 feet dtrtent;easterly, when measured at -right anglesfroni-sald Center Line at Highway ' Engineer's Station EHH 13+00;,thence northerly 380 feet, more or less, to e. point 110, •'felt distant southerly, when measured radially from said T. Line et highway Engineer's ,Stetion FI 94+00, .and the and of. this Ilne description.' TRACT. „y„ That certain portion of Section 10, Township 23 North, flange 4 East, W.H., In King -County, Washington described as follows: eeg1'nning at the northwest corner of sold Section and running thence South -along the West line thereof. 1160.66 feet to a stone monument; thence east at right angles 924.51 feet to a stone monument In the east .line of East Mirginel Way; thence South- 13.05'00" East along_ sold. East Marginal Way 1.112.14 feet to the true point of beginning;. thence.continuing-South 13°05,00"East 612.46 feet to the east line of Goverment Lot -15; thence North 0'-4'10,7" ,rest 628.61 feet; thence South-76f55'00" West 141,55 feet to the true point of beginning; EXCEPT -that portion of sold Government Lot 15 which Iles south of the Worth 50 feet of said Government Lot. iEfl Q MU 995 ITEM N0.j. (Continued) The lends being herein condemned contain an ere,. of 320,730 square feet, more or lass, the specific details concerning all of which may be found within those certain maps of definite location now of record and on file in the Office of the Director of. - -.-Highways at Olympia, Hashington, bearing date of approval September 4,: 1963, revised •Aprl.l-6', 1965-;-and the center line of which is also of record In Volume 3 of Mlghaay • Plats, pages.74 and 75, under Auditor's file ilo. 5717325, records of Ring .County, Stete'of:Washington, `.-TOCETHEnWITH all rights of ingress and egress, it any.(including.all existing, futu re orpotential easements of access, light, view end air) to, from and between said Primary'State Highway No. I and the remainder of said Tract ''7 . In Patud tn:_, . PRIIIAHY STATE HIGHWAY MO. I (SR 99) FOSTER INTERCHANGE TO S0. 118th 5T. r ;r I-'r h1r0,7 Ica- ....... (rpe,r., • County Tree ' er. (81.N5 - 8-24-65) Rffl 60 Rite 999 IT'IS FURTdi:R ORDERED, ADJUDGED AND DECREED That upon pay- ment.of the sum of Two Thousand Four Hundred Ninety-two and 53/100 Dollars ($2,492.53) to the treasurer of king County, and the further payment into the registry of the above entitled court of the sum of Three Hundred Twenty -Two Thousand Five Hundred ''Seven and 47/lu0 Dollars 5322,507.47), together with all statutory costs in a sum to be taxed, including $100.00 pursuant to • Chapter 125, Laws of 19.55, Ex. Sess.,• together with coats pur- oua.it to :2CW •..tt.i•0, plus interest, the petitioner, the State • of Washington, shall be and become the owner in fee simple of.- • the .i ands,. real estate, premises and appurtenances and -other property sou. -;at co oe appropriated herein,. together with the access rights including air, view and light of the•abutting ."property'to um :ignt of way being acquired 'herein from said . recjonder.,a, and shall be entitled to enter - into -possession.. thereof an,1'to cake, hold, own and at _all tines thereafter. uee. ant possess the same, and that such payo.onc sra11 be in full'for taking,. condemnation and appropriac-cn arc use of'. the'same. • IT IS FURTHER ORDERED, ADJUDGED AHD DECREED :..,,.' upon.lpay ::.ent of said award (less taxes:, costs and interest into.the • registry of the court in ..•Ls :ause for the account of respondents • -Squire' Investmont.Company and.?ogee Sound Drido,. s Dry dock "the clerk thereof. be,.and is r.ereoy orderoo-..... ._rested to. satisfy said judgment and to .'.oli such sum o:.:.c.:o, `.or distri- bution botween said respondents pursuant to the furc.•e.- order of this court. ST IS. cURddR ORDERED, ADJUDGED AND Si..c .cli0'That the peti-. tio:,ur, during its construction of the highway lard. to be c....,tructoc upon the area acquircc by this action, shall deposit :?roximate:y 107,000 cubic yards of dirt material upon property owned by respocc-_nt Squire Investment Company' located on the west lilt 60.11141.997 side of that county road known as Gant Marginal. Way South in Ch...inmediate •,Letnity of parcel 1-293'+. Saki appror.lmete gwanti.Ly of, d.i.rt ,hat lo) ):, - Lt,,a teal'. -an an the now right of way 11nc on the east -1de of Parcel 1-2939 where • petitioner will be making a slope on respondents' remaining land.. - IT IS FURTHER 0W0}-:R1D, Ai)JlinGED ADD DE['REs:o Thnt [luring the construe ti.on of the highway facility to be constructed upon . ': the area acquired by this action the parent and basalt rock which will be remo:,ed•from the slope we• t'of the new ri.ght.of. way. 1111.e on the east side ofParcel1-2939, which slope .is' located upon the resp,ndents' rn,nalning. land, shall-re,nain the . property of. respondent,. Said rock, presently, consisting. of ' approximately 6.25) cubic ynrde; shall he stock-ptLed by the petitioner on 'the remaining property Of the respohdents north... Of. the C. C.- Lets15 Donation Land C1a1m'Llne. IT IS FURTHER ORDERED, ADJUDGED AND=DECREED-that at the :tinier the pet.tt ioner,'the State of Washington, becomes the owner. - ofthe property arid property rights ,sought to be appropriated. herein ashercinbcfore prc•-ride, all. quarry rock et that time - removed Cr,m its native state, -.au that a11`that is 'left to do to such rock to to haul it away for retail .Sale -or to the.- crusher plant. shall be an.l remai,t the property of the res(ondents: who nha11immediately remove It _'rem the area to be. -acquired • • by this .action and fni.ling Lc so remove said material respondents' shall forfei. t: their interest: therein. • 4EFL 60 1Y1Mi 993 TI' I7 r,Onl uEu oianA .:U. 0L''J111Y'VO AND DI'RREEO That. • during the cuur,e of cat,: constroot l.on, the petitioner Ye and ' lt hereby to. ordurnd to con:: l:ru•:1. a 14.Luot. wide.dlrt.r'amp- •`: uv1. c!ing rc•n::unab It vol L:uloa nacc:r.: to and trot: Otto elevated grade of. Ecst Marnrnal Way South (as that grade w.11 exiet .following the Alumplet:lon of conetructionl, whleh temp ot,a)1. .descend in an easterly or suntneantorly direction front the ntw .grade of Oast Marginal -Nap South to the. cxisting elo0at.ion of rcopondentn'- raid propertyand shall be.placod ottlter at the. - 1ucati.om whuro the ex lati.ng r]irt road in'tht extreme llorthwes terly, l:prnrT of 'respondents' r..;t, prOporty 1nteit'secla with trout Marginal bay South, or. at respondents' option,at. any. place to the South thnrenf -'lo:: (he clovated portion of sa11 East , Metr (I.nnl Way dut,to. - - rl' [ 1,q,,t!(ER ADJU 4 D AND:DI'CACLD That' O fter.eun.aru..t t r l �, ,.,i t lun,:r Lhc clovat ion of .rite' t4,i t t'ruparty boundary 11:e 1 0-tln ay right oE. wa`y t It ahlty that prontrtl i.h.ntll_led hereln as (coin 1-2939 shall • 6e-tl:o same or applr'xtmately tn1 ::ame tle'vation as -the elevn- tiun. pl ghat'. cuun-c rood '.mown as tl..ryinal Way South, • nn-.,tt presently gala`.:;. rot 501IlIt 999 -1- tx)ttt: IN ol•r:(1.h,: J U-O fl--E Pre.9ant,,:1 hy: J911N ',1, ,U'13)I4N1.1.1; Attorney :Iencral.. • `.Spat lel Nl.olstant • Attorneys 'L'nr. Petitioner ' , 1orney Uunernl Appraved as•to form and Nam' a/ c t 11" rYCnll.ut lull]: Edvidge Watt, Vel,len. '1`ev.E 1 rrfllryus • Alt or noys tor•Sgul c Inve,twent INa ny\I • Klrldr:ll, 6: it 11.am.., Vornens, Iete s. dull itt ttorney, for .itutre Inveatmen[ 'on•nny Mr Kdly t 2tOinT11 Y.. nm;e orne s for•PugetSDry flock Company - Ilia 00 11100100'); .. 4.1.X.i. IN THE SUPERIOR COURT OF THE STATE OF WASHINGTOik, 44,1 IN AND FOR KING •?'1 ';.:-"- '- COUNTY e 4.,, Ay, ...,.. 1, ';,::.: .2 : ."T4,.STATE OF WASHINGTON, 'PS- r.'.,... : q.P. i ,- - Petitioner, NO. 646846 4 'r't1,4, ) • '''';''.. E iiii.f Ail: brder of the above named Court 13c; entered amending ,.., :-....2:'":".:.... • :. .: • and Judgment ancii)eZFEE76f Appro riatimil: ?4,41,7-.:-. 1,.!.,y,..,..„,,,. . .. .. IT IS NERgBY STIPULATED AND AGREED by.and:berween the '. ....„.. AWaahington corporation; .4;Z Iii-'.irhe,.Petition and Order Adjudicating Publie Use/be athendedt6"17 :.::: ..0.4`,r's;': ''.1;%".";:i': SquikE /N'VESTHENT COMPANY a ':',.,1!, .partie's hereto that the description .....„...,.,...,: Ni"'-'. •'.A; . ,4:1..!,, t...c,z; "A" at herete.and made 'a-Tart:hereof ....and",'' 1/4.5-:,-:- Respondenta. . •. AMENDING DESCRIPTION SIIPU LATIONAND ORDES AS TO ITEM - NO. I ... 1 'c'.: ) • . •.:z, ,-,,,..., -".5,-.:.%,. 'OA scription to conform to ',;.:1;-: DATED this , If day of 196 7 . . "E.." - . : • stipulation JOHN. J. O'CONNELL Attorney Oeneral . JOHN J CHAMPAGNE Assis nt Attorney General Attorneys. for Petitioner. ,r - . ELVIDGE, WATT, VEBLEN, TEWELL & VENABLE0:: •: Attorneys for Respondents, Squire . :."o,•- Investmentyompany • .-3(7115-5Etr. " BULLI1T, Attorneys for Squir Invc.::tment Comp6ny_2 /7'6' • SMEEL,'•McKELVY,HENXC,IEVENSOf477-t UHLMANN, Attorneya for Puget. Sound Bridge and, Dry Dock -Company ' . _ IN THE SUPERIOR COURT OF THE STATE OF WASHINGTIgko IN AND FOR KING COUNTY THE STATE OF WASHINGTON, Petitioner, Vs. . SQUIRE INVESTMENT COMPANY, a Washington corporation; et al., Respondents. STIPULATION AND ORDER AMENDING DESCRIPTION AS TO' ITEM NO. 1 • IT IS HEREBY STIPULATED AND AGREED by. and between the •...Parties hereto that the description as to Item No. 1 contained. . . and Judgment and De-c7-•erBf Appropriatien,,- in the Petition and Order Adjudicating Public Use/be 'amende(1 to • ' conform to Exhibit "A" attached hereto and 'made . a part hereef,. .and • ". • • • that • an order of the above named court be entered amending saiti. description to conform tol.stjpui.jon • DATED this ) day of , 1967. • • JOHN J. O'CONNELL • Attorney General JOHNJ CHAMPAGNE 0- Assis nt Attorney General Attorneys for Petitioner. / - Attorneys W tW'ReIggena.1,1Ettuir151"75 InvestmenVompany • 7'7') e" -7,411DiTET177-VIL BULLITT, Attorneys for Squire Investment Company_ , SKEEL, MaLLVY, HENXE, EVENSON & UHLMANN. Attorneys for Puget Sound. ' • Bridge and Dry Dock Company- . " n _ _ ORDER This matter coming on for hearing based on the foregoing stipulation, and the court being advised in the premises and con- sidering the records and files herein, now, therefore, IT IS ORDERED that the description_ as toItemNo. and Judgment and Decree of Appropriation..:' contained in the Petition and Order Adjudicating Public•Use/filed • herein be and hereby is amended to conform to Exhibit "A"'attached .hereto andMadea part hereof. DONE IN OPEN COURT this ;% deyof *"`,''� .i; ,Presented by: �'•:�' _. JOHN, J. 0!CONb•ELL Attorney General' J iCI�APfPACNE asie nt Attorney General Attorneys for Petitioner. JUDGE Approvedasto -form and ` -• Notice of Presentation waived: ELVIDGE,-WATT, VEBLEI1, TEWELL & -VENABLES, Attorneys for respondent Squire InveAtment Company j i / 7Li? /' " u/ RID DELL, WI IAM VORHEES.,,IVFE'd BULLITT, Apfoorngjy for'SquireInveetmentl; Company ,, S1C0y'L, McKELVY, HENCE, EVENSON & UHLMANN, Attorneys for Puget Sound Bridge and Dry Dock Company ORDER This matter coming on for hearing based on the foregoing . stipulation, and the court being advised in the premises and con- sidering the records and files herein, now, therefore, IT IS ORDERED chat the do sc ription. as to Item No. and Judgment and Decree of AppipopriAtion` contained in the Petition and Order Adjudicating Public Use filed'. -herein be, and hereby is amended to conform to Exhibit "A" attached.':• hereto and made a part hereof.. DONE IN -OPEN COURT this .'7. day -of_` 1967 . Presented -by: JOHN J. O'CONNELL Attorney General 7 J Asais /nt Attorney General Attorneys -for Petitioner. Approved as toform and Notice of Presentation waived: -VELVIDGE; WATT, VEBLEN, TEWELL & EHABLES, Attorneys for respondent Squire Invnybtment Company.i J RIDDELL WILLIAMS .VORHEES, IV E-&- /" BULLITT Aptorney, for Squire Investment Company p .' ... (/ SH�t:I-7 IcRL'LVY, HENCE, EVENSOW & UHLMANN, Attorneys for Puget Sound Bridaeend Dry Dock Company EXHIDIT .A. AHEI10En h.CRIPTIOH HAY 12, 195/ ITCA HO. I PARCELS 1-2939 1-n1,4 114CRESTER-AARTIES; SQUIRE lAVESTCENT CV.PA4Y, o Washington Corporation; 1119E1:TCA QUARRY DIVISION CF FUCZT SOLP:0 ardoot co DRY00C CO. IT,10.51PTiON • •'FAIlf. L "A" 1)11 that part of- the folio/inn descrihed Tract "'I," lyi,g ea,tcrly of a lira . parallel with rpd being 110 feet 'lion) Westerly, when measured at rieht angies • and/or radially front the fl Linn Survey of Primary State Highway PO. 1, Fostor Intcrehongt, to louth 110th_Street. •, PARCEL 'ql" A14 that port of said Tract "X" lying westerly of the above described Parcel etliterly oi a rinc described ,as follows; fleain at o o t 110 feet distnnt.westerly, when measUred'at,ight angles from said F Inc at Highwcy Engineer's Station...I 66425; then. South 58.1725" West 230.32 feet; thenceSouth 18.10'43" Cast 100 feei to a point, and the and of this line description. • TRACT "X" • • , Tracts 19, 20, 21, 22, 31, 32 and Riverside Stone Quarry, Riverside • Into -urban Tracts, according to plat recorded In Volume /0 of Plots-, -...Page'74, in King-Coouty, Washington; EgCCPT. portion conveyed to State . of Washington for Secondary State Hip) -way 1?o. 5-11; •ALSO EXCEPT. THE 'Wirth 25-fact. of said Tinct 19.• . , . PARCEL "C" • • . All that part of the following described Tract "Y" lying westerly of a line described • .8egin,al a point 30 feet distant easterly, when measured at right angles from the' • 'Marginal Way Cantor Line Survey of said Primer./ Stato Highway Pc. 1 at Highway Enginc•'r's -.Station Cia4 10400; thencenorthwestcrly 300.7 Feet, mere or loss, to a point 50 feet distant eaSterly, when .oOsurod at right aAgles f,oai sold Center Line at Highway Ingineor's-Station•EM 13400; then. northerly 5C0 feet, more or loss, to o point 110 feot.distant southorly, when measured radially from said F' Line at Highway Englneor's Station F) 94,40,.ond tho ond of this lino description. TRACT "Y" Thot cortoin portion of Section 10, Township 23 north. Range 4 EoSt. 'In King County, Wa:hington described al; follow:: 0nOinniu0 -at the northwn,t co,v.r or said Suction and running [hone,. South along -the West line thereof 1163.66 feet to a stone monorenz; thence cast at right angles 924.51 feet to a stor.c ,:,noment in the east line of Ecst Harginal Way; thence South 13'05'00" Cast along said Cast Marginal 1/0y 1112.14 feet to the tree point of heginAing; thence continuing South 13'05'00" East 612.4S fnct to the cat: line of Govermyent Lot 15; thence north 0.4'10.7" west G20.61 feet; thence South 7655'00" West 141.55 feet to tho true point of beginning: E/XCPT.that portion of said Cone -,en Lot 15 which lioS south of the North 50 foot; of :cid Government tot. ITCA uo. I (Contin,.d) The lands being heroin condemned contain an area of 323,730 square feat, more or las:, tho specific ectails concerning all of which may be found within those certain maps of definite location ncel of recorJ end on in the Office of the Dircctor of . • Highways at Olympia, Washington, bearing date of approval Septembbr 4, .1563, revised Apri) 6, 1965; and the center line of 'which is.alSo of record in Volume 3 of'f1191iway Plats, pages74 and 75, undor Auditor's Filo no. 5717325, 'records of King County, -State of Washington. TOGUEER vilia 01 rights of ingress and cgres,, soy (including all avisting, rotor, or potential cosc.cns of access, light, view and alr) to, from and between . :Wald Priory State Highway llo. 1 and the recaalnder of said Traci "X", County /eroby oor t lf o Ghnt thorG or, oot t.07(1 torto in the sum of ' 'or 19a , oeolnst the saove Cosorlbed pro'perty. Dated thlo - day ot ,- K) County Troosuror. ! Pnimny STATE loGIVAY HO. 1 (SR 9o) FOSTER INTZRCHANCE 4 SO. 1130 ST. (01,115 - 0-24-65) I.-. • . , .ryltos.11. r-• • • , , ..:e..-•;• • • • :- - , i);rtri i !iqqi'd • t;! il lit.ffiit 0!IP.'"'!!!1 '!ilfi'll', lo1; '4Pi ?I', , . ,,I. olill ii- ;1z 1:1 iiii 1; i: f ;Iltdtlicr31' 'J.4:11;1111 ri !;:Oliqi:° j ! qilltlii I 1 ' 2 iz 04_, I.kt'i11i?i)I..I.4Cifl1'tilii,'si);ttiil;k,?.iIiml•1''t:i1i1t;ii;l1' t - iIi1i i-2-4 '., Flu 14.3. 5." 3 ! COMPTROLLER rtres and hors Only; fl/ s•le this day of 15/72, botaven S411112 l2V2A0(3, •ruhlrgsro sorporetion, hereinafter called the Grsetor, part- -hr first part, and TM :ZIT 27 SIAlTLE, • ausileSpal corporatist., hereinafter .c_ lroride, mart; ,f :he .•cy..1. part, UrilffSSE-TR. n,a,. cc •naltur, for and :e consideration of the ism of Cin AID :0;100 Gollars v-s »000r .alsable tor.s1Ccrations, receipt rf +filch ts hereby ackoowledged, -reb. •-risvyr rrantr. to the Gninte., Its sohcessore and ss•igns, toe right, rrivilege arE esthdrici, t. construct, erecc, alter, improve, repair, aod maintain gus &on e-chorr vverbead AII:ttet, across, over, woo end uoder Lag f011eving ter rr'nel !anis Imr -remises sit-atei In the Cosnty cf KLIZ, State of Peshingtor, 7, east fort r- tne ver: 20 feet if the feet1 the soi.th er feet of 'frac: 22, Riverside inter,ban Tracts, &chording to plat thereof re. ytrded in ,o-sole Li) of Plate, Page '.3, records if .ing County, nabingtere. " veto. -.h.t 'Intl: at ail tines to the Grantee, its eve sssss re an! assigns, of iczrers and egress Irma ersld lugs, acres& •rioiniag leads of the Grantor fcr the v_pose ronstrsrting, recorut,ctIng, repairing, renewing, altering and engaging so:: ;on: vires Lad onclIOns. :nderstcmd SI.. agreed -.tat the City of Seattle may grant other utilities and ;xi:liege occr.py •old..1) the aceYq described property for -de abvve !.scribed purposes. rhe City sf Seattle and/or rther 4t:11t1es are to be responsible, se provided ti flr sny damage 'vaulty., to the Creator through their negligence in the hon. lb^ dna ddiritafando or adrd VY 'Ares and shrhers across, ever, under and rmo the rroperty of the Grantor. Yr the event it become nevessary to relocate riljurt the gp etre artd an- cror rue erecting rhe Gity cf Seattle, Pei-arises:A or Lighting will an4 relocate said gin wire an4 meteor vithin the Iverein described easement tree at its sole cost &red expense. She rights, title, privilege and authority hereby granted shall continue and be such time as the Grantee, Its evermore or seeigne, .1.11 remise- -ently roove said g•.z, wire. and 11.r4:30n frO, said leads, or sball othervier penes- yencly abeneloo gu,-, wires end anchors, at which time all such rishts and title, irivileg• Lod authority herebY (rented shell tersilfsdtc. PITWaS irSIDOZOF, ,ls inotnnsent nes been executed the toy add yeer firet SCOJISZ 11M4*ININT COICHIIT • ki.(i.LLti-. eirstki..1AL /;-, • lFIIF No,EZILL..1 COMPTROLLER (FOR CDRROYATE orisreiff`, Sttxt or tAtt.lLtOC) ss doter! or me ) • Oa.thls 1 . i .y of 1'^'�� A.D. lyi2, b for..sr p.rso.a}ly Y trod Jet. as jj..� . to ae team to a the 2f. L•, ?reside., and�jAZ., n to s. Lasso to be the <aetery, of the SQIMR IDrOa.lt CORM!, the corycrttioo that etecoted the ' .hula nod foregoing lestswent, tad each atYovledged .tld loet[lant to be the fr. and voluntary act .ad d..d of said coryor.ti.n, for the We and yueyoses :hereto aentlosex and e.eh on oath .t.t.d that they vere authorised tc execute [.li !n.teutnt, sad 'hat th..t.1 .fftx.d is tea ceryorate seal of said Sirpore- - ' _v V110005 n¢nnr. I have hereunto set sr hand .rd affixed my official seal and year a`xut written. CITY OF TUKWIL WASHINOTON ORPINANCE NO. /1 38 AN ORDINANCE OF THE CITY OF 111r1ILA ENACTED PURSUANT TO ROI 35A.14.330 ADOPTING A LAND USE PUN AND ZONING REGU- IMItr 61(T1R AREA DE5CRI1E0 LYING OITSIDE, OF INC CITY OF 11.1KWILA ARO CDOIONLY KNOWN AS RIVERIas AND PROYIDIIa MAT SAID telt SHALL DECOIE SUBJECT ID SAID LAND USE PIA1l AND ZONING PECULATION UPON AIOIEtAT10N TO THE CID OF TUKWILA. WHEREAS, it 1s reasonable to expect that hereinafter described ere. may, at s c. tine In the future, be annexed to the City of Tuhr1I,. end WHEREAS, pursuant to Ordinance /986 of the City of Tukwila, concerning envlromeentel policy and the State Envlroraantal Policy Act, an environmental assessment has been prepared and reviewed by t. Responsible 0fficial of the City and a negative declaration reached and said erviromental essessrxent end declaration have been available through the review process, and WHEREAS, the Tukwila Planning Commission has recommended adoption of a land use plan and zontnq regul,tlon as an extension of the lukwlle Comprehensive Land Use Plan to Include sell ere. under the provisions of ROW 3SA.14.330, end WHEREAS, two public hearings upon said proposal were held upon proper public notice before the Tukwila City Council on October 11. 1979, and November 26, 1979. NOW, THEREFORE. BE IT ORDAINED BY THE CITY COUNCIL Of THE CITY OF 157*ILA AS FOLLOWS, Section 1. The zoning map for the Riverton area as orepared and published by the Office of Casoanity Development for the City of Tukwila, attached hereto et Exhibit A. doled September IS, 1979, and contained In Planning Division File No. kW 99-14-CA is hereby adopted for the are. hereinafter described, pursuant to the authority and provisions of RCM 15-A.14.330. S,ctlon I. Ter' pu11c1es and standards for future developzimit, uti 11za(10n, end future growth of the City o1 Tukw11e es adopted in Ordinance No. 1039, together with the regulations and restrictions for land use and developrnt being the Tutwlle Zoning Code, Title 1/ of the ...kips) cede, as heretofore and hereafter amended, shell apply to said area In the manner set forth In the land use plan and zoning regulation herein adopted. ;I RF^n'.GS Ct1tCiiUl15 9 Srctlmw 1. That at such ttoe as said described area, or any part thereof shell be annexed to the City of Tubed', the City Cc:.ncll may provide In the &emotion ordinance that so much of said area as thereby annexed shell be subjected to and a part of the Comprehensive Lend Use Plan end zoning reputelon herein adopted to extension to the Comprehensive Plan and toning regulations for the City of Tulidl.. Section 4. gone areas on the proposed zoning map hay be inconsistent with the Comprehensive Plan Rao, these actions occurring as a result of p,h11' h..rtngs and related Input. It 1; deeomd that the proposed zoning In these areas is consistent with the policies of the Compre- hensive Plan and the nap is hereby amended to be consistent with the zoning action taken by this ordinance. Seaton 5. The area subject to said land use plan, zoning regulation and amp Is described In the attached 'Exhibit B'. Section 6. A certified copy of this ordinance shall be filed in the 0ffice of the King County Department of Records end Elections. Certified copies shell be filed with the following City of Tukwila Departments: A. Office of City Clerk B. Office of Community Development C. Department of Public Works D. City Attorney Section 7. This ordin nce shell be in force and effect five days Iron and after its passage by the Council and publication as required by law. PASSED BY THE CITY COINCIL OF THE CITY OF TUKWILA, WLSHINGTOI. at a regular reeling thereof this aft, diy of December , 1979 A1T(ST: rowed as to fors: ty Attorney, La e E. Karl Edgar. 0. loch, wyor Kleine Anderson, City Clerk 9Ar11a111k bcord C:eanicle - Decsber as. 1979 .1y FOTENTIA;. RV{:RTCN AM£XATION AI -CA PiT.1:5n) 7.ct G r.i-T2 ^_Y rwAY wcl.Raa R•i-.20 ONE -0AILS 7AELl•4.. R-J Tr0Er Att P}p FMCS t?v9.H» C-i ,ZOKER-0LD 0.r SAL CY ILC#L 1E SAL SAS Lprt e0XASTR0 EXIIIAIT A 4044 ilk PROPOSED ANNEXAT10N TO 40 CITY Of TUKWILA (RIVERTON AREA) EINIBIT B Beginning at the point of Intersection of the Southerly margin of South 133rd Street and the Westerly margin of 42nd Avenue South In Section 15, Township 23 North, Range 4 East, W1lamette Meridian, said point being the existing city limits of the City o1 Tukwila as established by City Ordinance No. 276; Thence Easterly along said Southerly margin of South 133rd .Alto Is the exist- ing limits of the City of iukdle, to Its Intersection with the Northwesterly line of Tract 17, fos:orla Garden Tracts, according to plat thereof recorded in voltage 9 of plats, page 95, records of King County, Washington; Thence Southwesterly elm() the said Northwesterly line of Tract 17 to Its intersection with the Easterly margin of South 135th Place; Thence Westerly to the Intersection of the Southerly margin of South 134th Street and the Westerly margin of 47rd Avenue South; Thence Southerly along the said Westerly margin of 47rd Avenue South to the South line of the C.C. Lewis Donation Claim No. 37; Thence Westerly along the said South line of the C.C. Lewis Donation Clatx No. 31 to the Easterly margin of State S19n Route No. 99: (Pacific Highway South); Thence northwesterly along the Easterly margin of State Route No. 99 to the intersection of a line 70 feet Southerly of and parallel with the -M1'-llee es shown on that certain drawing of Pacific State Highway No. 1 (SR 99), South 118th to Jct. Mo. 1-K, Right -of -Way Sheet 1 of 7 Sheets, with approval date July 23, 1957, said parallel line being the Southerly limited Access Line of the State highway Interchange; Thence Easterly alcn9 said Limited Access Line to the East line of Section 9, Township 23 N., Renga 4 E., W.M.; Thmle Northerly along said psi line of Section 9 to the intersection of the Northerly Limited Access L1ne.as shorn on said State MI9May drawing; Thence Westerly and Northerly along sold Limited Saes' Line and Its Northerly extension to its Intersection with the thread of the Owaoflh River; Thence Easterly and Southerly atu.g the thread of the Mramish River to the point of intersection with the Easterly margin of 42n1 Ave. S., said point being the existirg city limits of the City or Tukwila as established by -City Ordinance No. 259; Thence Southerly along the casting city limits as established by City Orellra,.. Uteri 259 and 276 to the point of beginning. CITY OF TUKWILA DOCUMENT RECORDING COVER SHEET Return Address City of Tukwila City Clerk's Department 6200 — Southcenter Blvd Tukwila, WA 98188 206-433-1800 Document Title AGREEMENT BErwasy 7 aRouP//5Li/tAGGL' I%/UF OF PAI6E7SOUND ANQ INC U7 OF UK / REIA77AIS i K/Y t7WYERS a1010, NNENT INTO CM' RI647 OF MI' PERH/T MZ2tao-/B0 Parties The City of Tukwila, Washington Other $1665 B/LL laai Name Feat Name Row, NEAC7N QOOPE.P,4T/v5 Al6EI-sew Company Name A area 5tATTLE 14)19* f8/a/ env 5tata WA Assessor's Property Tax Parcel/ Account Numbers 73 404004130 7345600190 AGREEMENT BETWEEN GROUP HEALTH COOPERATIVE OF PUGET SOUND AND THE CITY OF TUKWILA RELATING TO PROPERTY OWNER'S ENCROACHMENT INTO CITY RIGHT OF WAY WHEREAS Group Health Cooperative, hereafter referred to as "Group Health" will construct a data and communications conduit that will connect two facilities located at 12400 East Marginal Way South, Tukwila, Washington (Parcel Number 7340600480) and 12401 East Marginal Way South, Tukwila, Washington (Parcel Number 7345600490), WHEREAS to connect the two facilities at above addressees, Group Health will construct said conduit within the City of Tukwila, hereafter referred to s "CITY", per Exhibit 'A', which permits CITY access to utilities located underground, WHEREAS Group Health recognizes that the CITY possesses police powers granted to it by the Washington State Constitution, Ali, XI to regulate its tights of way and to generally provide for the public health, safety, and welfare, and that the CITY hkewisc has the legal authority to abate any obstructions or encroachments of it nghts of ways or utility easements und_r RCW 7 48; WHEREAS Group Health recognizes that should the CITY at any time require access to the nght of way at the locations descnbod above, the CITY has the authonty to remove any obstructions or encroachments on the nght-of-way and can charge the cost of such removal to the responsible property owner, and, WHEREAS Group Health recognizes that the CITY also has the authority to Ole a lawsuit requiring removal of any obstructions or encroachments in the tight -of -way, NOW THEREFORE, in consideration of the promises and mutual covenants of the parties set forth herein, the sufficiency of which consideration as hereby acknowledgc4, IT IS HEREBY AGREED AS FOLLOWS CITY hereby grants to Group Health, the nght and penniasion to use CITY nght- of- way for the mutilation, repair, maintenance and use of a data and communications conduit within that certain portion of the tight -of -way as reflected on Exhibit "A". This permission shall run with the land for the benefit of Group Health and its successors and assigns Group Health's ability to use CITY tight -of -way is not exclusive and the CITY may require relocation in the future or the CITY may collocate other utilities within the same nght-of-way In exchange for and in conaideration of the CITY's agreement to forbear any filing of a lawsuit requtnng removal of the obstruction or encroachment created by Group Health on the tight -of --way located at the address, above, Group Health agrees to defend, indemnify, and hold the CITY harmless as follows* Group Health shall maintain accurate engincenng plans and details of all installations within the right of way and shall provide as -built plans pnor to close-out of Permit Number MI2000-180. CITY shall determine the acceptability of any as -built submittals Group Health agrees to defend, indemnify and hold harmless the CITY from any and all claims for damages brought by any party regarding the data conduit, it's opmtlon, maintenance and repair of the same, and ahall defend, indemnify and hold harmless the CITY from all liability for the CITY's actions taken, if any, to remove the encroachment or obstruction from the CITY's right-of-way, in the event the CITY is required to do so to install, consttuct, repair or otherwise maintain utilities within the CITY's nghlof--way This indemnification shall include damages, costs, and reasonable attorney's fees, and shall not apply with respect to any willful or negligent tortuous act or omission of CITY Whenever the CITY determines that it is necessary for any of Group Health's facilities to be moved or relocated to accommodate the construction, alteration, repair, or improvement of the nghtof-way for purposes of public welfare, health, or safety, CITY shall notify Group Health in wntmg of such determination, and Group Health shall promptly submit plans for such relocation. Within 90 days of the approval by the CITY of the plans for relocation, Group Health shall relocate those facilities designated by the CITY All costs of moving or relocating such facilities ahall be the sole responsibility of Group Health Group Health shall subscribe to and maintain membership in the regional "one - call" utility location service and shall promptly locate all of its lines upon request The City shall not be liable for any damages to Group Health's system, components, or interruptions in service for which Group Health has failed to properly locate its facilities within the prescnbed time limits and guidelines established by One -Call The CITY shall also not be liable for any damages to Group Health system components or for interruptions in service resulting from work performed under any other permit issued by the CITY If any of Group Health's action or lack of action to correct a situation that threatens life or property, the CITY may order Group Health to immediately correct said emergency situation, or at the CITY's discretion, undertake measures to correct situation itself Group Health shall be liable for all costs, expenses, and damages attributed to the emergency as undertaken by the CITY. CITY shall be reimbursed of all costs within thirty (30) days of the completion of the emergency project Nothing in this Agreement shall relieve Group Health from any obligation to obtain approvals or necessary permits from applicable federal, state and CITY authonues Dated this day of 4s/43212000 CITY OF TUK W ILA PUBLIC ORKS DiichCrOR GROUP HEALTH COOPERATIVE PUGETAWIND DIRECTOR OF ADMINSTRATIVE SERVICES �g spy. 8rran Snc/hrn pp - ALP Oe this day, before me personally appeared aibfofrROW to me known to be the PUBLIC WORKS DIRECTOR for the City of •Tuukwdti and executed the instrument on behalf of the City of Tukvola in Ns capacity LIC WORKS DIRECTOR and acknowledged that he is aithonzed to do so at their free and voluntary act and deed, for the uses and purposes therein mentioned al, WY STATE OF WASHINGTON COUNTYF KING ter GIVErtipsd(4,my hand and official scat this •3� day of aura 2000 =Cg Aofr %� �'.b'r •l'CA iiil ' . oTARPt•. Si AAUC STATE OF WASHINGTON COUNTY OF KING (7../— a A -_min NOTARY PUBLIC id for the State of Washington residing at My commission expires h -/6. 0 y On this day, before me personally appeared ''' to me known to be the)lftll✓ «iidnwveahv. Oc i4rr for Group Health oopcntive, and executed this instrument on behalf of Group Health Cooperative his capacity aa'i s.tr tt pf fl��k.,"s%'aliw and acknowledged that he is authonzed to do so at their free and voluntary act and deed, for the uses and purposes therein mentioned GIVEN under my hand and offp l seal this 30 day of—I"t"`c 2000 O ti�ct^ C Pt:.�LLf 5D OTARY PUBLC in and for the State of yI Washington residing at My Commission expires 4 -i - 0 Approved as to form Attorney f• e City of Tukwila Return Address CITY OF TUKW ILA Public Works 6200 Southcentcr Blvd Tukwila, WA 98188 0 (206)033•1800 Document Title(s)i Parties: Other: I!J1IJ3I1IIJOI CITY OF TUKWILA DOCUMENT RECORDING COVER SHEET Easement - Traffic Sienol Coy of Tukwila, WA 6200 Southcenter Boulevard Tukwila, WA 98188 Last Fint Initial Group Health Cooperative of Pueet Sound Company Name (If business) 12460 E Morainal Wav S Address Tukwila WA 98168 City State Zip Legal Description: West 60' of Lots 22 & 31 Riverside Interurban Tracts to King County (734060 Volume 20/74) Assessor's Property Tax Parcel/Account Number(s): 7340690480 7340600490 20020430000157 EASEMENT GROUP HEALTH COOPERATIVE OF PUGET SOUND, a Washington non -profs corporation, hereinafter referred to as 'GRANTOR,' for SI000, which u hereby acknowledged to be fair and just compenaaston. do by then presents grant unto THE CITY OF TUKWII.A, a municipal corporation of King County. Washington, hereinafter referred to as 'GRANTEE.' a perpetual rightofway easement for traffic signal loops- traffic signal poles, mat arms and cabinets purposes with the necessary appurtenance through. over and across the property crosshatched and described on Exhibit A, which property is situated in King County. Washington GRANTEE shall have the eight, w,out prior institution of any Sot or proceeding at law, at MOO as may be necessary to enter upon said property, for the purpose of construction. repairing. altering or reconstruction said traffic stand loops, traffic signal poles. mat arms and cabinets or making any connections therefore; provided that such constructing, repairing. altering or reconstructing of said traffic signal loops, traffic signal poles. mast arms and cabinets shall be accomplubed In such a manner that the private improvements existing outside the sCewalk arca in this right-of-way shall not be disturbed or destroyed. or in the event they are dsturbed or destroyed. they will be replaced in as good a condemn as they were immcdtately before the property was entered upon by the GRANTEE The GRANTOR shall retain the right to use said easement, so long as said use does not interfere with the installation and maintenance of the traffic signal loops. tragic signal poles, mast arms and cabinets and so long as the use does not tnserfece with use and purposes herein mentioned. GRANTEE agrees that upon completon of such work. the surface of such easement shall be restored and replaced to a condemn substantially equal to Nat before the work was commenced, to the extent that it u practical to do so. GRANTOR shall not be 'table for. and GRANTEE shall defend. indemnify. hold harmless and protect GRANTOR from any claim or liability. which may be made, incurred or asserted by GRANTEE, GRANTEE'. agents or employees, contractors, or any thud parties. arising directly of trducntly from the constriction, repair. alteration. improvement or use of the traffic signal loops. traffic signal polo, mass arms and cabinets This easement shall be a covenant running with the land and shall be binding upon the successors. hens and assigns of the GRANTOR hereto In witness whereof. GRANTORIS) hereunto set their hod, this ID fti day of & . 2002 GRANTOR: Group Health Cooperation of Puget Sound a Washington non-profit corporation r' By. uJ OsH V. S a51 / Title }Qwa[y_rma, AV6hss1,11filarivt= sE1•ryls-E.J GRANTEE City of Tukwe. ■ mumcipol corporation of King County. Washington ByJim � � J1 ( one 0�`}' )i1,d2! STATE OF WASHINGTON ) )ss County of King ) / On tftis der of before me(',ilk n. • (a*S5 A GROUP HEALTH COOPERATIVE OF PUGET SOUND, a Washington non-profit an cnrporaion, that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said Washington general partnership e and purpose therein mentioned, and on oath stated dot hetshe was authorised to uecute e said instrument 2002, personally appeared,_ the Q/+fGNSSA/ YS IN WITNESS WHEREOF. I hart hereunto set my hard and affixed my official seal tf the day and year first above written O O� ss I�[o Nor44 ti STATE OF WASHINGTON ) 4N ARY PUBLIC t0 and for the State of Washtngton Raiding at • i a /ITYT, My commission cxpiras ////a//Q5j )a. County of King ) Arai • On that day of _ ii.e.e- 2002, personally appeared before me STFI/ate /i1Gl4ET the AIFlyOR of CITY OF TUKWILA. a municipal corporation of Km{ County. Washington. that executed the within and foregoing instrument. and acknowledged ad intrumenl to be the free and voluntary act and deed of sod Washington general partnership and purposes therein mentioned, and on oath stated that hehhe was authorized to execute said insuumenl IN WITNESS WHEREOF. I have hereunto set my hard and affixed my official seal the day and year fast Shove written. OTARY PUBLIC in and for the ate of Wash,ngt Residing at / i t s'i ,7v4 My commission wirer �AQ /OGr Exhibit A EAST MARGINAL WAY PERMANENT EASEMENT A permencnt uremen, Deer. upon end across the Wen 60' or Lou 22 and 31 Rrvenrde Inleru,Ean Trans eddloon to King County (734060 Volume 10r/4) ti 0 O a When Recorded Return to: Sound Transit Real Estate Union Station 401 S. Jackson Street Seattle, WA 98104-2826 Attn: Johnsic Clark 86359f 0091JJMITqfflhI1IYIfll�4�*0 a1 6 i7a�ti:a GUIDEWAY EASEMENT Grantor: Group Health Cooperative, a Washington Non-Proflt Corporation Grantee: Central Puget Sowid Regional Transit Authority Abbreviated Legal Description: PTN Tracts 21-22 & 31-32, Riverside Interurban Tracts, Vol. 10, P. 74. Full Legal Description is on page hereof. Assessor's Property Tax Parcel Account Number: 734060-0480-00 Reference Numbers of Documents Assigned or Released, if applicable: N/A Group Health Cooperative. a Washington Non -Profit Corporation (the "Grantor") is the owner of real property located in the City of Tukwila commonly known as 12400 E, Marginal Way South and more particularly described in the legal description attached as Exhibit A (the "Property"). THE CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY, (the "Grantee"), a Washington regional transit authority, is developing high capacity Transit service in the central Puget Sound region, including the Central Link Tight rail system that will extend from S. 154i° Street in Tukwila to downtown Seattle (the "Project"). Line Segment e750 R/W 6TUK0.13 :am nppn•M t In 1/07 EXC."... TAX NOT REQUIRED • . sa e-dr t5 z,,n neputy Grantee desires to use a certain portion of the Property in connection with the construction, operation and maintenance of the Project. The boundaries (the "Easement Area") are more fully described in the attached Exhibit B. AGREEMENT I. Grant of Easement. Grantor, for and in consideration of valuable consideration, receipt of which is hereby acknowledged by Grantor, hereby conveys and warrants to Grantee, its successors and/or assigns, the easements described herein, including a guideway easement and a permanent easement within and through the Easement Area in connection with the Project, including but not limited to the construction, operation, inspection, maintenance. replacement, improvement, removal and use of a segment of Grantee's Central Link light rail system and all appurtenances thereto, and related uses that Grantee may hereafter deem appropriate. Grantee's use of the Easement Area shall include, but not be limited to, placement of underground utilities, columns, foundations, aerial guideway, retention pond, and low impact drainage systems. Grantee shall have the right to access property in addition to that depicted in Exhibit B, as determined by the Grantee, for the purpose of trimming trees and vegetation that are higher than the top of rail and within ten feet of the aerial guideway. In the event private improvements in the Easement Arca arc disturbed or damaged by Grantee's use of the easement, on or before the end of any associated Temporary Construction Easement (TCE), they shall be replaced with a paved surface, a gravel surface, a hydro -seeded surface, a low impact drainage surface, or a combination thereof. During the term of any associated TCE, disturbed or damaged fences shall be replaced with chain -link or wood fence. During the Term of any associated TCE, Grantee may on an interim basis, restore the Easement Area to a reasonably safe and convenient condition. Grantee shall have the right, but not the obligation, to enter the Easement Area to remove structures or other impediments and to maintain the Easement Area for its intended use. together with the right to inspect and to construct, maintain, repair and replace aerial structures within the Easement Area. 2. Grantor's Use of Eaitmeat Area. Grantor shall retain the right to use the property within the Easement Area, so long as Grantor's use does not unreasonably interfere with Grantee's use of the Easement Area. Grantor may park vehicles, landscape Line Segment *750 WY/ eTUKO4) hem Appmed 11,211)3 2 and/or pave the surface of the Easement Atea. Any other use is subject to written approval by Sound Transit, which approval shall not be unreasonably withheld. In no event may Grantor construct permanent structures or store flammable, explosive, or hazardous materials within the Easement Area. In the event the Grantee discovers such items in the casement area the Grantee has the right to immediately remove such items at the Grantor's expense. No obstructions of any kind whatsoever, other than those identified above in this Section 2 shall be allowed within 5 feet of Grantee's aerial guideway or appurtenances thereto. The Grantor shall make no use of the Easement Arca whatsoever in the area above the aerial guideway structure, or the arca 5 feet below the bottom of the aerial guideway structure. 3. Representations and Indemnifications. Grantee shall al all times exercise its rights under this easement in accordance with the requirements of all applicable statutes, orders, rules and regulations of any public authority having jurisdiction. Grantee does hereby indemnify Grantor from and against any and all liability, loss, damage, expense, actions, and claims incurred by Grantor in connection therewith, to the extent arising from the exercise by Grantee, its servants, agents, employees and contractors of the rights granted in this easement. 4. Binding Effect. This casement is appurtenant to and shall run with all real property now owned or hereafter acquired by Grantee as part of the Central Link light rail project, which includes aerial, tunnel, and at -grade facilities in the Project area operated by Grantee for high capacity transportation system purposes and shall inure to the benefit of Grantee, its successors and assigns and shall be binding upon the Property and Grantor, and their respective heirs, successors and assigns. 5. Insurance. Grantee shall maintain commercial general liability insurance with reasonable limits of liability covering the Easement Area on activities of Grantee on its agents, employees or contractors upon and the Inc. maintenance or repair by Grantee or its agents employees or contractors of the Easement Area. Grantee shall provide Grantor, on request, certificates of insurance evidencing such coverage. Grantee shall have the right to provide the coverage required herein under blanket policies provided that the coverage shall not be diminished by reason thereof. 6. Legal Proceedings. The parties hereto agree that in the event it becomes necessary for any party to defend or institute legal proceedings as a result of the failure of tither party to comply with this easement, it is understood and agreed that the prevailing party in such litigation shall be entitled to be reimbursed for all costs incurred or expended in connection therewith, including, but not Limited to, reasonable attomey's fees (including paralegal fees and fees for any appeals) and court costs. Lane segment 0750 3 11/w ✓1 UMW) Form Apparel 1141/0l 7. Condemnation. This easement is granted under the threat of condemnation. 8. Recording. This easement shall be recorded in the real property records of King County, Washington. ����//� A Dated and signed on this �3�f. day of A-t a Az z sr 20Qif. . Group Health GOOperaltye of Puget Soand, a Washlnet04 Non -Profit Corporation Grantor By: Its: r, JVTP STATE OF WASHINGTDN ) Counry of k rA) �) ) ��''" certify that I know or have satisfactory evidence that '?t{2' d ItV is the person who appeared before me, and said person acknowledged that he signed this instrument, on oath stated that he is authorized to execute the insrumeni and acknowledged it as the EX ECi rvJE IL"? of the corporation to be the he, and vofmtary act of such party for the uses and purpose mentioned in this instrument. Line Segment a7S0 ;VW 0TUK043 Tam Approved 1121,01 4 till ((Pleasepr6rot tt mme egibly)bly) NOTARY PUBLIC in or the Sate of Washington, relining at My commission expires: Lg i EXHIBIT A — Legal Description of Entire Parcel Grantor's Entire Parcel: PARCEL A THAT PORTION OF TRACTS 21, 22, 31 AND 32 OF RIVERSIDE INTERURBAN TRACTS, AS PER. PLAT RECORDED IN VOLUME 10 OF PLATS, PAGE 74, RECORDS OF KING COUNTY, DESCRIBED AS FOLLOWS. BEGINNING AT A POINT ON THE WESTERLY MARGIN OF PRIMARY STATE HIGHWAY NO. 1, FOSTER INTERCHANGE TO S. 118s" STREET. AS CONDEMNED UNDER SUPERIOR COURT CASE NO. 646846, THAT BEARS SOUTH 04 DEGREES 33 MINUETS 59 SECONDS EAST 165.03 FEET DISTANT FROM THE POINT OF CURVATURE OF THE WEST MARGIN. HIGHWAY ENGINEERS STATION 76 r05.30, SAID POINT ALSO BEING THE SOUTHEAST CORNER OF THAT CERTAIN TRACT OF LAND AS DESCRIBED IN OP DON AGREEMENT RECORDED UNDER RECORDING NO. 7506090402; THENCE SOU TH 04 DEGREES 33 MINUTES 59 SECONDS EAST ALONG SAID MARGIN 615.17 FEET TO A POINT LYING 110 FEET WESTERLY OF AND OPPOSITE ENGINEERS STATION 68425; THENCE SOUTH 58 DEGREES 17 MINUTES 25 SECONDS WEST 230.32 FEET; THENCE SOUTH 21 DEGREES 32 MINUTES 52 SECONDS EAST 36.80 FEET TO THE SOUTH LINE OF TRACT 32 OF THE RIVERSIDE INTERURBAN TRACTS; THENCE NORTH 89 DEGREES 17 MINUTES 24 SECONDS WEST 476.97 FEET ALONG THE SOUTH LINE OF TRACTS 31 AND 32 TO THE EASTERLY MARGIN OF EAST MARGINAL WAY AS ESTABLISHED BY WARRANTY DEED FOUND IN KING COUNTY RECORDS. KING COUNTY RECORDING NO. 7412090465; THENCE NORTH 18 DEGREES 38 MINUTES 24 SECONDS WEST 12.63 FEET ALONG SAID EASTERLY MARGIN; THENCE NORTH 12 DEGREES 54 MINUTES 24 SECONDS WEST 443.4E FEET ALONG SAID EASTERLY MARGIN: THENCE NORTH 10 DEGREES 07 MINUTES 24 SECONDS WEST 333.78 FEET ALONG SAID EASTERLY MARGIN TO THE SOUTHEAST CORNER OF OPTION AGREEMENT RECORDED UNDER RECORDING NO. 7506090402; THENCE SOUTH 89 DEGREES 17 MINUTES 24 SECONDS EAST PARALELL TO THE SOUTII LINE OF TRACTS 31 AND 32 OF THE RIVERSIDE INTERURBAN TRACTS, A DISTANCE OF 774.30 FEET TO THE POINT OF BEGINNING; SITUATE IN THE CITY OF TUKWILA, COUNTY OF KING, STATE OF WASHING TON. I.ine 5agmrni also R/W NTUK043 Fain Approved 11,11Q0 5 EXHIBIT B - Legal Description of Easement Area Guideway Easement Area Acquired by Grantee: THA r PORTION OF THE ABOVE DESCRIBED ORANTOR'S PARCEL DESCRIBED AS FOLLOWS: COMMENCING AT A POINT HAVING SOUND TRANSIT SOUTH ZONE COORDINATES OF N 282708.22.E 1382219.35, SAID POINT BEING. BY SOUND TRANSIT SURVEY, THE SOUTHEAST CORNER OF SAID GRANTOR'S PARCEL; THENCE N04.33'53"W ALONG THE EAST LINE OF SAID GRANTOR'S PARCEL, THE SAME BEING THE WEST LINE OF SR 599, A DISTANCE OF 265.17 FEET TO THE TRUE POINT OF BEGINNING; THENCE CONTINUE N04°33 '53"W ALONG SAID EAST LINE A DISTANCE OF 349.98 FEET TO THE NORTHEAST CORNER OF SAID GRANTOR'S PARCEL; THENCE N89•15'57"W ALONG THE NORTH LINE OF SAID GRANTOR'S PARCEL A DISTANCE OF 6.86 FEET: THENCE S05°40'32"E A DISTANCE OF 350.68 FEET TO THE TRUE POINT OF BEGINNING. CONTAINING 1,196 SQUARE FEET MORE OR LESS. Permanent Easement Area Acquired by Grantee: THAT PORTION OF THE ABOVE DESCRIBED GRANTOR'S PARCEL DESCRIBED AS FOLLOWS: BEGINNING AT A POINT HAVING SOUND TRANSIT SOUTH ZONE COORDINATES OF N 282708.22. 6 1382219.35, SAID POINT BEING. BY SOUND TRANSIT SURVEY, THE SOUTHEAST CORNER OF SAID GRANTOR'S PARCEL; THENCE N04°33'53"W ALONG THE EAST LINE OF SAID GRANTOR'S PARCEL, THE SAME BEING THE WEST LINE OF 5R599, A DISTANCE OF 85.30 FEET; THENCE N89°03'39"W A DISTANCE OF 20.09 FEET TO A POINT DISTANT 20.00 FEET, MEASURED AT RIGHT ANGLES. FROM THE. EAST LINE. OF GRANTOR'S PARCEL: THENCE 504 33.33"B PARALLEL WITH SAID EAST LINE A DISTANCE OF 15.07 FEE I; THENCE N89°03'59"W A DISTANCE OF 27.17 FEET THENCE S52'26'13"W A DISTANCE OF 6.25 FEET; THENCE S03°34'18"W A DISTANCE OF 14.57 FEET; THENCE N8998'17"W A DISTANCE OF 32.41 FEET; THENCE S02°24'08"W A DISTANCE OF 44.89 FEET; THENCE 541°59.03"E A DISTANCE OF 56.64 FEET TO THE SOUTH LINE OF SAID GRANTOR'S PARCEL; THENCE N58°19.06"E ALONG SAID SOUTH LINE A DISTANCE OF 65.00 FEET TO THE POINT OF BEGINNING. CONTAINING 7,436 SQUARE FEET MORE OR LESS. Line 5e8TIxn14750 R/W WTUK043 Form Applored 11,21/01 6 NES; SW1/4 & SE'. SW1. SEC 10, T 23 N. R 4 E. W.M. ow .AIL' GUIDEWAY 58 599 50•'33'S r Ij e,f� aj F. -ea 0C1311 I. C 11aN patr 7 or : - pll - SEC TCCIAD. i_) FIB p3 OUT r A.220.00' ..23.00' 1 1-ins• 1-I.r o- 0Y8'N ...D'1Irr71• f r.m.3lru'30 . I°an aRVt DATA q27 6-3C'S.'N C42•3113, 20 W 62.17 A11.10i 1.0G' IG, ar Itl \ 'u4. M util»;i6an� 7.53'I' M AL W_ ' w1ro1 • 311.Itl �FGIN IC 1 N h1 LIMB - - - - 1101 1111 11.Y111 ..• - - - - 1Ta111011-G-nt 11K SWOT cow WIT row NADI 1.916311 I T1*AK MI:K.011K I00EI.3 L2 u 4 N1 ran'. 12.: • ISNDTN DATA WI'I.'32'e U1.113211 23.72 'S.a' vro3.11 t 3. 30' rw 80 10 0 40 '60 HAD 83 (90 ar' . NAVO 48 OMB at 1 'WIN AREA IS MD NC A114 COAT! A55ES771 AMMO. rIO 'An[ AO IA: ESV1 'DI CMST tart AOG55 CSV• .003 MT mir- ® n IIAASu1I5 li0 1.061 SAIL IIIAKII SrSTi9 L t°1+11E SNEET OF 2 1911:11An PAWL An. 0.35W B. ODOM, 1.1: 1,'H r rG 1AK: W41.Ifr1. .0.441 Tr WVAIRI10 AMA 1v.uo113VT 11J1 7 PARCEL MAD 755-TU<-043 Asigim 73A0600A80 OIIC - 2/3/Al 04WD GPI rt Ix CO0rt1A11K t0R Ap- 6/A r wr 2 I . 27. 3i CITY CI TV(M'IA 'f-NC CO ITY, WA NEV. SW% & SE Y. SW'. SEC 10, 1 23 N, R 4 E: W.hi. • .1 LevOY D•-• Salo 32 s 1 L, Sat•Is'src a.as' : R•1 •-. 11 I Ll S22•2112•♦ a.f9' ,'•: .1 U syf.1•nt five' L i;;.�• 11 L9 Nod,urs•W 1s.ol • I ' . i _ p I LIa, II♦11. A ,9♦Ns • �':" I (rv) e� I i4 'I ! .I I _ ••037f at. -- . 1. �s ay'`^* ' ve'1e•if tb•+� .___i sya t/ ..9ao 111.Kr SR meat m �` I0 SQM LWS.( -. sovnl fora r '� • ao cl s9 r '. L .. f 9 t. `1 ,.♦.y i .I tn.-. • s< a :.1 DETA L 1 , (SE -A L -y D' ZEN — 6— n.rt, 910-14-..n t1M I .S 0 25 SO /� UM) 63 (91) ,/I I — l,r:, CI,/ Li N NA 0 Be N♦1•n:r rr I� 1 5C♦LL N •Ec, Exhibit --••• — — — 1R 1.e tart B — — — — — NRM., L0C unlr r.111L 20? S 11.1 1K LLwa, L1v. WC., K1.a Cattle ♦SSlffpn WOW SHEET 2 0r 1 %,tiJ L.--1' :::;I E'�---.: ! L' ; ;-:I I I EEC 1♦I a MO '0P COIS LSY' ♦CCcss ISM .1401.1.1111 osv, 1..♦V, 1RA O1 t•4s_ mot.' — 1 Iy 19.Lo /}�+' PARCEL VAP 75,-TUX-0a3 nW 23♦06 80 c m_'lnl/oa 3 A t:. A♦rC14nf ,' Np�� n. o. e. v-1w„ ,.r1 C `/• 1Y.0: 11.11S11) t1K 1..1 IsOWf1• S'S,lr I1G. L� 1 /1/rs1C RECORDING REQUESTED 00 AND REIV014 ADDRESS: Sound Transit Real Estate Unton Station 401 S. Jackson Saul Seattle, WA 98i(:I 2826 Ann: Johnsie Clark MffiIf 200917001 1;3 "4 I" 47.ee k7L Nty Yie SHARED ACCESS EASEMENT AND MAINTENANCE AGREEMENT 863594- .1ST AP, I a GRANTORS: Group Health Coopoutiee A Washington Non Pica Corporation GRANTEES: Cenral Pugei Sound Reg,otu:3 Transn Authority ABBREVIATED LEGAL DESCRIPTION: Portion Trans 21.22 k 31-32, Riverside Interurban Tracts. Vol. 10, P. 74. ASSESSOR'S TAX PARCEL NO.: 734060-0e80-00 EX" ' TAX NOT RE:YJIRED ,on 0JW a TUX043 1 Fan Approved by Lep181i3/03 Lao far. by 1Dpnu en 3129a4 L SHARED ACCESS EASEMENT AND MAINTENANCE AGREEMENT This Shared Access Easement and Maintenance Agreement (the "Agreement") is entered this ' day of _June , 2004, by and between Group Health Cooperative, a Washington Non -Profit Corporation (Grantor) and Central Puget Sound Regional Transit Authority (Sound Transit) with reference to the following facts: RECITALS: A. Grantor is the owner of the real property located in the city of Tukwila, King County, Washington legally described and depicted in Exhibit A attached hereto. B. Grantor is the owner of the real property located in the city of Tukwila, King County, Washington legally described and depicted in Exhibit B attached hereto. C. Grantor is the owner of the real property located in the city of Tukwila, King County, Washington legally described and depicted in Exhibit C attached hereto. D. As part of Sound Transit's construction of the Link light rail project, Sound Transit acquired real property interests from Grantor, and agreed, among other things to enter into this Shared Access Easement and Maintenance Agreement granting necessary easement interests and establishing maintenance obligations of the parties. NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows: 1. Recitals and Exhibits Incorporated. Each recital set forth above and each Exhibit attached hereto is incorporated into this Agreement as though fully set forth herein. 2. Grant of Easement. Grantor, for and in consideration of Ten (510.00) Dollars and Other Good and Valuable Consideration, receipt of which is hereby acknowledged by Grantor, does hereby make, declare, sell, transfer, convey, warrant and establish a 15 foot wide perpetual, non-exclusive easement through and over Grantor's Property, in the Easement Area more particularly described in Exhibit B. for the benefit of Grantor's Property and Sound Transit for the purpose of Grantor's and Sound Transit's use and maintenance of a shared roadway (to be used by Grantor and Sound Transit) to provide vehicular and pedestrian ingress to and egress from East Marginal Way to Grantor's and Sound Transit's property. Grantee shall provide 48 hour advance notice to Grantor to coordinate access. Grantee's use of the Access Easement shall be solely for performance of construction of Central Link Light Rail System and maintenance activities for the light rail system, storm water detention pond, and appurtenances thereto. Use of the Access Easement shall be solely by employees of Sound Transit and contractors thereof. a/W v TUK0.3 2 ram Approved by legal VIVO) Ya) Lam caved by 1Dourn on ef29.ea 3. Roadway Maintenance. Roadway will be maintained by Grantor. Any damage caused explicitly by Sound Transit or its Contractors shall be paid for by Sound Transit and/or the Contractor causing damage. 4. Binding Effect. The covenants and agreements set forth in this Agreement shall be covenants running with the land. Such covenants shall be binding upon. and inure for the benefit of the parties hereto and their respective successors and assigns. The Agreement granted hereby shall have priority over any and all liens, encumbrances or other interests in the encumbered property, and shall survive transfer of the fee ownership of, or any leasehold estate in, the encumbered property. 5. Rcoordine. This Agreement shall be recorded in the real property records of King County, Washington. 6. Costs and Attomevs' Fees. The parties hereto agree that in the event it becomes necessary for any party to defend or institute legal proceedings as a result of the failure of either party to comply with the terms, covenants. agreements and/or conditions of this Agreement, it is understood and agreed that the prevailing party in such litigation shall be entitled to be reimbursed for all costs incurred or expended in connection there- with, including, but not limited to, reasonable attomey's fees (including paralegal fees and fees for any appeals) and court costs. 7. Notices. Any and all notices or other communications required to per- mitted by this Agreement or by law to be delivered to, served on or given to tither party to this Agreement by the other party to this Agreement, shall be in writing and shall be deemed properly delivered, given or served when personally delivered to such pany, or in lieu of personal services, when telecopied or when mailed by United States mail, express, certified or registered, postage prepaid, or by a nationally recognized overnight delivery service, charges prepaid, addresses as follows: TO: Group Health Cooperative c/o Trammell Crow Company 12501 E. Marginal Way South Tukwila, WA 98168 TO: Sound Transit 401 South Jackson Street Seattle, WA 98104 All notices so telecopied shall be deemed delivered upon transmission thereof and all notices so mailed shall be deemed received on the date which is 24 hours after delivery to the overnight delivery service by the sender, or if placed in the United States mails, on the date of the return receipt or, if delivery of such United States mail is refused PAY 1 TUKda) 3 Form Appraed by Legal lit PO) Lael saved by IDoama m 6,29,01 or cannot be accomplished, 48 hours after deposit in the United Stales mails. Either patty may changc its address for the purpose of this Section by giving ten (10) days advance written notice of such change to the other party in the manner provided in this Section. 8. Amendment. This Agreement may not be modified, amended or terminated without the prior written approval of the then owners of the land which is benefited or burdened by the provisions of any amendment to this Agreement. 9. As used herein, the term "Grantor" shall refer to Group Health Cooperative and its successors and assigns; the term "Grantee" or "Sound Transit" shall refer to Central Puget Sound Transit Authority and its successors and assigns. IN WITNESS WHEREOF, this Agreement is executed by the parties, intended to be legally bound, as of the date first written above. -gyo is. 2004 before me, a Notary Public in and for the State of Washington, personally appeared �{yjt' and , personal y known to me (or proved to me on the basis of satisfactory evidence) to be the person(.) wbo executed this instrument and acknowledged it to be his/her/their Gee and voluntary act and deed for the uses and purposes mentioned in the imtrumcnl. IN WITNESS WHEREOF, 1 have hereunto set my land and official seal the day and year first • above wrinen. STATE OF WASHINGTON COUNTY OF KINO On this jkilt, day of a/W • TUKOU Qk PUBLIC In Washington, residing a My appoimmwmires Print Name WIMAIA the l�rt of P 4 Fart Approved by Idyl 11I le01 Lan saved by Womb m d19A04 5 FAT E. OF WA3HTNOFON COON IY OF KING �-t ,.J. On this day off y pot- 2000 before me. a Notary Public in and for the Slate of Washington, personally appeared _60t -crUJ as. and , personally known to me (or proved to Inc on the basis of satisfactory evidence) to be the person(s) who executed this instrument and acknowledged it to be haler/their free and voluntary act arid deed for the uses and purposes mentioned in the instrument. IN WITNESS.WI11�iF.Us s j have hereunto set my hand and official seal the day and year first above written ratsel.`oaya ‘04,s ra ei yes iy rrr ,h'1.4ats2 rttr 11. I's"s'-S STArE OF WASFIrNOfoyJ a. COUNTY OF KING ) NOTARY PUBLIC in an for the State of Washington, residing at vif r11 d My appointmnen eaplres 2./2Fs,/Ofu Print Name /E7EJ A- z.7-EuExiSOAf On this day of 2004 —, before me, a Notary Public in and for the State of Washington, personally appeared and personally known, to me (or proved to me on the bests of satisfactory evidence) to be the person(s) who executed this instrument and acknowledged it to be his/her/their free and voluntary act and deed for the uses and purposes mentioned In the instrument. IN WITNESS WHEREOF, I have hereunto bet my hand and official sal the day and year Cost above written a/w a TUKCel NOTARY PUBLIC in and for the Store of Washington, residing at My appointment expires Print Name 5 Form Approved by Levi a I L117 Lae saved by /Downs an 6'1eg4 TXHIBIT A Grantor's Entire Parcel: PARCEL A: THAT PORTION OF TRACTS 21, 22, 31 AND 32 OF RIVERSIDE INTERURBAN TRACTS, AS PER PLAT RECORDED IN VOLUME 10 OF PLA TS, PAGE 74. RECORDS OF KING COUNTY. DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY MARGIN OF PRIMARY STATE HIGHWAY NO. I, FOSTER IN IERCHANGE TO S. 118r" STREET, AS CONDEMNED UNDER SUPERIOR COURT CASE NO.646846. THAT BEARS SOUTH 04 DEGREES 33 MINUETS 59 SECONDS EAST 165.03 FEET DISTANT FROM THE POINT OF CURVATURE OF THE WEST MARGIN, HIGHWAY ENGINEERS STATION 76/05.30. SAID POINT ALSO B61NG THE SOUTHEAST CORNER OF THAT CERTAIN TRACT OF LAND AS DESCRIBED IN OPTION AGREEMENT RECORDED UNDER RECORDING NO.7506090402; THENCE SOUTH 04 DEGREES 33 MINUTES 59 SECONDS EAST ALONG SAID MARGIN 615.17 FEET TO A POINT LYING 110 FEET WESTERLY OF AND OPPOSITE ENGINEERS STATION 68 r25; THENCE SOUTH 58 DEGREES 17 MINUTES 25 SECONDS WEST 230.32 FEET; THENCE SOUTH 21 DEGREES 32 MINUTES 52 SECONDS EAST 36.80 FEET TO THE SOUTH LINE OF TRACT 32 OF THE RIVERSIDE INTERURBAN TRACTS; THENCE NORTH 89 DEGREES 17 MINUTES 24 SECONDS WEST 476.97 FEET ALONG THE SOUTH LINE O.' TRACTS 31 AND 12 TO THE EASTERLY MARGIN OF EAST' MARGINAL WAY AS ESTABLISHED BY WARRANTY DEED FOUND IN KING COUNTY RECORDS, KING COUNTY RECORDING NO. 7412098065; THENCE NORTH 18 DEGREES 38 MINUTES 24 SECONDS WEST 12.65 FEET ALONG SAID EASTERLY MARGIN; THENCE NORTH 12 DEGREES 54 MINUTES 24 SECONDS WEST 443.48 FEET ALONG SAID EASTERLY MARGIN; THENCE NORTH 10 DEGREES 07 MINUTES 24 SECONDS WEST 333.78 FEET ALONG SAID EASTERLY MARGIN TO THE SOUTHEAST CORNER OF OPTION AGREEMENT RECORDED UNDER RECORDING NO. 7506090402; THENCE SOUTH 89 DEGREES 17 MINUTES 24 SECONDS EAST PARALELL TO THE SOUTH LINE OF TRACTS 31 AND 32 OF THE RIVERSIDE INTERURBAN TRACTS, A DISTANCE OF 774.30 FEET TO THE POINT OF BEGINNING; SITUATE IN THE CITY OF TUKWILA, COUNTY OF KING, STATE OF WASHINGTON. RN/ • TUK043 6 Form Appeved by Legal 8/15,93 W r saved by 1Douns en 6/2901 EXHIBIT B Accen Easement Area Acquired by Grantee: THAT PORTION OF THE ABOVE DESCRIBED GRANTOR'S PARCEL DESCRIBED AS FOLLOWS: COMMENCING AT A POIN T HAVING SOUND TRANSIT SOUTH ZONE COORDINATES OF N 282703.22, E 1382219.35, SAID POINT BEING, BY SOUND TRANSIT SURVEY, THE SOUTHEAST CORNER OF SAID GRANTOR'S PARCEL; THENCE N04°33'53'W ALONG THE EAST LINE OF SAID GRANTOR'S PARCEL, TIIE SAME BEING THE WEST LINE OF SR599, A DISTANCE OF 85.30 FEET; THENCE N39'03'59"W A DISTANCE OF 20.09 FEET TO A PO1N T. DISTANT 20.00 FEE r, MEASURED AT RIGHT ANGLES, FROM THE EAST LINE OF GRANTOR'S PARCEL, AND SAID POINT BEING THE TRUE POINT OF BEGINNING; THENCE 504'33'33"E PARALLEL WITH SAID EAST LINE A DISTANCE OF 15.07 FEET; THENCE N39°03'59"W A DISTANCE OF 27.37 FEET THENCE S52°26'13"W A DISTANCE. OF 6.25 FEET; THENCE, 503°34'18-W A DISTANCE OF 14.57 FEET; THENCE N89°18' 17"W A DISTANCE OF 32.41 FEET; THENCE N60°55'25"W A DISTANCE OF 60.89 FEET; THENCE N88°52'28"W A DISTANCE OF 172.15 FEET TO THE BEGINNING OF A CURVE HAVING A RADIUS OF 220.00 FEET; THENCE WESTERLY, TO THE LEFT, ALONG SAID CURVE THROUGH AN ANGLE OF 40°40'24" AN ARC DISTANCE OF 156.75 FEET; THENCE S50°18'08"W A DISTANCE OF 142.79 FEET TO THE BEGINNING OF A CURVE HAVING A RADIUS OF 167.00 FEET; THENCE SOUTHWESTERLY, TO THE RIGHT, ALONG SAID CURVE THROUGH AN ANGLE OF 30°53'24" AN ARC DISTANCE OF 90.28 FEET; THENCE S81 °16'32"W A DISTANCE OF 22.62 FEET TO THE WEST LANE OF SAID GRANTOR'S PARCEL, THE SAME BEING THE. EAST LINE OF EAST MARGINAL WAY SOUTH; THENCE NIT:13'21'W ALONG SAID WEST LINE A DISTANCE OF 15.04 FEET TO A POINT DISTANT 15.00 FEET, MEASURED AT RIGHT ANGLES, FROM THE PROLONGATION OF THE PREVIOUS DESCRIBED COURSE; THENCE N81.16'32"E A DISTANCE OF 23.72 FEET TO THE BEGINNING OF A CURVE HAVING A RADIUS OF 152.00 FEET; THENCE NORTHEASTERLY. TO THE LEFT. ALONG SAID CURVE THROUGH AN ANGLE OF 30'58'24" AN ARC DISTANCE OF 82.17 FEET; THENCE N50°I3'08"E A DISTANCE OF 142.79 FEET TO THE BEGINNING OF A CURVE HAVING A RADIUS OF 235.00 FEET; THENCE EASTERLY, TO THE RIGHT, ALONG SAID CURVE THROUGH AN ANGLE OF 40°49.24" AN ARC DISTANCE OF 167.44 FEET; THENCE S88°32'28"E A DISTANCE OF 175.83 FEET; THENCE S60°55'25"E A DISTANCE OF 21.48 FEET; THENCE S89°03'59"E A DISTANCE OF 86.34 FEET; THENCE NIO°39'02"E A DISTANCE OF 108.58 FEET 70 A POINT ON THE EAST LINE OF SAID GRANTOR'S PARCEL; THENCE SO4°33'53"E ALONG SAID EAST LINE A DISTANCE OF 38.10 FEET TO THE TRUE POINT OF BEGINNING. CONTAINING AN ACCESS EASEMENT AREA OF 11.547 SQUARE FEET MORE OR LESS. R/W a 7UK041 7 Farm Approved by Legal V 11/03 Lsl oared by /Downy on 6/19,04 NOTE: THE BASIS OF BEARINGS IS THE WASHINGTON COORDINATE SYSTEM OF 1983, 1991 ADJUS TMENT (NAD 83/91). COORDINATES ARE REFERENCED TO THE SOUND TRANSIT LINK LIGHT RAIL SOUTH ZONE PROJECT DATUM. TO CONVERT TO THE WASHINGTON COORDINATE SYSTEM OF 1983/91, NORTH ZONE, FIRST SUBTRACT 100.000 FROM BOTH THE NORTHING AND EASTING, THEN MULTIPLY THESE COORDINATES BY THE COMBINED SCALE FACTOR OF 0.999997515. RIW•TURO,S B Form Approval by Lepl 1/11107 Lau saved by 100Imu m 6•7904 NE, SW. & SE. SW. SEC 10. T 23 N, R 4 E; W.U. Iw1a.AY _— tm .iel t P- 151.0E G-1rer1• o'9.MY.1 fit AIPROR IOt.RTr9M 4 IOIU' N LIIT t:14 nA ArmSxPT.—\ EX SP. •(,. slr5.'l,t ..w i-ra9.00 R•uS.a• t1 1.154.75' e.uv..r /'n..r..•rr tb \'s.i. la r r5ru• �4 T •54a••nor �\G —i LULU - 113C A111 10.11 I4 - I10111PTy-4011R VT' COOTS RAM 4r LI4 r4w,RpnLa JAM m I.41,a ------- - - -- rA514.1104'IR10141 • 11 M1Yv11'w IS.OA LS S41hrJ2•a 17.62 60 •0 0 60 160 -J NMI 50ALC 1M SEC, NAD 83 (91) NAVD 66 FXHI9IT C •AAC6 AREA 15 IROY MC R IMO COLNTY ASS[SSOR •CCOIm. 4R r.l LN• IIV C01111 [Sul 'Ri51101 I(SY [Wl yr 94256 40 11Nt 110.1 1.A1111AY[11 SYSTOI WREN SNEEI 1 v 2 IAIRI Af* W R40 5, SS... .1. ISM a1 1Y0: OPT. Mr. 101.1 I aunlw .a* PIPJUrtml 120 r.V PARCEL MAP 735 TLIN-043 MESON Id 7340600460 o.lt _ 11/27y Or. 0R06• 1114TM WOPIRAI,vC a9a a Mn ;n 1m: 1. 0. AI • Al CITY O 'LR1111A RING C,MTY. WA NE . SwY. & SEY SW . SEC 10, T 23 N, R 4 E; W.M. • 1 uhCIK OAIA -; in... I tI S/••,S•SrY SAC `;-- 8 8!' I, 1 to cv'n',S•w •.ry' Ei gt. "-T t 1 99O'9r •''• Adl' . `. lI F- 1.11 r'� • Si '• � nl >~ tr 22 i ' SRaSII *A5 •' 1 (T..) H J •' ' 1 nvlrAiri'rt 1' 1 T -! 1 SrrSTlrr Jaw" --�cr I '_ — .•, • ', BIa Yt AC RK SS MOOS. iK x 7 (Iasf .sar+o l y, �1 I 19 - ;- 1yI 1' t 1 �$ slt$ I A- ;..-. IM • se -._ so, L 'ra LLiL1L 11 t0a+rnC Ugla — — — — siar-9'-Iu•IWl mr' l 25 0 23 50 = (\NAO 83 (91) MT CPBR 1'M rum tOrt„4 MAVD 88 — — — — — POEM MC scat[ Ic,vs • EXHIBITC ea ----- m I.¢I:Kt USDSKI tiR I* ccr • - - ueMx, III. erw.sr PARCEL AREA IS 7Y',T .e CC., ASSSSSCR RICO. SNErT 2 OF 2 'CC Wt. MA., ISVI Ivs 4v.s CSVT ACCESS ILI CpMAVtKI MO ilianS01'OlirT'I, '%• •.Rm AIEA .Atir aa•AT DC: nI t. : Vo lns mu RAVVVIN1PT PARCEL MAP 755-T1M-043 %A' f� yt 19.2rA, �}. '%gyt tua tx/VNf /11/•S Qom/ ASSESSOR ICI: 7240600180 Om ,U./43 ILI 6IAI 1n A.mcl.5rs gm! ON. qrw 9992IVI,rc ,n •A. IGI At TT2Cn An l K<lIY 4.1 ion ,s41a` CI fY 0C TIXWICA KIAC COWTY, NA FILED FOR RECORD AT REQUEST AFTER RECORDING RETURN TO King County Property Set vices Division 500 Fourth Avenue, Room 500A Seattle, WA 98104 ,iJfl 20041101000177 e 0 Oe4F8ee as e.es 82240 COUNTY, '8 Reference No: Guideway Easement/ Grantor: King County, Washington Grantee: The Central Puget Sound Regional Transit Authority Legal Des: West '4 of Sec.I0. Township23 N, Rangc 4E Tax ID No: TL4 7340600421 GUIDEWAY EASEMENT THIS AGREEMENT made this I day of OC-r03ETi. , 20ak, between King County, a political subdivision of the State of Washington, hereinafter called the Grantor. and the Central Puget Sound Regional Transit Authority, hereinafter called the Grantee. WITNESSEfu WHEREAS, the Grantor herein is the owner of that cenain parcel of land, hereinafter "the Property". des:.ribed as follows: THE NORTH 20 ACRES OF THE FOLLOWING DESCRIBED TRACT: PORTIONS OF THE WEST HALF OF SECTION 10. TOWNSHIP 21 NORTH, RANGE r EAST. W.M., IN KING COUNT Y. WASHINGTON, DESCRIBED AS FOLLOWS: LOTS 22, 23, 24 AND THAT PORTION OF LOT 25 OF BENNE. ITS INTERURBAN TRAC IS. UNRECORDED, LOTS 17, 18, 19, 20, 21 AND 22 AND THE RIVERSIDE STONE QUARRY OF RIVERSIDE INTERURBAN TRACTS. ACCORDING TO PLAT RECORDED IN VOLUME 10 OF PLATS AT PAGE(S) 74. IN KING COUNTY, WASHING TON, AND RIVER STREET AS VACATED BY SUPERIOR COURT CAUSE NO. 663488, ALL LYING SOUTHWESTERLY OF PRIMARY STATE HIGHWAY NO. I, FOSTER INTERCHANGE TO SOUTH 113n' STREET, AS ESTABLISHED BY WARRANTY DEED UNDER KING COUNTY RECORDING NO. 5884275, AND SUPERIOR COURT CAUSE N0.646346 AND NORTHEASTERLY OF EAST MARGINAL WAY SOUTH AS ESTABLISHED BY SUPERIOR COURT CAUSE 646697. 046846 AND 646939 AND THAT PORTION DEEDED TO KING COUNTY BY QUIT CLAIM EXCISE TAX NOT REQUIRED Klee Co. F6wrth Ceetlon 09944 1 DEED AS RECORDED UNDER RECORDING N0. 1004994, AND WARRANTY DEED UNDER RECORDING N0. 7412090465, MORE PARTICULARLY DESCRIBED AS FOLLOWS, COMMENCING AT A POIN r 50 FEET DISTANT EASTERLY. WHEN MEASURED AT RIGHT ANGLES FROM THE EAST MARGINAL WAY CENTER LINE SURVEY OF PRIMARY STATE HIGHWAY NO. I, FOSTER INTERCHANGE TO SOUTH 118 " STREET. AT HIGHWAY ENGINEER'S STATION EMW 13.00; THENCE SOUTH 0790'05" EAS f ALONG THE EASTERLY MARGIN OF EAST MARINGAL WAY 135.36 FEET TO A POINT ON A UNE 50 FEET SOUTH OF AND PARALLEL TO THE NOR rH 1.1 NE OF GOVERNMEN f LOT 15, SECTION 10, TOWNSHIP 23 NORTH. RANGE 4 EAST, W.M.; THENCE SOUTH 87.32'19" EAST PARALLEL. TO SAID NORTH LINE 37.31 FEET TO THE WESTERLY LINE OF LOT 19. RIVERSIDE INTERURBAN TRACTS; THENCE SOUTH 0197'43" WEST ALONG 5A1D WEST LINE 113.72 FEET TO THE NORTHWEST CORNER OF LOT I RI V ERTON; THENCE SOUTFI 8S°22'17" EAST ALONG THE NORTH LINE OF SAID LOT 1 A DISTANCE OF 1.90 FEET TO THE NORTHEAST CORNER OF SAID LOT I; THENCE SOUTH 02°24'24" EAST ALONG THE EAST LINE OF SAID LOT 1 A DISTANCE OF 123.54 FEET TO THE EASTERLY MARGIN OF EAST MARGINAL WAY AS LS TABI.ISHED BY QUIT CLAIM DEED FOUND IN KING COUNTY RECORDS RECORDED UNDER RECORDING N0. 1004994; THENCE NORTH 78'41'05" EAST 12 FEET TO THE EASTERLY MARGIN OF EAST MARGINAL WAY AS ESTABLISHED BY WARRANTY DEED FOUND IN KING COUNTY RECORDING NO. 7412090465, THENCE SOUTH I1'18'55" EAST ALONG SAID EAST MARGIN 501 21 FEET; THENCE SOUTH 10.07'24" EAST 107.94 FEET; THENCE SOUTH 89'17'24" EAST PARALLEL f0 THE SOUTH LINE OF LOTS 31 AND 32 RIVERSIDE INTERURBAN TRACTS A DISTANCE OF 774.10 FEET TO THE WESTERLY MARGIN OF PRIMARY STATE HIGHWAY NO. 1, FOSTER INTERCHANGE TO SOUTH 116' STREET; THENCE NORTH 0493'39" WEST ALONG SAID WESTERLY MARGIN 165.03 FEET TO A POINT OF CURVATURE TO THE LEFT; THENCE ALONG SAID CURVE WHOSE RADIUS IS 1190 FEET A DISTANCE OF 1554.78 FEET TO THE WEST LINE OF LOT I. RIVERSIDE INTERURBAN TRACTS; THENCE. SOUTH 01.37'43" WEST ALONG THE WEST LINE OF LOTS 17 AND 18 RIVERSIDE INTERURBAN TRACTS 64.86 FEET TO THE NORTHEAST CORNER OF LOT 22 OF BENNETT'S INTERURBAN TRACTS (UNRECORDED); 'THENCE SOUTH 78'39'60" WEST ALONG THE NORTH LINE OF SAID LOT 22 A DISTANCE OF 91.98 FEE f 10 THE EAST MARGIN OF EAST MARGINAL WAY. THENCE SOUTH 04.57'54" EAST ALONG THE BAST MARGIN 268.62 FEET TO THE POINT OF' BEGINNING. SAID NORTH 20 ACRES BEING DELINEATED ON SURVEY RECORDED UNDER RECORDING N0. 7512150809; WHEREAS the Grantee herein is responsible for developing, operating and maintaining a portion of the Central Puget Sound Regional transit Authority Central Link Light Rail system that will link South I54i6 Street to downtown Seattle; WHEREAS the Grantee desires a Guideway Easement, (hereinafter "Easement") over, through. across and under a portion of the Property as part of its rail system; NOW, i HEREFORE, the parties agree as follows: A. Grant of Easement Grantor, for and in consideration, $ 34,864.00 (Thirty four thousand eight hundred and sixty four dollars), receipt of which is hereby acknowledged, does by These presents grant unto said Grantee, its heirs, successors and assigns, an Easement over, through, across and under a portion of the Property fot the purposes specified herein, being more particularly described as follows: THAT PORTION OF THE ABOVE DESCRIBED GRANTOR'S PARCEL DESCRIBED AS FOLLOWS COMMENCING AT THE INTERSECTION OF THE EAST UNE OF EAST MARGINAL WAY SOUTH AND THE SOUTH W ESTEKLY LINE OF PRIMARY STATE HIGHWAY N0. I (S. R. 599) FOSTER INTERCHANGE TO SOUTH 1 I8r" STREET, SAID IN TERSECTION BEING MARKED BY A CONCRF.TF. POST OPPOSITE HIGHWAY STATION 94400 AS SHOWN ON THE SURVEY RECORDED UNDER RECORDING NO.7512150609, THENCE SOUTHEASTERLY ALONG THE SOUTHWESTERLY LINE OF SAID S R. 599. BEING A CURVE TO THE RIGHT, HAVING A RADIUS OF 1390 FEET, THROUGH AN ANGLE OF 4'28'51" AN ARC LENGTH OF 108.71 FEET, r'0 THE NORTH -MOST CORNER OF GRANTOR'S PARCEL (BEING THE NORTHWEST CORNER OF TAX PARCEL 734060 0421); rHF.NCF. SOUTHEASTERLY ALONG THE NORTHEASTF.RI.Y LINE OF GRANTOR'S PARCEL. THE SAME BEING THE SOUTHWESTERLY LINE OF SR 599, BEING A CURVE TO THE RIGHT HAVING A RADIUS OF 1390.00 FEET, AN ARC DISTANCE OF 340.05 FEET TO A POINT HAVING SOUND TRANSIT SOUTH ZONE COORDINATES OF N 284509 13. E 1331176.01. SAID POINT BEING, BY SOUND TRANSIT SURVEY, THE INTERSECTION OF SAID NORTHEASTERLY LINE OF GRANTOR'S PARCEL WI TH THE SOU r IWESTERLY LINE OF THE SOUND TRANSIT LINK LIGHT RAIL RIGHT OF WAY, SAID POINT HEREINAFTER REFERRED TO AS POINT "Z", AT WHICH POINT A TANGENT LINE BEARS S54•: 8'28"E, AND SAID POINT BEING THE TRUE POINT OF BEGINNING; THENCE CONTINUE SOUTHEASTERLY, TO T11E RIGHT, ALONG SAID 1390-FOOT RADIUS CURVE AND SAID NORTHEASTERLY LINE OF GRANTOR'S PARCEL, THROUGH AN ANGLE OF 08'24.27" AN ARC DISTANCE OF 203.97 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT "Y", ll IENCE NORTHWESTERLY, TO THE LEFT, ALONG A NON -TANGENT CURVE HAVING A RADIUS OF 1171M FEET AND A LONG CHORD OF N49°47'02"W 27.73 FEET, THROUGH AN ANGLE OF01"21'21" AN ARC DISTANCE OF 27.73 FEET, THENCE N50'2"42"w A DISTANCE. OF 162.96 FEET; THENCE N51'31'04"W A DISTANCE OF 13 10 FEET TO THE TRUE POINT OF BEGINNING. TOGETHER WITH THAT PORTION OF GRANTOR'S PARCEL. DESCRIBED AS FOLLOWS: COMMENCING AT ABOVE DESCRIBED POINT "Y" ON TIIE EAS fERLY LINE 7HEREOF. THE SAME BEING THE WESTERLY LINE OF SR 599, SAID LINE BEING A CURVE. HAVING A RADIUS OF 1390.00 FEET, AND AT WHICH POINT A TANGENT LINE BEARS 546"14'01"E; THENCE SOUTHEASTERLY. TO THE RIGHT. ALONG SAID 1390-FOOT RADIUS CURVE AND SAID NOR TIIF,ASTERLY LINE OF GRANTOR'S PARCEL. THROUGH AN ANGLE OF 18.50'58" AN ARC DISTANCE OF 457.29 FEET TO A POINT HAVING SOUND TRANSIT SOUTH ZONE COORDINATES OF N 284014.85. E 1382005.89. SAID POINT HEREINAFTER REFERRED TO AS POINT "X" AND BEING THE TRUE POINT OF BEGINNING. THENCE: CONTINUE SOUTHEASTERLY. TO THE RIGHT, ALONG SAID CURVE AND SAID NORTHEASTERLY LINE OF GRANTOR'S PARCEL, THROUGH AN ANGLE OF 00'39'35' AN ARC DISTANCE OF 16.00 FEET; THENCE S63.50'06"W A DISTANCE OF 11.02 F EET' THENCE N26°09'54"W A DISTANCE OF 16.00 FEET; THENCE N63•50'06"E A DISTANCE OE 10.78 FEET TO THE TRUE POINT OF BEGINNING. TOGETHER WITH THAT PORTION OF GRANTOR'S PARCEL DESCRIBED AS FOLLOWS: COMMENCING AT ABOVE DESCRIBED POINT "X" ON THE EASTERLY LINE. THEREOF, TIIE SAME BEING THE WESTERLY LINE OF SR 599, SAID LINE BEING A CURVE HAVING A RADIUS OF 1390.00 FEET, AT WHICH POINT A TANGENT LINE REARS 527'21'03"E: THENCE SOUTHEASTERLY, TO THE RIGHT. ALONG SAID 1390-FOOT RADIUS CURVE AND EASTERLY LINE OF GRANTOR'S PARCEL. THROUGH AN ANGLE OF 11.05' 12" AN ARC DISTANCE OF 268.97 FEET TO A POINT HAVING SOUND TRANSIT SOUTH ZONE COORDINATES OF N 283765.58, E 1732105.80, SAID POINT HEREINAFTER REFERRED TO AS POINT "V" AND BEING THE TRUE POINT OF BEGINNING; THENCE SOUTHEASTERLY. TO THE RIGHT. ALONG SAID 1390-FOOT RADIUS CURVE AND EAST LINE OF GRANTOR'S PARCEL THROUGH AN ANGLE OF 11°43'58" AN ARC DISTANCE OF 284.64 FEET TO THE END OF SAID 1390-FOOT RADIUS CURVE; THENCE SO4°73'S I"E ALONG THE EAST LINE OF GRANTOR'S PARCEL A DISTANCE OF 165.25 FEET TO THE SOUTHEAST CORNER OF GRANTOR'S PARCEL: THENCE N89.15'S7"W ALONG THE SOUTH LINE THEREOF A DISTANCE OF 6.86 FEET: THENCI: N05.40'52"W A DISTANCE OF 143.37 FEET; THENCE N06.44'13"W A DISTANCE OF 162.96 FEET TO THE BEGINNING OF A CURVE HAVING A RADIUS OF 1171.84 FEET; THENCI: NORTHERLY. TO THE LEFT, ALONG SAID CURVE THROUGH AN ANGLE OF 0041' 17" AN ARC DISTANCE OF 136.79 FEET TO TIIE TRUE POINT OF BEGINNING ALL CONTAINING A TOTAL AREA OF 4,097 SQUARE FEET MORE OR LESS. Drainage (Easement Area Acquired by Grantee: THAT PORTION OF THE ABOVE DESCRIBED GRANTOR'S PARCF.I. DESCRIBED AS FOLLOWS: BEGINNING AT ABOVE DESCRIBED POINT"X" (IN TIIE GUIDEWAY EASEMENT AREA DESCRIPTION ABOVE) ON THE EASTERLY LINE OF GRANTOR'S PARCEL, THE SAME BEING 1 HE WESTERLY LINE OF SR 594, SAID LINE BEING A CURVE HAVING A RADIUS OF 1190.00 FEET, AT WHICH POINTA TANGENT LINE BEARS 527.23'03"E; THENCE S63•50'06"W A DISTANCE OF 10.78 FEET; THENCE N26°09'54"W A DISTANCE OF 12.00 FEET; THENCE. N63°50'06"E A DISTANCE OF 10.47 FEET TO THE EAST LINE OF GRANTOR'S PARCEL. BEING A NON -TANGENT CURVE HAVING A RADIUS OF 1390 FEET. THENCE SOUTHEASTERLY, TO THE RIGHT, ALONG SAID CURVE AND EASTERLY LINE OF GRANTOR'S PARCEL. THROUGH AN ANGLE OF 00°29'41"AN ARC DISTANCE OF 12.00 FEET TO THE POINT OF BEGINNING; TOGETHER WITH THAT PORTION OF GRANTOR'S PARCEL DESCRIBED AS FOLLOWS: COMMENCING AT SAID POINT "X"; THENCE SOUTHEASTERLY. TO THE RIGHT. ALONG SAID CURVE AND EASTERLY LINE OF GRANTOR'S PARCEL, THROUGH AN ANGLE OF 00'39'35" AN ARC DISTANCE OF 16.00 FEET TO THE TRUE POINT OF BEGINNING; THENCE S61.50'06"W A DISTANCE OF 11.02 FEET; THENCE 526'09'54"E A DISTANCE OF 12.00 FEET: THENCE N63.50'06"E A DISTANCE OF 11.09 FEET TO THE EAST LINE OF GRANTOR'S PARCEL, BEING A NON -TANGENT CARVE HAVING A RADIUS OF 1390 FEET; THENCE NORTHWESTERLY, TO THE LEFT, ALONG SAID CURVE AND EASTERLY LINE OF GRANTOR'S PARCEL. THROUGH AN ANGLE OF 00°29'41"AN ARC DISTANCE OF 12.00 FEET r0 TRUE POINT OF BEGINNING; ALL CON fAININO A TOTAL AREA OF 261 SQUARE FEET MORE OR LESS. NOTE. THE BASIS OF BEARINGS IS THE WASHINGTON COORDINATE SYSTEM OF 1983, 1991 ADJUSTMENT (NA D 83,91). COORDINATES ARE REFERENCED TO THE SOUND TRANSIT LINK LIGHT RAIL SOUTH ZONE PROJECT DATUM. TO CCNVERT TO THE WASHINGTON COORDINATE SYSTEM OF 198361. NORTH ZONE FIRST SUB TRACT 100.000 FROM BOTH THE NORTHING AND FASTING, THEN MULTIPLY THESE COORDINATES BY THE COMBINED SCALE FACTOR OF 0.99999751 5. D. Purpose. The use and purpose of the Easement granted herein shall be limited to the construction. operation, inspection, maintenance, replacement, improvement, removal of Grantee's Tight rail system, including columns, foundations, aerial guideways, drainage systems, utilities and the appurtenances thereto and other uses associated with the light tail system. Grantee's access shall be Through those areas depicted in Exhibit A attached hereto. Grantee shall have the right to access properly in addition to those access areas depicted in Exhibit A for the purpose of trimming trees and vegetation as provided in this Easement. fhe Grat,ec herein, by accepting and recording this Easement, agrees to the terms and conditions set forth below. C. Terms and Conditions of Use: I. A( LSS ONTO EASEMENT AREA. Grantee shall have the right, but not the obligation, to enter the Casement Area in accordance with Section 2 below to maintain the Easement Arca for its intended use, together with the right to inspect and to construct. maintain. repair and replace its aerial structures and appurtenances within the Easement Area. 2. RIGHT OF ACCESS ON GRANTOR'S PROPERTY. Grantee shall contact King County, Department of Transportation ("DOT'), Transit Division, Design and Construction Section or its successor department at least 72 hours prior to going onto the Grantor's Property for any reason. Access shall be subject to security approval which may effect the access route and may set limitations on the rime and duration of access as determined by the Grantor. In case of an emergency, the Grantee shall have the right to pet form any repairs to Grantee's light rail system required, in Grantee's sole discretion, to mitigate, minimize or eliminate the cause of the emergency, but Grantee shall notify Grantor of the maintenance activity within 24 hours of its contrnencement. Grantee must obtain a Special Use permit in order to perform non emergency work or place any improvements on the Grantor's Property not approved by Grantor on the date of this Easement. 1. GPNTOR'S USE OF EASEMENT AREA. Grantor's use shall not interfere with Grantee's authorized use of the Easement Area. 4. MAIN (ENANCE RESPONSIBILITY The Grantee shall assume full maintenance responsibility for all of its improvements lying within the Easement Area. Grantee may trim trees outside of the Easement area that arc higher than the top of rail and within ten feet (10') of the aerial guideway stnmmre, subject to the prior written approval of Grantor. 5. KgaTORATION AFTER INSTALLATION. AFlcr any activity by the Grantee upon the Property, Grantee will return the Property to its original condition, or to a condition satisfactory to the Grantor, by repairing any damage done to the Property including. but not limited to. property damage to slopes, shrubbery, trees. landscaping, fencing, roadway, drainage facilities or structures. 6. 1NQyMNITY AND HOLD HARMLESS. The Grantee agrees to indemnify and hold harmless Grantor as provided herein to the maximum extent possible under law. Accordingly, the Grantee agrees for itself, its successors and assigns to defend, indemnify and bold harmless Grantor, its appointed and elected officials and employees from and against liability for all claims, demands, suits and judgments including costs of dcfcnse thereof for injury to persons, death or property damage which is caused by, arises out of. or is incidental to Grantee's exercise of rights and privileges granted by this Easement. The Grantees obligations under this section shall include: (a) The duty to promptly accept tender of defense and provide defense to Grantor at Mc Grantee's own expense. (b) Indemnification of claims made by the Grantee's own enployees or agents. In the event it is necessary for Grantor to incur anomey's fees, legal expenses or other costs to enforce the provisions of this section, all such fees, expenses and costs shall be recoverable from the Grantee. Grantee's indemnity and dcfcnse obligation shall not apply to any claims, demands, suits or judgments arising from Grantor's sole negligence. In the event it is determined that RCW 4.24.115 applies to this Easement agreement, the Grantee agrees to defend, hold harmless, and Grantor to the maximum extent permitted thereunder, and specifically for its negligence concurrent with that of Grantor to the full extent of Grantee's negligence. Grantee agrees to defend, indemnify and hold harmless Grantor for claims by Grantee's employees and agrees to waiver of its immunity under Title 51 RCW, which waiver has been mutually negotiated by the panics. 7. NO WARRANTY. By granting this Easement, Grantor gives no wamuuy of title or interest in the Easement area. This Easement is Intended to convey rights and interest only for the use and purpose specifically authorized by this Easement. R. JURISDICTION. By granting this Easement, Grantor does not transfer jurisdiction of the Easement Area to any other department of Grantor. This Easement does not deprive Grantor of any powers, rights, or privileges it now has or may later acquire in the future to regulate ore use of and to control the Properly. 9. DAMAGES. If any damage is caused by reason of performing any act authorized by this lasement, Grantee will promptly pay the Grantor the amount necessary to pm the Grantor in the position that Grantor would have been had the damage not occurred. 10. BINDING EFFECT. This Easement is appunennnt to and shall run with all real propcny now owned or hereafter acquired by Grantee as pan of the Central Link Light Rail, project, and shall inure to the benefit of Grantee. its successors and assigns, and shall be binding upon the Property and Grantor, end their respective heirs, successors and assigns. 11. ASSIGNMENT. The Grantee may not assign this Easement or any rights acquired under it without the prior written consent of the Grantor. All terms and conditions of this Easement are binding upon the heirs, successors and assigns of the Grantee, and all privileges and obligations of the Grantee apply to its heirs, successors and assigns as if they were specifically mentioned wherever the Grantee is mentioned. BY: Agnes Govern Title: Chief 1 rim Administrative Officer 12. 1N_SIJRANCE Grantee shall maintain commercial general liability insurance with reasonable limits of liability covering the Easement area on activities of Grantee or its agents, employees or contractors upon and in the use, of the Easement area. Grantee shall provide Grantor, on request, certificates of insurance evidencing such coverage. Grantee shall have the right to provide the covctage required herein under blanket policies provided that the coverage shall not be diminished by reason thereof. The Grantee shall make Grantor an additional insured under its insurance policy. 13. OTHER APPLICABLE LAWS. Grantee will comply with all federal, state and local laws, and will assume all costs. expenses and responsibility in connection with compliance without any liability on the pan of the Grantor. 14. RECORDING. This Easement shall be recorded in the real property records of King County, Washington. DATED this / I , day of O r ,F- ' GRANT KING CO TY, WASHINGTON BY: ��a2 TITLE: ',V DATE: / .- Z 7-8 / GRANTEE: CENTRAL PUG" SOUND REGIONAL TRANSIT ORITY odaiiid DA 200 GRANITE: CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY BY: Phil O'Dell Title: Project Delivery Support Services Director Date: rp/ti faµ APPROVED AS TO FORM: BY: Jennifer -Belk, Legal Counsel Date: /0/✓f/D1/ STATE OF WASHINGTON I ) ss. COUNTY OF King ) I certify that I know or have satisfactory evidence that Phil O'Dell is the person who appeared before me, and acknowledged that he/she signed this instrument and acknowledged it to be the free and voluntary act and deed of the Central Puget Sound Transit Authority for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said agreement d414lae4A-• (Signature) Ea. A- : S EEc7.50'4 (Please print name legibly) NOTARY PUBLIC in and for the State of Washington, residing al VE-N)PAOre.t:; . My commission expires: L 'Leal STATE OF WASHINGTON )SS COUNTY OF KING 1 certify that Calvin floggard, Section Manager signed this instrument, on oath stated that he was authorized by the King County Executive to execute the instr anent, and acknowledged it as the Facilities Maintenance Division, Real Estate Services Section of King County, Washington to be the fret and voluntary act of said County for the uses and purposes mentioned in the instrument. � Dated this 1 dl^ t day of L , 20 6'�y"�'n,sn�^'y, NOTARY PUBLIC in and for the State of Washington, residing et:? "L " --1 ' 1lDssvONttEtl N 5-2 NDTAAr a 0 �i 64r.$"40 �'' ��f OfIWt.sN`yo` My appointment expires: STATE OF WASHINGTON fss COUN IY OF KING On this day • of appeared nineiGoverlr to me known to be the Interim Chid Administrative Officer of the Central Puget Sound Regi„nzl Transit Authority and xknowiedged said instrument to be the free and voluntary act and dccd of said regional transit authority for the use; and purposes :herein mentioned, and on oath ,rated that yhe i0 nuthonzed to execute said instrument, and that the seal affixed is the corporate seal of said regional transit authority. 20041, before nre personally GIVI.N under my hand and official seal the day and year last above written. NOTARY PUBLIC in and for the State of Washington, residing at. My appointment expires 9 SEy. NW. & NW. 5W. & NEy. SW V. SEC 10, T 23 N, R 4 E; W.M. 00 RAIL Ttx-042 4i TAx I,D. 734060-0421 stt o[r. tee• as 204040�00 r,ororaav �m.ar - - - - un rausn ar - - - Van t10.7r-0-Mr liar >nmT mmA u,x - ,wl .ARR - m rNa lm — -- - - - UMW uat m.aar -'' --- -UMW linflnr. NeW .041 Elsa I xe.nTu wr ILIddAllia. nYup 114 flan •.n 1Na117 n1101 00 50 0 ,00 200/ N�/I SLATE 14 •EET • +•:i7 srul NAO e3 (01) NA.) as Exhibit A f' �d 07itt•4 Efa1 Tr, Gnus LS., 0S SYCCT ' Or a •.tm arce a,tn4r mn • ev R 1Aq: OM mIC [x,n 1 7011.7.4 ARR T *004 p.r, If. PARCEL MAP 755- ILK -042 Amu= o4 734060042 'oak aao eewr. 4Z 01/11N• v-n mC ®� C TT p 71.101.LA RIND COUP,. NA SE. NW. & NW. SW. & NE. SW. SEC 10. T 23 N. R 4 E; W.M. 9ETAIL — - - — I700 Am nom 44/ - - — 4729111/00-0-TAT ilif MT OD= OA • • • wino, tort. — — — — — FIRRATT Ulf PANT ram — — Mir WAIC LAW LAIMAt 112140l04 It, ;raw em •746 I I GMLIN ASIMX17122 PON csia 1114(1.1011 012021 1.04 DATA 13 1403TS00f C 10.47 if S2.704 54 PlISNWIT Clan DATA CC 11-13110.02. 4-11001 6-07029,17 C7104.7.27W.Sly IICCF [877M1 40840 OAT* ONAD 83 (91) slAVO 68 .:,.—Exhibit A 40100140 CS, OS GOYS' Ire STEP. 2 OF 3 Wiwi AKA 01 044' OrarsiT nfT RI rim mai Mit 517141142 PEODADD PARCEL MAP 753-TU4-042 MS= a, 7348600421 mm NM/. ORM 4140 Oxon. it-20 CITY OF %AVILA IMO C0.4114, WA SE. NW. & NW. SW. & NE. SW. SEC 10. T 23 N. R 4 E; 112.1811 — - — 1.100 40 Mall to — - - — van 1100-0-147 Ltd VW TOM LIK — — — — — POPO, WC PI - - 1II 1116 UMW till 1.601, W00111111 RUMP, ;51.14.17: FEL Alt PUN cO6 30 10 0 9'3 SO 0 SCALE 111 FEET HAD 83 (91) NAVD 83 Exhibit A DADDirAE t.s.• 00. CO, 3347 SNEET 3 OF 3 788451 r140 1 6641110 616. OAT 666, 1661660 MINIM INF PARCEL MA. 755- ILK-042 4.731200700 7.340100421 TAM W.V. op. KOK awn Wow 144 .T". CITY OF 10711ILA KING =NM WA • . 1 OPTION TO P0000111 PLOTS 0•11111 r? OOma7. . esahlnpts Corporation, Its e.w.O.O. •red assigns. het.lafeer OO11e0 'Opti1v0'. hereby grants to the Mee ICIPALITT Or I0TSaOLR0* SIMTLI. • emiolpal cerp.ratim of the State of pahingtoo, its maws.. ad ....gee. Mal*11.r jolotly .11w 'Irt10'. a Option to ►urdl••e the reel property described in Mille 'A', hereinafter .lied the 'Propertr. .. Mown by the plot pea hereto naked 1S11/T '1'. ea the ten and coedit... heroin at forth. 1. C11,01 0r ORIOP ape Tun For 11.000.00, Ms Option. hereby Rate to Metre the right to purchase the Property Open the term and coediting. .t forth l0 thie Agreement during • ter. Of Mote meth@ free ire. 1 until Atm.t II. 1171. 2. FNMA" MICR MIN 0211 The parer. price Of 11,0 Property. *all M Mts... y ealtl*lylng the total ammo rest.' Of the partite of lUfP"I the Property .tested y Mts. y 11.25, .i4 parch.. prim Ifl IA .rAi net to exceed • maim. of I1,0071,000. Metre shall ham the right to •.erelm lte Option to ►molar •11 Of the Property Ms... Mew, ee It •hell here the right to p.roh.se rely the earth 17 seem Of said property. The total smsae tentage fee mime. of mtrli5l.O the pored•e prim stall -be Meer.de0d by en led..Yent survey by a limes. rummer 00t1o1oetety to bete Metre and the ("timer. Mee rmata of the matey 0M1l be repeated la melds a bath potties to Ole Agreement red the tea fa the matey Mall be paid by Mt.. The moat paid tee the Optire a raw 1 of 1 P.O.. fV Omar.. 1a Peregra. 1 bare.. W11 be smelted to the phrmam price at amoral. Of the Option. 1. MIMI. Or OPTION m0 right to rattler Mi. Option to rvr.ese great. wader this Amt..t Nall be ear0l*0O by written notice, n eat postage prepaid. chit. tab. ail. certified or registered ail. return receipt roqurt.ed. addressed to. KIOI.gf rlIg I/OqC.nirNlul9tCo. if 1i� .Mettle. eachlets 0110e or mesh Other Minas a -Option. shell specify in mit.' from time to tW, or shall M Mad delivered thereto. Metro Mall Mee tbe obligati. to does the true..Ion within N Odes alb. Metro rattler. the Option to Purchase 00 .how, by Optiaor'e maim of notice. e. CONY OP If Min Optima 1 Mitcham Mall be emrelaed by Pietro, title insurance, e00roe fees al closing costa co.trrrily Mr. by the Opt.wer well be paid y Pietro. beat property tee. for the spa month tee period is .blch the P1Cyerty Is conveyed shell M prorated between Astro and the Opt1Ooer, as of the date M UNI acquires title to the Property. Notre . M11 farther pry 1p to Tip IWW OO.LAY 1/100.001 for ..pert foe. mtr111y teed 10a0em1y Ihe11M by Optic., for the 0alatim get thle offer. 1. OOuwoAaca 0/ PI/17 Ceete7emos of the Property to Notre 0111 M y /tattler, e araty 12e.1 free of 11w. title defects or .slung *enrage ..crab or cherme or Mena es. *nett MM. moon. Le I.Yr•i Potato sr /fete 0..1., building or wee a.al0tlm1 O.0a1 to the , Mlldleq and owning regul0tl0ns, and rm. 2 of 1 Peg. sin1v 3* � O earnests end r .00000la. of record w of ineatdwr 71. Ind. S aid deed .1e.11 be done•= by Optleaer to the flower O auo..l 71t1. I...re.a Compeer. to be delivered to metre ayex romlvt of payment of the pemtmsse price. 1. Rtim1ATI0m Or Op7101 eel«s metro amerclw. its Option to Paronmee the Property a. provided In chile Agreement. al. agte.ment .hall terminate and be of no force or effect end metro .hell ereorte ouch 12,47 Wrr,n ta as are necessary to clear Optloner's title, mod u ;! .11 .poi.* heretofore paid by Metro .hell be forfeited to Opllemr. 7. ACcirom0 *1 l7w M.tre'..csptm of tn. Agreement shall he condltlomd won .ppropel by the Metropolitan Cem,ell and .hall 0. slgnlfled b7 metre tiling tn. Optic to ►arl..e for recording with the ling Cori= 0.porton= of h.clards end election. before Jon.. JO, 1f75. O . IA7107 PO. OPTION If this option •ball be accepted by Metro ander the terms of Paragraph 7 of this lwtr.nt. Payment of the IS.000 described le Paragraph 1 of this I.strrnt shell be code on mr before Am* 30. 1e7S. 1a7SP this fp' day .1 i'p p , 1077, .t Mettle, feeblgtw. T a00I� 131ee00alf COM21T By. BY. Pep. 3 of S rage. _v O=A7f Of IfN.II1L70p 1 I as. COMITY OF mac Om tel. d.7 of �p , if 70 before me tbe ..in .atary faA11e 1.,stl for tee—L�... et ...l{W]d.tsa.�.me{. e7 cat.hlw.d and goose. pseer117 gp001 tan r..Metiwy, of the �myd �jr� � the terp.r.tlw that .rg*M .g. of—ltl.wt r aMmemlodped the sold 1e0trswt to do the free and tele.tar7 act .cod aged of .a1d c•tp.fotlon ter tes tome eed, pmmpom0 there= mmtl..ed mod eon can stated that they we= =thorned to e..aate the said testament and oat the seal attired 1. the corporate seal of sold corporation. WIMPS my hand and oftlela1 heal hereto *nixed the day .d 7e.m In this certificate IMo.e 1tts. n of la.hf.pbon, fuldlAg at rye 4 of 7 tow 7506090402 FEFPE '3E21 Fa � s a a 41rommi— AF-9.77 a o e 0 750609C402 — A or TA: Soule. lawman. Co. Marine pram 4.1 abrtlast lay Soma Wed IN to Tswty Job Pe. LS4-04 F1LEO for Record at Request of Rai prbowl •lidNog fa MN ma* saw 1 0.71-p WARRANTY i DEED The O••barb yi... 1....•...o f.r•S..,j 01 O • f• W e.ai1*rair of 011If DoNn CD CD see aid r.Ad• sarlere iae. eery W clout_a the Curly d Roy. Monte d suited.. ti - all interest • W fellcoly d•snibol goal .side: r i All Yet portico of the si.a4l1* Sees query, Suet. 11 eel 71. d Sur Strut ee va440 h7 action of the Repartee Curt el the S44 of Wahl4ta for Lies Ooaty 1e Use le. M141..11 le the situate* Dur,er4.a reacts. Suttee 10, 4vp 13 I., IP 1 lest. 0..., in lies County. N4t4tco, as toured 4 vole. 10 of plats 74 is I...ed. of Res Oeisl7, t./1.011; lying Silly of • lane 4.00 feet Ply of (es authored at right eagles 4) .d p4.11.l .lie t1Y fellatio; daeribd e44ru4t Sagloal4 at the le4rneetico of 16.44 1264 St. with tut Peesl.l My Seu4; Thence .soy the centerline Moer4ol la Kett CUL Peal 4 nee Comb 4 aced. 4 seism 14 of tools. passe rep-711 (Auditor'srlaPe r.i7s . 1001114) Tocer4 d Res Monti, saa\L/4.. Muth 4.15'4' vest 419.33 feet; Tbe*cl earth I1•34'lA' Net 144.60 I4t to the Ltereeet/ee with South Wth Thews berth 10.07.4' N.. e41.70 feet; flume Perth 11.30'S10 Yea e70.09 feet .so et Leos 4 • point that bear. knish 7/•I11'01' use 1lsteet 70.00 feet free • paint ,Min • lire 30 feet a.4*t rely era des heroin described easterlies 44rte4 the .1y nulls tut said tamed Slur Street, the 4re0.es of the herein described ..er ]lee; 97CDf ray parties of said ..44d Slue Street adlelaf4 bet 1, Sleek 1, Uterus Okla., a theseded is Veloum ll of plate page lf. gourds of said Suety. Ca4lnly 11.400 Si. It. use r lee.. 1N Met Per7141 Pay Math Igether .fib W rye Y .ate ell rerwy .loges fa ease 41 fills epee the shadier peperty s •sob rile of .y red .Ikb i•ow. bey be escoe•9d bw.hr s eel sa9.ely. Y ed.eny .Y wawa 91•. W .poe0k✓eme fe• blghwe7 proem, rd to the son *atm ad PM... es If the *Us bent .sad 1d Cur rs1o1 by ess.eutls pr.•1ies..r. S.Yert Dcood •*440n d W Y.Y d erbbkt••. rit*.Yd Y W Ce.Y d Fed. pee d144607144. sees. arse .K r.a t� -4-14 K 7412090465 RATS a WAS0IGTON oar vp 4 pad Mr Ur Mee d .warts. all .9e.td.a.r Y/ seam lensed/ rem O .... .... .. .. .... .__.._.........._..._... ._sees_.. _...._.le es Imams leMdes Y11.u.al • reeThed la sal....... esMd m .tiler eMaaunt and alcnr.r41 r en 104 - -Igead V sad avid Y-ea.....___....._._.A ad.erar'y e.t lu1a.d drm s ad papas s r` Weir nanamel Maws al, lead ad eltlY w11ae day sad iv Orel tho.e arena stern Peat in are for W d.a...4.eR ,C3IeGe.yta AOInO.,a t 4.M• fray. Or 0110112IOTOa. I r Cowry or atm On ties. .,w sees_ day A..nsamh_,.JD2/. __ _ ..........befell a p.e0y append 1,a11... 3001ra MIOIIIe6............ end .J.anna.D.. SKylre _..._._._.... to W lawn r 4 the Seeand..Ylo s.St1eldeat..... .d . Relented --se es _.......... d the eorps*tlen t4l enraged 11u 1se9a07 Intl/oae*C ad ae WrMdtd .N Ine.9menl to be 11Y free and enamel/ nee and Mad of said torpeatls1 fen the We end playa. therein rot, loped sadoa oath q*t.d that _Um ars.. sees . authorised to notate odd Instrument ament a jpy(y.r7dY Ito a.ps*1e ..I of die aspsal4. ',1*. neeiptia my bed mad *Meet .d W des • . .. :'•. .. •. . .r•1a rr. •. woos Polar • v w W SW of 1.11Y. Y. c.•♦tl`._. '�,r 0 II I i � I I fisoracp ow 9 •• a os �Or0♦ si IRt, ytie � •11flit.0,4 First American Commitment ALTA Commitment for Title Insurance ISSUED BY First American Title Insurance Company File No: NCS-341596-WA1 COMMITMENT FOR TITLE INSURANCE Issued By FIRSTAMERICAN TITLE INSURANCE COMPANY NOTICE IMPORTANT -READ CAREFULLY: THIS COMMITMENT IS AN OFFER TO ISSUE ONE OR MORE TITLE INSURANCE POLICIES. ALL CLAIMS OR REMEDIES SOUGHT AGAINST THE COMPANY INVOLVING THE CONTENT OF THIS COMMITMENT OR THE POLICY MUST BE BASED SOLELY IN CONTRACT. THIS COMMITMENT IS NOT AN ABSTRACT OF TITLE, REPORT OF THE CONDITION OF TITLE, LEGAL OPINION, OPINION OF TITLE, OR OTHER REPRESENTATION OF THE STATUS OF TITLE. THE PROCEDURES USED BY THE COMPANY TO DETERMINE INSURABILITY OF THE TITLE, INCLUDING ANY SEARCH AND EXAMINATION, ARE PROPRIETARY TO THE COMPANY, WERE PERFORMED SOLELY FOR THE BENEFIT OF THE COMPANY, AND CREATE NO EXTRACONTRACTUAL LIABILITY TO ANY PERSON, INCLUDING A PROPOSED INSURED. THE COMPANY'S OBLIGATION UNDER THIS COMMITMENT IS TO ISSUE A POLICY TO A PROPOSED INSURED IDENTIFIED IN SCHEDULE A IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THIS COMMITMENT. THE COMPANY HAS NO LIABILITY OR OBLIGATION INVOLVING THE CONTENT OF THIS COMMITMENT TO ANY OTHER PERSON. COMMITMENT TO ISSUE POLICY Subject to the Notice; Schedule B, Part I -Requirements; Schedule B, Part II -Exceptions; and the Commitment Conditions, First American Title Insurance Company, a Nebraska Corporation (the "Company"), commits to issue the Policy according to the terms and provisions of this Commitment. This Commitment is effective as of the Commitment Date shown in Schedule A for each Policy described in Schedule A, only when the Company has entered in Schedule A both the specified dollar amount as the Proposed Policy Amount and the name of the Proposed Insured. If all of the Schedule B, Part I -Requirements have not been met within six months after the Commitment Date, this Commitment terminates and the Company's liability and obligation end. First American Title Insurance Company Dennis J. Gilmore President Jeffrey S. Robinson Secretary If this jacket was created electronically, it constitutes an original document. This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Pan' I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1 31 17) Page 1 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington COMMITMENT CONDITIONS 1. DEFINITIONS (a) "Knowledge" or "Known": Actual or imputed knowledge, but not constructive notice imparted by the Public Records. (b) "Land": The land described in Schedule A and affixed improvements that by law constitute real property. The term "Land" does not include any property beyond the lines of the area described in Schedule A, nor any right, title, interest, estate, or easement in abutting streets, roads, avenues, alleys, lanes, ways, or waterways, but this does not modify or limit the extent that a right of access to and from the Land is to be insured by the Policy. (c) "Mortgage": A mortgage, deed of trust, or other security instrument, including one evidenced by electronic means authorized by law. (d) "Policy": Each contract of title insurance, in a form adopted by the American Land Title Association, issued or to be issued by the Company pursuant to this Commitment. (e) "Proposed Insured": Each person identified in Schedule A as the Proposed Insured of each Policy to be issued pursuant to this Commitment. (f) "Proposed Policy Amount": Each dollar amount specified in Schedule A as the Proposed Policy Amount of each Policy to be issued pursuant to this Commitment. (g) "Public Records": Records established under state statutes at the Commitment Date for the purpose of imparting constructive notice of matters relating to real property to purchasers for value and without Knowledge. (h) `Title": The estate or interest described in Schedule A. 2. If all of the Schedule B, Part I —Requirements have not been met within the time period specified in the Commitment to Issue Policy, this Commitment terminates and the Company's liability and obligation end. 3. The Company's liability and obligation is limited by and this Commitment is not valid without: (a) the Notice; (b) the Commitment to Issue Policy; (c) the Commitment Conditions; (d) Schedule A; (e) Schedule B, Part I —Requirements; (f) Schedule B, Part II —Exceptions; and (g) a counter -signature by the Company or its issuing agent that may be in electronic form. 4. COMPANY'S RIGHT TO AMEND The Company may amend this Commitment at any time. If the Company amends this Commitment to add a defect, lien, encumbrance, adverse claim, or other matter recorded in the Public Records prior to the Commitment Date, any liability of the Company is limited by Commitment Condition 5. The Company shall not be liable for any other amendment to this Commitment. 5. LIMITATIONS OF LIABILITY (a) The Company's liability under Commitment Condition 4 is limited to the Proposed Insured's actual expense incurred in the interval between the Company's delivery to the Proposed Insured of the Commitment and the delivery of the amended Commitment, resulting from the Proposed Insured's good faith reliance to: (i) comply with the Schedule B, Part I —Requirements; (ii) eliminate, with the Company's written consent, any Schedule B, Part II —Exceptions; or (iii) acquire the Title or create the Mortgage covered by this Commitment. (b) The Company shall not be liable under Commitment Condition 5(a) if the Proposed Insured requested the amendment or had Knowledge of the matter and did not notify the Company about it in writing. (c) The Company will only have liability under Commitment Condition 4 if the Proposed Insured would not have incurred the expense had the Commitment included the added matter when the Commitment was first delivered to the Proposed Insured. (d) The Company's liability shall not exceed the lesser of the Proposed Insured's actual expense incurred in good faith and described in Commitment Conditions 5(a)(i) through 5(a)(iii) or the Proposed Policy Amount. (e) The Company shall not be liable for the content of the Transaction Identification Data, if any. (f) In no event shall the Company be obligated to issue the Policy referred to in this Commitment unless all of the Schedule B, Part I —Requirements have been met to the satisfaction of the Company. (g) In any event, the Company's liability is limited by the terms and provisions of the Policy. This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conti/tions; Schedule A; Schedule B, Pan' I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1-31-17) Page 2 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington 6. LIABILITY OF THE COMPANY MUST BE BASED ON THIS COMMITMENT (a) Only a Proposed Insured identified in Schedule A, and no other person, may make a claim under this Commitment. (b) Any claim must be based in contract and must be restricted solely to the terms and provisions of this Commitment. (c) Until the Policy is issued, this Commitment, as last revised, is the exclusive and entire agreement between the parties with respect to the subject matter of this Commitment and supersedes all prior commitment negotiations, representations, and proposals of any kind, whether written or oral, express or implied, relating to the subject matter of this Commitment. (d) The deletion or modification of any Schedule B, Part II —Exception does not constitute an agreement or obligation to provide coverage beyond the terms and provisions of this Commitment or the Policy. (e) Any amendment or endorsement to this Commitment must be in writing and authenticated by a person authorized by the Company. (f) When the Policy is issued, all liability and obligation under this Commitment will end and the Company's only liability will be under the Policy. 7. IF THIS COMMITMENT HAS BEEN ISSUED BY AN ISSUING AGENT The issuing agent is the Company's agent only for the limited purpose of issuing title insurance commitments and policies. The issuing agent is not the Company's agent for the purpose of providing closing or settlement services. 8. PRO -FORMA POLICY The Company may provide, at the request of a Proposed Insured, a pro -forma policy illustrating the coverage that the Company may provide. A pro -forma policy neither reflects the status of Title at the time that the pro -forma policy is delivered to a Proposed Insured, nor is it a commitment to insure. 9. ARBITRATION The Policy contains an arbitration clause. All arbitrable matters when the Proposed Policy Amount is $2,000,000 or less shall be arbitrated at the option of either the Company or the Proposed Insured as the exclusive remedy of the parties. A Proposed Insured may review a copy of the arbitration rules at http://www.alta.org/arbitration. This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1 31 17) Page 3 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington ALTA Commitment for Title Insurance ISSUED BY First American Title Insurance Company File No: NCS-341596-WA1 Transaction Identification Data for reference only: Issuing Agent: First American Title Insurance Company National Commercial Services Issuing Office's ALTA® Registry ID: Commitment No.: NCS-341596-WA1 Property Address: 12100 E Marginal Way S, Seattle, WA Revision No.: Issuing Office: 920 Fifth Avenue, Suite 1200, Seattle, WA 98104 Reference No.: South Base Issuing Office File No.: NCS-341596-WA1 Escrow Officer Name: Escrow Officer Number: Escrow Officer Email: Escrow Assistant Name: Escrow Assistant Number: Escrow Assistant Email: Title Officer Name: Matthew Chakoian Title Officer Number: (206)448-6283 Title Officer Email: mchakoian@firstam.com SCHEDULE A 1. Commitment Date: September 27, 2018 8:00 AM 2. Policy to be issued: (a) 2016 ALTA® Owner's Policy Proposed Insured: (b) j� ALTA® Policy Proposed Insured: Amount Premium Tax $TBD $TBD $TBD (c) (� ALTA® Policy $ Proposed Insured: 3. The estate or interest in the Land described or referred to in this Commitment is Fee Simple 4. The Title is, at the Commitment Date, vested in: King County, a political subdivision of the State of Washington, who acquired title as the Municipality of Metroplitan Seattle, a municipal corporation 5. The Land is described as follows: See Exhibit "A" attached hereto and made a part hereof This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy,* the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or /ts issuing agent that may be in eledron/c form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1-31-17) Page 4 of 13 ALTA Commitment for The Insurance (8-1-16) - Washington First American Schedule BI & BII ALTA Commitment for Title Insurance ISSUED BY First American Title Insurance Company File No: NCS-341596-WA1 SCHEDULE B, PART I Requirements All of the following Requirements must be met: 1. The Proposed Insured must notify the Company in writing of the name of any party not referred to in this Commitment who will obtain an interest in the Land or who will make a loan on the Land. The Company may then make additional Requirements or Exceptions. 2. Pay the agreed amount for the estate or interest to be insured. 3. Pay the premiums, fees, and charges for the Policy to the Company. 4. Documents satisfactory to the Company that convey the Title or create the Mortgage to be insured, or both, must be properly authorized, executed, delivered, and recorded in the Public Records. This page is only a part of a 2016 ALTAO Commitment for Tdle Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commibnent Conditions; Schedule A; Schedule B, Part I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1-31-17) Page 5 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington Schedule BI & BII (Cont.) ALTA Commitment for Title Insurance ISSUED BY First American Title Insurance Company File No: NCS-341596-WA1 SCHEDULE B, PART II Exceptions THIS COMMITMENT DOES NOT REPUBLISH ANY COVENANT, CONDITION, RESTRICTION, OR LIMITATION CONTAINED IN ANY DOCUMENT REFERRED TO IN THIS COMMITMENT TO THE EXTENT THAT THE SPECIFIC COVENANT, CONDITION, RESTRICTION, OR LIMITATION VIOLATES STATE OR FEDERAL LAW BASED ON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION, GENDER IDENTITY, HANDICAP, FAMILIAL STATUS, OR NATIONAL ORIGIN. The Policy will not insure against loss or damage resulting from the terms and provisions of any lease or easement identified in Schedule A, and will include the following Exceptions unless cleared to the satisfaction of the Company: 1. Any defect, lien, encumbrance, adverse claim, or other matter that appears for the first time in the Public Records or is created, attaches, or is disclosed between the Commitment Date and the date on which all of the Schedule B, Part I -Requirements are met. 2. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records. 3. Any facts, rights, interests, or claims which are not shown by the Public Records but which could be ascertained by an inspection of the Land or by making inquiry of persons in possession thereof. 4. Easements, claims of easement or encumbrances which are not shown by the Public Records. 5. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by the Public Records. 6. (A) Unpatented mining claims; (B) Reservations or exceptions in patents or in Acts authorizing the issuance thereof; (C) Water rights, claims or title to water; whether or not the matters excepted under (A), (B) or (C) are shown by the Public Records; (D) Indian Tribal Codes or Regulations, Indian Treaty or Aboriginal Rights, including easements or equitable servitudes. 7. Any lien, or right to a lien, for services, labor or materials or medical assistance heretofore or hereafter furnished, imposed by law and not shown by the Public Records. 8. Any service, installation, connection, maintenance, construction, tap or reimbursement charges/costs for sewer, water, garbage or electricity. This page is only a part of a 2016 AL TAi Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commibnent to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements; Schedule B, Part II -Exceptions; and a countersignature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1-31-17) Page 6 of 13 1, & ALTA Commitment for The Insurance (8-1-16) l Washington - SCHEDULE B - SECTION 2 (continued) SPECIAL EXCEPTIONS 1. Lien of the Real Estate Excise Sales Tax and Surcharge upon any sale of said premises, if unpaid. As of the date herein, the excise tax rate for the City of Tukwila is at 1.78%. Levy/Area Code: 2413 For all transactions recorded on or after July 1, 2005: A fee of $10.00 will be charged on all exempt transactions; A fee of $5.00 will be charged on all taxable transactions in addition to the excise tax due. 2. Liability, if any, for pro-rata portion of Real Property taxes which are carried on the King County Tax Rolls, as tax account no. 073300-0071-08, are exempt. We note Special Charges for the year 2018 in the amount of $10.91, of which $10.91 has been paid. Balance due: $0.00. (Affects Parcel A) 3. Liability, if any, for pro-rata portion of Real Property taxes which are carried on the King County Tax Rolls, as tax account no. 734060-0421-02, are exempt. We note Special Charges for the year 2018 in the amount of $16.79, of which $16.79 has been paid. Balance due: $0.00. (Affects portion of Parcel B) 4. Liability, if any, for pro-rata portion of Real Property taxes which are carried on the King County Tax Rolls, as tax account no. 073300-0110-01, are exempt. We note Special Charges for the year 2018 in the amount of $10.99, of which $10.99 has been paid. Balance due: $0.00. (Affects remainder of Parcel B) 5. Any franchises and/or unrecorded easements for private or public utilities affecting that portion of said premises lying within vacated river street. 6. Condemnation in King County Superior Court by the State of Washington, of rights of access to state highway and of light, view and air by decree entered undisclosed, Cause No. 646697. (Affects Parcel No. A) This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. ,Form 5030000 (1-31-17) Page 7 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington 7. Condemnation in King County Superior Court by the State of Washington, of rights of access to state highway and of light, view and air by decree entered undisclosed, Cause No. 646846. (Affects Parcel No. B) 8. Relinquishment of all existing and future rights to light, view and air, together with the rights of access to and from the State Highway constructed on lands conveyed by document in favor of the State of Washington: Recorded: May 28, 1965 Recording No.: 5884778 9. Covenants, conditions, restrictions and/or easements: Recorded: January 23, 1973 Recording No.: 7301230400 10. Right to make necessary slopes for cuts or fills upon said premises for East Marginal Way South as granted by deed recorded December 9, 1974 under Recording No. 7412090465. 11. Conditions, notes, easements, provisions contained and/or delineated on the face of the Survey recorded May 16, 1975 under Recording No. 7505160590 in Volume 4 of surveys, at Page 150, in King County, Washington. Document(s) declaring modifications thereof recorded September 5, 1975 as Recording No. 7509050552 of Official Records. 12. Conditions, notes, easements, provisions contained and/or delineated on the face of the Survey recorded December 15, 1975 under Recording No. 7512150809 in Volume 5 of surveys, at Page 171, in King County, Washington. 13. The terms and provisions contained in the document entitled "Ordinance No. 1138" recorded February 21, 1980 as Recording No. 8002210461 of Official Records. 14. Easement, including terms and provisions contained therein: Recording Information: June 4, 1992 under Recording No. 9206041100 In Favor of: U.S. West Communications, Inc., a Colorado corporation For: Telecommunications facilities Affects: Parcel B 15. Easement, including terms and provisions contained therein: Recording Information: November 1, 2004 under Recording No. 20041101000177 In Favor of: The Central Puget Sound Regional Transit Authority For: Aerial guideways, drainage systems and utilities Affects: Parcel B This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1 31 17) Page 8 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington 16. Title to vest in an incoming owner whose name is not disclosed. Such name must be furnished to us so that a name search may be made. 17. Unrecorded leaseholds, if any, rights of vendors and security agreement on personal property and rights of tenants, and secured parties to remove trade fixtures at the expiration of the term. File Number: NCS-341596-WA1 This page is only a part of a 2016 ALTA() Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements ; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1 31 17) Page 9 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington File Number: NCS-341596-WA1 INFORMATIONAL NOTES A. Effective January 1, 1997, and pursuant to amendment of Washington State Statutes relating to standardization of recorded documents, the following format and content requirements must be met. Failure to comply may result in rejection of the document by the recorder. B. Any sketch attached hereto is done so as a courtesy only and is not part of any Title Commitment or Policy. It is furnished solely for the purpose of assisting in locating the Land and First American expressly disclaims any liability which may result from reliance made upon it. C. The description can be abbreviated as suggested below if necessary to meet standardization requirements. The full text of the description must appear in the document(s) to be insured. Ptn Sec 10 Twp 23N Rge 4E NW Qtr & SW Qtr and Ptn Lots 17-22, Riverside Interurban Tracts Vol. 10, P. 74 APN: 073300-0110-01 and 073300-0071-08 and 734060-0421-02 D. A fee will be charged upon the cancellation of this Commitment pursuant to the Washington State Insurance Code and the filed Rate Schedule of the Company. This page is only a part of a 2016 ALTA() Commitment for Title Insurance issued by First American Title Insurance Company. This Commibnent is not valid without the Notice; the Commibnent to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Pan' I -Requirements; Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1 31 17) Page 10 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington First American Exhibit A ISSUED BY First American Title Insurance Company File No: NCS-341596-WA1 The Land referred to herein below is situated in the County of King, State of Washington, and is described as follows: PARCEL A: A TRACT OF LAND IN THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 10, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SECTION 10, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON; THENCE SOUTH ALONG THE WEST LINE OF THE NORTHWEST QUARTER OF SECTION 10 AFORESAID, 1168.66 FEET TO A STONE MONUMENT SET AT THE INITIAL POINT OF LAND RELEASED BY ADA H. BENNETT TO THE DUWAMISH INVESTMENT CO. ON AUGUST 7, 1913; THENCE EAST AT RIGHT ANGLES ALONG THE SOUTH LINE OF SAID RELEASED LANDS 924.51 FEET TO A STONE MONUMENT AT THE INTERSECTION OF SAID SOUTH LINE OF THE SAID RELEASED LANDS WITH THE EAST MARGINAL LINE OF THE PACIFIC HIGHWAY; THENCE SOUTH 13°05' EAST ALONG SAID EAST MARGINAL LINE OF THE PACIFIC HIGHWAY 567.14 FEET TO THE POINT OF BEGINNING OF THIS TRACT; THENCE SOUTH 13°05' EAST ALONG THE EAST MARGINAL LINE OF THE PACIFIC HIGHWAY 545 FEET; THENCE NORTH 76°55' EAST PERPENDICULAR TO SAID HIGHWAY 141.55 FEET, MORE OR LESS, TO THE EAST BOUNDARY OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 10; THENCE NORTH 0°04'10.7" WEST ALONG SAID EAST BOUNDARY OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 10, 559.36 FEET, MORE OR LESS, TO A LINE WHICH IS 545 FEET FROM AND PARALLEL TO THE SOUTH BOUNDARY LINE OF THIS TRACT; THENCE SOUTH 76°55' WEST ALONG SAID LINE 545 FEET FROM AND PARALLEL TO THE SAID SOUTH LINE 267.51 FEET, MORE OR LESS, TO THE POINT OF BEGINNING; EXCEPT THAT PORTION THEREOF LYING WESTERLY AND NORTHERLY OF THE MARGINS OF PRIMARY STATE HIGHWAY NO. 1 AS ESTABLISHED BY JUDGMENT AND DECREE OF APPROPRIATION ENTERED FEBRUARY 21, 1966 UNDER KING COUNTY SUPERIOR COURT NO. 646697, ITEM NO. 2; (BEING KNOWN AS A PORTION OF TRACTS 20 AND 21 OF BENNETT'S INTERURBAN TRACTS, ACCORDING TO THE UNRECORDED PLAT THEREOF). This page is only a part of a 2016 ALTAO Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements,• Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. 'Form 5030000 (1-31-17) Page 11 of 13 . ALTA Commitment for Tide Insurance (8-1-16) Washington PARCEL B: THE NORTH 20 ACRES OF THE FOLLOWING DESCRIBED TRACT: PORTIONS OF THE WEST HALF OF SECTION 10, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: LOTS 17, 18, 19, 20, 21 AND 22 AND THE RIVERSIDE STONE QUARRY OF RIVERSIDE INTERURBAN TRACTS, ACCORDING TO PLAT RECORDED IN VOLUME 10 OF PLATS AT PAGE(S) 74, IN KING COUNTY, WASHINGTON, AND RIVER STREET AS VACATED BY SUPERIOR COURT CAUSE NO. 663488, ALL LYING SOUTHWESTERLY OF PRIMARY STATE HIGHWAY NO. 1, FOSTER INTERCHANGE TO SOUTH 118TH STREET, AS ESTABLISHED BY WARRANTY DEED RECORDED MAY 28, 1965 UNDER KING COUNTY RECORDING NO. 5884778, AND SUPERIOR COURT CAUSE NO. 646846 AND NORTHEASTERLY OF EAST MARGINAL WAY SOUTH AS ESTABLISHED BY SUPERIOR COURT CAUSE 646697, 646846 AND 646939 AND THAT PORTION DEEDED TO KING COUNTY BY QUIT CLAIM DEED AS RECORDED UNDER RECORDING NO. 1004994, AND WARRANTY DEED RECORDED DECEMBER 9, 1974 UNDER RECORDING NO. 7412090465, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT A POINT 50 FEET DISTANT EASTERLY, WHEN MEASURED AT RIGHT ANGLES FROM THE EAST MARGINAL WAY CENTER LINE SURVEY OF PRIMARY STATE HIGHWAY NO. 1, FOSTER INTERCHANGE TO SOUTH 118TH STREET, AT HIGHWAY ENGINEER'S STATION EMW 13+00; THENCE SOUTH 07°30'05" EAST ALONG THE EASTERLY MARGIN OF EAST MARGINAL WAY 135.36 FEET TO A POINT ON A LINE 50 FEET SOUTH OF AND PARALLEL TO THE NORTH LINE OF GOVERNMENT LOT 15, SECTION 10, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M.; THENCE SOUTH 87°32'19" EAST PARALLEL TO SAID NORTH LINE 37.31 FEET TO THE WESTERLY LINE OF LOT 19, RIVERSIDE INTERURBAN TRACTS; THENCE SOUTH 01°37'43" WEST ALONG SAID WEST LINE 133.72 FEET TO THE NORTHWEST CORNER OF LOT 1 RIVERTON; THENCE SOUTH 88°22'17" EAST ALONG THE NORTH LINE OF SAID LOT 1 A DISTANCE OF 1.90 FEET TO THE NORTHEAST CORNER OF SAID LOT 1; THENCE SOUTH 02°24'24" EAST ALONG THE EAST LINE OF SAID LOT 1 A DISTANCE OF 123.54 FEET TO THE EASTERLY MARGIN OF EAST MARGINAL WAY AS ESTABLISHED BY QUIT CLAIM DEED FOUND IN KING COUNTY RECORDS RECORDED UNDER RECORDING NO. 1004994; THENCE NORTH 78°41'05" EAST 12 FEET TO THE EASTERLY MARGIN OF EAST MARGINAL WAY AS ESTABLISHED BY WARRANTY DEED RECORDED DECEMBER 9, 1974 IN KING COUNTY RECORDING NO. 7412090465; THENCE SOUTH 11°18'55" EAST ALONG SAID EAST MARGIN 501.21 FEET; THENCE SOUTH 10°07'24" EAST 107.94 FEET; THENCE SOUTH 89°17'24" EAST PARALLEL TO THE SOUTH LINE OF LOTS 31 AND 32 RIVERSIDE INTERURBAN TRACTS A DISTANCE OF 774.30 FEET TO THE WESTERLY MARGIN OF PRIMARY STATE HIGHWAY NO. 1, FOSTER INTERCHANGE TO SOUTH 118TH STREET; THENCE NORTH 04°33'59" WEST ALONG SAID WESTERLY MARGIN 165.03 FEET TO A POINT OF CURVATURE TO THE LEFT; This page is only a part of a 2016 AL TA® Commitment for Title Insurance issued by First American Ttle Insurance Company. This Commibnent is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements,• Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1-31-17) Page 12 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington THENCE ALONG SAID CURVE WHOSE RADIUS IS 1390 FEET A DISTANCE OF 1554.78 FEET TO THE WEST LINE OF LOT 17, RIVERSIDE INTERURBAN TRACTS; THENCE SOUTH 01°37'43" WEST ALONG THE WEST LINE OF LOTS 17 AND 18 RIVERSIDE INTERURBAN TRACTS 64.88 FEET TO THE NORTHEAST CORNER OF LOT 22 OF BENNETT'S INTERURBAN TRACTS (UNRECORDED); THENCE SOUTH 78°39'00" WEST ALONG THE NORTH LINE OF SAID LOT 22 A DISTANCE OF 91.98 FEET TO THE EAST MARGIN OF EAST MARGINAL WAY; THENCE SOUTH 04°57'54" EAST ALONG THE EAST MARGIN 268.62 FEET TO THE POINT OF BEGINNING; SAID NORTH 20 ACRES BEING DELINEATED ON SURVEY RECORDED DECEMBER 15, 1975 UNDER RECORDING NO. 7512150809. This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not valid without the Notice; the Commibnent to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I -Requirements, Schedule B, Part II -Exceptions; and a counter -signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Form 5030000 (1 31 17) Page 13 of 13 ALTA Commitment for Title Insurance (8-1-16) Washington L.41 King County King County Metro Transit Division Department of Transportation South Interim Base Site Lighting Calculations and Fixture Cutsheets September 2018 (111L.t)TETRA TECH L;S-astrtirwre Grams Tal 206.8i3A1en Fan 7a, Bie31 .vr.•rv,:a :-�tnJi uxn in association with KPFF Engineers LikECE:VED �C t 3 2wa TUKWILA PUBLIC WORKS OCT 12 201a Community Development _ _:__-r---------- i a i e'1 • i I.rem-,t'v.r'..«ui ial.A_ai. _e.s .. .•',A 3., 1,,•e.'e.i -a?J4" r,..,'e.,e.,'--1.1'I.,i.r'l.r•I.)i.1i.4i.4i..'1.•s.43. 33.21). fr,1"3lrir.a'l.l;.]' •.ti.l 711'rM; 33.0 i n'a.li.. l7.)la.I a.s • , • t ) t 1; al {i r'l 11L%a4.64 ' •, )Lt'I •,' 1' . '1.s(-11-3-17 . . I.4).13.,'I 3.I • 1 3.11.3ln' a.11.1'].)•1.23.2'1.a;.1•I.,a.1'4.13.11.23.3'1.01., la']!I1 :,.H-A.L. 'I.13.53.33.1 .03.)i.. ,..•.li.)ia).lia). 4,.• .-ii•.•.1. 13.2 i.•i.. i.• 3.4 3..2:21,j1 'ui.l ia'1. ,'•{ 4.1.4 1..'.'.•i.....a1.ri.al.a]..si.,,;_rr�lis'i...�,.v(}.1 -r___-_• V• ,..• Ii. .i4.1•I]1 01 ., •1 n,'.11.,1.•j,;i�+•a-vcr.^.'.:,.".'i7e:.1.1.4.1. O..6 1'•. t's.•'•.1 i.1) ,> •i.4 i.. ).43...,3. ini.s .11.l s l• lay.ni.3361 Yt•e191i.5t.,••14.E4a' N./I 4.1.4.s :. 11 03.2. 23. - .. '• a',.',,1'01.13 •3..i.,i 'r h; ��j�•��j�•��� I 1 ,� r •. o _• i � - .1-._ _ -�; _. 7• r -- ��l.dt)_1 '�.�•,.,',.. i.>ti 1 { 1 , . 5. i 1 , p 1 i..i.,;.a • . 1 ,i1 ) ] 0 ] t I II i.1i �.�•r. 1%1 ;•:It lit •e] 3) !, .1 11s 1,.'I ' L, t" l• 4Lr`i. •\.Ii. i. i , i i. 's li. i.oi .Shi i s ,• -•, ,i: -"Y'TstL•a-l.. ..• .t�i.l i.l 43. 'f}'1.f 1!sia i. i.si�si xs%'ali xi. i.sili. • 1.,i.)1.s'x. 1.s`r. i.]•,)i.o i. ilis • i,isisi ]'s 1: ']l.'s. �..). ,., :.•ia ,.t L. ,.,1 .1, ,1. ,..Sa11i.1 i• 1].,:,•a •.11ai..: ,.,1 ,',.1 i. ♦,,. ). ', 1'.,i •. •:.. 'r•i,: •i .. 1. ). •., +�•e- .,i.ai lln0:,,1:.e:..'...v>.,•r.]',1.•i..i.r',.ai.1',a'+xi. ,:•'a 'i1.11 •,"e.'..i. •,;.tit S.tia'.n 1. ):.•ia'•a i..ini. i..1�Y..,1a in'r•',. ,t•..ti •i,ei.el.l • ).,',n ..',.a'•o'r, i.•i l:.,'t ,',a.a :.Ii •,I•. '.,i.• )n•.] � ,:. xil ••. 1::i is;x:,'•.•iri.):�;.•i.tini..:.ci.{:.,1a :.):..:.:.h.1: •i.,i t' •:.,•t.•1.•.)'a. .x i. . }�si,'.fil Ltli , •i.oi. ia:�: a '• '�o ��, ♦ ]1.\ s ,• x. i 4 31' •• 3.0 il. .a 3111 )4.4 P 1 ilia: .. ,.. • .11.0 3.0.4., 4. . ,.s •t.1 :1•: 1, I: 1'11 i.. t., r••1 t't.{ • t1.} iai li.) i.t:,, i.a'1.)1.]'a.r 3.1 )., i.l :..'..1 .1.1 •l.l i.l i.) • 3133r13.3 a.• ,.l•.,i.•i.•'•.,\.li.l'r.)1.1.1.1•,.a i.1 :.4 {.1 •.• {.• •.• 3.1'I.. i.,:.•:.••I.,1.• 3.1 ;.,'1.] .. :1{:.• 1.1:.,1., 1.1:.33.]3.3:.13.): .e.,.]l.•: .1:.0: ,,3.33.13.7 3.13 .1. i., 3.4 1.1'1.e'a., '. ,.•.. i.4.•1.])., �r.•)� ••a ,. 3.. .1.0.1 •.1 :.• , '*.j }.a'1. 11.11 . 1'4.a'1.1 •i.0 }..:.11.1 ?. IA • ,i il., •.i 1.1 .l , .ai. i./1.t I I I 1 3.11e%15.411.43.1' •:.1 i.. .13. 3.e;.43a'1.3 3.1 ; "T,'t,,' •' • ,.1 1.I1733i �i.•:., 3.3 e1.13.4$.I3.0.0.13.13.31.33.313e i.l'..1••.):.):n'rei.,•.3i.0i 3.0 3.43.0 ] ,di. i-13.33.13.0.13.1.1.0 i.,i..i.,i.,i.,i A1. ,.1i.r e',.,', I.e 'sliril •�.,f.,i 1111, 415331.)) 1 i,•I S].1LIi.)i ;.1i.43/1 7 4. ).1.1 la r r 3.0 3.•3.13 1 :.I',., i.I'r.,'t•.ar.11.1'•. Maintenance ,•, •I.,) 1.0).)✓i. 03.,3.0:.0 1..,•,_ • r' Ier rr:/Y: ri'.,Y ,;., ,.•i.i) I.• 1.0 13.0. : ..4.3..t` :,•'..,1.,;.ti. I. ) 1:.1i.4 .03.43 3.33.4 ,'i;,.,'I., 3.03.1 ... 33.,3.1).13.a•,.••.1 i. • 1.,'1feJ ..,; I'1 a•t.a •,. 3.33.0).4'r 1'1 a •.•i.)'..2• .•; .1.4•I .j4. "•f )i a . i.fi.1'a 13. •,.,. ]. 33.33.1).0�y��t' SOUTH BASE SITE, Area - 328585 Sq.ft Total Watts = 20352.8 LPD 0.062 Watts/Sq.ft PARKING ILLUMINANCE Illuminance (Ft) Average = 4.41 Maximum = 8.5 Minimum = 1.6 Avg/Min Ratio = 2.76 Max/Min Ratio 5.31 I d milvs Ns ]. •1.4 1.3 '.ef.. 1, , I IJ i.,•,.a•1., .,: ):. •,.]'•.11. 3.1I ••ta 3.1.11) 1. `'.• .. ■■ i 313i 1'1 ,:.: 1; 1 ;.1' 1 3.,l� a.] 1 '1nI5 t•''{. e331.2i.4•.•1.10. . 1/03.13n1.1313.e3 ]'{.1'1•.1,.{ i.]']. J.. .11 .• 1 i.2..4313.13.. •.1 oa. 1a ii t.. 1.�� i.4 Luminaire Schedule Symbol Qty Label Tag LLF Lum. Watts Lum. Lumens [] 2 EASC_J4F540 Area Light 25k Lum Type 0.600 235 25200 O 33 EASC_25NX40 Area Light 56k Lum Type 0.600 470 56500 23 VWPH-L30-730-TFT-SDGL-OP Wall Pack L30 Type IV 0.600 2533 r 6 VWPH-L60-730-TFT-CGL-OPT Wall Pack 60L Type IV 0.600 _35.5 68.8 5470 2 27 EWNB_F4740 Wall Pack L12K Type IV 0.600 125 13700 • FIXTURE H, I GE Evolve. LED Area Lic,hting Scalable EASC EAS C-4-J 5-N-5-4 0-B-D K B Z EASC-4-Z5-N-5-40-B-DKBZ powered by GE Product Features The next evolution of the GE Evolve'" LED Area Light continues to deliver outstanding features, while adding greater Flexibility, style and scolability. This latest design offers higher lumen outputs and provides photometric combinations with high efficacy. providing the obility to meet even a wider range of area lighting needs. Additionally, the new EASC Evolve Luminaire comes with a specially designed auto dealership optic for exceptional illuminance on the dealership's front row. 0ptionol programmable motion sensing for Title 24 compliance is available. Applications • Site, area, and general lighting applications utilizing advanced LED optical system providing high uniformity, excellent vertical light distribution, reduced offsite visibility, reduced on -site glare and effective security light levels. • Ideal for small to large retailers, commercial to medical properties, and big box retailers. Flnusinq • Die -cost aluminum housing. • Slim architectural design incorporates an integral heat sink and light engine, ensuring maximum heat transfer, long LED life, and a reduced Effective Projected Area IEPAI. • Meets 3G vibration standards per ANSI C136.31-2010 for Slipfitter and Mounting Arm configurations. Meets 1.5G vibration standards for Knuckle Slipfitter Mounting. LED fs (ipto a Assembly • Structured LED arrays for optimized area light photometric distribution. • Evolve light engine with directional reflectors designed to optimize application efficiency and minimize glare. • Utilizes high brightness LEDs, 70 CRI at 4000K and 5000K typical. Lumen Maintenance • Projected L90>100,000 hours per IES TM-21 • Projected Lux per IES TM-21 at 25°C for reference: All lup to 398 WOthl L98 L95 - L91 oof va.a,..csy u.sd.m.u4 earl.mur,oaa new.eme.w. t omen Ambient Temperature Factors: 10 1.02 20 101 25 100 30 0.99 M.. _.. 0.98 0-S Standard t meet models wolbNe Most SKUs of L Series & ' Pleader refer notmeet al. neax refer w the d. l OPL hts oo for the blest and most compile information. wwr.d•signllghts.orq/peL Ratings • ® listed, suitable for wet locations. • .® listed with option code "J' SKUs. • IP66 rated optical enclosure per ANSI C136.25-2009. • Temperature rated at -40° to 50°C 1-40° to 35°C for fixtures over 390 watts). • Upward Light Output Ratio IULORI = 0. • Title 24 compliant with "H' motion sensor option. • Compliant with the material restriction requirements of RoHS. Mounting • 10-inch 1254mm1 mounting arm for square pole prewired with 24-inch (610mm) leads. • 10-inch 1254mm1 mounting arm for round pole prewired with 24-inch 1610mm1 leads. option • Slipfitter mounting for 2 3/8-inch 160mm) O.D. pipe prewired with 24-inch 1610mml leads. • 10-inch 1254mm1 mounting arm for round or square pole prewired with 24-inch l61amml leads. r,tp.n • Knuckle Slipfitter mounting for 2.3-3" 0.0. pipe. pre -wired with 24-inch 1610mml leads. Finish • Corrosion resistant polyester powder pointed, minimum 2.0 mil. thickness. • Standard colors: Block & Dork Bronze. • RAL & custom colors available. Electrical • 120-277 volt and 347-480 volt available. • System power factor is >90% and THD <20%.* • Class "A" sound rating. • Photo electric sensors IPE) available for all voltages. • ANSI C136.41 dimmable PE receptacle is available making the unit "adaptive controls ready' • Surge Protection Options: For 120-277VAC and 347-480VAC per IEEE/ANSI C136.2-2015. - 6kV/3kA "Basic" surge protection, standard. - 10kV/5kA "Enhanced" surge protection available with R option. • System power factor and THD is tested and specified at 120V input and maximum food conditions. Ordering Number Logic Evolves,' LED Sallable Area L)ght iEASC) EAS G E=Evolve C A=Area S=Scalable 0= 120-277 1= 120• 2 = 20B• 3 = 240r 4 = 277= D. 347• N = 3476480 'Sped], it ruse *Word se9dd F.Ronl l=Leh R. Rght N . Not ADDIkable 5=529nA kR 7.700,16 50 • CAN select 395wacreole thnmo fp Medan sµerfisd nrebtni to Pole ord Fixture. orm emu in Loud NdlMI Net.trioet. DS Symmet1K Medium 8300 82 ES Symmet c Medium 12700 119 FS Symmetric Medium 15000 137 GS Symmetrc Medium 17100 _ 156 H5 Symmetric Medium 21200 199 l5 Symmetric Medium 25200 235 KS Symmetric Medium 30000 _ 283 LS Symmetric Medium 38000 380 N5 Symmetric Short 9200 82 PS Symmetric Short 13800 119 QS Symmetric Short 16400 177 R5 Symmetrc short 10700 156 55 Symmetric Shod 23100 199 T5 5ymmetnc Shod 27400 235 U5 Symmetilc Short 7300E 283 V5 Symmetric Short 41500 360 N A4 Asymmetric Forward 4200 44 F L, R B4 Asymmetric Forward 6500 62 F, L, R C4 Asymmetric Forward 7600 72 F, L, R 04 Asymmet a Fo word 8700 82 F, I, R E4 Asyrnmetre Forward 12900 119 F. L,R F4 Asymmetre Forward 15400 144 F,1,R G4 Asymmetric Foram 17100 156 F, L. R H4 Asymmetric Forward 21200 199 F, L, R 14 Asymmetric Forward 25200 235 F, L, R K4 Asymmetric Forward 30000 283 F L, R L4 Asyrrunetric Fonword 38300 380 F, L,R Al Asymmetric Wide _ 4700 44 F. L, R B3 Asymmetre Wide 7100 62 F, L. R Cl FSJmmelre Wide 8300 72 F. 1, R 03 Asyrmnetre Wide 9500 82 F. L.R E3 asymm tr c wide 13900 119 F. L, R F3 Asymmetric Wde 1680E 144 F, L, R. G3 Asymmetric Wde 18700 156 F. 1, R H3 Asymmetric Wide 23100 199 F,1, R 13 Asymmetre Wide 27400 235 F L, R K3 Asymmetric Wde 3300E 283 F.l. R L3 Asymmet K Wide 41500 380 F. L, R A2 Asy me(e NM 0w 4600 44 F, I. R B2 Asymmetric Narrow 6800 62 F, L, R C2 Asymmetric Narrow 8000 72 F, L.R D2 Asymmetric NatrOw 9100 81 F L. R E2 Asymmetric Narrow 13400 119 F, L. R F2 Asymmetnc Narrow 16200 144 F, L,R G2 Asymmet a Norrow 1800E 156 F L R H2 Asymmetrc Narrow 2230D 199 F. L,R J2 Asymmetric Narrow 26500 235 F,I,6 K2 Asymmetric Narrow 31900 283 F L R L2 Asymmetric Narrow 4000E 380 F. L. R KA Asymmetrc 100• Wde Auto 35400 283 F L R LA Asymmetric 100• Wide Auto 46900 398 F, c R •Rating values for 8 and G me based an rated lumens and may vary due to fur tolerances. 1=Nax• A • A= ANSI C13641 7.pn Deming PE • Receptacle to D= AN9C13641 7-pin4rrrnrg PE Rec1podemt. C Shorting Cap T. Metaled-1PE fenctel sake*'O D dwr must alsoo beeaaddeadaed Wn Bavm8NS cd. n add enl hdNAve F older P rdrgexrd 5. Knuckle098510r PE a a smarm Um Ea 2.3n.. 3 0In OD Ten0r1. stocked vAth Nods0,45r WIted ok relievable 0 0 0 2 EASC D5N540 1ES EASC E5N540_IES EASC F5N540_IE5 EASC G5N540 1E5 EH5 EASCASC 155NN541E5 040IES EASC_KSN540_IES EASC 15N740 .IE5 EASC N5N540 IE5 EASC PSN540_,IES EASC_Q5N540_IES ERSCR51540 1E5 EASC_SSN540_IES EASC 15N540__, 165 EASC_U5N540- JE5 EASCEASC 05455654E 74E_71E5E$ EASC B*F540 JES EASC C4F540��.IES FASCD4F540— .IFS EASCASCfE0F4F55440I 0 EE55 EAS E_C_G4f540 .IE5 EASC H4F540 .IE5 EASC 10540-IE5 EASC_K4F540_IES 55_L4F740T„_ 1ES EASC A3F540_6S EASC_83F540_IES EASC C3F540 .IE5 EASC 03F540_1E5 EASC E3F540_R5 EA5(_F3F340 JES EASC G3F540 1E5 EASC_H3F540IfS EASC_13540 _IES EASC K3F540 IES EASC 13F740_IE5 EASC A2F540 IES EASC82F540'^.IES EASC_C2F540__ 703 EASC D2F540 1ES EASC_E2F540 IE5 EASC F2F540—.1ES EASC_G2540_1ES EASC,H2540_1E5 EASC 12540 IES EASC'K2F540_I5 EASC L2F740 1ES LASC_KAF540 IFS 5.5_LAF7400 1ES 10•Mm for -kPl.'a: &pd5 D=0vmm�q Spoare Pole D52 = Gad, Brave 10-100o802 11} p5hed wdh leads' GRAY =Gray F = Fusvg 10•Amato( WIRE =Wfiae N= Motion Sens0.`D Ruud Pole Contact manufacturer 1 - 0UVCacudo wpµeewMtod4 R =rSSurgelaadercolors. P ecten r Npe1237Ein ODI Kul=*cal Croons pp4edwith leads t Oernung leads MI be 10'4r911a round or puvidsdnrauyh W bock square pAK suppled peamW ,ess spurho has D PE fdKdn When...18ring mama 9me8Cy.an H• re of 9' Maro'g rem and tie selected evenedBlue p increase IN krithserna # Darryl iiaaidad wdnR man Do mrdwrzleao ni * ra.ti EASCD5N554 1ES EA5C_E5E9550_ IE5 EASC F5N550_ 1ES EASC G5N550IE5 EASC HSN550_IES EASC15N5S0 1ES EASC K5N550 JES EASC_L5N)50_1E5 EASC N5N550 1E5 EASC P5N550 1E5 EASC_05N550IE5 EASC RSN550 IE5 EASC_SSN550_ 1ES EASC T5N550_ IE5 EASC U5N5`A_IES EASC_V5N750_,_,.,,,, 1ES EASC A4E550 .IE5 EASC-84F550��.1ES EAST:C4F550_IES EASC_D4F550 IFS EA3E4f550_ ES EASCF4f550 1E5 EASC G4550IE5 EASC H4F550 7E9 EASC J4 F550 IES 551(2 550_1E5 EASC_14F750IES EASC A3F550_1ES EASC83F550_ I6S EASC C3F550_ 1ES EASC_D3F550 1E5 EASC E3550_IEj EASC F3F550_IES EASC_G3F550 1E5 EASC_N3F550 1E5 EASi_13F550_IES EASC_K3f550 IE5 EASC_13F550_IES EASC A2F550 IE5 EASC_B2F550_ Ifs EASC_C2F550!ES EASC D2F550_ 1E5 EASC 62F550_1ES EASC F2F550 JES EASC G2F550_.IE5 EASC_H2f550�—IES EASC J2F550.IE5 EASC_K2F550_IES EASC L2F750 1E5 F ASC�KAFSSe 1E5 EASC_1AF755_ 7E5 Photometrics 1°ASC Type V - Symmetric Medium IK5) 30,000 Lumens, 5000K IFASC_K5NSS0_ .iesl 2 Gnu0g Nuance n Units 0Ie r Mounung Ngltt 0 4D Nord Fornardestimiat Grade — Venad pMx dwagn npnapmd ongk of momum candepomer a AS• Vend plane Waugh harems mye of 72. f A5C Type IV-A0ystllnelllC forwo rrt 3, 509 1.11rnmrl5, 5330K IE ASC_ K4f55C1__:Ir'sl GlldDistance nlvrasor MWntin Neght0 4a UNa1 Fmcomm values a Grade vu! cal pima dtragh norvmld ogle alm arena 00dlryw.r at 45• — Vaned plane throghlrraaaa angle of 72. _.C. Type ID • Asy nnletnr. Wide ,1,047C• kitnem, o 55051 I EA55. J God 061mnn MN al Mwnng 84412 a40' Mad FeacaM Voles at Grade — pmthagh Fcrvonmlangle vacarof momiaricar lepweid20• — Vaaca planet rough eoricor80^n94015F EASC Type II • Asymmetric nc 31,900 Lumens, 5000KIEASi. f..,I,550__.IeGI God Distance aof Mounting a aces 0IMOI Footeaodie Values Grade —Vaned plane through honimtd angle of maximum on*epwer al65. — veneer prom thagn horaonld orgle d E.O. CA51: Type t! - Symmetric Short (US) .33,0001..umens, s000K fFASC_115N550,_des) ...tame in Wm of Moamug weight at 40 for ;Rae dle valuesel Grade Verucd plane though 909...wl org. d rnmamum cocky..re• of 20. vertical plane rhragh hcFewitd m9le of sr FAF.C.'Igoe Iv Psyrrnneir L: f-n,wetr. W el 7,FS LDEYIE0S.Fi:/lK/K iEA<I:,, Ei•t�SE:O,.,,.irei Grd Dmanc20 MAs o1 mounting Height at 3a inm01 FOalcadle vox. at Grade Grid Ponca n Una d FFKA."5lleg42a DMid rcamndevoYese8 Wilde *mai clone through harimmq ogle dmammm candepaeeo of A5• — Verca paw [Iv ough'ariewlo! angled 7r W dic4 plane I18541 horizontal angle of rroamxnca dkpoxx MN' — vertical prone though noreored angle of SY ':A5CTupe 11 An! r ,e, P :S 0340Lums1t : 30(1FC I,L'A ( F.ESSfl .last Gal Defame ns of Mounting Height of 30' coital FQ0lcade VOlues al Grade Veram al Wore through horuo9rg10dmaamum 5Mkpawen a6, Vermd pane through hanmma angle of60. Photo natr'ics L.:S . I.1 p. II - Asymctric Auto IKAI <iLul csrr.. 5000K{EASC_KAr 550_ ies) 4t1041cCl, C Ar,014 on ePt, ng � .551 Co 6r — .0[0 rb<C.dp+bvm'n 600 01,00000.0.0 ronalq ne MO' — Vet P'>ne'llruyl Ivwv' roe 51 le H-Motion Sensing Option: EASC Type II - Assgrrietric Auto RA! 45.900 Lumens, 50Df& IEASC_LAI.750_.le') r.l00rrev Or.. 01 anti- +.004/Vil en tl•Wd rmnw1.5 Gmee • Intended for high mounting app:icotions. between 15-30ft 14.57-9.14m1. For mounting heights exceeding 30ft. pole mounted sensors ore recommended. • Provides o coverage area radius for walking motion of 15-20ft (457-6.10m1. • Provides 270° of coveroge I-90° is blocked by the pole). • Comes standard with 50% dimmed light output with no occupancy. and full power of occupancy. • Comes standard with photocell (unction. Note: It is not necessary to olso purchase PE receptocle or control • Comes standard with o 5 minute occupancy time delay and a S minute romp -down to the 50% dimmed level. • Must order with deccrctive mounting crm options "A' or "8'. • Fixture power increase of 1W expected with sensor use. Note: Standard options moy be reprogrommed in the field. Reprogromming instructions included in product shipment. — 4n.tl Pb a 150046 eysm:y mp5 a V. maven um orderP'6c?Q —n<d>rme 0004 wum:vmpea lr Sensor Pattern: 70' 10' 27 1P 10' 10' I 70' Sensing Pattern Area Fixture Lip to 30 ft. Product Dimensions (Option A) 10" Arm for Square Pole Mount (Option B) 1011 Arm for Round Pole Mount (Option 0) 10" Arm for Square Pole Mount or Round Pole Mount Option ()includes all rnountin3 hardware in Option A and Option 5 5,00 hie .000101 'd Pl..,n xl• A,mw mnrn 5.-0.115 rc6 OOP. In mom 00 115 mm001 e•, Illm.l L11>.n Ill mml BACK VIEW Option A orld D Squore Pole 3.5 inch - 4.5 inch Pole 189 mm- 115 nun/ 116691M w}0 mml SIDE VIEW 000 151 mm1 • 1a> In la 501 Pel 105n. 1}» mml IVA 00.00 1 7— 'IiIuiIII. I I I MS I}y mml 56110 Pur.Ohlr 166> mml }Sin 1119mm1 165 moll 6575n •III>m mm1116}ern 06}5 N 1:6 mn. TOP VIEW FRONT VIEVJ 0•un Illmml BACK VIEW Option B and O Round Pole 3 5 inch - 4.5 inch 0D Pole 189 mm0D- 115 mm001 }1}5•• :5• mml 11011m •}50m 101 1 1101 1 50161n 1116mm1 • Approximate net weight: 43-471bs 119. 50 - 21.32 kgs) Contact mnnufnciurer for speclrlc configuration weight • Effecllve Projected Area (EPA) with 10' Mounting Arm' 0.97 sq ft max 10.09 sq ml Product. ' r'=•;,ions RACK VIEW ' fittte TOP VIEW In 717MK OHLY 0.9 MI IIS60mm on] 1119 99911 66660:, 16210m n1 SIDE VIEW • Approximate net weight. 41-45 Ibs 118 60 - 20.41 kgsl Contact manufacturer for specific configuration weight • Ff!ective Pro;ected Area (EPA( with Slipbtlec 0.47 sq ft mox 10.04 sq ml KNUCKLE SLIP)II'LRARM MOUNT 0' TO 45' AIMING RANGE I ,x6 m On. P6,rm 001 RACK VIEW (Option Si Knuckle Arm Mount in 152 mm1 169n 16 .n ub mml ▪ TOP VICW SS•nx•.u.}.9•0 to Rib in 19661 96.91 SIDE VIEW son 1122 mnl FRONT VIEW FRONT VIEW • Approxirnole net weight 41-45 Ibs 118.60 - 20.41 kgsl Contact monufocturer for specific configuration weight. • Effective Projected Aleo:EPA( with fixture mounted of 45• upward. 1 97 sq f! mox Mounting Information Mounting Arms for Siipfitter Grilling Templates for Siipfitter Arms Cu Aral Mount SQUARE POLE MOUNTING ARM 3.5 TO 4.5-inch 43910 114mm1 SQUARE (WILL ALLOW 4 FIXTURES PER POLE ®90 DEGREES.I ORDER SEPARATELY FROM FIXTURE AS CATALOG NUMBER SPA-EAMTIOBLCK "Black' SPA-EAMTIODKBZ "Dark Bronze" ROUND POLE MOUNTING ARM 3.5 TO 4.5-inch 189 to 114mml OD (WILL ALLOW 4 FIXTURES PER POLE ®90 DEGREES I ORDER SEPARATELY FROM FIXTURE AS CATALOG NUMBER RPA-EAMTIOBLCK "Black" RPA-EAMTI00KBZ 'Dark Bronze" 5.250 in. -I 1133 mm MINI 1.812 in + 146mm1 1.250 in. DIA 132 mm DIA( Hole SQUARE POLE MOUNTING 312 in. DIA.. (8 min DIA.] 478 in. DIA Ill mm DIA( —-I% (2 Places! 156 mall 4.392 in. --1 1117 mall -•—.6561n. (17 mall --- -• 1.312 in 133mm1 ROUND POLE MOUNTING 3.5 TO 4.5-inch 189 to 114mm10D round pole ma.nong oral .312 In. DIA IB mm01A.1 1 5.250 ic. 1133 mm MINI 1.812 I (46 mal)_ I .750 in DIA 119 mm DIA.j HOR 438 in DIA. 111 mm DIA( 12 Places -.-.t. 5.438r m 2719ir 1138mm1 169 mall Wall Mounting Bracket Adapter Plate ORDER SEPERATELY FROM FIXTURE AS CATALOG NUMBER W MB-EAMT06 .NOTE: For Wall Mounting. order luminoire with mounting arm: C = EXT Slip -fitter 2" Pipe (2.378 in. OD)supplied with leads. bbwated by C,E Other mounting patterns are available tor retrofit Installations. Contact manufacturing for other available mounting patterns. u 1'o07M4 cr. IM 07Ldly of Not 'espM"e wea) ,n'Teretca V wiled s su0letl to c^"-"C9 wrw roue u win an onnn or 14210.O..n wren mpwt0 ✓en c0orelay 111$U nCur6•l.pa,eet06yCA sa ...Ins Ow Len'c: (Tow Corr,c-y 0 ?DAM w6wwcurrentbyge.com 01P3090IRev05/02/181 FIXTURE D VOLTAIRE MINI ARCHITECTURAL WALL PACK VWM V iNAH-L20/740-120 VWM H - L20/740 - T3 - DBZ - SDGL - OPTIONS - DIM - UNV {Poe OR MU Cl 1011322111 KAP MORN NRR61 1E911 *IW tam 01 MOO CROSS SECTIONS LED VWMV IW27 ,, 65 lest LI P - L� 1oo,ne From raw VWMVIWeigln 551ba1 From Veer ORDERING INFORMATION S.. Vow 3.1/F 5.de Vim, AX on Uphph1 AIDPIKOIMn SERIES VWY V011are M. Ann.:everal Wa::Pace TYPE V 11prHcn131 VWatt& LED PACKAGE man ed'a LUMEN PACKAGE E..unple 1111740 NOMINAL LUMENS NOMMEN MIEN 1.700 MINIMUM CPI R COT 1121•BC CPI. 3GC01 140 BOCRI,,000 /S0. 70 CAI5006 UO 7000 130.10 CPI 3000K 140. 1D CRI. IC0AK 150.10 CPI. 5000K AVERAGE SYSTEM WATTAGE 13 16 75 DISTRIBUTION TL Lam6rlian 0.011 utbn RIO 1 LIT onryl Tl IYee III K700n171 AINISH OPTIONS 1c, cuslan cdar, ribs it* WlM al liv:c- 1 ELK Enact RAI /90041 Gel Ore menn 01R Medium e•ave GRAY slamare stay SLY Satin alaninm1RAl/90061 WKT Mite (RAI/90031 SHIELDING W6l 5oI:l. a.Ut1edtenured lemaered 171a111en1 CCL CRar emaere0class :ens OPTIONS See bate la oaten h:es PC Fat10,7 n0IYIa00ollonnlyl apla•111170V 706V. or 711Y anI: mum meta, yalupl SPIO )OVA/101Vlure• otoran1pn DRIVER OIM VOLTAGE Muumuu hirer aawsre0 la 0.10V lan1rn11 120 770V 101 70 0. 277 771V UNV 170217V 11111 H E Williams. Inc • Carthage. M.o. • www hew torn • 417.351.4065 FEATURES GENERAL • EngMan0 rdi Itichantuality tnlwe relebuily o byame. and gWlily • Proo:0•4aetwily an0•coanlhgeling Iry wanways.Inp..,, pre clean. andlata0et • Inlenked la use'. both uPlrjl and down 1.2Hl apaiolens • Aaal6c'w17 dalgre0 bewtnnl and [al Lousngs 0larnd seam2ss.y w.If Ivey el arch:nuu:al sbrles • Puree se lo%mdeld to allow runoff el 0.1t and wale! for an alwa75.Uean appearance - 07lonalene:92.sa. ng onolntell a::able • Rated >50.000.3ws at 10% loam• mateterinu 11101 • ANSI 30002,,COOK, or 5000K CC7. • M:mml,m79 CPI • A.ailabla in siral*Ca'C':r.•p. catons • This Iialw•'uaroudl madelha USA THERMAL • IntaerU C'e.ual aluminum ha&ant acw0es axonal paslioe Verret a apemen) ▪ Concealed lealsn/ Oesi9n preserves nthileclwal aDP,RIPce • Ra:•d am5:en10aerel'n9 lemderalwe • 30C 10517. 1110 1111. • 30.7.la 45.0 0.261 OPTICAL • Fun Wlnll dere.sey tamalianlate:., Id.wn.0, 20,1'441ton,enll 1 au light w4ara :I -a needed wish mmimS glee ELECTRICAL • 0.IOVOmnog sla10a70. • 161A/101V amp. a0nnen o0lanaI QLe Fewomc l. aAte.. .wl ,n.gi ealto I.a t..layt Ism% r m..el reams 3 1• 18mf Wa1: Mows Pap 1017 VWM VOLTAIRE MINI ARCHITECTURAL WALL PACK LED DISTRIBUTION DETAILS SPECIFICATIONS Kaoline - Diet asl aluminum antic,:. T6 am Al Man wpm - In:a9r113,0 tall all>-1:num heals.. and LED sou. prawC, panne thermal manapemenl Rased ambient apex el nu lemonalwe 30•C to 50•C IL70. ll)f. 3PC to1S-00701 00 lie& Sante, - Cenral output wow.. It11cw011 660 Se es - ANSI 3000K. t006K.a, 50CCK CC7. 10 or BO CM LEDs 170 wood board 0ngn 110 SLI1- Chip on bark 110 Olive, - 0 10Y demung Electrical - 170.711 VAC mu. range. 5C. 60111. Inwer lacier > 90. 7110 r70% 81 lull Mad 1CC (less A romphew Oui l disconnect .coo pre.oe0. llelt9 • Sum, durable poNevar °owe& n• a1ncee Ic alplphal•.lre•mul•. slap prerraa'ed me•a: mere and e.taeds AMA 7604 spenlnnons lcr 0unaar G ,0.1:1y Aveilae in sit stantatd t0brs Cualom colors naaable Mounting - Sc'lacn moo. Rrectry over a ma.07:lal ac. Must be anthwe0 to advs.. strut ✓a that can sale% suapon In13,1 w•p0Ie 51bs1 Mellor, • tCSAus ter Lilian asl;an'a1•Ve swab% 1st we: balms • 0e1pn1'phts Consortium 00.1111d or000a1 Nat all verstel. el tea (radix 0 Ii e TC au died see the MC 31 al ww dea5n1ip5n wp/OPL • [V4031 .100>50000 bows ;et IES IM.71 • Iasi eO to R51M.19 0711arne:0a • Leine Fan, Idled. • IDADar1•51ya M.admownt:eh: aapricat one cn7l • POTS compliant • IP65 rated. • low 74 emnplianl mill PC oaten • Alt clan1led per IFS TM 15.11 Warmly - 5 ma, landed Arranty. sea how cum/w.an:nly V` VWMH TL VWMV TI VWMH/V TI VWMH/V T1 Char Glass ICGLI Solile G43,150611 FIXTURE Series VWMR PERFORMANCE Onuibulran TL package /10 DATA A.era3c WOII.go Sys,em 13 CET 3000 CI ea, Glass ICGI) 5 alma Gloss 15041 I BUG i Ret g' Oclr.c,M I Mow,Oelr.c,ed lumens IIm7WI'' I MEMINEIM®MIMM EPNA ate lumens' Um/WI ' 1000 ®' MEEMMIIM 5000 ®�®� 117 Ifi 3000 ®MEEMMIEMEMIN BI UOfaO 1000 ®11110ZE111111103311111 ®" 1111ECCO®®® n L:0 75 3000 mummiacuommaie GI LC GI OM ®" •2311111111MIMEEIN WilIMMIEMIIIIEMMEIIIIIIIMEIIM YWYV TL 110 13 MEDEMIIIIII®EIMMEIM 4000 ®' MIIM0MZEM ® LI/ 16 3000 31 UO co ®" ®" ®' IECEMIIKEEM ®" ®MEEMINIZIM11111101111 Tl LI0 75 3000 1111151EMMIIM® 31 DO G1 F000 MOMMEMEDIMMIIIM 5000 MISEIMINEEMNIEIIMINIMI WA' emmm., areapre le 170V!m;wl111V+a-1 I7'mae.3arawiwl000.rl0 vepe ease mr4:atenN llonvnew I]11V ap:yyn.t mem,. mummee mm 179144 I M.A Rome s Oman me hate a ]STlergaanoe LUMEN MAINTENANCE union Package Amhrter Tenp „spat led l]0 haven. 7n L20 75•C >60.000 35C >54030 45.0 >60.00G 110/l17 75.0 >55.000 35•C >55 01:0 45'C >55.090 OPTIONS Nark e.. t. :lama 1ES IM eOc aponu • Repaellalci0<amemst.11n1151M 21 MOUNTING DETAILS PC Feelny.nslacee button style aho:otel1 1120V. 706V. et 7/7V an%. r'..s1 spec', so'1a7e1 wnl7Ata11 W Ilamt Pagr7a7 •.e w1111ar•.1.re. 1101T PATTERN DETAIL H F. William,. Inc • Car, ha g0. Mlssuun • www hew cool • 417.350•4065 bnnm conflllsen: u6Pa , OM -le +awl pate 14[mo 90 REVa/11(1 GARAGE FIXTURE D VOLTAIRE ARCHITECTURAL WALL PACK VWP &- 01-1-L20/740-120 TYPI LED 115 VWP H - L30/740 - T3 - DBZ - SDGL - OPTIONS - DIM - UNV NDi3 0 I31 171U ml MIMMLI RBI 91001.1 UMW emu MINI IDLY 1I0/11 In U1UR0G CROSS SECTIONS VWPN W'epnl 15Lb1 mearr.:m wean: won FM/IGWC or MSGK 21 6, sari 1-1 q.v., -I FIom rlew VWPV We,ph1 23. es Q31r �I 1 L1'-••1 lr•1T /rant Vow SIC. Vow Up1;h1 99960ean Side Wew snow woh EM/1CN'C pr 630X ORDERING INFORMATION L'plphl A9phcalan L J Side Vow sown will. EM/<W or MSGK SERIES VWP Vo1111,e A,cnilecr1U Wall Pack TYPE N Norval. Ml ✓ Venxel LED PACKAGE See lac, 0,;u1e • •Io', 11, 34•a LUMEN PACKAGE F ...plc 160/140 NOMINAL LUMENS MINIMUM CRI & CCT 730 • 70 CRI 3600K 140 . 10 CPI. 4000K 75C • 70 CRI 5000 DISTRIBUTION AVERAGE SYSTEM WATTAGE 36 10 T3 Tn. III nT Iyoe Forward Throw FINISH OPTIONS For Lamm cdp,, win Jx VWP a1 bua,.epn.' ILK Slack IRAL 1911C01 eel 0a,1 Mon,e 011 Med1,m6'0na GRAY S'endard grey ELV Sell. alum,num. IRAI MODS) WMT Who. IPA:49003) SHIELDING 10GL Soho.. 011 I used le,Iured lempele0 glass,ns C6l Der tempered glass lens OPTIONS See pipe 310, Doran dee111 EYN W 4•wa11 nregra! emergency LEG diver. 5133 lumen oulpul 1170.211V n1y1 VWPV mchdel muting el tension Increases I'umly depth) SF 5 ogre ruse 1120V. 27IV. 0. 341v on•y. mask Ipeclly renege) OPTIONS IConlnued) Of Opole lose 1208V 210V. or 460V only, must soer.l, w:te9el PC stallemle d 6u11o01, 98omre7.1120V, 20614 c, 217V only, tl s0ecd, ,mlM0e1 MSCX Emory musing tortes.. used to mum con I wi'n FM 0' OCC cplao CONDUIT ENTRY 1otuee 1e1u11e muan9 e1m'mn wnen uec19e0 wnn condo.: entry Co0ul entry pm»Esd0,1n I? f0T1apered ppe Ovead anf p19 Coa, I I mega be sup07.10 L./ ote,t. CR CL CO VWPN ONLY EM/10WC R19ni s10e mndu•1 en11y lell ode module entry Dual moduli entry hell end EVN) 10.wa11 emrpenn LED dower.1000 lumen ourpul, lave :unmeule. I-nclpdes musey ens. Increases I,nw1 depth. 120.211V only: not ',ble win CR Dane CO c9lanll OC C WSFEP.211. L_ raeclsy mta-ed ocnpsnq senor. Include s hous.ng exrensw lmc,ea0es li,lw'1 derhl. most sprit, lens. see pace 2 los deter,' Op,anol ISA 100 vale 03. Ordered se774 e11 7see access... ACCESSORIES IVWPHonlyl FSIR 100 Remote centro'kl 1:r Occupancytnml' DRIVER 0IM 0mmino droe, prewlao lur 0.10Vmntrols VOLTAGE 121 120V 206 208V 177 211v UNV 17071/V 347 311V Inrude s slepdcw•n unslom•e,l 480 180V OncIaees sIe7da11e '10n71c,me1 H f W'II11ams. Inc • Carthage. M15500II • www hew. c0m • 417.351•e065 FEATURES GENERAL • F names,. wllh:MI„971e1.10ue1oy avials to Insure relmbiLry. normance. and am171, • P,oydts security and accent l,pnnnp lor walkway. strikes. per...wets. end xc des • Inlander, 10 use 1n bo'h uoIghl end down6Po appl'mal'ans. • Aesmer.callx despnee noomme l and T11 n0useg0 blend seamlessly w11n a yyr yol 61m:1e0Iurel exists • Pp7pa311ul1y modeled loallow rued' of Mr end water to, en'Mays clean eppeerence • A1cn.lrlsteln0nm0 wens.. cor on can be ,cad w,lh m wll0opl FM Ic moms us1Mlics Ih,c,gmul an emoe rojec, • DMMaul ene9,.saengpnolocell/ occupancy sensor eve.1v011 Prep >50.000 and u11 el 10i'wnun rnemienence 1:701 • ANSI 3000K. 4000K o15000K CCL: nwomurn /0 CR1 • Avy..40Ie n sot standard In'u1 woos • Ina li,lule s proany lade In the USA THERMAL • lnegl4 ro.ca01 elumnum nca7slnl O:s,011 Darnel peslire thermal rrallnagemenl • Can(fated melsne deu01 preserves ermlleclu,el eipewance • R1:ed 101 •10'C 10401C e1n0.7n1 c9e:aIng empele:ale 120.0 to IC'C win FM/10WC, 0•C 1a 39'C w,hOM/1W). OPTICAL • Acly1,0 mecnan 091cs Maduce Standard 115 c.s"erans . xu1:410N der6.ry mmpllml cres (a0wdphI onTI Pace Ipe where a's owed with minme19le'e ELECTRICAL • 0• 10V dn'mmo s1nda,d • 101A/101V stage promo anal riled • LEDseuemw Opp. lomnanlle comet p.n.s Coy 101 ncresud re end, RLE • eir t onto, arm. .vela seeders par ova swam., tr,ra• spur drat -men (lease 1:7‘7Iy Ou-nly rexren p• Dace W Slams Wall Pa9e1013 VWP VOLTAIRE ARCHITECTURAL WALL PACK LED DISTRIBUTION SPECIFICATIONS M•ueing - O0•cetl eIumeum endow.. Thermal Menapameol Integre, de •cask elunm,m nee sink ena LE 0 assemole a'o.de passlre mums. mwlscemenl Rred •717C •e 40'C 11n0.em d0ra11ng Iemperelve I.20'C to 107C won FM/ICWC: 04C to 39Y wnn FM/4W). Optical 3,etew - Premi en, 0,10111n mica. Mlrecorescry114Nn0eo pro.", ended IFS dis::.6al,ens LE0 Assemble - ANSI 3000K. 1000K. r 50CdK CCI, m'm'mnsn 10 CRI LF0t. LE0 Drier- 0.10V dnmm9 Electrical - 170• 217. 341. end <B0 VAC mpa: range.50.60N7 power lector> 90 7110420t or Iu11 load FCC Clefs A camµm,. 103A/101V 0u17epra:trmnrn0l,d OmcFrsco0mcl pmv.ded Fin iN - 5.9e, 0,14611 041yesler mwde, ei bonded to 0700Sphale •Least mulleee9s peel reeled meld. meet end e,ceeds AAMA 7604 specd'cat.ons IN outdoor du,e311117 A,e,lehl• In sr. standard eola't Caen Colas e::n'e Meuning • Surl,Oe mounts d11r11y eve: a mei mull. oulletbpb Must be anchored to see9VeI10I, actsdl the cal salely su0tra I'., lure we/n1 IV W PM • 15 In S. VWPV • 23 16s1 Owings- • 1C5Aa milled as tummy,. suitable lot wet ncel'ms • 01s190lpn1s Consri.,n0as1111e0 prp0uxl Nor ell yetsipns ol'nis product may 6e OLC ws1i1,1a. see Me O1C Oua115ed Pm0ucss List al www es.pli9nls a0/OPl • Cs'Weed L7Olmenma nlnnce >50.000 mu1 per IFS 7M•21. • Tested to IFS IM• 19.08,1.Meces • L lLMng faoul4Cled • 10A Cork Sty epprowdlduwni.gh: epplcamns0npl. • RONSmm;I1n1. • IP65 rated • 1.11e 710cmp'"can• wanly OCCWS 15P-211 :_ [plan • 8UGN•ss111ed per 1ES 1M•15.11. Warr vale • 5•,ew I.m,1ed warmly. see 11w LW/ wau,ly We11 Pace 2o'3 FI T3 T3 TFT T T U.G'ss1CC1: See Glass ISC011 Der Gless1CGL: Some GIess15061 XTURE SHOES VW/M PERFORMANCE n15IRIBU LION TI DATA 1117AFN RACK ALF L30 WATTAGE' 36 ICI 3000 CLEAR GI A551CM 1 501.114 CI ASS ISOCI BUG RATINGS OELIVFREO ESNIACY lUM(NS" IlM/YII" 3174 88.2 GILIVFOLO IiI ICACY IUMLHS" IIMIWI" 2563 82.3 131-1113.61 4000 3327 92., 3106 86.3 5000 3436 355 3209 891 L60 70 3060 5933 8e8 5687 84,1 8F010.61 4000 6611 911 6112 66.2 5000 8831 91.8 6316 911 TIT 130 35 3000 2113 751 2533 70.4 97010.67 4000 28.4' 790 2655 738 5000 2139 01.9 2743 76.2 110 70 3000 5470 711 5065 72.4 82•170-02 4000 5E84 813 5309 255.8 5000 5876 83.5 518E 78.4 3000 3115 865 2906 80.6 LIO 36 4000 3403 945 3111 683 67•Ltl'G1 71 _ _ _ 5003 3365 94.0 3160 878 3000 6111 66 2 5813 63 0 L60 IC 400C 9604 9/.2 6351 9C 7 82-J0G1 VWPV 5000 6767 957 6317 902 3000 2840 78 5 2651 73 6 636 35 4000 3103 852 2895 804 87-0110.61 TFT 5CCA 3686 851 2681 600 3000 5622 13 2 5125 73 7 L66 70 ICCO 5999 657 5600 800 83•60•67 5600 5967 as2 5570 156 • er*O00w 0V e.e11001 ft. can/Yuy nm e:w1 n01 ova.sswrpe vette on. egs pm el XV nv0ga Ir1v Telu.ltres revel m au0emre m17 if SWAIM 71 Mw!s ,sew. •e nosed on /VC •,e•ml,emoval. BOLT PATTERN DETAIL Slams r•LLLi.tooli Jo". N E WIIUams. Inc • Car the g e. Misa0u71 a www hew c0m 0I7.35B•4065 »e•.rmowowl r•r,•, a•a'a. »U+qe•, ..r• +au MOWIOSIOU RL'1007/18 VOLTAIRE ARCHITECTURAL WALL PACK uwp OPTIONS OCCUPANCYSENSOR OCCWS FSP-211 - L2 N08(86 IlYS SFMI e Fully e0lus,a0le high and low dimmed light !awls. e Designed for LED fixtures: ratted for extreme temperatures and up l0 200.000 on/oll cycles. e Hardroll selpont with automatic calibration option for convenience and added energy savings. e A4juslable via handheld wireless conlpuralion tool lordered separate„I. e IP66 rand with choice of lenses for wet and outdoor legations. and mount Mg heights from 6' to 20'. e Adiuslab0 time delay and c0t01I delay FanOry set to 10% dimming at 5 minutes. culoll et 1 hour. Il•T Tm3' L2 Lana or Factory -installed button -style photocell 1120V.206V. at 277V and must specify voltage) OCCUPANCY SENSOR ORDERING INFORMATION 000W5 FSP-211.__ Factory- installed occupencysen0Ol, must specify lens 1120V or 277V only/ LENS L2 Coverage el 6' mooning height' .00 1.3 Coverage al 20' m0unling height gag' con! iguratin tool;5I= - " e wireless tool stores W to five re emeter profiles to Speed nn'.,g.-- in of multiple pesensors Rq3 spicily n an:.ty required r propel Visit www 00ll0opper.c0n for more intormetin. H.E. Williams. Inc. • Carthage. Mtssaun a www.hew.com a 417-356.4065 �(lliams wILLiemS LED Wall 'age 30l3 FIXTURE J N Series (EWNB) EASC-4-K4-7-40-DKBZ powered by GE Product Features The next generation of the GE Evolve*" LED Wall Pack is designed to efficiently illuminate walkways, area, and general lighting applications. The EWNB features an advanced LED optical system that provides high uniformity, excellent vertical light distribution. reduced on -site glare and effective security light levels. The EWNB Wall Pock offers identical photometrics to the EANB Area Light, which allows lighting designers to capitalize on the same features without compromising site layouts. In keeping with a sleek design strategy, this product offers a modern look, balancing the need for photometric scalability with reliable workhorse performance. Applications: • Wall mounted, site, area and general lighting utilizing an advanced LED optical system providing uniformity, vertical light distribution, reduced on -site glare and effective security light levels. Housing • Die-cast aluminum housing. • Slim architectural design incorporates an integral heat sink and light engine, ensuring maximum heat transfer, long LED life, and a reduced Effective Projected Area 'EPA). • Meets 1G vibration level per ANSI C136.31-2001. For 26 rating contact manufacturer. LED & Optical Assembly • Structured LED array for optimized area light and wall pack photometric distribution. • Evolve*" LED light engine utilizes reflective technology to optimize application efficiency and minimize glare. • Utilizes high brightness LEDs. 70 CRI at 3000K, 4000K & 5000K typical. Lumen Ma 1111E3 all MCP • Projected L90>50,000 hours per IES TM-21 Projected Lxx per IES TM-21 at 25°C for reference: EWNB l98 L95 L90 Narks: ll Projected, based on 04-so(loom hour Intngl 7100E Lighting Foci Verification TesNp Tolerances apply1044. d lu0,E flu.and lumen maintenance measurements. Lumen Ambient Temperature Factors: µ� ■ tier SEC Standard qualified models available. Please refer to ::,: •;.dcs.Iyr: yi r,.n ciQP. for complete information. Paling, • SAS listed, suitable for wet locations. • IP66 rated optical enclosure per ANSI C136.25-2009. • Temperature rated at -40° to 50°C. • Upward Light output Ratio IULOR) = 0 • Title 24 compliant with "H" motion sensor option. • Compliant with the material restriction requirements of RoHS. flaunting • Flush wall mount with convenient tab and slot mounting for easy'3" box installation. 112" conduit holes are included for non-7 box installation. Finish • Corrosion resistant polyester powder painted. minimum 2.0 mil. thickness. • Standard colors: Black and Dark Bronze. • RAL & custom colors available. Lie8.t-El col • 120-277 VAC and 347-480 VAC available. • System power factor is >90% and THD <20%. • ANSI C136.41 7-pin dimming receptacle, standard. • ANSI photo electric sensors IPEI available for all voltages. Light Grid compatible. • Dimming/Occupancy: - Wired 0-10V continuous dimming - DALI digital dimming. Contact manufacturer for availability. - Standalone motion sensor based dimming using "H" option code. • Surge Protection per ANSI C136.2-2015. - 6kV/3kA "Basic" surge protection, standard. - 10kV/5kA "Enhanced' surge protection optional. • EMI: Title 47 CFR Part 15 Class A Accessories • Escutcheon Plates - See page 6 • PE Accessories - See Page 3 Ordering Number Logic Evolve LED Wall Pock N Series (EWNB( E WN E = Evolve W = Wall Pock N= Housing • Sees A4 Be Ce D4 E4 F4 A3 83 C3 03 E3 F3 A2 B2 C2 02 82 E2 B 8 - Photometric" 0. 120.27M Seres"IV ..1=120 2.208 • 3.240 4.277 5.480 0.347 N= 347.48010 •Not available with Firs.% Must wltogewith choose ad. -creel +..e AsymmeV[nxs4ard4000 4300 Asym eoidrmword- 5800 6200 Asymmetric Forward 7500 5000 Asymmetric Forward 9200 9800 Asymmetric Forward 10,800 11,500 Asymmetric Forward 12.900 13.700 AsymnieUx Wide 4300 4.600 Asymmetric Wide 6200 66 0 Asymmetric Wide 8100 6.600 Asymmetric Wide : 9900 10.500 Asymmetric Wide 11.600 12400 Asymmetric Wide 13.900 14,700 Asymmetric Norma 4200 4.500 Asymmetric Narrow 6.100 6.500 Asymmetric Narrow 7900 8 400 Asymmetric Norsow 9,700 10300 Asymmetric Narrow 11400 12.100 ASVAMetrie Narrow 13600 14400 PE Accessories Ito be ordered separotelyl 7 44 58 70 89 98 125 44 58 70 89 96 125 44 56 70 89 98 125 30= 30001f• ! 1 • Nore • N 4D•40008 '3.Button PE. SG` A•ANSI C13641 I05eka 7'pnPEReceptnde# LO1 CCT 0•ANSI C136.41 ARPmaedtuils 7-pin PE Receptacle with shorting Cop # `Only awimbleaim voltage 1.23 and 9. #Order Dimming/Control PE as a separate tem see accessories section of ale dotasheet for ordering formation 93029237 PED.MV-4ED.7 ANSI C136.41 Dimming PE, 120-277J 93029238 PED-347-110-7 ANSI C136.41 Dimming PE, 347V 93029239 PED.480-LED-7 ANSI C136.41 Dimming PE, 480V Bl-U0G7 81-UO-G2 B1.U0.G2 Bl-U0-G2 B2-u0 G2 82-U0-G3 B1-U0-G1 81-U0-61 B1-U0-G2 B2-U0-G2 B2-U0 G2 B2-U0.G2 B1-U0-61 81-U0-61 8222-u0-G2 B2-U0-62 82-U0-G2 82, (10G3M, 28299 28294 80436 73251 81-110G 81-u0•62 61-U0-G2 B2-U0-G2 B2-u0-G2 B2-U0-G3 61-U0-G1 81-U0-G1 B: UO-G2 B2-U0-G2 B2-U0-G2 B2-U0 62 B1-V0-G1 B1-00 61 82-UO-G2 B2-u0-G2 82-U0 G2 82-UO G2 PEC071 PECiTI PECDIL SCCL•PEr7: None Required I ■ECR • Block -I D = E0ternol Dimming OR82 • Oath Bronze -'. Leads Provided GRAY • Groy (0.10Vo11 Input) i whiff • White + F • Fusing i Conlon manufacturer L •Tod less May for other colors. f R • 100v Enhanced Surge Protection N • Motlon Sensor # U = DALI Dimming+n 3008=Special Opibns # R 8 N options cannot be purchased toget5er. ` Not available with voltage 5.00nd H. + Compatible with = UghtGrd 2.0 nodes. n Not compotlble at 347-480% with A -level optic code. or with motion sensor control. EWNB A0730_IE5 EWNB 84730_IES EWNB_C4730_IES EWNB D4730_IES EWNB E4730_IES EWNB F4730_ IES EWNB_A3730IES EWNB 83730_IES EWN8 C3730_IES EWNB-A4700_IES EWNB 84740_IES EWNB C0740 IES EWNB 04740_IES EWNB A0750 JB EWN13_84750_IES EWNB C4750 IES EWNB 04750_IES EWNB E4/40_IES EWNB J4750_,IES I. EWNB F4740_IES EWN8 E4750_IES EWNB A3740 IES EWNB A3750_IES EWN8 83740_IES EWN15.51375C_IES EWNB C3740_IES EWNB C3750_IE5 EWNB_D3730 IES EWNB D7740_IES EWNB 03750_IES EWNB E3730 IES EWNB E3740 IES EWN8 E3750_IES EWN13_F3730 1E5 CWNB 13740 IES EWNB F3750_ 105 '+ EWN0_02730 IES EWNB 02740 IES EW115_02750_IES EWNB827301ES EWNB 82740_IES EWNB 82750_0E5 EWNB C2730_IE5 7wNB C2740_IES EWN8 C2750_IES EWNB 02730_IES EWNB Di740_IES EWNB 02750_IES EWNB E2730 IES EWNB 2740 IES EWNB E2750_1ES EWN6, F2730., IE5 EWN5,F2740m, 1E5 EWNB F2750r, 1ES,, .. STANDARD 120.277V STANDARD oew STAND ARD SO7V Shorting cap Photometrics EWNB Type IV - Asymmetric Forward IF41 EWNB Type IV -Asymmetric Forward (A4) 13,700 Lumens, 5000K (EWNB_F4750_,IESI 4,300Lumens, 5000K IEWNB_A4750_,IESI L,a DeramenU is a ,Maplm wnm rcotone v«nn L.me — Vera. acre 0•r* ro,urrim« ti•rman a dem.nl out• — vm[a urrr Oro.0 rawa:a opt rr S' EWNB Type III - Asymmetric Wide 1F3) 14,700 Lumens, 5000K (E W NB_F3750__IES) a[Im,[e:,.ru aMr Gov rrey'l o:)J. Iq rmrMe vat's a•riee'e — :xo y, ra,,o. c••ce V a ma�va[muem•rem — W u-.relvmyS bond rant cl Sr S. EWNB Type II - Asymmetric Narrow 1E2) 14,400 lumens, S000K (EWNB_F2750__,IESI Wzrce n I.rlfs dMormgxeglaclnld C I ram[nrdm e var. GrcOe — Yen.. lane Vtiowa b'Kxa r t c/amau-I [oekxa cl SS) — vautl pkae Ixas90 havental m4. tlta L:d Datexen urns rc,rp,q+rcxc.:s..d mnelrwra• al Graft — vrma acre we[q, roemeua mar a[mdepoama• —ver4m'[We C[mSa rw r:a acre or r>r EWNB Type III - Asymmetric Wide (A3) 4,600 Lumens, 5000K IEWNB_A3750_,IES) U0Oebxenlnls Marna, r,prq a IS-1,c rom[yOl vcLes at Gale — Vnlra lame •,.m,r Nrand aqe a0m11m1[mdex a. -1;r — vK.ea lane Mecca. rarmva rpi a Sr EWNB Type II - Asymmetric Narrow IA2) 4,500 Lumens, 5000K IE W NB_A2750_ I ESI Gra waxen was 0 eyn.apwq'I0: 15-.',o' reams. vaal — VMla,p p1r.• Wo✓,1 bve.,icl any* el,rom:yn coaatpua o165' — un cal ptre 11,wy bur'a' mqe tl V Product Dimensions Isometric View Front View 188 in.15 mml DIA for use with nOW n. 1102 mml 0cicg0n 80414 places) Back View 44 In. 1112 ram; Top View Side View 88 in 15 mml DIA for use with 3 250 in. 183 mml Octagon 80414 plpcesl f i, • Approximate Net Weight. 17 Ibs 17.71 kgsl ••,. ' • Effective Projected Area IEPA). 0.42 sq ft max 10.04 sq. ml Accessories: Escutcheon Plotes Cover unsightly debris and marks left behind from replacing HID product with escutcheon plates. Avoiloble in square and rectangular sizes. as well as in an ossortment of colors to match the luminaire. Accessories are ordered and shipped separately from the luminaire. E W N - 1. fch ,,sso,..ron 17;.:1;: W • We, OWk N • RAG:g ILCK • COrY URI • CcA !WARR GRAY - WHO • WAIR warm Was mob* Ccnioc Morulocme H-Motion Sensing Option: Mb Pk 4.0.ACkS1- 1. rran 1-- 7 1 '115A,R5R‘I It4X L 1=n1, 1 IS VOW r WkW 12Mol 1r KO Ilea.rn1 , ..,..... .. • Intended for mounting applications between 8-25ft. • Delivered factory setting of 50% dimmed light output with no occuponcy. % . ;' • Provides a coverage orea radius for walking motion of 15-20ft 14.57-6.10ml. • Provides 180° of coveragel-180° is blocked by the wall). ke...., ,/ - _,....... • •7-77-,,..._.... i, c...•:1 .._-.• • -;:tik.'-',,,,,. /—.. / 1 • May be reprogrammed using additional remote programmer. ., Remote Programmer port number: WS FSIR-100 PROGRAMMER(1976341. Photoelectric control is integrated through the motion sensor. and is offered os standard. Sensor Pattern: Wart Side 4cr 30 20 10 4030 2010 1020 30Aff • Vehicles Pedestrians . Pock www.currentbyge.com ,'2200?0'RsOR9'.1AcGA,v ,RA ',R,PkrtAA Pour; otornetcn pc...Jed SuGt(110 Merge..., route 4 ...es coe Losap ly,co:vc.....et +AM rne•09,61..fte,b7atory condom Cuver.: pewee ty GE n 0 tar.e., o1 to Gerd Elect. Comm-, 0/01,GE 0,11110e.05/04/171 DRAFT DRAFT Geotechnical Engineering Report King County South Interim Base Tukwila, Washington September 28, 2018 CE Clarity Engineering LLC RE(' ' /F ' OCT 12 2013 Community Development RECEIVED OCT 292018 TUKWILA PUBLIC WORKS Prepared for: Tetra Tech, Inc Seattle, Washington Prepared By: Clarity Engineering LLC 12705 SW 248th Street Vashon, WA 98070 DRAFT Clarity Engineering Ll. C DRAFT GEOTECHNICAL ENGINEERING REPORT KING COUNTY SOUTH INTERIM BASE TUKWILA, WASHINGTON SEPTEMBER 28, 2018 Prepared for: Tetra Tech, Inc Seattle, Washington Attention: Marcel Bodsky Prepared by: Clarity Engineering, LLC 12705 SW 248th Street Vashon, WA 98070 Matthew D. Gibson, PhD, PE Principal Project No: 107 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT CONTENTS Clarity Engineering LLC 1 INTRODUCTION 1 1.1 PROJECT UNDERSTANDING 1 1.2 SCOPE OF SERVICES 1 1.3 BASIS OF REPORT 2 1.4 USE OF THIS REPORT 3 1.5 LIMITATIONS 3 2 SITE AND SUBSURFACE CONDITIONS 5 2.1 SITE CONDITIONS 5 2.2 SUBSURFACE EXPLORATIONS 5 2.3 INTERPRETED SUBSURFACE CONDITIONS 6 2.3.1 VM Building 6 2.3.2 OPS Building 7 2.4 ADDITIONAL EXPLORATIONS AND GROUNDWATER LEVEL MONITORING 7 3 EARTHQUAKE ENGINEERING HAZARD 7 3.1 LIQUEFACTION AND LATERAL SPREAD 7 3.2 SEISMIC DESIGN INFORMATION 8 Table 1: IBC 2015 Seismic Design Parameters 8 4 SHALLOW FOUNDATIONS 8 4.1 BEARING PRESSURES AND FOOTING DEPTHS 9 Table 2: Shallow Foundation — Allowable Bearing Pressures 9 4.2 UPWARD RESISTANCE 9 4.3 LATERAL RESISTANCE 10 4.4 MAT FOUNDATIONS AND SLABS -ON -GRADE 10 5 SUBGRADE WALLS 10 6 DEWATERING CONSIDERATIONS 12 7 SURFACE WATER INFILTRATION CHARACTERISTICS 12 7.1 VM BUILDING 13 7.2 OPS BUILDING 13 7.3 GROUNDWATER MOUNDING 13 8 EARTHWORK 13 8.1 SUBGRADE PREPARATION 13 8.1.1 VM Building Footings 14 8.1.2 OPS Building 14 8.1.3 Slabs -on -Grade 14 8.2 STRUCTURAL FILL 15 Project No: 107 ii KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering !LC 8.3 WET WEATHER CONSIDERATIONS 16 8.4 TEMPORARY SLOPES 17 9 SITE DRAINAGE CONSIDERATIONS 17 10 ADDITIONAL SERVICES 17 11 REFERENCES 19 APPENDIX A: SUBSURFACE EXPLORATION A-1 APPENDIX B: GEOTECHNICAL LABORATORY TESTING B-1 APPENDIX C: HISTORIC EXPLORATIONS - SOUTH BASE FACILITY C-1 APPENDIX D: HISTORIC EXPLORATIONS —EXISTING PARKING GARAGE D-1 FIGURES Figure 1 - Site Vicinity Map Figure 2 - Site and Exploration Plan Figure 3 - Aerial photograph of site during quarry operations Project No: 107 iii KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC DRAFT GEOTECHNICAL ENGINEERING REPORT KING COUNTY SOUTH INTERIM BASE TUKWILA, WASHINGTON 1 INTRODUCTION This report presents geotechnical engineering recommendations for the King County South Interim Base facility (Facility) located at 12400 East Marginal Way South in Tukwila, Wash- ington (see Figure 1- Site Vicinity Map). This report supersedes any preliminary conclusions and recommendations previously provided in e-mails, meetings, or by verbal communica- tion. 1.1 Project Understanding The current facilities located on the site consist of a multilevel parking structure, a large com- mercial building, a one-story addition to the commercial building, a stormwater pond, and paved parking areas and throughways (see Figure 2 - Site and Exploration Plan). We under- stand that the existing commercial buildings will be demolished prior to construction of the new Facility. Construction of the Facility consists of the following features: • Vehicle Maintenance (VM) Building located at the southwest corner of the site. This building is a proposed one-story, at -grade structure that will have maintenance pits used to service buses. We understand that the maintenance pits will extend up to seven feet below exist grade. • Operation (OPS) building located at the northeast corner of the site where a storm - water pond currently exists. This building is a proposed one-story, at grade structure. • Infiltration facilities along the east and west boundaries of the site. • Paving over most of the site including existing building locations. 1.2 Scope of Services This scope of services was authorized under work order no. 4 under contract E00455E16 is- sued by Tetra Tech, Inc effective July 9, 2018. The scope was developed based on our under- standing of the project, project objectives, schedule, budget, risk management preferences, and report purpose. The portion of our scope of services covered by this report include: • Data search and gathering of existing geotechnical information. Project No: 107 1 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC • Site visit to visually observe field conditions and site features visible at the surface. • Geotechnical subsurface explorations: perform field tests, collect samples, and install groundwater monitoring instruments. • Geotechnical laboratory tests. • Geotechnical engineering evaluations and provide recommendations for: • Seismic hazard • Liquefaction and lateral spread • Settlement • Shallow foundations • Retaining walls • Groundwater levels • Groundwater infiltration • Earthwork Our scope of services did not include: • Removing instrumentation that we installed at the site. It is the Owner's responsibil- ity to properly decommission subsurface installations in accordance with Washington State regulations when use of the instrumentation is no longer needed. • Restoring site conditions to pre -exploration conditions. 1.3 Basis of Report Our geotechnical evaluations, explorations, conclusions, and recommendations are based on: • The limitations of our approved scope, schedule, and budget described in our scoping letter dated June 18, 2018. • Our understanding of the project and information provided by Tetra Tech, Inc and their design team. We assume this information is representative and accurate. • The 2015 International Building Code. • Existing geotechnical subsurface data by Converse Davis Dixon Associates Inc. for the existing King County South Base facility located to the north of the project site. • Existing geotechnical subsurface data by Earth Consultants, Inc. for the existing park- ing garage located at the northwest corner of the project site. • Published United States Geologic Survey geology and topography maps. Project No: 107 2 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC • Site and subsurface conditions we observed in the subsurface explorations as they ex- isted at the time of the explorations. • The results of field testing performed during the explorations and laboratory testing performed on samples we collected from the explorations. • Groundwater measurements made with vibrating wire piezometers (VWPs) installed in two of the exploration boreholes. • Our experience for similar projects with similar site conditions. • Assumptions described in this report. 1.4 Use of this Report This report was prepared for the exclusiveuse of Tetra Tech, Inc and their design consultants for the King County South Interim Base. This report should not be used for other purposes without Clarity Engineering's review. This report is an informational document and is not to be used for construction contractual purposes. Clarity Engineering should be retained to review the applicability of assumptions, conclu- sions, and recommendations of this report if any of the following occurs: • Conditions at or adjacent to the site change due to natural forces or human activity. • The basis of this report has changed or is no longer representative or accurate. • Project details or schedules change or new information about the project or site be- comes available. • If the site ownership or land use has changed. • Regulations or laws change. 1.5 Limitations This report for the King County South Interim Base was prepared in accordance with local generally accepted engineering principles, practices and standards. No warranty is ex- pressed or implied. The findings and recommendations contained in this report are based upon the services you requested and approved. Geotechnical engineering requires the application of professional judgment, as no study can completely quantify subsurface conditions. Any interpretations of subsurface conditions in this report are based on our analyses, experience, and judgment. There is no warranty that these subsurface conditions occur anywhere on the site except at the exact location and exact Project No: 107 3 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT . Clarity Engineering LLC time when and where explorations and field tests were conducted. Groundwater levels can be especially sensitive to seasonal and other changes. Clarity Engineering is not responsible for interpretations others may make using this report. The conclusions and recommendations in this report assume that field explorations and tests, and our interpretations accurately portray and represent subsurface conditions at the site. If, during excavation and/ or construction significantly different subsurface conditions are en- countered from that described in this report, our firm should be immediately notified and retained to review these conditions and, if necessary, revise our recommendations. Unantic- ipated soil conditions are commonly encountered during excavation and construction and cannot be fully anticipated by widely spaced subsurface sampling locations and testing in- tervals. The owner should be prepared to accommodate potential extra costs through the development of a contingency fund. If there is a significant lapse of time between our report submittal and the start of construc- tion, we should be retained to review and verify site conditions. Clarity Engineering cannot be responsible for any deviation from the intent of this report including, but not limited to the nature of the project, the construction timetable, and any construction methods discussed in this report. The recommendations contained in this report are not intended to direct the contractor's methods, techniques, sequences or procedures, ex- cept as may be specifically described in the report. Clarity Engineering will not be responsi- ble or liable for any construction, scheduling, or safety activity on this site. Project No: 107 4 KC Interim South Base - Geotech Report (DRAFT).docx 1 DRAFT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 SITE AND SUBSURFACE CONDITIONS 2.1 Site Conditions Clarity Engineering LLC The project site is located between E Marginal Way South and Highway 99 in Tukwila, WA. The current facilities located on the site consist of a multilevel parking structure, a large one- story commercial building, a one-story addition to the commercial building, a stormwater pond, and paved parking areas and throughways. Based on historic topographic maps (Wal- dron 1962) and geology and mineral resource documents (Cole and Fraser, 1969), the site was once a rock outcrop consisting of basalt and sandstone. The Riverton quarry was formed at the site in 1930 to mine the basalt. An aerial photograph of the site during quarry operations is shown in Figure 3. 1 Figure 3 - Aerial photograph of site during quarry operations According to these documents, the quarry consisted of many working levels with the lowest occurring along the eastern boundary near the highway. The quarry was apparently back - filled however the methods and composition of that backfill is unknown except where the historic explorations and the explorations performed for this study sampled the fill. 2.2 Subsurface Explorations We performed three mud -rotary borings and one hollow -stem auger boring drilled for the current project to evaluate the subsurface conditions at the locations of proposed develop- ment. The locations of these borings are shown on Figure 2 - Site and Exploration Plan. De- tailed information on methods used for the subsurface explorations and boring logs are pre- sented in Appendix A. Laboratory test methods and results are presented in Appendix B. In addition, we have reviewed documents of historic explorations performed by others for Project No: 107 5 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC previous development of this site and the King County South Base facility to the north. His- toric boring logs prepared for the development of the existing parking garage structure are presented in Appendix C. Note that a site map and some pages of the boring logs were miss- ing from this document. Boring and test pit logs and site map that were prepared for the original King County South Base facility are presented in Appendix D. For this study, we measured groundwater piezometric levels using vibrating wire piezome- ters installed in two boreholes and observed indications of groundwater in a third borehole. Groundwater level observations are also available from the historic explorations completed by others. All observations indicate that groundwater levels vary across the site from ap- proximately 4 to 20 feet below existing ground surface. The groundwater levels are likely influenced by rainfall, the water level in the Duwamish River, the geometry of the quarry excavations, groundwater flow from the surrounding area and slope at the south end of the site, and environmental factors. 2.3 Interpreted Subsurface Conditions Our understanding of the subsurface conditions of the project site are based observations of conditions encountered in our explorations, our review of historic explorations, and our un- derstanding of the historic quarry activity at the project site. Given the variability of subsur- face conditions we observed at the site and for purposes of this design report we have as- sumed different subsurface conditions across the site. 2.3.1 VM Building At the southwest corner of the site where the VM building is proposed we observed a four to five -inch layer of asphalt pavement over approximately 1 to 2 feet of fill. Beneath the fill we encountered dense to very dense sand that appears to be native soils down to the maximum explored depth of 31.5 feet below ground surface (bgs). Some of the sand was slightly ce- mented indicating that it likely is or was derived from a weathered sandstone. Groundwater observations were obscured by the exploration methods used near the planned VM Building, however groundwater piezometric measurements were made by vibrating wire piezometer installed in exploration MW-4. Measurements made during the month of September indicate a piezometric level four feet below the ground surface. Moisture contents of samples collected from explorations B-3 and MW-4 appear consistent with this piezometric Project No: 107 6 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC surface. These groundwater measurements were made during the dry season; we expect that wet season groundwater levels could be higher by approximately two to three feet. 2.3.2 OPS Building At the northeast corner of the site near the existing detention pond and the planned OPS building, we observed a four to five -inch layer of asphalt pavement over approximately 1 to 2 feet of base gravel fill. Beneath the gravel base we observed silt, sand, and gravel fill to a depth of about 15 feet bgs underlain by a medium dense to dense sandy silt fill to a depth of 27 feet bgs. Based on groundwater levels, it is possible that the sandy silt was placed in submerged conditions. Below 27 feet bgs we encountered a hard, blue -gray, sandstone down to the maximum explored depth of 30 feet bgs. Groundwater was observed in boring B-3 at depths of 12 to 14 feet bgs. Measurements gath- ered from the VWP instrument installed in exploration MW-1, indicates a piezometric surface 12 feet bgs. Moisture contents of samples collected from these two explorations appear con- sistent with this piezometric surface. Explorations completed for the existing parking structure indicate the shallowest depth of groundwater encountered at that time was nine feet bgs with localized seepage at shallower depths. Explorations completed for the King County South Base facility to the north of the site measured groundwater fluctuations of four to six feet. This seasonal fluctuation should be considered likely for the OPS building and nearby facilities. 2.4 Additional Explorations and Groundwater Level Monitoring Additional test pits are scheduled to be performed in November 2018 and groundwater pie- zometric levels will continue to be monitored through May 2019 to assess seasonal ground- water levels and infiltration rates at the site. Results of the additional explorations and groundwater monitoring will be incorporated into the final version of this report. 3 EARTHQUAKE ENGINEERING HAZARD 3.1 Liquefaction and Lateral Spread We evaluated the liquefaction potential of soils within the project area using the simplified method of Boulanger and Idriss 2014. Earthquake input parameters used in our analyses Project No: 107 7 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC were determined using the 2008 United States Geological Survey (USGS). seismic hazard model for a recurrence interval of 2,475 years (Petersen et al, 2008). We used a design earth- quake magnitude of 7.1 and peak ground acceleration (PGA) equal to 0.63g. Based on our analyses, the site soils are not susceptible to liquefaction. Given that the site soils are not liquefiable, the risk of liquefaction -induced settlement and lateral spreading for this site is low. 3.2 Seismic Design Information Based on our interpretation of the existing subsurface data, the site can be classified as a Site Class C for structures. Site Class C seismic parameters for this site that should be used to construct a code -based spectrum are shown in Table 1 below. Table 1: IBC 2015 Seismic Design Parameters IBS 2015 Seismic Parameter Value Site Class Designation C Short Period SRA, Ss, Site Class B 1.51g Long Period SRA, Si, Site Class B 0.57g Seismic Coefficient, FA 1.0 Seismic Coefficient, Fv 1.3 Short Period SRA, Ss, Site Class C 1.51g Long Period SRA, Sl, Site Class C 0.74g SRA = Spectral Response Acceleration Source: USGS US Seismic Design Maps 4 SHALLOW FOUNDATIONS In our opinion, the VM and OPS buildings and slabs -on -grade can be supported by shallow foundations. However, given the varying subsurface conditions, differing preparation of subgrade soils and allowable bearing pressures are required. The VM building foundations can be placed on dense, in -situ soils assumed to be no more than 2 feet below the bottom of the foundations. The OPS building foundations can be placed on structural fill that will need to be placed to fill the excavation created by the demolition of the existing stormwater deten- tion pond. Project No: 107 8 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT 4.1 Bearing Pressures and Footing Depths Clarity Engineering LLC Sliallow, square and strip footing foundations for the two buildings can be designed for the allowable bearing pressures in Table 2, provided the subgrade preparation recommendations in Section 8.1, Subgrade Preparation are followed. Table 2: Shallow Foundation - Allowable Bearing Pressures Location Allowable Bearing Foundation Pressure Soils VM Building OPS Building ksf = kips per square foot 8 ksf 3 ksf Dense, In -Situ Sand Structural Fill A temporary, one-third increase in bearing pressure is allowed for wind and earthquake loading cases. Footing widths should be a minimum of 18-inches. The VM Building foundations can be founded on the dense, native sand encountered in bor- ings B-3 and MW-4 at 2 feet bgs. The footings should be founded at the lower elevation as determined from the following criteria: • two feet below finished grade, • the bottom elevation of the demolished existing communications building footings, • the lowest elevation of soil disturbed by demolition activities. If the above criteria are too costly or onerous for construction, then the footings can be de- signed for an allowable bearing pressure of 3 ksf and founded on prepared structural fill as described in Section 8.1, Subgrade Preparation. For static loading conditions, footings will experience settlement as loads are applied to the footings. For footings less than 5-foot-square, we estimate that total settlements from long- term loads will be less than one inch and differential settlements will be approximately half of the total settlements. Actual settlement will depend on preparation of the subgrade prior to concrete placement. 4.2 Upward Resistance Upward building forces can be resisted by the self -weight of the footing and compacted soil above the top of footing. Only soil within the vertically projected footprint of the footing Project No: 107 9 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC should be considered. The soil unit weight above the footing can be assumed to be 125 pounds per cubic foot if compacted, structural fill is used. 4.3 Lateral Resistance Shallow foundations can resist lateral forces by the combination of sliding resistance along the base of the footing and passive pressure against the face of the footing. An ultimate co- efficient of friction for footings and slabs founded on structural fill can be assumed to be 0.55. Ultimate passive resistance for footings can be calculated using an equivalent fluid weight of 450 pounds per cubic foot. A minimum factor of safety of 1.5 should be used for sliding. 4.4 Mat Foundations and Slabs -on -Grade Mat foundations and slabs -on -grade founded on prepared subgrade can be designed assum- ing a Winkler spring model. A coefficient of subgrade reaction for a 1-foot square plate is estimated to be approximately 150 pounds per cubic inch. This coefficient can be modified to larger slabs sizes using the equation Where, ks = kl (1+Blz \4B J ks = kl (]+B)2 zB for footings/slabs where B < 20 for footings/slabs where B >_ 40 Ks = modulus of subgrade reaction, interpolate for intermediate values of B Ki = modulus of subgrade reaction, 1-foot square plate B = Foundation width Slabs should be underlain by a minimum of 6-inches of compacted drainage layer to serve as a sub -slab drainage and capillary break layer. Slabs -on -grade constructed below the design groundwater level should be designed to resist uplift forces induced by hydrostatic pressures. The pressure will be equal to the depth of the base of the slab below the groundwater level multiplied by the density of water. • 5 SUBGRADE WALLS For retaining walls backfilled on one side only, the structural engineer can estimate the lateral load and resistance on the walls using an equivalent fluid to represent the soil. We make the Project No: 107 10 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC following recommendations for walls with backfill placed per the structural fill recommen- dations as follows: • Retaining wall footings should be designed as described in Section 4, Shallow Foun- dations; • For a yielding wall, defined as one in which the top rotates at least 0.1 percent of the wall height, with level backfill, the wall should be designed for an active horizontal equivalent fluid density of o 35 pounds per cubic foot (pcf) for soils above the design groundwater level, or; o 18 pounds pcf for soils below the design groundwater level. • For a non -yielding wall with level backfill, the wall should be designed for an at -rest equivalent fluid density of o 55 pcf should be used for soils above the design groundwater level, or; o 28 pcf for soils below the design groundwater level. • For seismic loads, add an incremental uniform earth pressure equal to 8H pounds per square foot (psf) where H is the height of the wall in feet to the active or at -rest earth pressures. • For uniform surface surcharges within a horizontal distance equal to the retained height of the wall, a uniform earth pressure should be applied to the wall. This uni- form earth pressure can be calculated as the uniform surface surcharge multiplied by 0.3 and 0.45 for active and at -rest wall conditions, respectively. • For passive resistance, use an ultimate passive equivalent fluid density of 550 pcf. The top two feet of soil providing passive resistance should be ignored. A factor of safety of at least 1.5 should be used in computing resistance to lateral loads. • For portions of the wall below the design groundwater level, a hydrostatic water pres- sure should be added to both the active and passive earth pressures. The water pres- sure will start at zero at the groundwater level and increase hydrostatically with depth at a rate of 62.4 pounds per cubic foot. • Hydrostatic uplift pressures will act on the base of retaining wall footings constructed below the groundwater level. The pressure will be equal to the depth of the base of the footing below the groundwater level multiplied by the density of water. Project No: 107 11 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC Note that these densities do not consider any surface loading conditions other than uniform surface surcharges. Clarity Engineering should be consulted to evaluate other surcharges conditions if they occur. 6 DEWATERING CONSIDERATIONS For dewatering purposes, we understand that excavations up to 5 feet below the groundwa- ter level will be required. Shallow excavations above the groundwater level may also en- counter localized seepage. Based on our understanding of the subsurface conditions, we as- sume that sumps and pumps could be used to manage groundwater inflow in these excava- tions. Additional test pits will be performed in November 2018 to further evaluate the use of sumps and pumps for excavation dewatering. 7 SURFACE WATER INFILTRATION CHARACTERISTICS Pilot Infiltration Tests (PITs) are scheduled to be performed in November 2018 to assess in- filtration at the site. For planning purposes, we estimated preliminary infiltration character- istics of the near surface soils based on grain -size tests performed on samples collected from the borehole explorations. The recommendations in this section are preliminary and will be updated for the final version of this report. Our evaluation of the subsurface infiltration characteristics is in general accordance with the Department of Ecology's 2014 Stormwater Management Manual for Western Washington (SMMWW). This manual was used to evaluate short-term infiltration rates for the soils tested. Correction factors to address uncertainties associated with variability in the subsur- face soils and the amount of siltation and bio-build-up that could occur over the design life of the facility were applied to these short-term infiltration rates to calculate a long-term de- sign infiltration rate. The SMMWW requires the base of all infiltration systems to be at least 5 feet above the seasonal high groundwater level, bedrock, or other low permeability layer. Per the SMMWW, this separation may be reduced to 3 feet if a ground water mounding anal- ysis, volumetric receptor capacity, and the design of the overflow and/or bypass structures are judged by the site professional to be adequate to prevent overtopping and meet design goals. Project No: 107 12 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT 7.1 VM Building Clarity Engineering LLC For the area around the VM building including the western boundary of the site we recom- mend a preliminary design infiltration rate of 1 to 2 inches per hour. These rates include correction factors assuming the PIT tests will be performed. While these infiltration rates may occur, the groundwater levels in this area were measured to be within four feet of the ground surface and may rise in the wet weather months. These seasonal high groundwater levels may result in insufficient separation between the groundwater level and the base of the infiltration facility. 7.2 OPS Building For the area around the OPS building including the eastern boundary of the site we recom- mend a preliminary design infiltration rate of 0.5 to 1 inch per hour. These rates include correction factors assuming the PIT tests will be performed. As discussed in Section 2.3.2, groundwater levels may occur as high as 6 feet below the ground surface based on the current groundwater level and historic fluctuations measured in the 1970's at the King County South Base facility to the north. 7.3 GROUNDWATER MOUNDING Groundwater mounding is an upward and outward expansion of the free water table, which results from a surface recharge method. Mounding can alter groundwater flow; however, the effects are often localized and may be temporary, depending on the frequency and duration of the surface recharge events. The 2014 SMMWW requires a groundwater mounding anal- ysis for projects where runoff from more than one acre will be infiltrated, or where it is de- sired to reduce the vertical separation between the bottom of the facility and the groundwater level to 3 feet. A groundwater mounding analysis was not in our scope of services. Clarity Engineering should be consulted if the above criteria are met and a mounding analysis be- comes necessary. 8 EARTHWORK 8.1 Subgrade Preparation Subgrade preparation for the new facilities should begin with the removal (stripping) of all deleterious matter, asphalt, concrete, and existing structures. Given the variability of Project No: 107 13 KC Interim South Base - Geotech Report (DRAFI').docx DRAFT Clarity Engineering LLC subsurface conditions, additional subgrade preparation will vary based on the proposed structure locations. 8.1.1 VM Building Footings The subsurface conditions near the proposed VM building location indicate dense to very dense native sands within a few feet of the ground surface. Given the bearing pressures recommended for this area, the footings subgrade should be prepared such that the footings are founded on undisturbed, dense to very dense native sand. This may require localized overexcavation of fill and other soils disturbed by demolition or construction activities. The contractor should consider the use of rat slabs of concrete or controlled density fill (CDF) to preserve the bearing conditions of the native sand. The footing excavations should also be maintained in state where surface water and groundwater are not allowed to flow into the excavation and pond on the footing subgrade. Footing excavations that require overexcava- tion to expose the bearing soils may be backfilled with CDF up to the base of footing eleva- tion. In this case the CDF backfill should have a width equal to the footing width plus twice the overexcavation depth and be centered on the footing location. 8.1.2 OPS Building A stormwater detention pond is currently present at the proposed location OPS Building. We understand the detention pond's infrastructure includes concrete, rip -rap, liner, organic material, and other physical features will be demolished and removed. We anticipate the demolition will expose undocumented fill placed during the initial backfilling of the quarry site. The excavation created by the detention pond demolition should be backfilled with structural fill, as described in Section 8.2, Structural Fill, prior to the placement of slabs -on - grade and building footings. It is possible that the demolition will occur below levels where groundwater seepage could occur. The contractor should be prepared to use sumps and pumps to control groundwater inflow. 8.1.3 Slabs -on -Grade Exposed subgrade for slabs -on -grade should be observed and evaluated by Clarity Engineer- ing. For the mat foundation areas, this evaluation should be performed by proof -rolling the exposed subgrade with a fully loaded dump truck. Where truck access is restricted, the sub - grade should be evaluated by probing the soil with a steel T-probe. Soft/loose soils identified Project No: 107 14 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC during subgrade preparation should be compacted to a firm and unyielding condition or over -excavated and replaced with structural fill, as described in Section 8.2, Structural Fill. If the subgrade requires additional filling to meet design elevations, then structural fill should be used above the proof -rolled or T-probed subgrade. 8.2 Structural Fill Structural fill will be required in areas where the site grade must be raised to proposed slab and footing elevations. Structural fill should meet the gradation requirements of Type 17 material in Section 9-03.16, Mineral Aggregate Chart in the City of Seattle Standard Specifi- cations. We estimate that some of the on -site material may be suitable for re -use as structural fill. Some of the excavated fill and native deposits could be silty and above optimum mois- ture content, and thus may be unsuitable for re -use as structural fill unless it is moisture con- ditioned to within 3 percent of the optimum moisture content. Depending on the project schedule, area available for moisture conditioning, and the time of year when construction is planned, moisture conditioning may be very difficult or not feasible. If moisture condition- ing is required and not feasible, material that meets the criteria should be imported. Clarity Engineering should evaluate the use of on -site material or any proposed imported materials or on -site soils for suitability as structural fill. The Contractor is responsible for protecting stockpiled material from becoming unsuitable while it is on site. Structural fill should be placed in uniform lifts and compacted to at least 95 percent of the Modified Proctor maximum dry density (ASTM International [ASTM] Designation: D 1557). For structural fill placed more than two feet below proposed base of footing and slab eleva- tions should be compacted to at least 90 percent of the Modified Proctor maximum dry den- sity. The thickness of soil layers before compaction should not exceed 10 inches for heavy equipment compactors and 6 inches for hand -operated mechanical compactors. The most appropriate lift thickness should be determined in the field using the contractor's selected equipment and fill and verified with in -situ soil density testing. All compacted surfaces should be sloped to drain to prevent ponding. Structural fill operations should be observed and evaluated by Clarity Engineering. Project No: 107 15 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT 8.3 Wet Weather Considerations Clarity Engineering LLC If earthwork is to be performed or fill is to be placed in wet weather or under wet conditions when control of soil moisture content is not possible, the following recommendations should apply and be incorporated into the contract specifications: • The ground surface in and surrounding the construction area should be sloped as much as practical to promote runoff of precipitation away from work areas and to prevent ponding of water. • Work areas or slopes should be covered with plastic. The use of sloping, ditching, sumps, dewatering, and other measures should be employed as necessary to permit proper completion of the work. • Earthwork should be accomplished in small sections to reduce exposure to wet con- ditions. That is, each section should be small enough so that the removal of unsuitable soils and placement and compaction of clean structural fill could be accomplished on the same day. The size of construction equipment may have to be limited to prevent soil disturbance. It may be necessary to excavate soils with a backhoe, or equivalent, located so that equipment does not pass over the excavated area. Thus, subgrade dis- turbance caused by equipment traffic would be reduced. • Fill material should consist of clean, well -graded, pit -run sand and gravel soils, of which not more than 5 percent fines by dry weight passes the No. 200 mesh sieve, based on wet sieving the fraction passing the 3/4-inch mesh sieve. The gravel content should range from between 20 and 50 percent retained on a No. 4 mesh sieve. The fines should be nonplastic. • No soil should be left uncompacted and exposed to moisture. A smooth -drum vibra- tory roller, or equivalent, should roll the surface to seal out as much water as practical. • In -place soil or fill soil that becomes wet and unstable and/or too wet to suitably com- pact should be removed and replaced with clean, granular soil (see gradation require- ments above). • Excavation and placement of structural fill material should be observed on a full-time basis by Clarity Engineering. • Grading and earthwork should not be performed during periods of heavy, continuous rainfall that prevents compaction requirements from being met. Project No: 107 16 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT 8.4 Temporary Slopes Clarity Engineering LLC All shoring and excavation work (and all project work) should be accomplished in compli- ance with applicable local, state, and federal safety codes. The contractor should be made responsible for meeting these codes, the stability of all temporary cuts and slopes, and control of all surface and groundwater encountered during construction. We anticipate that excavations can be accomplished with conventional excavating equip- ment, such as a dozer or track hoe. For planning purposes, vertical cuts up to 4 feet may be attempted vertically in unsaturated soil, if there are no indications of slope instability. How- ever, vertical cuts should not be made near property boundaries, or existing utilities and structures. For cuts greater than 4 feet, we recommend that temporary unsupported, open - cut slopes should be no steeper than 1.5H:1V. Exposed cut slopes may need to be protected with a waterproof covering during periods of wet weather to reduce sloughing and erosion. Ditching sumps, trench drains, and other measures may need to be used as necessary to permit proper completion of the work. Surface water should not be allowed to flow into excavations. 9 SITE DRAINAGE CONSIDERATIONS Site grading should be planned to transmit water away from buildings and slabs. Perimeter, sub -slab, and footing drains should be used for the buildings and hydraulically connected to drain the capillary break layer. These drains should consist of 4-inch diameter perforated pipe wrapped in filter fabric and placed on a bed of and surrounded by 6 inches of clean free - draining sand and gravel. Roof drains and pavement drainage should not be tied into footing drains. 10 ADDITIONAL SERVICES The conclusions and recommendations presented in this report assume that Clarity Engineer- ing will continue to be consulted to perform the following services that are included in our current contractual scope of services: • Perform four test pits and conduct Pilot Infiltration Tests. • Collect VWP measurements of groundwater levels through the end of Spring 2019. Project No: 107 17 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT Clarity Engineering LLC • Review and modify recommendations as additional information and site data become available. • Review the final project plans and specifications to evaluate the implementation of our design recommendations. • Review of contractor's requests for information. • Review of the contractor's geotechnical submittals. • Observe geotechnical construction activities including the preparation of foundation subgrade, slabs -on -grade subgrade, excavation of infiltration facilities, demolition of existing building foundations, among other activities to evaluate the conditions ob- served during construction relative to those assumed in this report. Project No: 107 18 KC Interim South Base - Geotech Report (DRAFT).docx DRAFT 11 REFERENCES Clarity Engineering LL_C ASTM International (2012). American Society of Testing Materials Annual Book of Standards, Vol. 4.08, West Conshohocken, PA. Boulanger, R. W., and I. M. Idriss. 2014. "CPT and SPT Based Liquefaction Triggering Proce- dures." Rep. No. UCD/CGM-14 1. Cole, Bert L., and Fraser, Don L., 1969, Geology and Mineral Resources of King County, Washington, Bulletin No 63., Division of Mines and Geology — State of Washington Depart- ment of Natural Resources. Seattle Building Code, 2015 Petersen, Mark D., Frankel, Arthur D., Harmsen, Stephen C., Mueller, Charles S., Haller, Kathleen M., Wheeler, Russell L., Wesson, Robert L., Zeng, Yuehua, Boyd, Oliver S., Perkins, David M., Luco, Nicolas, Field, Edward H., Wills, Chris J., and Rukstales, Kenneth S., 2008, Documentation for the 2008 Update of the United States National Seismic Hazard Maps: U.S. Geological Survey Open -File Report 2008-1128, 61 p. Troost, K.G., Booth, D.B., Wisher, A.P., and Shimel, S.A., 2005, The geologic map of Seattle — a progress report: U. S. Geological Survey open file report 2005-1252, scale 1:24,000 Waldron, Howard, H., 1962, Geologic map of the Des Moines Quadrangle, Washington, U.S. Geological Survey, scale 1:24,000 Project No: 107 19 KC Interim South Base - Geotech Report (DRAFT).docx DRA FT t4 Seattle r friand .$..atr$$$ ADMIRAL T r'hti ti. Fri t,l LLR? ' '.t8tJI HEI, �I 61ORi'M 6EACON Project Site 0 k-tT's�ht5 Medina Bciuc E rtE 'pillage M rcer l5land EnV itC Nv.ca5tle Bryn Mawr h ht Skyway 5 z ila 1 mile 2 miles Renton King County Metro Transit Division South Interim Base Tukwila, Washington SITE VICINITY MAP CLARITY ENGINEERING LLC I FIG.1 Geotechnical Consultants M I I E I I I N IIIIII M MN EMI MI I 111111 DR :\ Projects \ 107 KC Transit Base Expansion \TaskOrderl-SouthBaseExpansion\D Approximate Site Boundary S 124TH ST Existing Parking Garage 2119 STORY MALMO LOE Proposed Vehicle Maintenance Building i Note: 1. Reference site layout based on 16070RC.dwg and 17002-05 C-SP-SITE.dwg provided by Tetra Tech, Inc. Existing Commercial Building 120 Existin Stormwater Pond 240 Legend S Exploration Location Prop Oper. i King County Metro Transit Division South Interim Base Tukwila, Washington SITE AND EXPLORATION PLAN CLARITY ENGINEERING Ll_C Geotechnical Consultants FIG.2 DRAFT APPENDIX A: SUBSURFACE EXPLORATION A-1 GENERAL Clarity Engineering LLC Field explorations for the King County South Interim Base project consisted of drilling four borings. The locations of both the recent and applicable existing explorations are shown on Figure 2 - Site and Exploration Plan in the main text of this report. A-2 BORINGS The explorations boreholes, designated MW-1, B-2, B-3, and MW-4, were drilled by Holt Ser- vices of Edgewood, Washington, under subcontract to Clarity Engineering, from September 4 through 6, 2018. The borings were drilled using a B-52 truck -mounted rig. Borings MW-1, B-3, and MW-4 were drilled using mud -rotary drilling techniques. Boring B-2 was drilled using hollow -stem auger techniques so that groundwater during drilling could be observed. Boring depths ranged from 25.5 to 30.5 feet below the existing ground surface. Washington one -call was contacted with at least 48 hours of notice prior to commencing bor- ing activities. Given numerous underground utilities at the site, we subcontracted with APS Locate Services to surface locate potential utilities with the area of exploration. The soils encountered in the borings were classified in general accordance with the Unified Soil Classification System, as described in Figure A-1. The logs of the borings are after this figure. A-3 INSITU TESTING Standard Penetration Tests (SPTs) were generally performed in the borings at 2.5-foot inter- vals in the upper 20 feet and at 5-foot intervals thereafter. A near surface grab soil sample was collected from boring B-2. The SPT tests were performed in general accordance with ASTM International (ASTM) Designation: D1586, Standard Method for Penetration Test and Split -Barrel Sampling of Soils. The SPT consists of driving a 2-inch outside -diameter split - spoon sampler a total distance of 18 inches into the bottom of the boring with a 140-pound hammer falling 30 inches. The number of blows required to cause the last 12 inches of pene- tration is termed the Standard Penetration Resistance (N value). When penetration re- sistances exceed 50 blows for 6 inches or less of penetration, the test is terminated and the Project Nu: 107 Al•KC Interim South Base • Gaoled, Report (ORAFT).docr DRAFT Clarity Engineering LLC number of blows and the corresponding penetration are recorded. The N-values were rec- orded by a representative from our firm and are noted and plotted on the log of the boring. The N-values provide a means for evaluating the relative consistency (stiffness) of cohesive soils and the relative compactness or density of cohesionless (granular) soils. A more detailed description of the N-values and how they relate to soil characteristics is presented in Figure A-1. The split -spoon sampler used during the penetration testing recovers a disturbed sample of the soil. Recovered samples were classified in the field and recorded on the logs by our field representative, sealed in jars, and submitted for laboratory testing. Laboratory testing was later performed on selected samples; the results of the testing are presented in Appendix B: In general, after each boring was completed, the bore hole was filled with bentonite chips, and the ground surface was restored to its pre-existing elevation. Restoration consisted of either a concrete patch or a flush -mounted well monument. Groundwater pressure monitoring instruments, vibrating wire piezometers, were installed in borings MW-1 and MW-2 at depths indicated on the boring logs. The surface of these boring was completed with a flush -mounted well monument head, cemented into place. A battery -operated data logging device was attached to the instrument wires and placed in the monument casing to allow for daily groundwater pressures to be recorded. The recorded groundwater pressures were used to calculate the groundwater piezometric level at the ex- ploration location. A-4 Test Pits and Pilot Infiltration Tests The explorations and field tests are planned for November 2018 and will be included in our final document. I'mwd No'. 107 A•2 KC Interim South Rase • G'ntcch Rrporl (1)RAFf).daca ROTS . GM SrO US LAl GOT CUENT .AFT Tetra Tech Inc. BORING NUMBER B-2 PAGE 1 OF 1 PROJECT NAME King County South Interim Base PROJECT NUMBER 107 PROJECT LOCATION Tukwda Washington DATE STARTED 9/6/18 COMPLETED 9/E/18 GROUND ELEVATION 28 ft NAVDBB HOLE SIZE 8 inches DRILLING CONTRACTOR Hel: Services GROUND WATER LEVELS: DRIWNG METHOD Hollow Stem Auger Y AT TIME OF D/BWNG 14.50tt/ Devi 13.501t LOGGED BY MDG CHECKED BY CLG AT END OF DRILLING — NOTES AFTER DRILLING — 0- c o 0 GRAPHIC LOG MATERIAL DESCRIPTION SAMPLE TYPE NUMBER RECOVERY % (ROD) BLOW COUNTS (N VALUE) POCKET PEN. (Isf) DRY UNIT Wi. (PLY) ♦ SPT N VALUE • 20 40 60 B0 LL PL • I _ _20 40 60 B0 0 FINES CONTENT (%) 0 20 40 60 80 - - - 10 _. 15 20 - 25 R1 • Asphalt • ,.,_ • •.. • - - _.. • (SM) Medium dense to very dense, gray -brown, silty Sand with fine gravel. moist [FILL] GB S-1 100 SPT S2 67 8-18-18 (36) SPT S3 56 15-17-16 (33) Z SPT S4 B3 17-23-26 (49) zSPT SS 89 11-22-21 (43) tense with water in pores Zsand SPT S-6 89 13-23-15 (38) I 5 (ML) Medium dense to dense, gray -brown, sandy Sill, wet [FILL.) gravel size basalt fragments in sample ZSPT S7 B9 13-9-11 (20) gravel size basalt fragments in sample SPT S8 BB 8- 613 (21) SPT S-9 89 14-17-17 No recovery drilling action indicates sandstone _ S . 50/3" Bottom of borehole at 27.6 feet. j5-10pT1 CRAFT BORING NUMBER B-3 , PAGE 1 OF 1 CUENT Tetra Teth Inc. PROJECT NAME King County South Interim Base PROJECT NUMBER 107 PROJECT LOCATION Tukwila Washington DATE STARTED 9/4/18 COMPLETED 9/4/18 GROUND ELEVATION 27.5 h NAVD88 HOLE SIZE 8 inches DRILLING CONTRACTOR Holt Services DRILLING METHOD Mud Rotary LOGGED BY MDG NOTES CHECKED BY CLG GROUND WATER LEVELS: AT THE OF DRIWNG — AT END OF DWLIJNG — AFTER DRIWNG — 10 u. 15 5 520 3- 3 fl 25 MATERIAL DESCRIPTION Asphalt (GM) Von/ dense, gray. well -graded Gravel with sand. moist to wet [FILL) F � Jm o j Z ae cc >a Os cc ww Oj1 m0= Z SPT 83 S-1 20-32-50 (82) (ML) Very dense, gray, S/t wnh sand and few gravel, wet. weak to moderate cementation Bottom of borehole at 25.5 feet. SS-2 PT 60 53-50/4" rSS-P3T 60 47-50/4" SPT 67 SI 20-31-26 (57) LP 100 26-43-56 (99) SPT 100 S6 45-50/3" SPT 100 S7] SPT 100 SB 50 _ 50 w o- OV Z r 0 • SPT N VALUE • 20 40 60 80 PL MC LL 20 40. 60 80 ❑ FINES CONTENT (%) ❑ 20 40 60 80 »• CUENT A Tetra Tech F Inc. BORING NUMBER MW-1 T PAGE 1 OF 1 PROJECT NAME King County South Interim Base PROJECT NUMBER 107 PROJECT LOCATION Tukwila. Washington DATE STARTED 9/5/18 COMPLETED 9/5/18 GROUND ELEVATON 28 h NAVD88 HOLE SIZE 8 inches DRIWNG CONTRACTOR Holt Seances GROUNDWATER LEVELS: DRIWNG METHOD Mud Rotary AT TIME OFDRJWNG — _ LOGGED BY MDG CHECKED BY CLG AT END OF DR I WNG — NOTES AFTER DRILLING — DEPTH (ro GRAPHIC LOG MATERIAL DESCRIPTION SAMPLE TYPE NUMBER -RECOVERY % (ROD) BLOW COUNTS (N VALUE) POCKET PEN. (ut) li ?cD r a • SPT N VALUE • 20 40 60 80 `L Lit. 20 40 60 80 ❑ FINES CONTENT (%) 0 20 40 60 60 _ - -•(21) 5 _ J - _ 10 - 15 - 20 .. _ 25 - 30 111.11111-, - Asphalt /-- • • • • • _ _ ... - - "� (SM) Medium dense, gray -brown, fine poorly graded silty Sand with fine gravel. moist (FILL) SPT S-1 100 10-10-11 (GM) Very dense, pray -brown, silty Gravel wish fine to medium S22-29-45 SPT 2 89 (74) ..._sr.‘"‹ AC a_< aO� s.O< a—Sc p0 C a- sand. moist (FILO SPT Z S 3 89 1S28-37 (65) SPT 6 15-18-23 (41) SPT S5 100 11-26-30 (56) (ML) Medium dense to dense. gray -brown. sandy Sill. wet. scattered gray sill partings (FILL) SPT S-6 0 12-14-16 (30) SPT 5..8 0 13-16-19 (35) zSPT S9 0 7-7-9 (16) Very dense. blue -gray. Sandstone Bottom o1 borehole at 30.2 feel. IS T �100 502 5-11 CLIENT Tetra Tech Inc. BORING NUMBER MW-4 PAGE 1 OF 1 PROJECT NAME King County South Interim Base PROJECT NUMBER 107 PROJECT LOCATION Tukwila. Washington DATE STARTED 9/4/18 COMPLETED 9/4/18 GROUND ELEVATION 28 ft NAVD88 HOLE SIZE 8 inches DRILLING CONTRACTOR Holt Services GROUND WATER LEVELS: DRILLING METHOD Mud Rotary ATTME OFDRIWNG — LOGGED BY MDG CHECKED BY CLG AT END OF DRILLING — NOTES AFTER DRILLING — o 0 o =l� 4-O t7 MATERIAL DESCRIPTION SAMPLE TYPE NUMBER RECOVERY % (ROD) BLOW COUNTS (N VALUE) POCKET PEN (Isr) D- ¢ n • SPT N VALUE • 20 40 60 80 1 PL MC Lit.CI— 20 1 • 40 60 80 0 FINES CONTENT (%) 0 20 40 60 Bo - - - -.. - _. _ 10 _ _ 15 -(76) .(SW-SM) '.'. 25 J 30 _ `Asphalt /-- .. •- _.-.. •. • • • • •_ • • - „ �..._. ..... » (SP-SM) Very dense. gray. fine to medium Sand with silt and trace gravel. wet occassional few gravel ZSPT S-1 100 16-20-25 (45) SPT S2 100 2D-2}31 (54) 16-21-33 (54)__ SP7 S J 89 20-31-47 SPT zSPT S5 100 26-33-34 (67) ZSPT 100 24-35-41 .. .• I :} f :.I ': I .;: I$ : Y .•. I ;j Very dense. gray, well -graded Sand welh silt and few gravel. wet grades with trace gravel Z SPT S7 too2 (68)36 SPT 100 2541-0 SPT S9 103 22<0- 50/6' Bottom of borehole at 31.5 feel DRAFT APPENDIX B: GEOTECHNICAL LABORATORY TESTING B-1 INTRODUCTION Clarity Engineering LLC This appendix contains descriptions of the procedures and the results of the geotechnical laboratory tests performed on soil samples obtained for the King County South Interim Base project. The samples were tested to determine basic index, physical, and chemical properties of the subsurface soils. The laboratory testing program was selected by Clarity Engineering and performed at the Shannon & Wilson, Inc. laboratory in Seattle, Washington. The results of the laboratory tests performed for the borings are shown in the attached table and figures. B-2 VISUAL CLASSIFICATION Soil samples recovered from the borings were visually reclassified in the laboratory using a system based on ASTM International (ASTM) Designation: D2487, Standard Test Method for Classification of Soil for Engineering Purposes, and ASTM Designation: D2488, Standard Recommended Practice for Description of Soils (Visual -Manual Procedure ASTM, 2007). This visual classification method allows for convenient and consistent comparison of soils from widespread geographic areas. Using this method, the soils are classified using the Unified Soil Classification System (USCS). The individual sample classifications have been incorpo- rated into the boring logs presented in Appendix A. B-3 Water Content Determination The natural water content of select soil samples recovered from the field explorations was determined in general accordance with ASTM Designation D 2216, Standard Method of La- boratory Determination of Water (Moisture) Content of Soil and Rock by Mass. Comparison of water content of a soil with its index properties can be useful in characterizing soil unit weight, consistency, compressibility, and strength. Water content, where tested, is plotted on each of the boring logs presented in Appendix A. B-4 GRAIN SIZE ANALYSES Grain size analyses were performed on selected samples of granular soils in general accord- ance with ASTM D422, Standard Method for Particle -Size Analysis of Soils and D1140, Amount of Material in Soils Finer than the No. 200 (75 micrometers jNmj; percent fines). I'mirct Na 107 B• 1 KC Interim South Base • Gnlerh Report (DRAFT). data DRAFT Clarity Engineering LLC Results of the grain size analyses are plotted as grain size distribution curves and the percent fines from the tests are shown in the boring logs in Appendix A. Grain size distribution is used to assist in classifying soils and to provide correlation with soil properties, including permeability, capillarity, susceptibility to liquefaction, and sensitivity to moisture 1'mjrrt No 107 11.2 K(' Interim South Base • G.otech Report (DRAFT).drex �'r SHANNON bWILSON.INC. LABORATORY TEST SUMMARY D %I It 1 Boring 11 r n O o. F Sample Number USCS WC (%) Gravel ss ° m e 8 is e C„ C, Soil Description B-2 2.5 S-2 8.0 B-2 5 S-3 SM 5.8 32• 50• 18' Silty Sand with Gravel B-2 7.5 S-4 6.6 B-2 10 S-5 10.3 B-2 12.5 S-6 7.2 B-2 15 S-7 20.3 B-2 20 S-8 16.0 B-2 25 S-9 16.3 B-3 2.5 S-I 8.6 B-3 5 S-2 9.8 B-3 7.5 S-3 GM 11.1 51• 34' 15' Silty Gravel with Sand B-3 10.5 S-4b 18.8 B-3 12.5 S-5 ML 17.2 17' 83' Silt with Sand B-3 15 S-6 18.5 B-3 20 S-7 17.4 B-3 25 S-8 19.4 ?OW -I 2.5 S-1 11.3 MW-I 5 S-2 SM 10.6 16' 53' 31' Silty Sand with Gravel MW'-1 7.5 S-3 8.9 MW-1 12.5 S-5 9.1 MW-1 15.5 S-7 ML 17.2 41' 59' Sandv Silt MW-1 25.5 S-10 18.3 MW-4 2.5 S-I 14.0 MW-4 5 S-2 SP-SM 16.5 6' 84' 10' 4.5 1.5 Poorly Graded Sand with Silt MW-4 7.5 S-3 21.5 MW-4 10 S-4 18.8 MW-4 12.5 S-5 12.6 MW-4 15 S-6 20.0 MW-4 20 S-7 SW-SM 11.4 23' 67' 10' 17.9 1.3 Well-Gradcd Sand with Silt and Gravel MW-4 25 S-8 15.7 MW-4 30 ,. S-9 18.2 '01Jt1A.rp IV A GSA MAW CLARr, F.AGMrrRING GAJ 5a IAGO? Winne 107 U o- 8 8 Percent 8 b F'rer 8 by Mass 8 8 7 V o 8 8 8 8 pKHr I BORING MW—J Test specimen did not meet minimum mess rearnmendefions ■ • 2 s 8 S R R 4 ' ' o 0 ' � d o o°4,94o' 4si8 B Grain Size (rem)o I I I _ 1 I gg g - ,. . N o _ in I- at y 5 ; 8 + I i t t p G a I � • I a s o m i_ g al tz i _ a, eV 1 rr • J et.' 1 a vm > e 1 I . m i-"it -1 t 1 I - 0 �' 8 4.2 i I I F : 8 S 8 8 8. 0 G 8 ssery G 8 dq Jasleo j Iua8JYd 0. 8 8 d 8: o .0+ G) cn''z^^ N I1 v 03 C 0 2 1- 0 �S&WILSON, INC. GRAIN SIZE DISTRIBUTION PLOT BORING B-2 es Gravel Sara Fines C I FM Coarse i Median Fame Sit Cl.eS. Mesh Operblg In Inches M1 r Men Openings per Inds. U.S. Standard Grkn Sue in Merrelers 8 oo^ 8' ,° B po t0 15 b t3 0 l�— a5 e o o' o eg, Grain Sae (mm)e Semple Iden3B01Lbn DepO•. (R) USCSUSCS 5j„ye Grasp Name 1 Gravel % Sand % Foes % < gym % < 2ym % WC % lasted By R.N.w By ASTM SId •B-2. S-] 50 SM Slty Sand wile Grave' 32 50 1e 5.B AKV C13e Test spMOuncn d1C not meet mrmmum mess mcanmenda/Aons. D =IJ(�SHAyL(QfJ &WILSON, INC. GRAIN SIZE DISTRIBUTION PLOT BORING B-3 100 Gravel Coarse FM Sand Coarse I Mle0i0a0 Fry Mesh Opening in inches Mean Openlrgs per Ind. U.S. Standard Fines Sit Grain Size le Memelere r8 a *boas o0re re? a i a - ( F+— ) ( 10 tl 25 r0 € <s y b u 25 10 9 9 k Grain Sue (mm) � 8 8 Sample Depth GUSSCS USCS G•seel Seed Fides <20pm <2pm WC testae R.vyw ASTM Iden3e:ipon (R) S by GrO. Name % % % % % % By By SId •B-3.S] 75 GM Siy Gravel win Sand 51 Ja 15 111 AKV C136 ■B-3.SS 12.5 Mt_ Sir wah5an0 11 B] 172 AKV Celt. • Test specimon did nor meet minimum mev recornmendutiau IS 17 zs ao d5 8 i 8 gZ 8 SI4 LVFSWILSON,INC. GRAIN SIZE DISTRIBUTION PLOT BORING MW-4 Gravel Sena Coarse Flee Coarse MeoArn Fee Flees Sift CIarSue Mesh Opening In Inches Mesh Operineo per Inch. U.S. Standard Grain Slag in Mlbmelen r l se —1 16) 4,7a .e e a e o Grain Sizo (mm) o e o 0 & /, a 8 I ernde n 0080 sym6d Grove Ne+he G:%I Sand F < 2Wm <2ym WeC Tested Review 5i0M •MWJ,S.2 5.0 SP.SM Pudy Graded Sandal% Si; 6 ea 10 16.5 AKV C136 ■6M'<,SI 20.0 SW-SM WCFCmded Sand wile Sat and Gravel 23 67 10 111 •KV C106 Test specunen did not meet minimum mass racommandolions. DRAFT Clarity Engineering I.LC APPENDIX C: HISTORIC EXPLORATIONS - SOUTH BASE FACILITY I'miecl No: 107 C•1 KC lnionm South Haw - GeWech Heporl (t)RAFI).docz DRAFT CbGeotechnical Consultants CONVERSE DAVIS DIXON ASSOCIATES, INC. 100 West Harrison, Seattle, Washington 98119 • (206) 285.5200 September 17, 1976 De Leuw Cather E. Company 720 Third Avenue Seattle, Washington 98104 Attention: Mr. Dorr M. Anderson • Vice President • ln.,.s P:,D/ele ,N S.A. . I. DIXON Exec.:ire Vire Preridera /Eucent R. MWII Vire Pride, C. RVH ➢ aide„ r,,. Pr„;I,.r Eucn.. A, MI>soa Vh, P,nMe., Ro...i,MVPuo. Vire President W-74-310-03 W-74-310-05 We herewith transmit 25 copies of our Final Report on the Foundation Exploration for the Metro Transit South Operating Base (Subdivision T3A74-03) and Unit Repair Facil- ity (Subdivision T3A74-05). Since the Unit Repair Facility will be constructed on the South Operating Base as part of the same contract, the results of the foundation explora- tions have been combined in a single report. This report completes Task I, Soils Investigation and includes all field exploration and laboratory test data contained in our Task F preliminary site report dated December 3,' 1975. As they became available during the course of the explora- tion, the findings and recommendations were discussed with members of your staff. This work was authorized by your letter of.September 19, 1974 with notice to proceed given by your letter of August 12, 1975 for the South Operating Base and September 4, 1975 for the Unit Repair Facility. CONVERSE DAVIS DIXON ASSOCIATES, INC. ti.av 4 rl.-q I Eugeeie R. McMaster Vice President ERM:ls J 1 DRAFT TABLE OF CONTENTS 1. INTRODUCTION 2. PROJECT DESCRIPTION 3. GEOLOGIC HISTORY 4. PROJECT SITE CONDITIONS 4.1 General 4.2 Surface Conditions 4.3 Subsurface Conditions 4.4 Ground Water 5. DISCUSSION AND RECOMMENDATIONS 5.1 General 5.2 Maintenance Building 5.2.1 Building Description 5.2.2 Subsurface Conditions 5.2.3 Foundations 5.2.4 Comparison of Foundation Alternatives 5.2.5 Floor Slab Support 5.2.6 Pressures on Buried Walls 5.3 Operations Building 5.3.1 Building Description 5.3.2 Subsurface Conditions 5.3.3 Foundations and Slab Support 5 4 Unit Repair Building 5.4.1 Building Description 5.4.2 Subsurface Conditions 5.4.3 Foundations 5.4.4 Slab Support 5.5 Washer -Fueling Building 5.5.1 Building Description 5.5.2 Subsurface Conditions 5.5.3 Foundations 5.5.4 Floor Support 5.5.5 Earth Pressure 5.6 Buried Tanks 5.7 Retention Pond 5.8 Parking Areas 5.8.1 Bus Storage Area 5.8.2 Employee Parking Area 5.9 Acoustic Walls and Berms 5.10 Bus -Only Ramp 5.11 Seismic Considerations 5.12 On -site Utilities and Piping 5.13 Inspection 6. LIMITATIONS REFERENCES CONVERSE DAVIS DIXON ASSOCIATES, INC. Page 1 2 3 6 6 6 7 10 13 13 13 13 14 14 24 25 27 29 29 29 30 30 30 30 31 33 33 33 33 34 36 on Buried Walls 37 37 38 39 39 42 45 46 46 47 47 48 49 DRAFT 1. INTRODUCTION This report presents the results of the final foundation exploration for the proposed South Operating Base and the Unit Repair Facility to be constructed for the Municipality of. Metropolitan Seattle in King County, Washington. A preliminary soils evaluation report (Task F) was submitted December. 3, 1975. The purpose of that earlier phase was to d ter:rine the general subsurface conditions as an aid in developing a site layout plan for the'vartou.s facilities. Since that time, additional -exploration, testing, and engineering studies have been completed for the purpose of providing foundation recom- mendations for the final design of the proposed facilities. All previous exploration and laboratory test data is included herein. The site layout studied is that shown on the Site Plan, Drawing 1. Technical details for the proposed site development and building designs were taken from the "Phase I Preliminary Design Report - South Operating Base" by DeLeuw Cather & Company. The scope of work for this phase of the investigation included additional drilling of twelve subsurface borings from 11 to 29 deep, excavating of fifteen test pits 5 to 12 feet deep, classi cation and laboratory testing of the soil samples obtained, engi- neering analyses based on the laboratory and field data, and the development of recommendations based on these and other considera- tions. CONVERSE DAVIS DIXON ASSOCIATES, INC. 1 DRAFT -2- 2. PROJECT DESCRIPTION The site includes approximately 20 acres .of undeveloped land located about one. mile south of the Seattle..city, limits between and` tO.L,t)le south of the intersection of East Margana•1 Wey`9outh.and S11-599. Formerly the Riverton Quarry, the site was filled to its present grade following cessation of quarry operations in 1973. The existing ground surface is seasonally covered with grass and slopes grauually from about elevation 21* on the south to approximately elevation 12 on the north. The main attached facility. the site employee structed runoff. the site structures will include a maintenance building with an operations building, a fuel -wash building, and a unit repair In addition to the structures, approximately 11 acres of will be paved to provide bus parking for 200 coaches and parking for 189 automobiles. A retention pond will be con - at the northeast side of the site to contain storm water The proposed locations for these facilities in relation to are indicated on Drawing 1. *elevation 0 = mean sea level CONVERSE DAVIS DIXON ASSOCIATES, INC. OBSERVED GRCUNDWAT3R ELEVATIONS N V • LEI m r R1 w v .DO .-I 40 ti W 00 -12- n n J M N V' Vl N o visual examination and laboratory testing. Undisturbed samples were DRAFT APPENDIX A Field Exploration Borings and Test Pits The subsurface conditions at the site were explored by means of 23 borings (B1 through B23) and 26 test pits (TP1 through TP26) at the locations indicated on the Site Plan, Drawing 1. The borings were drilled with a truck -mounted continuous flight hollow -stem auger to depths ranging from 10.1 feet to 32.8 feet below the existing ground surface. Continuous supervision of the drilling and sampling, and logging of the soils and rock encountered was ' carried out by our project geologist. The subsurface materials encountered are shown graphically on the boring logs, Drawings A-2 through A-24'. Representative soil samples from the borings were secured for 0 0 .D � 1 rr m N N N o n cv penetration resistance using non-standard procedures. obtained using a 3.25-inch or 3.00-inch 0.D. sampler. Disturbed samples were obtained' with the "Standard Penetration Test" which M N M cc,'0 utilizes a 2-inch O.D. split -spoon sampler. All samplers were m N N M driven by mean:: of a 140-pound hammer dropping a distance of 30 inches. Normally each sample was obtained by an 18-inch penetration of the sampler and the number of hammer blows for each 6-inch incre- o ment was recorded. The blow counts shown on the boring logs are N 0 N for such 6-inch increments except as noted where lesser penetration was achieved. The blow counts required to drive the 3.25 O.D. and 3.00 O.D. samplers have been converted by estimating to standard In borings B1 through B11, the bedrock was drilled and core samples .n .n 0 0)0 0N obtained utilizing a 5' long NX core barrel. Drill fluid consisted �° of a constant flow of fresh water that was not recirculated. The coring run location, together with the percentage of core recovered ro c C is shown at the respective depth on the boring log. Photographs .I OOA o of the rock cores are presented on Plates A-25 through A-29. w ...I N f� r • N I` .D .D .o R1 O N 47 0 .D .1 N \ \ \ S., > N , N N D 0 N CONVERSE DAVIS DIXON ASSOCIATES, INC. 1:43R1/4,FT Twenty-six test pits were excavated with a tractor -mounted backhoe capable of penetrating to depths of about 14 feet. Continuous logs of the subsurface conditions were made at the time of the ex- cavation. In addition, ground water conditions and stability of the excavated walls were noted.. Representative bulk soil samples were obtained at regular intervals during excavation. The soils encountered are shown graphically on the test pit logs, Drawings A-36 through A-55. Five field density tests were taken in certain of the test pits and the results are presented in Appendix B. In as many borings and test pits as possible, measurements of the stabilized ground water level were recorded. The levels, with the dates recorded, are noted on the boring logs. All borings and test pits were backfilled at the conclusion of the field exploration. Nine piezometers, consisting of a 24-inch long slotted "Hydrotip" and a h-inch diameter plastic riser pipe to the ground surface were installed with the tips packed in gravel in borings Bl, B4, B6, B7, B9, B11, B16, B19 and B22 for periodic water level obser- vations following drilling. The subsequent groundwater measure- ments recorded in the piezometers together with the date of the reading, are tabulated in the text in Section 4.4, Ground Water. Those samples, including rock cores, not completely used for testing have been stored in our laboratory and are available for examination should it be desired. Due to the elapsed time since they were secured, changes in moisture content and appearance of the samples have occurred. CONVERSE DAVIS DIXON ASSOCIATES. INC. 1 erRLrp y�, 1975 ��; ti� � LOG OF BORING NO. B 1 • e-j Vr.r,p STANDARD PENETRATION o; @O A BLOWS PER FOOT•• a 0 50 100 16.5 - _ - 1-C .-� . .. �� : ., Brownish gray, silty, fine -medium SAND with occasional gravel (Fill) --moist, loose to medium dense 114 9 10 0 10.0_ - E _ 2-Cr, 1 1: 1 • `� Dark gray, fine, sandy SILT with occasional siltstone fragments & 1. brownish gray, silty, fine -medium sand (Fill) I --moist, medium dense 14/5" ! > 1Q0 • 5.0 - L10 - _ I '.1' r t • Gray,• fine -coarse, sandy SILT with occasional gravel ti --wet-- f occasional rock fragments 1 drilling rough and irregular refuse 50 .. ... _ = 3-A =• �" rocky I 2.5 > )00 Dark gray and gray, moderately _._..t..._....__......_........ 0.0- -15 7- Run 1 66% RCY '. 4 weathered, thinly laminated I '- :. numerous partings along near- r horizontal bedding planes I 15.0' t i -5.0= - '-20 _ _ Run 2 996% \ ...::_,, :, (. i. started coringat — f. Gray, moderately weathered SANDSTONE with some dark gray, thinly laminated siltstone. moderately hard to hard. No fracturing-- y._ i .. ............._ = \ occasional partings •alon near% \ horizontal bedding planes / ..j..__ ............._.._... -10.0- - - Bottom of hole at elev. -8.5 Boring completed Oct. 15, 1975 Piezometer installed on Oct. 22, 1975. Hole flushed, piezbmeter Yip at elevation -8.5, installatioj bacJ iIJed with gravel. See text, ec, tor ground water os woci urements. indicates individual coring runs with the percent core recovery (length cored versus length recovered). i :.. _ ...... •A. 2°O.D. split -spoon sampler-.7_vrmer B. 3-o.a thin -mall sampler •• Standard Panetrolion Resistonco except C. 3-1/4" 0.0. x 2-I/2" liner for 2' O.D. split -spoon convicts icts estimated using non-standard procedures: level 0 25 50 WATER CONTENT -./ dry wcigl t S impervious seal Bostic „nil li uid lunit tIp , - --- .4 D 3.1/2" 0.D. split bural sampler . 0 pie,omerer X. sample not recovered oturol wale, content SOUTH OPERATING BASE Seattle, Washington for De Leuw Cuther & Company ING eP olyULIER A-2 CONVIIRSI DAVIS DIXON ASSOCIA•tl'S . 6r^r..l.,m.rl c_•,'r•:•,,..,r. ^::aw W-74-310-03 �:H 599 Linn I ."(Sei•rilc TPI• 25 1^ ti 20 ■ "_• f~ A PROPOSED 4 044INTENANCE I 7.8NL01NG 6 ■ TP-9 ■ 'P-I PROPERTY LINE TP-18 lc Line 2 CPERAT IONS BUILDING PROPOSED _L941T REP . - 5ILDING ..... tirT' i 0\ 81\ kA e-2 )h `\ B-2 • B-;I TP-7 . EAST MARGyNAL WAY 5. TP-26 •u• TP-■II e/iF24 • e-23 PROPOSED WASHER- FUELING BUILDING i r'e-1• ih25 ns • 8-10 lip SITE PUN JM ERM SOUTH OPERATING BASE Seattle, Washington for DeLeon Corker & Canpony 1 roe•• ERM e•tc SEP. 1976 100 17117, w-74-710-23 5 CONVERSE DAVIS DIXON ASSOCIATES. INC. Grutetbntr,d Co,rulr„ �E "rly[T+a , Nmared by lntegolo1Ena ber.e•n boring A ra,r pity V E A ma;vAol, ro kno.n only ar polnN e.p1vee A 0 909.9 .111 / vary fan that elro.n. LEGEND: F • Fill B = McFall 5 • Sandstone A = Allwi.m 5'F • 5 feet of 911 underlain by B ba.lt bedrock encountered In r••1 pit or boring - Typical • \E 5R 599 2225'F 05i5'F S • • PROPOSED RETENTION PON • A'F _ NSF■ • - r• f.Pfarff Ru.G ei Ant • • 5'F A • 6F 2'F_ q • •12-5F Sf�l S �} InrF.t je Colocl between Boson & / \ Sardyon• Bedrock B'F • PROPERTY LINE - — - — EAST MARGINAL WAY S. B'F • • • IYF • 7.5'F T • s-F- .41,-1-- PROPOSED OPERATIONS BUILDING � �a ^ JM "'ma^ ERM �•" ERM 20'F • 241E ■ 12.E eu4 * R•Gf Mf• 9.5'F e � • 10'F T • e AL PROPOSED UNIT REPAIR BUILDING I • 21'F 12a5'F PROPOSED • WASHER- FUELING 9,51E BUILDING •W°T ipF • a �•'F ■ _9�'F - 1 -e J INFERRED BASALT/SANDSTONE CONTACT SOUTH OPERATING BASE Seattle, Washington /or Delver Collier & Co.pony 2• rtc SEP. 1576 I sr•u. 1 100' I',W.•R W-7e-010-00/55 CONVERSE DAVI' DIXON ASSOCIATES. INC. Grorrr9nrr,d Con draw, DATE 17, DRILLED. Oct. RAF�+ �4 4/ �Qr `' 16, 1975 LOG OF BORING NO. B 2 �43 ia, AO STANDARD PENETRATION �i °�v o, 6 BLOWS PER FOOT u 0 50 100 _ ! Mottled brown and gray, silty, fine -medium SAND with occasional 1 gravel & occasional pockets of 19 1-C 1 fine sand (Fill) 115 14 O --moist, medium dense 10 5 1 I occasional cobbles 10.0 2-A • 10: ' grades slightly coarser 15 5.0 10 water encountered at 12' i 103-A 16 t11 .1 54 1 Gray, medium -coarse SAND and 15 - fine -medium SAND with rock fragments (Fill) 0.0 4 A --moist, medium dense to dense 1 drilling hard and firm at 17' 11 i - 11 i -20 ( _................. Run 1 r ;.+ Dark gray, slightly weathered to -5.0 _ 76% A, A fnPsi, BASALT- vcry fractured, - RCY r hard --25 Run 2 ° • . �.. e auger refusal at 21', started r coring at 21.5', approximately _ R CY,'�� 6", intensely fractured layer -10.0- -�• Bottom of hole at elev. -9.0' -_30 Boring completed Oct. 16, 1975 = Ground water level not determined. A. 2"OD. split -spoon sampler • water level 0 25 50 B. 3°O.D. thin-wollsampler • • Standard Penetration Resistance except WATER CONTENT -% dry woig t C. 3-I/4" 0.0. x 2-1/2° liner for 2" OD. split -spoon samples estimated 3-1/2" 0.D. split torrul sampler using non-stondord procedures. f1 2 impervious seal luslic pietomelor hp p qu. limit li d lendD. X. sample not recovered LJ .nor - urol water content SOUTH OPERATING BASE NUMBER Settle, Washinglon A-3 :oeT for De Leuw Cattier & Company CONvr.RSr ImvIS 1)IxON ASSOCIATI'S (,,-•.,,,r,.,,.d r",,.r., ,,,. P1DJ W-74-310-03 1 oTR, & 4i 17.9_ •D:r.1975 b , ti a. '''vvv LOG OF BORING NO. B 3 4�� ,r ti4 grvO STANDARD PENETRATION 4.z....., ` e+ �� o r�� oc� 0 BIDWS PEk FOOT •' ° 4 ti i:..,w':e::"s::°.w.%°f";�.'`~•wr��::a C-�0; OJV�'> 0 50 100 _ .1 • :.',(1, Gray, silty, fine -medium SAND - with occasional gravel (Fill) 15.0 � 1 C +se; tiS --moist, medium dense 118 4 ti,rf 20 _5 \ occasional thin layers of fine - Wit' sand L. grades finer with increasing 4 10.0-- _ 2-C .1', � silt --moist to wet, very loose to soft 126 2 2 ® _ 10 11 . grades denser to a brown, silty, = '1 fine -medium sand with occasional - ,% �„ gravel and weathered rock 17 5.0- 3-C ,rEl.r1 fragments 123 37 O '. 7-15 S 1, moist, dense 37 1.............._....... - 1i firmer, smooth drilling at 17' �',' 0.0 1� a , auger refusal at 19' i :20 '� ' started coring at 19.5' _ _ . .... _ kun 1 92a�, - ' + Dark gray, slightly weathered to _ ' ' +" fresh BASALT with some secondary - 5,0 ' Run 2 100%;`, , e ", calcite cementation of froc:ures --very to slightly Fractured, - RCY .. , hard a25 _ Bottom of hole at elev. -6.6' -10.0-- Boring completed Oct. 16, 1975 - No groundwater obssrved during -30 drilling. _ - - •A. 2 0. D. split-spoonsampler •�,wotet Icvei 0 25 50 B. 3"0.0. thin -wall sampler • • Standard Penetration Resistance exceDl WATER CONTENT -/. ry weight C. 3-I/4" 0 D. x. T-I/2° lino, Im 2' O.D. cpinl-spoer sample$ asllmoted • 0. 3-1/2' O.D. split banal sampler using non-slundord procedures. F� f mpervious seal piotometer tip W0°I'° II aid Ilrnit ,h-m-n—A- L oNrol rioter content X. somDlu not recwe,ed L] -SOUTH OPERATING BASE oe,wlec nouncri Seattle, Washinglr,n for De Leuw C_athcr & Company A-4 CONVIl1(SII)AV IS DIXON ASSOCIATES - ,,-•.,''''", l r:-",rr:,.on. no'. n„a W--74-310-03 DATE DRILLED, D RA _1r 4•-,. 4/ 4,,",,t., ,•:' - ° 4`" 16.7 Oct. F A. •it' 4 ,•;`' 17, 1975 • tog- Z..`-.L.C. •.,,.4,:z T „s, LOG OF BORING NO. B 4 • At0' ,t- er,p_ STANDARD PENETRATION ,i3' 1.-T,:rmt".'',:t.t.n.V.V.,===',7,:r.° r'-' V A BLOWS PER FOOT 4 -t.O4a,i• c•;' ,...,inng.:M.',1.=',47,••"""' • '''''""'"" 4"." 43-3:,- 0 50 100 - flif ,I" • Gray and dark greenish gray, silly, fine -medium SAND with occasional gravel and rock fragments (Fill) 21 - _ 1-C ':At -moist, medium dense 118 18 A 0 - p‘l: i very hard drilling below 5.5', 19 7-5 _ A „--.„ ciugered to 6.5 and used rock bit to clean caving hole to 9 / 10.0,- - .... ••• ^ • r :, .,,`,.. Dark gray, slighlty weathered to fresh BASALT • --very fractured, 1::: ! hard - 100% ...";,.` •• .. •• started coring at 9' 5.0.= ,--- RCY i• ,. 4 ::: Run 2 f, Dark gray and gray, slightly L.15 100/ a.t: weathered, thinly laminated to .._ __ ........ - RCY 't'.'.'.-:.; laminated SILTSTONE and 0.04-- •SANDSTONE --no fracturing --hard, partings along near- horizontal bedding planes 7-20 Bottom of hole at elev. 0.7' I - Boring completed Oct. 17, 1975 _ _ Piezometer installed on Oct. 17, . : 1975. Ilc•Ii.• fh.shP4 -zoirtor _ ,_ tip ot elevation 0.7 installation - backfilied with gravel —25 -10.0 - _ See text, Section 4.4 for ground- water measurements. i - ' --i- - i - ; -1,".- 7 ..• - , _ I *A. 20.0. split -spoon samPier • w0 25 50 ater level D. 30.D. thin - woll sampler • • Standard Penetration Resistance (wept WATER CONTENT -% dry weight C. 3-1/4" 0.0 a. 2-1/2" liner for 2" O.D. split -spootri samples estimated impervious seal plastic limit liquid limit D. 3-1/2" 0.D. split barrel sumplor using non-standurd procedures. 13 piezorneter tip . 2!turol water content X. sample nut recovered SOUTH OPERATING BASE un 10,41110 NUMPER • Seat i lc, Washington for De Lcuw Cother & Company A-5 (.ONVF.RSF L)AVIS I)IXON ASSOCIA TT'S • r.,,./••,..,/ i.,•,.,../.,,,/, ,"„"' W-74-310-03 q 31 II ..: , ,<3.,,,,,. O ',& Oct <2"' / 1.4..2tuiii.i k 7, 1975 . LOG OF BORING NO. B 5 ,. A) •2-,,..9 STANDARD PENETRATION 1 ::::::It 00- A BLOWS PER E001-•• ,,t• 1j..°551,,,,,..,.,., ,..11: , :1 , Mr1=7,... 8-,..5, 43%,9-43 0 50 100 _ - dr . Brown to gray, silty, fine -coarse SAND with occasional gravel and cobbles (Fill) --moist, loose 7 22 ! A 10.0-7. . _ 5,,,,. ' - ' '' - - ...; : 7 z77- '•7.... .:1z. Dark gray and gray, weathered, thinly laminated to laminated SILTSTONE and SANDSTONE --no fracturing --moderately hard partings along near-horzontal i - 5.0,-_- _ - _ - Run 1 100% RCY -_, . /;- .11,._--i: ._. bedding planes, grades to moderately weathered started coring at 8.5' - Gray, fresh, fine SANDSTONE i 0.0 - =15 - :- .• Run 2 1009/02:''' RCY _-_ '.-- with some thinly laminated layers of dark gray SILTSTONE --slightly fractured, hard to / very hard _ Dark gray and gray, weathered, -5,0 ••.= - —20 _ - --- thinly laminated to laminated SILTSTONE and SANDSTONE --no fracturing, moderately hard partings along near -horizontal bedding planes i i -10.0-,---- = .:---25 - Bottom of hole at elev. -2.1 Boring completed Oct. 17, 1975 No groundwater observed during drilling. *A 20 D. spirt - spoun so nptor . B. S'O.o thin -wall sampler ' • Slondord Penetration Resistnnce orcept C. 3-1/4" 0.1) x 2-1/2" inor for 2" OD split -spoon samples estimated D. 3-1/2" 0 D. split burr I sampler using non-stondurd procedures water levc4 ° 25 50 WATER CONTENT -% dry were 1 o l-pervious scat Pr'thc liquid lunit Pierometer I.p !""1 . 0 X. sample not recovered Zinaturat wale. content SOUTH OPERATING BASE Seattle, Washington for De I,euw Cathcr & Company nRArrims Nomocn A-6 CONVEUSE DAVIS DIXON ASSOCIATES 6,,,,,b,,d C.,,,,:,,,,. W-74-310-03 DATE DRILLED: ^ IL.�i1i/L�] DRAFT zr� 17.0 A 4, o o4' OCt. F ,Q+ 20, 1975 B 6 k'4, yt .44' T LOG OF BORING NO. . ` e �� d?�4 STANDARD PENETRATION �00 d'� O�v�oO ABLOWS PER FOOT •• h >.......a...�r,..a...,.,. .•..r.,,..,,,..n.. Cc.; 0.\wO 0 50 100 = • t et Brownish gray, silty, fine -coarse SAND with gravel (Fill) I _ - 1-C ti•/, ;. •//' --wet, loose to medium dense cobbly at 1.5' 124 7 18 10.0•! 7-5 - . j cobbly at 5.5' - - - —10 2-C 50/2, i......................_..., > 10 „�11 r � Z <.; , r ,. started coring at 8.5' Dark gray, slightly weathered to fresh BASALT --moderately l�` Run 88% 5.0 = — RCY ' `w .. r ,I ^ fractured, hard changes to slightly fractured —15 - Bottom of hole at elev. 4.0' Boring completed Oct. 20, 1975 0.0 _ - Piezometer installed on Oct. 20, 1975, hole flushed, piezometer - tip at elevation 4.0' , installed -20 with gravel back fill See text, Section 4.4 for ground- -5.0.-7 water rneav2r=rten!s. —25 -10.0-- - -30 ••A. 2"0.D. split- spoon sampler Icvel 0 25 50 B. 30.D. thin -wall son pier • • Standard Penetration Resistance except _voter WATER CONTENT -% dry weight C. 3-1/4" 0.D x 2-1/2" Imor for 2" 0.0split-spoor samples estimated S trrperviws seal plastic limit liquid limit .D. 3-I/2" O.D. split hurrol sampler using non-standord procedures. © piezometer hp Lnatu,al wale. content X. sample not recovered SOUTtI OPERATING BASE wuwuirra Seattle, Washington for De l.euw Cother & Company A-7 CONVF.RSI'_ DAVIS DIXON ASSOCII\TIS a,'„n,n,J..,fr:,.,r.,,,,.,,,,, e„a'•W-74-310-03 1 DA•TE DRILLED: Ct A°j C h 4.d' 18 3 20 1975 LOG OF BORING NO. B 7 e 4 3,2�o STANDARD PENETRATION rirwM. .r.j... 47. O�c,, a if G BLOWS PER FOOT • • 0 50 100 L Brown and gray, silty, fine -medium SAND with occasional grovel (Fill) 6 15 ) - 1 C I --moist, dense 130 23 41 a) 5 ' grades less silty +._ '.._....._.:.._ r'1 14 10.E 2-C layer of brown, medium to 117 28 34 - 10 I coarse sand and gravel - wet I l �, I 10 5.0 : 3-C changes to brown In color 132 16 31 O 15 r boulders between 16.5' & 17.5' '... ...._._._..._ 6 Brown, fine -coarse SAND with {{ occasional gravel (Fill) 0.0 4-A 18 21 20 ff -saturated, dense I 5.0,=! di Et r-25 'er; . started coring at 25.3' Dark — Run 1 , , , gray, moderately weathered -10 OC - - 100% RCY a ; , r ;;, .. BASALT with some secondary calcite cementation of fractures --intensely to very fractured --hard —30 Run°2 ' e r '< 4 grades to fresh and very fractured - 100/ ;,, = RCY . . r changes to moderately fractured _ _ J —15.0,= —35 _ Bottom of hole at elev. -14.2 Boring completed Oct. 20, 1975 - Piezometer installed on Oct. 20, 1975. Hole flushed, piezometer Hp at elevation-14.2,•installation - 6ackfllIe with r ve S•ct xt malts.' .4 for group wu4'er rmreatur6- A. 2"O.O. split- spoor sampler •-y-water IerN 0 25 50 B. 3"0.0. thin -roll sampler • • Standard Penetration Resistance except WATER CONTENT -% dry were t impervious C. 3-1/4" 0.0 x 2-I/2" liner for 2" 00. split -spoor samples estimated S seal plastic limit liquid limit D. 3-I/2" 0 D. split barrel complLr using non- siondord procedures .• Ei pieeomcler Imp /� ' •nuturnl writer content X. sample not recovered t] SOUTH OPERATING BASE DRANG NurI0,e Seattle, Washington for De Leuw Cother & Company A-8 d CONVCRSI-. DAVIS DIXON Assoc:l,\ res - . (.,,.n,6,,,,.,1 c..,,,,.:-.,,,,. �Pe0' W-74-310-03 DATE DRILLED: .�\ 18.0 ¢2.,. Oct. 21, 1975 LOG OF BORING NO. B 8 ��� k. ,�+ 541PO STANDARD PENETRATION $" O�UJ �� ratPER FC)OT•• 50 100 - Brownish gray and gray, silty, fine- - medium SAND with occasional t gravel and fine -coarse sand with 6 i 15.0--- 1-C ` ' a trace of silt and occasional ", 129 15 i — gravel (Fill) 1/75 25 -5 ,tt --moist, medium dense 10/. cobbly at 5' harder drilling at 7' 8 i 10.0t 2-A I occasional small lenses (1") of ' 14 ® ® j _ ‘, coarse sand 21 -10 •r° drills easier below 9' - ) / 7 5.0- 3-C 1 '# 9 134 22 _ 33 -15 - I Brown, fine -medium SAND with occasional coarse sand and small 6 0.0- 4 C (Fill) --wet, dense 123 19 - gravel d drilling hard at 20.0' 37 -20 — , ^ started coring at 21.5' Dark -5.0- _ Run 1 84% . s, , ;I; gray, slightly weathered BASALT with some secondary calcite cementation of fractures RCY : 'r --slightly to moderately fractured -25 revv --hard j.... a ..._ = sue' ' lost drilling fluid between 23' & ' - 26 / -10.0- . _ Bottom of hole at elev. -8.5' ' -30 Boring completed Oct. 21, 1975 _ " Measured at end of drilling, May _ not be stabilized. -15.0- -35 •A. 2"0.D split - spwu co raptor • l_water level 0 25 50 B. 3"0 D. thin - wall sampler "•Standard Penetration Rosisl°nco °script WATER CONTENT -"4 dry wcig I • inpn C. 3-1/4" 0.D. s 2-I/2" iner for 2" 0.D. split -spoon samples estimated viws scat plastic limit liquid limit D. 3-1/2" 0.D. split barrel sampler using non-standard procedures. f-9 piezometer lip �jp _ , voter content X. sample not recovered E. Lnolure! SOUTH OPERATING isASE w',"R Seattle, Washington for De Leuw Cather & Company A-9 CONvrRSI- I)AVIS DIXON ASSOCIA'fLS r•,."„n,„,.,) r•:„".:,,,,,. I"„"a' W-74-310-03 �TG{I-1 toO 21.0 u. ��} O 4~r 'l 4�� h 1975 LOG OF BORING NO. B 9 ,, r°'e "3 4 d'24.o STANDARD PENETRATION Vp Or"�v hh4.✓i0 0 BLOWS PER FOOT • • u� s..,.., r..aur,..na,..0 ...... ..�."""., w v OJ,y4) �v, :Pw :^,.:" 0 50 100 — - Fi Brownish gray, silty, fine-inedium - SAND with occasional gravel & _ -78 1-A , :'i ` thin layers of medium to coorse sand (Fill) 18 - ,1 [, --moist, dense 18 - 5 grades finer with little or 15.0-- tit}' no clean sand i grades to medium dense 6 2A ,• t/ 8 _ r, h4 12 10.0-_ -- 10 d „I.grades e dense to very dense - �' 4 3-A 1 tr 18 0 0 - a 32 -15 5.0-- grades to wet 12 = 4-A 1' 20 O O - r f 26 --20 0.0'_ changes to dark brownish gray '• - r e� with occasional rock fragments 8 _ 5-A '' j 24 0 0 > 100 Z _ZF' 50/2„ 25 Run 1 t , • , ,. started coring at 24.6' -5.0- 90°/a Black, slightly weathered to - - 90%CY ^ fresh BASALT some secondary calcite cementation of fractures - a',. --very fractured, hard -�0 Bottom of hole at clew. -7.5' -10.0 _ Boring completed Oct. 21, 1975 - Piezometer installed on Oct. 21 - 1975. Hole flushed, piezometer tip at elevation -7.5, installation -35 backfilled with gravel. See text, Section 4.4 for groundwater i -15.0 ^ measurements. ..A. 2-"O.P. split -spoon sampler SLwaler Itv, 0 25 50 B. 3"0 D. thin- wall son pier ••Standard Penctrolion Resistance except C. 3-I/4" 0.D s 2-1/2" .nor • Standard 2" OD. split -spoor snmpIns eslimnted WATER CONTENT-/ impervious seal pudic Ihail dry neigh liquid lend. .D. 3-1/2" 0 D. spht t.urrel sompler using non-stondnrd procedures. 0 piecomelor lip ~ _f� Lnolarul wider camera X. sumplo not recovered - SOUTIi OPERATING BASE nan","„ Seattle, WasIunglon for De Leuw Colher & Company A-10 CONvI.RSI. I)AVIS DIXON ASSO(;IA'l'l-S r•,'•,,.,):.,,,.,/ r.-",".:,.,,,,. ""' I"oo W-74-310.-03 I) ,t.ec)�,// C"v 20.2 15.0 10.1 5.0 0.0 -5.0 .A. 2"O.O. D. S"O.U. C. 3-1/4" D. 3-1/2" X. somplo j,�D: §2. sQv t•ort- 1975 ioQ LOG OF BORING NO. B 10 -,, 4,�4, 2 r` 8„1P2° STANDARD PENETRATION vT4<YU -ITC.ABLOWSPERFOOT•` ...... > .,„ . r,....,.r. 0 50 100 S -10 _ 15 20 25 1-C 2-C f 4 i Brownish gray, silty, fine -medium SAND with occasional grovel and occasional layers of fine-mediumv, sand with troce of silt (Fill) 10/22 --moist, dense grades finer with little or no clean sand mottled dark gray and brown drilling hard below 10' boulder from 10' to 11.5' started coring at 11.0', cored through boulder & soil at 11.51 127 .75 125 17 22 33 28 34 j Run 1 97 RCY ` � : Dark gray to block, slightly BASALT weathered --very fractured, hard Bottom of hole at elev. 5.2' Boring completed Oct. 22, 1975 `Measured at end of drilling. May not be stabilized. split -spool so nplor _Q_water thin -wall on pier • • Standard Penetrolion Resistance except 0.0. x 2-1/2" incr for 2"0.D. split -spoon :omeles estimated 0.D. split barn I sampler using non-slondord procedures. not rccaverer legal 0 • 25 50 WATER CONTENT - % dry wciyl I s impervious seal 0 pie:omeler lip plastic limit—� liquid Iin1 L alurol puler content SOUTH OPERATING BASE Seattle, Washington for De Leuw Cather & Company 011.4 iN A-ll CONVCIi51' DAVIS DIXON ASSOCIATES (.,,,.,) ..,Ic:•-,r•„;tot, . mesa'. W-74-310-03 ll L1975 r 16.5 d• ,, tr, M LOG OF BORING NO. B 11 ,:?:'e �,?c'j vo.$S�a¢ STANDARD PENETRATION ,) -�T @V ,B BLOWS PER VOOT•` a.. 0 50 100 - 1-C 1 1'- 1 i Brown, silty, fine -medium SAND with occasional grovel and pockets of clean, fine sand (Fill) Gist, medittDtslense 114 21 27 ' 10.0-_ --10 2 A 1 • n Dark grog, silty SAND with rock fragments (Fill) --moist, medium dense.to very dense drilling hard below 10' 22 50 - i e' e started coring at 11.0' 5.0 — - —15 Run 1 100a/ RCY .':: . , . ' e e e Dark gray, slightly to moderately weathered BASALT --intensely to very fractured with up to 1/4" joint filling and weathering hard hard I moderately to / 0.0-- 5.02- -10.' - —20 _ - 5 - 0 - Bottom of hole at elev. 1.5' Boring completed Oct. 22, 1975 Piezometer installed on Oct. 22, 1975, Hole flushed, piezometer tip at elevation 1.5, installation backfilled with gravel. See text, Section 4.4, for groundwater 111Cusulemenrs. i ,A. 2"00:01- spwa su,. for B. 3"0.0 thin- well sampler • • Slandod Penotrntion Residence except C. 3-1/4" 0.11. ,. 2-1/2" inor la 2" 00split-spoon somples estimated na D. 3-1/2" O. D. split bal soerplor using numslandnrd Prao'dures. 11 wok, level 0 25 50 r WATER CONTENT - % dry weight impervious seal pie:omelet lip cost lc limit liquid llmll X. sample not acovered U 2notumt water content SOUTH OPERATING BASE Scott In, Washington for De Leuw Cather & Company IN ON AWING eVw EM A-12 11i0J W-74-310-03 CONVI:RSiDAVIS DIXON ASSOCIATES - n,,„r,./,,,l..,l r'„o.,,:,.,,,,. rrV DATE DRILLED. March 15, 1976 D RAF 4i Av by 17.9 15.0 10.0 5.0 0.0 -5.0 -10.0 LOG OF BORING NarVill STANDARD PENETRATION ULOWS rER FOOT • • 100 - - - - `5 -_ - - - 10 - = - - -15 _ _ -20 :25 - = 1-A 2-A� 3-A(Fill) 4-A T1,r '',f 1 �¢r1 S•+' ( 111--ii.' p , I.Brown, } " Cray, silly fine to medium SAND (Fill)--wct,Iouse / 13 3 4 9 8 6 4 7 3 54J6' 50 n,r / .__.... O >.100 Brown, fine SAND with occasional gravel to 4" (Fill) 3 --moist, medium dense / 5/76 V* Broom, silly, fine to medium SAND with occasional gravel -moist, medium dense ---mogrades to loose to medium dense with occasional basalt rock fragments and silt silty, fine to medium SAND with numerous moderately weathered to weathered basalt fragments (Fill) --moist, medium dense_ Brown'silty, fine to medium SAND with occasional gravel (Fill) --saturated, loose , basalt fragments 1acTc basart --highly fractured Bottom of hole at elev. 6.6' Boring completed March 15, 1976 *Measured al end of drilling, May not be stabilized. I-4-•9 II .3 A. 7'C.O. coat - spar.,, ;water B. 3 01). Thin --.roll ron.Mlrr ••Standard Penetration Resistance nscept C. 3-1/4" O.U. x 2-1/Z'• lirnr for 2 0.0. split -span samples est ialalcd D. 3-1/2" 0.0. spl:11,ri n1 sonrpinr using non-standard procedures X. somata not fecmcicu water level 0 25 50 WATER CONTENT % dry wc.ght mperviour. SE I piozonlntar lip L plastic limitligurd land -j% nalurnl water content SOUTH OPERATING BASE Seattle, Washington for De Le OW Cocker & Campuny �CONVI-.RSI 1)AVIS DIXON ASS O(.1A'I I'S UM AWING 111.01.111 t. II A-13 4w, W-74-310--03 J iL D: 15, 1976 :T - ry ° 2 4Q /. V 4� LOG OF BORING 1pibri,3.�. L 0 4 4 Jr,9 STANDARD PENETRATION . �a51 o\Cr 4., oV2• Li 0tDWS E'ER FOOT•• 0'r ro o,.,,,,,.r.an..<,v.,• ,".n ....N.,',. V?0' yn-." 1-A :1"--" k Gray, silty, fine to medium SAND with occasional gravel & trace of organic mutter (Fill) 1�r 10 2 �{• ., l - •- 2-A I J e`I, 5 • ' --moist, medium dense 3/15 . cobble at 4' — 76 5 62 10.0_ r• -J - .- _ -10 3-A 4-A A • \1� vA hx,;i , — --- f Brown & gray, fine to medium SAND with some small gravel (Fill) 'l"y --wet, dense to very dense occasional pocket or lenses of silty, fine to mudium sand 8" water in boring at 6' sample --saturated 9 27 r 1 34 t9 26 38 32 ©.. 0 _ 5.0-.:: 0.0� -5.0-- '� -15 - - - _ 20 5-A 6-A 7 A I. 4 r • `'-. Brown & gray, silty, fine SAND & silty, fine to medium SAND with occasional gravel (Fill) --moist, dense (based on drilling, blow counts p y p• n, ) : probably notre representative) occasional lenses or pockets of rp medium sand --saturated .kj auger brings free water to , surface during drilling occasional highly weathered \ rock fragments 56 57 4 8 12/5' 20/1' 00 0 © •..>•100 0 >100 B ac BASAI T --highly Frr.rrrrred \--hard J -10.0 5 _ 30 Bottom of hole at elev. -4.8' Refusal with auger et 20' 1" Boring completed March I5,1976 *Water level during drilling. May not be reliable. l‘,( .1.e 21,V A. 2"0.D. cold -swim :wavier 0. 3' 01 thin- wall sampler • `Slnndord Penetration Resistance except C. 3-1/4' 0.D. x 2-I/2.. lino for 2" 011. split-spools;anyles estimated D. 3-I/& 0O. split barrel sampler using non. standard procedu, ca. .e_water level 0 25 50 WATER CONTENT -% dry wnigt 1 i impervious seal pietwrnctor hip ploitic limit liquid land . X. somp'a not rocovcrcd - 1 natural water cadent SOUTH OPERATING BASE Seattle, Washington for De Lcuw Cattier & Company IAWING n uuuwn A-14 CONVLRSII DAVIS DIXUN r\S'.00;AI-Is - r,,-.•r„r.,,•,.dr.•o.,.;'.,,,,. "eOJ n W•74-3 O Oa DATE DRILLED: D/ v 17.3• r�\F O �4ir" March .` 15, 1976 8 �,? LOG OF BORING A "� do STANDARD PENETRATION �� .,..1.,' eK.,,o- p00J 4 @V A BLOWS PER FOOT*. 99� Gray, silty, fine to medium SAND _- '1.1.-' with occasional gravel (Fill) --moist, medium dense to dense 13 - 1-A i i trace 16 of wood 9 4 2—A .•' 1 •' changes to medium dense, 9 --2-'-':): i , multicolored with slight increase 6 13 - 3-A ,. in moisture water at 6.5' 7 12 10.0,=_ il 1 7 LI1` Gray, fine to medium SAND with 12 4 - • 61. some silt (Fill) --moist to wet 6 - 4-A I '. bb• occasional pocket or lense of 9 _10 gray, silty, fine to medium -i sand --saturated grades coarser to interbedded, 5.0,L - 5-A i' 1 !'' .. brown, fine to coarse sand with minor gravel & fine sand --saturated, dense to very dense 24 25 ® ' :-15 - ti tip; cobbles between 16.5' & 17.5' O.O - C'' 7 - 6-A . .j Brown & gray, silty, fine to medium SAND with occasional gravel 17 24 -20 7-A • , ,. : \Fill) --moist, dense ./ 10%., ._ �...... ... 400 - BASALT --highly fractured f -5.0-.- Bottom of hole at elev. -4.5' Refusal with auger at 20'6" 25 Boring completed March 15, 1976 Groundwater level riot determined. -10.0 30 17 .3 `I•S -15.. - 11 ... ....... _ ........ ......................... A. 2"0n spi' spear. snm;, ar y_noter level 0 25 50 D. 3"O.D thin Noll sampler • • Standard ror.Irorion Resistance except WATER CONSENT - / thy weight C. 3-1/4" 0.D. x 2- /2" tinar for 2" D.D. split -spoon samples est imnlud D 3-12" ()a. split bored sampler using n-sInndord procedures. S impervious seal plastic m 0 pi,netcr hp hd . , liquid lend um X. sonipla not leeaeeicd ' normal v.1o, content SOUTH OPERATING BASE ur o“rt Seattle, Washington for De Lem./ Cattier & Company A-15 CONVF.RSI DnvIS DIXON ASSOCIATES c,,,n./mi..,l r;,,,,,,,;,,,,,, '„T W-74-310-03 1 T �•r 17.4 RILL -0: 4 o�4V 5, 1976 aQ- LOG OF BORING Na. 8 }5. .. �N�o ?rod too: STANDARD PENETRATION o- Q.• 1y_� o�i r, Q. � ULOWS FCR FU07 ... 44- y Mr., ...va., ...w....r ....a ...n„<..a r2u`.y �000 0 50 100 `,.b Gray & brown, silty, fine to - 1 p medium SAND with occasional 14 1-A t,r gravel (Fill) 15 .Ep --moist, medium dense to dense 9 13 • 2-A t11g Gray, fine to medium SAND 18 0 Ft.' with occasional pockets or 6 1' • 3-A l�{f $ lenses of silty, fine to medium 3/ 5776 13 - -' 10:' 4-A ��{1^ ° 6.--medium ° ° sand (Fill) --moist to wet, lCi' dense to dense 15 10 29• - Brown & fine 10 , ° ° e ,•, gray, silty, to medium SAND with occasionol gravel --moist, very dense water in hole 44 5.. 5-A epee 7 14 15 it°°°• ° ° ° o Brown, fine to medium SAND with occasional small gravel . --wet, dense 27 0.0 6-A ,°,°a o ` (2' of heave prior to sampling) grades coarser with coarse 17 29 °° ° sand & small gravel 19 20 •.•. 76 7-A °, Black BASALT --highly fractured 24/1" . > 03 -5.0 Bottom of hole at eiev. -3.8' - Refusal with auger at 20'6" ----25 Boring completed March 10, 1976 *Water level measured during -10.0- drilling. May not be reliable. —30 -15.0-- 'A. 2"0 L 11. Split spoon caniplar • Swn,nr level 0 25 50 R. t'•O.I rh n wall cm, plcr • • Slnndord Pent:lrolian Re stnn:r• except WATER CONTENT - '/. dry weld' I ' imgerviaus C. 3-1/1." 0.D x 2-1/2" mar 1u 2" O.D. spit -spoon son+pies estimated Baal plastic linnt liquid lunil 0 3-1/2" 0.D ',phitro, re! sampan.using , .n-slundurd procedures rT pioroi r' ler lip �,� wat X. suns; le not menv,ned l) nnL turn) er core in SOUTH OPERATING BASE unnrinc Nurmnl Scott le, Washington for De Lcuw Cattier & Company A-16 CONVI.RSI. I)AVIS DIXON ASSOCIA71'.$ �70" W-74-310-03 DATE DRILLED, !ID RAFT kr 4, 17.6 ---, March Q , 0 kr E,t.• k ra --,-.r.- 15, 1976 .. . LOG OF BORING NOt11-16- ...,,,:k. .,..,44- q 011',2.Th STANDARD PENETRATION,C',._,r4o4- A Rims POFool' • & ,..,.....,......,...”. ,,„„,.,—,..,..,,..... 6 ..a. iisat:utrIt:7:t .7'..;i:::•;"Z't , :t , M:72:t;;;;:tr'.",v i--..,". c6.9,1,Y•to co 0 1 ^ 1 0 Brown & gray, silty, fine to medium _ - ..c. SAND with occasional gravel 16 1-A ;I. ,, _nip. — m 0 LL,E_Mdieqme_enS. 4 8 G - 2-A .1•1, - 1 ,, Brown, fine to medium SAND (Fill) 4 \ --saturatecl. very dense , 18 36 2' ., ---5 - -f0? 3-A 1 ;4 ',,, brown & gray, silty, fine to medium ,. SAND (Fill) --moist, dense 1 \ (drove rock in front of sampler) . • Cli 10.0•- - 4-A 9 ..1',.; ,1 \occasional cobbles 13 18 ' ' •brown, -very fine to fine SAND '.7-10 .111 in with some silt (Fillr - .1.1- --saturated, very dense (water in 7 5 0__ • - - - 5-A . ' II Brown & gray, siliY, fine to medium t SAND (Fill) --moist, medium dense 8 15 —15 _ _ : less dense between 11.5 & 13.5' grades slightly cleaner to - brown & gray, fine to medium • 0.0-_— _ 6_A 4 sand with some silt ",! -moist, dense 15 16 tii . _ _ 41 25 —20 - 7-A di ''... 10 ..... s.,,_.____ •.,__, Black BASALT -highly fractured --5.0 _ 1- - ,-- Bottom of hole at elev. -3.8' .. • , - —25 Refusal with auger ot 21' 1.. - Boring completed March 16, 1976 Porous stone piezometer -10.0--L tip set at elev. -3.8 with 1/2" P.V.C. riser pipe to surface. - Tip backfilled with 2' of pea —30 _ gravel. Hole backfilled with cuttings to 3 - below ground surface. Bentonite _ — plug placed from 2' to 3'. Last 2' of hole backfilled with cuttings. - See text, Section 4.4 For ground- _ water measurements. , . _ - — 3.L - --- A. 20.f . split- spoon sumftter • v_vraler level ° 25 • 50 D. 30.0 thin - woll sculptor • • Slondurd Penairotion Resi,.tonce °step! WATER CON 1CNT - % dry weigt I C. 3-1/4" O.D. s 2-1/2 'nisi- for 2" O.D. split -spoon sump', cstirnoled tnaPervious seal plostic limit liqukf limit o 3-1/z•• (:) D. ,pror,,,, ,,A so,,,rer using non-standard procedures. .pierorneler X. soma', not recovcred natural water conleid SOUTH OPERATING BASE 1 s.,ort•ir., Washington for De Leuw rather & Company A-17 (.:()NvERSE DAVIS DIXON AS'',OLIATFS („..,I.,,,,.,/ (.--,.,..,,,, ''„,''' W-74-310-03 DATE 01111.1.E.Dt RAFT 4., : h 18.4 March kr e..-4, 4 C) 4' ei ' lo, 1976 LOG OF BORING-N6.117t.. 'kr" ••• ••c,°\- , ..,,, • .. 4'....„4 C)-•isrd STANDARD PENETRATION 6.0' '-ka,.‹) i). BLOWS PER F(X)T • • 4--, eci0 •••"' ' ' '' " ''''"""'"" C3--, 0 50 . 100 - r:-Pifi Brown 4 giuy, interbedded, fine I _ _ — "' to median, SAND & silty, fine to medium SAND with occasional 21 15.0 7 1-A i,,, gravel (Fill) --moist, dense • _ 1 9 10.0.- -- —5 _ - - .--- 2-A 3-A 4-A ) .11 ,14 •• •-y 1 saturated - 3/1./76 (water in boring) l' to 1.5' loose to medium dense zone 17 5 14 8 15 15 10 ; dsoe:elayers changes to medium dense to ' 7 14 .. —10 .7; , Brown & gray, silty,fine to medium ... . 5.0,- _ - - 5-A i, SAND with occasional gravel (Fill) --moist, medium dense ..., occasional pocket or layers of LI 'inc to medium sand with small ' --saturated 12 9 17 7-15 gravel Brown & gray, interbedded, fine _ ; :-.-_ • li ,., to coarse SAND with small & 7 ; 0.0 -_ 6-A 1 .,} ,1 .•:ql. 1 gravel some silt and silty, 1 fine to medium sand with occasional gravel (Fill) 17 23 ,----20 .1', l'," lil t• --sand layers saturated, dense ..__ ''--- 7-A ' ____ Black BASALT --highly fractured 109,, C.1 : . >:100 - Bottom of hole at elev. -4.0' ,L25 _ _ Baring allowed 'o stand with auger at 22' water level rose _ 2' in 15 minutes; water — apparently cut off by augers -10.0-: Boring completed March 16, 1976 7-30 ...... ....... - 80 minutes after completion, - _ water level at 3' 5". - — .1-0 _ • .-- A. 20.1 sp!t- speon so•npter • 7_vroter level 0 25 50 D. 3"0 0 Iltin- wall soirpter • • Standard l'enetrolion Ret.islonce except WATERONTCNT - dry want I 1 C./a C. 3-1/4" 0.0 x 2-1/2" liner for 2" OD bpi it -sooner ilirripies estimated tataerv,at..r•nal plastic limit liquid lilt II 0 3' ire' J.D.split aortal sornulor user,' non-slondurd rii0110tiliie5, U lAczornelor lip '-22101ol X. sorn,:le nut recovered ..niir7conlen' 1 SOUTH OPERATING BASE rik liiiiollitil Nili.1 11 Seattle, Vh5l ,i ngs on • for De Lcuw Cuther & Company I A-18 CONVITim- DAVIS pixoN ASSOl:1A1 FS 10. 04 - 10.0 - 15.0 STANDARD PENETRATION BLOWS PER FOOT•• 50 100 -- - I ilf''4 11 1' Gray, silly, fine to mdiurn SAND (Fi 11) upper 1 ' saturated & very 14 7:- l-A lit';,1,:.,..._sofi -- moist,_medimn dense __.." 8 ,, ,tt atk brown, silty, fine to medium o 16 = ` -'-' 114,1•;. SAND with numerous basalt 18 it 1, fragments (probable crushing ,lot waste) --moist medium ' 20 9 - _ 3-A It' '`I 1,1:1' 1 1, Clnse 10 11 9 - Brown & gray, silty, fine to - -10 4-A 4;3.'11 ,,, • . . medium SAND with occasional gravel (Fill) --moist, medium dense 7 15 . Gray -brown, fine to medium SAND with occasional gravel & some silt 8 7 5-A • and silty fine to medium sand 9 0 . --wet to moist, medium dense 8 -15 ,.„, - . . . . . alternating hard & softer zones •,, . . 15' to 18.5 ' 9 6-A 18 27 Dark gray to gray, highly weathered, thinly 'omit -rated to -20 laminated SILTSTONE and SANDSTONE (drilling smooth between 18.5 & 20.5& slightly 10 - 7-A easier below 20.5') increasing percentage of 7 33 C? -..-,A sandstone with layers up to 1.5". 21 0 -25 8-A V,...Z some vertical oxidation zones M > 100 drills firmer 1'0/.5 (upper port of sample appears soil -like & remolded -may be cutting0Jm drilling) =-30 Bottom of boring at elev. -9.9' - - - - h- :35 - Refusal with auger at 24.5' Boring caved to 19'2" after drilling, water level al 5'2" after m reoval of auger. Boring completed March 16, 1976 i .._ 9 ' _---- ' „ - A. 2.'0 D. split - spoon srarnidar . p_water level B. 3"0.0 thin- wall SUIT pl,r • • Standard Penetration Resistance mot C. 3-1/4" O.D. x 2-1/2. linlf for 2" OD split -spoon samples aslirnated D. 3- I/2" ().D. split bar, :I sampler using non-standard procedures. fl piazornelen tip X. sur,ola n01 recaverer . iretperviOUS Selll 0 WATER CONTENT -3/4 dry vrerg I Plastic lirnd liquid limit CONVTRSI• MAVIS DIXON ASSOCIATIS - natural woler content 1 Olt AWING NUN.' 11 A-I9 SOUTH OPERATING BASE Sealrle, VVashinntan for Do 1..CfrW Cattier & Campany W-74-310-03 ' , '0 ,23 4 4. ° 4? rt 16.4 10.0 5.0 0.0 -5.0 -10.0 -15.0 -20.0 1976 LOG OF BORING NO4il;.•01r-• 141 STANDARD PENETRATION BLOWS PER FOOT•• _ - _ -.: -5 - ."-- - P -10 1-A 2-A '-'-` 4-A . 1!-JJ ".• f'll I., il 1,1- T .)7 lilt , I . , Dark brown to gray, silty, fine to medium SAND with occasional gravel (Fill) -moist, medium clenso : occasional gravel or small cobbles; changes to hi own in color & grades with rleci,?csinc, ' \ silt content & slighlty higher ;" \.M_O_istiire,_..___. 11 8 16 11 16 3 14 61 21 24 18 OA • i-\ Brown, fine to coarse SAND with j• occasional small graVel & some Lilt (Fill) --wet medium dense 4 Dark gray to gray, silty, fine to - it medium SAND with occasional 4 - 5-A ,q•• gravel (Fill) --moist, dense ' 31 0 '.15 141 1 ri. (irregular penetration of samplev \ assumed gravelly; blow count \_p..1y not representative) il roba12 41 .,7_ • Biown, medium SAND with soma - :_- - _ - 6-A 1,11, 1„ _44 1 coarse sand & minor small gravel (Fill) --saturated, medium dense -\ (3" of water in boring at 17.5' / 3 12 17 5 5 31N. , .:120 _ - -_L,- - \ so,nple) 7 , Durk gray & gray, highly weathered - _-_-._ thinly laminated to laminated I 4 7-A SILTSTONE & SANDSTONE 35 0 . > >101 -•- f.. -,:.- 2 drills filmier (upper part of 00/5, z - 8-A ,-,: ---..: -25 sample sand, heave indicated; weathered rock starts at 19') , ••,.. ___ 67 33/2' CO ; >100 .: _ Porous stone piezorneter tip set at : .. - 24.5'. Tip backfilled with 2' of - pea grave1.1/2"P.V.C. riser pipe - Z-30 to surface. Hole bock filled to within 3' of surface with cuttings. . Benton ife plug placed from 2'to3,' Last 2' filled with cuttings. - Bottom of hole at elev. -8.9' - Refusal with auger at 24.7' _35 Boring completed Merck 16, 1976 See text, Section 4.4 for ground- , - .._ water measurements. - _ 11.1 A-3A , A. 2 0.1:1 spinspoon same • x_waler level B. 300thin- troll sampler • • Slumlord Penetration Resist.. e‘cept C. 3-1/4" 0.0 2- I/2." lido, for 2" O.D. split -spoon surApl,s cutiomted inpervious seal D 3-1/2" 0.D. split snmpt,r, using non• standard prosedins. Pletorneler hp X. :Pawls not ieern.zred SOIJTHr 6 • P BASE Seattle, Wrrhingtcit for De Teuw Cather & COIrlapl)y 25 50 WATER CONTEN1 - % dry .tio! I plastic lirnll liquid - no Iwo! woler conlorl A.prt: 0 A-20 (..(11N/V1.10,1 1)Alf1 DIXON ASSOC1A 1 IS ,,„/.„,. ,/ W -74- 310- 03 DATE DRILLED: March 17, 1976 0� RA, FT LOG OF BORING NQ:-ta*,• ♦1 �"oQ w cc�;� n� x o; iv co i,, ..,... n�, ���. ..,....n.ln re al .....,r�r..,,. 0_ 40''51 0 lit► F( Gray, very fine to fine SAND _ r.,11.11I with some silt to a silty, very 1-A •(t) fine to fine SAND (Fill) 3/1 /76 1;1,lil--mcist to wet, -loose _ S7" F grouelly zone 8. occasional 2-A --$ si fG I 'one of find to mcc!iu:n sand FIT with lirtlo or no silt 10,0- 3-A 'j r1 1 changes to Tay .& broom in color _ rrlr}-,r�--rotulaied _ - 4-A I1)EI„, Gray, fine SAND (Fi-II) ...,',..P.,,,a�P.;,L --saturated, loose -•...,',..P.,,,occasional small rock fro menu <� '"� & ravel- g 5 r.= 1 Drillss very cobbly, probably looseBlock rock 5,0 15 0.0 =_ —70 5.01— --25 - 10.0-- fragments ..__ BASALT ---hard Bottom of hole at elev. 5.3' Refusal with auger at 11'9" Boring completed March 17; 1976 *Measured at end of drilling. May not be stabilized. h 5.3 5 4 3 2 5 4 4 17 20 5 4 6 1001, STANDARD PENETRATION P. BI.DWS P20 TOOT • • 50 i 100 :. 100 • A. 2OD ,.plil-,pope so';'p'r y_wuIe level • 0 25 50 B. 3`a.O thin - wall s4A pi:r •• Slondord Penetration N,:cistosce except WAT ER CONTENT-/ di were l C. 2-1/4" U.D. r. 2-1/2 •re:r rut 2" o.D. sptil -,perm to myca ostimopp cd liver viouc r1.01 D. 3-1/2" 0 U. ,pfil herr I•:or.i1';nr using non -slumlord Procedures. ' 0 piexometer lip Dlasl is I,mif ^ liquid I,n,I X. oamplo nr,I recovered tJ Zrnurol worm conlenl SOUTH OPERATING BASE „"WINO AWING. Sea lIle, \'sea-hingtO11 A --ell for De L',uw Cuthnr & Company - C(.)N 1.Il.SI I)AVI.) I)IXUN ASS<)CIA'1I,; „n,,,,.d r••..•:.;IL.r. „"' W-7.1--310-0,, DATE DRaLCI): March 17, 1976 DR, FT O 13.7 10.0. 0.0- -i0.0 -15.0- _ - 10 —15 2.0 —25 —30 LOG OF 80f11NG' O. 1,21• STANDAIIO PENEIRATI0?I ,5. IiI17ND PGR I-OUF `" So 100 '_ 6 inches crTerf rock_ 1 _ ;ntelbeddsd brown, fibrous PEAT,,, und silty PEAT with occasional -�-- 7 GG9 thin inter bed of gray, organic 3/17/76 SILT --moist, sort Brown -gray, very fine, sandy 2 SILT with organic molter & occasional thin (approx. 1")54 y 2 r �� fine to medium sand lenses 6 --saturated, soft firmer drilling between 15'& 1 L/ (8' of heave prior to sampling - sand washed from casing prior 21 to driving) 97 41 Dade gray to black, medium SAND with occasional wood & very thin 58 (< 1/2"). silly sarel layer -sotunoted, very dense (3' heave at 22.5'. Auger washed 55 to 23.5' prior to sampling) grades slightly finer with less organic matter Yo 52 (6' of heave at 27.5--Auger washed prior to sampling) 13 occasional organic matter 89 35 45 Bottom of hole at -15.3' Boring completed March 17, 1976 *Water level mcesu;ed during drilling. May not be reliable. t3.4 ..__ ........................_............ 29 ° A 2.'01 . zt:hl - spoen samp:er. U. 3"0.I ih,,I ...I11 samples ••SInnJ:nd r, .'t,*lion Rc•cisluaca e,c:pl C. 3-I/q" 0. i). r. 2-1:2" liiucr to 2' 0.U. soli; - tp00n sumplos uslan0:ed D. 3-1/2' ().D. sl.l.t t argil ::ampler using nun _tOndord procedures. X. sample nut rnc-,•ve,ed SOUFI-i OPERATING BASE Seattle, Warhitlglon - V wnler level 0 impervious seal pictoinelcr Ilp 25 50 WAI tR CONTENT - 2 dry we•gl t plastic lirr•il liquid limit Latural renter conlanl NNA0•I::. I P[v for De Leury C:aillcr li Company ^- o <XJP:VI.<ht DAVIS DIX(N ASSOf.lAIFS ,.•„a,.,..,!r••..,..,.• e;;„''W•-74-310-03 L DATE DRILLED: March 17, 1976 LOG OF BODING N 18. 15. 10. 5. 0 -5 1 STANDARD PENETRATION A BLOWS PER FOOT" 50 100 4 _ f Brown, silty, fine to medium SAND - �� with occasional gravel (Fill) 22 _ _ 1' 1-C r% :11. . moist, medium dense 131 47 .� pt �4 upper 6" saturated,soft 3U 8 - -5 2-C r -, 11..I. Lark brown, silty, fine to medium SAND with occasional gravel & 100 10 16-_....._........_ ......................_........ _ P rock fragments (Fill) - '. ''___Lrloist, very d s �, Dal* gray SILT with numerous 0-:_ .sittstor.e/sandstone fragments & occasional gravel (Fill) I -10 3-C --moist, stiff (no recovery 100 4, . t • >1 - 4-A ,.`,,r probably driving on cobble) 100 = cobhly during drilling below 6' sample consists of rock fragments ® • I . ' >100 0- _ in a possible silt -sand matrix. I -15 probable fractured bedrock refusaI with auger at 1 l' 8" : - Black BASALT -highly fractured I 0.- Porous stone piezorneter tip set - at 10.5'. Tip packed in gravel. I -20 1/2'P.V.C. riser pipe to surface. �..._._.............._ - Hole backfilled with cuttings. - 1 Bottom of hole. at 6.6' .0 _ Boring completed March 17, 1976 -25 _ See text, Section 4.4 for ground- water. measurements. .0 Ig,d -30 -(0____,‘' T - o oc A. 2..0.0. split- poen sampler • B. 3"0.D. thin -wall sampler "Standard Penetrotien Resistance except C. 3-1/4" 0.D. x 2-1/2" liner for 2" O.D. split -spoon samples estimated .0. 3-1/2" U.D. split barrel sampler using ron-standard procedures. X. sample not xecoveted wale, level impervious seal piezomolel lip WATER CONTENT -% dry weight !Acrylic limit liquid limit er content SOUTH OPERATING BASE Seattle, Washington for De Leuw Collier & Company CONVGKSI' DAVIS DIXON ASSOCIATES („ rot, r,u,r.J c„u,urcnre u� „aoa W-74-310-03 DR AWING NuNel:n A-23 'II u 1 P DRA A- DRA A-27 DRA 1 EMI INN MN NMI MI MN NEI =I INN MEI NEI I= NMI MN NE INN MI INN NM MN MN INN MN NMI I MI N IMiN MI 1 N IIME A-29 DRAFT 4`w 0-LE 'E ,31- DESCRIPTION 0 Jti•J ,A Y. •., fL ' Brown, fine to medium SAND with gravel and small crushed rock (Fill) -- medium dense -- slightly moist 2 3 \E?( :k% fl•: C�'.; � ' Crushed ROCK - 1/4" to 1/2" diameter - little or no matrix (Fill) . --dry 5--�- Brown, SILT brown PEAT s 7 vv organic and -- soft some wood debris at 5 feet w 9- 10 I I- 12- 13- - Gray SILT with some organic matter and some thin (approx. 1") layers of fine sand -- soft 14---� Surface elevation approximately 14.0 feet. Small amount of water entered test pit at 5' and in lower 2'. Test pit walls remained vertical with some minor failure in the clean crushed rock. Completed 9/23/75. LOG OF TEST PIT NO. 1 PREPARED BY: pqp� SOUTH OPERATING BASE Seattle, Washington for De Leuw Lather & Company DRAWING NUMBER A-30 CHECKED BY. DER APPROVED BY, ERM DATE: Oct. 1975 1scA1.E: — — — — ' PROJECT w - 74 - 310 - 03 NUMBER: CONVERSE, DAVIS AND ASSOCIATES, INC. Cans#/ting Engineer: m14 Grologh/ 1 )RAFT c o U- $ >• ill DESCRIPTION I -I.;i.rti 2 _J;lti.: 3 4-.. 5 *VI., f.?f: •C• t Brownish gray and gray, silty, fine SAND and crushed rock (Fill) -- very dense 6�y(- ti! IL Greenish gray, silty SAND with numerous boulders (fill) -moist 7- Brown to dark brown, organic SILT PEAT 8 9 w w �w w and with some minor gray silt with organic matter -- soft -- moist - 10 w II changes to light brown silt with some organic matter Surface elevation approximately 14.4 feet. Approximately 5 to 10 gpm water entered test pit at 5' to 6 1/2' level. Test pit walls remained vertical. Completed 9/23/75. LOG OF TEST PIT NO. 2 PREPARED BY: pAp/1, SOUTH OPERATING BASE Seattle, Washington for De Leuw Cather &Company NUMBER A-31 CHECKED BY: DER APPROVED BY: ERM DATE: Oct. 1975 5 !SCALE : - - - - (HUMeERT W- 74 - 310 - 03 CONVERSE, DAVIS AND ASSOCIATES, INC. Conmlring Engineers mod Geologists 11 AFT S 2-. E E DESCRIPTION 1 2-w.). 4-'ti�ll ::%. �''•" C.' l Brownish gray and gray, silty, fine SAND with crushed rock (Fill) , -- very dense -- slightly moist 1, 5- 6 7 -fi i;• ; flr P r ;;: Greenish gray, silty SAND with numerous rocks ranging from gravel to cobble (rock is highly j weathered) (Fill) -- dense -- moist . • 8-c. Brown to dark brown, organic SILT and PEAT ^ -- soft -- moist 10—^ w w w II M- w ......W* grades lighter brown in color with less organic matter 12 \ww some thin layers of gray, fine sand 13 Surface elevation approximately 14.0 feet. Seepage at 7.5 feet. Completed 9/23/75. . LOG OF TEST PIT NO. 3 PREPARED BY:,3'm/PAP SOUTH OPERATING BASE Seattle, Washington for De Leuw Cather & Company DRAWING NUMBER A-32 CHECKED BY: DER APPROVED BY: ERN OATS' Oct. 1975 IeCALE: - - - - [HUMRER' W - 74 - 310 - 03 CONVERSE, DAVIS AND ASSOCIATES, INC. Consnhong Engineers and Geologists MI 1E11 IMO MIN Ell MINI I= MN NMI =I MI INN MI NMI =I INN Mil 1•11 IMO )RAFT Depth N - 0 L 1 t Feet DESCRIPTION 1�. Pie Brown, silty SAND with crushed rock (Fill) (smells of fuel oil) -- loose -- slightly moist 3— 4 T_ _�- =:::-7 Interbedded, dark gray SHALE or SILTSTONE and gray, very fine to fine SANDSTONE - some crossbedding strike approximately N65°E 5 dip approximately 6°South -- hard less weathered to very hard 7 grades • Surface elevation approximately 15.7 feet. Some water entered bottom of pit through apparent fractures. Completed 9/23/75. LOG OF TEST PIT NO. 4 • PREP•REO OT pAp/j%� FsAo/pt SOUTH OPERATING BASE Seattle, Washington for De Leuw Cother & Company OR•FINO NUMHER A-33 c Nrc KEn it,DER "PPnovro ur: ERM D"TE' Oct. 1975 s°•LE: - - - - r°""' n: W - 74 - 310 - 03 UMUFCONVERSE, DAVIS AND ASSOCIATES, INC. Cvv Itiug Enginrrrt and Geningitlf DRAFT -Ecer— aruvr DESCRIPTIOI� 0 1 r Brown, silty SAND and crushed ROCK to 2" diam. (Fill) -- loose -- slightly moist 4 7 Jl 41 Gray, very fine, sandy SILT with occasional pieces of dark gray siltstone (Fill) -- medium dense -- moist Piece of . dark gray siltstone and gray, very fine sandstone „` .,., Black BASALT -- very hard Surface elevation approximately 16.0 feet. Approximately 1 gpm water entered test pit at top of basalt. Test pit walls remained vertical. Completed 9/24/75. LOG OF TEST PIT NO. 5 rRE PA REo UT : PAP/Z7R SOUTH OPERATING BASE Seattle, Washington for De Leuw Cather & Company NR•MINO OMRER A-34 CHECKED eT: DER A PPR OVro RT. ERM DATE: Oct. 1975 !SCALE: - - ...... IPROJECT W - 74 - 310 - 03 NUMRE H. CONVERSE, DAVIS AND ASSOCIATES, INC. Co,»,ddng Guginrro and Gmingnit )RAFT • • o cLL u, DESCRIPTION 0 . iv, 1 Brownish gray, silty SAND and crushed ROCK -- loose to medium dense -- slightly moist (Fill) I 2e! I' _...� Gray, sandy SILT with occasional pieces of siltstone (fill or weathered rock) -- moist 3-s Interbedded, dark gray SILTSTONE (approx. 1/4" _ layers) and gray, very fine sandstone (less than . V thick layers) strike N 60° E dip 5" Swill-. -- hard becoming very hard at 3' 9" - refusal at 3' 9" Surface elevation approximately 15.4 feet. No ground water encountered. Completed 9/24/75. LOG OF TEST PIT NO. 6 PREPARED °Y PAp��,,.,t SOUTH OPERATING BASE Seattle, Washington ,.UMI;NG ,N c,..c.En °.: DER for De Leuw Cother & Company A-35 errnovcu BY ERM °"c: Oct. 1975 (`uEE: - - - - Hu m".1' W - 74 - 310 - 03 CONVERSE, DAVIS AND ASSOCIATES, INC. • C",n,d,in,g ISngi,rreI and Geologists DRAFT nLv o a- $ ,r, DESCRIPTION 11, 2 _ . 4. 1'• ., `ti Brown, silty, fine to medium SAND and crushed rock (2" diameter) s •ith occasional small roots -- medium dense -- slightly moist (Fill) 3-; 4-P 6 ~ 8 -' ' 1;, 1'f. 1i ,1,if 11 1 . Brown to dark brown, silty, fine to medium SAND with rock fragments to approximately 6" diam. -- loose -- moist (Fill) occasional organic matter 9 Gray, Interbedded SILTSTONE and SANDSTONE -- moderately weathered, hard 10 5 = changes to hard and refusal at 12 feet 12 Surface elevation approximately 15.7 feet. Approximately 2 to 3 gpm water entered at 8' level. Completed 9/24/75. LOG OF TEST PIT NO. 7 PREPARED BY PAp/ry SOUTH OPERATING BASE Seattle, Washington for De Leuw Cother & Company NUMBIEER A-36 U,.Cc.E° °r: DER ♦r,•.OVEr. °r: ERM 'Arc' Oct. 1975 l'''''r.i - - - - I',Z T u nE.. W - 74 - 310 - 03 CONVERSE, DAVIS AND ASSOCIATES, INC. Co:nubb,g Engineers ,,,,r Grologhu DRAFT • a,- o 0 ,� DESCRIPTION '.Air\:'• / .•�` ',Pi' Gray and brown, silty, fine to medium SAND with occasional gravel .4, -- loose --.slightly moist (Fill) 2 '.>f/�. / : f Brown, fine to medium SAND with some silt (Fill) :„ -- medium dense -- moist 3 41', 77it_/, 7 ff. Gray, silty, fine to medium SAND with occasional grovel (Fill) -- medium dense, moist grades to dense below 4 feet g.,,: g_M`,' 10 4 .,v., 4 x v ♦ `, °. . �y Bieck BASALT - moderately fractured, hard Surface elevation approximately 16.2 feet. Moderate amount of water entered pit (approximately 5 gpm of rock boundary). Completed 9/24/75. LOG OF TEST PIT NO. B PREPARED «+: PAP/d''n SOUTH OPERATING BASE Seattle, Washington „UMBE„ c REEKED Rr, DER for De Leuw Cather & Company A-37 APPROVED or: ERM nArE: Oct. 1975 zcn"E: - - - - o�'cr W - 74 - 310 - 03 IHUMBER: CONVERSE, DAVIS AND ASSOCIATES, INC. Cantu! 'lug Engineer' and G.otog;n, )RAFT S o ELL DESCRIPTION 0 2 ..�,� Brown and gray, silty, fine to medium SAND with occasional gravel and very fine, sandy SILT -- medium dense -- slightly moist (Fill) 9 Y ' / i t Brown, fine to medium SAND with minor silt -- medium dense -- moist (Fill) 5 J ' %r Gray, silty, fine to medium SAND with occasional gravel -- medium dense -- slightly moist (Fill) occasional thin lenses of moist, fine to medium sand 7 g- - I0Ott! II y' 12-0 13 fl tit' ". , l4 t, 1. Brown to brownish gray, silty, fine to medium SAND with gravel and cobbles (Fill) Surface elevation approximately 17.0 Feet. Some water entered test pit from 12' and below. Test pit walls remained vertical. ' Completed 9/24/75. LOG OF TEST PIT NO. 9 PREPARED BY : pAp��tn SOUTH OPERATING BASE Seattle, Washington for De Leuw Cather & Company NUMBER A-33 LHEE KID Ut: DER APPROVED ,,.: ERM"" Oct. 1975 C::“',., - - - - 1"ce..R W - 74 - 310 - 03 CONVERSE, DAVIS AND ASSOCIATES, INC. Cm„uUing Engine,'r and Geol'giiis RAFT m 0o ti 0 i. ^ DESCRIPTIO N I - 'f r Brown and gray, fine to medium SAND with = occasional roots (Fill) I -- medium dense -- slightly moist 2- i- +�'•; ;'� Gray, silty fine to medium SAND with occasional gravel (Fill) -- moist 3--/Lti:E 4- �.` : Brown, fine to medium SAND with occasional gravel (Fill) -- medium dense — moist 5 �' %, '• , • Brown and gray, silty, fine to medium SAND with occasional gravel (Fill) =� -- medium dense -- moist 6JatJ 7;;.' — 8 <r', V : . <., r Y ` <'Y Block ack BASALT - mcderct2!y fractured refusal at 8 feet Surface elevation approximately 16.4 feet. Water entered test pit from 5 1/2 feet at approximately 100 gpm. Completed 9/24/75. LOG OF TEST PIT NO. 10 PREPAREo or. PAP��nI SOUTH OPERATING BASE Seattle, Washington for De Leuw Cather & Company RAYINUM.G A-39 CHECKE.0 R,: DER APPR bvEu u,: ERM u",E' Oct. 1975 l'` ' - - - - `NuMnEH: -• E� W - 74 310 - 03 CONVERSE, DAVIS AND ASSOCIATES, INC. Conndtiug lin&errf n„d Grolo.gifb 1 DRAFT L o`. 0 p DESCRIPTION _, 1'L v� • Brown and gray, silty, fine SAND and silty, fine to medium SAND with occasional gravel -- loose --.slightly moist (Fill) 2 _ 2 -;`If E''', Brown, fine to medium SAND -- medium dense -- moist (Fill) 3-•1;' 4�L�•� 5- 6; 7 `\< r-- <' !•P ' ci' Dark gray to black, silty SAND and ROCK mixture (plan) waste) (Fill) dense -- moist 8 ti,, ' Da* gray to black., miutura of SiLT, SANDDui larger ROCK fragments ( plant waste ) (Fill) -- medium dense -- wet 9-��1� ..L� Black SHALE -- hard refusal at 10 feet 10 Surface elevation approximately 17.5 feet. Approximately 5 m entered test pit from 7 feet and below. Completed 9/24/775, LOG OF TEST PIT NO. 11 • PREPARED WI PAP dm SOUTH OPERATING BASE Seattle, Washington NUMBER CHECKED Ely: DER for De Leuw Cather & Company A-40 APPRovEo R,: ERM o.'E: Oct. 1975 SEA`' - - - — 2.,,W ,' W - 74 - 310 - 0:3 CONVERSE, DAVIS AND ASSOCIATES, INC:. CoirmlIi„g 1,nginrrrr and Grol..gha )RAFT I Depth N A W N — 0 In t i t t l Feet in DESCRIPTION . =T Ap roximately 2 inches dark aray.CRIJ$HED ROCK f— Dark brown & brown SILTSTONE & SANDSTONE -- highly weathered, highly fractured, medium soft �- Gray, interbedded SILTSTONE & SANDSTONE -- moderately weathered, medium hard -- slightly weathered, hard below 3.5' Surface elevation at 15.3 feet. Refusal with backhoe at 5.5 feet. Can only be advanced by chipping with teeth on bucket. Very minor seepage in upper 1.5 feet. Completed 3/19/76 LOG OF TEST 27* PREPARED a.: .1 f3D SOUTH OPERATING BASE Seattle, Washington for De Leuw Cathcr & Company °PAWI�n I A-41c 4iECKl.O BY: DEP. ^rPHov Eo ay. KRA1 ' '- April 1976 ''=C^CE, ---- `C' W-74-3 10-03 VHH HCmurddng CONVERSE, DAVIS AND ASSOCIATES, INC. linpinrrrs and Grnlopisti )RAFT Depth 0 in. 0 E >, rn DESCRIPTION j r 9 inches dark Kay mixture of silty SAND & ROCK f' fragments (Hill --loose to soft. moist to wet Gray & brown SILTSTONE & SANDSTONE --thinly laminated to laminated, moderately to highly weathered, moderately to highly fractured r J 3- 4 5 —, tl Gray SILTSTONE & SANDSTONE --thinly laminated to laminated, moderately weathered, hard Surface elevation 15.7 feet. Minor seepage from upper one foot. Less than 1/4 gallon per minute. Completed 3/19/76 LOG OF TEST PIT NO. 13 a rnEPenCO H.: jrD SOUTH OPERATING BASE Seatile, Washington for Do Leuw Cather & Company UR AWING UHDEF A-42 CHECKED He DER APPROVED BY: ARM r,A*E-. April 1976 VALE, - - - - lH"HHE`H? W- 76-3 1 0-03 CONVERSE, DAVIS AND ASSOCIATES, INC. Cnrmrlring tiugbmrn and Cr^lnpifrr )RAFT w c o 0 DESCRIPTION • 3 to 6 inches dark brown & brown CRUSHED ROCK j with sandy silt matrix (Fill) - moist J 1 ram_ _ �. = Brown SILTSTONE & SANDSTONE highly i 2- 3: - -_ yT --highly weathered. fractured. soft Gray SILTSTONE & SANDSTONE with minor brown oxidized zones --moderately to highly weathered, moderately hard 4-r St 6= } =- Gray SILTSTONE & SANDSTONE --thinly laminated to laminated, moderately weathered, hard Surface elevation 16,0 feet. No groundwater encountered. Completed 'y/19/76. LOG OF TEiY" PIT• NO; .14 ••• PRZ PnRPo or: JBB -SOUTH OPERATING BASE Sealtle, Washington „`;,Mn. HO uIECKEu ur: DER for De Leuw Calher & Company q-43 —1 e PPr:ovEo UT: ERJA on'E• April 1976 -1""E: - - - - PR'uEa W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. Co,,,,dn„g Frig;»PP., A„d Cenmgisn )RAFT f 1 Depth o -1 m cn ? w N — 0 i n t t 1 1 1 1 i I 1 Feet E in DESCRIPTION 1Mixture. 1 of dark gray SAND, SILT, & ROCK fragments (Fill) J --moist to saturated Brown & gray SANDSTONE & SILTSTONE LE --thinly laminated to laminated, moderately to highly weathered, moderately hard Grades to hard, some differential weathering Surface elevation of 16.3 feet. Approximate) 3 gallons per minute entering test pit from 2.5 foot level. Completed 3/19/76 LOG OF TEST PIT NO. 15 PWEPAI,r, el'JBB SOUTH OPERATING BASE Seattle, Washington for De Leuw Cathor & Company `NUMBER`' A-44 cRI'cliPn Iir: DER ♦PPR OVP.DRv' ERNL u*re: April 1976 rsc'"-E. ---- Il;�M„a? W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. Cmwdting J qi,, rrr ,wd Grotogi.u, )RAFT 1 6r•c LL 16 DESCRIPTION \ I 1. 2 -ti f3 ‘;I;. 1 A% rI.! If : 1' Gray, silty, fine to medium SAND with occasional gravel & rock fragments (Fill) --moist, medium dense 4 5-1 l� P' r' % 1 ' tl Mixture of SILTSTONE & SANDSTONE ROCK fragments & silty, fine to medium SAND (Fill) --moist, dense 6 7 .r� ' :_ ��. . ' Brown & gray ROCK fragments & GRAVEL with little or no fines (Fill) --medium dense, saturated d 1. L - = _ �� Gray & brown SILTSTONE & SANDSTONE --thinly laminated to laminated, moderately weathered, moderately to highly fractured Surface elevation at 16.5 feet. .• Water entering test pit from 5.5'to 7' through fractures in bedrock. Test pit required pumping prior to logging. Test pit was pumped for approximately 2-1/2 hours with Homelite model 20S 1.5-1A; Pumped & lowered water by approximately 9 inches. Pump rated at 5500 gal/hr. (91.7 gpm) by manufacturer. Completed 3/19/76 LOG OF TEST PIT NO . 16 rnEvenEo ar BBB SOUTH OPERATING BASE Seattle, Washington for De Leuw Cather & Company Cr/AWING c. „ uMnEn A-45 CHE c KEo A.: DE2. svvnor Eo nv: ERM^*":April 1976ALO: ---- �Uf`�` W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. Cow ,dring 1a1Ainrrn and Geohgir,J{ DRAFT t Depth 0t tD . W N — 0 in t t t t t t t t Few 0 x Lo DESCRIPTION 1,-7 A f, Mixture of dark brown & gray, silty SAND. & CRUSHED ROCK (Fill) --moist, medium dense Brown SILTSTONE & SANDSTONE --thinly laminated to laminated moderately _ fractured, moderately to highly weathered r L __ - m Gray with some brown SILTSTONE & SANDSTONE --moderately weathered, moderately fractured, hard Surface elevation of 15.8 feet. Very minor seepage from 1 to 2 feet. Water observed entering test pit through fractures near 7 foot level at approximately 2 gallons per minute. Completed 3/19/76 LOG OF TEST PIT NO . 17 CHFPARED K.. in SOUTH OPERATING BASE Seattle, Washington for De Leuw C:olher & Company 0 �".M11"n A-46 caECKEU n.: DER- nvvgovEn Kr: [fj/ r,,,,•: April 1976 1- sc•Ee' ---- 17'"''' W-74-310-03 u ur,n. CONVERSE, DAVIS AND ASSOCIATES, INC. Co,i,,,1,;,,,; lingmeers ,,n,l Geohghrf DRAFT . 2 j •cLL p E DESCRIPTION 0 %.� 7,-,- 8 inches CRUSHED ROCK (Fill) I 1 2 3 -4:' I Gray, silty, fine to medium SAND with numerous siltstone & sandstone fragments up to 3 feet in diameter (Fill) --moist, medium dense 4- Gray, CRUSHED ROCK with some silty sand matrix (Fill) --moist,dense 5 6_ ==_ = � Groy SILTSTONE & SANDSTONE --thinly laminated to laminated, moderotely yleatheted..hard _ _..,_., — - Surface elevation approximately 16.2 feet. Very minor seepage from 6" depth. Completed 3/19/76 J LOG OF TEST PIT NO. 18 'DEI,nEDor: _1BB SOUTH OPERATING BASE Seattle, Washington For De Lcuw Cather & Company oMeew A-47 eNrr'ED s.: DER „eruov ED Dv: ER.M ' ° April 1976 s`„": — — -- r'.',g ': W-74-310--03 CONVERSE, DAVIS AND ASSOCIATES, INC. C,a,t„bung hrivnrra and 6enlnquti� DRAFT o T v, . DESCRIPTION - 0) (T A W N - C `,'' f� „I? 1 lti J f , Groy, siltytfine to medium SAND with occasional Lgravel & numerous siltstone & sandstone fragments (Fill) --moist, medium dense ti " Changes to gray & brown in color , --moist to wet, less dense „" Black BASALT --highly fractured, hard Refusal at 7 feet. Surface elevation at 16.7 feet. Seepage (2-3 gpm) entering test pit from thin fractures in bedrock or from level just above bedrock. Completed 3/19/76. LOG OF TEST PIT NO. 19 r I1Er"prD o.: JBB SOUTH OPERATING BASE Seattle, Washington for De Lcuw Cather & Company °""""N., NUMBER A-48 EMFCK.D ,,., DER "rrnorro ov: ERM u^*E: April 19761"•'": ----- W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. Cnnudting Eugimcr, and Grolopist RAFT I Depth a, to A w ro — O in /...1.. F_ ..,I Feet 0 v DESCRIPTION fd{ , Gray, silty, fine to medium SAND with occasional gravel (Fill) -- wet, loose �' y, ,` (`' f Brown to gray, silty, fine to medium SAND with numerous basalt, sandstone & siltstone fragments -- moist, loose (Fill) Saturated at 4.5 feet. �• Black BASALT --highly fractured, hard Surface elevation of 16.4 feet. Test pit caved moderately. Prim ary failure through slabbing of walls. Groundwoter entering test pit from 4-6 foot level at approximately 5-10 gpm. Completed 3/19/76. LOG OF TEST PIT NO. 20 ancreneo or: jBg SOUTH OPERATING BASE Seattle, Washington for De Lcuw Caiher & Company NVIAULn A-49 cMccrco II.: DER • 'rvnovro nr: ERM `'" r April 1976 I'c"'.c:•---- "''M ' W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. Cum thing Engineer-5 w,d Grnlogi,u )RAFT d `--LL 0N gyp' . DESCRIPTION 0firrtt 71••: ,/ ', Gray, silty, fine to medium SAND with occasional gravel (Fill) --moist to wet, soft mot, p ram____, 1 Brown, silty, fine to medium SAND with some silt (Fill) �--moist, medium dense; bottom 6 inches saturated 3 - 4 5 ). 6 -'or : .?: !! AIL, C. ., Dark brown & gray silty, fine to medium SAND with gravel & numerous rock fragments (rock size to 24") (fill) --moist, medium dense N . % 1 .' ,1 Black BASALT --highly to moderately fractured, hard ' 7 Surface elevation at 15.9 feet. Minor seepage at top of pit. Approximately 80-120 gpm seeping into pit below the 5 foot level. Completed 3/22/76 LOG OF TEST PIT NO. 21 meP"nro BY: )BB SOUTH OPERATING BASE Seattle, Washington for De Lcuw Caiher & Company ureueF A•-50 CHECKED or: DER. e,rworco or: EI:M o,,•:: April 1976 I"•c`.---- I�;,;.,;,V',' W - 7 4 - 3 1 0 - 0 3 CONVERSE, DAVIS AND ASSOCIATES, INC. Co',cnlimg E,onrtr, nod Gn,ingi,c, )RAFT • Depth = O co CO -4 a cn P w ry — 0 �n t it i i Feet 0 E c^ DESCRIPTION V, ;'L t. Dark brown, silty, fine to medium SAND & CRUSHED ROCK (Fill) --moist to wet. mediurn dense, y . Brown, silty,fine to mediurn SAND & CRUSHED ROCK (Fill) --moist, dense • :q. I. .:1; Green, s, fium ND with crushed medito 6SAinch size (Fill) rock &iltyrock fragments --moist, medium dense, numerous wood fragments at upper boundary Dark brown, sandy SILT (topsoil) I --moist to saturated, loose I Gray to brownish gray, fine, sandy SILT with occasional organic matter --moist, soft Increasing organic matter & numerous branches & roots .° o • o Gray, fine to medium SAND --moist to saturated, medium dense Surface elevation approximately 15.3 feet. Seepage entering test pit between 4.5 & 5.5 feet at a rate of approximately 1 gallon per minute Completed 3/22/76 LOG OF TEST PIT NO. 22 °EHnOEnn.: iBg SOUTH OPERATING BASE Seattle, Washington HewINN NI/Milt," fHLONFO °' DER_ for De Leuw Cather & Company A-51 n,raorrn n.: (=RDA_ n•',::April 1976 Isulc: ---- !H1°oewT W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. CownTh', 1eji,r0,, .nd GcnIgrifis DRAFT Depth N — O in i i i Feet 0 DESCRIPTION \ti Brown & gray, silty, fine to medium SAND with occasional gravel (Fill) occasional roots upper 6" � i.I --moist to wet, medium soft to medium dense E , � Dark brown, silty, fine to medium SAND & CRUSHED„ ROCK (Fill) --moist, dense i, 2 inch asphalt airfare 3 _ .. Dark gray, CRUSHED ROCK with silty sand matrix (Fill) --moist. dense 4- �l. Brown, silty, fine to medium SAND with occasional ve & c k t ve d - Gray, silty, fine to medium SAND with numerous rocl• fragments (Fill) --moist. dense 6- 7- 8- - 10- II- 12 Brown, very fine, sandy SILT with occasional organic matter --moist, soft Occasional lenses or pockets of organic slit approximately 6 inches in thickness Surface elevation approximately 13.4 feet. Minor seepage entering test pit from between 7-9 feet at approximately one gallon per minute. Completed 3/22/76 LOG OF TEST PIT NO. 23 Pnca.nEDn.. JBB SOUTH OPERATING BASE Seattle, Washington for De Leuw Cother & Company Numnt, A-52 c HFcKen I... DER ,.P..ov.n.,.. 1=F A& „L, April 1976 I.c^.-c ---- I;;;;;;;„ `.T W-74-310-03 CONVERSE, DAVIS ANI) ASSOCIATES, INC. . Cn„.,de„s t:,,t-ineo:, ,,,,d Gco6,gi lir 1 RAFT s co.!:a o DESCRIPTION ' 0 W. i. Gray, silty, fine to medium SAND with occasional (Fill) --wet, soft I -;'•� j./..i f,')'-' ; I L_gravel Brown, silt fine to medium SAND with occasional gravel Fill) --moist, medium dense 2 �,f;i 31� .1;,�l) �� I Brown,Fine to medium SAND with occasional gravel (Fill) --wet to saturated, medium dense 4_ 5-1 )'f^1C f'•)i /p ' Dark brown to gray, silty, fine to medium SAND with occasional crushed rock (plant waste) (Fill) --moist, dense 6-1c,„I 7-F''' y% '1 Dark brown to gray, silty, fine to medium SAND & ROCK FRAGMENTS to 1 foot diameter (Fill) --moist, medium dense 9 • 's•1 1, •10 c Brown, silty, fine to medium SAND with occasional gravel & rock fragments (Fill) --moist, dense ( Dark brown to gray, silty, fine to medium SAND r with occasional rock fragments (Fill) -moist, dense] — I I - '"' Black BASALT with minor shale moderately to highly fractured, hard 1 Surface elevation approximately 18.1 feet. Seepage entered test pit from l'9" to 3'6". Approximately 3 gallons per minute. When bedrock was encountered, ground water entered test pit through rock fractures at approximately 5 to 10 gallons per minute. Completed 3/22/76 LOG OF TEST PIT NO . 24 .aCn,,.. 1B6 SOUTH OPERATING BASE Seattle, Washington for De Lcuw Lather & Corn on, annWINC.NUMBER A-53 c NECKED "r: DEI2 ^ri Novcc,..: FIZM c "'aril 1976 1sC"": --- '- IHuuoi;.+' W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. Co,uullinx la,xi,rrrrr ;,nd Grnlnpirt, )RAFT s o -LL o r DESCRIPTION 0 1 � • j! r I J 7 Brown, silty, fine to medium SAND with some fine to medium sand (Fill) --moist to wet, loose to medium dense 2 _ 3 -..' 4-''� l i1; ,r. ' J. b `L 11 Dark brown to gray, silty, fine to medium SAND with occasional gravel & numerous basalt, sandstone & siltstone fragments (Fill) --moist, dense to very dense • 5 -V.» 6 711t,, 6 m- rr 5 i 1. Brown, silty, fine to medium SAND (Fill) --moist to wet, medium dense Numerous rock fragments & cobbles at 8 feet. Changes to brown in color Black BASALT --moderately to highly fractured,hard - 10 Surface elevation approximately 17.8 feet. Seepage entered test pit from 7' & below at a rate of approximately 3 to 4 gallons per minute. Completed 3/22/76 LOG OF TEST PIT NO. 25 anEn^uEn or: JBB SOUTH OPERATING BASE Seattle, Washington nU:,„E',` c,w1CNEu o. DER. for De Leuw Calhcr & Company A-54 ^l,-novru or. ERM "•'. April 1976 ^'-' - - - -. I 2°-:,',,V W-74-310-03 CONVERSE, DAVIS AND ASSOCIATES, INC. (emu/Ping Imghwcrr ,e,d Gcologah r DRAFT 1 I Depth = O a y m cn A w- n� — O Fee' 0 11 N DESCRIPTION r Brown, silty, fine to medium SAND with occasional gravel (Fill) --saturated, soft t= ; Dark brown, silty, fine to medium SAND with - -1 occasional crushed rock (Fill) --moist dense ) • '44 •}; .1' Brown, fine to medium SAND with some silty sand & accasioral gravel (Fill) --wet medium derse r I ;Vt.occasional Brown & gray; silty, fine to medium SAND with gravel & trace of organic matter (Fill) --moist, dense j I'\ , Brown, fine to medium SAND with some silt to silty fine to medium sand (Fill) --wet to saturated, medium dense 11"• }11 L{i,l . '11 Brown & gray, silty, fine to medium SAND with occasional grovel (Fill) --moist, medium dense to dense c Surface elevation approximately 19.4 feet. Minor seepage entered test pit from between 5 & 7 feet at the rate of approximate 2 gallons per minute. Completed 3/22/76 LOG OF TEST PIT NO. 26 onerenco or: 3D8� SOUTH OPERATING BASE Seattle, Washington „UM„I, _r .r.. crn II DEW_ for De Leuw Carper & Company A-55 .- ' `r W-74-310-03 srrnovc(.1 or: LRIA on'r° Aril 1976 o - -- u„F .--1f°:c"' CONVERS)3, DAV1S AND ASSOCIATES, INC. Co,,,,di,ll,t ra,ginern ,,,,d Geolor.;t,f DRAFT Clarity Engineering LLC APPENDIX D: HISTORIC EXPLORATIONS - EXISTING PARKING GARAGE I'miccl Na 107 1) 1 KC Interim South rlase . G•otwh Repoli (DRA!T) doca DRAFT Otojcs Earth Consultants Inc. September 21, 1999 E9905.2 Trammell Crow Company 1017 - 114th Avenue Smnhesst buns 250 Wimp Washington 91004 Attention: Cava Stand Doer Dar. We ore plessid to submit our report titled '0eotuhnbd Engineering Study, Proposed Group 1M.nh Garage, 12400 Eoot Marginal Wsy South, Tukwila, Wsahington.' This report presents the results of our field exploration, selective laboratory tuts. and engineering analysis. Resod on the results o1 our study, It is our opinion the proposed structure an be constructed generally a pinned. Support for Po proposed parking garage con be provided using s conventional spread and continuous looting foundation system beefing on compatent netNI .oil or on .truotur.l fill uesd 10 modify site 9redos. Slab -on -grade doors may W .Im$lerly supponad. We apWestst. 1N1 opportunity to be of continued service to you. 11 you have any questions, or If wo an be of funh.r assistance, please call. Slnserey, EARTH CONSULTANTS, W4C. / Kyl. R. Campbell, P.E. Minnow of Oeot.chnlcal Services Ir.WabWn 1m5. 13t1Peu NE, S..Al. gdrr.. WaPigtn OWWS Belem (425)Oahe) MX(rt5)740al 1o1FaIIN1Men) 1 DRAFT TAOL! Of CONTENTS Eio05-2 Beats] hales analetlon 1 ISILCOOMEIRII 2 MKS Iubaudaa 2 &mutes= 33 La01slacaslne OIICLn11OM AND 1ECOMMEIOA11ONI ➢IOatN 4 4 11n MeefelNn end Oenefel l.Mro,k 4 FoundWsoa 5 Nihon -Mods Floors S I.1.ml O..l.n Cendder.tlene 7 E.uv.u.ntnd Lan.. 9 111. a.ln. 5 flGltn Iuaopt mid 4ak05 9 10 tallasulladau 10 AMEMCIGEI App.ndt. A fled Exploration Appendix S Laboratory Teat Results LLIMEM11 l#I Plata 1 Vldnity Map Pieta 2 Oaring Location Pan Pate 3 Typical Peeing Subdr.ln Detail Plata 4 Utility Tranoh SoakI1l Plate Al L.Send Plata, A2 through AS bring Logs Pate 11 Grain Sias A011y1. ig DRAFT DRAFT OEOTECHNICAI ENGINEERING STUDY ►RO►OSED GROUP HEALTH GARAGE 12400 EAST MARGINAL WAY SOUTH TUKWILA, WASHINOTON E-9SOS•2 INIB UCIl0M ganmai This report presents the results of the geotahnical englnmdng study completed by Earth Consuhents, Inc. IECII for the proposed Group Health Geroge at 12400 Eat MerpInal Way South In Tukwila, Washington. The general location of the she is shown on the Vicinity Map, Piste 1, The purpose of this study was to explore the subsurface conditions at the site and bleed on the conditions encountered to develop gootechnlcal recommendations for the proposed site development. At the rims our study was Wormed, the she, misting building, proposed parking garage, and our exploratory locations were approximately as shown on the Boring Location Plan, Piste 2. froimt IMa1otton We understand It Is planned to construct a perking gangs within a portion of on existing complex. The proposed perking structure will have an approximetl footprint of 74,000 sours lest and will occupy the northern portion of the site. The perking garage will consist of one level of on -grade perking and two to three levels of above grade parking. The structure will be of reletivoly heavily loaded concreb•hame construction with the ground level consisting of a Concrete Illb•on•grade floor. lewd on our experience with ,knifes projects, we anticipate wail loads will be on the order of six to eight kips per lineal loot, column loads on tin order of one thousand two hundred 11 200) to one thousand flvgJtu0ded 11,I0OL kips and sleb•on•grade floor loads of two hundred nth f200Lggunde.per.1guua loot. In order to achieve construction aubgrade elevations, we enddpate cup and fins of less than five fat will be nesessery. If the above design orlterla ere Incorrect or change, we should be consulted to review the recommendations contained In this report. In any else, ICI should be rebind to perform ■ general review of the final construction design. 1 OEOTECHN*CAL ENGINEERING STUDY Trammell Crow Company September 21, 1909 11TE cotdomoNB lades.' E•1111O11•2 Pepe 2 TM subject site oonelete o1 an ',register shaped property located et 12400 Eat Merginel Wry Louth Ism Plop 1, Vicinity Map). The proposed garage she Is currently occupied by an whet paved, surface level parking lot used by en exleiing Group Heehh medial facillty, The site is bordered to the eat by a detention pond, to the west by Eat Marginal Way South, to the north by a Metro Innah facility and to the south by an incites toed that extends out to East Marginal Way South along existing perking top end the north well of 1M existing medical budding. The proposed perking parsgs era Is essentially flat with little discernible elevation ehenge. This arse was graded for the existing surface level parking lot. The northern portion of the site Is bordered by a three to five foot high north feting slope that extends down to the adleoent property to the north. The proposed Geroge sits is paved and contains little to no vegetation. Vegetation is limited to planter area around the perimeter of the existing parking lot Modica • Subsurface conditions were evaluated by drilling three borings at the epproximste locations shown on Piste 2. PION refer to the bring Logs, Plates A2 through AB, for a detailed description of the conditions encountered et each location explored. A deeorlptlon of the field exploration methods Is Included In Appendix A. The following Ise generalized description of the subsurface condition encountered. Underlying the asphalt at our boring locations, we encountered one to two end one -hell fat of medium dense fib. TM 1111 consists of silty and with grovel end an angular silty wave) bus material IUnIfisd Soil Classification, SM end OM, respectively) with trace amounts of organic and Imecelleneous debris. 9C t 1 DRAFT DRAFT OEDTECMNICAL ENOINEENINO STUDY Trammell Crow Company E•51306.2 September 21, 1999 Page 3 Underlying the asphalt and fill, we eneoumered medium dense to very dense silty send with gravel IBM) and silty gravel with sand 10M). The dens@ to very dense soil was encountered at two end one-half to six and on1-helf feet below existing grade to the maximum exploration depth of twenty-one and one-half 121.5) feet. Localised :ones of medium dense loll were encountered In Boringe I-2 and S-3 at nine and one-half to eleven 111) lest below prods In areas of Incr.ued moisture or impose. flownfluass Oroundwater seepage was observed In ow boringsst depths tenpins from nine to twenty 120) feat below existing reds. Seepage was observed at several Nvele between this rends end sppears to be predominantly motoring In Interlude of r.l.tNely permeeble sand and gravel. In addition, localized tones of Iron oxide staining end mottling were observed at throe to four feet below pod.. The presence of the Iron oxide staining end mottling suggests perched groundwat.rae.page may be encountered in sits excavations if earthwork is performed during the waiter or spring. The connector should be aware tut lroundweter Is not static. Thera will likely be Iluotultlon. In the level depending *nth* season, amount of rainfall, surface water runoff, and other lectors. Generally, the water level la higher and the seepage rite Is greater In the wetter winter months (typically October through M.O. I.b.ntonr Taming Laboratory tuts were conducted on rlpreuntative soli samples to verify or modify the field soli classification end to *valuate the general physical properties end engineering cherso4608tbs of the soil encountered. Visual INk dlsulfiostlons ware supplemented by groin sloe analyses on representatNe sop samples. Moisture content tuts were performed on all samples. TM results of loboetory testa performed on specific ample. are provided either at the appropriate ample depth on the Individual boring loge or on a ..peons dots shut contained In Appendix S. It N import.nt to note that those tut results may not accurately represent the overall Inaltu soil conditions. 0w geotsMnial recommendations ere based on our Interpretation of these test results end their use In guiding our engineering lodgment. ECI cannot be responsible for the Interpretation of these data by others. 010 S DEOTECMNICAL EN0INEFANO STUDY Trammell Crow Comwny E-111100-2 September 21, 1999 page 4 In sccordines with our Standard Fee Schedule end Gummi Conditions, the soli samples for this protect will be discarded after a period of fifteen days following completion of tell report unless we ars otherwise directed In writing. OLCUSSION AND SICOMMENDATIOM$ Saud on the results of our study, h is our opinion the proposed perking gsoge can be constructed generally as planned. Wilding support can be provided using a convention.' ' pried and continuous footing foundation sysi.m 6iirinp on. cdmpstnnt florist! 1olle or 09 structural ilg triad to modn•pn lly 111e pr'des._91lb•odifloor. may-4. aImiiuly supported. This report has been prepared for specific application to this project only end In a manner consistent with then level of care and skill ordinarily exercised by other members of the professlon currently practicing under alrNNr conditions In this area for the exclusive use of Tremnell Crow Company and their r.prseentativa. No warranty, expreseed or Impaled, Is men.. This report, In Its entirety, should be Included In the project contract documents for the Information of the connector. Bib teeantlen end O.n.tal penhwork The footprint area of the proposed parking garage should be stripped and cleared of existing asphalt paving end other deleterious material. Existing utility pipes to be abandoned should be plugged or removed so they do not provide a conduit for water and caves 1011 siturarlen and potential instability problems. Following the dripping operetlon, the ground status where structural IIr, slobs or foundations are to be pieced should be observed by o representative of ICI. P roofrolling may be necessary In order to Identify soh or unstable area. Froolrolling Raul be performed under the observation of ■ repreeentstly. of ECt. Ball In loose or soh areas If reeomp.ct.d and still excessively yielding, should be ovsr.00svated and r.placed with atructunl fill to a depth that will provide a stable Ow beneath the foundation or general structural fib. The optional use of a geot.xtile fabric placed directly on the ov.oxcavated surface may help to bridge unstable areas. For this applketion, Mlofi 600X or approved equivalent should be used. r.n C.wnr. r.. f• a g$ 1N W DRAFT DRAFT OIOTECIINICAL ENGINEERING STUDY Trammell Craw Company September 21, 1999 E-6606-2 Peg. 6 It may be possible to crush the existing site pavements and concrete curbing for use es structural R" material". Materials reclaimed by crushing and used as fill should have a maximum size of three Inches and should be mixed with soli to provide' well graded materiel. Structural 1tl1 Is defined as any compacted 1111 placed under buildings, roadways, dabs, ptwantsnta, or other bad -bearing areas. Structural fill under floor 'labs and footings should be placed In horizontal IIHs not exceeding twelve (121 Inches In loose thickness end compacted to a minimum of 90 percent of Its labarstory manlmum dry dimity determined In @ cocrdene* vAth ASTM Tut Designation D-1667-91 (Modified Proctor). The fill materials should be pieced st or neer thek optimum moisture contort. FIII under pavements and walls should also be placed In horizontal Otte and compacted to 90 percent of maximum dinghy e xcept for the top twelve 1121 Inches which should be compacted to 96 percent of maximum denalty. During dry weather, most soils which are compactible and non -organic con be used as atructurel fill. The onalte sells at the time of the subsurface exploration should be suited@ for use as structural 1111, provided the grading operations ere conducted during dry weather. However, the else eel's have greater then 5 percent fines owing the No. 200 slave. Boll with fines In tole range will dsgrado If exposed to asoesslvs moisture, and oompation end grading will be difficult if the soli moisture Incr elgnlfloantly above Its optimum condition. If the elm soil le exposed to moisture and cannot be adequately compacted then h may be necuuly to Import a soil Nat can be compacted. During dry weather, any non•organb compatible soli with a maximum grain glee of six Inches can be used. FIII soils for use during wet weather should consist of a fairly well graded granular material having ■ manlrnum grain ate@ of six Inches and no more than 6 percent fines puWng tha No. 200 sieve based on the minus 3/4-Inch fraction. A oontingenoy In the earthwork budget should es Included for this poulblcty. Fauodatlaog Based on the results of our study, H la our opinion the proposed perking garage can be supported on 9 conventional sordid end continuous looting foundation system peering on competent native soil or on structure' till used to modify sits grades. . tor. aa.n n. OEOTECHNICAL ENGINEERING STUDY Trammell Crow Company E-6606.2 September 21. 1999 Page 6 For frost protection, exterior foundation elements should he placed at a minimum depth of e ighteen 1111 Inches below final exterior grads. Interior spread foundations can be pieced at e minimum depth of twelve 112) Inches below the top of slab, except In unheated areas, where Interior foundation elements should be founded at a minimum depth of eighteen 116) Inches. With foeight thoutleoeln4e}rp6on 1 gel led be dusedrfo, oop et a tn, an allowable ors wll bearing09. to a ding of • t tno 4 'lea u�i�wesNudde�w�wDeFNdI'6pey�en be used for competent native Boll or etructurel fIS. Loading 01 this magnh provided with a theoretical lector-of•ufety In excess of three against actual shear failure. For ahen•term dynando biding conditions, a ons•thlyd Inoreees In the above Viewable bearing oapeoltlee con be used. Contlnuoue end individual "greed footing" should hone minimum widths of eighteen 1111) and twenty-four (241 Inches, respeetively. With structure' 'ceding es expected, lots' Battlement of about one Inch Is entblpated with differential movement of about ona•IWf inch. Most of the anticipated settlement should occur during construction 11 deed loads are applied. Horizonte' bids can be resisted by friction between the bus of the foundation and the supparting 'oil and by passive soli pressure toting on the face of the buried portion of the foundation. For the letter, the foundation moat be poured 'neat' against the competed native soils or backllllsd with structural 1111. For frictional cepac1ty, g enetlloltnt of .40 gap be used. For puede Barth pressure, the walled@ resistance can be computed using en e quivalent fluid pressure of four hundred f400) pct. Th4 p Itgrai resistance yelg0 an aJ weblg ve'Ba4 g lactor•of-eefaty of 1.6 has boon included. Ai movement of the foundation element le required to mobilize Nil passive resistance, the passive resistance should be neglected 11 such movement Is not aoeptable. Footing excavations should be observed by a representative of ECI, prior to pining forms or reber, to verily that conditions are as enthlpeted In this report. Sigh -on -Grade Siloam 94ban-grsde floors may be supported en competent native toll or on structure' Iic used to modify site prides. Disturbed eubgrade sop must either be compacted In•plsce or repriced with atruclursl fin. then Civans. r. Y 1 DRAFT DRAFT GEOTECHNICAL ENGINEERING STUDY Trammell Crow Company September 21, 1999 E-99062 Page 10 Existing utility pipes to be abandoned should be plugged or removed so that they do not provide a canduh for water and cause soil seturstion and .tabdlty problem. 1191fTAT10Ni Our recomnsndetlens and conclusions ere based on the observed she conditions, selective Isborstory tasting Ind engineering acetysas, the design information provided us and our experience and engineering judgment. The conclusions and reeommendetlors are professionsi opinions derlved in • manner consistent with that level of cora and skill ordinarily exercised by other numbers of the profession currently practicing under similar conditions In this arse. No warranty is expressed or Implied. Ths reeomnnndselons submined In this report are based upon the data obtained from the borings. toll and groundwater conditlers between borings may vary from thou encountered. Tho nature and extent of variations between the exploratory locutions may not become evident until construction. If violations do appear, ECI should be requested to reevaluate the recommendations of this report and to modify or verify them In wilting prior to proceeding with the construction. Addt1on.LOdtl9 As the geole:Mica' engineer of record, ECI should be stained to perform a genard review of tls final design and specificattons to verily that the senhwork and foundation recommendedons have been properly Interpreted and implemented In the design and In the Construction specifications. ECI should also be retained to provide geotechnlcal services during construction. This is to observe compgsnde with the design comps, spscificatlens or recommendstkxlsend to Blow design ohenges In the event subeurfece conditions differ from thou entklpeted prier to the sun of consuudtlon. We do not accept responsibility for the performance of the loundstlon or earthwork unless we ere retelned to review the construction drawings and specifications, and to provide constuction observation and testing services. Cormou•TH lea ig as anc•- oPP- e f Qaln talEIFEEMINBY a Or uucl�i�nFcrMi.-• 1 1-- a .wr t191 a -.. Q►;/ �yy (1 11e., , r 4 , t . s_A 64-j— Iy •�Bo�- i A irk,_,j, ..-5- 1 :. ° it , i.: x.. fvER�o,Q 14TH a = la, i II Ice ' rt , (0 .. 41 1 % IS4 HE illan 3 . 2 �I 1 ilt '1 , 1,lntsl n, ,.... L.' 1� 1 HI11DYK" '' CUM tatrrosu • • tly �' t n'Li/l 1 � • Nit `\ RNerenn.: King County) raap ale 9y Tnoma. Medan Map. Doted 1099 Zf�C' NOTE: TM p1n moy avian area too. . EGI cannot W ra.pelemlo ha any eub.eeuent trielrolorprotaBon ol us Intorrnotko molting Born btaoh a Milo roprodretlona et Only Moto Earth Consultants, Inc. Vicinity Map Group Health Parking Garage Tukwlls, Washington Dnrn OLS Oats Sept.•ce Not No. Na62 t]r.k.d MOM Oats WIMP ROW 1 1 DRAFT 4 Inch m9 DYnMM PMdt11d P. Wnpped In Dn9vga hark 11 9c1, rola 9 Ion mh / 4 Inch mot. 6219 }i7ii O SCHEMATIC ONLY - NOT TO KYLE NOT A CONSTRUCTION DRAWING anima 1Ud9.e mei; raw. .99 or other kw plmla.b9 y 11 l0,14. P7M aggregate ko Portl910 Contra Carrara; Suction 1413.1(1) d Ira WS00T Sp.9Dc0deno Dra91 gm g doom;tI k dosed 9. PVC pip ILO w.n noros Sari or Narl lacing doom; pip )o o ro, wan. 0. 0 wnapctl Do not IW 19*09 9 es. Wrap d.ou pipe 09 n99 U9 1. ,p dw91*9. dr9hn trio loalip Ikaa Wrap wan MM 140 Fels hl9b a 9PIfn19aM. lilt IC\ Earth Consultants Inc. TYPICAL FOOTING 5US09WN DETAIL Croup H..1tn P.rkln. Garage Tukwila. Y..hlnaton Peel. 14.1106-9 Oran. 7LS Dra Sept. '99 Checked r.cn Date 9/17/99 'Plata 7 1 DRAFT Soden 9j9•:fR .% Nonlnd Supporting Floor Slab or Nu. Roadc.y Amos LEGEND: A.pUI or Con:r.n Plmmrnl or Comm Floor S1.0 1a11 9Lt.n11 or Bow Pock Bede; Compacted 0M189. Sol co Imported SP.d A Ateladd as D99de9d tt ITV Sk9 Pr.plr.lkn of the °aunt e.nnaerk Isogon d Ihe AOWtn.d Mp9r1 Tp1. Mh9n4m P.runap. or Maatn.rn laoontory Dry Denalay as Pr D119rmd Rd,od b.by AM Tpl M.D 1167.71 (M0OMd odor). Union Od,.rw11. Spltated In m9 Macho! Aspen Teat S.19hg Weal; Mtl9rte1 Type 0.p.nd. on Typo al Pip .no d 1 09 500 W Conipm t9 1n. Maral.p1Ynr9 L 11e Type d np9 519dN. Earth Consultants Inc. TYPICAL !RUSTY TRENCH FILL Croup R.91tn Parkin". coca. Tukwila, N.onln9ton Pal. N.A9O6-7 Or..n. CIS Data Sept. '99 Checked API Dot. 9/17/99 'PSta 1 t. r 1 DRAFT DRAFT APPENDIX A FILL& EXPLORATION E•Ss0S•2 Our subsurface exploration was performed on September 2, 1999. Subsurface conditions at the site were explored by drilling three borings to a maximum depth of iwentyone and one-half (21.51 feet below existing grade. The borings were drilled by Aasocleted Drilling Inc. using a truck•nwunted drill rig. Contlnuous•fllgh), hollow -stem augers were used to advance and support the borsholaa during 'emoting. Approximate boring locations were determined by pacing from features as 'town on iM site map provided by the client. TM locations of the borings should be considered accurst', only to the degree implied by the method used. These approximate locations are shown on the Boring Location Pin, Pits 2. The field exploration was continuously monitored by a geologist from our firm who classified tha soils encountered, maimsined a leg of rich boring, obtained representative samples, end observed pertinent sits features. All samples were vlsuelly clmllled In accordance with the Unified Soil Classification System which is presented on Piste Al, Legend. Pepruentetive Boll samples ware placed In closed contalner' and returned to our laboratory for further examination end testing. Standard Panatretlon Tots (SPT) were performed at 'elected Interveb In general accordance with ASTM Test Designation D-15136. The split spoon sempies were driven with a one hundred forty 1140) pound hemmer freely felling thirty (301 Inches. The number of blows required to drive the last twelve (121 Inches of penetration are called the "N-value". This value helps to cheractarfes the site soils and Is wed In our engineering 'wises. Logs of the borings are presented on Pates A2 through Ai. The finer logs represent our Interpretations of the Seal logs and the results of the le9oretory exsmihetion and tests of field Samples. TM stratlllcetIon fins on the legs represent the approximate boundaries between soil types. In utwllty, the transitions nay be more gradual, ig DRAFT DRAFT Bed612 LOg Pme Pope Group MAMA P.Nq Oam. 1.. 1I3 M062 I Lamm MOY~ am 66 U/l/PP I ormean IVI/M NA, M.r►_61 a6.O.rdf. oM A•.. DOW.. USA IMA MM. A.... BPT 00433.6..44 O.r.. r.r [wry.... ❑ kW*" Wag o l.rrr ®ArirmA l..r.a War. 111.. AI r R .r..c l•r.i 13K3.310.01 I I L 112 v IPI .. KR • MAP dm — 9Y NpuIB Brown dry"MD.0 W.'t. m.tlum anw. molt TM .+ ._. 7 ' OM — — —_ WO. dry SAND. pm demo.mtt .31%tla. d..a..n aM.Milt* lt .I,M2P66 6.ppl1Maty .1610. 1° It 1. .T 11� 11 11 11 11 BM — — — — --- — O.grv.n.AP.y.11y SANG AM5I..V. Mry5., P...1 M•b •°aom.. pay.IlAM I 11n 'llt. tt't/ 1 IrthContan :U Easults Inc.Or Wing Loy Group N.. NAM2 anew Tpt.I., VI5Nllpn ... W. 11063 1 Pr. Gl. 1 aim B.p1.7P aura MOM 1 w. VIM I Iu. At y1r..,�.. ow..�.. a. mv.r..rr r. ow.h . 31 wow... .r..../ Myn.en.iiM Mr ..a AP.M.rl.rr.4 .N.2..r a/An r1. A•6. ...a.1. 1 Soft Lop RIP Wont 3i. 4. Glary HId2IP..LLtO Oa.w 2 2 l.Ial 1 1�IIn l�067 MOM -1 °.t Ow.Ira.O VLM I 67/M b1.1.. 67 66.6.66.- Af.otlt61 mow.. USA r.r.wr OPT *Am swim aura: Mk ORIN . 013.315915 0 Pam* t✓D A..+rAres . G... r.°' AI ' it Ie t 1I e 11. Myl•1 •OM N— foam my ONAV!Ldeand my dam, melt OM foam My SAND MA amyl Iwyaom�.tnd y4.rSSoha ewe ap sbantandem :I SO6-ti1.01idt4llp MI6 Barg B I !�., 41Earth Consultants Inc.. OaringLegI w.w HAMS PMIq G.I.P. IP.m WW2 PALMS 1 Pr &VS avow. MOM or VIVM 1 wow Al AK Apormr/ =... �r1�.+.rws: d.o.r w.c...r ge.1r .Mrw MNVI1114.0 OAm w 1 W DRAFT DRAFT Balm Loa mot mom ... . 121.1M 1471a111 FMJ9 0.1.09 1 2 M1. 1997.7.. Ne9-2 I MOM am cm 1 cm... ma.. L7/1, I vans .....I..: 0.2 00..C.4.r. A.bcagd 01.1141.t NSA 44M144...! sal' 79a4.afl7077. Fa. = 7107.01.76.7 Q vA. ❑ P.m. t8 N7.797.47.979.e.9.wiw ow. w ow .Ave tl OdA urn �.. Patin Let 9 a 4 111 d, Ila 14 1 n 11 11 Mr11 MI11 1 2 — ) a T l Slew.ay. &' 4D *III 0enel. madlnn dense. meld . ad02 2 wry dense. 2011014a 0.b 22 .°acpM1..1 1 arm a - 10 — — 12- 11 II — 1•— ,— Ohl Om 1Y2 SANOwN Viva, dam, w1 .°.Cem.1 wry01e1.. Mg from A IIbil. M11.ad1.I awl sm. 422e7.n.l meat 42ae.iml mad4m d111M. wN aim 10.11%. 0re... haYdt w.laese -0OL.n4a wry OW. moat somUl. aW1°a1ll.laena e.ela a g QI111U,u .10 Earth Consultants Inc. awing Lao olmq IAA, W23197727. 1 Pas,.. 116042 a4. OLS I a. 0l °lI oar MOM I or WIWI I Aa y70. ew.. +M..~.aw. .lw 11 02 .rb~e.• •As �a..... Y yNay..es. y.M... ��M. *!1 jl. It gal Yt F■F 1 &Ong Log Qe.lp 14WO1 P.Ml2O.rage I 1 I Jo or too y YOS.2 aaOM .10. I On.. O. H2,11 HAS 11.916, 192 11201o.4s. AMati1M mlF Mold M9A ..,....11.. Srr mood son. m.o. H.I. cw.oa . ❑Wars. WO ❑rr..w ®.. w. Mard.0MM. On. ,Ia. w 0, aM. n m y} (1 d 5tl ivle c.o.. P1tIq lCl 1 1 2.1 u 11. 110 ■ M U \�/�.��I. F. ' IA —' 1 — 2 — ) 1Ilf Il 10''1'' 11 f 81,1 ((12r rstool mew say BOW alb growl, d.ma, moat E.°°mu wry dew •ammo 111aWn dam. 1° — 11 SM anyUry BAND Mn;MK 111.1641 dam., wan a.elq .2011 ar. 1A- 11^ lr OM On2.M2 GRAY& of 1 Mnd. .dry dense. wage aM110 lignal M 1r pony Iplwp 1.t91wm11.1111 frir q �10. a.dmri r2 r ■aan141adU 11.0 gUd coop. i 11(% .w Earth Consultants Inc. EloOno Om* N•707$ Pr.A� .qe.p Oae roast ~moon 0...1. 0001-2 eve 019 1 O.&WM Oa MOM 10.. WIMPnM AS ream am-Microrl 0veal..0►r�n 0er.I..r.e.dlMw..aw.\ . s/Irnd .ir11,...• “.m.... nr.wvn.am....m. w o..r map n..Ma..w...r..••1Maims r DRAFT DRAFT APPENDIX 1 AIORATORY TEST RESULT( E-18471-2 IM LtiM� 1� a 1 1 1 A PERCENT COARSER BY WEIGHT BROS 9 9 "° IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �° IIIIIIIIuuuunnuunnnunmm�uuuul ,m�,°IIIIII,111111111111111111111111111111111111 IIIIII woe ee IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11111111111111111111111111 1111111111111111 111111 to IIIIIIIIIIIIIIIIIIIIIIIIIII!ll0HIRlilll Illlli IIIIIIIIIIIIIIIIIU1811Pi11111l hhuIIl 11 11111 111111111111I!511111 II 1111111111111111111 11111! 11111111111:111111W11 1l11111111111111 11 11111: II111111:i111IIIIIIIIIIIIlIlIIIIIIIIIIIIIII 11 II: I IIIIIIIII IIII I;I IIIIIHIIIIIIIIIIIIII IIIIIIIIIIII IIIIIIIII Hill 111111111111111111111111111 IIIII! 14111111 i111111i1111111111111111111111111 11111. 11111IEi111IIII1111111111I111II111111111111111II 'd1117Y1111171i1'11111111111111111 11111111111 111 :17BIIIli 11111 111111111111111111111111 III 11111111 11111! pituu11111111111111111111111111111111111111 IIIII: ;11111111111111111111111111111111 IIIIIIIIIIIIIII IIIIIIIII'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII; ro 1 E t �.a 6 0 oat 9 8 R 9 9 R PERCENT FINER BY WEIGHT 1 1 1.4 a 61 17< 1 0 D o ti11 I 1 Earth Consultants Inc. GRAIN SUE ANALYSES Croup Health Parking CeraS. Tukwila. 11aa111nIten Prat. No.6506-1I Orem CLS I Da1.Sap1.'99 Chackad MGX I Dam 9/16/99 I "NU E1 1 Technical Information Report KING COUNTY Department of Transportation Metro Transit Division City of Tukwila South Interim Base Improvements Unclassified Use Permit 90% Design Submittal RECEIVED OCT 29 2018 TUKWILA PUBLIC WORKS B, CEOV ED OCT 12 20 Community Develop 411, Prepared By TETRA TECH 1420 5th Avenue Seattle, Washington 98122 +1.206.883.9300 12 October 2018 .• TABLE OF CONTENTS LIST OF FIGURES III LIST OF TABLES III ENGINEER'S CERTIFICATE IV 1.0 PROJECT OVERVIEW 5 1.1 Predeveloped Conditions 5 1.2 Developed Conditions 6 1.3 Soils and Groundwater 7 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 19 2.1 King County 2016 Surface Water Design Manual 19 2.2 City of Tukwila 2010 Infrastructure Design and Construction Standards 24 3.0 OFFSITE ANALYSIS 25 3.1 Level of Analysis 25 3.2 Offsite Analysis 25 4.0 FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID), AND WATER QUALITY ANALYSIS AND DESIGN 30 4.1 Predeveloped Site Hydrology (Part A) 31 4.2 Developed Site Hydrology (Part B) 32 4.3 Performance Standards (Part C) 34 4.4 Flow Control System (Part D) 35 4.5 Water Quality System (Part E) 36 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN 38 6.0 SPECIAL REPORTS AND STUDIES 40 7.0 OTHER PERMITS 41 8.0 CSWPP ANALYSIS AND DESIGN 51 8.1 Proposed Erosion and Sediment Control Overview 51 9.0 BOND QUANTITIES, FACILITY SUMMARIES, DECLARATION OF COVENANT 53 10.0 OPERATIONS AND MAINTENANCE MANUAL 54 APPENDIX A — FLOWCHARTS 55 APPENDIX B — WESTERN WASHINGTON HYDROLOGY MODEL 58 APPENDIX C — ENGINEERING CALCULATIONS 172 APPENDIX D — OTHER REPORTS AND STUDIES 178 APPENDIX E — BONDS, FACILITIES SUMMARY, AND COVENANTS 300 APPENDIX F — CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN 301 APPENDIX G — OPERATIONS AND MAINTENANCE MANUAL 302 Technical Information Report South Interim Base October 2018 LIST OF FIGURES Figure 1: Technical Information Report (TIR) Worksheet 8 Figure 2: Project Vicinity Map 14 Figure 3: Study Area and Sub -Basin Locations 16 Figure 4: Downstream Analysis 0' — 1,320' 29 Figure 5: Downstream Analysis 1,320'+ 29 LIST OF TABLES Table 1: Other Adopted Area -Specific Requirements 23 Table 2: Offsite Analysis Resource Review 26 Table 4: Pre -Developed Site Breakdown by Threshold Discharge Area 31 Table 5: Pre -Developed Site Hydrology 32 Table 6: Developed Site Breakdown by Threshold Discharge Area 33 Table 7: Developed, Unmitigated Site Hydrology 33 Table 8: Control Structure Characteristics 36 Table 9: Developed, Mitigated Site Hydrology 36 Table 10: Permit Matrix — South Interim Base 41 Technical Information Report South Interim Base October 2018 iii ENGINEER'S CERTIFICATE I hereby certify that this Technical Information Report for the South Interim Base project has been prepared by me or under my supervision and meets the minimum standards of the City of Tukwila and normal standards of engineering practice. I hereby acknowledge and agree that the jurisdiction does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities designed by me. Technical Information Report South Interim Base October 2018 iv 1.0 PROJECT OVERVIEW King County Metro Transit Division proposes developing a new Transit Operations Base in the City of Tukwila. This facility will expand the existing South Base facility (located at 12100 East Marginal Way South in Tukwila) with an interim base consisting of an operations building, a vehicle maintenance building, and additional bus coach parking for up to 126 buses. The South Interim Base will be located to the south of the existing facility at 12400 East Marginal Way South (Parcel No. 7340600480). The parcel is zoned as MIC/L — Manufacturing Industrial Center/Light Industrial. A parking garage and commercial office building currently occupy the project site. The parking garage will be retained; however, the existing office building will be demolished as part of an earlier phase of this project. The Transit Base will provide the following features: • Electrical upgrades, landscaping, and lighting. • Buildings for Transit operations and vehicle operations and maintenance staff. • Relocation of a drainage detention and upgraded water quality facilities. • Development of transit parking. • Separated employee parking entrance to garage. This Technical Information Report (TIR) will review the storm drainage design requirements according to the 2016 King County Surface Water Design Manual (KCSWDM) and the 2010 City of Tukwila Infrastructure Design and Construction Standards (IDCS) manual. The TIR worksheet is located in Figure 1. 1.1 PREDEVELOPED CONDITIONS For the purposes of this TIR, predeveloped conditions shall correspond to the project site's existing conditions prior to any demolition activity. 1.1.1 Parking Garage A multistory parking garage is currently located in the northwestern quadrant of the property. The parking garage is accessed via the main property entrance on East Marginal Way South, with pedestrian access connecting to the sidewalk in the Marginal Way Right -of -Way near the northwest corner of the property. The parking garage will be retained for use in the developed condition. Adjacent landscaping will be retained to the greatest extent practicable. 1.1.2 Commercial Office Building A two-story office building currently sits near the center of the site. The building has a net footprint of approximately 167,900 square feet (3.85 acres) and is slated to be demolished as part of the demolition phase of this project. Technical Information Report South Interim Base October 2018 5 1.1.3 Stormwater Infrastructure Currently, stormwater onsite drains to two distinct locations: one near the northeastern corner of the site and one to a catch basin in the Marginal Way Right -of -Way. As discussed in Section 3.0 of this report, these sub -basins are two distinct threshold discharge areas (TDAs), with TDA 1 corresponding to the portion draining to the north eastern corner and TDA 2 corresponding to the portion draining to the Marginal Way Right -of -Way. TDA maps can be found in Figure 3. TDA 1 Stormwater infrastructure in TDA 1 consists of an existing pipe and catchbasin network, a combined wetpond/detention pond (separated into two cells by a 7'-3" tall baffle located in the middle of the pond), and a flow control riser structure. The combined pond has a total depth of approximately 10 feet and provides a dead storage (for stormwater treatment) of 44,000 ft3 (1.010 ac-ft) and a live storage of approximately 25,533 ft3 (0.586 ac-ft). The storm pipe inletting to the combined pond has an invert elevation below that of the invert that outlets from the riser structure, thus creating a permanent tailwater condition in the upstream pipe network. Each catchbasin rim elevation, however, is set to be either at or above the top of the riser, so overtopping of structures upstream of the combined pond likely does not occur except in extreme storm events. TDA 2 Stormwater infrastructure in TDA 2 consists of an existing pipe and catchbasin network. The network discharges directly into a catchbasin located in the East Marginal Way Right -of -Way with no onsite detention or water quality treatment. 1.1.4 Other Utilities The property is currently served by sanitary sewer, water (potable, irrigation, and fire protection), and power. With the exception of sanitary sewer and potable water, all utilities serve both the existing commercial office building and the existing parking garage. Additionally, the fire protection water line forms a complete loop around the existing office building. 1.2 DEVELOPED CONDITIONS 1.2.1 Proposed Buildings and Site Use The project proposes to construct two new buildings: an operations building in the northeastern corner of the property and a vehicle maintenance building in the southwestern corner. The majority of the site will be paved or overlaid to accommodate bus coach parking, storage, and circulation. A new driveway entrance will be constructed to facilitate access to the existing parking garage while keeping passenger vehicle traffic separate from bus coach traffic. 1.2.2 Stormwater Infrastructure As discussed in Section 3.0 of this report, this project is divided into two distinct TDAs. Due to vertical constraints, the TDA boundaries needed to be adjusted to accommodate the proposed stormwater infrastructure (See Figure 3). Each TDA is described below: Technical Information Report South Interim Base October 2018 6 TDA 1 In the proposed condition, TDA 1 will provide detention using modular chamber technology. The facility will provide approximately 14,898 ft3 (0.342 ac-ft) of live storage at a depth of 3.67 feet. A full description of the detention facility can be found in Section 4.4 of this report. TDA 1 requires Enhanced Basic water quality treatment. The entire site is also considered "High -Use" and requires oil control. Both these requirements will be a Contech Filterra (or approved equal), which is capable of providing both Enhanced Basic treatment and Oil Control in a single facility. See Section 4.5 of this report for further information. TDA 2 In the proposed condition, TDA 2 will increase the 100-year peak flow by 0.0176 cubic feet per second (cfs). Since this increase is less than 0.1 cfs, flow control is not required for this TDA. TDA 2 also requires Enhanced Basic water quality treatment and is also classified as "High -Use." Treatment will be provided with two Contech Filterra units, which are capable of providing both oil control and Enhanced Basic treatment in a single facility. 1.2.3 Other Utilities The project proposes to retain the majority of onsite utilities. Additional sanitary sewer connections will be made to all proposed buildings in the form of side sewers. Such connections will be made to the existing, onsite sanitary sewer infrastructure. New potable water lines will be necessary for all proposed buildings. Fire prevention lines, non -potable lines, and irrigations lines will be maintained and extended as necessary. Temporary power installed during the demolition phase of this project will be retained and upgraded to be undergrounded and permanent. 1.3 SOILS AND GROUNDWATER The United States Department of Agriculture (USDA), National Resource Conservation Service (NRCS) has not mapped soils within the project vicinity. At the time of this 90% design TIR, a draft geotechnical engineering report has been prepared by Clarity Engineering, LLC (Appendix D — Other Reports and Studies). Clarity Engineering notes that the property used to be part of the Riverton Quarry, and has been subject to backfill following the quarry's closure. The content of the backfill is largely unknown, save for areas tested by other geotechnical investigations. Clarity engineering found silty sands and gravels below the backfill. An infiltration rate of 0.5-2.0 inches per hour is recommended for stormwater design, however Clarity Engineering noted the presence of high groundwater tables (within four feet of the surface) when they performed a summer inspection. Further investigation is set to be performed in November 2018 to better characterize the seasonally high groundwater table. For the time being, this TIR assumes infiltration to be infeasible to remain conservative in our design. Technical Information Report South Interim Base October 2018 7 Figure 1: Technical Information Report (TIR) Worksheet Technical Information Report South Interim Base October 20I8 8 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Project Owner Phone Address J e %iu;d' Ley kL pfe ko frw+S rf Project Engineer aux& cu.r► e,11 PE Company Te.k..TeaI Phone (ZoC $$3 - 13L1- Part 3 TYPE OF PERMIT APPLICATION r�Landuse (e.g.,Subdivision / Short Subd. / UPD) u Building (e.g.,M/F / Commercial / SFR) ❑Clearing and Grading o, Right -of -Way Use ❑ Other Part 2 PROJECT LOCATION AND DESCRIPTION Project Name DPER Permit # Location Township 23 N Range 'F C Section /0 Site Address [Zlfoo EMeyy7.,,J cJa(1,.S -r kw71.1 L#( lsipg Part 4 OTHER REVIEWS AND PERMITS ❑ DFW HPA ❑ COE 404 ❑ DOE Dam Safety ❑ FEMA Floodplain ❑ COE Wetlands ❑ Other ❑ Shoreline Management ❑ Structural RockeryNault/ ❑ ESA Section 7 Part 5 PLAN AND REPORT INFORMATION Technical Information Report a Full Site Improvement Plan (Engr. Plans) Type of Drainage Review ❑ Targeted Plan Type (check Er Full (check one): U Simplified one): ❑ Modified ❑ Large Project ❑ Simplified Date (include revision dates): ❑ Directed Date (include revision dates): Date of Final: Date of Final: Part 6 SWDM ADJUSTMENT APPROVALS Type (circle one): Standard / Experimental / Blanket Description: (include conditions in TIR Section 2) Approved Adjustment No. Date of Approval: 2016 Surface Water Design Manual 1 4/24/2016 KING COUNTY; WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 7 MONITORING REQUIREMENTS Monitoring Required: Start Date: Yes / No Describe: Completion Date: Re: KCSWDM Adjustment No. Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan : Special District Overlays: Drainage Basin: ilu.i„Jants� ZtVd Stormwater Requirements: See. SLAM T.Z R- Part 9 ONSITE AND ADJACENT SENSITIVE AREAS ❑ River/Stream ❑ Lake ❑ Erosion Hazard ❑ Wetlands ErLandslide Hazard ❑ Closed Depression ❑ Coal Mine Hazard ❑ Floodplain ❑ Seismic Hazard ❑ Other ❑ Habitat Protection Steep Slope Part 10 SOILS Soil Type Slopes Erosion Potential ❑ High Groundwater Table. (within 5 feet) ❑ Sole Source Aquifer ❑ Other ❑ Seeps/Springs ❑ Additional Sheets Attached 2016 Surface Water Design Manual 2 4/24/2016 KING COuN i Y, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE ❑ Core 2 — Offsite Analysis ❑ Sensitive/Critical Areas ❑ SEPA ❑ LID Infeasibility ❑ Other LIMITATION / SITE CONSTRAINT ❑ Additional Sheets Attached Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Threshold Discharge Area: (name or description) Core Requirements (all 8 apply): Discharge at Natural Location Number of Natural Discharge Locations: 2. Offsite Analysis Level: Q / 2 / 3 dated: Flow Control (include facility Level: 1 /® / 3 or Exemption Number summary sheet) Flow Control BMPs Elae.)cK4-100 Conveyance System Spill containment located at: Erosion and Sediment Control / CSWPP/CESCL/ESC Site Supervisor: 5c�C..5c.. VP Construction Stormwater Contact Phone: Pollution Prevention After Hours Phone: Maintenance and Operation Responsibility (circle one): Private / ublic If Private, Maintenance Log Required: Yes / No Financial Guarantees and Provided: Yes / No Liability Water Quality (include facility Type (circle one): Basic / Sens. Lake nhanced B--- / Bog summary sheet) or Exemption No. Landscape Management Plan: Yes / No Special Requirements (as applicable): Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None Requirements Name: Tu.f,.,,a1%..... 5t Co•-ij' 7/art Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / lone 100-year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: /3/4 2016 Surface Water Design Manual 3 4/24/2016 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Source Control ommercia• "industriland use) Describe land use:'—auks/4- Cevt-kr Describe any structural controls: Oil Control High -use Site: Ye / No Treatment BMP: (PS/17Co 7€ke -o .u/r e s Maintenance Agreement: Yes / ®o with whom? Other Drainage Structures Describe: Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION Clearing Limits Stabilize exposed surfaces a Cover Measures and restore Temporary ESC Facilities Perimeter Protection r—Remove u Clean and remove all silt and debris, ensure a Traffic Area Stabilization operation of Permanent Facilities, restore operation of Flow Control BMP Facilities as Sediment Retention necessary Surface Water Collection ❑ Flag limits of SAO and open space preservation Dewatering Control — 4 , e4ec areas r�:I �:1 Dust Control ❑ Other ❑ Flow Control i 0 Protection of Flow Control BMP Facilities (existing and proposed) Maintain BMPs / Manage Project Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch) Flow Control Type/Description Water Quality Type/Description Er CJ Detention ❑ Infiltration ❑ Regional Facility 0 Shared Facility E Flow Control BMPs ❑ Other (qua- 06 ❑ Vegetated Flowpath ❑ Wetpool Filtration a -Oil Control ❑ Spill Control Flow Control BMPs a Other 5,06 Ft tie(' 6N/Poate,44,('8. 370 Ce i'Zon S �0.1�Er r{��q �}. 5L,.1.1 LJl o\c.> +2OVI Rogi c'r-65►.krnend Z1? 2016 Surface Water Design Manual 4 4/24/2016 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS ❑ Drainage Easement ❑ Covenant ❑ Native Growth Protection Covenant ❑ Tract ❑ Other ❑ Cast in Place Vault ❑ Retaining Wall ❑ Rockery > 4' High ❑ Structural on Steep Slope ❑ Other Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. Signed/Date 2016 Surface Water Design Manual 4/24/2016 5 Figure 2: Project Vicinity Map Technical Information Report South Interim Base October 2018 14 4VO11OMSH CO. KENiV1ORE BOTHE KIN CO- . VASHON GLAND TA MA • Technical Information Report South Interim Base to REDMOND • DUVAL L • MAPLE VALLEY BLACK DIA o • CARNATIOI Q FALL cn-Y PR> STON • SNOQU4L1 0 October 2018 15 Figure 3: Study Area and Sub -Basin Locations Technical Information Report South Interim Base October 2018 16 • • • • TDA2 o-N 4...._ NORTH; ,,,,,,•,•,..mu - 'b,..,...,,,,.it 7� / - .� p i i i i 1 1 i W 11 � Or ,^ WQ FACILITY tru LJ TDA 2 DISCHARGE LOCATION TDA 2 SOUTH WQ FACILITY TDA 1 NORTH WQ FACILITY TDA BOUNDARY (TYP) TDA 1 DISCHARGE LOCATION TDA 1 - TARGET SURFACES LAWN - 2,726 SF - 0.0626 AC INCLUDES ALL ONSITE PGPS/NPGPS NATIVE - 1,339 SF - 0.0307 AC INCLUDES ALL PGIS ROAD - 231,752 SF - 5.3203 AC INCLUDES ALL PGIS ROOF - 29,131 SF - 0.6687 AC NPGIS WALK - 4,323 SF - 0.0992 AC INCLUDES ALL OTHER NPGIS TDA 2 - TARGET SURFACES LAWN - 15,844 SF - 0.3637 AC INCLUDES ALL ONSITE PGPS/NPGPS ROAD - 65,580 SF - 1.5055 AC INCLUDES ALL PGIS ROOF - 5,285 SF - 0.1213 AC NPGIS WALK - 217 SF - 0.0050 AC INCLUDES ALL OTHER NPGIS • • • • TDA 1 DISCHARGE LOCATION TDA BOUNDARY (TYP) FP fTh 1 i 1 1 1 1 -1 1 1 1 1 1 1 1 TDA 1 - TARGET SURFACES LAWN - 26,594 SF - 0.6105 AC INCLUDES ALL ONSITE PGPS/NPGPS POND - 15,136 SF - 0.3475 AC NPGIS ROAD - 87,827 SF - 2.0162 AC INCLUDES ALL PGIS ROOF - 132,632 SF - 3.0448 AC NPGIS WALK - 14,037 SF - 0.3222 AC INCLUDES ALL OTHER NPGIS TDA 2 - TARGET SURFACES LAWN - 23,595 SF - 0.5417 AC INCLUDES ALL ONSITE PGPS/NPGPS ROAD - 28,548 SF - 0.6554 AC INCLUDES ALL PGIS ROOF - 35,473 SF - 0.8144 AC NPGIS WALK - 4,478 SF - 0.1028 AC INCLUDES ALL OTHER NPGIS 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 2.1 KING COUNTY 2016 SURFACE WATER DESIGN MANUAL This project is subjected to a Full Drainage Review, per Figure 1.1.2.A of the KCSWDM (Appendix A — Flowcharts), therefore all nine (9) Core Requirements and all five (5) Special Requirements Apply. 2.1.1 Core Requirements 2.1.1.1 Core Requirement #1: Discharge at the Natural Location The existing discharge locations will be maintained to the greatest extent practicable. While the on -site grading and drainage patterns will change with this development, stormwater management and runoff detention will be provided in such a way that the runoff flowrate durations exiting the site boundaries match those of the existing condition as specified in the KCSWDM and the Tukwila IDCS. Runoff generated by the proposed development is not expected to create significant adverse impacts to downhill properties or downstream drainage facilities. 2.1.1.2 Core Requirement #2: Offsite Analysis A qualitative, Level 1 Offsite Analysis has been performed for this project at the time of this submittal. A more in-depth, quantitative analysis may be required by Tukwila on a future submittal. Please refer to Section 3.0 for the full analysis. 2.1.1.3 Core Requirement #3: Flow Control This project is divided into two distinct Threshold Discharge Areas (TDAs; see Section 3.0 for TDA delineation and justification), with TDA 1 draining to the east and TDA 2 draining to the West. TDA 2 is exempt from the Flow Control requirement (see Section 4.4 for justification), while TDA 1 will provide subgrade detention to match the Level 2 — Conservation to Existing duration requirement, as specified in the Tukwila IDCS. Specifications of the Flow Control design can be found in Section 4.4 of this report. 2.1.1.4 Core Requirement #4: Conveyance System Two distinct conveyance systems have been designed for this project; one for each TDA. Both a Uniform Flow Analysis and a Backwater Analysis were performed for each TDA to verify pipeful velocities and ponding depth due to downstream tailwater constraints. The full analysis can be found in Section 4.5.1 of this report. 2.1.1.5 Core Requirement #5: Erosion and Sediment Control A full Construction Stormwater Pollution Prevention Plan (CSWPPP) is provided as a separate attachment, along with Temporary Erosion and Sediment Control (TESC) Plans. The CSWPP recommends Best Management Practices for managing stormwater runoff during construction only. Post -construction pollutant management is specified in the Operations and Maintenance Manual. Technical Information Report South Interim Base October 2018 19 2.1.1.6 Core Requirement #6: Maintenance and Operations A full Operations and Maintenance (O&M) Manual is included as a separate attachment. The O&M manual addresses operating and maintaining onsite stormwater infrastructure and facilities. The O&M manual also includes pollutant source control management for the post -construction site. For pollutant management BMPs that should be used during construction, refer to the CSWPPP. 2.1.1.7 Core Requirement #7: Financial Guarantees and Liability Any required financial liability documents will be prepared for the project during the final engineering permitting process with the City of Tukwila. 2.1.1.8 Core Requirement #8: Water Quality This project is required to meet Enhanced Basic stormwater quality treatment standards. Enhanced Basic Treatment is intended to remove dissolved metals in addition to the removal of total suspended solids that Basic treatment provided. The full design of the water quality system can be found in Section 4.5 of this report, however a summary is provided below: Treatment for both threshold discharge areas will be provided via four (4) Contech Filterra facilities. See Section 4.5 of this report for further information. 2.1.1.9 Core Requirement #9: Flow Control BMPs The property encompasses more than 22,000 square feet and is located inside the Urban Growth Area, and it is not feasible for this project to comply with the LID Performance Standard. Therefore, the project must comply with the Large Lot BMP Requirements. The large lot BMPs are specified in an order of preference, so this project will address each requirement in the order it is specified. 1. "The feasibility and applicability of full dispersion...must be evaluated for all target impervious surfaces." INFEASIBLE: It is not possible to provide the requisite vegetated flowpath length. 2. "When full dispersion of target impervious roof areas is not feasible or applicable...the feasibility and applicability of full infiltration of roof runoff must be evaluated..." INFEASIBLE: Seasonally high groundwater tables are estimated to occur as high as one foot below the ground surface. It will not be possible to maintain a three-foot separation between the bottom of an infiltration facility and the seasonally high groundwater table. 3. "All target surfaces not mitigated by Requirements 1 and 2 above, must be mitigated to the maximum extent feasible using one or more BMPs from the following list." a. Full Infiltration INFEASIBLE: Seasonally high groundwater tables are estimated to occur between one and five feet below the ground surface. It will not be possible to maintain a three-foot separation between the bottom of an infiltration facility and the seasonally high groundwater table. b. Limited Infiltration Technical Information Report South Interim Base October 2018 20 c. INFEASIBLE: Seasonally high groundwater tables are estimated to occur as high as one foot below the ground surface. It will not be possible to maintain a three-foot separation between the bottom of an infiltration facility and the seasonally high groundwater table. Bioretention FEASIBLE: Preliminary geotechnical studies show that it may be possible to provide one -foot of vertical separation between the seasonally high groundwater and the bottom of a shallow, open -to -air facility. A preliminary design infiltration of 0.5-2 inches per hour was calculated. However, the project geotechnical engineer will make a future site investigation in late 2018 or early 2019 to improve their estimation of the seasonally high groundwater table. The only target surface for Core Requirement #9 is new impervious surfaces (i.e. impervious surfaces that replace pervious surfaces), however we will apply the bio- retention BMP to a majority replaced impervious surface since the site is already approximately 86% impervious. The site is within the Urban Growth Area, so assuming till soils onsite the equivalent storage depth for impervious surfaces is 0.6 inches. Approximately 40,000 ft2 of impervious surfaces will drain directly to the bioretention swale: V = (Tributary Area) (Equivalent Storage Depth) V = (40,000 ft2)(0.6 in) (1 ft) = 2,000 ft3 12 in The minimum required storage volume is 2,000 cubic feet. However, the swale volume provided is approximately 3,180 cubic feet, thus providing additional potential for infiltration. The design ponding depth is six (6) inches, with an additional six (6) inches of depth for freeboard. Assuming the lowest preliminary design infiltration rate, 0.5 inches per hour, the design drawdown time is 12 hours and the swale-full drawdown time is 24 hours (see the equation below); both drawdown times are 24 hours or less. Ponding Depth tdrawdown, design depth = Infiltration Rate Total Depth _ tdrawdown, total depth = Infiltration Rate d. Permeable Pavement (0.5 ft 0.6(1 ft2 'n) = 12 hr in/hr) (o.5 in/hr) (1 ft n) = 24 hr INFEASIBILE: The site use under the developed condition is a transit base and is classified as "high use." Per infeasibility criteria #27 (Appendix C, Section C.2.1.7), permeable pavement may not be used at sites defined as "high use." 4. "All target surfaces not mitigated by Requirements 1, 2, and 3 above must be mitigated to the maximum extent feasible using the Basic Dispersion BMP..." SATISFIED: All target surfaces mitigated via bioretention. Technical Information Report South Interim Base October 2018 21 5. "BMPs must be implemented, at minimum... to an impervious area equal to at least 10% of the site/lot..." SATISFIED: More than 10% of the total site area is mitigated via bioretention. 6. "The soil moisture holding capacity of new pervious surfaces must be protected in accordance with KCC 16.82.100 (F) and (G). KCC 16.82.100 (F) requires that the duff layer or native topsoil be retained to the maximum extent practicable. KCC 16.82.100 (G) requires soil amendment to mitigate for lost moisture holding capacity where compaction or removal of some or all of the duff layer or underlying topsoil has occurred...The specifications for compost amendment can be found in Reference 11-C." SATISFIED: All new pervious surfaces will be protected, and compost amended per the specifications located in Reference 11-C of the 2016 KCSWDM. 7. "Any proposed connection of the roof downspouts to the drainage system must be via a perforated pipe connection as detailed in Appendix C, section C.2.11." SATISFIED: All roof downspouts will be connected to the drainage system via perforated pipe connections, as specified in Appendix C, Section C.2.11. Technical Information Report South Interim Base October 2018 22 2.1.2 Special Requirements 2.1.2.1 Special Requirement #1: Other Adopted Area -Specific Requirements Table 1: Other Adopted Area -Specific Requirements Resource Response Critical Drainage Areas (CDAs) Master Drainage Plans (MDPs) This project ultimately drains to Riverton creek and the Duwamish River. Per the Washington State Department of Ecology's Impaired Waterbody List 303(d)/303(b) and the City of Tukwila's 2013 Surface Water Comprehensive Plan, the ,Duwamish River is impaired for Fecal Coliform, Dissolved Oxygen, Temperature, and High pH. These problems and the mitigation thereof are described in Section 3.2.4.4 of this TIR. ;This project is not subject to a Large Project Drainage Review, therefor it does not need to prepare a Master Drainage Plan. :To the best of our knowledge, this project site is not any City - or County -adopted Master Drainage Plan. Basin Plans (BPs) To the best of our knowledge, this project site is not subject to a City- or County -adopted basin plan. Salmon Conservation Plans (SCPs) This project drains to the Duwamish River, a Salmonid bearing water body. A WRIA Salmon Habitat Plan was ratified by the City of Tukwila in 2005, however to our knowledge this plan does not contain any stormwater management requirements. Stormwater Compliance Plans (SWCPs) To the best of our knowledge, the project site is not subject to any Stormwater Compliance Plans. Lake Management Plans (LMPs) This project does not drain to a lake, nor is it near or adjacent to a lake. Therefore, it is not subject to any Lake Management Plans. Flood Hazard Management Plans (FHMPs) This project does not rely on, nor does it propose, any facilities, maintenance practices, or programs covered in the King County Flood Hazard Management Program. Due to the stabilized state of the Duwamish River near the project site, the site lies outside of the 100-year floodplain. Flooding is not 'expected except in the case of catastrophic infrastructure t failures. Shared Facility Drainage Plans (SFDPs) . This project does not drain to any shared facilities, nor does it ipropose any shared facilities. 2.1.2.2 Special Requirement #2: Flood Hazard Delineation This project is located outside of 100-year floodplain (King County iMap) and is located in FEMA Flood Zone X (unshaded) — which corresponds to areas outside of both the 100- and 500-year floodplains. Technical Information Report South Interim Base October 2018 23 2.1.2.3 Special Requirement #3: Flood Protection Facilities This project does not rely on any flood protection facilities located near or directly adjacent to the property. There are currently no flood protection facilities on the property, and no flood protection facilities are proposed for this project. 2.1.2.4 Special Requirement #4: Source Control This project is a commercial development and will incorporate the appropriate pollutant source control BMPs from the King County Stormwater Pollution Prevention Manual. The Source Control Plan can be found in the Operations and Maintenance Manual, which is included as a separate attachment. 2.1.2.5 Special Requirement #5: Oil Control This project is classified as "high use," and will provide oil control per the High -Use Menu in Chapter 6 of the KCSWDM. Oil Control will be managed by a Coalescing Plate Separator in both threshold discharge areas. Please see Section 4.5 of this report for the Oil Control design and specifications. 2.2 CITY OF TUKWILA 2010 INFRASTRUCTURE DESIGN AND CONSTRUCTION STANDARDS The City of Tukwila modifies the 2009 King County Surface Water Design Manual (KCSWDM) in the 2010 Infrastructure Design and Construction Standards (IDCS). King County updated the KCSWDM in 2016, however and update to the IDCS is still in progress. For the purposes of this TIR, the specifications in the 2010 IDCS are assumed to apply to the 2016 KCSWDM and shall supersede the KCSWDM where applicable. Technical Information Report South Interim Base October 20I8 24 3.0 OFFSITE ANALYSIS 3.1 LEVEL OF ANALYSIS This project proposes to closely match the developed outflows to existing flow durations. As such, a Level 1 Offsite Analysis has been completed. If the City deems that a more quantitative analysis is necessary to accurately describe the downstream characteristics of this project, a higher -level analysis (as described in the KCSWDM) will be provided in a future submittal. 3.2 OFFSITE ANALYSIS 3.2.1 Task 1 — Define the Study Area The study area is the immediate, existing, manmade, downstream conveyance network (including pipes, ditches, culverts, etc.) that a) either define or are defined by the downstream flow path, and b) are within '/< mile (1,320 feet) of the project site. The study area also includes those areas upstream of the site that discharge directly onto the project property. For this project, such upstream areas are limited to a large hill located along the southern property line. 3.2.1.1 Define the Threshold Discharge Areas This site contains two separate Threshold Discharge Areas (TDAs). TDA 1 consists of the northeasterly portion of the site that drains into the existing combined treatment/detention pond before discharging from the site. This TDA ultimately discharges to Riverton Creek, then to the Duwamish River, but does not do so within 'A mile of the site. TDA 2 consists of the portion of the site that drains westerly towards the Marginal Way Right -of - Way. Stormwater is either captured onsite and conveyed to the storm network in Marginal Way, or sheet flows into the Right -of -Way, where it is captured by the city -maintained storm system. This runoff is then conveyed to Riverton Creek. Riverton Creek is a tributary to the Duwamish River, but it does not discharge to the larger waterbody within % mile of the project site. While the two TDA flowpaths do eventually converge in Riverton Creek, they do not converge within '/< mile of the project site. Therefore, each TDA is considered distinct by the definition specified in Chapter 1 of the KCSWDM (pg. 1-10). Technical Information Report South Interim Base October 2018 25 3.2.2 Task 2 — Review All Available Information for the Study Area The available information has been reviewed and is summarized in the table below: Table 2: Offsite Analysis Resource Review Resource Res•onse Adopted Basin Plans To our knowledge, there are no adopted basin plans for stormwater management for the Duwamish Estuary sub - watershed of the Duwamish-Green Watershed. Floodplain/Floodway (FEMA) Maps Other Offsite Analysis Reports This project is mapped as FEMA Flood Zone X (unshaded), which corresponds to areas located outside the 500-year floodplain. To our knowledge, there are no other, publicly available offsite analysis reports. Per King County iMap: • Per the 2005 CAO, the site is located in a lower tributary area. Sensitive Areas Folio • Per the 2005 CAO, the site has a "low" basin condition. • Per the 1990 SAO, the Duwamish River is classified as a Class 1 Stream and contains Chinook Salmon. Per Tukwila iMap: • Riverton Creek is classified as a Type 2 Stream (in Pipe) • The project site is directly adjacent to the Highway 599 Right -of -Way, which is subject to Shoreline Jurisdiction — Shoreline Residential/Shoreline Residential Outside Buffer. • The hill adjacent to the south property line is classified as a Class 3 (moderate) Landslide Hazard. DNRP Drainage Complaints and Studies To our knowledge, there have been no drainage complaints made or studies conducted on or adjacent to the project site. Road Drainage Problems To our knowledge, there are no road drainage problems on or adjacent to the eject site. King County Soils Survey No USDA data is available at the property location. Wetlands Inventory Maps There are no wetlands on or adjacent to the project site. Migrating River Studies Per both King County and Tukwila iMaps, the project site is not within a channel migration hazard area. Washington State Department of Ecology's latest published Clean Water Act Section 303(d) List of Polluted Waters Bacteria Problem (Type 1) No (see next resource) Dissolved Oxygen Problem Yes — The section of the Duwamish River directly adjacent to (Type 2)._ _ _ _ the project site is currently classified as Category 2. _ _ Temperature Problem (Type 3) Yes — The section of the Duwamish River directly adjacent to t he project site is currently classified as Category 5. r Metals Problem I No (Type 4) 1 Technical Information Report South Interim Base October 2018 26 Resource Response Phosphorous Problem Washington State Department Ir(Type 5) of Ecology's latest published I Turbidity Problem No 303(d) List of Polluted Waters !High pH Problem (Type 7) Yes — The section of the Duwamish River directly adjacent to the project site is currently classified as Category 5. Tukwila 2013 Surface Water Comprehensive Plan Table B-2: Fecal Coliform contamination is listed as Category 5 (Table B- 2). Fecal Coliform qualifies as a Bacteria (Type 1) problem in the KCSWDM. Appendix D: "Water quality in Riverton Creek is thought to be consistent with other urbanized creeks in the Puget Sound Area showing elevated levels of fecal coliform, elevated temperatures, and low dissolved oxygen levels. Temperature, dissolved oxygen, pH, and fecal coliform are the constituents of concern in Riverton Creek based on the Category 5 (impaired) listings of the Duwamish River and the Green River. In addition to these parameters, total suspended solids and turbidity are also of concern." King County Surface Water Design Manual — Reference 11-C No water quality problems identified at this time King County Designated Water Quality Problems (Surface Water Design Manual — Reference 10, iMap) No water quality problems identified at this time. Adopted Stormwater Compliance Plans To the best of our knowledge, this project site is not subject to any adopted stormwater compliance plans. 3.2.3 Task 3 — Field Inspect the study Area A field inspection was performed on August 13th, 2018. 3.2.4 Task 4 — Describe the Drainage System, and Its Existing and Predicted Drainage and Water Quality Problems 3.2.4.1 Upstream Drainage System Analysis The property slopes generally from south to north. Due to the presence of an existing hill on the southern property boundary, very little run-on enters the site. The property line does not coincide exactly with the crest of the hill; however, the hill is heavily vegetated, stabilized, and considered to be well -drained. Although the USDA has not performed a soils survey in the vicinity of the project site (soils are assumed to be hydrologic group C), run-on is expected to be negligible. 3.2.4.2 Downstream Drainage System Analysis The two separate threshold discharge areas are discussed below: Technical Information Report South Interim Base October 2018 27 TDA 1 Runoff discharges from the site as either sheet flow or in -pipe flow and is conveyed directly into an existing ditch that extends the length of the eastern property line. Runoff then flows north in the ditch to the % mile mark. Beyond the % mile mark, the runoff will flow through a series of ditches, culverts, and minor conveyance systems until it discharges into Riverton Creek, just upstream of the confluence between Riverton Creek and the Duwamish River. TDA 2 Stormwater runoff is captured and detained on site. Detained runoff is released at controlled rates into the existing storm network in the Marginal Way Right -of -Way. Stormwater that is uncapturable sheet flows into the Marginal Way Right -of -Way, where it enters the existing storm network through catchbasin inlets. Once the runoff enters the existing storm network, it is conveyed to the west side of Marginal Way and discharges into Riverton Creek, which is conveyed under Marginal Way in a 48-inch diameter pipe. Runoff flows north in Riverton Creek to the'/< mile mark. Beyond the % mile mark, Riverton Creek discharges directly to the Duwamish River. Technical Information Report South Interim Base October 2018 28 • • •. . , • • • Figure 4: Downstream Analysis 0' — 1,320' ---►TDA 1 - TDA 2 Figure 5: Downstream Analysis 1,320'+ T—� TDA 1 Technical Information Report South Interim Base TDA 2 L -5 October 2018 29 3.2.4.3 Existing Drainage and Water Quality Problems As discussed in Section 3.2.2, there are no known downstream drainage problems. However, the project does drain to the Duwamish River, which, at least for the river reach to which the project drains, is listed on the Washington State Department of Ecology's Polluted Waterbodies 303(d)/303(b) List for dissolved oxygen (DO), temperature, and high pH Problems. The dissolved oxygen problem is listed as Category 2: Waters of concern. Category 2 problems have some evidence of a water quality problem, but not enough evidence to show consistent impairment. The bacteria, temperature, and high pH problems are listed as Category 5: Polluted waters that require a water improvement project. Category 5 problems have data showing violations of water quality standards, yet no pollution control program is in place. 3.2.4.4 Predicted Drainage and Water Quality Impacts The proposed developments are not anticipated to create new drainage problems, nor are the developments anticipated to exacerbate any existing drainage problems. Per Section 5.6.4.b of the IDCS: Currently, the City is not requiring mitigation target to address a specific downstream water quality problem (i.e., listing as a 303d water quality problem), but mitigation requirements may be added in future modifications to these standards. The 2010 IDCS and the 2016 KCSWDM are the most recent stormwater management standards applicable to this project, therefore this project will not provide additional water quality treatment to mitigate for downstream impaired water bodies. Technical Information Report South Interim Base October 2018 30 4.0 FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID), AND WATER QUALITY ANALYSIS AND DESIGN 4.1 PREDEVELOPED SITE HYDROLOGY (PART A) As discussed in Section 1.1 of this report, the'predeveloped conditions for this project correspond to the existing site conditions prior to any demolition activity. Under the existing conditions, the project site impervious surface coverage is approximately 86%. The existing commercial office building contributes the majority of this area, with parking and associated drive aisles, sidewalks, and an existing combined treatment/detention pond accounting for the rest of the impervious area. The site is broken down by surface type in the table below: Table 3: Pre -Developed Site Breakdown by Threshold Discharge Area Type TDA 1 TDA 2 Total Area Drains to Existin • Ditch Drains to Right -of -Way Lawn and Landscaped Areas Includes all pervious surfaces except forested areas 26,594 23,595 50,189 Road Includes all pollution -generating, impervious surfaces (i.e. roads, parking stalls, gravel driveways, etc.) Roof Includes only non -pollution generating roof space. Pollution -generating roof space is considered "road". 87,827 132,632 28,548 35,473 116,375 168,105 Sidewalk Includes all non -drivable, non -roof, impervious surfaces (i.e. pedestrian access, sidewalks, hiking trails, etc.) Pond Open -to -air water surfaces are considered "impervious" under standard runoff calculation methods. 14,037 4,478 15,136 1 0 18,515 15,136 Project Totals 276,226 92,095 368,321 Note: All areas have units of square feet; all areas are considered to be "flat" unless otherwise noted. With the exception of a steep slope area (a large hill) to the south, the project site is very flat, exhibiting a total vertical relief of approximately nine (9) feet over a length of about 950 feet. The hill, spanning the length of the south property line, was neglected from hydrologic and hydraulic analysis as the hill is heavily vegetated and stabilized and no land disturbing activity is proposed in that area. Similarly, the existing parking garage is also excluded from analysis as the parking garage will be retained into the developed condition. Technical Information Report South Interim Base October 20I8 3I An existing, combined treatment/detention pond controls the outflow characteristics of TDA 1. While as - built documents have not been located for review, the civil engineering construction plans (prepared by Barghausen Consulting Engineers, Inc.) indicate that the pond is approximately 10 feet deep and provides 44,000 ft3 of dead storage (for water quality treatment) and 25,533 ft3 of live storage (for detention and release rate control). The pond riser uses a single orifice and notch weir design. The weir is six inches wide, nine inches tall, and the bottom of the notch is set to be 1.75 feet above the outletting pipe invert. The riser itself extends 2.5 feet above the outletting pipe invert and has a diameter of 12 inches. The bottom orifice is located on the bottom of the riser structure and has a diameter of 5 1/4 inches. These characteristics combined yield the following hydrologic characteristics for the predeveloped condition (as modeled by WWHM). Table 4: Pre -Developed Site Hydrology Return Period TDA 1 TDA 2 Drains to Existin • Ditch Drains to Ri • ht-of-Wa 5 Year 1.4981 0.8138 10 Year 1.8248 0.9373 25 Year 2.2971 1.0990 50 Year 2.6954. 1.2238 100 Year 3.1362: 1.3525 Note: All flows have units of cubic feet per second (cfs) Both a basin exhibit for all predeveloped TDAs and the flow frequency modeling analysis are available in Appendix B — Western Washington Hydrology Model. 4.2 DEVELOPED SITE HYDROLOGY (PART B) In the developed condition, the project site impervious surface coverage is approximately 95%. The majority of the site will be paved to allow for bus coach circulation and storage. Two new buildings will be constructed to facilitate operations management and vehicle maintenance. All stormwater infrastructure will be subsurface to better facilitate the intended site use. Due to vertical constraints, it was not possible to provide the required treatment train and detention facility in TDA 1 while maintaining the predeveloped condition TDA boundaries. The proposed site will be graded such that the 100-year peak flow generated by TDA 2 will not increase by more than 0.10 cfs when compared to the predeveloped 100-year peak flow; therefore TDA 2 is exempt from the flow control requirement (per Section 5.6.A.3.a of the IDCS). The detention requirement remains entirely within TDA 1, as is consistent with the existing condition. The site is broken down by surface type in the table below. Note that while the individual TDA values have changed, the total site area remains consistent with that of the predeveloped condition. Technical Information Report South Interim Base October 2018 32 Table 5: Developed Site Breakdown by Threshold Discharge Area Type TDA 1 TDA 2 Total Area Drains to Existing Ditch Drains to Right -of -Way Lawn and Landscaped Areas Includes all pervious surfaces except forested areas 2,731 15,844 18,575 Forested Areas Includes all areas of native vegetation. This area is "steep." Road Includes all pollution -generating, impervious surfaces (i.e. roads, parking stalls, gravel driveways, etc.) Roof Includes only non -pollution generating roof space. Pollution -generating roof space is considered "road". 1,339 235,186 31,078 65,580 5,285 1,339 300,766 36,363 Sidewalk Includes all non -drivable, non -roof, impervious surfaces (i.e. pedestrian access, sidewalks, hiking trails, etc.) Project Totals 11,061 281,395 217 86,926 11,278 368,321 Note: All areas have units of square feet all areas are considered to be "flat" unless otherwise noted. The developed site characteristics yield the following hydrologic flow frequency values (as modeled by VWVHM). Table 6: Developed, Unmitigated Site Hydrology Return Period TDA 1 TDA 2 TDA 1 Change from Drains to Existing Ditch Drains Pre-Develo • ed TDA 2 to Right -of -Way Change from Pre-Develo • ed 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 2.4320 3.0732 3.5090 4.0745 4.5073 4.95081 +1.35401 +1.5751! +1.68421 +1.7774 +1.8119 +1.8146 0.6558 0.8358 0.9590 1.1196 1.5431 1.3701 0.0216 0.0220 0.0217 0.0206 0.0193 0.0176 Note: All flows have units of cubic feet per second (cfs) Both a basin exhibit for all developed TDAs and the flow frequency modeling analysis are available in Appendix B — Western Washington Hydrology Model. Technical Information Report South Interim Base October 2018 33 4.3 PERFORMANCE STANDARDS (PART C) 4.3.1 Flow Control The IDCS manual significantly modifies Core Requirement #3: Flow Control. Much of the City of Tukwila have been developed for several decades and their receiving waterbodies have stabilized to the new hydrologic regime. The City applies the 40/20 criterion (as specified in the Stormwater Management Manual for Western Washington, Washington State Department of Ecology) to areas that have had at least 40% total impervious surface area for more than 20 years. The subject property for this project falls under this category, however special considerations must be given to each threshold discharge area. 4.3.1.1 Application of Flow Control Standards Per Figure 5.9.1 of the IDCS, the project site is subject to Level 2 — Conservation to Existing flow control. 4.3.1.2 Flow Control Standard Requirements Level 2 Conservation to Existing flow control is analogous to Conservation Flow Control as specified in the KCSWDM, which requires that flow durations in the developed condition be match to the pre - developed condition from one half of the two-year flow to the 50-year flow and that the two- and 10-year developed peak flows not exceed their corresponding pre -developed values. The key difference between the two flow control standards is that Conservation Flow Control requires the pre -developed condition to be as historic (or forested) conditions, while Level 2 Conservation to Existing requires the pre -developed condition to be modeled as existing conditions. 4.3.2 Water Quality The IDCS notes that the water quality treatment requirement is based on land use. Given the intended use for the developed site, this project is required to provide Enhanced Basic treatment. Each TDA will select a treatment option from the Enhanced Basic Menu in Chapter 6, Section 6.1.2 of the KCSWDM. This site is also classified as "high use," so each TDA will select oil control options from the High -Use Menu located in Chapter 6, Section 6.1.5 of the KCSWDM. 4.3.3 Target Surfaces Per Core Requirements 3, 8, and 9 of the KCSWDM, the target surfaces for this project are: • New impervious surfaces that are not fully dispersed • New pervious surfaces that are not fully dispersed • Replaced impervious surfaces. Note that these target surfaces do not include any existing impervious surfaces. All existing impervious surfaces are exempt per Section 5.6.A.1 of the IDCS. Technical Information Report South Interim Base October 2018 34 4.4 FLOW CONTROL SYSTEM (PART D) Flow control has been designed for each TDA and complies with the standards set forth in Section 4.3 of this report. However, in TDA 2 the increase the 100-year peak flow (predeveloped to developed) is 0.0176 cfs, as modeled by WWHM. According to Section 5.6.A.3.a: The exception to requiring flow control in this area shall be as follows: The facility requirement in the Level 2 Conservation to Existing Conditions is waived for any threshold discharge area in which there is no more than a 0.1-cfs difference in the sum of developed 100-year peak flows for those target surfaces subject to this requirement and the sum of existing site conditions 100- year peak flows for the same surfaces. TDA 2 will increase the 100-year peak flow rate by less than 0.1 cfs, therefore it is exempt from the flow control requirement. 4.4.1 Flow Control Methodology and Computer Modeling Flow control design was performed in accordance with the KCSWDM. Continuous hydrologic modeling was performed using the Western Washington Hydrology Model (v.4.2.15, also known as WWHM2012 with the July 2018 update), which is developed by the state Department of Ecology and is listed as an approved model in the KCSWDM. The duration criteria located in the options menu of the model were modified to allow a pass/fail threshold of 100% instead of the default 110%. Under default settings, the occurrence frequency of runoff flows exceeding the 2-year discharge rate may exceed the corresponding predeveloped flow frequencies by up to 10%. This design standard is insufficient to meet Level 2 flow control as the 2- and 10-year peak flows are required to match, not exceed, predeveloped conditions. By adjusting the duration criteria settings, we ensure that any automatic detention sizing will always meet Level 2 flow control requirements. WWHM groundwater modeling functionality is limited and is generally not performed within the program unless wetlands mitigation and recharge analysis is required. There are no wetlands on, downstream from, or adjacent to the project site, so groundwater is not modeled for this project. 4.4.2 Size and location of Proposed Flow Control Facilities The proposed, subsurface detention facility for TDA 1 will be located near the eastern property line. Due to the large footprint required for detention, a standard detention vault would conflict with multiple utilities. As such, modular chamber detention technologies will be used, as they allow for utility conflicts to be easily resolved by connecting smaller detention sub -facilities with small pipes that can facilitate utility crossings. This design requires a facility with a foot print of 5,625 ft2 and a depth of 3.67 feet. Excluding freeboard, the active storage provided is 14,898 ft3 (0.342 ac-ft), and a total vault volume of 20,865 ft3 (0.479 ac-ft). The requisite riser structure is a 3-orifice design and is detailed below: Technical Information Report South Interim Base October 2018 35 Table 7: Control Structure Characteristics Feature Value Units Riser Height I 2.5 feet Riser Diameter 18 inches Orifice 1 Height 0.00 feet Orifice 1 Diameter 5 - 3/8 inches Notch Height 1.10 feet Notch Width 0.50 feet Table 8: Developed, Mitigated Site Hydrology Return Period TDA 1 TDA 1 Drains to Change from Ri • ht-of-Wa Pre -Developed 2 Year 0.9434 -0.1346 5 Year 1.2775 -0.2206 10 Year 1.5320 -0.2928 25 Year 1.8940 -0.4031 50 Year 2.1945 -0.5009 100 Year 2.5231 -0.6131 Model outputs detailing the Stream Duration are available in Appendix B - Western Washington Hydrology Model. 4.5 WATER QUALITY SYSTEM (PART E) 4.5.1 Water Quality Treatment TDA 1 TDA 1 is designed to use two Contech Filterra facilities. To meet enhanced basic treatment standards, the Filterra units are sized in WWHM per Ecology's GULD approval to provide 91% filtration. Each unit requires custom manufacturing to accommodate the large inflows generated by the site and horizontal and vertical facility footprint constraints, so functionally equivalent technologies will only be accepted if they are (1) shown to fit into the same or smaller area as the Filterra units and (2) stamped and signed by a Professional Engineer licensed in the State of Washington. TDA 1 is further divided into two sub -basins that will convey through a northern and a southern system before entering the detention facility. The northern system requires a Filterra media bay measuring 25 feet long by 18 feet wide with a total vault depth of 5 feet (rim to outletting invert). This configuration is large and deeper than standard Filterra units; at the time of this report coordination with Contech is underway to accommodate the larger facilities. Technical Information Report South Interim Base October 2018 36 The southern facility is identical to the northern one, excepting that the media bay will be 13 feet wide and 20 feet long, and the depth will also be 5 feet. TDA 2 Similar to TDA 1, TDA 2 is also split into a northern and southern sub -basin. Each drains to a Large Filterra unit located in a landscaping area adjacent to the project frontage. The northern Filterra requires a standard FTPD 0811 facility with a media bay measuring 8 feet by 11 feet. The southern Filterra requires a standard FTPD 0813 facility with a media bay measuring 8 feet by 13 feet. 4.5.2 Oil Control The Contech Filterra is sufficient to provide oil treatment by virtue of providing enhanced treatment. The GULD-approved design filtration rate for enhanced basic treatment is slower than that of the GULD- approved oil treatment filtration rate, so oil -laden inflow will be treated for oil by the same process that provided enhanced basic treatment. Since the facilities will be providing both oil control and enhanced treatment, it is expected that the media will need more frequent maintenance than it otherwise would for a single treatment goal. This increased frequency is specified by Contech and is included in the Operations and Maintenance Manual. Technical Information Report South Interim Base October 2018 37 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN Two distinct conveyance systems have been designed for this project; one for each TDA. Both TDAs are constrained vertically by existing infrastructure, thereby forcing several pipes in the storm network to the 0.2% minimum slope so that the network can meet the existing discharge elevations. Each TDA is described below, and all calculations referenced can be found in Appendix C — Engineering Calculations. TDA 1 Both a Uniform Flow Analysis and Backwater Analysis were performed per Section 4.2.1.2 of the KCSWDM. The Uniform Flow Analysis was performed to ensure compliance with the minimum self-cleaning velocity threshold. Section 4.2.1.1 limits the minimum velocity at full flow to 3.0 feet per second (fps) and the minimum bed slope to 0.20%. Under pipe -full conditions with HDPE pipe, and a slope of 0.20%, a 15-inch pipe is sufficient to convey the 25-year design flow of 4.07 cfs (Qcapacity = 4.17 cfs), and to provide a barrel velocity of 3.0 fps (V15 nch = 3.40 fps). The backwater analysis analyzed the pipe network along the longest trunkline from the discharge location to the upstream -most catchbasin. TDA 1 discharges to an existing ditch where the ordinary high water, 25-, and 100-year water surface elevations are unknown. As such, the tailwater elevation was assumed to be the elevation at 50% of the outletting pipes diameter in the 25-year storm event (TW = IEout + 0.5D), and 90% of the outletting pipe's diameter in the 100-year event (TW = IEout + 0.9D). Per Section 1.2.4.1 of the KCSWDM, overtopping is permitted in new pipe networks for runoff events that exceed the 25-year design capacity as long as the over flow from the 100-year event does not create or aggravate a severe flooding or erosion problem. Since there are no known downstream flooding or erosion problems, we do not anticipate 100-year event overtopping to create or exacerbate such problems. The effects of detention and water quality facilities were neglected for this analysis. Additionally, energy losses due to bends and junctions were neglected and each pipe was sized to carry the full 100-year flow. These effects will be modeled at the time of the 90% submittal. The backwater analysis shows that no overtopping will occur in either the 25- or 100-year events. TDA 2 Similarly, to TDA 1, both a Uniform Flow Analysis and Backwater Analysis were performed per Section 4.2.1.2 of the KCSWDM. The Uniform Flow Analysis was performed to ensure compliance with the minimum self-cleaning velocity threshold. Section 4.2.1.1 limits the minimum velocity at full flow to 3.0 feet per second (fps) and the minimum bed slope to 0.20%. Under pipe -full conditions with HDPE pipe, and a slope of 0.21%, a 12-inch pipe is sufficient to convey the 25-year design flow of 1.12 cfs (Qcapacity = 2.36 cfs), and to provide a barrel velocity of 3.0 fps (V15-inch = 3.00 fps). The backwater analysis analyzed the pipe network along the longest trunkline from the discharge location to the upstream -most catchbasin. TDA 2 discharges to an existing catchbasin. Since the inflow characteristics of to this catch basin are not known, the outletting pipe was assumed to be flowing at a depth of 50% of the outletting pipes diameter in the 25-year storm event (TW = IEout + 0.5D), and 90% of the outletting pipe's diameter in the 100-year event (TW = IEout + 0.9D). Technical Information Report South Interim Base October 2018 38 Per Section 1.2.4.1 of the KCSWDM, overtopping is permitted in new pipe networks for runoff events that exceed the 25-year design capacity as long as the over flow from the 100-year event does not create or aggravate a severe flooding or erosion problem. Since there are no known downstream flooding or erosion problems, we do not anticipate 100-year event overtopping to create or exacerbate such problems. The effects of detention and water quality facilities were neglected for this analysis. Additionally, energy losses due to bends and junctions were neglected and each pipe was sized to carry the full 100-year flow. The backwater analysis shows that no overtopping will occur in either the 25- or 100-year events. Technical Information Report South Interim Base October 2018 39 6.0 SPECIAL REPORTS AND STUDIES A geotechnical engineering report has been prepared for this project by Clarity Engineering, LLC. The report is attached in Appendix D — Other Reports and Studies. Technical Information Report South Interim Base October 2018 40 7.0 OTHER PERMITS Table 9: Permit Matrix — South Interim Base Permit Trigger/Activity Responsible A. enc Timing Conditions/Comments Submittal Requirements Status Interim Base Building Demolition Permits Local Permits and Reviews City of Tukwila Unclassified Use Permit for Land Use Permit includes 90% storm drainage plans. Chapter 18.66TMC Unclassified Use permit for Garage use. Temporary certificate of occupancy for King County use. Garage is grandfathered and will not go to design review. King County In progress Requires City Council Public Hearing (Type 5 permitting decision pursuant to TMC 18.108.050) 'Plan to submit Oct. 15th 1 ihtto://www.tukwilawa.gov/ wp-content/uploads/DCD- Apps-Unclassified-Use- i Permit.pdf LIIKing County updating the response to criteria that :was drafted for the UUP for 'garage and site development emailed earlier 8/15/18. In Progress City of Tukwila Sensitive Areas Review Chapter 18.45 TMC Construction and other activities that cause disturbance within sensitive areas (e.g., areas of potential geologic instability, steep slopes, stream buffer impact) King County Concurrent with other City permits, if needed. 1 ❑ Request for Sensitive ,Areas Review Site ;restoration planting is part lof the demolition permit 'application for the removal of deck on hillside. No proposed disturbance of !steep slopes. ❑ Public Notice 4-41$$ Technical Information Report South Interim Base October 2018 41 Permit City of Tukwila Curb Cut Variance Administrative Decision Chapter 11.04 TMC Trigger/Activity Responsible Agency Activities within City right -of- King County (ways including curb cuts. i ;New curb cut for garage 1 'access. Timing Conditions/Comments Submittal Requirements ❑ Request for Curb Cut Variance Status In progress City of Tukwila Tree Clearing Permit Chapter 18.54 TMC Tree Removal Requires replacement of trees removed as part of development for 4-inch diameter King County Exempt. May require ,concurrence from City. ❑ Exempt 'N/A City of Tukwila ' Removal of any structure in its entirety. Demolition Permit King County In progress In progress will take 6 weeks for ❑ Request for Demolition : review from submittal Permit 'date. Sound Transit Track Access Permit Required for access within Contractor ,10 feet of rail tracks City of Tukwila Commercial underground fuel tank Fire Marshal removal/installation permit Commercial Underground/Ab oveground Fuel Tank Removal/Installs tion Permit International Fire Code 105.7.8 Two weeks prior to need for track access. 1 Gary from King .30 days prior to County and , removal Parametrix will notify Ecology within the 30 day period Contractor will submit two • Notification required 2 ' weeks prior to need for weeks prior to need for track access track access. ❑ Fuel Tank Removal application ($150 per tank) Technical Information Report South Interim Base October 2018 42 Permit Trigger/Activity Responsible Agency Regional Permits King County !Necessary if building is over N/A Historic 40 years old. Preservation Office Approval Timing Conditions/Comments The timing varies. Not required as per Tom. See memo from Linda. King County (Required if dewatering Tetratech will N/A WTD Industrial Waste Discharge Permit/Construct ion Dewatering Approval King County Construction waste management report during demolition is required :confirm with civil about need for construction. Not a city permit requirement but needed for King County and contractor use. Submittal Requirements Status Request for Historic Preservation Office Review Prior to start of demolition Not needed for demolition. Wastewater Discharge Permit Application Contractor Contractor completes Puget Sound Clean Air Agency Notice of Demolition Demolition of structure. Include slope stabilization plan for removal of pedestrian bridge. Submit 10 days prior to demolition. Final Hazmat & Asbestos survey week of 8.27.18, Asbestos found. Recommend removal prior to demo. ❑ Notice of Demolition Application II Asbestos Survey completed by Parametrix. Technical Information Report South Interim Base October 2018 43 Permit Trigger/Activit Responsible Agenc Timing Conditions/Comments Submittal Requirements Status State Permits Washington Department•of Ecology (Ecology) Construction Stormwater General Permit (National Pollutant Discharge Elimination System [NPDES]) Triggered by ground disturbance greater than 1.0 acre • https://ecology.wa.gov/Requ lations-Permits/Permits- certifications/Stormwater- general- perm its/Construction- stormwater-permit. A Construction Stormwater General Permit is required for any project that involves: • 1) Soil disturbance such as !clearing, grading, excavation, and/or demolition that will disturb one acre or more, and 12) There is a potential that stormwater from all or a portion of the construction !site could enter surface waters or conveyance systems that discharge to "surface waters. (Takes 30 days but can take up to 180 days (agency has up to one year to act). Public notification (30 • days). Apply via Ecology's WQWebPortal ❑ Notice of Intent form ❑ SWPPP (Chuck will provide the SWPPP) ❑ Public Notification Detailed project description, site plans, and mitigation plans. Typically prepared at 30- 60% design level. Construction best management practices and Temporary Erosion and Sediment Control (TESC) Plan. Submittal Date: Sept/Oct. 2018 Washington Department of Ecology (Ecology) Notification of Onsite Hazardous Materials Presence of on -site groundwater or soil ;contamination that exceeds Ecology criteria Ecology notification required at least 90 days after discovery ,of contaminants. ❑ Notification for Onsite Hazardous Materials Form Depending on geo-tech assessment: Following remediation of all onsite contamination, Ecology requires a Report of Remediation. Submittal during demolition Technical Information Report South Interim Base October 2018 44 Permit Trigger/Activity Responsible Agency Timing Conditions/Comments Submittal Requirements Status Interim Base Construction Permits Local Permits and Reviews Technical Information Report South Interim Base October 2018 45 City of Tukwila Unclassified Use Permit for Land Use Permit includes 90% storm drainage plans. Chapter 18.66TMC Design Review Permit Application Construction Permit Application for site development including building, grading and drainage. Unclassified Use permit — City classifies base expansion use as mass transit facility — public notice, public meeting at city and a public hearing '/decision to approve/ approve with conditions or deny and request revisions by city council 120 days — 'City planner's general :feedback was that denial was not foreseen — but ' rather approval with conditions if applicable Design review with planning commission meeting 120 days can be concurrent with Unclassified Use Permit Review if design review application is submitted during or at the same time as the Unclassified Use Review —to be confirmed King County 120-210 days !Need by January/February Be in front of Council in !January. Expect 4 months after 'submittal. http://www.tukwilawa.gov/wp- Submittal Date: content/uploads/DCD-Apps- . End of Sept/Early Unclassified-Use-Permit.pdf October ❑ Submit for Administrative I Design Review with Planning Commission Type 2 decision, Planning Commission makes recommendation to Director of Community Development Decision Submit applications for water and sewer concurrency to Valley View and Water District 125. Include availability letters from Districts in UUP submittal. ❑ Submit plans (see the Zink for the plan requirements located below the initial application materials checklist), and other listed basic information. II Have funds ready to pay and the signage ordered for the public notice requirements. Jennifer checking to see if King County Roads Department has time to make the signs or Fast Signs fiLNeed signed affidavit of ownership and hold harmless agreement. Technical Information Report South Interim Base October 20I8 46 ELPay fees for both the land use fees and the public notice distribution. ❑ Need transportation analysis Technical Information Report South Interim Base October 2018 47 Permit Trigger/Activity City of Tukwila New Construction Construction Permit Electrical Permit (separate to be submitted by contractor) City of Tukwila Public Works Department Transportation Impact Fees 9.48 TMC and Ordinance 211 Regional Permits Puget Sound Clean Air Agency Notice of Construction (NOC) The fee applies to any new construction that requires a building permit and generates any new PM peak hour trips. The TIP is 'charged to each development according to •an impact fee schedule based on defined zones. Responsible Agency Contractor Timing Conditions/Comments Submittal Requirements Submittal TBD In City review King County The fees are , assessed as part of the building permit and are due and payable when the permit it issued Construction of new facility :King County 120 days (or more) ❑ Construction Permit D18- 0258 ['Compute from TIP Fee Schedule ❑ Notice of Construction Submittal ❑ Public Notice Status Submittal Date: January ,2019 King County WTD Industrial Waste Discharge Permit/Constructio n Dewatering Approval State Permits Required if dewatering during construction is required ;N/A ❑ Wastewater Discharge Permit Application Technical Information Report South Interim Base October 2018 48 City of Tukwila !Any proposal that requires a !King County State i state or local agency decision Environmental ito license, fund, or undertake a , Policy Act (SEPA) ' project can trigger Threshold environmental review under Determination For Phase 2 Building Construction Washington Department of Ecology (Ecology) Construction Stormwater General Permit (National Pollutant Discharge Elimination System [NPDES]) Triggered by ground disturbance greater than 1.0 acre SEPA (see WAC 197-11-704 for a complete definition of agency action). SEPA requires all governmental agencies to !consider the environmental impacts before project approval. https://ecolocw.wa.gov/Requlati ons-Perm its/Permits- certifications/Stormwater- general-permits/Construction- • stormwater-permit. A Construction Stormwater General Permit is required for any project that involves: 1) Soil disturbance such as clearing, grading, excavation, and/or demolition that will disturb one acre or more, and 2) There is a potential that storm water from all or a portion of the construction site 'could enter surface waters or conveyance systems that •discharge to surface waters. Tetra Tech SEPA Lead Agency 'Threshold Determination issued at 30% design. Typically, 2-month process, including 14- day public comment period. Decision is appealable to the Hearing Examiner. 'Takes 30 days but can take up to 180 days (agency has up to one year to act). Public notification (30 days). ❑ SEPA Checklist ❑ Additional SEPA Information Sheet ❑ Determination - DNS (City) 1 ❑ Public Notification (City) The City's standard Determination of Non - Significance (DNS) and checklist form. Typically prepared at 10-30% design level. To be submitted with the City's I Combined Permit Application. ❑ Notice of Intent form ❑ SWPPP (Chuck will provide the SWPPP) ❑ Public Notification Detailed project description, site ' plans, and mitigation plans. Typically prepared at 30-60% design level. Construction best management practices and Temporary Erosion and Sediment Control (TESC) Plan. Submittal Date: x/x118— Determination x/x/18 — end of 14-day comment period Appeal? Submittal Date: January 2019 Technical Information Report South Interim Base October 20I8 49 Technical Information Report South Interim Base October 20I8 50 8.0 CSWPP ANALYSIS AND DESIGN A full Construction Stormwater Pollution Prevention Plan (CSWPPP) and Stormwater Pollution Prevention and Spill Control Plan are included as a separate attachment. 8.1 PROPOSED EROSION AND SEDIMENT CONTROL OVERVIEW Temporary erosion and sedimentation control (TESC) measures will be implemented to reduce and minimize impacts resulting from construction activities include the following: • Project Phasing: Limit clearing and grubbing to smaller areas which could be worked progressively from end to end, to reduce the risk of erosion. • Identify. Clearing Limits: Stake or fence clearing limits and identify sensitive areas and associated buffers. • Provide Cover Measures: Provide temporary and/or permanent cover measures within the timeframe prescribed by the KCSWDM for "wet season" and "dry season" to minimize erosion. Cut and fill slopes, which are susceptible to erosion and do not require additional construction. Areas should be mulched and vegetated as soon as they are graded. • Perimeter Protection: Provide filter fabric (silt fence) fencing or vegetated buffer strips down slope of all disturbed areas flowing to adjacent properties or storm drainage systems. • Traffic Area Stabilization: Provide stabilized construction entrances and construction traffic areas to prevent erosion and reduce transport of sediment onto City streets. • Sediment Retention: Route sediment laden runoff from exposed areas to temporary sediment traps prior to discharge to downstream systems. Provide catch basin inserts to filter runoff from construction areas. • Surface Water Control: Runoff draining toward disturbed areas should be intercepted and re- routed to bypass disturbed areas. Runoff from exposed onsite (roadway) areas should be collected along the project length and conveyed to the temporary sediment pond facilities prior to discharge. • Protection of Existing Storm Drainage Facilities: Existing storm drainage facilities and conveyance systems are to be protected throughout the project duration. Flows which are tributary to existing systems should be routed through sediment trapping facilities prior to entering existing system. Existing catch basins and inlets shall be protected with filters prior to earthwork operations. • Site Monitoring and Facility Maintenance Programs: All TESC facilities are to be monitored and maintained throughout the project duration. • Dust Control: Dust control measures such as sprinkling are to be incorporated to reduce impacts to adjacent properties. Technical Information Report South Interim Base October 2018 51 The primary sediment removal mechanism will be through the use of perimeter protection or filter fencing along the downstream slopes and diverting runoff away from exposed areas. Additionally, separating offsite runoff from onsite (sediment laden) runoff will reduce the required sediment trapping facility size. Technical Information Report South Interim Base October 2018 52 9.0 BOND QUANTITIES, FACILITY SUMMARIES, DECLARATION OF COVENANT See Appendix E — Bonds, Facilities Summary, and Covenants for backup material to support project bonding, facility summaries, and covenants. Technical Information Report South Interim Base October 2018 53 10.0 OPERATIONS AND MAINTENANCE MANUAL The Operations and Maintenance Manual (including a description of Pollutant Source Control Best Management Practices) is included as a separate attachment. Technical Information Report South Interim Base October 2018 54 APPENDIX A - FLOWCHARTS - KCSWDM Figure 1.1.2.A: Flowchart for Determining Type of Drainage Review Required - KCSWDM Table 1.1.2.A: Requirements Applied under Each Drainage Review Type Technical Information Report South Interim Base October 2018 55 FIGURE I.1.2.A FLOW CHART FOR DETERl1ILNING TYPE OF DRAINAGE REVIEW REQUIRED Is the project a single family residential or agricultural project that results in 22,000 sf of new plus replaced Impervious surface or a7,000 sf of land disturbing activity, results in less than 5,000 square feet of new plus replaced pollution generating impervious surface, results in less than % acre of pollution generating pervious surfaces AND meets one of the following criteria? • The project meets the Basic Exemption from flow control In Core Requirement #3. Note the Basic Exemption thresholds are applied by project site. • For projects inside the Urban Growth Area on predominately till soils: The project results in no more than 7,947 square feet of target impervious surfaces' as defined In Section 1.1.2.1 AND proposed pervious area is equal to or less than 14,941 — 1.88 x (total target impervious surfaces) • For projects inside the Urban Growth Area on predominately outwash soils_ The project results in no more than 6,872 square feet of target impervious surfaces' as defined In Section 1.1.2.1 AND proposed pervious area is equal to or less than 20,343 — 2.96 x (total target impervious surfaces) • For outside the Urban Growth Area on predominately lib' soils: The project results in no more than 5,074 square feet of target Impervious surfaces" as defined In Section 1.1.2.1 AND proposed pervious area is equal to or less than 11,570 — 2.28 x (total target impervious surfaces) • For outside the Urban Growth Area on predominately outwash soils: The project results in no more than 4,000 square feet of target impervious surfaces' as defined in Section 1.1.2.1 AND proposed pervious area is equal to or less than 10,720 — 2.68 x (total target impervious surfaces) • Is an agricultural project that qualifies for the 'Impervious Surface Percentage Exemption For Agricultural Projects" detailed in Core Requirement 3 Yes SIMPUFIED DRAINAGE REVIEW Section 1.1.2.1 Note: The project may also be subject to Targeted Drainage Review as determined below. Is the project a single family residential or agricultural protect that results in 12,000 sf of new plus replaced impervious surface or 17,000 sf of land disturbing activity AND is not subject to Large Project Drainage Review as defined in Section 1.1.2.5? No 1 Does the project result In 12,000 sf of new plus replaced impervious surface or z7,000 sf of land disturbing activity? No Yes DIRECTED DRAINAGE REVIEW Section 1.12.3 Does the project have the characteristics of one or more of the following categories of protects (see more detailed threshold language on p. 1-15)? 1. Projects containing or adjacent to a flood, erosion, or steep slope hazard area; or projects within a Critical Drainage Area or Landslide Hazard Drainage Area. 2. Projects proposing to construct or modify a drainage pipe/ditch that is 12' or larger or receives runoff from a 12" or larger drainage pipe/ditch. 3. Redevelopment projects proposing >_$100,000 in improvements to an existing high -use site. No Reassess whether drainage review Is requIred per Section 1.1.1 (p. 1-9). Is the project an Urban Planned Development (UPD), OR does it result in 250 acres of new impervious surface within a subbasin or multiple subbasins that are hydraulically connected, OR does it have a project site a50 acres within a critical aquifer recharge area? Yes } TARGETED DRAINAGE REVIEW Section 1.1.2.2 FULL DRAINAGE REVIEW Section 1.12.4 LARGE PROJECT DRAINAGE REVIEW Section 1.12.5 Technical Information Report South Interim Base October 2018 56 TABLE 1.11.A REQUIREMENTS APPLIED UNDER EACH DRAINAGE REVIEW TYPE Single family residential projects and agricultural projects that result in 2,000 sf of new pits replaced impervious surface or a7,000 sf of land disturbing activity but do not exceed the new plus Simplified replaced PGIS. new PGPS, and new pervious surface thresholds specified in Sec. 1.1.2.1; OR is an agricultural project that qualifies for the "Impervious Surface Percentage Exemption For Agricultural Projects". Single family residential projects and agricultural projects that result in ?2.000 sf of new plus Directed replaced impervious surface or 27,000 sf of land disturbing activity that are not subject to Simplified Drainage Review or Large Project Drainage Review Projects that are not subjed to Directed, Full or Large Project Drainage Review, AND have characteristics of ono or more of the following categories of projects: 1. Projects containing or adjacent to a flood, erosion, or steep slope hazard area; projects within a Targeted Critical Drainage Area or Landslide Hazard Drainage Area. 2. Projects that construct or modify a drainage pipelditoh that is 12" or larger or receive runoff from a 12" or larger drainage pipe/ditch. 3. Redevelopment projects with 4100,000 in improvements to a high -use site.(') All projects that result in 22,000 sf of new plus replaced impervious surface or Z7,000 sf of land Full disturbing activity but are not subject to Simplified Drainage Review, Directed Drainage Review , OR Large Project Drainage Review_ Large Project UPDs, OR projects that result in 250 acres of new impervious within a sub -basin or multiple sub- basins that are hydraulically connected, OR project sites 450 acres within a critical aquifer recharge area. DRAINAGE REVIEW TYPE Simplified Directed Targeted Full Large Categ 1 Categ 2 Catog 3 Project SIMPLIFIED DRAINAGE REQUIREMENTS SEE NOTE 4 CORE REQUIREMENT #1 Discharge at Natural Location 1(4) ✓ (2,3) *(2) ✓ 1 1 CORE REQUIREMENT #2 i((4) (2,3) *(2) 1(3) 1(3) 1(3) Oftsite Analysis CORE REQUIREMENT #3 ✓«) 1. (2,3) *(2) 1(31 1(3) Flow Control CORE REQUIREMENT #4 Conveyance System 1.(4) ✓ (2,3) *(z) 1 1 1 CORE REQUIREMENT #t6 Erasion & Sediment Control 1(4) ✓ (2,3) 1 1 1 ✓ ✓ CORE NlaintenaanceUIREMENT #6 & Operations �(4) (2,3) *(2) 1✓ 1 1 CORE REQUIREMENT #7 ✓ 4) ✓ (2,3) *(2) 1(3) 131 1(31 1(3) Financial Guarantees & Liability CORE REQUIREMENT 88 ✓(t) ✓ (2,3) *(2) 1(3} 1(3) Water Quality CORE REQUIREMENT Pa Flow Control BMPs 1(4) 1 ✓ ✓ SPECIAL REQUIREMENT #1 1(4) 1. (2,3) 1(3) 1(3) 1(3) Other Adopted RequirementsSPECIAL REQUIREMENT Flood Hazard Area Delineation ✓(t) ,1 (2,3) 1(3) 1(3) 1(3) SPECIAL REQUIREMENT #3 1(4) ✓ (2,3) 13) 1(3) 1(3) Flood Protection Facilities SPECIAL REQUIREMENT #4 1(4) 1(2,3) 13) 1(3) 131 13} 1(3) Source Control SPECIAL REQUIREMENT #5 1(4) 1(2,3) 1(3) 13) 1(3) Oil Control 411 Category 3 projects installing oil controls that construct or modify a 12-inch pipe/ditch are also Category 2 projects. 62) May be applied by DPER based on project or site -specific conditions. Documentation of compliance required_ r') These requirements have exemptions or thresholds that may preclude or knit their application to a specific project a) A proposed project subject to Simpered Drainage Review that complies with the Simplified drainage requirements detailed in Appendix C Is presumed to comply with all the core and special requirements in Sections 1.2 and 1.3 except those requirements that would apply to the project if it is subject to Targeted Drainage Review as specified in Section 1.1.22_ Technical Information Report South Interim Base October 2018 57 APPENDIX B - WESTERN WASHINGTON HYDROLOGY MODEL - Site Characteristics and Model Inputs Unmitigated Condition Output Report - Mitigated Condition Output Report - 15-Minute Water Quality Flowrate Output Report - Non -Report Outputs (Water Quality Treatment Percentages) Technical Information Report South Interim Base October 2018 58 • TDA 2 DISCHARGE LOCATION i 17: r I */71,",:: 4 ir TDA 1 DISCHARGE LOCATION ./Z i - aP.ft- TDA 2 w _ \ FP TDA BOUNDARY (TYP) FP z 11 I 1 1 1 1 1 1 TDA 1 - TARGET SURFACES -7111111 LAWN - 26,594 SF - 0.6105 AC INCLUDES ALL ONSITE PGPS/NPGPS POND - 15,136 SF - 0.3475 AC NPGIS ROAD - 87,827 SF - 2.0162 AC INCLUDES ALL PGIS ROOF - 132,632 SF - 3.0448 AC NPGIS WALK - 14,037 SF - 0.3222 AC INCLUDES ALL OTHER NPGIS TDA 2 - TARGET SURFACES LAWN - 23,595 SF - 0.5417 AC INCLUDES ALL ONSITE PGPS/NPGPS ROAD - 28,548 SF - 0.6554 AC INCLUDES ALL PGIS ROOF - 35,473 SF - 0.8144 AC NPGIS WALK - 4,478 SF - 0.1028 AC INCLUDES ALL OTHER NPGIS i TDA 2 NORTH %/♦//�// TDA 1 BYPASS WQ FACILITY WQ FACILITY TDA 2 DISCHARGE LOCATION TDA2 SOUTH WQ FACILITY TDA 1 NORTH WQ FACILITY TDA BOUNDARY (TYP) „7--A TDA 1 DISCHARGE LOCATION TDA 1 - TARGET SURFACES LAWN - 2,726 SF - 0.0626 AC INCLUDES ALL ONSITE PGPS/NPGPS NATIVE - 1,339 SF - 0.0307 AC INCLUDES ALL PGIS ROAD - 231,752 SF - 5.3203 AC INCLUDES ALL PGIS ROOF - 29,131 SF - 0.6687 AC NPGIS WALK - 4,323 SF - 0.0992 AC INCLUDES ALL OTHER NPGIS TDA 2 - TARGET SURFACES LAWN - 15,844 SF - 0.3637 AC INCLUDES ALL ONSITE PGPS/NPGPS ROAD - 65,580 SF - 1.5055 AC INCLUDES ALL PGIS ROOF - 5,285 SF - 0.1213 AC NPGIS WALK - 217 SF - 0.0050 AC INCLUDES ALL OTHER NPGIS Landuse Slope TDA 1- Drains to Ex. Pond Existing Developed TDA 1- Bypass IDA 1 Dev Total Developed TDA 1 Subbaslns South North Lawn Flat Mod Steep 0.6105 0.0626 0.0627 0.0031 0.0284 0.0342 Subtotal 0.6105 0.0626 0.0627 0.0031 0.0284' 0.0342 Forrest Flat Mod Steep 0.0307 0.0307 0.0307 Subtotal 0.0307 0.0307 0.0307 Road Flat Mod Steep 2.0162 5.3203 5.3991 0.0788 1.7869 • 3.5334 Subtotal 2.0162 5.3203 5.3991 0.0788 1.7869 3.5334 Roof Flat Mod Steep 3.0448 0.6687 0.7135 0.0447 0.3463 0.3224 Subtotal__ __ 3.0448 0.6687 0.7135 0.0447 0.3463 0.3224 Sidewalk Flat Mod Steep 0.3222 0.0992 0.2539 0.1547 0.0992 Subtotal 0.3222 0.0992 0.2539 0.1547 0.0992 Pond Flat 0.3475 Subtotal 0.3475 Grand Total 6.3413 6.1816 6.4599 0.2784 2.1923 3.9893 "All areas in acres V✓WHM Landuse Inputs - TDA 1 Technical Information Report South Interim Base October 2018 61 Landuse Slope TDA 2- Drains to ROW Existing Developed TDA 2 Subbaslns South North Totals Existing Developed lawn Flat Mod Steep 0.5417 0.3637 0.1624 0.2013 L1522 0.4264 Subtotal 0.5417 0.3637 0.1624 0.2013 1.1522 0.4264 Forest Flot Mod Steep 0.0307 Subtotal 0.0307 Road Flat Mod Steep 0.6554 15055 0.8374 0.6681 2.6716 69046 Subtotal 0.6554 1.5055 0.8374 0.6681 2.6716 6.9046 Roof Flat Mod Steep 0.8144 0.1213 0.1213. 3.8592 0.8348 Subtotal 0.8144 0.1213 0.1213 3.8592 0.8348 Sidewalk -Flat Mod Steep 0.1028 0.0050 0.0050 0.4251 0.2589 Subtotal 0.1028 0.0050 0.0050 0.4251 0.2589 Pond Flat 0.3475 Subtotal _ 0.3475 Grand Total 2.1142 1.9955 1.1212 0.8744E 8.4555 8.4555 "All areas in Does Technical Information Report South Interim Base VVWHM Landuse Inputs - TDA 2 October 2018 62 WWHM2012 PROJECT REPORT 1 • General Model Information Project Name: 60% Unmitigated Site Name: KC Metro South Base Site Address: 12400 East Marginal Way South City: Tukwila Report Date: 10/4/2018 Gage: Seatac Data Start: 1948/10/01 Data End: 2009/09/30 Timestep: 15 Minute Precip Scale: 0.000 (adjusted) Version Date: 2018/07/12 Version: 4.2.15 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POC1: 50 Year Low Flow Threshold for POC2: 50 Percent of the 2 Year High Flow Threshold for POC2: 50 Year 60% Unmtegated 10/4/2018 9.52.10 AM Page 2 Landuse Basin Data TDA 2 - Drains to ROW Predeveloped Land Use TDA 1 - To Combined Wetpond Bypass: No GroundWater: No Pervious Land Use acre C, Lawn, Flat 0.6105 Pervious Total 0 Impervious Land Use ROADS FLAT ROOF TOPS FLAT SIDEWALKS FLAT POND acre 2.0162 3.0448 0.3222 0.3475 Impervious Total 0 Basin Total 0 Element Flows To: Surface Interflow Groundwater Existing Combined WelEpiciisitig Combined Wetpond 60% Unmitigated 10/4/2018 9.52. 10 AM Page 3 Bypass: No GroundWater: Pervious Land Use C, Lawn, Flat Pervious Total Impervious Land Use ROADS FLAT ROOF TOPS FLAT SIDEWALKS FLAT Impervious Total Basin Total No acre 0.5417 0 acre 0.6554 0.8144 0.1028 0 0 Element Flows To. Surface Interflow 60% Unmitigated Groundwater 10/4/2018 9 52 10 AM Page 4 • Mitigated Land Use TDA 2 - Drains to ROW TDA 1 - To New Detention Bypass: No Bypass: No GroundWater: No GroundWater: No Pervious Land Use acre C, Lawn, Flat 0.3305 Pervious Land Use acre C, Lawn, Flat 0.0632 Pervious Total 0 C, Forest, Steep 0.0307 Impervious Land Use acre Pervious Total 0 ROADS FLAT 1.5384 ROOF TOPS FLAT 0.1213 Impervious Land Use acre SIDEWALKS FLAT 0.005 ROADS FLAT 5.3985 ROOF TOPS FLAT 0.7112 Impervious Total 0 SIDEWALKS FLAT 0.2567 Basin Total 0 Impervious Total 0 Basin Total 0 Element Flows To: Surface Interflow Element Flows To: Surface Interflow Groundwater 60% Unmitigated 10/4/2018 9.52.10 AM Groundwater Page 5 60% Unmitigated 10/4/2018 9 52 10 AM Page 6 Routing Elements Predeveloped Routing Existing Combined Wetpond Depth: 9.9 ft. Discharge Structure 1 Riser Height: 2.5 ft. Riser Diameter: 12 in. Notch Type: Rectangular Notch Width: 0.500 ft. Notch Height: 0.750 ft. Orifice 1 Diameter: 5.25 in. Elevation:0 ft. Element Flows To: Outlet 1 Outlet 2 SSD Table Hydraulic Table Stage Area (feet) (ac.) 0.000 0.000 0.100 0.081 0.200 0.083 0.300 0.084 0.400 0.085 0.500 0.086 0.600 0.087 0.700 0.088 0.800 0.090 0.900 0.091 1.000 0.092 1.100 0.093 1.200 0.094 1.300 0.095 1.400 0.096 1.500 0.098 1.600 0.099 1.700 0.100 1.800 0.101 1.900 0.102 2.000 0.103 2.100 0.104 2.200 0.106 2.300 0.107 2.400 0.108 2.500 0.109 2.600 0.110 2.700 0.111 2.800 0.112 2.900 0.114 3.000 0.115 3.100 0.116 3.200 0.117 3.300 0.118 3.400 0.119 3.500 0.121 60% Unmitigated Volume Outlet (ac-ft.) Struct 0.000 0.000 0.008 0.237 0.016 0.334 0.025 0.410 0.033 0.042 0.051 0.059 0.068 0.077 0.087 0.096 0.105 0.115 0.125 0.134 0.144 0.154 0.164 0.174 0.185 0.195 0.206 0.216 0.227 0.238 0.249 0.260 0.272 0.283 0.294 0.306 0.318 0.330 0.341 0.354 0.473 0.529 0.579 0.626 0.669 0.710 0.748 0.784 0.819 0.853 0.885 0.916 0.946 0.975 1.022 1.128 1.266 1.429 1.612 1.813 2.031 2.264 2.621 3.218 3.843 4.315 4.580 4.838 5.055 5.257 5.449 5.630 NotUsed NotUsed NotUsed NotUsed 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 000 0.000 0.000 0.000 0 000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10/4/2018 9 52 10 AM 3.600 0.122 0.366 5.804 0.000 0.000 0.000 0.000 3.700 0.123 0.378 5.970 0.000 0.000 0.000 0.000 3.800 0.124 0.390 6.131 0.000 0.000 0.000 0.000 3.900 0.125 0.403 6.285 0.000 0.000 0.000 0.000 4.000 0.126 0.416 6.435 0.000 0.000 0.000 0.000 4.100 0.130 0.428 6.580 0.000 0.000 0.000 0.000 4.200 0.133 0.442 6.721 0.000 0.000 0.000 0.000 4.300 0.137 0.455 6.858 0.000 0.000 0.000 0.000 4.400 0.140 0.469 6.992 0.000 0.000 0.000 0.000 4.500 0.143 0.484 7.122 0.000 0.000 0.000 0.000 4.600 0.147 0.499 7.250 0.000 0.000 0.000 0.000 4.700 0.150 0.514 7.375 0.000 0.000 0.000 0.000 4.800 0.154 0.529 7.497 0.000 0.000 0.000 0.000 4.900 0.157 0.545 7.617 0.000 0.000 0.000 0.000 5.000 0.161 0.561 7.734 0.000 0.000 0.000 0.000 5.100 0.164 0.577 7.849 0.000 0.000 0.000 0.000 5.200 0.168 0.594 7.962 0.000 0.000 0.000 0.000 5.300 0.171 0.611 8.074 0.000 0.000 0.000 0.000 5.400 0.174 0.628 8.183 0.000 0.000 0.000 0.000 5.500 0.178 0.646 8.291 0.000 0.000 0.000 0.000 5.600 0.181 0.664 8.397 0.000 0.000 0.000 0.000 5.700 0.185 0.683 8.501 0.000 0.000 0.000 0.000 5.800 0.188 0.702 8.604 0.000 0.000 0.000 0.000 5.900 0.192 0.721 8.706 0.000 0.000 0.000 0.000 6.000 0.195 0.740 8.806 0.000 0.000 0 000 0.000 6.100 0.198 0.760 8.905 0.000 0.000 0.000 0.000 6.200 0.201 0.780 9.002 0.000 0.000 0.000 0.000 6.300 0.204 0.801 9.099 0.000 0.000 0.000 0.000 6.400 0.208 0.822 9.194 0.000 0 000 0.000 0.000 6.500 0.211 0.843 9.288 0.000 0.000 0.000 0.000 6.600 0.214 0.864 9.381 0.000 0.000 0.000 0.000 6.700 0.217 0.886 9.472 0.000 0.000 0.000 0.000 6.800 0.220 0.908 9.563 0.000 0.000 0.000 0.000 6.900 0.223 0.930 9.653 0.000 0.000 0.000 0.000 7.000 0.226 0.953 9.742 0.000 0.000 0.000 0.000 7.100 0.228 0.975 9.830 0.000 0.000 0.000 0.000 7.200 0.231 0.998 9.917 0.000 0.000 0.000 0.000 7.300 0.233 1.022 10.00 0.000 0.000 0.000 0.000 7.400 0.235 1.045 10.09 0.000 0.000 0.000 0.000 7.500 0 237 1.069 10.17 0 000 0.000 0.000 0.000 7.600 0.239 1.093 10.26 0.000 0.000 0.000 0.000 7.700 0.242 1.117 10.34 0.000 0.000 0.000 0.000 7.800 0.244 1.141 10.42 0.000 0.000 0.000 0.000 7.900 0.246 1.166 10.50 0.000 0.000 0.000 0.000 8.000 0.248 1.191 10.58 0.000 0.000 0.000 0.000 8.100 0.251 1.216 10.66 0.000 0.000 0.000 0.000 8.200 0.254 1.241 10.74 0.000 0.000 0.000 0.000 8.300 0.258 1.267 10.82 0.000 0.000 0.000 0.000 8.400 0.261 1.293 10.90 0.000 0.000 0.000 0.000 8.500 0.264 1.320 10.98 0.000 0.000 0.000 0.000 8.600 0.267 1.346 11.05 0.000 0.000 0.000 0.000 8.700 0.270 1.373 11.13 0.000 0.000 0.000 0.000 8.800 0.273 1.401 11.21 0.000 0.000 0.000 0.000 8.900 0.276 1.428 11.28 0.000 0.000 0.000 0.000 9.000 0.279 1.456 11.36 0.000 0.000 0.000 0.000 9.100 0.280 1.484 11.43 0.000 0.000 0.000 0.000 9.200 0.280 1.512 11.50 0.000 0.000 0.000 0.000 9.300 0.280 1.540 11.58 0.000 0.000 0.000 0.000 Page 7 60% Unmitigatetl 10/4/2018 9. 52. 10 AM Page 8 9.400 9.500 9.600 9.700 9.800 0.281 0.281 0.282 0.282 0.282 1.568 1.596 1.624 1.653 1.681 11.65 11.72 11.79 11.86 11.93 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 60% Unmdigated 10/4/2018 9:52.10 AM 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Mitigated Routing Page 9 60% Unmitigated 10/4/2018 9.52.10 AM Page 10 Analysis Results POC 1 411 u 0 a :a 1011 .2 + Predeveloped x Mitigated Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.6105 Total Impervious Area: 5.7307 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0.0939 Total Impervious Area: 6.3664 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 1.078041 5 year 1.498132 10 year 1.82478 25 year 2.29714 50 year 2.695413 100 year 3.13618 Flow Frequency Retum Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 2.432023 5 year 3.073225 10 year 3.509019 25 year 4.07445 50 year 4.507314 100 year 4.950767 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 1.308 3.154 1950 1.155 3.399 1951 1.147 1.971 1952 0.894 1.748 1953 0.883 1.887 Ranked Annual Peaks 1954 0.865 1.978 1955 1.195 2.241 Rank Predeveloped Mitigated 1956 0.971 2.206 1 3.1080 4.8326 1957 1.359 2.506 2 2.8688 4.5214 1958 0.883 2.019 3 2.8444 4.3538 60% Unmitigated 10/4/2018 9.52 11 AM 1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Page 11 60% Unmitigated 0.828 1.244 0.899 0.783 0.805 0.959 0.874 0.851 1.107 1.036 0.924 0.907 0.893 1.540 0.843 0.826 1.196 0.831 0.855 1.513 0.934 1.169 1.047 2.084 1.435 0.782 0.982 1.424 1.417 0.840 0.785 2.869 2.298 0.938 0.707 0.748 0.884 1.461 1.196 0.836 2.113 1.198 0.856 1.483 0.841 3.108 1.353 0.846 2.475 2.844 1.565 2.056 2.026 2.140 1.861 2.071 2.026 2.581 1.724 2.970 3.377 2.350 2.266 2.702 2.795 1.686 2.466 2.834 1.911 2.064 2.525 3.457 3.115 2.541 3.585 2.913 1.840 2.535 2.195 3.386 2.053 2.568 4.354 3.473 1.822 1.577 1.714 2.253 2.402 2.332 2.358 4.833 2.405 2.637 3.086 2.398 4.521 2.068 1.827 4.227 3.412 3.138 Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 10/4/2018 9 53.22 AM Page 12 4 2.4749 4.2268 5 2.2977 3.5853 6 2.1135 3.4729 7 2.0841 3.4575 8 1.5646 3.4123 9 1.5400 3.3986 10 1.5132 3.3864 11 1.4827 3.3769 12 1.4607 3.1545 13 1.4349 3.1375 14 1.4245 3.1147 15 1.4173 3.0856 16 1.3590 2.9699 17 1.3526 2.9135 18 1.3078 2.8344 19 1.2442 2.7953 20 1.1981 2.7024 21 1.1965 2.6374 22 1.1963 2.5811 23 1.1955 2.5677 24 1.1689 2.5408 25 1.1554 2.5348 26 1.1474 2.5254 27 1.1066 2.5056 28 1.0471 2.4665 29 1.0356 2.4045 30 0.9818 2.4022 31 0.9708 2.3984 32 0.9591 2.3580 33 0.9376 2.3502 34 0.9342 2.3317 35 0.9244 2.2660 36 0.9074 2.2526 37 0.8992 2.2410 38 0.8940 2.2057 39 0.8926 2.1952 40 0.8842 2.1395 41 0.8831 2.0710 42 0.8830 2.0676 43 0.8743 2.0642 44 0.8653 2.0562 45 0.8556 2.0532 46 0.8550 2.0264 47 0.8505 2.0258 48 0.8464 2.0186 49 0.8433 1.9781 50 0.8414 1.9709 51 0.8405 1.9113 52 0.8361 1.8872 53 0.8310 1.8610 54 0.8276 1.8399 55 0.8264 1.8273 56 0.8052 1.8223 57 0.7850 1.7476 58 0.7834 1.7237 59 0.7820 1.7135 60 0.7481 1.6861 61 0.7075 1.5767 60% Unmitigated 10/4/2018 9:53:22 AM Page 13 60%Unmitigated 10/4/2018 9.53.22 AM Page 14 1.7152 2 1.7370 2 1.7588 1 1.7806 0 1.8024 0 1.8241 0 1.8459 0 1.8677 0 1.8895 0 1.9113 0 1.9331 0 1.9548 0 1.9766 0 1.9984 0 2.0202 0 2.0420 0 2.0637 0 2.0855 0 2.1073 0 2.1291 0 2.1509 0 2.1727 0 2.1944 0 2.2162 0 2.2380 0 2.2598 0 2.2816 0 2.3033 0 2.3251 0 2.3469 0 2.3687 0 2.3905 0 2.4123 0 2.4340 0 2.4558 0 2.4776 0 2.4994 0 2.5212 0 2.5429 0 2.5647 0 2.5865 0 2.6083 0 2.6301 0 2.6518 0 2.6736 0 2.6954 0 44 40 38 34 31 29 28 25 22 21 20 17 14 12 2200 Fai 2000 Fai 3800 Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a' Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai n/a Fai The development has an increase in flow durations from 1/2 Predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. The development has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. 60% Unmitigated 10/4/2018 9 53 23 AM Duration Flows Flow(cfs) Predev Mit Percentage Pass/Fail 0.5390 266 1796 675 Fai 0.5608 245 1637 668 Fai 0.5826 229 1468 641 Fai 0.6044 204 1343 658 Fai 0.6261 190 1226 645 Fai 0.6479 179 1105 617 Fai 0.6697 170 1001 588 Fai 0.6915 158 919 581 Fai 0.7133 151 854 565 Fai 0.7351 140 789 563 Fai 0.7568 133 726 545 Fai 0.7786 126 666 528 Fai 0.8004 119 608 510 Fai 0.8222 114 568 498 Fai 0.8440 110 531 482 Fai 0.8657 107 489 457 Fai 0.8875 98 449 458 Fai 0.9093 92 418 454 Fai 0.9311 88 389 442 Fai 0.9529 84 365 434 Fai 0.9747 78 339 434 Fai 0.9964 74 315 425 Fai 1.0182 70 294 419 Fai 1.0400 64 272 425 Fai 1.0618 60 255 425 Fai 1.0836 54 237 438 Fai 1.1053 50 221 442 Fai 1.1271 44 207 470 Fai 1.1489 39 194 497 Fai 1.1707 36 180 500 Fai 1.1925 33 171 518 Fai 1.2143 29 159 548 Fai 1.2360 27 145 537 Fai 1.2578 23 139 604 Fai 1.2796 21 135 642 Fai 1.3014 20 121 605 Fai 1.3232 19 114 600 Fai 1.3449 17 107 629 Fai 1.3667 16 105 656 Fai 1.3885 14 100 714 Fai 1.4103 14 91 650 Fai 1.4321 14 88 628 Fai 1.4539 14 83 592 Fai 1.4756 11 73 663 Fai 1.4974 8 71 887 Fai 1.5192 8 66 825 Fai 1.5410 7 64 914 Fai 1.5628 6 62 1033 Fai 1.5845 4 58 1450 Fai 1.6063 3 54 1800 Fai 1.6281 2 53 2650 Fai 1.6499 2 53 2650 Fai 1.6717 2 50 2500 Fai 1.6935 2 47 2350 Fai Page 16 60% Unmitigated 10/4/2018 9.53 22 AM Page 15 Water Quality Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.7846 acre-feet On-line facility target flow: 1.034 cfs. Adjusted for 15 min: 1.034 cfs. Off-line facility target flow: 0.5841 cfs. Adjusted for 15 min: 0.5841 cfs. 60% Unmitigated 10/4/2018 953.23 AM LID Report LID Tecnmque Used for Treatment 7 Total Volume Needs Treatment (acd) Volume Through Fatllily (ace) Inaltration Volume (ac-a) Cumulative Volume In0ltralon Crean Percent W!ume InFltrated Water Duality Percent Water Quality Treated Comment Total Volume Infiltrated 000 0.00 0.00 0.00 0.00 0% cuNI Treatmt Comabance winUDAnalys Standard 8% o12.yr 10 50% of 2-n Duration 000011 s Result Failed Page 17 60% Unmlligaled 10/4/2018 9.53 23 AM Page 18 POC 2 J ON + Predeveloped x Mitigated Predeveloped Landuse Totals for POC #2 Total Pervious Area: 0.5417 Total Impervious Area: 1.5726 Mitigated Landuse Totals for POC #2 Total Pervious Area: 0.3305 Total Impervious Area: 1.6647 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #2 Return Period Flow(cfs) 2 year 0.634172 5 year 0.81376 10 year 0.937267 25 year 1.099007 50 year 1.223838 100 year 1.352541 Flow Frequency Return Periods for Mitigated. Return Period Flow(cfs) 2 year 0.655826 5 year 0.835835 10 year 0.958985 25 year 1.119594 50 year 1.243106 100 year 1.370089 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #2 Year Predeveloped Mitigated 1949 0.855 0.870 1950 0.852 0.896 1951 0.533 0.542 1952 0.438 0.460 1953 0.473 0.497 1954 0.517 0.534 1955 0.578 0.600 1956 0.571 0.592 1957 0.669 0.685 1958 0.517 0.539 1959 0.508 0.538 60% Unmitigated POC #2 10/4/2018 9.54. 33 AM 1960 0.551 0.560 1961 0.565 0.581 1962 0.471 0.493 1963 0.547 0.563 1964 0.513 0.533 1965 0.695 0.709 1966 0.444 0.462 1967 0.772 0.800 1968 0.880 0.910 1969 0.631 0.645 1970 0.592 0.612 1971 0.707 0.730 1972 0.774 0.781 1973 0.417 0.441 1974 0.656 0.673 1975 0.701 0.741 1976 0.507 0.521 1977 0.511 0.540 1978 0.631 0.663 1979 0.864 0.910 1980 0.874 0.877 1981 0.658 0.682 1982 0.951 0.976 1983 0.739 0.773 1984 0.479 0.496 1985 0.659 0.682 1986 0.556 0.582 1987 0.853 0.896 1988 0.507 0.537 1989 0.634 0.671 1990 1.272 1.255 1991 0.981 0.981 1992 0.475 0.491 1993 0.401 0.419 1994 0.423 0.448 1995 0.580 0.603 1996 0.657 0.666 1997 0.627 0.640 1998 0.600 0.627 1999 1.298 1.326 2000 0.632 0.651 2001 0.662 0.696 2002 0.841 0.854 2003 0.654 0.664 2004 1.207 1.236 2005 0.554 0.566 2006 0.496 0.504 2007 1.136 1.160 2008 0.963 0.964 2009 0.776 0.821 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #2 Rank Predeveloped Mitigated 1 1.2984 1.3261 2 1.2721 1.2553 3 1.2066 1.2357 4 1.1361 1.1601 Page 19 60% Unmitigated 10/4/2018 955. 18 AM Page 20 5 0.9808 0.9811 6 0.9630 0.9765 7 0.9511 0.9636 8 0.8798 0.9102 9 0.8744 0.9099 10 0.8637 0.8959 11 0.8552 0.8955 12 0.8533 0.8770 13 0.8517 0.8700 14 0.8411 0.8538 15 0.7765 0.8213 16 0.7744 0.7997 17 0.7723 0.7809 18 0.7386 0.7731 19 0.7069 0.7414 20 0.7006 0.7300 21 0.6946 0.7088 22 0.6688 0.6956 23 0.6615 0.6848 24 0.6589 0.6823 25 0.6578 0.6823 26 0.6565 0.6728 27 0.6560 0.6715 28 0.6537 0.6657 29 0.6344 0.6635 30 0.6322 0.6631 31 0.6314 0.6515 32 0.6313 0.6448 33 0.6267 0.6398 34 0.5996 0.6268 35 0.5923 0.6118 36 0.5799 0.6030 37 0.5776 0.6003 38 0.5706 0.5921 39 0.5650 0.5824 40 0.5563 0.5811 41 0.5535 0.5660 42 0.5509 0.5626 43 0.5471 0.5597 44 0.5325 0.5424 45 0.5171 0.5404 46 0.5167 0.5388 47 0.5134 0.5379 48 0.5109 0.5369 49 0.5083 0.5339 50 0.5075 0.5330 51 0.5073 0.5207 52 0.4963 0.5045 53 0.4791 0.4974 54 0.4746 0.4957 55 0.4728 0.4933 56 0.4708 0.4910 57 0.4442 0.4616 58 0.4375 0.4604 59 0.4233 0.4481 60 0.4167 0.4410 61 0.4008 0.4190 60% Unmitigated 10/4/2018 9.55:18 AM Page 21 60% Unmitigated 10/4/2018 9.55. 18 AM Page 22 Duration Flows Flow(cfs) Predev Mit Percentage Pass/Fail 0.3171 1702 1984 116 Fai 0.3262 1551 1772 114 Fai 0.3354 1401 1618 115 Fai 0.3446 1260 1476 117 Fai 0.3537 1134 1325 116 Fai 0.3629 1036 1203 116 Fai 0.3720 949 1080 113 Fai 0.3812 870 991 113 Fai 0.3904 782 907 115 Fai 0.3995 720 838 116 Fai 0.4087 666 763 114 Fai 0.4178 620 706 113 Fai 0.4270 566 653 115 Fai 0.4362 527 600 113 Fai 0.4453 494 560 113 Fai 0.4545 452 523 115 Fai 0.4636 413 479 115 Fai 0.4728 385 441 114 Fai 0.4820 362 412 113 Fai 0.4911 339 384 113 Fai 0.5003 321 358 111 Fai 0.5094 289 332 114 Fai 0.5186 271 312 115 Fai 0.5277 251 292 116 Fai 0.5369 238 269 113 Fai 0.5461 221 250 113 Fai 0.5552 201 230 114 Fai 0.5644 194 218 112 Fai 0.5735 183 203 110 Fai 0.5827 168 195 116 Fai 0.5919 157 180 114 Fai 0.6010 146 165 113 Fai 0.6102 137 156 113 Fai 0.6193 131 145 110 Fai 0.6285 123 138 112 Fai 0.6377 113 132 116 Fai 0.6468 108 121 112 Fai 0.6560 101 115 113 Fai 0.6651 93 107 115 Fai 0.6743 88 101 114 Fai 0.6835 82 96 117 Fai 0.6926 81 88 108 Pass 0.7018 78 82 105 Pass 0.7109 76 80 105 Pass 0.7201 74 79 106 Pass 0.7292 67 76 113 Fail 0.7384 67 71 105 Pass 0.7476 63 67 106 Pass 0.7567 57 62 108 Pass 0.7659 55 61 110 Pass 0.7750 52 58 111 Fail 0.7842 48 54 112 Fail 0.7934 46 51 110 Pass 0.8025 43 50 116 Fail 60% Unmitigated 10/4/2018 9 55.16 AM 0.8117 0.8208 0.8300 0.8392 0.8483 0.8575 0.8666 0.8758 0.8850 0.8941 0.9033 0.9124 0.9216 0.9307 0.9399 0.9491 0.9582 0.9674 0.9765 0.9857 0.9949 1.0040 1.0132 1.0223 1.0315 1.0407 1.0498 1.0590 1.0681 1.0773 1.0865 1.0956 1.1048 1.1139 1.1231 1.1322 1.1414 1.1506 1.1597 1.1689 1.1780 1.1872 1.1964 1.2055 1.2147 1.2238 41 48 40 45 39 41 34 40 31 37 27 33 26 32 24 29 21 26 20 25 19 23 17 18 16 16 15 16 14 15 13 13 12 12 11 10 117 Fail 112 Fail 105 Pass 117 Fai 119 Fai 122 Fai 123 Fai 120 Fai 123 Fai 125 Fai 121 Fai 105 Pass 100 Pass 106 Pass 107 Pass 100 Pass 100 Pass 122 Fail 111 Fail 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 114 Fail 114 Fail 114 Fail 114 Fail 100 Pass 100 Pass 85 Pass 85 Pass 120 Fail 120 Fail 150 Fail 125 Fail 100 Pass 100 Pass 133 Fail 133 Fail 150 Fail 150 Fail The development has an increase in flow durations from 1/2 Predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. The development has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. Page 23 60% Unmitigated 10/4/2018 9.55 19 AM Page 24 Water Quality Water Quality BMP Flow and Volume for POC #2 On-line facility volume: 0.2148 acre-feet On-line facility target flow: 0.2677 cfs. Adjusted for 15 min: 0.2677 cfs. Off-line facility target flow: 0.151 cfs. Adjusted for 15 min: 0.151 cfs. 60% Unmitigated 10/4/2018 955.19 AM LID Report LID Technique Used for Treatmerdfi Total Volume Needs Treatment (ach) Volume Through Faality lac-0) Infiltration Volume tact) Cumulate. Volume Infiltration Credit Percent Volume Infiltrated Water Oualuy Percent Water Quality Treated Comment Total Volume Infiltrated 0.00 000 0.00 0.00 040 0% cnNO TO Compeanco wellLID Standards% 012-yr to 50% of Duration Analysts Roses r Feted Page 25 60% Unmitigated 10/4/2018 9.55. 19 AM Page 26 Model Default Modifications Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. IMPLND Changes No IMPLND changes have been made. 60% Unmitigated 10/4/2018 9.55.19 AM Appendix Predeveloped Schematic DA 1 Combi etpo 6.34ac I A '_ Existing Combined etpond DA2- Drains to ROW 2.11ac Page 27 60% Unmitigated 10/4/2018 9.55. 19 AM Page 28 Mitigated Schematic DA 1 New Detent 6.46ac DA 2 - Drains to ROW 2.00ac 60% Unmitigated 10/4/2018 9.55 20 AM Predeveloped UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END 2009 09 30 RUN INTER❑ OUTPUT LEVEL 3 0 RESUME 0 RUN 1 UNIT SYSTEM END GLOBAL PILES <File> <Un#> < File Name < ID WDM 26 60% Unmitigated.wdm MESSU 25 Pre60% Unmitigated.MES 27 Pre60% Unmitigated.L61 28 Pre60% Unmitigated.i.52 31 POC60% Unmitigatedl.dat 30 POC60► Unmitigatedl.dat END FILES OPN SEQUENCE INGRP INDELT 00:15 PERLND 16 IMPLND 1 IMPLND 4 TMPLND 8 IMPLND 14 RCHRES 1 COPY 502 COPY 501 DISPLY 2 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #< Title > ••TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND 2 TDA 2 - Drains to ROW MAX 1 2 31 9 1 Existing Combined Wetpond MAX 1 2 30 9 END DISPLY-TNFOT END DISPLY COPY TIMESERIES # # NPT NMN ••• 1 1 1 502 1 1 501 1 1 FIND TIMESERIES END COPY GENER OPCODE # # OPCD ••• END OPCODE PARM # # K •• END PARM END GENER PERLND GEN- INFO <PLS > .. ..--Name >NBLKS Unit -systems Printer ••• # - #< User t-series Engl Metr ••• in out ••• 16 C, Lawn, Flat 1 1 1 1 27 0 END GEN-INFO ••• Section PWATF.R••• ACTIVITY <PLS Page 29 60% Unmitigated Active Sections 10/4/2018 9:55:21 AM Page 30 # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ••• END PRINT -INFO 16 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY IWAT-PARM1 <PLS > IWATER variable monthly parameter value flags PRINT -INFO # - # CSNO RTOP VRS VNN RTLI ••• <PLS > Print -flags PIVL PYR 1 0 0 0 0 0 # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PROS TRAC 4 0 0 0 0 0 16 0 0 4 0 0 0 0 0 0 0 0 0 1 9 8 0 0 0 0 0 END PRINT -INFO 14 0 0 0 0 0 END IWAT-PARM1 PWAT-PARM1 <PLS-> PWATER variable monthly parameter value flags •`• IWAT-PARM2 # - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ••• <PLS > IWATER input info: Part 2 ••• 16 0 0 0 0 0 0 0 0 0 0 0 #- # ••` LSUR SLSUR NSUR RETSC END PWAT-PARM1 1 400 0.01 0.1 0.1 4 400 0.01 0.1 0.1 PWAT-PARM2 8 400 0.01 0.1 0.1 <PLS > PWATER input info: Part 2 •`• 14 400 0.01 0.1 0.1 # - # ...FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC END IWAT-PARM2 16 0 4.5 0.03 400 0.05 0.5 0.996 END PWAT-PARM2 IWAT-PARM3 <PLS > IWATER input info: Part 3 ••• PWAT-PARM3 # - # •••PETMAX PETMIN <PLS > PWATER input info: Part 3 ••• 1 0 0 # - # •••PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP 4 0 0 16 0 0 2 2 0 0 0 8 0 0 END PWAT-PARM3 14 0 0 PWAT-PARM4 END IWAT-PARM3 <PLS > PWATER input info: Part 4 ••• # - # CEPSC UZSN NSUR INTFW IRC LZETP ••• IWAT-STATE1 16 0.1 0.25 0.25 6 0.5 0.25 <PLS > ••• Initial conditions at start of simulation END PWAT-PARM4 # - # ••• RETS SURS 1 0 0 PWAT-STATEI 4 0 0 <PLS > ••• Initial conditions at start of simulation 8 0 0 ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ••• 14 0 0 # - # `•` CEPS SURS UZS IFWS LZS AGWS GWVS END IWAT-STATE1 16 0 0 0 0 2.5 1 0 END PWAT-STATE1 END IMPLND END PERLND SCHEMATIC <-Source-> <--Area--> <-Target-> MBLK ••` IMPLND »Name» # <-factor-> <Name> # Tb10 ••• GEN-INFO TDA 1 - To Combined Wetpond••• »PLS > Name Unit -systems Printer ••• PERLND 16 0.6105 RCHRES 1 2 # - #< > User [-series Engl Metr ••• PERLND 16 0.6105 RCHRES 1 3 in out ••• IMPLND 1 2.0162 RCHRES 1 5 1 ROADS/FLAT 1 1 1 27 0 IMPLND 4 3.0448 RCHRES 1 5 4 ROOF TOPS/FLAT 1 1 1 27 0 IMPLND 8 0.3222 RCHRES 1 5 8 SIDEWALKS/FLAT 1 1 1 27 0 IMPLND 14 0.3475 RCHRES 1 5 14 POND 1 1 1 27 0 TDA 2 - Drains to ROW". END GEN-INFO PERLND 16 0.5417 COPY 502 12 ••• Section IWATER". PERLND 16 0.5417 COPY 502 13 IMPLND 1 0.6554 COPY 502 15 ACTIVITY IMPLND 4 0.8144 COPY 502 15 »PLS > Active Sections IMPLND 8 0.1028 COPY 502 15 # - # ATMP SNOW IWAT SLD IWG IQAL ••• 1 0 0 1 0 0 0 Routing 4 0 0 1 0 0 0 RCHRES 1 1 COPY 501 16 8 0 0 1 0 0 0 END SCHEMATIC 14 0 0 1 0 0 0 END ACTIVITY NETWORK <-Volume-> »-Grp» <-Member-><--Mult-->Tran »-Target vols> <-Grp» c-Member-> ••` PRINT -INFO <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # `•• <ILS > Print -flags PIVL PYR COPY 502 OUTPUT MEAN 1 1 48.4 DISPLY 2 INPUT TIMSER 1 # - # ATMP SNOW IWAT SLD IWG IQAL COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 1 0 0 4 0 0 0 1 9 4 0 0 4 0 0 0 1 9 8 0 0 4 0. 0 0 1 9 14 0 0 4 0 0 0 1 9 <-Volume-> <-Grp» <-Member-><--Mult-->Tran <-Target vols> <-Grp» <-Member-> ••• 60% Unmitigated 10/4/2018 9 55.21 AM Page 31 60% Unmitigated 10/4/2018 9 55.21 AM Page 32 <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ••• 1.700000 0.099862 0.154155 0.975218 END NETWORK 1.800000 0.101010 0.164256 1.022106 1.900000 0.102157 0.174472 1.127717 RCHRES 2.000000 0.103305 0.184802 1.265898 GEN-INFO 2.100000 0.104453 0.195247 1.428654 RCHRES Name Nexits Unit Systems Printer ••• 2.200000 0.105601 0.205808 1.612013 # - #< >< ---> User T-series Engl Metr LKFG ••• 2.300000 0.106749 0.216483 1.813473 in out ••• 2.400000 0.107897 0.227272 2.031270 1 Existing Combine-004 1 1 1 1 28 0 1 2.500000 0.109045 0.238177 2.264075 END GEN-INFO 2.600000 0.110192 0.249196 2.621016 ••• Section RCHRES". 2.700000 0.111340 0.260330 3.218146 2.800000 0.112488 0.271579 3.842695 ACTIVITY 2.900000 0.113636 0.282943 4.315211 <PLS > Active Sections 3.000000 0.114784 0.294421 4.580286 # - # HYFG ADFG CNFG HTFG SDFG GOFG OXFC NUFG PKFG PHFG ••• 3.100000 0.115932 0.306014 4.838058 1 1 0 0 0 0 0 0 0 0 0 3.200000 0.117079 0.317722 5.054607 END ACTIVITY 3.300000 0.118227 0.329545 5.257298 3.400000 0.119375 0.341483 5.448617 PRINT -INFO 3.500000 0.120523 0.353535 5.630381 <PLS > Print -flags PIVL PYR 3.600000 0.121671 0.365702 5.803960 # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PINK PHCB PIVL PYR 3.700000 0.122819 0.377984 5.970422 1 4 0 0 0 0 0 0 0 0 0 1 9 3.800000 0.123966 0.390381 6.130619 END PRIMP -INFO 3.900000 0.125114 0.402892 6.285241 4.000000 0.126262 0.415518 6.434859 HYDR-PARM1 4.100000 0.129706 0.428489 6.579951 RCHRES Flags for each HYDR Section ••• 4.200000 0.133149 0.441804 6.720923 # - # VC Al A2 A3 ODFVFG for each ••• ODGTFG for each FUNCT for each 4.300000 0.136593 0.455463 6.858120 FG FG FG FG possible exit ••• possible exit possible exit 4.400000 0.140036 0.469467 6.991845 • • • • • • • • • • • • ••• 4.500000 0.143480 0.483815 7.122358 1 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2 4.600000 0.146923 0.498507 7.249888 END HYDR-PARM1 4.700000 0.150367 0.513544 7.374640 4.800000 0.153810 0.528925 7.496794 HYDR-PARM2 4.900000 0.157254 0.544651 7.616511 # - # FTABNO LEN DELTH STCOR KS DB50 5.000000 0.160697 0.560720 7.733937 < >< < < < < < ••• 5.100000 0.164141 0.577135 7.849202 1 10.010.00.00.50.0 5.200000 0.167584 0.593893 7.962427 END HYDR-PARM2 5.300000 0.171028 0.610996 8.073717 HYDR-INIT 5.400000 0.174472 0.628443 8.183174 RCHRES Initial conditions for each HYDR section ••• 5.500000 0.177915 0.646235 8.290886 # - # ••• VOL Initial value of COLIND Initial value of OUTDGT 5.600000 0.181359 0.664371 8.396937 ••• ac-ft for each possible exit for each possible exit 5.700000 0.184802 0.682851 8.501404 < >< > <___><___><---><---><---> ••• <___><___><___><___><___> 5.800000 0.188246 0.701675 8.604358 1 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.900000 0.191689 0.720844 8.705864 END HYDR-INIT 6.000000 0.195133 0.740358 8.805983 END RCHRES 6.100000 0.198236 0.760181 8.904773 6.200000 0.201340 0.780315 9.002284 SPEC -ACTIONS 6.300000 0.204444 0.800760 9.098569 END SPEC -ACTIONS 6.400000 0.207548 0.821515 9.193671 FTABLES 6.500000 0.210652 0.842580 9.287636 FTABLE 1 6.600000 0.213755 0.863955 9.380503 99 4 6.700000 0.216859 0.885641 9.472312 Depth Area Volume Outflowl Velocity Travel Time." 6.800000 0.219963 0.907638 9.563097 (ft) (acres) (acre-ft) (cfs) (ft/sec) (Minutes)••• 6.900000 0.223067 0.929944 9.652894 0.000000 0.000000 0.000000 0.000000 7.000000 0.226170 0.952562 9.741735 0.100000 0.081496 0.008149 0.236525 7.100000 0.228378 0.975399 9.829649 0.200000 0.082644 0.016414 0.334497 7.200000 0.230585 0.998458 9.916667 0.300000 0.083792 0.024793 0.409674 7.300000 0.232793 1.021737 10.00281 0.400000 0.084940 0.033287 0.473050 7.400000 0.235001 1.045237 10.08812 0.500000 0.086088 0.041896 0.528886 7.500000 0.237208 1.068958 10.17260 0.600000 0.087236 0.050619 0.579366 7.600000 0.239416 1.092900 10.25629 0.700000 0.088383 0.059458 0.625787 7.700000 0.241623 1.117062 10.33921 0.800000 0.089531 0.068411 0.668994 7.800000 0.243831 1.141445 10.42138 0.900000 0.090679 0.077479 0.709575 7.900000 0.246039 1.166049 10.50281 1.000000 0.091827 0.086662 0.747958 8.000000 0.248246 1.190874 10.58353 1.100000 0.092975 0.095959 0.784465 8.100000 0.251332 1.216007 10.66356 1.200000 0.094123 0.105371 0.819347 8.200000 0.254419 1.241449 10.74291 1.300000 0.095270 0.114899 0.852804 8.300000 0.257505 1.267200 10.82161 1.400000 0.096418 0.124540 0.884996 8.400000 0.260591 1.293259 10.89966 1.500000 0.097566 0.134297 0.916058 8.500000 0.263677 1.319627 10.97709 1.600000 0.098714 0.144169 0.946101 8.600000 0.266764 1.346303 11.05391 60% Unmitigated 10/4/2018 9.55.21 AM Page 33 60% Unmitigated 10/4/2018 9.55.21 AM Page 34 8.700000 0.269850 1.373288 11.13012 8.800000 0.272936 1.400582 11.20576 8.900000 0.276023 1.428184 11.28083 9.000000 0.279109 1.456095 11.35534 9.100000 0.279508 1.484046 11.42930 9.200000 0.279906 1.512037 11.50273 9.300000 0.280305 1.540067 11.57565 9.400000 0.280704 1.568137 11.64805 9.500000 0.281103 1.596248 11.71995 9.600000 0.281501 1.624398 11.79136 9.700000 0.281900 1.652588 11.86230 9.800000 0.282299 1.680818 11.93276 END FTARLE 1 END STABLES EXT SOURCES <-Volume-> <Member> <Name> a <Name> a WDM WDM WDM WDM 2 PREC 2 PREC 1 FVAP 1 EVAP TEND EXT SOURCES F.XT TARGETS <-Volume-> <-Grp> <Name> a RCHRES 1 HYDR RCHRES 1 }IYDR COPY 501 OUTPUT COPY 502 OUTPUT END EXT TARGETS SsysSgap<--Mutt-->Tran tem strg<-factor->strg ENGL 1 ENGL 1 ENGL 0.76 ENGL 0.76 <-Member-><--Mult-- >Tran <Name> 8 a<•factor->strg RO 1 1 1 STAGE 1 1 1 MEAN 1 1 48.4 MEAN 1 1 48.4 MASS -LINK <Vclume> <-Grp> <-Member-><--Mult--> <Name> <Name> a a< -factor-> MASS -LINK 2 PERLND PWATER SURD 0.083333 END MASS -LINK 2 MASS -LINK 3 PERLND PWATER IFWO END MASS -LINK 3 MASS -LINK 5 IMPLND IWATER SURD END :ASS -LINK 5 MASS -LINK 12 PERLND PWATER SURO END MASS -LINK 12 MASS -LINK 13 PERLND PWATF.R TFWO END MASS -LINK 13 MASS -LINK 15 IMPLND TWATER SURD END MASS -LINK 15 MASS -LINK 16 RCHRES ROFLOW END MASS -LINK 16 END MASS -LINK END RUN 60% Unmitigated 0.083333 0.083333 0.083333 0.083333 0.083333 <-Target vole> <-Grp> <-Member-> <Name> a a <Name> a 8 PERLND 1 999 EXTNL PRF.0 IMPEND 1 999 EXTNL. PREC PERLND 1 999 EXTNL PETINP IMPLND 1. 999 EXTNL PF.TINP <-Volume.> <Member> Tsys Tgap Amd '•• <Name> a <Name> tem strg strg••• WDM 1000 FLOW F.NGI. REPL WDM 1001 STAG F.NGT. REPL WDM 501 FLOW F.NG1, REPL WDM 502 FLOW 8NG1, REPL <Target> <Name> RCHRF.S RCHRF.S RCHRES COPY COPY COPY COPY 10/4/2018 9 552'. AM <-Grp> < Member->••• <Name> a a••* INFLOW IVOL INFLOW IVOL INFLOW IVOL INPUT MEAN INPUT MEAN INPUT MEAN INPUT MEAN Mitigated UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 RUN INTERP OUTPUT LEVEL RESUME 0 RUN 1 END GLOBAL FILES <File> <Un8> <-ID-> WDM 26 KESSU 25 27 28 30 31 END FILES END 2009 09 30 3 0 UNIT SYSTEM File Name •• 60% Unmitigated.wdm Mit60% Unmitigated.MES Mit60% Unmitigated.L61 Mit60i Unmitigated.L62 POC60► Unmitigatedl.dat POC60% Unmitigated2.dat OPN SEQUENCE INGRP PERLND 16 PERLND 12 IMPLND 1 IMPLND 4 IMPLND 8 COPY 501 COPY 502 DISPLY 1 DISPLY 2 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 a - a< 1 TDA 1 2 TDA 2 END DISPLY-INFO1 END DISPLY COPY TIMESERIES a - 8 NPT NMN 1 1 1 501 1 1 502 1 1 END TIMF.SF.RIES END COPY GENER OPCODE 8 8 OPCD ••• END OPCODE PARM a a END PARM END GENER PERLND GEN-INFO <PLS > 8 - a< K •. Name 16 C. Lawn, Flat 12 C, Forest, Steep END GEN-INFO ••• Section PWATER*** INDELT 00:15 Title >• ••TRAN PIVL - To New Detention MAX - Drains to ROW MAX DIG1 FIL1 PYR DIG2 FIL2 1 2 30 1 2 31 >NBLKS Unit -systems Printer ••• User t-seriee, Engl Metr in out ••• 1 1 27 0 1 1 1 27 0 ACTIVITY <PLS > •••**........ Active Sections YRND 9 9 Page 35 60% Unmitigated 10/4/2018 9.55 21 AM Page 36 8 - 8 ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PiIOS TRAC ••• 8 - 8 ATMP SNOW TWAT SLD TWG TIDAL 16 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 4 0 0 0 1 9 12 0 0 1 0 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 1 9 END ACTIVITY 8 0 0 4 0 0 0 1 9 END PRINT -INFO PRINT -INFO <PLS > Print flags PIVL PYR IWAT-PARM1 8 - 4 ATMP SNOW PWAT SED PST PWG PQAL MSTI. PEST NITR PHOS TRAC <PLS > IWATER variable monthly parameter value flags 16 0 0 4 0 0 0 0 0 0 0 0 0 9 8- # CSNO RTOP VRS VNN RTI,1 ••• 12. 0 0 4 0 0 0 0 0 0 0 0 0 9 1 0 0 0 0 0 '''VEND PRINT -INFO 4 0 0 0 0 0 e o 0 0 PWAT-PARM1 END IWAT-PARM1 <PLS > PWATER variable monthly parameter value flags •• 4 8 CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFCHWT ••• IWAT-PARM2 16 0 0 0 0 0 0 0 0 0 0 0 <PLS > IWATER input info: Part 2 ••• 12 0 0 0 0 0 0 0 0 0 0 0 8- 9 ••• LSUR SLSUR NSUR RETSC END PWAT-PARM1 1 400 0.01 0.1 0.1 4 400 0.01 0.1 0.1 PWAT-PARM2 8 400 0.01 0.1 0.1 <PLS > PWATER input info: Part 2 ••• END IWAT PARM2 0 - 8 ***FOREST LZSN TNFTLT LSLR SLSUR KVARY AGWRC 16 0 4.5 0.03 400 0.05 0.5 0.996 IWAT-PARM3 12 0 4.5 0.08 400 0.15 0.5 0.996 <PIS > IWATER input info: Part 3 ••• END PWAT-PARM2 9 - 8 ***PETMAX PETMIN 1 0 PWAT-PARM3 4 0 <PIS > PWATER input info: Part 3 ••• 8 0 8 - 8 •••PETMAX ❑ETMIN INFEXP INFILD DEEPER BASETP AGWETP END IWAT-PARM3 16 0 0 2 2 0 0 0 12 0 0 2 2 0 0 0 IWAT-STATE1 END PWAT-PARM3 <PLO > • Initial conditions at start of simulation PWAT-PARM4 R - 8 ••• RETS SUBS <PLS > PWATER input info: Part 4 1 0 0 8 8 CEPSC UZSN NSUR INTFW IRC LZETP ••• 4 0 0 16 0.1 0.25 0.25 6 0.5 0.25 8 0 0 12 1.2 0.3 0.35 6 0.3 0.7 END IWAT-STATEI END PWAT-PARM4 END IMPLND PWAT-STATE1 <PLS > ••• Initial conditions at start of simulation SCHEMATIC ran from 1990 to end of 1992 (pat 1-11-951 RUN 21 ••• <-Source-> --Area--> <-Target-> MBLK 8 • 8 ••• CEPS SURS UZS TFWS LZS AGWS GWVS <Name> 8 <-factor-> <Name> 8 Tb1# 16 0 0 0 0 2.5 1 0 TDA 1 To New Detention... 12 0 0 0 0 2.5 1 0 PERLND 16 0.0632 COPY 501 12 END PWAT-STATE1 PERLND 16 0.0632 COPY 501 13 PERLND 12 0.0307 COPY 501 12 END PERLND PERLND 12 0.0307 COPY 501 13 IMPLND 1 5.3985 COPY 501 15 IMPLND IMPLND 4 0.7112 COPY 501 15 GEN-INFO IMPLND 8 0.2567 COPY 501 15 <PIS >< > Name Unit -systems Printer ••• TDA 2 - Drains to ROW." - MUser t-series Engl Metr ••• PERLND 16 0.3305 COPY 502 12 in out ••• PERLND 16 0.3305 COPY 502 13 1 ROADS/FLAT 1 1 1 27 0 IMPLND 1 1.5384 COPY 502 1S 4 ROOF TOPS/FLAT 1 1 1 27 0 IMPLND 4 0.1213 COPY 502 15 8 SIDEWALKS/FLAT 1 1 1 27 0 IMPLND 8 0.005 COPY 502 15 END GEN-INFO ••• Section IWATER••• Routing END SCHEMATTC ACTIVITY <PIS > Active Sect' 8 8 ATMP SNOW IWAT SLD IWG IQAL 1 0 0 1 0 0 0 4 0 0 1 0 0 0 8 0 0 1 0 0 0 END ACTIVITY PRINT -INFO <ILS > Print flags NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran < Target vole> <-Grp> c-Member > •• <Name> 8 <Name> 8 8c-factor >strg <Name> 8 d <Name> 8 8 ••• COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 COPY 502 OUTPUT MEAN 1 1 48.4 DISPLY 2 INPUT T:MSER 1 PIVI, PYR <-Volume-> <-Grp> <-Member-><--Mult-->Tran < Target vols> <-Grp> <-Member-> ••• 60% Unmdigaled 10/4/2018 9.55 21 AM Page 37 60% Unmdigaled 10/4/2018 9.55.21 AM Page 38 <Name> # END NETWORK RCHRES GEN-INFO RCHRF.S # - #< <Name> # #<-factor->strg <Name> # # <Name> # # ••• Name END GEN-INFO ••• Section RCHRES*** ACTIVITY <PLS > Nexits Unit Systems Printer • ----><-• > User T-series Engl Metr LKFG in out totete MASS -LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS -LINK 13 MASS -LINK 15 IMPLND IWATER SURO 0.083333 COPY INPUT MEAN END MASS LINK 15 END MASS -LINK Active Sections END RUN # • # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG END ACTIVITY PRINT INFO <PL.S > Print -flags P.VL PYR # - # HYDR ADCA CONS HEAT SF.D GQL OXRX NUTR PLNK PHCR PIVI. PYR END PRINT -INFO HYDR-PARM1 RCHRF.S Flags for each HYDR Section # • # VC Al A2 A3 ODFVFG for each ••• ODGTFG for each FG FG FG FG possible exit ••• possible exit • • • • • • • • • • • • • • END HYDR-PARM1 FUNCT for each possible exit HYDR-PARM2 # - # FTABNO LEN DF.i.TH STCOR KS DB50 ••• >< >< >< >< >< .___> ••• END HYDR-PARM2 HYDR-TNTT RCHRES Initial conditions for each HYDR section ••• # - # ••• VOL Initial value of COI.TND Initial value of OUTDGT ••• ac-ft for each possible exit for each possible exit END HYDR-TNIT END RCHRF.S SPEC -ACTIONS END SPF.C-ACTIONS FTABLES END FTABI.F.S EXT SOURCES <-Volume > <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> <Name> # <Name> # tem strg<-factor >strg <Name> # # <Name> # # WDX 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC WDX 2 PREC FNGI. 1 IMPLND 1 999 EXTNL PREC WDM 1 EVAP ENGI. 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGI, 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-Member-><--Xult-->Tran <-Volume-> <Member> Tsys Tgap Amd ••• <Name> # <Name> # #<-factor >strg <Name> # <Name> tem strg strg*.* COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW F.NGL REPL COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL COPY 2 OUTPUT MEAN 1 1 48.4 WDM 702 FLOW ENGL REPL COPY 502 OUTPUT MEAN 1 1 48.4 WDM 802 FLOW ENGL REPL END EXT TARGETS MASS -LINK <Vclume> <-Grp> <-Member-><--Mult > <Target> <Name> <Name> # #<-factor-> <Name> MASS LINK 12 PERLND PWATER SURO 0.083333 COPY END MASS -LINK 12 60% Unmitigated 10/4/2018 9 55'21 AM <-Grp> <-Member->*** <Name> # #••• INPUT MEAN Page 39 60% Unmitigated 10/4/2018 9.55 21 AM Page 40 Predeveloped HSPF Message File Mitigated HSPF Message File 60% Unmitigated 10/4/2018 9.55.21 AM Page 41 60% Unmitigated 10/4/2018 9.5521 AM Page 42 Disclaimer Legal Notice This program and accompanying documentation are provided 'as -is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All Rights Reserved. Clear Creek Solutions, Inc. 6200 Capitol Blvd. Ste F Olympia, WA 98501 Toll Free 1(866)943-0304 Local (360)943-0304 www.clearcreeksolutions com 60 % Unmiligaled 10/4/2018 9 55.21 AM Page 43 WWHM2012 PROJECT REPORT General Model Information Project Name: Site Name: Site Address: City: Report Date: Gage: Data Start: Data End: Timestep: Precip Scale: Version Date: Version: 90% FC with Filterra KC Metro South Base 12400 East Marginal Way South Tukwila 10/12/2018 Seatac 1948/10/01 2009/09/30 15 Minute 0.000 (adjusted) 2018/07/12 4.2.15 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POC1: 50 Year Low Flow Threshold for POC2: High Flow Threshold for POC2: 90% FC with Fi!terra 50 Percent of the 2 Year 50 Year 10/12/2018 1 59 48 PM Landuse Basin Data Predeveloped Land Use TDA 1 - To Combined Wetpond Bypass: No GroundWater: No Pervious Land Use C, Lawn, Flat Pervious Total Impervious Land Use ROADS FLAT ROOF TOPS FLAT SIDEWALKS FLAT POND Impervious Total Basin Total acre 0.6105 0.6105 acre 2.0162 3.0448 0.3222 0.3475 5.7307 6.3412 Element Flows To: Surface Interflow Groundwater Existing Combined Werpating Combined Wetpond Page 2 90% FC with Filterra 10/12/2018 1.59.48 PM Page 3 TDA 2 - Drains to ROW Bypass: No GroundWater: Pervious Land Use C, Lawn, Flat Pervious Total Impervious Land Use ROADS FLAT ROOF TOPS FLAT SIDEWALKS FLAT Impervious Total Basin Total Element Flows To: Surface No acre 0.5417 0.5417 acre 0.6554 0.8144 0.1028 1.5726 2.1143 Interflow Groundwater 90% FC with Filterra 10/12/2018 1.59.48 PM Mitigated Land Use TDA 1 - To New Detention - North Bypass: No GroundWater: No Pervious Land Use acre C, Lawn, Flat 0 0342 Pervious Total 0.0342 Impervious Land Use ROADS FLAT ROOF TOPS FLAT SIDEWALKS FLAT acre 3.5334 0.3224 0.0992 Impervious Total 3.955 Basin Total 3.9892 Element Flows To: Surface Interflow Groundwater TDA 1 - Filterra - NorthTDA 1 - Filterra - North Page 4 90% FC with Filterra 10/12/2018 1 59.48 PM Page 5 TDA 2 - Drains to ROW - North TDA 1 - Bypass Bypass: No Groundwater: Pervious Land Use C, Lawn, Flat Pervious Total Impervious Land Use ROADS FLAT SIDEWALKS FLAT Impervious Total Basin Total No acre 0.2013 0.2013 acre 0.6681 0.005 0.6731 0.8744 Element Flows To: Surface Interflow Groundwater TDA 2 - Filterra - NorthTDA 2 - Filterra - North 90% FC with Filterra 10/12/2018 1. 5948 PM Page 6 Bypass: GroundWater: Pervious Land Use C, Lawn, Flat Pervious Total Impervious Land Use ROADS FLAT ROOF TOPS FLAT SIDEWALKS FLAT Impervious Total Basin Total Yes No acre 0.0001 0.0001 acre 0.0788 0.0447 0.1547 0.2782 0.2783 Element Flows To: Surface Interflow Groundwater 90% FC wah Filterra 10/12/2018 1.59:48 PM Page 7 TDA 2 - Drains to ROW - South Bypass: No GroundWater: No Pervious Land Use acre C, Lawn, Flat 0.1624 Pervious Total 0.1624 Impervious Land Use ROADS FLAT DRIVEWAYS FLAT Impervious Total Basin Total acre 0.8374 0.1213 0.9587 1.1211 Element Flows To: Surface Interflow Groundwater TDA 2 - Filterra - SoutrTDA 2 - Filterra - South 90% FC with Filterra 10/12/2018 1.59.48 PM TDA 1 - To New Detention - South Bypass: No GroundWater: No Pervious Land Use C, Lawn, Flat C, Forest, Steep Pervious Total Impervious Land Use ROADS FLAT ROOF TOPS FLAT Impervious Total Basin Total acre 0.0284 0.0307 0.0591 acre 1.7869 0.3463 2.1332 2.1923 Element Flows To: Surface Interflow Groundwater TDA 1 - Filterra - SoutPTDA 1 - Filterra - South Page 8 90% FC with Filterra 10/12/2018 1 59.48 PM Page 9 Routing Elements 3.600 0.122 0.366 5.804 0.000 0.000 0.000 0.000 Predeveloped Routing 3.700 0.123 0.378 5.970 0.000 0.000 0.000 0.000 3.800 0.124 0.390 6.131 0.000 0 000 0.000 0.000 ExistingCombined Wet and 3.900 0.125 0.403 6.285 0.000 0.000 0.000 0.000 P 4.000 0.126 0.416 6.435 0.000 0.000 0.000 0.000 Depth: 9.9 ft. 4.100 0.130 0.428 6.580 0.000 0.000 0.000 0.000 Discharge Structure: 1 4.200 0.133 0.442 6.721 0.000 0.000 0.000 0.000 Riser Height: 2.5 ft. 4.300 0.137 0.455 6.858 0.000 0.000 0.000 0.000 Riser Diameter: 12 in. 4.400 0.140 0.469 6.992 0.000 0.000 0.000 0.000 Notch Type: Rectangular 4.500 0.143 0.484 7.122 0.000 0.000 0.000 0.000 Notch Width: 0.500 ft. 4.600 0.147 0.499 7.250 0.000 0.000 0.000 0.000 Notch Height: 0.750 ft. 4.700 0.150 0.514 7.375 0.000 0.000 0.000 0.000 Orifice 1 Diameter: 5.25 in. Elevation:0 ft. 4.800 0.154 0.529 7.497 0.000 0.000 0.000 0.000 Element Flows To: 4.900 0.157 0.545 7.617 0.000 0.000 0.000 0.000 Outlet 1 Outlet 2 5 000 0.161 0.561 7.734 0.000 0.000 0.000 0.000 5.100 0.164 0.577 7.849 0.000 0.000 0.000 0.000 5.200 0.168 0.594 7.962 0.000 0.000 0.000 0.000 SSD Table Hydraulic Table 5.300 0.171 0.611 8.074 0.000 0.000 0.000 0.000 Y 5.400 0.174 0.628 8.183 0.000 0.000 0.000 0.000 5.500 0.178 0.646 8.291 0.000 0.000 0.000 0.000 Stage Area Volume Outlet 5.600 0.181 0.664 8.397 0.000 0.000 0.000 0.000 (feet) (ac.) (ac-ft.) Struct NotUsed NotUsed NotUsed NotUsed 5.700 0.185 0.683 8.501 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.800 0.188 0.702 8.604 0.000 0.000 0.000 0.000 0.100 0.081 0.008 0.237 0.000 0.000 0.000 0.000 5.900 0.192 0.721 8.706 0.000 0.000 0.000 0.000 0.200 0.083 0.016 0.334 0.000 0.000 0.000 0.000 6.000 0.195 0.740 8.806 0.000 0.000 0.000 0.000 0.300 0.084 0.025 0.410 0.000 0.000 0.000 0.000 6.100 0.198 0.760 8.905 0.000 0.000 0.000 0.000 0.400 0.085 0.033 0.473 0.000 0.000 0.000 0.000 6.200 0.201 0.780 9.002 0.000 0.000 0.000 0.000 0.500 0.086 0.042 0.529 0.000 0.000 0.000 0.000 6.300 0.204 0.801 9.099 0.000 0.000 0.000 0.000 0.600 0.087 0.051 0.579 0.000 0.000 0.000 0.000 6.400 0.208 0.822 9.194 0.000 0.000 0.000 0.000 0.700 0.088 0.059 0.626 0.000 0.000 0.000 0.000 6.500 0.211 0.843 9.288 0.000 0.000 0.000 0.000 0.800 0.090 0.068 0.669 0.000 0.000 0.000 0.000 6.600 0.214 0.864 9.381 0.000 0.000 0.000 0.000 0.900 0.091 0.077 0.710 0.000 0.000 0.000 0.000 6.700 0.217 0.886 9.472 0.000 0.000 0.000 0.000 1.000 0.092 0.087 0.748 0.000 0.000 0.000 0.000 6.800 0.220 0.908 9.563 0.000 0.000 0.000 0.000 1.100 0.093 0.096 0.784 0.000 0.000 0.000 0.000 6.900 0.223 0.930 9.653 0.000 0.000 0.000 0.000 1.200 0.094 0.105 0.819 0.000 0.000 0.000 0.000 7.000 0.226 0.953 9.742 0.000 0 000 0.000 0.000 1.300 0.095 0.115 0.853 0.000 0.000 0.000 0.000 7.100 0.228 0.975 9.830 0.000 0.000 0.000 0 000 1.400 0.096 0.125 0.885 0.000 0.000 0.000 0.000 7.200 0.231 0.998 9.917 0.000 0.000 0.000 0.000 1.500 0.098 0.134 0.916 0.000 0 000 0.000 0.000 7.300 0.233 1.022 10.00 0.000 0.000 0.000 0.000 1.600 0.099 0.144 0.946 0.000 0.000 0.000 0.000 7.400 0.235 1.045 10.09 0.000 0.000 0.000 0.000 1.700 0.100 0.154 0.975 0.000 0.000 0.000 0.000 7.500 0.237 1.069 10.17 0.000 0.000 0.000 0.000 1.800 0.101 0.164 1.022 0.000 0.000 0.000 0.000 7.600 0.239 1.093 10.26 0.000 0.000 0.000 0.000 1.900 0.102 0.174 1.128 0.000 0.000 0.000 0.000 7.700 0.242 1.117 10.34 0.000 0.000 0.000 0.000 2.000 0.103 0.185 1.266 0.000 0.000 0.000 0.000 7.800 0.244 1.141 10.42 0.000 0.000 0.000 0.000 2.100 0.104 0.195 1.429 0.000 0.000 0.000 0.000 7.900 0.246 1.166 10.50 0.000 0.000 0.000 0.000 2.200 0.106 0 206 1.612 0.000 0.000 0.000 0.000 8.000 0.248 1.191 10.58 0.000 0.000 0.000 0.000 2.300 0.107 0.216 1.813 0.000 0.000 0.000 0.000 8.100 0.251 1.216 10.66 0.000 0.000 0.000 0.000 2.400 0.108 0.227 2.031 0.000 0.000 0.000 0.000 8.200 0.254 1.241 10.74 0.000 0.000 0.000 0.000 2.500 0.109 0.238 2.264 0.000 0.000 0.000 0.000 8.300 0.258 1.267 10.82 0.000 0.000 0.000 0.000 2.600 0.110 0.249 2.621 0.000 0.000 0.000 0.000 8.400 0.261 1.293 10.90 0.000 0.000 0.000 0.000 2 700 0.111 0.260 3.218 0.000 0.000 0.000 0.000 8.500 0.264 1.320 10.98 0.000 0.000 0.000 0.000 2.800 0.112 0.272 3.843 0.000 0.000 0.000 0.000 8.600 0.267 1.346 11.05 0.000 0.000 0.000 0.000 2.900 0.114 0.283 4.315 0.000 0.000 0.000 0.000 8.700 0.270 1.373 11.13 0.000 0.000 0.000 0.000 3.000 0.115 0.294 4.580 0.000 0.000 0.000 0.000 8.800 0.273 1.401 11.21 0.000 0.000 0.000 0.000 3.100 0.116 0.306 4.838 0.000 0.000 0.000 0.000 8.900 0.276 1.428 11.28 0.000 0.000 0.000 0.000 3.200 0.117 0.318 5.055 0.000 0.000 0.000 0.000 9.000 0.279 1.456 11.36 0.000 0.000 0.000 0.000 3.300 0 118 0.330 5.257 0.000 0.000 0.000 0.000 9.100 0.280 1.484 11.43 0.000 0.000 0.000 0.000 3.400 0 119 0.341 5.449 0.000 0.000 0.000 0.000 9.200 0 280 1.512 11.50 0.000 0.000 0.000 0.000 3.500 0 121 0.354 5.630 0.000 0.000 0.000 0.000 9.300 0.280 1.540 11.58 0.000 0.000 0.000 0.000 90% FC with Flterra 10/12/2018 1 59.48 PM Page 10 90% FC with FJterra 10/12/2018 1 59 48 PM Page 11 9.400 9 500 9.600 9.700 9.800 0.281 0.281 0.282 0.282 0.282 1.568 1.596 1.624 1.653 1.681 11.65 11.72 11.79 11.86 11.93 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 90% FC with Fi'terra 10/12/2018 1.59 49 PM 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Mitigated Routing Vault 1 Width' 92 ft. Length: 92 ft. Depth: 3.5 ft. Discharge Structure Riser Height: 2.5 ft. Riser Diameter: 18 in. Notch Type: Rectangular Notch Wdth: 0.500 ft. Notch Height: 1.100 ft. Orifice 1 Diameter: 5.375 in. Elevation:0 ft. Element Flows To: Outlet 1 Outlet 2 Vault Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.194 0.000 0.000 0.000 0.0389 0.194 0.007 0.154 0.000 0.0778 0.194 0.015 0.218 0.000 0.1167 0.194 0.022 0.267 0.000 0.1556 0.194 0.030 0.309 0.000 0.1944 0.194 0.037 0.345 0.000 0.2333 0.194 0.045 0.378 0.000 0.2722 0.194 0.052 0.409 0.000 0.3111 0.194 0.060 0.437 0.000 0.3500 0.194 0.068 0 463 0.000 0.3889 0.194 0.075 0.488 0.000 0.4278 0.194 0.083 0.512 0.000 0.4667 0.194 0.090 0.535 0.000 0.5056 0.194 0.098 0.557 0.000 0.5444 0.194 0.105 0.578 0.000 0.5833 0.194 0.113 0.598 0.000 0.6222 0.194 0.120 0.618 0.000 0.6611 0.194 0.128 0.637 0.000 0.7000 0.194 0.136 0.655 0.000 0.7389 0.194 0.143 0.673 0.000 0.7778 0.194 0.151 0.691 0.000 0.8167 0.194 0.158 0.708 0.000 0.8556 0.194 0.166 0.725 0.000 0.8944 0.194 0.173 0.741 0.000 0.9333 0.194 0.181 0.757 0.000 0.9722 0.194 0.188 0.773 0.000 1.0111 0.194 0.196 0.788 0.000 1.0500 0.194 0.204 0.803 0.000 1.0889 0.194 0.211 0.818 0.000 1.1278 0.194 0.219 0.832 0.000 1.1667 0.194 0.226 0.846 0.000 1.2056 0.194 0.234 0.860 0.000 1.2444 0.194 0.241 0.874 0.000 1.2833 0.194 0.249 0.888 0.000 1.3222 0.194 0.256 0.901 0.000 1.3611 0.194 0.264 0.914 0.000 1.4000 0.194 0.272 0.927 0.000 Page 12 90% FC with Filterra 10/12/2018 1. 59.49 PM Page 13 TDA 2 - Filterra - North Bottom Length: 11.00 ft. Bottom Width: 8.00 ft. Depth: 0.75 ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To 1 Filtration On Hydraulic conductivity: 24.82 Depth of filter medium: 1.8 Total Volume Infiltrated (ac-ft.): 111.839 Total Volume Through Riser (ac-ft.): 7.289 Total Volume Through Facility (ac-ft.): 119.127 Percent Infiltrated: 93.88 Total Precip Applied to Facility: 0 Total Evap From Facility: 0 Discharge Structure Riser Height: 0.7 ft. Riser Diameter: 1000 in. Element Flows To: Outlet 1 Outlet 2 Sand Filter Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.002020 0.000000 0.000 0.000 0.0083 0.002020 0.000017 0.000 0.050 0.0167 0.002020 0.000034 0.000 0.051 0.0250 0.002020 0.000051 0.000 0.051 0.0333 0.002020 0.000067 0.000 0.051 0.0417 0.002020 0.000084 0.000 0.051 0.0500 0.002020 0.000101 0.000 0.052 0.0583 0.002020 0.000118 0.000 0.052 0.0667 0.002020 0.000135 0.000 0.052 0.0750 0.002020 0.000152 0.000 0.052 0.0833 0.002020 0.000168 0.000 0.052 0.0917 0.002020 0.000185 0.000 0.053 0.1000 0.002020 0.000202 0.000 0.053 0.1083 0.002020 0.000219 0.000 0.053 0.1167 0.002020 0.000236 0.000 0.053 0.1250 0.002020 0.000253 0.000 0.054 0.1333 0.002020 0.000269 0.000 0.054 0.1417 0.002020 0.000286 0.000 0.054 0.1500 0.002020 0.000303 0.000 0.054 0.1583 0.002020 0.000320 0.000 0.055 0.1667 0.002020 0.000337 0.000 0.055 0.1750 0.002020 0.000354 0.000 0.055 0.1833 0.002020 0.000370 0.000 0.055 0.1917 0.002020 0.000387 0.000 0.055 0.2000 0.002020 0.000404 0.000 0.056 0.2083 0.002020 0.000421 0.000 0.056 0.2167 0.002020 0.000438 0.000 0.056 0.2250 0.002020 0.000455 0.000 0.056 0.2333 0.002020 0.000471 0.000 0.057 0.2417 0.002020 0.000488 0.000 0.057 90% FC with Filterra 10/12/2018 1 59 49 PM Page 15 1.4389 0.194 0.279 0.953 0.000 1.4778 0.194 0.287 0.988 0.000 1.5167 0.194 0.294 1.030 0.000 1.5556 0.194 0.302 1.076 0.000 1.5944 0.194 0.309 1.127 0.000 1.6333 0.194 0.317 1.180 0.000 1.6722 0.194 0.324 1.237 0.000 1.7111 0.194 0.332 1.296 0.000 1.7500 0.194 0.340 1.357 0.000 1.7889 0.194 0.347 1.421 0.000 1.8278 0.194 0.355 1.485 0.000 1.8667 0.194 0.362 1.552 0.000 1.9056 0.194 0.370 1.620 0.000 1.9444 0.194 0.377 1.689 0.000 1.9833 0.194 0.385 1.759 0.000 2.0222 0.194 0.392 1.830 0.000 2.0611 0.194 0.400 1.902 0.000 2.1000 0.194 0.408 1.974 0.000 2.1389 0.194 0.415 2.047 0.000 2.1778 0.194 0.423 2.121 0.000 2.2167 0.194 0.430 2.195 0.000 2.2556 0.194 0.438 2.269 0.000 2.2944 0.194 0.445 2.344 0.000 2.3333 0.194 0.453 2.418 0.000 2.3722 0.194 0.460 2.493 0.000 2.4111 0.194 0.468 2.571 0.000 2.4500 0.194 0.476 2.660 0.000 2.4889 0.194 0.483 2.750 0.000 2.5278 0.194 0.491 2.856 0.000 2.5667 0.194 0.498 3.066 0.000 2.6056 0.194 0.506 3.346 0.000 2.6444 0.194 0.513 3.680 0.000 2.6833 0.194 0.521 4.057 0.000 2.7222 0.194 0.528 4.467 0.000 2.7611 0.194 0.536 4.901 0.000 2.8000 0.194 0.544 5.349 0.000 2.8389 0.194 0.551 5.803 0.000 2.8778 0.194 0.559 6.253 0.000 2.9167 0.194 0.566 6.688 0.000 2.9556 0.194 0.574 7.100 0.000 2.9944 0.194 0.581 7.482 0.000 3.0333 0.194 0.589 7.826 0.000 3.0722 0.194 0.597 8.128 0.000 3.1111 0.194 0.604 8.387 0.000 3.1500 0.194 0.612 8.605 0.000 3.1889 0.194 0.619 8.785 0.000 3.2278 0.194 0.627 8.939 0.000 3.2667 0.194 0.634 9.158 0.000 3.3056 0.194 0.642 9.322 0.000 3.3444 0.194 0.649 9.482 0.000 3.3833 0.194 0.657 9.639 0.000 3.4222 0.194 0.665 9.792 0.000 3.4611 0.194 0.672 9.942 0.000 3.5000 0.194 0.680 10.09 0.000 3.5389 0.194 0.687 10.23 0.000 3.5778 0.000 0.000 10.37 0.000 90% FC wah Ftterra 10/12/2018 1:59.49 PM Page 14 0.2500 0.002020 0.000505 0.000 0.057 0.2583 0.002020 0.000522 0.000 0.057 0.2667 0.002020 0.000539 0.000 0.058 0.2750 0.002020 0.000556 0.000 0.058 0.2833 0.002020 0.000572 0.000 0.058 0.2917 0.002020 0.000589 0.000 0.058 0.3000 0.002020 0.000606 0 000 0.059 0.3083 0.002020 0.000623 0 000 0.059 0.3167 0.002020 0.000640 0.000 0.059 0.3250 0.002020 0.000657 0.000 0.059 0.3333 0.002020 0.000673 0.000 0.059 0.3417 0.002020 0.000690 0.000 0.060 0.3500 0.002020 0.000707 0.000 0.060 0.3583 0.002020 0.000724 0.000 0.060 0.3667 0.002020 0.000741 0.000 0.060 0.3750 0.002020 0.000758 0.000 0.061 0.3833 0.002020 0.000774 0.000 0.061 0.3917 0.002020 0.000791 0.000 0.061 0.4000 0.002020 0.000808 0.000 0.061 0.4083 0.002020 0.000825 0.000 0.062 0.4167 0.002020 0.000842 0.000 0.062 0.4250 0.002020 0 000859 0.000 0.062 0.4333 0.002020 0.000875 0.000 0.062 0.4417 0.002020 0.000892 0.000 0.063 0.4500 0.002020 0.000909 0.000 0.063 0 4583 0 002020 0.000926 0.000 0.063 0.4667 0.002020 0.000943 0.000 0.063 0.4750 0.002020 0.000960 0.000 0.063 0.4833 0.002020 0.000976 0.000 0.064 0.4917 0.002020 0.000993 0.000 0.064 0.5000 0.002020 0.001010 0.000 0.064 0.5083 0.002020 0.001027 0.000 0.064 0.5167 0.002020 0.001044 0.000 0.065 0.5250 0.002020 0.001061 0.000 0.065 0.5333 0.002020 0.001077 0.000 0.065 0.5417 0.002020 0.001094 0.000 0.065 0.5500 0.002020 0.001111 0.000 0.066 0.5583 0.002020 0.001128 0.000 0.066 0.5667 0.002020 0.001145 0.000 0.066 0.5750 0.002020 0.001162 0.000 0.066 0.5833 0.002020 0.001178 0.000 0.066 0.5917 0.002020 0.001195 0.000 0.067 0.6000 0.002020 0.001212 0.000 0.067 0.6083 0.002020 0.001229 0.000 0.067 0.6167 0.002020 0.001246 0.000 0.067 0.6250 0.002020 0.001263 0.000 0.068 0.6333 0.002020 0.001279 0.000 0.068 0.6417 0.002020 0.001296 0.000 0.068 0.6500 0.002020 0.001313 0.000 0.068 0.6583 0.002020 0.001330 0.000 0.069 0.6667 0.002020 0.001347 0.000 0.069 0.6750 0.002020 0.001364 0.000 0.069 0.6833 0.002020 0.001380 0.000 0.069 0.6917 0.002020 0.001397 0.000 0.070 0.7000 0.002020 0.001414 0.000 0.070 0.7083 0.002020 0.001431 0.673 0.070 0.7167 0.002020 0.001448 1.904 0.070 0.7250 0.002020 0.001465 3.498 0.070 90% FC with Fillerra 10/12/2018 1.59:49 PM 0.7333 0.7417 0.7500 0.7583 Page 16 90% FC with Filterra 0.002020 0.002020 0.002020 0.002020 0.001481 0.001498 0.001515 0.001532 5.386 7.528 9.896 12.47 0.071 0.071 0.071 0.071 10/12/2018 1. 59:49 PM Page 17 TDA 1 - Filterra - North Bottom Length: 25.00 ft. Bottom Width: 18.00 ft. Depth: 0.75 ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To 1 Filtration On Hydraulic conductivity: 24.82 Depth of filter medium: 1.8 Total Volume Infiltrated (ac-ft.): 570.395 Total Volume Through Riser (ac-ft.): 51.514 Total Volume Through Facility (ac-ft.): 621.91 Percent Infiltrated: 91.72 Total Precip Applied to Facility: 0 Total Evap From Facility: 0 Discharge Structure Riser Height: 0.7 ft. Riser Diameter: 1000 in. Element Flows To: Outlet 1 Outlet 2 Vault 1 Vault 1 Sand Filter Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Dlscharge(cfs) Infilt(cfs) 0.0000 0.010 0.000 0.000 0.000 0.0083 0.010 0.000 0.000 0.259 0.0167 0.010 0.000 0.000 0.260 0.0250 0.010 0.000 0.000 0.262 0.0333 0.010 0.000 0.000 0.263 0.0417 0.010 0.000 0.000 0.264 0.0500 0.010 0.000 0.000 0.265 0.0583 0.010 0.000 0.000 0.266 0.0667 0.010 0.000 0.000 0.268 0.0750 0.010 0.000 0.000 0.269 0.0833 0.010 0.000 0.000 0.270 0.0917 0.010 0.000 0.000 0.271 0.1000 0.010 0.001 0.000 0.272 0.1083 0.010 0.001 0.000 0.274 0.1167 0.010 0.001 0.000 0.275 0.1250 0.010 0.001 0.000 0.276 0.1333 0.010 0.001 0.000 0.277 0.1417 0.010 0.001 0.000 0.278 0.1500 0.010 0.001 0.000 0.280 0.1583 0.010 0.001 0.000 0.281 0.1667 0.010 0.001 0.000 0.282 0.1750 0.010 0.001 0.000 0.283 0.1833 0.010 0.001 0.000 0.284 0.1917 0.010 0.002 0.000 0.286 0.2000 0.010 0.002 0.000 0.287 0.2083 0.010 0.002 0.000 0.288 0.2167 0.010 0.002 0.000 0.289 0.2250 0.010 0.002 0.000 0.290 0.2333 0.010 0.002 0.000 0.292 0.2417 0.010 0.002 0.000 0.293 90% FC with Filterra 10/12/2018 1 59:49 PM 0.2500 0.010 0.002 0.000 0.294 0.2583 0.010 0.002 0.000 0.295 0.2667 0.010 0.002 0.000 0.296 0.2750 0.010 0.002 0.000 0.298 0.2833 0.010 0.002 0.000 0.299 0.2917 0.010 0.003 0.000 0.300 0.3000 0.010 0.003 0.000 0.301 0.3083 0.010 0.003 0.000 0.302 0.3167 0.010 0.003 0.000 0.304 0.3250 0.010 0.003 0.000 0.305 0.3333 0.010 0.003 0.000 0.306 0.3417 0.010 0.003 0.000 0.307 0.3500 0.010 0.003 0.000 0.308 0.3583 0.010 0.003 0.000 0.310 0.3667 0.010 0.003 0.000 0.311 0.3750 0.010 0.003 0.000 0.312 0.3833 0.010 0.004 0.000 0.313 0.3917 0.010 0.004 0.000 0.314 0.4000 0.010 0.004 0.000 0.316 0.4083 0.010 0.004 0.000 0.317 0.4167 0.010 0.004 0.000 0.318 0.4250 0.010 0.004 0.000 0.319 0.4333 0.010 0.004 0.000 0.320 0.4417 0.010 0.004 0.000 0.322 0.4500 0.010 0.004 0.000 0.323 0.4583 0.010 0.004 0.000 0.324 0.4667 0.010 0.004 0.000 0.325 0.4750 0.010 0.004 0.000 0.326 0.4833 0.010 0.005 0.000 0.328 0.4917 0.010 0.005 0.000 0.329 0.5000 0.010 0.005 0.000 0.330 0.5083 0.010 0.005 0.000 0.331 0.5167 0.010 0.005 0.000 0.332 0.5250 0.010 0.005 0.000 0.333 0.5333 0.010 0.005 0.000 0.335 0.5417 0.010 0.005 0.000 0.336 0.5500 0.010 0.005 0.000 0.337 0.5583 0.010 0.005 0.000 0.338 0.5667 0.010 0.005 0.000 0.339 0.5750 0.010 0.005 0.000 0.341 0.5833 0.010 0.006 0.000 0.342 0.5917 0.010 0.006 0.000 0.343 0.6000 0.010 0.006 0.000 0.344 0.6083 0.010 0.006 0.000 0.345 0.6167 0.010 0.006 0.000 0.347 0.6250 0.010 0.006 0.000 0.348 0.6333 0.010 0.006 0.000 0.349 0.6417 0.010 0.006 0.000 0.350 0.6500 0.010 0.006 0.000 0.351 0.6583 0.010 0.006 0.000 0.353 0.6667 0.010 0.006 0.000 0.354 0.6750 0.010 0.007 0.000 0.355 0.6833 0.010 0.007 0.000 0.356 0.6917 0.010 0.007 0.000 0.357 0.7000 0.010 0.007 0.000 0.359 0.7083 0.010 0.007 0.673 0.360 0.7167 0.010 0.007 1.904 0.361 0.7250 0.010 0.007 3.498 0.362 Page 18 90% FC with Filterra 10/12/2018 1. 59.49 PM Page 19 0.7333 0.010 0.007 5.386 0.363 TDA 1 - Filterra - South 0 7417 0.010 0.007 7.528 0.365 Bottom Length: 25.00 ft. 0.7500 0.010 0.007 9.896 0 366 Bottom Width: 10.00 ft. 0.7583 0.010 0.007 12.47 0.367 Depth: 0.75 ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To 1 Filtration On Hydraulic conductivity: 24.82 Depth of filter medium: 1.8 Total Volume Infiltrated (ac-ft.): 310.473 Total Volume Through Riser (ac-ft.): 26.348 Total Volume Through Facility (ac-ft.): 336.82 Percent Infiltrated: 92.18 Total Precip Applied to Facility: 0 Total Evap From Facility: 0 Discharge Structure Riser Height: 0.7 ft. Riser Diameter: 1000 in. Element Flows To: Outlet 1 Outlet 2 Vault 1 Vault 1 90% FC with Filterra Sand Filter Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infllt(cfs) 0.0000 0.005 0.000 0.000 0.000 0.0083 0.005 0.000 0.000 0.144 0.0167 0.005 0.000 0.000 0.145 0.0250 0.005 0.000 0.000 0.145 0.0333 0.005 0.000 0.000 0.146 0.0417 0.005 0.000 0.000 0.147 0.0500 0.005 0.000 0.000 0.147 0.0583 0.005 0.000 0.000 0.148 0.0667 0.005 0.000 0.000 0.149 0.0750 0.005 0.000 0.000 0.149 0.0833 0.005 0.000 0.000 0.150 0.0917 0.005 0.000 0.000 0.150 0.1000 0.005 0.000 0.000 0.151 0.1083 0.005 0.000 0.000 0.152 0.1167 0.005 0.000 0.000 0.152 0.1250 0.005 0.000 0.000 0.153 0.1333 0.005 0.000 0.000 0.154 0.1417 0.005 0.000 0.000 0.154 0.1500 0.005 0.000 0.000 0.155 0.1583 0.005 0.000 0.000 0.156 0.1667 0.005 0.001 0.000 0.156 0.1750 0.005 0.001 0.000 0.157 0.1833 0.005 0.001 0.000 0.158 0.1917 0.005 0.001 0.000 0.158 0.2000 0.005 0.001 0.000 0.159 0.2083 0.005 0.001 0.000 0.160 0.2167 0.005 0.001 0.000 0.160 0.2250 0.005 0.001 0.000 0.161 0.2333 0.005 0.001 0.000 0.162 0.2417 0.005 0.001 0.000 0.162 10/12/2018 1 59.49 PM Page 20 90% FC with Filterra 10/12/2018 1.59.49 PM Page 21 0.2500 0.005 0.001 0.000 0.163 0.2583 0.005 0.001 0.000 0.164 0.2667 0.005 0.001 0.000 0.164 0.2750 0.005 0.001 0.000 0.165 0.2833 0.005 0.001 0.000 0.166 0.2917 0.005 0.001 0.000 0.166 0.3000 0.005 0.001 0.000 0.167 0.3083 0.005 0.001 0.000 0.168 0.3167 0.005 0.001 0.000 0.168 0.3250 0.005 0.001 0.000 0.169 0.3333 0.005 0.001 0.000 0.170 0.3417 0.005 0.002 0.000 0.170 0.3500 0.005 0.002 0.000 0.171 0.3583 0.005 0.002 0.000 0.172 0.3667 0.005 0.002 0.000 0.172 0.3750 0.005 0.002 0.000 0.173 0.3833 0.005 0.002 0.000 0.174 0.3917 0.005 0.002 0.000 0.174 0.4000 0.005 0.002 0.000 0.175 0.4083 0.005 0.002 0.000 0.176 0.4167 0.005 0.002 0.000 0.176 0.4250 0.005 0.002 0.000 0.177 0.4333 0.005 0.002 0.000 0.178 0.4417 0.005 0.002 0.000 0.178 0.4500 0.005 0.002 0.000 0.179 0.4583 0.005 0.002 0.000 0.180 0.4667 0.005 0.002 0.000 0.180 0.4750 0.005 0.002 0.000 0.181 0.4833 0.005 0.002 0.000 0.182 0.4917 0.005 0.002 0.000 0.182 0.5000 0.005 0.002 0.000 0.183 0.5083 0.005 0.002 0.000 0.184 0.5167 0.005 0.003 0.000 0.184 0.5250 0.005 0.003 0.000 0.185 0.5333 0.005 0.003 0.000 0.186 0.5417 0.005 0.003 0.000 0.186 0 5500 0.005 0.003 0.000 0.187 0.5583 0.005 0.003 0.000 0.188 0 5667 0.005 0.003 0.000 0.188 0.5750 0.005 0.003 0.000 0.189 0.5833 0.005 0.003 0.000 0.190 0.5917 0.005 0.003 0.000 0.190 0.6000 0.005 0.003 0.000 0.191 0.6083 0.005 0.003 0.000 0.192 0.6167 0.005 0.003 0.000 0.192 0.6250 0.005 0.003 0.000 0.193 0.6333 0.005 0.003 0.000 0.194 0.6417 0.005 0.003 0.000 0.194 0.6500 0.005 0.003 0.000 0.195 0.6583 0.005 0.003 0.000 0.196 0.6667 0.005 0.003 0.000 0.196 0.6750 0.005 0.003 0.000 0.197 0.6833 0.005 0.003 0.000 0.198 0.6917 0.005 0.004 0.000 0.198 0.7000 0.005 0.004 0.000 0.199 0.7083 0.005 0.004 0.673 0.200 0.7167 0.005 0.004 1.904 0.200 0.7250 0.005 0.004 3.498 0.201 90% FC with Fi!terra 0.7333 0.7417 0.7500 0.7583 0.005 0.005 0.005 0.005 0.004 0.004 0.004 0.004 5.386 7.528 9.896 12.47 0.202 0.202 0.203 0.204 10/12/2018 1.59 49 PM Page 22 90% FC with Fi!terra 10/12/2018 1 59.49 PM Page 23 TDA 2 - Filterra - South Bottom Length: 13.00 ft. Bottom Width: 8.00 ft. Depth: 0.75 ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To 1 Filtration On Hydraulic conductivity: 24.82 Depth of filter medium: 1.8 Total Volume Infiltrated (ac-ft.): 146.468 Total Volume Through Riser (ac-ft.): 14.549 Total Volume Through Facility (ac-ft.): 161.018 Percent Infiltrated: 90.96 Total Precip Applied to Facility: 0 Total Evap From Facility: 0 Discharge Structure Riser Height: 0.7 ft. Riser Diameter: 100 in. Element Flows To: Outlet 1 Outlet 2 Sand Filter Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.002 0.000 0.000 0.000 0.0083 0.002 0.000 0.000 0.060 0.0167 0.002 0.000 0.000 0.060 0.0250 0.002 0.000 0.000 0.060 0.0333 0.002 0.000 0.000 0.060 0.0417 0.002 0.000 0.000 0.061 0.0500 0.002 0.000 0.000 0.061 0.0583 0.002 0.000 0.000 0.061 0.0667 0.002 0.000 0.000 0.062 0.0750 0.002 0.000 0.000 0.062 0.0833 0.002 0.000 0.000 0.062 0.0917 0.002 0.000 0.000 0.062 0.1000 0.002 0.000 0.000 0.063 0.1083 0.002 0.000 0.000 0.063 0.1167 0.002 0.000 0.000 0.063 0.1250 0.002 0.000 0.000 0.063 0.1333 0.002 0.000 0.000 0.064 0.1417 0.002 0.000 0.000 0.064 0.1500 0.002 0.000 0.000 0.064 0.1583 0.002 0.000 0.000 0.065 0.1667 0.002 0.000 0.000 0.065 0.1750 0.002 0.000 0.000 0.065 0.1833 0.002 0.000 0.000 0.065 0.1917 0.002 0.000 0.000 0.066 0.2000 0.002 0.000 0.000 0.066 0.2083 0.002 0.000 0.000 0.066 0.2167 0.002 0.000 0.000 0.066 0.2250 0.002 0.000 0.000 0.067 0.2333 0.002 0.000 0.000 0.067 0.2417 0.002 0.000 0.000 0.067 90% FC with Filterra 10/12/2018 1:59:49 PM 0.2500 0.002 0.000 0.000 0.068 0.2583 0.002 0.000 0.000 0.068 0.2667 0.002 0.000 0.000 0.068 0.2750 0.002 0.000 0.000 0.068 0.2833 0.002 0.000 0.000 0.069 0.2917 0.002 0.000 0.000 0.069 0.3000 0.002 0.000 0.000 0.069 0.3083 0.002 0.000 0.000 0.070 0.3167 0.002 0.000 0.000 0.070 0.3250 0.002 0.000 0.000 0.070 0.3333 0.002 0.000 0.000 0.070 0.3417 0.002 0.000 0.000 0.071 0.3500 0.002 0.000 0.000 0.071 0.3583 0.002 0.000 0.000 0.071 0.3667 0.002 0.000 0.000 0.071 0.3750 0.002 0.000 0.000 0.072 0.3833 0.002 0.000 0.000 0.072 0.3917 0.002 0.000 0.000 0.072 0.4000 0.002 0.001 0.000 0.073 0.4083 0.002 0.001 0.000 0.073 0.4167 0.002 0.001 0.000 0.073 0.4250 0.002 0.001 0.000 0.073 0.4333 0.002 0.001 0.000 0.074 0.4417 0.002 0.001 0.000 0.074 0.4500 0.002 0.001 0.000 0.074 0.4583 0.002 0.001 0.000 0.075 0.4667 0.002 0.001 0.000 0.075 0.4750 0.002 0.001 0.000 0.075 0.4833 0.002 0.001 0.000 0.075 0.4917 0.002 0.001 0.000 0.076 0.5000 0.002 0.001 0.000 0.076 0.5083 0.002 0.001 0.000 0.076 0.5167 0.002 0.001 0.000 0.076 0.5250 0.002 0.001 0.000 0.077 0.5333 0.002 0.001 0.000 0.077 0.5417 0.002 0.001 0.000 0.077 0.5500 0.002 0.001 0.000 0.078 0.5583 0.002 0.001 0.000 0.078 0.5667 0.002 0.001 0.000 0.078 0.5750 0.002 0.001 0.000 0.078 0.5833 0.002 0.001 0.000 0.079 0.5917 0.002 0.001 0.000 0.079 0.6000 0.002 0.001 0.000 0.079 0.6083 0.002 0.001 0.000 ' 0.079 0.6167 0.002 0.001 0.000 0.080 0.6250 0.002 0.001 0.000 0.080 0.6333 0.002 0.001 0.000 0.080 0.6417 0.002 0.001 0.000 0.081 0.6500 0.002 0.001 0.000 0.081 0.6583 0.002 0.001 0.000 0.081 0.6667 0.002 0.001 0.000 0.081 0.6750 0.002 0.001 0.000 0.082 0.6833 0.002 0.001 0.000 0.082 0.6917 0.002 0.001 0.000 0.082 0.7000 0.002 0.001 0.000 0.083 0.7083 0.002 0.001 0.067 0.083 0.7167 0.002 0.001 0.190 0.083 0.7250 0.002 0.001 0.349 0.083 Page 24 90% FC with Filterra 10/12/2018 1 59.49 PM Page 25 0.7333 0.7417 0.7500 0.7583 0.002 0.002 0.002 0.002 0.001 0.001 0.001 0.001 0.538 0.752 0.989 1.246 90% FC wah F Iterra 10/12/2018 1.59.49 PM 0.084 0.084 0.084 0.084 Analysis Results POC 1 o' it 0 0 n ry + Predeveloped x Mitigated Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.6105 Total Impervious Area: 5.7307 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0.0934 Total Impervious Area: 6.3664 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 1.078041 5 year 1.498132 10 year 1.82478 25 year 2.29714 50 year 2.695413 100 year 3.13618 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.9434 5 year 1.277484 10 year 1.532038 25 year 1.89397 50 year 2.194534 100 year 2.523119 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 1.308 1.005 1950 1.155 0.920 1951 1.147 1.058 1952 0.894 0.781 1953 0.883 0.784 1954 0.865 0.765 1955 1.195 1.157 1956 0.971 0.864 1957 1.359 1.130 1958 0.883 0.867 Page 26 90% FC with F.Iterra 10/12/2018 1. 59 49 PM Page 27 1959 0.828 0.768 1960 1.244 1.038 1961 0.899 0.779 1962 0.783 0.693 1963 0.805 0.684 1964 0.959 0.823 1965 0 874 0.745 1966 0.851 0.776 1967 1.107 1.011 1968 1.036 0.885 1969 0.924 0.873 1970 0.907 0.841 1971 0.893 0.804 1972 1.540 1.287 1973 0.843 0.798 1974 0.826 0.721 1975 1.196 1.134 1976 0.831 0.772 1977 0.855 0.741 1978 1.513 1.041 1979 0.934 0.790 1980 1.169 0.936 1981 1.047 0.899 1982 2.084 1.450 1983 1.435 1.005 1984 0.782 0.743 1985 0.982 0.893 1986 1.424 1.406 1987 1.417 1.342 1988 0.840 0.746 1989 0.785 0.660 1990 2.869 2.325 1991 2.298 1.898 1992 0.938 0.863 1993 0.707 0.652 1994 0.748 0.650 1995 0.884 0.849 1996 1.461 1.359 1997 1.196 1.236 1998 0.836 0.789 1999 2.113 1.263 2000 1.198 0.965 2001 0.856 0.764 2002 1.483 1.324 2003 0.841 0.771 2004 3.108 2.780 2005 1.353 1.239 2006 0.846 0.814 2007 2.475 2.216 2008 2.844 2.418 2009 1.565 1.183 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 3.1080 2.7797 2 2.8688 2.4175 3 2.8444 2.3252 90% FC with F Iterra 10/12/2018 2.00.37 PM 4 2.4749 2.2160 5 2.2977 1.8981 6 2.1135 1.4499 7 2.0841 1.4061 8 1.5646 1.3586 9 1.5400 1.3424 10 1.5132 1.3240 11 1.4827 1.2872 12 1.4607 1.2634 13 1.4349 1.2390 14 1.4245 1.2357 15 1.4173 1.1833 16 1.3590 1.1573 17 1.3526 1.1341 18 1.3078 1.1296 19 1.2442 1.0580 20 1.1981 1.0410 21 1.1965 1.0379 22 1.1963 1.0112 23 1.1955 1.0054 24 1.1689 1.0050 25 1.1554 0.9646 26 1.1474 0.9364 27 1.1066 0.9195 28 1.0471 0.8989 29 1.0356 0.8929 30 0.9818 0.8854 31 0.9708 0.8734 32 0.9591 0.8665 33 0.9376 0.8644 34 0.9342 0.8633 35 0.9244 0.8493 36 0.9074 0.8409 37 0.8992 0.8230 38 0.8940 0.8140 39 0.8926 0.8035 40 0.8842 0.7979 41 0.8831 0.7897 42 0.8830 0.7890 43 0.8743 0.7840 44 0.8653 0.7806 45 0.8556 0.7794 46 0.8550 0.7763 47 0.8505 0.7721 48 0.8464 0.7707 49 0.8433 0.7679 50 0.8414 0.7650 51 0.8405 0.7642 52 0.8361 0.7456 53 0.8310 0.7450 54 0.8276 0.7431 55 0.8264 0.7405 56 0.8052 0.7214 57 0.7850 0.6930 58 0.7834 0.6836 59 0.7820 0.6596 60 0.7481 0.6523 61 0.7075 0.6501 Page 28 90% FC wilh Fl!terra 10/12/2018 2.00 37 PM - Page 29 90% FC with Filterra 10/12/2018 2 00 37 PM Duration Flows The Facility PASSED Flow(cfs) Predev Mit Percentage Pass/Fail 0.5390 10960 10091 92 Pass 0.5608 9670 8827 91 Pass 0.5826 8449 7689 91 Pass 0.6044 7418 6697 90 Pass 0.6261 6521 5813 89 Pass 0.6479 5749 5071 88 Pass 0.6697 5020 4400 87 Pass 0.6915 4395 3769 85 Pass 0.7133 3908 3281 83 Pass 0.7351 3429 2851 83 Pass 0.7568 2990 2492 83 Pass 0.7786 2573 2145 83 Pass 0.8004 2261 1857 82 Pass 0.8222 1962 1604 81 Pass 0.8440 1721 1409 81 Pass 0.8657 1485 1218 82 Pass 0.8875 1264 1052 83 Pass 0.9093 1077 872 80 Pass 0.9311 923 735 79 Pass 0.9529 797 615 77 Pass 0.9747 697 542 77 Pass 0.9964 609 486 79 Pass 1.0182 540 442 81 Pass 1.0400 486 408 83 Pass 1.0618 437 382 87 Pass 1.0836 413 352 85 Pass 1.1053 381 333 87 Pass 1.1271 346 301 86 Pass 1.1489 321 274 85 Pass 1.1707 304 255 83 Pass 1.1925 289 238 82 Pass 1.2143 268 217 80 Pass 1.2360 257 199 77 Pass 1.2578 237 186 78 Pass 1.2796 231 176 76 Pass 1.3014 219 164 74 Pass 1.3232 200 158 79 Pass 1.3449 193 150 77 Pass 1.3667 182 145 79 Pass 1.3885 178 140 78 Pass 1.4103 172 137 79 Pass 1.4321 163 133 81 Pass 1.4539 156 129 82 Pass 1.4756 152 128 84 Pass 1.4974 147 124 84 Pass 1.5192 139 123 88 Pass 1.5410 135 120 88 Pass 1.5628 129 116 89 Pass 1.5845 126 116 92 Pass 1.6063 121 111 91 Pass 1.6281 116 109 93 Pass 1.6499 114 104 91 Pass 1.6717 111 103 92 Pass Page 30 90% FC with Filterra 10/12/2018 2 00.37 PM Page 31 1.6935 110 101 91 Pass Water Quality 1.7152 107 97 90 Pass Water Quality BMP Flow and Volume for POC #1 1.7370 100 94 94 Pass On-line facility volume: 0.7846 acre-feet 1.7588 94 93 98 Pass On-line facility target flow: 1.034 cfs. 1.7806 92 92 100 Pass Adjusted for 15 min: 1.034 cfs. 1.8024 90 89 98 Pass Off-line facility target flow: 0.5841 cfs. 1.8241 87 84 96 Pass Adjusted for 15 min: 0.5841 cfs. 1.8459 84 79 94 Pass 1.8677 80 76 95 Pass 1.8895 78 71 91 Pass 1.9113 75 65 86 Pass 1.9331 73 60 82 Pass 1.9548 67 57 85 Pass 1.9766 64 56 87 Pass 1.9984 61 52 85 Pass 2.0202 58 50 86 Pass 2.0420 55 47 85 Pass 2.0637 53 41 77 Pass 2.0855 48 37 77 Pass 2.1073 44 35 79 Pass 2.1291 42 34 80 Pass 2.1509 39 31 79 Pass 2 1727 36 24 66 Pass 2.1944 35 24 68 Pass 2.2162 33 20 60 Pass 2.2380 30 18 60 Pass 2.2598 29 15 51 Pass. 2.2816 27 15 55 Pass 2.3033 23 15 65 Pass 2.3251 23 14 60 Pass 2.3469 21 13 61 Pass 2.3687 20 12 60 Pass 2.3905 19 11 57 Pass 2.4123 19 11 57 Pass 2.4340 17 9 52 Pass 2.4558 17 8 47 Pass 2.4776 16 8 50 Pass 2.4994 14 7 50 Pass 2.5212 14 7 50 Pass 2.5429 14 6 42 Pass 2.5647 14 5 35 Pass 2.5865 14 5 35 Pass 2.6083 14 5 35 Pass 2.6301 12 4 33 Pass 2.6518 8 3 37 Pass 2.6736 8 3 37 Pass 2.6954 8 3 37 Pass 90% FC with F Iterra 10/12/2018 2.00.37 PM Page 32 90% FC vnth Filterra 10/12/2018 2.00.37 PM Page 33 LID Report LID Technique Used for Treatment 7 Total Volume Needs Treatment (ac-01 Volume Through Faouty (aca) Infiltration Volume /,ac-d) CumWathe Volume Infiltration Credit Percent Volume Infiltrated Water Ovahty Percent Water Quality Treated Comment Vault I POC 0 572.51 0 0.00 7DA 1 • Flltana • North 0 565.94 0 000 7DA 1- Fleena - South 0 300.51 0 0.00 Total Volume Infiltrated 1744.96 0.00 0.00 0.00 0.00 0%No 7reeL Credit Compliance wtn LID Standard 0% o12.yr 10 50% of 2.n Duration Analysis Result = Failed 90% FC with Ftlterra 10/12/2018 2.00:37 PM POC 2 ,ace .2 isi i Ire + Predeveloped x Mitigated Predeveloped Landuse Totals for POC #2 Total Pervious Area: 0.5417 Total Impervious Area: 1.5726 Mitigated Landuse Totals for POC #2 Total Pervious Area: 0.3637 Total Impervious Area: 1.6318 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Retum Periods for Predeveloped. POC #2 Return Period Flow(cfs) 2 year 0.634172 5 year 0.81376 10 year 0.937267 25 year 1.099007 50 year 1.223838 100 year 1.352541 Flow Frequency Return Periods for Mitigated. POC #2 Return Period Flow(cfs) 2 year 0.643529 5 year 0.821915 10 year 0.944155 25 year 1.103785 50 year 1.226682 100 year 1.353145 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #2 Year Predeveloped Mitigated 1949 0.855 0.858 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 Page 34 90% FC with Filterra 0.852 0.879 0.533 0.535 0.438 0.453 0.473 0.488 0.517 0.526 0.578 0.589 0.571 0.583 0.669 0.675 0.517 0.528 0.508 0.525 10/12/2018 2:01.53 PM Page 35 1960 0.551 0.551 1961 0.565 0.573 1962 0.471 0.484 1963 0.547 0.554 1964 0.513 0.524 1965 0.695 0.701 1966 0.444 0.454 1967 0.772 0.787 1968 0.880 0.893 1969 0.631 0.637 1970 0.592 0.601 1971 0.707 0.718 1972 0.774 0.773 1973 0.417 0.423 1974 0.656 0.661 1975 0.701 0.727 1976 0.507 0.512 1977 0.511 0.530 1978 0.631 0.647 1979 0.864 0.892 1980 0.874 0.871 1981 0.658 0.671 1982 0.951 0.963 1983 0.739 0.760 1984 0.479 0.488 1985 0.659 0.672 1986 0.556 0.572 1987 0.853 0.880 1988 0.507 0.525 1989 0.634 0.585 1990 1.272 1.248 1991 0.981 0.970 1992 0.475 0.484 1993 0.401 0.410 1994 0.423 0.437 1995 0.580 0.593 1996 0.657 0.661 1997 0.627 0.630 1998 0.600 0.615 1999 1.298 1.306 2000 0.632 0.641 2001 0.662 0.681 2002 0.841 0.844 2003 0.654 0.652 2004 1.207 1.213 2005 0.554 0.559 2006 0.496 0.497 2007 1.136 1.142 2008 0.963 0.949 2009 0.776 0.807 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #2 Rank Predeveloped Mitigated 1 1.2984 1.3064 2 1.2721 1.2481 3 1.2066 1.2130 4 1.1361 1.1423 90% FC with Filterra 10/12/2018 2.02.45 PM 5 0.9808 0.9705 6 0.9630 0.9626 7 0.9511 0.9494 8 0.8798 0.8933 9 0.8744 0.8924 10 0.8637 0.8799 11 0.8552 0.8790 12 0.8533 0.8710 13 0.8517 0.8578 14 0.8411 0.8440 15 0.7765 0.8073 16 0.7744 0.7870 17 0.7723 0.7731 18 0.7386 0.7605 19 0.7069 0.7267 20 0.7006 0.7175 21 0.6946 0.7006 22 0.6688 0.6811 23 0.6615 0.6753 24 0.6589 0.6718 25 0.6578 0.6705 26 0.6565 0.6613 27 0.6560 0.6608 28 0.6537 0.6520 29 0.6344 0.6470 30 0.6322 0.6411 31 0.6314 0.6369 32 0.6313 0.6303 33 0.6267 0.6152 34 0.5996 0.6010 35 0.5923 0.5925 36 0.5799 0.5887 37 0.5776 0.5849 38 0.5706 0.5828 39 0.5650 0.5733 40 0.5563 0.5722 41 0.5535 0.5593 42 0.5509 0.5539 43 0.5471 0.5514 44 0.5325 0.5348 45 0.5171 0.5300 46 0.5167 0.5278 47 0.5134 0.5258 48 0.5109 0.5251 49 0.5083 0.5250 50 0.5075 0.5245 51 0.5073 0.5122 52 0.4963 0.4972 53 0.4791 0.4884 54 0.4746 0.4878 55 0.4728 0.4841 56 0.4708 0.4836 57 0.4442 0.4536 58 0.4375 0.4527 59 0.4233 0.4371 60 0.4167 0.4227 61 0.4008 0.4102 Page 36 90% FC with Filterra 10/12/2018 2.02.45 PM Page 37 90% FC with Flterra 10/12/2018 2.02.45 PM Duration Flows The Development Failed :duration increase for more than 50% of the flows. Flow(cfs) Predev Mit Percentage Pass/Fall 0.3171 1702 1773 104 Fai 0.3262 1551 1603 103 Fai 0.3354 1401 1466 104 Fai 0.3446 1260 1335 105 Fai 0.3537 1134 1220 107 Fai 0.3629 1036 1110 107 Fai 0.3720 949 1008 106 Fai 0.3812 870 919 105 Fai 0.3904 782 846 108 Fai 0.3995 720 780 108 Fai 0.4087 666 736 110 Fai 0.4178 620 675 108 Fai 0.4270 566 623 110 Fai 0.4362 527 563 106 Fai 0.4453 494 527 106 Fai 0.4545 452 484 107 Fai 0.4636 413 450 108 Fai 0.4728 385 420 109 Fai 0.4820 362 390 107 Fai 0.4911 339 359 105 Fai 0.5003 321 340 105 Fai 0.5094 289 317 109 Fai 0.5186 271 296 109 Fai 0.5277 251 272 108 Fai 0.5369 238 255 107 Fai 0.5461 221 232 104 Fai 0.5552 201 220 109 Fai 0.5644 194 207 106 Fai 0.5735 183 193 105 Fai 0.5827 168 179 106 Fai 0.5919 157 165 105 Fai 0.6010 146 154 105 Fai 0.6102 137 144 105 Fai 0.6193 131 139 106 Fai 0.6285 123 129 104 Fai 0.6377 113 121 107 Pass 0.6468 108 116 107 Pass 0.6560 101 109 107 Pass 0.6651 93 102 109 Pass 0.6743 88 95 107 Pass 0.6835 82 87 106 Pass 0.6926 81 84 103 Pass 0.7018 78 80 102 Pass 0.7109 76 80 105 Pass 0.7201 74 75 101 Pass 0.7292 67 69 102 Pass 0.7384 67 64 95 Pass 0.7476 63 62 98 Pass 0.7567 57 60 105 Pass 0.7659 55 58 105 Pass 0.7750 52 54 103 Pass 0.7842 48 51 106 Pass 0.7934 46 47 102 Pass Page 38 90% FC with Ft!terra 10/12/2018 2.02.45 PM Page 39 0.8025 0.8117 0.8208 0.8300 0.8392 0.8483 0.8575 0.8666 0 8758 0.8850 0.8941 0.9033 0.9124 0.9216 0.9307 0.9399 0.9491 0.9582 0.9674 0.9765 0.9857 0.9949 1.0040 1.0132 1.0223 1.0315 1.0407 1.0498 1.0590 1.0681 1.0773 1.0865 1.0956 1.1048 1.1139 1.1231 1.1322 1.1414 1.1506 1.1597 1.1689 1.1780 1.1872 1.1964 1.2055 1.2147 1.2238 43 46 41 44 40 40 39 39 34 37 31 34 27 31 26 28 24 27 21 23 20 21 19 17 17 16 16 16 15 15 14 13 13 12 12 11 106 Pass 107 Pass 100 Pass 100 Pass 108 Pass 109 Pass 114 Fail 107 Pass 112 Fail 109 Pass 104 Pass 89 Pass 94 Pass 100 Pass 100 Pass 92 Pass 92 Pass 91 Pass 100 Pass 88 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 100 Pass 114 Fail 114 Fail 100 Pass 100 Pass 100 Pass 85 Pass 85 Pass 85 Pass 120 Fail 100 Pass 125 Fail 100 Pass 100 Pass 100 Pass 133 Fail 100 Pass 100 Pass 100 Pass The development has an increase in flow durations from 1/2 Predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. The development has an increase in flow durations for more than 50% of the flows for the range of the duration analysis. 90% FC wah Fi!terra 10/12/2018 2.02:45 PM Water Quality Water Quality BMP Flow and Volume for POC #2 On-line facility volume: 0.2148 acre-feet On-line facility target flow: 0.2677 cfs. Adjusted for 15 min: 0.2677 cfs. Off-line facility target flow: 0.151 cfs. Adjusted for 15 min: 0.151 cfs. Page 40 90% FC with RIterta 10/12/2018 2 02:45 PM Page 41 LID Report I ID TeCmldue Used for Treatment 7 Total Volume Needs Treatment (ac40 Volume Through Facility (aC41 Infiltration Volume (apt) Cumulative Volume ulfil0a0on Credit Percent Volume Innlbaied Water Duality Percent Water duality Treated Comment TDA2- Flterra- North POC 0 10841 0 0.00 TDA2- Fl0ena • South POC ❑ 14653 ❑ 000 Tool Volume ln0l6ated 254.93 0.00 0.00 0.00 0.00 0%No treat Geed Compliance withLID Standard 8% of 2-yr to 5016 of 2.0 Duration Re;0I1 e Result Foaled 90% FC with Filterra 10/12/2018 202 45 PM Model Default Modifications Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. IMPLND Changes No IMPLND changes have been made. Page 42 90% FC with Filterra 10/12/2018 2 02.45 PM Page 43 Appendix Predeveloped Schematic SI DA1 'fli DA2- ombi Drains to etpo 1" ROW 6.34ac 2.11 ac Existing Aombined etpond 90% FC with Filterra 10/12/2018 2.02.45 PM Mitigated Schematic n DA 1 New Deten North S I 3.99ac DA 1 Filterr North S11 • DA 1 New Detent South S 12.19ac DA 1 - Filterra - outh q]ra) ;-rs DA 1 Bypas 0.28a , .r; • i DA2 .r DA2- :�: Drains ••, Drains to ROW ' ROW - South I 0.87ac I 1.12ac SI SI DA 2 Filterr North DA2- Filterra - outh Page 44 90% FC with Filterra 10/12/2018 2.0247 PM Page 45 Predeveloped UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END 2009 09 30 RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 UNIT SYSTEM 1 END GLOBAL FILES <File> <Un#> < File Name •• .ID-> ••• WDM 26 90% FC with Filterra.wdm MF,SSU 25 Pre90% FC with Filterra.MES 27 Pre90% FC with Filterra.L61 28 Pre90% FC with Filterra.L62 31 POC90% FC with Filterra2.dat 30 POC90% FC with Filterral.dat END FILES OPN SEQUENCE INGRP INDELT 00:15 PERLND 16 IMPLND IM?LND 4 IMPLND 8 IMPLND 14 RCHRES 1 COPY 502 COPY 501 DISPLY 2 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #< Title > ••TRAN PIVL DIG1 FIL1 PYR DIG2 FiL2 YRND 2 TDA 2 - Drains to ROW MAX 2 31 9 1 Existing Combined Wetpond MAX 1 2 30 9 END DISPLY INFO1 END DISPLY COPY TIMESERIES # - # NPT NMN ** 1 1 1 502 1 1 501 1 1 END TIMESERIES FIND COPY GENER OPCODE # # OPCD **• END OPCODE PARM # # K •• END PARM END GENER PERLND GEN-INFO <PLS >< Name >NBLKS Unit -systems Printer ••• # - # User t-series Engl Metr ••• in out ••• 16 C, lawn, Flat 1 1 '1 1 27 0 END GEN-INFO ••• Section PWATER*** ACTIVITY <PLS > Active Sect. # # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC 16 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT INFO <PIS > Print -flags # - # ATMP SNOW PWAT SED PST PWG PQAL MSTI, PEST NITR PROS TRAC 16 0 0 4 0 0 0 0 0 0 0 0 0 END PRINT -INFO PWAT PARM1 <PLS > PWATER variable monthly parameter value flags *•• # - # CSNO RTOP UZFG VCS VUZ VNN VIEW VIRC VLE INFC HWT ••* 16 0 0 0 0 0 0 0 0 0 0 0 END PWAT PARM1 PIVL PYR 9 PWAT-PARM2 PWATER input info: Part 2 ••• # - # ***FOREST I,ZSN INFILT LSUR SLSUR KVARY AGWRC 16 0 4.5 0.03 400 0.05 0.5 0.996 END PWAT PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 •• :.A # # •••PETX PETMIN INFEXP INFILD' DEEPER BASETP AGWF,TP 16 0 0 2 2 0 0 0 END PWAT- PARM3 PWAT PARM4 <PLS > PWATER input info: Part 4 # - # CEPSC UZSN NSUR INTFW IRC LZF,T❑ •'• 16 0.1 0.25 0.25 6 0.5 0.25 END PWAT-PARM4 PWAT STATE1 <PLS > *•• Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *•• # - # ••• CEPS SUBS UZS IFWS LZS AGWS GWVS 16 0 0 0 0 2.5 1 0 END PWAT-STATE1 END PERLND IMPLND GEN-INFO <PLS >< > Name Unit -systems Printer ••' # # User [-series Engl Metr *'• in out ••* 1 ROADS/FLAT 1 1 1 27 0 4 ROOF TOPS/FLAT 1 1 1 27 0 8 SIDEWALKS/FLAT 1 1 1 27 0 14 POND 1 1 1 27 0 END GEN-INFO '•• Section IWATER••• ACTIVITY <PIS > Active Sections # - # ATMP SNOW IWAT SLD IWG IQAL 1 0 0 1 0 0 0 4 0 0 1 0 0 0 8 0 0 l 0 0 0 14 0 0 1 0 0 0 END ACTIVITY PRINT INFO <ILS > Print -flags PIVL PYR # # ATMP SNOW IWAT SLD IWG IQAL 1 0 0 4 0 0 0 1 9 4 0 0 4 0 0 0 1 9 8 0 0 4 0 0 0 1 9 14 0 0 4 0 0 0 1 9 90% FC with Fillerra 10/12/2018 2.02.50 PM Page 46 90% FC with Flterra 10/12/2018 2 02 50 PM Page 47 END PRINT -INFO <Name> # END NETWORK <Name> # #c-factor->strg *Name> # # <Name> # # ••• IWAT-PARM1 <PLS > IWATER variable monthly parameter value flags ••• RCHRES # - # CSNO RTO? VRS VNN RTLI *** GEN-INFO 1 0 0 0 0 0 RCHRES Name Nexits Unit Systems Printer 4 0 0 0 0 0 # - #< ><---> User T-series Engl Vetr LKFG 8 0 0 0 0 0 in out 14 0 0 0 0 0 1 Existing Combine-004 1 1 1 1 28 0 END IWAT-PARM1 END GEN-INFO ••• Section RCHRES... IWAT PARM2 <PLS > IWATER input info: Part 2 # • 8 ••• LSUR SLSUR NSUR RETSC 1 400 0.01 0.1 0.1 4 400 0.01 0.1 0.1 8 400 0.01 0.1 0.1 14 400 0.01 0.1 0.1 END TWAT-PARM2 IWAT-PARM3 <PLS > IWATER input info: Part. 3 # - 8 •••PETMAX PETMTN 1 0 0 4 0 0 B 0 0 14 0 0 END IWAT-PARM3 IWAT-STATE1 <PLS > ••• Initial conditions at start of simulation 4 - 8 ••• BETS SURS 0 0 4 0 0 8 0 0 14 0 0 END IWAT-STATEI ACTIVITY <PLS > Acti 4 - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG 1 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > Print -flags PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR 1 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO HYDR-PARM1 RCHRES Flags for each HYDR Section # - 8 VC Al A2 A3 ODFVFG for each *•• ODGTFG for each FUNCT for each FG FG FG FG possible exit ••• possible exit possible exit • • • • • • • • • • • • • • ••• 1 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2 END HYDR PARM1 HYDR-PARM2 # - # FTABNO >< • 1 l< END HYDR-PARM2 HYDR-INIT LEN DELTH STCOR KS DB50 0.01c < < 0.00.00.5< 0.0 END IMPLND RCHRES Initial conditions for each HYDR section ••• # - # ••• VOL initial value of COLIND Initial value of OUTDGT SCHEMATIC ••• ac-ft for each possible exit for each possible exit c-Source-> <--Area--> c-Target-> MBLK ••• c >< > <---><•-->c--->c ><.--> ••• <.-><---><---><---><---> *Name> 4 <-factor-> <Name> # Tbl# ••• 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TDA 1 - To Combined Wetpcnd••* END HYDR-INIT PERLND 16 0.6105 RCHRES 1 2 END RCHRES PERLND 16 0.6105 RCHRES 1 3 IMPLND 1 2.0162 RCHRES 1 5 SPEC -ACTIONS IMPLND 4 3.0448 RCHRES 1 5 END SPEC -ACTIONS IMPLND 8 0.3222 RCHRES 1 5 FTABLES IMPLND 14 0.3475 RCHRES 1 5 FTABLE 1 TDA 2 - Drains to ROW... 99 4 PERLND 16 0.5417 COPY 502 12 Depth Area Volume Outflowl Velocity Travel Time••• PERLND 16 0.5417 COPY 502 13 (ft) (acres) (acre•ft) (cfs) (ft/sec) (Minutes)••• IMPLND 1 0.6554 COPY 502 15 0.000000 0.000000 0.000000 0.000000 IMPLND 4 0.8144 COPY 502 15 0.100000 0.081496 0.008149 0.236525 IMPLND 8 0.1028 COPY 502 15 0.200000 0.082644 0.016414 0.334497 0.300000 0.083792 0.024793 0.409674 Routing 0.400000 0.084940 0.033287 0.473050 RCHRES 1 COPY 501 16 0.500000 0.086088 0.041896 0.528886 END SCHEMATIC 0.600000 0.087236 0.050619 0.579366 0.700000 0.088383 0.059458 0.625787 NETWORK 0.800000 0.089531 0.068411 0.668994 <-Volume-> <-Grp> <-Member-><--Mult-->Tran *-Target vols> <-Grp> <-Member-> • • 0.900000 0.090679 0.077479 0.709575 <Name> 8 <Name> # a*-factor->strg <Name> # # *Name> If # •** 1.000000 0.091827 0.086662 0.747958 COPY 502 OUTPUT MEAN 1 1 48.4 DISPLY 2 INPUT TIMSER 1 1.100000 0.092975 0.095959 0.784465 COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TTMSF.R 1 1.200000 0.094123 0.105371 0.819347 1.300000 0.095270 0.114899 0.852804 1.400000 0.096418 0.124540 0.884996 1.500000 0.097566 0.134297 0.916058 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vole> c Grp> c-Member-> ••* 1.600000 0.098714 0.144169 0.946101 90% FC with Flterra 10/12/2018 2 02:50 PM Page 48 90% FC with Filterra 10/12/2018 2 02 50 PM Page 49 1.700000 0.099862 0.154155 0.975218 8.700000 0.269850 1.373288 11.13012 1.800000 0.101010 0.164256 1.022106 8.800000 0.272936 1.400582 11.2.0576 1.900000 0.102157 0.174472 1.127717 8.900000 0.276023 1.428184 11.28083 2.000000 0.103305 0.184802 1.265898 9.000000 0.279109 1.456095 11.35534 2.100000 0.104453 0.195247 1.428654 9.100000 0.279508 1.484046 11.42930 2.200000 0.105601 0.205808 1.612013 9.200000 0.279906 1.512037 11.50273 2.300000 0.106749 0.216483 1.813473 9.300000 0.280305 1.540067 11.57565 2.400000 0.107897 0.227272 2.031270 9.400000 0.280704 1.568137 11.64805 2.500000 0.109045 0.238177 2.264075 9.500000 0.281103 1.596248 11.71995 2.600000 0.110192 0.249196 2.621016 9.600000 0.281501 1.624398 11.79136 2.700000 0.111340 0.260330 3.218146 9.700000 0.281900 1.652588 11.86230 2.800000 0.112488 0.271579 3.842695 9.800000 0.282299 1.680818 11.93276 2.900000 0.113636 0.282943 4.315211 END FTABLE 1 3.000000 0.114784 0.294421 4.580286 END FTABLES 2.100000 0.115932 0.306014 4.838058 3.200000 0.117079 0.317722 5.054607 EXT SOURCES 3.300000 0.118227 0.329545 5.257298 <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> 3.400000 0.119375 0.341483 5.448617 <Name> # <Name> # tern strg<-factor->strg <Name> # # <Name> # # ••• 3.500000 0.120523 0.353535 5.630381 WDM 2 PREC ENGL 1 PERLND 1 999 EX1Ni, PREC 3.600000 0.121671 0.365702 5.803960 WDM 2 PREC ENGL 1 IMPEND 1 999 EXTNi. PREC 3.700000 0.122819 0.377984 5.970422 WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETI.UP 3.800000 0.123966 0.390381 6.130619 WDM 1 EVAP ENGL 0.76 IMP1,ND 1 999 EXTNL PETINP 3.900000 0.125114 0.402892 6.285241 4.000000 0.126262 0.415518 6.434859 END EXT SOURCES 4.100000 0.129706 0.428489 6.579951 4.200000 0.133149 0.441804 6.720923 EXT TARGETS 4.300000 0.136593 0.455463 6.858120 <-Volume > <-Grp> <-Member-><--Mult-.->Tran <-Volume-> <Member> Tsys Tgap Amd ••• 4.400000 0.140036 0.469467 6.991845 <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg... 4.500000 0.143480 0.483815 7.122358 RCHRES 1 HYDR RO 1 1 1 WDX 1000 FLOW ENGL REPL 4.600000 0.146923 0.498507 7.249888 RCHRES 1 HYDR STAGE 1 1 1 WDM 1001 STAG ENGL REPL 4.700000 0.150367 0.513544 7.374640 COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL 4.800000 0.153810 0.528925 7.496794 COPY 502 OUTPUT MEAN 1 1 48.4 WDM 502 FLOW ENGL REPL 4.900000 0.157254 0.544651 7.616511 END EXT TARGETS 5.000000 0.160697 0.560720 7.733937 5.100000 0.164141 0.577135 7.849202 MASS -LINK 5.200000 0.167584 0.593893 7.962427 <Volume> c-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->••• 5.300000 0.171028 0.610996 8.073717 <Name> <Name> # #<-factor-, <Name> <Name> # k••' 5.400000 0.174472 0.628443 8.183174 MASS -LINK 2 5.500000 0.177915 0.646235 8.290886 PERLND PWATER SURD 0.083333 RCHRES INFLOW IVOL 5.600000 0.181359 0.664371 8.396937 END MASS -LINK 2 5.700000 0.184802 0.682851 8.501404 5.800000 0.1813246 0.701675 8.604358 MASS'LINK 3 5.900000 0.191689 0.720844 8.705864 PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOI. 6.000000 0.195133 0.740358 8.805983 END MASS -LINK 3 6.100000 0.198236 0.760181 8.904773 6.200000 0.201340 0.780315 9.002284 MASS -LINK 6.300000 0.204444 0.800760 9.098569 IMPLND IWATP.8 SURO 0.083333 RCHRES INFLOW IVOL 6.400000 0.207548 0.821515 9.193671 END MASS -LINK 5 6.500000 0.210652 0.8425130 9.287636 6.600000 0.213755 0.863955 9.380503 MASS -LINK 12 6.700000 0.216859 0.885641 9.472312 PERLND PWATER SURD 0.083333 COPY INPUT MEAN 6.800000 0.219963 0.907638 9.563097 END MASS -LINK 12 6.900000 0.223067 0.929944 9.652894 7.000000 0.226170 0.952562 9.741735 MASS -LINK 13 7.100000 0.228378 0.975399 9.829649 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN 7.200000 0.230585 0.998458 9.916667 END MASS -LINK 13 7.300000 0.232793 1.021737 10.00281 7.400000 0.235001 1.045237 10.08812 MASS-1,INK 15 7.500000 0.237208 1.068958 10.17260 IMPLND IWATER SURO 0.083333 COPY INPUT MEAN 7.600000 0.239416 1.092900 10.25629 END MASS -LINK 15 7.700000 0.241623 1.117062 10.33921 7.800000 0.243831 1.141445 10.42138 MASS -LINK 16 7.900000 0.246039 1.166049 10.50281 RCHRES ROFLOW COPY INPUT MEAN 8.000000 0.248246 1.190874 10.58353 END MASS -LINK 16 8.100000 0.251332 1.216007 10.66356 8.200000 0.254419 1.241449 10.74291 8.300000 0.257505 1.267200 10.82161 END PASS -LINK 8.400000 0.260591 1.293259 10.89966 8.500000 0.263677 1.319627 10.97709 END RUN 8.600000 0.266764 1.346303 11.05391 90% FC with Filterra 10/12/2018 2 02.50 PM Page 50 90% FC with Fddterra 10/12/2018 2 02 50 PM Page 51 Mitigated UCI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END 2009 09 30 RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 UNIT SYSTEM END GLOBAL FILES <File> <Un#> < File Name------- < ID-> WDM 26 90% FC with Filterra.wdm MESSU 25 Mit90% FC with Filterra.MES 27 Mit90% FC with Filterra.L61 28 Mit90% FC with Filterra.L62 31 POC90% FC with Filterra2.dat 30 POC90t FC with Filterral.dat END FILES OPN SEQUENCE INGRP INDELT 00:15 PERLND 16 IMPLND 1 IMPLND 4 IMPLND 8 IMPLND 5 PERLND 12 RCHRES 1 RCHRES 2 RCHRES 3 RCHRES 4 RCHRES 5 COPY 2 COPY 502 COPY 602 COPY 1 COPY 501 COPY 601 DISPLY 2 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # #< Title >• ••TRAN PTVI, DTG1. FIL1 PYR DIG2 FIL2 YRND 2 TDA 2 - Filterra - North MAX 1 2 31 9 1 Vault 1 MAX 1 2 30 9 END DISPLY-INFO1 F.ND DISPLY COPY TIMESERIES # - # NPT NMN ••• 1 1 1 2 1 1 502 1 1 602 1 1 501 1 1 601 1 1 END TIMESERTES END COPY GENER OPCODE # # OPCD END OPCODE PARM # # END PARM K •• 90% FC with Fdlerra 10/12/2018 2 02 50 PM END GENER PERLND GEN-INFO <PLS ,< Name- >NBLKS Unit -systems Printer • # - # User [-series Engl Metr in out ••• 16 C, Lawn, Flat 1 1 1 1 27 0 12 C, Forest. Steep 1 1 1 1 27 0 END GEN-INFO ••• Section PWATER••• ACTIVITY <PLS > Active Sections # - # ATMP SNOW PWAT SED PST PWG PQAL MSTI, PEST NTTR PHOS TRAC 16 0 0 1 0 0 0 0 0 0 0 0 0 12 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > Print -flags # - # ATMP SNOW PWAT SED PST PWG PQAL MSTI, PEST NITR PHOS TRAC 16 0 0 4 0 0 0 0 0 0 0 0 0 12 0 0 4 0 0 0 0 0 0 0 0 0 END PRINT -INFO PWAT-PARM1 <PLS > PWATER variable monthly parameter value flags ••• # - # CSNO RTOP UZFG VCS VUZ VNN VIEW VIRC VLE INFC HWT ••• 16 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PIVL PYR 9 9 PWAT-PARM2 <PLS > PWATER input info: Part 2 ••• # - # ...FOREST LZSN INFTLT LSUR SLSUR KVARY AGWRC 16 0 4.5 0.03 400 0.05 0.5 0.996 12 0 4.5 0.08 400 0.15 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 ••• # - # ***PETMAX PETMIN INFRXP INFILD DF.EPFR RASETP AGWETP 16 0 0 2 2 0 0 0 12 0 0 2 2 0 0 0 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 # - # CEPSC UZSN NSUR INTFW IRC LZETP ••• 16 0.1 0.25 0.25 6 0.5 0.25 12 0.2 0.3 0.35 6 0.3 0.7 END PWAT-PARM4 PWAT-STATE1 <PLS > ••• Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-1 1-95) RUN 21 • # - # ••• CEPS SURS UZS IEWSLZS AGWS GWVS 16 0 0 0 0 2.5 1 0 12 0 0 0 0 2.5 1 0 END PWAT-STATE1 END PERLND IMPLND GEN-INFO <PLS >< > Name Unit -systems Printer ••• # - # User [-series Engl Metr ••• in out ••• 1 ROADS/FLAT 1 1 1 27 0 4 ROOF TOPS/FLAT 1 1 1 27 0 8 SIDEWALKS/FLAT 1 1 1 27 0 Page 52 90% FC with Filterra 10/12/2018 2.02 50 PM Page 53 5 DRIVEWAYS/FLAT 1 1 27 0 PERLND 16 0.2013 RCHRES 1 2 END GEN-INFO PERLND 16 0.2013 RCHRES 1 3 ••• Section IWATF.R••• IMPLND 1 0.6681 RCHRES 1 5 IMPLND 8 0.005 RCHRES 1 5 ACTIVITY TDA 2 - Drains to ROW - South... <PLS > Active S PERLND 16 0.1624 RCHRES 4 2 # - # ATMP SNOW TWAT SLD IWG IQAL ••• PERLND 16 0.1624 RCHRES 4 3 1 0 0 1 0 0 0 IMPLND 1 0.8374 RCHRES 4 5 4 0 0 1 0 0 0 IMPLND 5 0.1213 RCHRES 4 8 0 0 1 0 0 0 TDA 1- To New Detention - South... 5 0 0 1 0 0 0 PERLND 16 0.0284 RCHRES 3 2 END ACTIVITY PERLND 16 0.0284 RCHRES 3 3 PERLND 12 0.0307 RCHRES 3 7. PRINT -INFO PERLND 12 0.0307 RCHRES 3 3 <TLS > Print -flags PIVL PYR IMPLND 1 1.7869 RCHRES 3 5 # - # ATMP SNOW TWAT SLD IWG IQAL IMPLND 4 0.3463 RCHRES 3 5 1 0 0 4 0 0 0 1 9 TDA 1- Bypass••• 4 0 4 0 0 0 1 9 PERLND 16 0.0001 COPY 501 12 8 0 0 4 0 0 0 1 9 PERLND 16 0.0001 COPY 601 12 5 0 0 4 0 0 0 1 9 PERLND 16 0.0001 COPY 501 13 END PRINT -INFO PERLND 16 0.0001 COPY 601 13 IMPLND 1 0.0788 COPY 501 15 IWAT-PARM1 IMPLND 1 0.0788 COPY 601 15 <PLS > IWATER variable monthly parameter value flags ••• IMPLND 4 0.0447 COPY 501 15 # - # CSNO RTOP VRS VNN RTLI ••• IMPLND 4 0.0447 COPY 601 15 1 0 0 0 0 0 IMPLND 8 0.1547 COPY 501 15 4 0 0 0 0 IMPLND 8 0.1547 COPY 601 15 8 0 0 0 0 5 0 0 0 0 Routing END IWAT-PARM1 PERLND 16 0.2013 COPY 2 12 IMPLND 1 0.6681 COPY 2 15 TWAT-PARM2 IMPLND 8 0.005 COPY 2 15 <PLS > IWATER input info: Part 2 ••• PERLND 16 0.2013 COPY 2 13 # - # ••• LSJR SLSUR NSUR RETSC PERLND 16 0.1624 COPY 2 12 1 400 0.01 0.1 0.1 IMPLND 1 0.8374 COPY 2 15 4 400 0.01 0.1 0.1 IMPLND 5 0.1213 COPY 2 15 8 400 0.01 0.1 0.1 PERLND 16 0.1624 COPY 2 13 5 400 0.01 0.1 0.1 RCHRES 2 1 RCHRES 5 7 END TWAT-PARM2 RCHRES 2 COPY 1 17 RCHRES 2 RCHRES 5 8 IWAT-PARM3 RCHRES 2 COPY 1 18 <PLS > IWATER input info: Part 3 ••• RCHRES 3 RCHRES 5 7 # - # •••PETMAX PETMIN RCHRES 3 COPY 1 17 7 0 0 RCHRES 3 RCHRES 5 8 4 0 0 RCHRES 3 COPY 1 18 8 0 0 RCHRES 5 1 COPY 501 16 5 0 0 RCHRES 1 1 COPY 502 16 END TWAT-PARM3 RCHRES 4 1 COPY 502 16 END SCHEMATIC IWAT-STATEI. <PI.S > ••• Initial conditions at start of simulation NETWORK # - # ••• RETS SURS <-Volume-> <-Grp> <-Member-><--Mult-->Tran <'Target vols> <-Grp> <-Member-> 1 0 0 <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # 4 0 0 COPY 502 OUTPUT MEAN 1 1 48.4 DISPLY 2 INPUT TIMSER 1 8 0 0 COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSF.R 1 5 0 0 END IWAT-STATEI END IMPLND SCHEMATIC <-Source-> --Area--> <-Target-> MBLK <Name> # <-factor-> <Name> # Tb1# TDA 1 - To New Detention North... PERLND 16 0.0342 RCHRES 2 2 PERLND 16 0.0342 RCHRES 2 3 IMPLND 1 3.5334 RCHRES 2 5 IMPLND 4 0.3224 RCHRES 2 5 IMPLND 8 0.0992 RCHRES 2 5 TDA 2 - Drains to ROW - North... 90% FC with Filterra 10/12/2018 2.02.50 PM <-Volume-> <-Grp> <-Member-><--Mult ->Tran <-Target vole> <-Grp> < Member-> <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer # - #< ><---> User T-series Engl Yetr LKFG in out 1 TDA 2- Filterra-018 2 1 1 1 28 0 1 2 TDA 1 Filterra-020 2 1 1 1 28 0 1 3 TDA 1 Filterra-023 2 1 1 1 28 0 1 Page 54 90% FC with Filterra 10/12/2018 2.02.50 PM Page 55 euallpd 41'n 3d %06 Wd OSZOZ 9lOZ/ZL/OL euanu 3d %06 Wd OS-ZOZ O LOZ/Zl/Ol m m W m 0000 '.40m o m n 3m n Z 0 Nomo: n0NAwNY 15 mv'0H W,COOM, MO J W W 0— 7 a b 0 W m 0z -3 N 0000 Z W N 0 H .......1 O 0 1GY .O n m d A A A n b www.....M, 0 0 0 0 0 0 0 0 0 m m ,,,,—O n x mZZ n x a N 0 0 N a w N Y a 00 nmx m ' a'..K '0 a0.Z.z am n• -3: n 3 7 K.,• • 7 A a M n > n,<W O1 r. o Y z v rn NawN v0 n 00007 7 n a 000on< Y O o m o O. N J 0 n 7. a+Y N0.wc .'•O m Y N 0 n 3 m n 7 wWoO—m W .'.m 5,.n 0000 O O N N N N. O r O Y o n rr O O O O O v 0< N n a 0 m m W m ' m Y W m m 0 O— O .' c n 000 00 a o o C UM S JJJo Y 0000wv ss oowoo —< n m 0 ..m 00000' m00 m -' X A ,O 00000V P.0 m n A n OM N m.' rm -3 0 00 00000 n O O O O O v _0 000Zr': O 0.000.m '3 • 7 Ai 3 < .• m n '1 7 .' ' ,17 c 0 0 . 0 0 0' 00000 .3 . . . . 0 vil m.r• ' mo O O O o v W✓ N N N N m 3 n 0 W n '0." O O O o 0. q •▪ • O O O O O V O< A m W m Y 0 ppOpp .' c 00000.m Q O O O O O V Ym O O O O O v 0 nm 0 00o m l 0000 '9 0 0 0 : 8 .0.00. .3 • •• 000 N M Y Y Y m S zm3 q m ((b�� • m ONA w NY 000 0U1AwNY n .�1 ONawNY an .-3 :3,,,. O ' 0'' '0 R0HH b7 : 0o vz < 0G1 K %1 yqy A fn '-3 N '-3 0 Z A atmn (0 Z a Z a v K 3 -3 .1 < .. < -i 1 0 0 .. 0• o Z a O b 'n < Y K H K• 7 q c b m 00000 • 00 Z 0 K r• 0v 3 YYYYY0• A n N 0bg▪ Pa ab • SAYYYYYY•..m 1b0 00000•0N0 pppppn 00000n'1• m 'n n • �1• 0 0 0 0 0 • 0 .0 m 0 Z• • W z 'n q O n o o 0 0 0 N o o 0 o o 0 b WI A a A a A• m O( 0 > *4 xn 0.. Z .'-qO oOo00.3q 000000 0 W W W W • 0 0 0 n m N m0to to7 ON 00000. OM n 0 0000007 0000022 Y N O m 11 m o 0 0 0 0• x m ow O 0 0 0 0 0 7 0 0 0 0 0 r m 0 0 0 0 0 0 m Y Y O X • • A 0 0000 x. 0 0 0 0 0 O • Y Y O ,'n 00000x. o 0 0 0 o Cl . EE 0000O• O Z•• aZ0-easa1 YY Y Y 0.4 • Y Y O m m n K K 01 01 01 0n .n m z • mr O m x m ✓ W S. N N N N N N N N N N N N N N N N N N N N N N Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W W J J W W N N N N A A A W N N N N A A w W OWN W P 0 O W N W W N W A O N W N w O N N W A O O� N W N N W A O P N W N Y J wN W 0 Y m . Y N w A N W O Y N W A N T J W O Y ON N J W O Y N A J W O Y W J W O Y N J W O Y Y N W A N Y N w A N J W O Y N W A M, D\ J W O Y N N J W O Y N, J W O Y N J W O Y N O\ J W O Y N J W Y N W A N �OOYNwA O.J W lOOYN W AT J W �OOYN J W �OOYNwPN J W �OOYNwaN J W'OOYNwPN J W �DOY NwPN J W �OOYN W A O� W O N W N W P N W d N W a N w O O O O O O O O O O O O O O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y ........ A A A A A A A A A A A A P A A A P P A P A A A A A P A A P a P a a a P P a a a a d a a P A a a a a A a d d P P A A d a A A a a A dP AAA A W W W W W W W W W 0 w W w w 0 0 w w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W w W W w O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N N N N N N N A a A P A N N N N N N N N N N Y O O O O O O NAW YO.O 'OWJTO.N Y00WNAa Y00WW AAwNY NNY Y A T W Y W A W Y W N W O w W O W N J O N N Y A N N W O N N J O 1-,NO& W W NJYO.OP N J Y NJ Y . W JNN NOA W 0N NOA'O W J1-..0 NNW NOA W W W N J Od b JNNON W N J o A W J NO.ON'O w N tO N W O W J Y P W Y N VJ N N O W J O a W Y N b N N b w J O A W Y N .O N O� b w J O A W Y N W N N b W J O A J Y N W N N b w O� 0 A J Y N W N N W W W J b W W N Y N W Y N w N O A00� W A O�NN W J SOY A W�ONA JOw NN'O W W N Jw YO W JOB mO W JN NO�O JN J OO�O�O�OOY w W d BONY JPNO�O �OONNO JO�JO J W O W w JP PON w J Y N J W W N 40 b W N J a W P N b w N b J W N J O\ b N Y O A N OA W W A w J b N Y N W A J J O NN O Y Y W b w W N N Y A A N W N Y W1-.. N O. N N O W A A Am O N O A N N N N O P O, 0 .P W W P N wNO O W A N W O J N N Y O O J . N W W w W 0. Y W Y W NWOmmnru101nr r N10 r o a r y r .. y .. r .. a m .. a m N M mmoaNNV N a. 0. O O M M M m 01 N a m 1D�Dmm1Dr r r r mmm 00000000000000000000000000000000000000000000 00000000000000000000000000000000000000000000 o m m m N 0. a m m ry n O r v 3.-on NN .1000mmmm O M O r m V1 , 01 .1 0, 0. m a 1D m w0000U0 am m00.. vrvimr m0� w UOm10101 NNN rrrrm i. - O N ry N N N N N ry NNNN N N N N N N m N 0 000000000000000000000 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 10 01 .0 n 01 r O O O O O O O O O O O O c 0 0 0 0 0 0 0 0 00000000000000000 0000 0000.. 3 00 0 0 0 0 0 0 o 0 0 0 0 O o m N m m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c 0 O 0 O 0 o 0 0 0 0 0 C 0 0 c o 0 0 0 0 O O O O O n N O .- 0 0 0 0 . m o 00000000000=00000000000000000000000000,00NWNM v. w000000000000000000 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .J U O O O O O C O O O O C O O C 0000000 0- 0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .. n v1 r m 0 0000000000000.0000000 N01 0(1Dn01mn0 r a0r a..m ✓1. 0Y1 N.-.ODD a0r n ON a a10r 01 amm01.. na0m01.I E.. f' 00?' n a a a a a a r M o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ........ 0 0 0 0 0 ~00.00.0...00.0.0.0.0.0. O O O O O O O O O O O O O O O O O O O O O C O > 4 0 0 0 0 0 0 0 0 0 c 0 0 o c O C O 0 0 0 c 00000000000000000000000o000.0000o00000000000 m000000000000000000000 000000000000000000000000 o 00 coo o00o 0 m.-......- N N N N N N N N N N N N 0 N 00O n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O 40 n 0 0 0 0 0 N N N N N N N 00 N N N N N N 0 44000000000000000000000 00000000000000000000000000000000000000000000 U 00000000000000000000000000000000000000000000mN M000000000000000000000 O O O O O O C O O O O O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 000000000000000000000 . . . . . . . . . . . . . 4: r0n nr 00 r Onr 0n0 Cnr O R int.-.on 10 0 n 0 O n m o r' i m O n m O n( D O n( D O C 1D00000m0n10O n100000 W a0O ..omm� ..0 m1D oi�i a 0 001e u0 n O 0 0 o m w r- 0 iril vl uni �C.. 000000000000 z F D 0 00000c0000000c00000000000000000000000000000WW 0000000000o00O00o0000 3-00 N 0040001 n0O n y r . 00O 000 N 0101 N 101N 0 00 r ON ar01.. 1D01 .. mom 0TN a100..n10000 w 0 0 .1 m N n N N n p a P b 0 0 0 0 h h r m m m m m 0 01 0 01 0 0 0 0 .. w UON mNvn Y1 ,. C O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O C O O O O O O O O 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000000000000000000000000.0000000000000000000 r m n a m m 0 10 n n m O1 r 01 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N 10.E m 0 (0 U1 r r N 10 O a 0 -000000 0 00000 00000 00 000000 m O N m N N .- 0 0 0 O O O O o O 0 0 0 0 0 0 0 0 0 0 0 0 m O m N N m N N m O N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Nmma.mm.,M,,a.,,— ,: U C O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1010 r .'r m m m O M M MM M O, 01.... 0 0 0 0 0 0 0 0 0 O O O C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C O 0 0 0 0 0 0 0 0 0 0 0 0 0).-.00 . 0 a mN m NO.mn010 r a0 0(00000Or r Nm v01 E UO L'1000m 11mm0.. m0m0 N n m0N 00 0ON a0r 01O ry mr r N m ]w000000,1 N N N N N v a a a 0(000101010r 0 0 0 0 00000000000000000000000000000000000000000000000 mc.N+ 04000000000000000000 000000000000000000 �Me >4000000000000000000 00000000000000000000000 0000.0000000000000 .L O O O C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (0.- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0,000000.000.000.0 aON 40000 000 00000000000000 0000 iQ 4 N N N N N N N N N N N N N N N N N N N N N N N N 0 N N N N N N N 0(010101010101010(0101010101010(01 U 00 O 0 0000000000 O 0000000 .- ('J 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000000000000000 00000000000000000 0 00000000000000000000000000000 W mr10 a0N Wan 01m mt.-Onr nr onr on r On 000 r On r0 r W Y 1 a n N m a n m Q W O n 0 O n m O n 10 O n 1 D O n W O h a n u 1 a n m f- i 0 00 0 0 0 0 0 o n 10 o n (O n 10 o n 10 0 n 10 0 n i(1 an m4..] O-Om100 n0m10m ..Cm100n..0m10 O1 (0 0 00.. a 001mr 00100.E n aN 0~100� m 0< 1 0 0 0 0 0 0 0 0 0 0 0 0 .. N N N 7 F N N N N n n n n n n n n n n n n n n W 4. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10/12/2018 2 02 50 PM 90% FC with Fi!terra 2 a 0 90% FC with Filterra eiiali d 41,M OJ %06 Wd 03 ZOZ BI OZ/ZL/0L euall,d 4UM DJ %06 Old OS ZOZ 91.OZ/Z L /O L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w O O b W J b r� V� A w N �+ 0 0 �O N J P tl� t!� A w �+ O O b m J Oi w N r• O �O m J ON b mO. W W WC.mON U O10)ON NO W ON lnTNO N ut 000 mO N UI Om W OmwOmwo WOO1 WOmwOm W OO1WOm W OO+W Om W OOW o W O 00WOmwOmwo WOmWOmwOmwOmWOmwOmwOc1WomwOMW omWO O J W O J w O J w O J w O J w O, w O J W O J W O J W O J W O J W O J W O J w O J w O W O J w O J w O J w O-,w O, w O J w O w O J W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oOOOOOOOOOOOOO0000 000 wWWWWWoOOooNNNNNN00000 J J J J J A T T T O� T T O� T T A A A A UTA A rObmm JU Aw b W NvO OJJN O W N. 00 W W JO1InA .O bmm J b O r W A In J m 0 r+ A ln,J mb.•N D InNOJbYN W UI MJbO N w A NJbOYw A 01JOlO A In J m b W O1 m b N W In T m b 0 m N O O A J N W b W J N l n b w J w P m N T O A m N P O A J I U I b W J✓ b b w J O A m N O1 0 A m N O1 0 A J.• 1 U t 0 W J N U 1 b W J o A m N T O A m O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0O O O O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COU1Wd,W0,0000000000000000000000000000000000000000000000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O b N m b O J 0 0 0 0 0 0 0 O O O O O O O0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M0010DAW0000000000000000000000000000000000000000000000000000000000000000 O U A m 0J ut W 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J b Y .W b O O O O O O O O O O O O O O O O U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W W W w W W w w W w w w W w W W w W W w w w w w w W w W W W W W W W W W w W W W W W W W W W W W W W W W W w w w N N N N N N N N N N N N N N C, O1 O1 O\ A A A A A A N N N . 0 0 V1WN J 01 Ui Aw wN'+IOmJ O\J O\1.0 N Ob 03J V Om WJUI W Nb JUG Nb Jln Nb,OW. W JOB A NOmT D O\ V N W W A A A t n C 1 C 1 T J J J N O J m m b b b 0 0 o N JO W J OwMbN W W. A JOw M W NUim,. A JNA J O W OIbN, m.AJOwO bNutm �+NmN A JOwNbNMmHA JOwONbNbb NU1O) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m b > Z b In - 0 0 W A A A w N N N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 N> O N r 0 O b m J N 0 Ut P �+ O O b 0] 0 A w N O O b J T 0 N A wN.00 0 W M W om W om worn W om gym.+ om m o m w 001 W 001 W 0m W omu W om W om .no m> wOTWO� WOmwOmwo.W0 001WOmWO-WO-WOO.WO4WOq Wonn > w O J W O J w O J w O J w O J w O J W O J W O J W O J W O J W O J W O J W O J w O J W O J W O J W O J w O J W O J w O J W O J w O M m W O N WON W O O� W O O� w O O� W O O� W O O� W O N 0 m 000000O0O0000000000000000000000000000000OOOO00000000O0000000000OO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W N Oo 000 00000000 O O O0000000000O00000o O 000o on o O0000000 00 0000OOOOOOoOOoo ut . b b.4 J J J J J J J J J J J u' u' J JJ W J W W J J W W J J W. J J J J inn > J J .4J J J J J J J J J J J J J J J JJJJJJJJ J J J J N wW W W W W W W W W W WWW W W W W W W W W W W w W W W W W w O M b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b b� W 0 0 0 0 0 0 0 0 0 0 O W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . n o 0000000000000000 0 0 0 000000000000000 O O O 0000000 O O O O O O O 00 O 0000000n< 00000000000000000000000000000000000000000000000000000000000Ooom0 N N N N N N N N N N N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J J OB W W W A A w N O O b N O O b 4 P A A w w N N 0 rl 0' m0 N J 0 m W m W b A b A 0 t n O l n A O l n O. n 0 0 J N J N J w m w W b A b A O n 3 r wtnJONP O,mOwM JbNA O�mONA J b.�wln JO NAO�OiO mb Jb.•w p� W ON A J b.•wln J ONA O�OO W Wmbrw0�(p O-'(D N O T .• O� Y W Ol W b A b .• O� Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -C O000000O0000000000O0O0000000O00OO0000000000000OOOO00000000000ooOonn 0000 O 00 O O O O O O 0000 0 0 0 0 0 0 OO O O O O O 000 O O O 0000 O 000 O 00000 O O O O O 00000 O 000 O-n O0000000000Oo 0 O O O O O O O O O 0 O 0 O OO O O O O O O O O O O O O OO 000000 O00000 0 000 0O0O-o 0000000000000000000000000000000000O00000000000000000000000 o 000OOOOOo0OOOOOOOo 0000O00O0O0000000 E 000000000a00000O000000000000 00000000000000000000O000000000000O0000000000000000000000000000000 00OOo 0000000000000O00000000000000000O000000000O000 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L �O— m m m m m J J .i Jm m m A o n .w mOObm b A A W NN MAN W 0+00 bJIn A O.w b mF+lnm bNlnbNUib NlnbNln MbNTbN OrbW.O1W NObNOP O rn 0.541667 0.005739 0.003109 0.000000 0.186858 0.325000 0.002388 0.000776 0.000000 0.070540 0.550000 0.005739 0.003157 0.000000 0.187523 0.333333 0.002388 0.000796 0.000000 0.070817 0.558333 0.005739 0.003204 0.000000 0.188187 0.341667 0.002388 0.000816 0.000000 0.071094 0.566667 0.005739 0.003252 0.000000 0.188852 0.350000 0.002388 0.000836 0.000000 0.071370 0.575000 0.005739 0.003300 0.000000 0.189517 0.358333 0.002388 0.000856 0.000000 0.071647 0.583333 0.005739 0.003348 0.000000 0.190182 0.366667 0.002388 0.000875 0.000000 0.071924 C.591667 0.005739 0.003396 0.000000 0.190847 0.375000 0.002388 0.000895 0.000000 0.072200 C.600000 0.005739 0.003444 0.000000 0.191512 0.383333 0.002388 0.000915 0.000000 0.072477 0.608333 0.005739 0.003491 0.000000 0.192177 0.391667 0.002388 0.000935 0.000000 0.072753 0.616667 0.005739 0.003539 0.000000 0.192842 0.400000 0.002388 0.000955 0.000000 0.073030 0.625000 0.005739 0.003587 0.000000 0.193507 0.408333 0.002388 0.000975 0.000000 0.073307 0.633333 0.005739 0.003635 0.000000 0.194172 0.416667 0.002388 0.000995 0.000000 0.073583 0.641667 0.005739 0.003683 0.000000 0.194837 0.425000 0.002388 0.001015 0.000000 0.073860 0.650000 0.005739 0.003730 0.000000 0.195502 0.433333 0.002388 0.001035 0.000000 0.074137 0.658333 0.005739 0.003778 0.000000 0.196167 0.441667 0.002388 0.001054 0.000000 0.074413 0.666667 0.005739 0.003826 0.000000 0.196832 0.450000 0.002388 0.001074 0.000000 0.074690 0.675000 0.005739 0.003874 0.000000 0.197497 0.458333 0.002388 0.001094 0.000000 0.074966 0.683333 0.005739 0.003922 0.000000 0.198162 0.466667 0.002388 0.001114 0.000000 0.075243 0.691667 0.005739 0.003970 0.000000 0.198827 0.475000 0.002388 0.001134 0.000000 0.075520 0.700000 0.005739 0.004017 0.000000 0.199492 0.483333 0.002388 0.001154 0.000000 0.075796 0.708333 0.005739 0.004065 0.673366 0.200157 0.491667 0.002388 0.001174 0.000000 0.076073 0.716667 0.005739 0.004113 1.904555 0.200822 0.500000 0.002388 0.001194 0.000000 0.076350 0.725000 0.005739 0.004161 3.498866 0.201487 0.508333 0.002388 0.001214 0.000000 0.076626 0.733333 0.005739 0.004209 5.386821. 0.202152 0.516667 0.002388 0.001234 0.000000 0.076903 0.741667 0.005739 0.004257 7.528259 0.202817 0.525000 0.002388 0.001253 0.000000 0.077179 0.750000 0.005739 0.004304 9.896087 0.203482 0.533333 0.002388 0.001273 0.000000 0.077456 END FTAHLE 3 0.541667 0.002388 0.001293 0.000000 0.077733 FTABLE 4 0.550000 0.002388 0.001313 0.000000 0.078009 91 5 0.558333 0.002388 0.001333 0.000000 0.078286 Depth Area Volume Outflowl Outflow2 Velocity Travel Time••• 0.566667 0.002388 0.001353 0.000000 0.078563 (ft) (acres) (acre-ft) (cfs) (cfs) (ft/sec) (Minutes)••• 0.575000 0.002388 0.001373 0.000000 0.078839 0.000000 0.002388 0.000000 0.000000 0.000000 0.583333 0.002388 0.001393 0.000000 0.079116 0.008333 0.002388 0.000020 0.000000 0.060028 0.591667 0.002388 0.001413 0.000000 0.079393 C.016667 0.002388 0.000040 0.000000 0.060305 0.600000 0.002388 0.001433 0.000000 0.079669 0.025000 0.002388 0.000060 0.000000 0.060582 0.608333 0.002388 0.001452 0.000000 0.079946 0.033333 0.002388 0.000080 0.000000 0.060858 0.616667 0.002388 0.001472 0.000000 0.080222 0.041667 0.002388 0.000099 0.000000 0.061135 0.625000 0.002388 0.001492 0.000000 0.080499 0.050000 0.002388 0.000119 0.000000 0.061412 0.633333 0.002388 0.001512 0.000000 0.080776 0.058333 0.002388 0.000139 0.000000 0.061688 0.641667 0.002388 0.001532 0.000000 0.081052 0.066667 0.002388 0.000159 0.000000 0.061965 0.650000 0.002388 0.001552 0.000000 0.081329 eN,Q.075000 0.002388 0.000179 0.000000 0.062242 0.658333 0.002388 0.001572 0.000000 0.081606 0 083333 0.002388 0.000199 0.000000 0.062518 0.666667 0.002388 0.001592 0.000000 0.081882 0.091667 0.002388 0.000219 0.000000 0.062795 0.675000 0.002388 0.001612 0.000000 0.082159 0.100000 0.002388 0.000239 0.000000 0.063071 0.683333 0.002388 0.001631 0.000000 0.082435 0.108333 0.002388 0.000259 0.000000 0.063348 0.691667 0.002388 0.001651 0.000000 0.082712 0.116667 0.002388 0.000279 0.000000 0.063625 0.700000 0.002388 0.001671 0.000000 0.082989 0.125000 0.002388 0.000298 0.000000 0.063901 0.708333 0.002388 0.001691 0.067333 0.083265 0.133333 0.002388 0.000318 0.000000 0.064178 0.716667 0.002388 0.001711 0.190433 0.083542 0.141667 0.002388 0.000338 0.000000 0.064455 0.725000 0.002388 0.001731 0.349825 0.083819 0.150000 0.002388 0.000358 0.000000 0.064731 0.733333 0.002388 0.001751 0.538557 0.084095 0.158333 0.002388 0.000378 0.000000 0.065008 0.741667 0.002388 0.001771 0.752610 0.084372 0.166667 0.002388 0.000398 0.000000 0.065284 0.750000 0.0023138 0.001791 0.989273 0.084648 0.175000 0.002388 0.000418 0.000000 0.065561 END FTABLE 4 0.183333 0.002388 0.000438 0.000000 0.065838 END FTABLES 0.191667 0.002388 0.000458 0.000000 0.066114 0.200000 0.002388 0.000478 0.000000 0.066391 EXT SOURCES 0.208333 0.002388 0.000497 0.000000 0.066668 <-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target. vole> < Grp> <-Member > ••: 0.216667 0.002388 0.000517 0.000000 0.066944 <Name> 8 <Name> 8 tem strg<•factor->strg <Name> 8 8 <Name> 8 8 ••• 0.225000 0.002388 0.000537 0.000000 0.067221 WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC 0.233333 0.002388 0.000557 0.000000 0.067497 WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC 0.241667 0.002388 0.000577 0.000000 0.067774 WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP 0.250000 0.002388 0.000597 0.000000 0.068051 WDM 1 EVAP F.NGL 0.76 IMPLND 1 999 F.XTNI, PETINP 0.258333 0.002388 0.000617 0.000000 0.068327 0.266667 0.002388 0.000637 0.000000 0.068604 END EXT SOURCES 0.275000 0.002388 0.000657 0.000000 0.0681381 0.283333 0.002388 0.000676 0.000000 0.069157 EXT TARGETS 0.291667 0.002388 0.000696 0.000000 0.069434 <-Volume-> <-Grp> < Member-><-- Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd 4.4 0.300000 0.002388 0.000716 0.000000 0.069710 <Name> 8 <Name> 6 8<-factor->strg <Name> 8 <Name> tem strg st.rg••• 0.308333 0.002388 0.000736 0.000000 0.069987 RCHRES 5 HYDR RO 1 1 1 WDM 1002 FLOW ENGL RF.PI, 0.316667 0.002388 0.000756 0.000000 0.070264 RCHRF.S 5 HYDR STAGE 1 1 1 WDM 1003 STAG ENGL REPL 90% FC with Flterra 10/12/2018 2.02:50 PM Page 62 90% FC with Filterra 10/12/2018 2:02:50 PM Page 63 COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL, REPL COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLAW F.NGI, REPL COPY 601 OUTPUT MEAN 1 1 48.4 WDM 901 FLOW ENGL REPL RCHRES 1 }IYDR RO 1 1 1 WDM 1004 FLOW ENGL REPL RCHRES 1 HYDR 0 1 1 1 WDM 1005 FLOW ENGL REPL RCHRES 1 HYDR 0 2 1 1 WDM 1006 FLOW ENGL REPL RCHRES 1 HYDR STAGE 1 1 1 WDM 1007 STAG PNGL, REPL COPY 2 OUTPUT MEAN 1 1 48.4 WDM 702 FLOW ENGL REPL, COPY 502 OUTPUT MEAN 1 1 48.4 WDM 802 FLOW ENGL REPL COPY 602 OUTPUT MEAN 1 1 48.4 WDM 902 FLOW ENGL REPL RCHRES 4 HYDR RO 1 1 1 WDM 1008 FLOW F,NGI, REPL RCHRES 4 HYDR 0 1 1 1 WDM 1009 FLOW ENGL REPL RCHRES 4 HYDR 0 2 1 1 WDM 1010 FLOW ENGL REPL RCHRES 4 HYDR STAGE. 1 1 1 WDM 1011 STAG ENGL REPL END EXT TARGETS MASS -LINK <Volume> <-Grp> < Member-><--Mult--> <Target> <-Grp> <-Member->••• <Name> <Name> # #<-factor-> <Name> <Name> # # " MASS -LINK 2 PERLND PWATER SURD 0.083333 RCHRES INFLOW IVOL END MASS -LINK 2 MASS -LINK 3 PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL END MASS -LINK 3 MASS -LINK 5 IMPLND IWATER SURD 0.083333 RCHRES INFLOW IVOL END MASS -LINK 5 MASS -LINK 7 RCHRES OFLOW OVOL 1 RCHRES INFLOW IVOL END MASS -LINK 7 MASS -LINK 8 RCHRES OFLOW OVOL 2 RCHRES INFLOW IVOL END MASS -LINK 8 MASS -LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END MASS -LINK 12 MASS -LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END MASS -LINK 13 MASS -LINK 15 IMPLND IWATKR SURO 0.083333 COPY INPUT MEAN END MASS -LINK 15 MASS -LINK 16 RCHRES ROFLOW COPY INPUT MEAN END MASS -LINK 16 MASS -LINK 17 RCHRES OFLOW OVOL 1 COPY INPUT MEAN END MASS -LINK 17 MASS -LINK 18 RCHRES OFLOW OVOL 2 COPY INPUT MEAN END MASS -LINK 18 END MASS -LINK END RUN 90% FC with/terra 10/12/2018 2.02.50 PM Predeveloped HSPF Message File Page 64 90% FC with F/Ierra 10/12/2018 2.02.50 PM Page 65 ERROR/WARNING ID: 341 6 DATE/TIME: 2003/10/20 12:15 RCHRES: 4 The volume of water in this reach/mixed reservoir is greater than the value in the "volume" column of the last row of RCHTAB(). To continue the simulation the table has been extrapolated, based on information contained in the last two rows. This will usually result in some loss of accuracy. If depth is being calculated it will also cause an error condition. Relevant data are: NROWS V1 V2 VOL 91 77.145 78.016 7.8314E+01 ERROR/WARNING TD: 341 5 DATE./TIME: 2003/10/20 12:15 RCHRES: 4 Calculation of relative depth, using Newton's method of successive approximations, converged to an invalid value (not in range 0.0 to 1.0). Probably ftable was extrapolated. If extrapolation was small, no problem. Remedy; extend ftable. Relevant data are: A B C RDEP1 RDE.P2 COUNT 0.0000E+00 208.04 -279.29 1.3425 1.3425E+00 2 Mitigated HSPF Message File Disclaimer Legal Notice This program and accompanying documentation are provided 'as -is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All Rights Reserved. Clear Creek Solutions, Inc. 6200 Capitol Blvd. Ste F Olympia, WA. 98501 Toll Free 1(866)943-0304 Local (360)943-0304 www.clearcreeksolutions.com 90% FC with Fillerra 10/12/2018 2.02 50 PM Page 66 90% FC with Fdlerra 10/12/2018 2.02.50 PM Page 67 Analysis Run Analysis Water Quality On -Line BMP 24 hour Volume (acTt) Standard Flow Rate (cis) I0.7846 I I1.0340 I Off -Line BMP Standard Flow Rate (cis) IO 5841 Wetland Input Volumes 1 LID RepoStream Protection Duration I LID Duration I Flow Fr ncy Water Quay 1 Hydrograph rt J Kng2012 Recharge Recharge Redeveloped-1Recharge Mitigated Analyze datasets Compact WDM 1 Delete Solecled r Monthly FF 1 501 POC 1 Predeveloped lbw 801 POC 1 Mdwalcd low Evap POC 1 POC 2 Fbod Frequency Method All Datasets 1 Fbw Stage I Precp C Log Pearson Type III 178 C Weibul r, Crnnane r Grirgorten Technical Information Report South Interim Base October 2018 166 1111 Analysis la Run Analysis Water Quality On -Line BMP 24 hour Volume (acdQ Standard Fbw Rate (ols) I0.2106 I0.2520 1 OH -Line BMP Standard Flow Rate (els) [0.1417 Stream Protection Duation I UD Duration I Flow Frequency Water Quality I Hydtotpaph Wetland Input Volumes I UD Report I Kng2012 Recharge 1 Recharge Redeveloped 1 Recharge Mitigated I Analyze datasets C r Monthly FF 11 y Compact WDM � Delete Selected � t_ 502 POC 2 Predeveloped How faJ2 POC 21.6aoartd liow Evap I POC 1 AlDatasets 1 Flow 1 Stage Precp Technical Information Report South Interim Base POC2 Flood Frequency Method f•' Log Pearson Type III 178 r Weibull r Cunnane f Grngorlen October 2018 167 TDA 1 - Filterra - North Mitigated Facility Name Downstream Connections Facility Type r PrecipitationAppliedtoFacddy r Evaporation Applied to Facdily Facility Dimensions Bottom Length (ft) Bottom Width (ft) Effective Depth (ft) Left Side Slope (HN) Bottom Side Slope (HN) Right Side Slope (HN) Top Side Slope (HN) 25 18 0 Infiltration Yes Hydraulic Conductivity (in/hr) Filter material depth (ft) Total Volume Filtrated (ac-ft) Total Volume Through Riser (ac{Q Total Volume (acdt) Percent Fitered Size Infiltration Basin I Target %: 100 Technical Information Report South Interim Base 570 395 51.514 621.91 91.72 TDA 1 FiRerra - North Outlet 1 Vau1 1 Outlet 2 Vault 1 Sand Filter 24.82 I2I Outlet 3 [0 J Quick Fitter Facility Dimension Diagram Outlet Structure Data 1 Riser Height (ft) Riser Diameter (in) Riser Type Notch Type 0.7 tern Flat J Orifice Diameter Height Number (in) (ft) 1 1.8 J 2 r—'i� 3 Filter Storage Volume at Riser Head (acft) .008 Show Filter Table Open Table -={ Initial Stage (ft) 0 1 October 2018 168 t9• TDA1 - Filterra - South Mitigated Facility Name Downstream Connections Facility Type r Precipitation Applied to Facility r Evaporation Applied to Facihly Facility Dimensions Bottom Length (ft) Bottom Width (ft) Effective Depth (ft) Left Side Slope (HN) Bottom Side Slope (HN) Right Side Slope (HN) Top Side Slope (HN) 25 10 0.75 0 0 Infiltration Yes -H Hydraulic Conductivity (Me) Filter material depth (ft) Total Volume Filtrated (ec-ft) Total Volume Through Riser (acfl) Total Volume (ac•ft) Percent Filtered Size Infiltration Basin Target %: too -:-I Technical Information Report South Interim Base TDA 1 - Reim,- South Outlet 1 Vault 1 Outlet 2 Vaud 1 Sand Filter Outlet 3 LD Quick Filter Facility Dimension Diagram Outlet Structure Data Riser Height (ft) Riser Diameter (es) Riser Type Notch Type Flat Orifice Diameter Height 24.82 J Number (in) (ft) 1 r1 —� 1.8 J 2 310.473 3 r— H 26.348 336.82 92.18 Filter Storage Volume at Riser Head (acft) .064 Show Filter Table Open Table —H Initial Stage (ft) 0 October 2018 169 $1 TDA 2 - Filterra - North Mitigated Facility Name Downstream Connections Facility Type r Precipitation Applied to Facility r (Evaporation Appied to Facy Facility Dimensions Bottom Length (It) Bottom Width (ft) Effective Depth (ft) Left Side Slope (HN) Bottom Side Slope (HN) Right Side Slope (HN) Top Side Slope (HN) TDA 2 - Fiterra - North Outlet 1 0 `Sand Filter 11 8 0.75 0 0 Infiltration Yes Hydraulic Conductivity (in/Fa) Fifer material depth (It) Total Volume Fihated (acH) Total Volume Through Riser (ac-It) Total Volume (acft) Percent Filtered Size Infiltration Basin I Target %: 100 Technical Information Report South Interim Base 24.82 -'i 111.833 7.289 119127 93.88 Outlet 2 0 1 Outlet 3 [0 Quick Filter Facility Dimension Diagram Outlet Structure Data Riser Height (ft) Riser Diameter (in) Riser Type Notch Type 0.7 111.1 Flat Orifice Diameter Height Number (in) (ft) 1 2 3 Fitter Storage Volume at Riser Head (ac-ft) .002 Show Filter Table Open Table Initial Stage (ft) 0 October 2018 170 G`r TDA 2 - Filterra - South Mitigated Facility Name Downstream Connections Facility Type r Precipitation Applied to Faciity r :Evaporation Applied to Faalitf Facility Dimensions Bottom Length (ft) Bottom Width (tt) Effective Depth (ft) Left Side Slope (HN) Bottom Side Slope (HN) Right Side Slope (HN) Top Side Slope (HN) !TDA 2 - Fiterra - South Outlet 1 rD 13 10 Outlet 2 fD 1 Sand Filer Infiltration Yes H Hydraulic Conductivity (in/hr) Filter material depth (ft) Total Volume Fitrated (acft) Total Volume Through Riser (acfl) Total Volume (acft) Percent Filtered Size Infiltration Basin Target %: 100 Technical Information Report South Interim Base 12412 H 146.468 14.549 161 018 90.96 Outlet 3 0 Quint Filter Facility Dimension Diagram Outlet Structure Data Riser Height (ft) Riser Diameter (in) Riser Type Notch Type Rat Orifice Diameter Height Number (in) (ft) 1 2 11:."I -H 3 kr— -.71 IF— -t•I Filer Storage Volume at Riser Head (aoft) .002 Show Filter Table 'Open Table Initial Stage (ft) 0 October 2018 171 APPENDIX C - ENGINEERING CALCULATIONS Vault Buoyancy and Anchor Sizing o To bo completed after the Geotechnical investigation is finished and the seasonally high groundwater table is known. Uniform Flow Analysis Backwater Analysis Technical Information Report South Interim Base October 2018 172 Uniform Flow Analysis 25-year Design Flow (cfs)1 TDA 1 4.0745 TDA 2 1.1196 1 Assumes TDA-wide, unmitigated flow Known Values Pipe Material DI HDPE PVC Manning's (1l 0.014 0.009 0.009 2 Per Table 4.2.1.D in the KCSWDM Equations Design Paramaters 1.486 Manning's Equation: Q = n Awl '/3s/z Hydraulic Radius: RH = vW = 1 ut pipeful flow Wetted Area: Aw ='=or at pipeful flow Minimum Velocity (fps)' 3 Maximum Velocity (fps)4 30 3 Per section 4.2.1.1, pg. 4-11 of the KCSWDM Per Table 4.2.1.A in the KCSWDM Pipe Capacity and Velocity Check Pipe No. TDA 1- Representative TDA 2 - Representative D (in) D (ft) Aw (ft') Rx (ft) Material n S (%) 15 1.25 1.23 0.31 HDPE 0.009 0.20% 12 1.00 0.79 0.25 HDPE 0.009 0.21% Q (cfs) V (fps) 4.17 3.40 2.36 3.00 APPENDIX E - BONDS, FACILITIES SUMMARY, AND COVENANTS Technical Information Report South Interim Base October 2018 300 APPENDIX F - CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN - Included as a separate attachment Technical Information Report South Interim Base October 2018 301 APPENDIX G - OPERATIONS AND MAINTENANCE MANUAL - Included as a separate attachment Technical Information Report South Interim Base October 2018 302 CI7 OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Ste 100 Tukwila, WA 98188 Telephone: (206) 431-3670 SEPA . ENVIRONMENTAL REVIEW APPLICATION FOR STAFF USE ONLY Permits Plus TYPE: P-SEPA Planner: File Number: £ /8'— oO//� Application Complete Date: Project File Number: PL /'-- 0099 Application Incomplete Date: Other File Numbers: NAME OF PROJECT/DEVELOPMENT: Rezone West Half of Parcel 7345600766 from LDR to C/LI BRIEF DESCRIPTION OF SCOPE OF WORK: Non -project action. This application requires public notice. Please see section 7 of the application checklist. LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. 12677 E. Marginal Way South, Tukwila WA 98168 LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement). #7345600766 DEVELOPMENT COORDINATOR/ PROJECT CONTACT: The individual who: • has decision making authority on behalf of the owner/applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City to whom all notices and reports will be sent. • PLEASE PRINT CLEARL Y Name: Gillian Zacharias Address: KSC-TR-0431, 201 South Jackson Street CITY, ST, ZIP Seattle, WA 98104 E-mail: gillian.zach rias(&kincoun Signature: ov Phone: 206-477-7915 Date: RECEIVED DEC 13 2010 Community Development \\citystore\City Common\Teri - DCD\Kirby\SEPA to fix\SEPA Environmental Review Application FINAL 5-9-16.docx COMPS _:TE APPLICATION CL _CKLIST The materials listed below must be submitted with your application unless specifically waived in writing by the Public Works Department and the Department of Community Development. Please contact each Department if you feel that certain items are not applicable to your project and should be waived. Application review will not begin until it is determined to be complete. ADDITIONAL MATERIALS MAY BE REQUIRED. The initial application materials allow project review to begin and vest the applicant's rights. However, the City may require additional information as needed to establish consistency with development standards. City staff are available to answer questions about application materials at 206-431-3670 (Department of Community Development) and 206-433-0179 (Department of Public Works). Check items submitted with application Information Required. May be waived in unusual cases, upon approval of both Public Works and Planning APPLICATIONCMATERIALS: ✓ 1. Application Checklist (1 copy) indicating items submitted with application. V 2. Completed ESA Screening Checklist, SEPA Environmental Checklist and drawings (5 copies). V 3. One set of all plans reduced to 8 1/2" x 11" or 11" x 17". V 4. Application Fee: See Land Use Fee Schedule. 5. Underlying permit application that triggers SEPA review. I/ PUBLIC NOTICE MATERIALS: �� 1 �� freGesSe.6 6. Payment of notice board fee (see Land Use Fee Schedule) to FastSigns OR provide a 4' x 4' public notice board on site within 14 days of the Department determining that a complete application has been received (see Public Notice Sign Specifications Handout). VName 7. Pay the fee as established by the Land Use Fee Schedule for generating mailing labels; OR provide an excel spreadsheet of mailing labels for all property owners and tenants (residents and businesses) within 500 feet of the subject property. Each unit in multiple family buildings e.g. apartments, condos, trailer parks --must be included. Once your project is assigned to a planner, you will be required to provide an electronic copy of the mailing label spreadsheet in the following format: Name, Street Address, City St Zip, with each of these fields as an individual column: Street Address City, St, Zip . Mr. Smith 1234 Park Ave S Tukwila WA 98188 PLEASE NOTF,: Regardless of whether you pay the City to generate the mailing labels or you provide them, there is an additional fee for postage and material as listed under Public Notice Mailing Fee on the Land Use Fee Schedule. Payment of this fee is due prior to issuance of the decision and you will receive a separate bill for this fee. / 8. If providing own labels, include King County Assessor's map(s) which shows the location of each property within 500 ft. of the subject lot. RECEIVED DEC 13 2018 Community Development \\citystore\City Common\Teri - DCD\Kirby\SEPA to fix\SEPA Environmental Review Application FINAL 5-9-16.docx Check items submitted with application Information Rei !d. May be waived in unusual cases, upo oroval of both Public Works and Planning PROJECT DESCRIPTION AND ANALYSIS: V 9. Vicinity Map with site location. / 17, 10. Provide four (4) copies of any sensitive area studies such as wetland or geotechnical reports if needed per Tukwila's Sensitive Areas Ordinance (TMC 18.45). See the Geotechnical Report Guidelines and Sensitive Area Special Study Guidelines for additional information. /(A, Iv l 11. Any drawings needed to describe the proposal other than those submitted with the underlying permit. Maximum size 24" x 36". RECEIVED DEC 13 2018 Community Development \\citystore\City Common\Teri - DCD\Kirby\SEPA to fix\SEPA Environmental Review Application FINAL 5-9-16.docx REZONE WEST HALF 7345600766 7345600766 PARENT FILE PL18-0099 THIS FILE L18-0114 COMP PLAN_ZONE AMEND/REZONE City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director NOTICE OF DECISION May 15, 2019 TO: Gillian Zacharias obo King County Metro, Applicant Blue Nile Holdings LLC, Owner King County Assessor, Accounting Division Washington State Department of Ecology Department of Commerce Sean Dimond, sean@untamed.be Anne Dimond, annedimond@gmail.com Brian Kennedy, graften@comcast.net This letter serves as a notice of decision and is issued pursuant to the Notice of Decision section of the Tukwila Municipal Code (TMC 18.104.170) on the following project approval. I. PROJECT INFORMATION Project File Number: L18-0114 Applicant: King County Metro Type of Decision: Comprehensive Plan and Zoning Code map changes Project Description: Map change from split -zoned Low Density Residential (LDR) and Commercial Light Industrial (C/LI) to Commercial Light Industrial Location: 12677 E Marginal Way S Associated Files: E18-0016 Existing Comprehensive Plan Designation/Zoning District: Split -zoned C/LI (eastern portion) and LDR (western portion) II. DECISION SEPA Determination: The City SEPA Responsible Official has previously determined that the project, as proposed, does not create a probable significant environmental impact and issued a Determination of Non -Significance (DNS). Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov Decision on Substantive Permit: The City Council has determined, following an open record hearing, that the application for a Comprehensive Plan and Zoning Map change does comply with applicable City and state code requirements and has approved the application based on the findings and conclusions contained in the ordinances, subject to the following conditions: 1. Within six years after the effective date of this ordinance, property owner shall implement a City -approved plan to daylight the Type II stream located within a pipe on the western half of the property. If daylighting the Type 11 stream is determined to be technically infeasible by the City, then the property owner shall upgrade the stream culvert for said stream. The plan to daylight the stream and/or to upgrade the stream culvert shall meet the standards in the Washington Department of Fish & Wildlife (WDFW) manual "Design of Road Culverts for Fish Passage" (2003 Edition, as it now reads or as hereafter amended). If daylighting or upgrading of the stream culvert is determined to be technically infeasible by the City, then the property owner shall plant native plants on the western portion of the Property in a manner that improves upon the original condition as part of a planting plan to be approved by the City. Additionally, the property owner shall also remove all existing impervious surfaces located within the stream buffer within six years after the effective date of this ordinance. For the purposes of this section, "technically infeasible" shall mean "not feasible due to contamination issues, conflict with utilities, or potential for harm to fish." 2. Within 180 days of the passage of this ordinance, the applicant shall record against the site a covenant or other document, approved by the City, requiring compliance with Condition 1. 3. Failure to comply with Conditions 1 and 2 shall cause the change to the Zoning Code Map to be null and void, the subject property shall revert to the zoning immediately preceding passage of this ordinance, and any subsequent use shall conform to the regulations specified by the Tukwila Municipal Code for the district in which such use is located. The Decision on this Application is a Type 5 decision pursuant to TMC 18.104.010. III. YOUR APPEAL RIGHTS No administrative appeal of the City Council Decision is permitted. Any party wishing to challenge the City Council Decision must file an appeal in King County Superior Court pursuant to the procedures and time limitations set forth in RCW 36.70C. An appeal challenging the DNS may be included in such an appeal. If no appeal of the City Council decision is properly filed in Superior Court within such time limit, the Decision on this permit will be final. IV. INSPECTION OF INFORMATION ON THE APPLICATION Project materials including the application, any staff reports, and other studies related to the permits are available for inspection at the Tukwila Department of Community Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington from Monday though Friday between 8:30 a.m. and 5:00 p.m. The project planner is Max Baker, who may be contacted at 2016-431-3683 for further information. L18-0114 Notice of Decision 2 Property owners affected by this decision may request a change in valuation for their property tax purposes. Contact King County Assessor's Office for further information regarding property tax valuation changes. Ap rtment of Community Development f Tukwila L18-0114 Notice of Decision 3 City of Tukwila Washington Ordinance No. ) i, o.6 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REZONING CERTAIN REAL PROPERTY LOCATED AT 12677 E. MARGINAL WAY S., TUKWILA, FROM SPLIT ZONE COMMERCIAL/LIGHT INDUSTRIAL (C/LI) AND LOW DENSITY RESIDENTIAL (LDR) TO COMMERCIAL/LIGHT INDUSTRIAL ONLY; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, in 1995 the City of Tukwila adopted the Zoning Code and Map based on consideration of existing conditions and long-term community goals, and these documents may be reviewed and updated as appropriate; and WHEREAS, as part of the City's 2018-2019 Comprehensive Plan docket of potential amendments, the City received an application for consideration of a change to the Comprehensive Land Use and Zoning Maps for the Metro Training Facility project, located at 12677 E. Marginal Way S. (the "Property"); and WHEREAS, the zoning on the Property is split, with part of the Property zoned Commercial/Light Industrial and the remaining part zoned Low Density Residential; and WHEREAS, the Applicant seeks to rezone the entirety of the Property to Commercial/Light Industrial to enable the Property to be used for a King County Metro Training Facility; and WHEREAS, the east fork of Riverton Creek flows across the northwest corner of the Property through an underground pipe, and TMC Section 18.45.110.B.5.g requires that "On properties being developed or re -developed, or when stream crossings in public or private rights -of -way are being replaced, existing culverts that carry fish - bearing watercourses or those that could bear fish (based on the criteria in WAC 222- 16-031, Washington Forest Practices Rules and Regulations), shall be upgraded to meet the standards in the WDFW manual "Design of Road Culverts for Fish Passage" (2003 or as updated) if technically feasible;" and W: Legislative Development\Rezone Metro property on E Marg Wy-2nd amd option final 5-13-19 MB:bjs Review and analysis by Barbara Saxton Page 1 of 4 WHEREAS, on January 23, 2019, the City mailed a Notice of Application to the surrounding property owners and tenants, and on April 17, 2019, held the required public meeting regarding the proposed rezone and change to the Zoning Code Map (Exhibit A); and WHEREAS, adjacent residents expressed concern about potential impacts to the stream and stream buffer located near the western half of the parcel; and WHEREAS, the City of Tukwila has complied with the requirements of the State Environmental Policy Act by making a determination on April 23, 2019 that no significant environmental impact would occur as a result of the Zoning Code Map change; and WHEREAS, notice of a public hearing was timely published in "The Seattle Times," posted onsite, and mailed to surrounding properties; and WHEREAS, on May 6, 2019, the City Council held a public hearing and, after receiving and studying staff analysis and comments from the public, has recommended approval of the rezone application, and has made and entered Findings and Conclusions thereon in support of that recommendation; and WHEREAS, after due consideration, the City Council concurs with the Findings and Conclusions and has determined the public interest will be served by approving the rezone application, which is in compliance with the City of Tukwila Comprehensive Plan's Land Use Map; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. Findings and Conclusions Adopted. The City Council hereby adopts Findings and Conclusions, attached hereto as Exhibit B and incorporated by this reference as if fully set forth herein. Section 2. Rezone Approved Subject to Conditions. The Property is located at 12677 E. Marginal Way S., Tukwila, Washington, in the block bounded by S. 128th St., 37th Ave. S., and S. 126th St. The site is further identified as King County tax parcel 7345600766, as legally described and shown in the attached Exhibit C. The site is hereby approved to be rezoned from a split zoning of Commercial/Light Industrial and Low Density Residential to Commercial/Light Industrial across the entire parcel, as shown in the attached Exhibit A, subject to the following conditions: 1. Within six years after the effective date of this ordinance, property owner shall implement a City -approved plan to daylight the Type II stream located within a pipe on the western half of the property. If daylighting the Type II stream is determined to be technically infeasible by the City, then the property owner shall upgrade the stream culvert for said stream. The plan to daylight the stream and/or to upgrade the stream culvert shall meet the standards in the Washington Department of Fish & Wildlife (WDFW) manual "Design of Road Culverts for Fish Passage" (2003 Edition, as it now reads or as hereafter amended). If daylighting or upgrading of the stream culvert is W: Legislative Development\Rezone Metro property on E Marg Wy-2nd amd option final 5-13-19 MB:bjs Review and analysis by Barbara Saxton Page 2 of 4 determined to be technically infeasible by the City, then the property owner shall plant native plants on the western portion of the Property in a manner that improves upon the original condition as part of a planting plan to be approved by the City. Additionally, the property owner shall also remove all existing impervious surfaces located within the stream buffer within six years after the effective date of this ordinance. For the purposes of this section, "technically infeasible" shall mean "not feasible due to contamination issues, conflict with utilities, or potential for harm to fish." 2. Within 180 days of the passage of this ordinance, the applicant shall record against the site a covenant or other document, approved by the City, requiring compliance with Condition 1. 3. Failure to comply with Conditions 1 and 2 shall cause the change to the Zoning Code Map to be null and void, the subject property shall revert to the zoning immediately preceding passage of this ordinance, and any subsequent use shall conform to the regulations specified by the Tukwila Municipal Code for the district in which such use is located. Section 3. Map Amendment Authorized. The Department of Community Development Director, or his designee, is hereby authorized to amend the City's official Zoning Code Map to show the zoning change as authorized in Section 2 of this ordinance. Section 4. Corrections by City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; references to other local, state or federal laws, codes, rules, or regulations; or ordinance numbering and section/subsection numbering. Section 5. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. Section 6. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City and shall take effect and be in full force five days after passage and publication as provided by law. W: Legislative Development\Rezone Metro property on E Marg Wy-2nd amd option final 5-13-19 MB:bjs Review and analysis by Barbara Saxton Page 3 of 4 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Special Meeting thereof this j �.? 0day of , 2019. ATTEST/AUTHENTICATED: e— >24 Christy O'Flaf%rty, MMC, City CI Allan Ekberg, Mayor APPROVED AS TO FORM BY: Rachel B. Turpin, City Attorney Filed with the City Clerk: Passed by the City Council — Published: Effective Date: Ordinance Number: _ 6 0 Attachments: Exhibit A, Zoning Code Map Exhibit B, Staff Report Exhibit C, Legal Description and Site Map W: Legislative Development\Rezone Metro property on E Marg Wy-2nd amd option final 5-13-19 MB:bjs Review and analysis by Barbara Saxton Page 4 of 4 City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director Hearing Date: Notification: STAFF REPORT TO THE CITY COUNCIL May 6, 2019 Mailed to properties and residents within 500' radius Site Posted: 1/23/2019 and 4/2/2019 Notice published in the Seattle Times File Numbers: E18-0016 SEPA L18-0114 Comprehensive Plan Amendment and Rezone Applicant: Project Name: Request: King County Metro King County Metro Training Facility Rezone Change Comprehensive Plan and zoning designation of west half of parcel 7345600766 from Low Density Residential to Commercial/Light Industrial Location: 12677 EAST MARGINAL WAY S (Tax Parcel # 7345600766) Comprehensive Plan/ Zoning Designation: Split Zoning: Low Density Residential (LDR) on western half, Commercial/Light Industrial on eastern half SEPA Determination: Determination of Non -Significance issued April 23, 2019 Staff: Max Baker Attachments: A. Site map with project proposal plans, storm drainage infrastructure, and stream/buffer delineations B. Applicant's response to Decision Criteria Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 106-433-1800 • Website: TukwilaWA.gov ; POTENTIAL ; ANNEXATION AREA City of Tukwila Comprehensive Plan & Zoning Map 14...Ise 20/ Pig•hogggg seirrLe- OR t0j Tar Tukwl • Int 1491.0•111 1.11-011 IR. taggIggi.••••• 1•44•LI.g.g.1111,4.1. "W.% 14.3ggag.ggy.galgoaggg• 4.411401 NIAN Kam Alt I I.* a ongggasg• g 4•441.0..•••••.! M111,18111 laggIgig Tggl. 4.1•61,61s,egggagi iebtoggighogggg Rim 414,1111 Zoning Districts, Overlays, and Sub -Areas NW. MN MS ...In.. •g1.11. Iggig 1,•1.14ggliagge.t rix•re.• • loon.m... RENTON Shoreline Overlay (Approelmarely 20T each side albriver) I. FINDINGS Background This application is part of the 2018-2019 annual docket for amendment of the Comprehensive Plan (the "Plan"). The purpose of an annual docket is to ensure that changes to the City's Plan are only considered once a year and that they are considered collectively for impact to the Plan. The Applicant, King County Metro, seeks to rezone the western half of a 71,440 square foot split - zoned lot located at 12677 East Marginal Way 5, Tukwila, WA 98168 (the "Property") from Low Density Residential (LDR) to Commercial Light Industrial (CLI), with corresponding Comprehensive Plan and zoning map amendments. The Property was developed in 1975 with a warehouse and offices. The Applicant is seeking the Comprehensive Plan amendment and rezone for the following reasons: 1. The parcel is split -zoned: the eastern portion fronting on E Marginal Way S is zoned Commercial/Light Industrial (C/LI) and the western portion is zoned Low Density Residential (LDR). The Property is ideal for Metro's intended future use, but the split -zoned condition creates uncertainty about how the Site could be developed to meet Metro's needs. 2. The current use of the Property since at least 1975 has been Tight industrial, specifically a truck terminal use with accessory warehouse and parking. Truck terminal use is nonconforming to the existing LDR zoning, but conforming to the C/LI zoning. Rezoning would remove confusion around applicability of zoning to the Property and its nonconforming status, encouraging future redevelopment conforming to existing regulations. 3. Rezoning the Property will strengthen the boundary between the LDR zone to the west and C/LI zone along E Marginal Way 5. This non -project proposal is a quasi-judicial change to the land use designation on the Tukwila Comprehensive Plan and Zoning Code maps. If the rezone is approved, any C/LI use would be permitted subject to all City regulations. The Applicant has stated the intention to construct new small- scale office buildings and an associated bus maintenance training bay. A neighborhood scale Comprehensive Plan and Zoning Map depicting the Property is below. The map shows existing Comprehensive Plan and Zoning designations with the Property outlined in turquoise. Existing LDR zoning is yellow, and existing CLI zoning is Tight purple. 2 jf : r - LDR CLI LDR LDR NCC M1C;L I_D R LDR Figure 1 - Comprehensive Plan and Zoning Map Site Information The Property is developed with an office building and associated warehouse structure which has been used as a trucking facility since at least 1975. The Property measures about 200' feet wide by 350' feet long on average, and extends north to south, fronting on E Marginal Way S and S 128th St. 3 The east fork of Riverton Creek flows across the northwest corner of the Property through an underground pipe. The Property contains environmentally sensitive areas, including a Type 2 watercourse (Riverton Creek) and its 100-foot buffer as shown in green on the map below." Figure 2 — Relief map with Wetlands and Watercourses Annexation and Zoning History: The subject property was created in unincorporated King County as Riverton, a replat of a portion of Riverside Interurban Tracts, on June 15, 1906. Lots 4 and 18-25 of Block 9 of Riverton were acquired by a single owner and a trucking operation was established on the property. The Becker Family owned the property at the time it was developed with the current service garage, distribution warehouse, loading dock, and related improvements in 1975. The Property was annexed into Tukwila in 1989 as part of the Riverton Annexation. Ordinance no. 1479 amended the Comprehensive Land Use Policy Plan Map and applied the Heavy Industry designation to Lots 1-4 and 22-25 of Block 9. Lots 18-21 were designated Low Density Residential. In 1995 the City adopted the 1995 Comprehensive Land Use Plan and Map for the City of Tukwila and a new zoning map. Lots 18-25 appear to have been consolidated between the Riverton Annexation in 1989 and the zoning map adoption in 1995. The lot consolidation did not affect the zoning boundary, resulting in a split -zoned lot. The zoning boundary was not changed in 1995 and the property remains split -zoned today. The existing trucking operation is nonconforming to the LDR use requirements in Table 18-6, TMC 18.09, and TMC 18.10.020. 4 Vicinity Information The Property is close to SR 599 freeway access. Land Use The land uses around the Property reflect the zoning. The property immediately west is developed with a single family home. Across S 128th St. to the south is Tukwila School District's bus parking lot and transportation building, zoned Neighborhood Commercial Center (NCC). Properties across E Marginal Way S to the southeast are also zoned NCC and are currently developed with single-family homes. Immediately to the north of the Property is a C/LI property containing a former single-family home that has been converted into a commercial structure. Additional single-family homes are located northwest of the Property on land that is zoned Low Density Residential (LDR). Figure 3 - Land Use Map Existing Regulations Current Conditions The Property was annexed into the City of Tukwila on April 15, 1989, as part of Ordinance No. 1508. A zoning map included with this ordinance confirmed the zoning classifications applied in Ordinance No. 1480 (Effective Date October 18, 1988) for the subject property. The Property was originally composed of multiple lots containing "R-1: Single Family Residence 7200" and "C-M: Industrial Park" zoning designations. In 1995, the City adopted a new Comprehensive Land Use Plan, Zoning Code, and Zoning Map. This new zoning code amended the number and names of zoning districts in the city: R-1 became LDR and C-M became C/LI. Between 1989 and 1995, the Tots composing the Property appear to have been 5 consolidated. However, the zoning boundary was not changed as part of either the lot consolidation or the 1995 Comprehensive Plan adoption, and the Property remains split -zoned today. The existing trucking operation is nonconforming on the LDR-portion of the Property pursuant to the use provisions in Table 18-6, TMC 18.09, and TMC 18.10.020. The trucking operation was in active, continual operation prior to the lot consolidation and annexation into the City of Tukwila. TMC 18.70 allows legally established nonconforming uses to continue and sets forth limitations on any expansion of nonconforming uses. Public Comments Notice was sent to property owners and tenants within 500' of the Property and agencies with jurisdiction. A Type 5 public meeting was held on April 17, 2019, and three nearby property owners attended. One residential property owner requested that a greater noise and visual buffer be provided on the west side of the property, to limit hours of operations to reasonable hours, to reduce the amount of visual impairment at the southeast corner of the lot for drivers pulling on to E.Marginal Way S, and to limit street parking to 5 hours a day. Two residential property owners expressed concern via email about the past contamination of the Property and potential impacts to the stream, as well the need for vegetated buffering around the site especially along the western portion adjacent to neighboring homes. They also expressed a desire to see the stream improved for fish habitat. Comprehensive Plan and Zoning Map Amendment Criteria The Applicant's response to the decision criteria is attached as Attachment B. 1. The proposed amendment to the [Comprehensive Plan and] zoning map is consistent with the goals, objectives, and policies of the Comprehensive Plan Four broad -reaching objectives are the basis for the elements, goals and policies for Tukwila's Comprehensive Plan. The Comprehensive Plan's primary objective is preserving and enhancing Tukwila's neighborhoods. The Community Image and Identity Element has the following goal: A community of inviting neighborhoods and vibrant business districts. (Goal 1.1) The policies then speak about recognizable boundaries. Strengthen the image and character of Tukwila's distinct areas and neighborhoods (Policy 1.1.2) Applicant Response: The subject property takes primary access from E Marginal Way S and is part of a node of C/LI and Neighborhood Commercial (NCC) zoning along this arterial that is not one lot deep (except on the subject parcel). Rezoning the west side of 6 the subject property to be consistent with this district will strengthen the image and character of the node by clarifying the uses allowed on the site, creating a consistent expectation about development on the property, and establishing clear definition between the residential neighborhood to the west and the commercial/light industrial uses along E Marginal Way S. Staff Response: The Zoning District boundary is not clearly identifiable in the neighborhood. The Property is split -zoned, leading to a lack of clarity in the use and development. Rezoning the Property would help create a consistent expectation about land use on the lot and will clearly define the residential neighborhood as distinct from the commercial and industrial uses along E Marginal Way S. The Natural Environment Element has the following goals: The City's air, land, and water resources are restored and protected for future generations. (Goal 4.1) Goal 4.4 Water resources that function as a healthy, integrated system; provide a long-term public benefit from enhanced environmental quality; and have the potential to reduce public infrastructure costs. Watercourses and their buffers, ...., are protected from encroachment and degradation and improved through mitigation, enhancement, and restoration projects. (Goal 4.6) Applicant Response: The proposed rezone will clarify applicable use requirements and position the property for redevelopment, which presents and opportunity to implement forward -thinking development techniques such as Low Impact Development (LID) and environmental enhancement and remediation (if necessary) consistent with this goal. The City has adopted a Critical Areas Ordinance in TMC Chapter 18.45 "Environmentally Sensitive Areas." The purpose of this chapter is to protect the environment, human life, and property; identify and classify ecologically sensitive areas; and protect these areas and their functions while allowing for reasonable use of public and private property. New development on the subject parcel is require to comply with applicable critical areas requirements to minimize development impacts using best available science. The east fork of Riverton Creek flows across the northwest corner of the property through and underground pipe, and redevelopment of the property presents an opportunity to address this sensitive area. The subject property has already had some environmental remediation and cleanup related to its historic use as a trucking facility. Contamination from leaking underground storage tanks was addressed in 1999, and periodic review by the Department of Ecology confirms that the remedial actions continue to eliminate exposure to contaminated soils by ingestion and contact. Work was performed under the Model Toxics Control Act and the Voluntary Cleanup Program (codified in Chapter 173-340 WAC). A restrictive covenant is recorded on the property documenting the contamination and cleanup work and prohibiting work that could disturb contaminated soils without review and approval by the Department of Ecology. Future work on the property is required to coordinate with Department of Ecology and address the restrictive covenant on the property. Substantial disturbance of the property could result in expanded cleanup efforts to eliminate contamination. Staff Response: Redevelopment of the Property as a commercial or light industrial use would require any development/use to be located outside of the stream buffer areas. The existing condition of a truck parking area built over the watercourse would be improved if the parking area is removed and the western portion of the Property restored as a natural area for the watercourse. The City has adopted a Critical Areas Ordinance in TMC Chapter 18.45, "Environmentally Sensitive Areas." New development on the Property is required to comply with applicable critical areas requirements to minimize development impacts using best available science. The east fork of Riverton Creek flows across the northwest corner of the property through an underground pipe (see Figure 4), and redevelopment of the property presents an opportunity to upgrade this sensitive area. TMC 18.45.110.B.5.g requires that "On properties being developed or re -developed, or when stream crossings in public or private rights -of -way are being replaced, existing culverts that carry fish -bearing watercourses or those that could bear fish (based on the criteria in WAC 222-16-031, Washington Forest Practices Rules and Regulations), shall be upgraded to meet the standards in the WDFW manual "Design of Road Culverts for Fish Passage" (2003 or as updated) if technically feasible." If daylighting or upgrading of the stream is proven to be technically infeasible, the western portions of the Property located within the stream buffer area could be planted with native plants that improves the original condition in species diversity and density, and all existing durable surfaces within the stream buffer could be removed to protect the Creek and its buffer. The rezone proposal provides an opportunity to improve the existing stream and buffer from its current condition which complies with the City's comprehensive plan goals. 8 Figure 4 — Sensitive Areas Map. Type II stream in pipe flows through northwest corner of slte; 100' buffers begin from where stream is not in pipe. A relevant Economic Development Element policy is: Promote and preserve economic use of industrial lands outside the MIC through appropriate buffering requirements and use restrictions. (Economic Development Policy 2.1.16) Applicant Response: The Subject Site is located just south of the MIC boundary, along E Marginal Way S, and has been in continual use as a commercial/light industrial property since prior to annexation in 1989. The proposed rezone supports this policy by preserving the existing C/Ll zoning and expanding it slightly to be consistent with the existing parcel boundary and other similar properties. Additionally, the proposed rezone will eliminate a confusing split -zoning condition, ultimately clarifying how the Subject Site can be used and supporting future redevelopment of the property. The C/LI zone and the landscaping requirements in Table A of TMC 18.52.939 establish appropriate buffering requirements and use restrictions to ensure that commercial and light industrial development is compatible with nearby residential uses. In addition, the requirement for a stream buffer also provides a natural division between the two types of uses. Staff Response: City staff concurs with the applicant's response; increased setback and screening requirements are set forth for C/LI properties located adjacent to any residential property including those zoned LDR. Additionally, the property has been in continuous use as a truck terminal since before annexation into the City of Tukwila, and this proposal will work to preserve a historically industrial land while enhancing the buffers for surrounding properties. Overall, this proposal is consistent with the goals, policies and objectives of the Comprehensive Plan. 9 and prohibiting work that could disturb contaminated soils without review and approval by the Department of Ecology. Future work on the property is required to coordinate with Department of Ecology and address the restrictive covenant on the property. Substantial disturbance of the property could result in expanded cleanup efforts to eliminate contamination. Staff Response: Redevelopment of the Property as a commercial or light industrial use would require any development/use to be located outside of the stream buffer areas. The existing condition of a truck parking area built over the watercourse would be improved if the parking area is removed and the western portion of the Property restored as a natural area for the watercourse. The City has adopted a Critical Areas Ordinance in TMC Chapter 18.45, "Environmentally Sensitive Areas." New development on the Property is required to comply with applicable critical areas requirements to minimize development impacts using best available science. The east fork of Riverton Creek flows across the northwest corner of the property through an underground pipe (see Figure 4), and redevelopment of the property presents an opportunity to upgrade this sensitive area. TMC 18.45.110.B.5.g requires that "On properties being developed or re -developed, or when stream crossings in public or private rights -of -way are being replaced, existing culverts that carry fish -bearing watercourses or those that could bear fish (based on the criteria in WAC 222-16-031, Washington Forest Practices Rules and Regulations), shall be upgraded to meet the standards in the WDFW manual "Design of Road Culverts for Fish Passage" (2003 or as updated) if technically feasible." If daylighting or upgrading of the stream is proven to be technically infeasible, the western portions of the Property located within the stream buffer area could be planted with native plants that improves the original condition in species diversity and density, and all existing durable surfaces within the stream buffer could be removed to protect the Creek and its buffer. The rezone proposal provides an opportunity to improve the existing stream and buffer from its current condition which complies with the City's comprehensive plan goals. 8 Figure 4 — Sensitive Areas Map. Type 1I stream in pipe flows through northwest corner of site; 100' buffers begin from where stream is not in pipe. A relevant Economic Development Element policy is: Promote and preserve economic use of industrial lands outside the MIC through appropriate buffering requirements and use restrictions. (Economic Development Policy 2.1.16) Applicant Response: The Subject Site is located just south of the MIC boundary, along E Marginal Way S, and has been in continual use as a commercial/light industrial property since prior to annexation in 1989. The proposed rezone supports this policy by preserving the existing C/LI zoning and expanding it slightly to be consistent with the existing parcel boundary and other similar properties. Additionally, the proposed rezone will eliminate a confusing split -zoning condition, ultimately clarifying how the Subject Site can be used and supporting future redevelopment of the property. The C/LI zone and the landscaping requirements in Table A of TMC 18.52.939 establish appropriate buffering requirements and use restrictions to ensure that commercial and light industrial development is compatible with nearby residential uses. In addition, the requirement for a stream buffer also provides a natural division between the two types of uses. Staff Response: City staff concurs with the applicant's response; increased setback and screening requirements are set forth for C/LI properties located adjacent to any residential property including those zoned LDR. Additionally, the property has been in continuous use as a truck terminal since before annexation into the City of Tukwila, and this proposal will work to preserve a historically industrial land while enhancing the buffers for surrounding properties. Overall, this proposal is consistent with the goals, policies and objectives of the Comprehensive Plan. 9 2. The proposed amendment to the Zoning Map is consistent with the scope and purpose of this title (the Zoning Code) and the description and purpose of the zone classification applied for. Pursuant to TMC 18.30.010, the C/LI district "is intended to provide for areas characterized by a mix of commercial, office, or light industrial uses. The standards are intended to promote viable and attractive commercial and industrial areas." The properties around the intersection of E Marginal Way S and S 128th St are a mix of commercial and industrial uses consistent with the purpose of the C/LI zone, including the Property which is used as a trucking facility. The Property is also similar in character to commercially and industrially zoned property in the immediate vicinity. Properties with frontage along E Marginal Way S tend to be zoned and used as commercial and industrial businesses. Uses transition from much more intense industrial activities with large warehouses and significant vehicular traffic in the north to lighter industrial and commercial uses further south. E Marginal Way S is a high -volume arterial with excellent connectivity to local and regional transportation networks. Along E Marginal Way S, the C/LI zoning serves as a logical transition between the Manufacturing Industrial Center (MIC) to the north and the Neighborhood Commercial Center (NCC) zoning to the south. The Property has been in continual operation as a trucking facility since prior to its annexation into the City of Tukwila. A trucking facility is nonconforming on the LDR-portion of the site. TMC 18.70 allows legally established nonconforming uses to continue and sets forth limitations on any expansion of nonconforming uses. The proposed rezone would bring the nonconforming portion of the trucking facility (that portion located in the LDR zone) into conformance with zoning code. 3. There are changed conditions since the previous zoning became effective to warrant the proposed amendment to the Zoning (and Comprehensive Plan) Map The Property was annexed into the City of Tukwila in 1989 and was originally composed of multiple Tots containing "R-1: Single Family Residence 7200" and "C-M: Industrial Park" zoning designations. Since then, the number and names of the zoning districts in the City were subsequently amended, and the Tots composing the Property appear to have been consolidated. However, the zoning boundary was not changed as part of either the lot consolidation or the 1995 Comprehensive Plan adoption, and the property remains split -zoned today. In the area near the subject property, single-family homes are mainly located away from E Marginal Way 5 to the west and to the east. E Marginal Way 5 is largely composed of commercial and industrial uses stretching from SR-599 to north down to the intersection of E Marginal Way S and 40th Ave S to the south. Since the 1995 Comprehensive Plan adoption the surrounding area has seen a marked increase in commercial and light industrial development. Parcel 7345600675 immediately north of the Property contains a former single-family home in the C/LI district that was converted to office use in 2008. Parcel 2384200010 across S 128th St to 10 the south was developed in 2017 with a small office structure for Tukwila School District's bus drivers and general faculty. Parcel 7340600774 further south was developed as a mixed -use apartment building with ground floor retail in 2008. To the north on parcel 7340600480 a former Group Health office building is currently being replaced with King County Metro's South Interim Bus Base which will contain offices, a bus maintenance garage, and parking for approximately 160 coaches. 7345600675 2008) 23842.00010 (2017) 1117340600774(2008) Figure 5: Commercial/Industrial parcels with developments since 1995. The proposed Comprehensive Plan Amendment to reclassify the entire parcel as Commercial Light Industrial will eliminate a split -zone condition, bring a legally established non -conforming use into conformance with the Tukwila Municipal Code, and establish zoning more consistent with the conditions along E Marginal Way S. 4. The proposed amendment to the (Comprehensive Plan and) Zoning Map will be in the interest of furtherance of the public health, safety, comfort, convenience, and general welfare, and will not adversely affect the surrounding neighborhoods, nor be injurious to other properties in the vicinity in which the subject property is located. Environmental remediation has been completed on the Property and any land -disturbing activities are required to be coordinated with Department of Ecology to ensure any remaining 11 contamination is appropriately remediated. A restrictive covenant has been recorded on the property to limit activities on the site to protect the environment and the public health, safety, and welfare. In addition and as discussed above, upgrades to the Riverton Creek and related mitigation would improve the natural area and improve the buffer between adjacent Low Density Residential properties to the north and west over the existing site conditions in the interest of general health, safety and welfare of the public. Development requirements set forth in TMC Chapter 18.30, "Commercial/Light Industrial (C/LI) District," establish appropriate buffers, increase setbacks compared to those required under the LDR zone, and require landscaping screening to separate the C/LI uses from residential development. Such requirements would further the public health, safety, comfort, convenience and general welfare of the surrounding neighborhoods. The request would extend the boundary line for the C/LI district to the western property boundary. Below is a table comparing the setback and height requirements for the two zones: LDR C/LI (when w/in 50 ft of LDR) Setbacks Front 20' 25' Second front 10' 15' Sides 1" floor 5' 15' 2nd floor 5' 20' 3rd floor 5' 30' Rear 10' 15-30' Height 30' 45' Standards in the C/LI zone are in place to minimize impact and any nuisance. No on -site hazardous substance processing, handing, or storage is allowed unless clearly incidental to the permitted use and is subject to state siting criteria. Performance standards are also in effect in the CLI for air quality, noise and SEPA compliance. II. CONCLUSIONS 1) Consistency with Comprehensive Plan • The proposed rezone is consistent with the Comprehensive Plan objectives, goals and policies which acknowledge the need to maintain and support commercial/industrial lands outside of the Manufacturing Industrial Center in a way that reduces impacts on adjacent properties and/or residential neighborhoods. 2) Consistency with Zone • The requested map change to C/LI for the entire parcel would remove a split -zone property from the City zoning map. 12 • The amendment would terminate partially -nonconforming land use on the Property that has been operating in the neighborhood since before annexation into the City of Tukwila. • Specific redevelopment plans will undergo environmental, design review and building permit review. 3) Changed conditions • The property has been split -zoned since at least 1995. Since that time properties along E Marginal Way S have been developed with a combination of commercial and Tight industrial uses, including but not limited the King County Metro South Interim Bus Base. The amendment will eliminate a split -zone condition, bring a legally established non -conforming use into conformance with standards for the Commercial/Light Industrial district in the Tukwila Municipal Code, and establish zoning more consistent with the conditions along E Marginal Way S. Benefit to community • The community will benefit through redevelopment of the site that will conform with development regulations set forth in the Tukwila Municipal Code, including but not limited to landscaping, setbacks, enhanced buffers from residential areas, and a significantly improved environment for the Type 2 stream that runs adjacent to and through the western portion of the Property. III. RECOMMENDATION Staff recommends approving the rezone request to change the existing Low Density Residential (LDR) zoning to Commercial/Light Industrial (C/LI), with corresponding Comprehensive Plan and Zoning map amendments, subject to the following conditions: 1. Within six years of the effective date of this ordinance, property owner shall implement a City approved plan to daylight (or, if daylighting is not feasible, to upgrade the stream culvert for) the Type II stream located within a pipe on the western half of the property. The plan shall meet the standards in the WDFW manual "Design of Road Culverts for Fish Passage" (2003 or as updated). If daylighting or upgrading of the stream culvert is proven to be technically infeasible, the western portions of the Property located within the stream buffer area shall be planted with native plants that improves upon the original condition as part of a planting plan to be approved by the City. Additionally, the property owner shall remove all existing impervious surfaces located within the stream buffer within the six -year time frame. 2. Within 180 days of the passage of this ordinance, the applicant shall record against the site a covenant or other document, approved by the City, requiring compliance with Condition 1. 3. Failure to comply with Conditions 1 and 2 shall cause the change to the Zoning Map to be null and void, the subject property shall revert to the zoning immediately preceding passage of this ordinance, and any non -conforming use shall cease to exist and any subsequent use shall conform to the regulations specified by the Tukwila Municipal Code for the district in which such use is located. 13 a- ••.:1IbiL \ \ - STORM DRAIN EASEMENT ; -4 ••aa ee‘e' : 4111,.11Lr lt .811 e4t s: •• • 41" I 1,1' • I L. OFFICE OFFICE WA REHOUSE TRAINING BAY • OFFICOSPACE 1 26 77 E. MARGINAL VVAri EXAMPLE OF POTENTIAL USE & ; K •••••111, is I • • SIDE SFTbA!:I': -� N N'fr---t'TORM OF';vN EA.SE_MtEN': • PER.ItME EP PENCE—N.,. \\\ `_"' ,._`IET?!{ry. •STREAM SUPFER E MARGINAL WAY S. EXAII P ..E OF POTENTIAL USE & LAY O rT /--25' FRONT ?F.TBA K 7 RAINING i FRO.N SETBACI: • T, �Fa ROE:. LINE Bra 1 Exhibit F: Project and Decision Criteria Narrative Rezone West Portion of Parcel No. 7345600766 from LDR to C/Ll Summary of Request King County Metro Transit (Metro) requests amendment of the City of Tukwila Comprehensive Plan & Zoning Map to change the comprehensive plan and zoning designations of a portion of parcel no. 7345600766 from Low Density Residential (LDR) to Commercial/Light Industrial (C/LI) consistent with the zoning on the eastern portion of the site. A contiguous parcel owned by the same property owner (no. 7345600685) and used as part of the development on parcel no. 7345600766 is already zoned C/LI and is not included in this request. Summary of the Reason for the Request As part of its long-range plans for growth of transit service in the region, Metro needs to purchase additional property for indoor mechanical training activities and construction offices. For that purpose, Metro is seeking to purchase property at 12677 E Marginal Way S (parcel no. 7345600766) and 12633 E Marginal Way S (parcel no. 7345600685) from Blue Nile Holdings, LLC (see Figure 1). 0 4or Parcel no 7345600766. subject of request bunk;', • 7 ,3, O'Vbe, n40 Parcel no. 7345600685. excluded from rcquesl 5;1 ,13‘21` 411%411016. Figure 1: Becker Transfer properties outlined in red. Source: King County iMap. The smaller parcel is zoned Commercial Light Industrial (C/LI). The larger parcel is split -zoned; the eastern portion fronting on E Marginal Way S is zoned C/LI and the western portion is zoned Low Density Residential (LDR). The site is ideal for Metro's intended future use of the site, but the split -zoned condition creates uncertainty about how the site could be developed to meet Metro's needs. Metro is pursuing the rezone to rectify this uncertainty for immediate short-term use and potential redevelopment. Metro understands that approval of rezones is considered within the Pagel of15 Rezone West Portion of Parcel No. 7345600766 from OR to C/LI Exhibit F: Project and Decision Criteria Narrative larger planning context and must be consistent with the vision for Tukwila, and for the surrounding neighborhoods. Metro believes that the rezone is consistent with the vision and character for this area, and that in the long term will provide opportunities for enhancement of the boundary between the residential and commercial areas. The use of the site since at least 1975 has been light industrial, specifically a truck terminal use with accessory warehouse and parking. Truck terminal use is nonconforming to the existing LDR zoning and conforming to the existing C/LI zoning (see Figure 2). Parcel no. 7345600766, subject of request i Parcel no. 7345600685, excluded from request Figure 2. Excerpt of City of Tukwila Comprehensive Plan & Zoning Map, subject properties outlined in red. Purple zoning is C/LI, yellow zoning is LDR. Split -zoning is discouraged by the City of Tukwila's Comprehensive Plan and tends to create uncertainty for future development or redevelopment. A history of the land use and zoning on the property is included in this application. Rezoning the property will strengthen the boundary between the LDR zone to the west and C/LI zone along E Marginal Way S. It will provide certainty for Metro by ensuring that the office uses can continue and that the site can be developed efficiently for those uses. To the extent that rezoning will remove confusion around applicability of zoning to the site and its nonconforming status, future redevelopment would be encouraged and that would offer opportunities to make the site development more conforming to existing regulations. Metro's Intended Use of the Site and a Conceptual Plan If the rezone is approved, Metro's current thoughts for use of the site are for office and indoor training activities that currently occur on the nearby South Base facilities. Metro has provided a drawing of what a potential layout for office and training use could look like (see Exhibit I), but is not seeking any review or approval of that layout at this time. Before Metro can realistically create a plan for specific uses that addresses applicable development standards, the rezone would need to be approved. Any future changes to the site to allow redevelopment would be subject to review by the City of Tukwila through Design Review because of the proximity to the LDR zone. At the time of a proposed redevelopment of the site, Metro would work with the City of Tukwila to ensure compliance with site development standards. Site Description The properties are collectively identified in the King County Assessor's records as "Becker Transfer." Parcel no. 7345600766 is approximately 1.64 acres (71,440 square feet) in size. Parcel no. 7345600685 is approximately 0.26 acres (11,490 square feet) in size. Parcel no. 7345600766 is split -zoned: the eastern portion fronting on E Marginal Way S is zoned Commercial/Light Industrial (C/LI), and the western portion is zoned Low Density Residential (LDR). Parcel no. 7345600685 is zoned C/LI. Refer to Figure 2. Page 2 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/Ll Exhibit F: Project and Decision Criteria Narrative The parcels are used as a single property that serves as the base of operations for Blue Nile Trucking, LLC. The site is accessed by one driveway on E Marginal Way S and two driveways on S 128th Street. Permanent structures include a service garage, distribution warehouse, loading dock, and fuel pump built in 1975; the remainder of the parcels are paved and/or graveled. Vehicles and trailers of varying sizes are stored along the north and west property lines. Surrounding land uses include a mix of single-family residential, commercial, and industrial. The east branch of Riverton Creek is present in the vicinity of and on the property. The creek flows through an open ditch and onto the northwest corner of the property for approximately 25 feet before entering an underground pipe. The creek flows through approximately 195 feet of underground pipe and daylights into another open ditch (see Exhibit G). The existing stream and buffer are significantly degraded due to undergrounding and surrounding development. Request Requests for changes in zoning are made pursuant to Chapter 18.84 TMC. Granting a rezone and accompanying Comprehensive Plan map change is allowed when consistency with the following criteria can be demonstrated: 1. The proposed amendment to the Zoning Map is consistent with the goals, objectives, and policies of the Comprehensive Plan. The proposed amendment is consistent with the applicable goals, objectives, and policies of the City's Comprehensive Plan. The proposed change from LDR to C/LI will clarify the boundary between the two zones at the subject location; facilitate future redevelopment consistent with the character of E Marginal Way S; and eliminate a nonconformity. Community /mane and Identity Element The Community Image and Identity element of the Comprehensive Plan establishes a framework to celebrate the City's history and environment, build on diversity, foster civic engagement, and accommodate growth that furthers the community's vision.' The proposed rezone will contribute to this framework by improving consistency of the property's designation with the following goals and policies: • Goal 1.1— A community of inviting neighborhoods and vibrant business districts. The subject property is accessed from E Marginal Way S and S 128th Street. The parcel is situated at the boundary between commercial and industrial uses on E Marginal Way S and residential uses further west and south in the area. The property is split - zoned, leading to a lack of clarity in the use and development of the site. Rezoning the property will help create a consistent expectation about land use on the lot and will clearly define the residential neighborhood as distinct from the commercial and industrial uses along E Marginal Way S. The proposed rezone will expand the C/LI zoning boundary to be consistent with the property boundary and the current use of the property. The proposed rezone is not expected to impact the character of the residential area for several reasons. The residential neighborhood has grown up around this industrial use that has been in continual operation since at least 1975 (see response to criterion 2, below, for additional property history). Additionally, given that a portion of the property is already zoned C/Ll, 1 Tukwila Comprehensive Plan, Community Image and Identity Element, page 1-2. Page 3 of 15 Rezone West Portion of Parcel No. 7345600766 from LOR to C/LI Exhibit F: Project and Decision Criteria Narrative the rezone will not invite new uses that are not already allowed adjacent to the residential neighborhood. Finally, the east branch of Riverton Creek, located along the west side of the subject property and approximately coincident with the proposed rezone, serves as a natural boundary or buffer between different land uses. The rezone will encourage the potential redevelopment of the site which may provide an opportunity to enhance the aesthetics of the site, clearly define the boundary to adjacent land uses, and provide capital investment into the neighborhood. • Policy 1.1.2 — Strengthen the image and character of Tukwila's distinct areas and neighborhoods. The subject property takes primary access from E Marginal Way S and is part of a node of C/LI and Neighborhood Commercial (NCC) zoning along this arterial that is one lot deep (except on the subject parcel) (see Figure 3). Rezoning the west side of the subject property to be consistent with this district will strengthen the image and character of the node by clarifying the uses allowed on the site, creating a consistent expectation about development on the property, and establishing clear definition between the residential neighborhood to the west and the commercial/light industrial uses along E Marginal Way S. e C/L Figure 3. Excerpt of City of Tukwila Comprehensive Plan & Zoning Map, I subject properties outlined in red. Economic Development Element The overall goal of the Economic Development element is to enhance the economic well- being of the community, including stimulating economic improvement for individual businesses and the community. The proposed rezone is consistent with this purpose and addresses the following goals and policies: • Goal 2.1— Tukwila has a strong role as a regional business and employment center which allows it to enhance and promote the community's well-being. The proposed rezone is supportive of the continued business use of the subject property (and, as described above, is not detrimental to the residential neighborhood to the west). Page 4 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative The rezone will eliminate a confusing split -zoning condition, which will clarify how the property can be used and support future redevelopment of the site as a commercial/light industrial property similar to other uses along E Marginal Way S. This contributes to Tukwila's image as a regional business center. The proposal is consistent with policies intended to implement this goal, as described below. • Policy 2.1.16 — Promote and preserve economic use of industrial lands outside the Manufacturing Industrial Center (MIC) through appropriate buffering requirements and use restrictions. The subject property is located just south of the MIC boundary, along E Marginal Way S, and has been in continual use as a commercial/light industrial property since before the neighborhood was annexed in 1989. The proposed rezone supports this policy by preserving the existing C/LI zoning and expanding it slightly to be consistent with the existing parcel boundary and other similar properties. Additionally, the proposed rezone will eliminate a confusing split -zoning condition, ultimately clarifying how the property can be used and supporting future redevelopment of the property. The C/LI zone and the landscaping requirements in Table A of TMC 18.52.030 establish appropriate buffering requirements and use restrictions to ensure that commercial or light industrial development is compatible with nearby residential uses. Table A in the code shows the standard buffer depths of 6 feet and 0 feet for side and rear yards, respectively, are increased to 15 feet, and the intensity of buffer plantings raised from Type II to Type III for new development within 50 feet of a residential zone. Design review is required for new development within 300 feet of a residential zone. These standards are protective of residential development and ensure commercial and light industrial development is compatible with surrounding land uses while also promoting viable and attractive commercial and industrial areas. In addition, the requirement for a stream buffer also provides a natural division between the two types of uses. • Policy 2.1.17 — Include standards in the development regulations for industrial uses that adequately mitigate potential adverse impacts on surrounding properties and public facilities and services. In addition to the use and buffering requirements described above, development in the C/LI zone is subject to performance standards, including standards adopted by the Puget Sound Air Pollution Control Agency for odor, dust, smoke, and airborne pollutants; noise standards adopted in TMC Chapter 8.22; and State and Federal standards for water quality and hazardous materials. Review under the State Environmental Policy Act (SEPA) provides substantive authority to mitigate potential adverse environmental impacts. Natural Environment Element The Natural Environment element guides future development in a manner to protect the community's environment, improve quality of life within the City, and protect residents from natural hazards. The proposed rezone addresses the following goals and policies in this element: • Goal 4.1— The City's air, land, and water resources are restored and protected for future generations and Policy 4.1.5 — Develop and implement programs that encourage Tukwila residents and businesses to take active measures to protect Page 5 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F. Project and Decision Criteria Narrative and enhance Tukwila's natural environment. Such measures could include the use of Low Impact Development (LID) techniques, natural streambank restoration, non -toxic lawn care, composting, and recycling, among others. The proposed rezone will clarify applicable use requirements and position the property for redevelopment, which presents an opportunity to implement forward -thinking development techniques such as Low Impact Development (LID) and environmental enhancement and remediation (if necessary), consistent with this goal. The City has adopted a Critical Areas Ordinance in TMC Chapter 18.45, "Environmentally Sensitive Areas." The purpose of this chapter is to protect the environment, human life, and property; identify and classify ecologically sensitive areas; and protect these areas and their functions while allowing for reasonable use of public and private property. New development on the subject parcel is required to comply with applicable critical areas requirements to minimize development impacts using best available science. The east fork of Riverton Creek flows across the northwest corner of the property through an underground pipe, and redevelopment of the property presents an opportunity to address this sensitive area. The subject property has already had some environmental remediation and cleanup related to its historic use as a trucking facility. Contamination from leaking underground storage tanks was addressed in 1999 and periodic review by the Department of Ecology confirms that the remedial actions continue to eliminate exposure to contaminated soils by ingestion and contact. Work was performed under the Model Toxics Control Act and the Voluntary Cleanup Program (codified in Chapter 173-340 WAC). A restrictive covenant is recorded on the property documenting the contamination and cleanup work and prohibiting work that could disturb contaminated soils without review and approval by the Department of Ecology. Future work on the property is required to coordinate with the Department of Ecology and address the restrictive covenant on the property. Substantial disturbance of the property could result in expanded cleanup efforts to eliminate contamination. • Goal 4.4 — Water resources that function as a healthy, integrated system; provide a long-term public benefit from enhanced environmental quality; and have the potential to reduce public infrastructure costs. The east fork of Riverton Creek flows across the northwest corner of the property primarily through an underground pipe. Approximately 25 feet of the creek flows through an open ditch before entering an underground pipe, where it travels for approximately 195 feet before daylighting into another open ditch (see Exhibit G). Redevelopment encouraged by the proposed rezone would provide opportunities to address this water resource, including improving surface water quality and quantity, restoring degraded buffer areas, and/or daylighting the stream. All of these opportunities would improve the health of water resources at and downstream of the subject stream and provide public benefits. • Goal 4.6 — Watercourses and their buffers, wetlands and wetland buffers protected from encroachment and degradation and improved through mitigation, enhancement restoration projects. The east fork of Riverton Creek has a significantly degraded buffer and is low - functioning due to being undergrounded in the property's vicinity. Redevelopment Page 6 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative encouraged by the proposed rezone would provide an opportunity to improve buffer and watercourse conditions. • Policies 4.6.1 through 4.6.4 — Policies related to regulation of land use and development, mitigation requirements, and sensitive areas studies. The City of Tukwila has adopted a comprehensive Critical Areas Ordinance (TMC Chapter 18.45) to regulate development in and adjacent to sensitive areas. The regulations ensure development is located and designed to achieve no net loss of sensitive areas functions through mitigation sequencing and compensatory mitigation. Redevelopment encouraged by the proposed rezone is required to comply with these regulations and provides an opportunity to improve conditions for the largely undergrounded stream. • Goal 4.7 — The water quality in Tukwila's wetlands, watercourses, fish and wildlife habitat areas and the Green/Duwamish River is improved over time. The stream has a significantly degraded buffer and is low -functioning due to being undergrounded at and in the property's vicinity. Redevelopment encouraged by the proposed rezone would provide an opportunity to improve buffer and watercourse conditions. • Policy 4.7.1— Improve surface water management and ensure provision of water quality treatment where required. Redevelopment encouraged by the proposed rezone would be required to conform to applicable stormwater and surface water management techniques and the King County Surface Water Design Manual 2016 (2016 KCSWDM) adopted by the City of Tukwila. • Goal 4.8 — Surface water generated by urban development does not exceed pre - development discharge rates The subject parcel is almost entirely covered with impervious surfaces. While the re- zone application will not modify the percentage of impervious surfaces on the site, future redevelopment encouraged by the proposed rezone will be required to comply with development standards that will reduce the amount of impervious surface coverage and detain, treat, and discharge surface water. Residential Neighborhoods Element The Residential Neighborhoods element focuses on neighborhood sustainability to preserve and enhance the sense of community in each residential neighborhood. The proposed rezone will occur adjacent to an existing single-family residential neighborhood. Because the rezone would affect land currently zoned for single-family residential use, Goal 7.1 and Policy 7.1.1 appear to be most applicable to the proposed rezone and are addressed below: • Goal 7.1— Residential Land Use Pattern: A land use pattern that encourages a strong sense of community by grouping compatible and mutually supportive uses and separating incompatible uses. The existing property is split -zoned, with the western portion zoned LDR and the eastern portion zoned C/LI. Since at least 1975, the property has been used for trucking operations, which is nonconforming to use requirements in the LDR zone. The split - zone condition creates confusion in the application of development requirements and therefore does not tend to encourage a sense of community at that location. In fact, it Page 7of15 Rezone West Portion of Parcel No. 7345600766 from LDR to C21 Exhibit F: Project and Decision Criteria Narrative tends to blur the boundary between the residential community and commercial operations. The proposed rezone will clarify the expectation for the use and development of the property in the future, which will solidify the character of the neighborhood in the immediate vicinity of the rezone and exclude incompatible uses from the LDR zone. The east branch of Riverton Creek creates a natural boundary to define residential uses from the commercial and industrial uses fronting along E Marginal Way S. • Policy 7.1.1— Maintain a comprehensive land use map that supports the preservation and enhancement of single-family and stable multi -family neighborhoods; eliminates incompatible land uses; and clearly establishes applicable development requirements through recognizable boundaries. The split -zone condition is confusing and does not provide a clear and recognizable boundary between land uses. The proposed rezone will establish a recognizable boundary and eliminate a confusing split -zone condition for the subject property. It will also make the boundary of the C/LI node around the intersection of E Marginal Way S and S 128th Street consistent on this parcel by expanding the C/LI zone to the property boundary. The rezone is likely to encourage redevelopment of the site and meet applicable development regulations which are designed to enhance the buffer between commercial and residential uses. 2. The proposed amendment to the Zoning Map is consistent with the scope and purpose of TMC Title 18, "Zoning Code," and the description and purpose of the zone classification applied for. The proposed rezone is broadly consistent with the scope and purpose of Title 18 TMC, "Zoning Code." The zoning code implements the City's Comprehensive Plan and, as discussed above, the proposed rezone is consistent with numerous goals and policies therein. More specifically, the proposed rezone is consistent with the description and purpose of the C/LI zone. Pursuant to TMC 18.30.010, the C/LI district "is intended to provide for areas characterized by a mix of commercial, office, or light industrial uses. The standards are intended to promote viable and attractive commercial and industrial areas." The properties around the intersection of E Marginal Way S and S 128th Street are a mix of primarily commercial and industrial uses consistent with the purpose of the C/LI zone, including the subject property which is used as a trucking facility. The subject property is similar in character to commercially- and industrially -zoned property in the immediate vicinity (see Figure 4). Properties with frontage along E Marginal Way S tend to be zoned and used as commercial and industrial businesses. Uses transition from much more intense industrial activities with large warehouses and significant vehicular traffic in the north to lighter industrial and commercial uses further south. E Marginal Way S is a high -volume arterial with excellent connectivity to local and regional transportation networks. Along E Marginal Way S, the C/LI zoning serves as a logical transition between the Manufacturing Industrial Center (MIC) and industrial zoning (L) to the north and the neighborhood commercial zoning (NCC) to the south (see Figure 3, above). Page 8 of 15 • t. i• Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F. Project and Decision Criteria Narrative • t Figure 4: Vicinity map, subject property outlined in red. Source: King County iMap. LDR zoning is not appropriate for the subject site. The purpose of the LDR zone is "to provide low -density family residential areas together with a full range of urban infrastructure services in order to maintain stable residential neighborhoods, and to prevent intrusions by incompatible land uses." The property has been in continual operation as a trucking facility since prior to its annexation into the City of Tukwila. A trucking facility is nonconforming to the use provisions of the LDR zone. Chapter 18.70 TMC, "Nonconformity," allows legally established nonconforming uses to continue and sets forth limitations on any expansion of nonconforming uses. A lapse or change in the use would cause abandonment of rights to nonconformity and any new use established is required to comply with current use regulations. In this way, TMC Chapter 18.70 seeks to reduce nonconformity as much as possible. The proposed rezone would bring the nonconforming portion of the trucking facility (that portion located in the LDR zone) into conformance with the zoning code. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Page 9 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative 3. There are changed conditions since the previous zoning became effective to warrant the proposed amendment to the Zoning Map. Conditions have changed considerably since the previous zoning became effective. The proposal to rezone the western portion of parcel no. 7345600766 is reasonable and warranted by the change in circumstances. The subject properties were created in unincorporated King County as Riverton, a replat of a portion of Riverside Interurban Tracts, on June 15, 1906 (see Figure 5).2 Contemporary legal descriptions also refer to this area as "Riverton Addition." Thereafter, Lots 4 and 18-25 of Block 9 of Riverton were acquired by a single owner and a trucking operation was established on the property.3 The Becker family owned the property at the time it was developed with the current service garage, distribution warehouse, loading dock, and related improvements in 1975. Figure 5: Excerpt of Riverton, a replat of part of Riverside Interurban Tracts, recorded in Volume 13 of Plats, Page 36, records of King County, Washington. Image shows all of Block 9, lots forming the subject property outlined in red. NOTE: The orientation of this map is such that north is to the right. Alder Street became S 126th Street and Herkimer Street became S 1281h Street. 2 Plat of Riverton, King County Recording No. 400820, recorded June 15, 1906 in Volume 13 of Plats, Page 36, Records of King County, WA. 3 The Tots were likely purchased by the Becker family, who likely also established the trucking business. Two businesses (Becker Trucking Inc. and Becker Transfer Co.) appear to have grown from this startup. Becker Trucking Inc. has been in operation since 1925 and operates out of Tukwila. Becker Transfer Co. bills itself as a fourth - generation transportation company and operates out of Issaquah. Page 10 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative Riverton was identified as the Riverton Annexation Area by the City of Tukwila. In preparation for annexation, the City adopted ordinances no. 1479, 1480, and 1481 to apply future land use designations and zoning designations to the Riverton area. Ordinance no. 1479 amended the Comprehensive Land Use Policy Plan Map and applied the Heavy Industry designation to Lots 1-4 and 22-25 of Block 9. Lots 18-21 were designated Low Density Residential. Refer to Figure 6. Figure 6: Exhibit B, Attachment H of City of Tukwila Ord. No. 1479. Map shows Riverton Annexation Area boundaries and approved comprehensive land use policy plan designations. Subject property is outlined in red. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Page 11 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/Ll Exhibit F: Project and Decision Criteria Narrative Ordinance no. 1480 amended the zoning map (see Figure 7). Lots 4 and 22-25 of Block 9 were zoned Industrial Park (C-M). Lots 18-21 were zoned Single Family Residence (R-1). Ord. 1481 adopted zoning code text amendments related to the Riverton Annexation. %�J ► . •..s•.• t l$U..P* i ltlflt --....a /111n 1 rsrsor Mir s .' ..I.-....•...4 s`r IRrir1r.T.1ta^'4•..': s,rr‘i i, ..• ssssl.41,811 :=_ 10•••w;..w.rvauu.� Ytl>relR6cs # , ... •o, _%S/- I� .5 R• 1 SINGLE FAMILY HESIDENCEI 12 000 R-1 SINGLE FAMILY RESIDENCE (7200 SF) R•4 LOW APARTMENTS RMH MULTIPLE RESIDENCE HIGH DENSITY i C-1 COMMUNITY RETAIL BUSINESS -" 1 C-2 REGIONAL RETAIL BUSINESS J . C-M INDUSTRIAL PARK M. I LIGHT INDUSTRY ^^; M-2 HEAVY INDUSTRY Figure 7: Excerpt of Riverton Annexation Area zoning from City of Tukwila Ord. No. 1480. Subject property is outlined in red. Lots 18-21 are zoned R-1 and lots 22-25 are zoned C-M. On March 27, 1989 the Tukwila City Council voted to approve ordinance no. 1508 to annex the Riverton Annexation Area effective April 15, 1989. A zoning map was included with this ordinance confirming the zoning classifications applied in ordinance no. 1480 for the subject property (see Figure 8). 1 I R-1 SINGLE FAMILY RESIDENCE 7200 7T--1 SINGLE FAMILY AESIUEri L 12,000 R-4 LOW APARTMENTS RMH MULTIPLE RESIDENCE HIGH DENSITY C-1 COMMUNITY RETAIL BUSINESS mow! ('` Dr� CIrlw,AT l OCTU QIJSINNNESS J C-M INDUSTRIAL PARK I h'-U vrrl(,t M-1 LIGHT INDUSTRY M-2 HEAVY INDUSTRY Figure 8: Excerpt of Riverton Annexation Area zoning map from City of Tukwila Ord. No. 1508. Subject property is outlined in red. Lots 18-21 are zoned R-1 and lots 22-25 are zoned C-M. In 1995, the City of Tukwila began to rewrite its comprehensive plan and zoning code to conform to the recently -adopted Growth Management Act. Ordinance no. 1757 repealed ordinance no. 1479 (among others) and adopted the 1995 Comprehensive Land Use Plan and Map for the City of Tukwila. Ordinance no. 1758 repealed ordinance no. 1481 (among others) and overhauled Title 18 TMC (Zoning Code) and adopted a new zoning map. The zoning code amended the number and names of zoning districts in the city. R-1 became LDR (Low Density Residential) and C-M became C/LI (Commercial/Light Industrial). Lots 18-25 appear to have been consolidated between the Riverton annexation in 1989 and the zoning map adoption in 1995. The lot consolidation did not affect the zoning boundary, resulting in a split -zoned lot. The zoning boundary was not changed in 1995, and the property remains split -zoned today. The existing trucking operation is nonconforming to the LDR use requirements in Table 18-6, TMC 18.09, and TMC 18.10.020. Page 12 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F.- Project and Decision Criteria Narrative The Becker family sold the property in 2005 to C&D Wells, LLC. C&D Wells, LLC sold the property to Blue Nile Holdings, LLC in 2016. Blue Nile Trucking, LLC continues to operate a trucking business from the property. The initial zoning districts applied in 1988-1989 do not appear to have been based on existing conditions or uses. The trucking business was in active operation on the site (having completed improvements in the mid-1970s) at the time. The character of the neighborhood has changed dramatically since zoning was initially applied and continues to evolve to this day. Industrial uses have spread southward from the Duwamish Manufacturing Industrial Center (MIC) and SR-599. As a result, residential development has occurred generally further to the south of the site. E Marginal Way S has become increasingly used for freight and other large vehicles. The evolution of neighborhood character is a changed condition warranting an amendment to the zoning map. The amendment will also eliminate a split -zone condition, bring a legally -established nonconforming use into conformance with the TMC, and establish zoning more consistent with the conditions along E Marginal Way S. 4. The proposed amendment to the Zoning Map will be in the interest of furtherance of the public health, safety, comfort, convenience, and general welfare, and will not adversely affect the surrounding neighborhood, nor be injurious to other properties in the vicinity in which the subject property is located. The request would extend the Commercial/Light Industrial (C/LI) boundary from the approximate center of a parcel to include the full boundaries of the parcel. The C/LI zone allows a number of commercial and light industrial uses that are consistent with the character of E Marginal Way S and nearby industrial uses. Impacts to neighboring residential properties are not anticipated. The residential neighborhood has grown up around the existing commercial/industrial business and the eastern portion of the property is already zoned C/LI. The rezone will not invite new uses that are not already allowed adjacent to the residential area. Development requirements set forth in TMC Chapter 18.30, "Commercial/Light Industrial (C/LI) District," establish appropriate buffers, increase setbacks compared to those required under the LDR zone, require landscaping screening to separate the C/LI uses from residential development, and require a stream buffer from the east branch of Riverton Creek. See Table 1, below, for a comparison of C/LI and LDR dimensional standards. In addition to dimensional requirements, new developments must demonstrate adherence to performance standards, including standards adopted by the Puget Sound Air Pollution Control Agency for odor, dust, smoke, and airborne pollutants; nose standards adopted in in Chapter 8.22 TMC; and State and Federal standards for water quality and hazardous materials. Review under the State Environmental Policy Act (SEPA) provides substantive authority to mitigate potential adverse environmental impacts for future development. Design review is required for any new development within 300 feet of a residential zoning district, which would apply to the subject property. Design review is intended to create well - designed developments that are harmonious with the natural and manmade environments. Review criteria for C/LI developments are related to the following topics: • Relationship of structure to site; • Relationship of structure and site to adjoining area; • Landscaping and site treatment; Page 13 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative • Building design; and • Miscellaneous structures and street furniture. Chapter 18.60 TMC sets forth design review criteria that will protect the residential neighborhood. Design review is completed either administratively by the Director of Community Development or quasi judicially by the Board of Architectural Review. Design review can include conditions of approval to address any potential issues that arise during review. Table 1: Comparison of C/LI and LDR dimensional requirements. Zoning Standard I C/LI Zone LDR Zone Development Area I None 1 45% Setbacks to Yards, • Front • Second Front • Sides • Rear minimum • 25 feet • 15 feet (near LDR) • 15 feet (1st floor near LDR) 20 feet (2nd floor near LDR) 30 feet (3rd floor near LDR) • 15 feet (1st floor near LDR) 20 feet (2nd floor near LDR) 30 feet (3`d floor near LDR) • 20 feet • 10 feet • 5 feet • 10 feet Height, maximum 4 stories or 45 feet 30 feet Landscape Requirements • Front • Sides • Rear • 15 feet (near LDR) • 15 feet (near LDR) • 15 feet (near LDR) None Environmental remediation has been completed on the site and any land -disturbing activities are required to be coordinated with the Department of Ecology to ensure any remaining contamination is appropriately remediated. A restrictive covenant has been recorded on the property to limit activities on the site to protect the environment and the public health, safety, and welfare. Conclusion The request, if approved, will rezone the western portion of parcel no. 7345600766 from Low Density Residential (LDR) to Commercial/Light Industrial (C/LI), thus removing the split -zone condition and recognizing the use that has occupied the site since at least the 1970s. Metro is seeking the rezone to facilitate its use of the property. The responses to the decision criteria set forth in TMC 18.84.020 consider the rezone within the larger context of the City's plan for this area, including the full scope of allowable uses within the C/LI zone. The same range of uses is currently allowed on the east portion of the subject property and, with buffers, setbacks, and landscaping requirements, redevelopment to a conforming use would offer opportunities to address site conditions or potential impacts and result in a net benefit to the neighborhood. • The proposal is consistent with the Tukwila Comprehensive Plan, including goals in the Community Image and Identity, Economic Development, Natural Environment, and Residential Neighborhoods elements. The proposal protects existing commercial/light industrial land and positions it for future redevelopment. Redevelopment of the property will occur in conformance with development and environmental regulations, and presents Page 14 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative significant opportunities to protect, enhance, or restore natural features. The rezone will eliminate a split -zone condition and create a clearly defined boundary between residential and non-residential uses. • The proposal is consistent with Title 18 TMC in general and the purpose and intent of the C/LI zone set forth in Chapter 18.30 TMC. The property is in an area characterized by a mix of commercial and light industrial uses and fronts along E Marginal Way S, a busy arterial. • Conditions have changed since zoning was applied in 1988-1989 and updated in 1995. The character of the neighborhood has changed dramatically: industrial uses have expanded to the north, especially with the establishment of the Duwamish Manufacturing Industrial Center (MIC). Residential development has occurred to the south and west, migrating away from the MIC. E Marginal Way S has become increasingly used for freight and other large vehicles. • The proposal is protective of the public health, safety, and welfare and will not adversely affect the surrounding neighborhood. Basic development standards, performance standards, and critical areas requirements mitigate potential adverse impacts to the residential neighborhood. Design review is required when new development occurs within 300 feet of a residential zone, which will ensure the use and site design is fully compatible with existing residential neighborhoods. Metro believes that this application demonstrates that a rezone is consistent with and satisfies the approval criteria in TMC 18.84.020. Metro therefore respectfully requests approval of the rezone request. Page 15 of 15 METRO REZONE LEGAL DESCRIPTION AND SITE MAP COMPREHENSIVE PLAN AND ZONING MAP CHANGE FILE L18-0114 TUSP N:-:SS LEGAL DESCRIPTION RIVERTON ADD ALL LOTS 18 THRU 25 Plat Block: 9 Plat Lot: 18 THRU 25 Quarter SW, Section 10, Township 23, Range 4 City of Tukwila Public Notice of Ordinance Adoption for Ordinance 2605. On May 13, 2019 the City Council of the City of Tukwila, Washington, adopted the following ordinance, the main points of which are summarized by title as follows: Ordinance 2605: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REZONING CERTAIN REAL PROPERTY LOCATED AT 12677 E. MARGINAL WAY S., TUKWILA, FROM SPLIT ZONE COMMERCIAL/LIGHT INDUSTRIAL (C/LI) AND LOW DENSITY RESIDENTIAL (LDR) TO COMMERCIAL/ LIGHT INDUSTRIAL ONLY; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. The full text of this ordinance will be provided upon request. Christy O'Flaherty, MMC, City Clerk Published Seattle Times: May 16, 2019 City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director Affidavit of Distribution Project Name: King County Metro Rezone Project Number: PL18-0099 Associated File Number(s): L18-0114 Date Mailed: MAY 16, 2019 Mailing requested by: Max Baker Mailer's signature: MB ❑ Board of Adjustment Agenda Packet ❑ Notice of Application for ❑ Board of Appeals Agenda Packet Shoreline Mgmt Permit E Determination of Non -Significance Q Notice of Decision ❑ Determination of Significance & Scoping Notice O Mitigated Determination of Non - Significance O Notice of Action ❑ Notice of Application O Notice of Public Hearing ❑ Notice of Public Meeting ❑ Official Notice ❑ Other: O Shoreline Mgmt Permit O Short Subdivision Agenda Parties of Record: Gillian Zacharias obo King County Metro, Applicant Blue Nile Holdings LLC, Owner King County Assessor, Accounting Division Washington State Department of Ecology Department of Commerce Sean Dimond, sean@untamed.be Anne Dimond, annedimond@gmail.com Brian Kennedy, graften@comcast.net City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director Affidavit of Distribution Project Name: REZONE WEST HALF OF PARCEL 7345600766 Project Number: PL18-0099 Associated File Number(s): L18-0114 Date Mailed: 04/02/2019 Mailing requested by: MAX BAKER Mailer's signature: SM ❑ Board of Adjustment Agenda Packet ❑ Board of Appeals Agenda Packet ❑ Determination of Non -Significance ❑ Determination of Significance & Scoping Notice ❑ Mitigated Determination of Non - Significance ❑ Notice of Action ❑ Notice of Application Parties of Record: ❑ Notice of Application for Shoreline Mgmt Permit ❑ Notice of Decision ❑ Notice of Public Hearing Z Notice of Public Meeting ❑ Official Notice ❑ Other: SEPA CHECKLIST ❑ Shoreline Mgmt Permit ❑ Short Subdivision Agenda ParcelNumber ToLine AddrLine 2384200005 2384200006 2384200007 2384200008 2384200008 2384200010 2384200055 7340600540 7340600640 7340600660 7340600661 7340600662 7340600664 7340600665 7340600666 7340600667 7340600668 7340600669 7340600681 7340600681 7340600686 7340600686 7340600744 7340600760 7340600761 7340600762 7340600762 7340600763 7340600764 7340600764 7340600766 7340600767 7340600767 7340600769 7340600770 7340600771 7340600772 7340600773 7340600773 7340600774 7340600774 7340600774 7340600774 7340600774 7340600775 7340600775 JACKSON ANTHONIr 3803 S 128TH ST ROBERTS BERNARD 3807 S 128TH ST GRAVES JAMES W+' 3809 S 128TH ST RASMUSSEN CARLO 3805 128TH ST Occupant 3805 S 128TH ST TUKWILA SCHOOL [ 4640 S 144TH ST Occupant 12909 E MARGINAL WAY S Occupant 3850 S 126TH ST UTILITIES SERVICE C 12608 E MARGINAL WAY S Occupant 4036 S 128TH ST LIU KENNETH+CHEI 12608 40TH AVE S STREBINGER MARTI 12604 40TH AVE S STAUDACHER ROBE 4020 S 128TH ST TUKWILA RENEWAL 910 MARKET ST ARMSTRONG BONI' 4015 S 126TH ST Occupant 4021 S 126TH ST LAM DAVID 24320 118TH AVE SE JONES CLINTON RIC 4035 S 126TH ST KONG WING-HO 11510 17TH AVE NE Occupant 12623 42ND AVE S OUYANG XIAN 12010 76TH AVE S Occupant 4044 S 128TH ST TUCCI JACK F+REGIE 4049 S 128TH ST HALL LARRY D+B BE 12902 E MARGINAL WAY S SMITH ALICE R 4102 S 130TH ST DEMPERE JACKIE 13217 40TH AVE S Occupant 4033 S 128TH ST BRENNER MICHAEL 4027 S 128TH ST Occupant 12822 E MARGINAL WAY S BOSTEDER D 21326 5TH AVE S RAUNIG ALAN JAME 12812 E MARGINAL WAY S Occupant 12800 E MARGINAL WAY S LIANG BAOYU 3012 S OTHELLO ST JENSEN RANDY L+K, BRACKEN RONDA WILLMORE SEAN P WHITEZEL VIRGINIA Occupant EGASHIRA GREGOR' Occupant Occupant Occupant Occupant Occupant Occupant Occupant 4106 S 130TH ST 4020 S 130TH ST 4026 S 130TH ST 4021 S 128TH ST 4016 S 130TH ST PO BOX 94485 12910 E MARGINAL WAY S 101 12910 E MARGINAL WAY 5 201 12910 E MARGINAL WAY S 202 12910 E MARGINAL WAY S 301 12910 E MARGINAL WAY S 302 12924 E MARGINAL WAY S 12930 E MARGINAL WAY S CityState TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA KIRKLAND WA TUKWILA WA TUKWILA WA KENT WA TUKWILA WA SEATTLE WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA DES MOINES WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA ZipCode 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98033 98168 98168 98030 98168 98125 98168 98178 98168 98168 98168 98168 98168 98168 98168 98168 98198 98168 98168 98108 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 7340600775 7340600775 7340600775 7340600775 7340600776 7340600777 7340600777 7340600781 7340600781 7340600782 7340600784 7340600784 7340600785 7340600785 7345600530 7345600530 7345600545 7345600555 7345600565 7345600565 7345600566 7345600566 7345600580 7345600580 7345600670 7345600670 7345600670 7345600670 7345600670 7345600675 7345600675 7345600690 7345600690 7345600690 7345600690 7345600695 7345600696 7345600705 7345600715 7345600720 7345600722 7345600740 7345600750 7345600755 7345600766 7345600810 7345600811 Occupant 12930 E MARGINAL WAY S BASEMENT Occupant 4008 S 130TH ST Occupant 4010 S 130TH ST RIVERTON HOLDING 4632 NE 89TH ST CHAMPA ASSOCIAT 6304 47TH AVE S Occupant 4037 S 128TH ST NGUYEN KHIEM+TI-4041 S 128TH ST Occupant 12822 37TH AVE S BOLTON CHERYL 28010 NE 153RD PL Occupant 12802 37TH AVE S Occupant 12830 37TH AVE S COOPER PAUL D 2225 S 132ND Occupant 12812 37TH AVE S DUNNE DENNIS M+ P.O. BOX 69641 Occupant 12449 E MARGINAL WAY S CAPELOUTO ISAAC' 5509 S BRANDON ST Occupant 12525 E MARGINAL WAY S Occupant 12529 E MARGINAL WAY S Occupant 12539 E MARGINAL WAY S ROSSO GENE J+ROB 3359 LAKEWOOD AVE SO Occupant 3732 S 126TH ST ROSSO GENE JULIU. PO BOX 80345 INTERNATIONAL GP 12201 TUKWILA INTRNTNL BL 4TH F Occupant 3716 S 126TH ST Occupant 12601 E MARGINAL WAY S 100 Occupant 12601 E MARGINAL WAY 5 110 Occupant 12601 E MARGINAL WAY S 200 Occupant 12601 E MARGINAL WAY S 210 MARGINAL ISLAND 2514 LAKE PARK DR S Occupant 12607 E MARGINAL WAY S ERITREAN KIDISTI N PO BOX 27481 Occupant 3725 S 126TH ST A Occupant 3725 S 126TH ST B Occupant 3725 S 126TH ST C Occupant 3727 S 126TH ST D CAMPBELL BRIE 19950 REDWING ST Occupant 3723 S 126TH ST CARBONATTO TINA 3717 S 126TH ST BEUSLINCH THOMA 3709 S 126TH ST PATAPOFF WILMA r 815 W MARION SARANTOS GREGOF 1415 196TH ST SE QUEALEY DARRELL 13714 S 128TH ST WONG JEFFREY M 1821 ROLLING-HLS AVE SE DIMOND ANNE M+' 3726 S 128TH ST Occupant 12677 E MARGINAL WAY S TOCHER JAMES LIOI 3535 S 126TH ST DOOPER DIANA M 3525 S 126TH ST TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA DUVALL WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA WOODLAND HILL TUKWILA WA TUKWILA WA TUKWILA WA ABERDEEN WA BOTHELL WA TUKWILA WA RENTON WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA 98168 98168 98168 98115 98118 98168 98168 98168 98109 98168 98168 98168 98168 98168 98168 98118 98168 98168 98168 98144 98168 98108 98168 98168 98168 98168 98168 98168 98144 98168 98165 98168 98168 98168 98168 91364 98168 98168 98188 98520 98012 98168 98055 98168 98168 98168 98168 7345600812 7345600825 7345600830 7345600840 7345600935 7345600935 7345600945 7345600947 7345600950 7345600950 7345600955 7345600965 7345600970 7345600975 7345600975 7345600980 7345600985 7345600990 7345600995 7345601000 7345601005 7359600020 7359600025 7359600030 7359600035 7359600035 7359600040 7359600056 7945200020 7945200020 7945200025 7945200035 7945200035 7945200040 7945200042 7945200045 7945200055 BALZARINI THOMA! 12611 37TH AVE S KURTTI JOHN A 12615 37TH AVE S COSTELLO CHERYL 112621 37TH AVE S HIBBS PHILLIP A 12633 37TH AVE S CLEAVELAND CURTI 16910 PLEASANT BEACH DR SE Occupant 3717 S 128TH ST SANCHEZ JULIAN 3712 S 130TH ST EVELYN SHAWN D+ 3716 S 130TH ST Occupant 3720 S 130TH ST CLINGMAN TIM PO BOX 88087 NGUYEN HELEN HA 3802 S 130TH ST Occupant 3808 S 130TH ST BUTTERFIELD SHEIL 3810 S 130TH ST Occupant 3816 S 130TH ST ALVARADO TONY 3816 SW 130TH ST DELREAL JUAN 3820 S 130TH ST DE PALMA ELIZABE 3826 S 130TH ST QUIROZ JASMINE 3832 S 130TH ST WYBLE DAVID+MEC 3836 S 130TH ST SCHNEEBELI R 12923 E MARGINAL WAY S LIN XIULAN 1432 MONTEREY AVE NE SAENGPRASEUTH C 3525 S 128TH ST SAENGPRASEUTH Si 3531 S 128TH ST DUCKERING RUTHA 12825 37TH AVE S Occupant 12815 37TH AVE S WONG KELVIN & LI 16215 9TH AVE SW PALOMA ORLANDO 12817 37TH AVE S JOHSON LOWELL+G 12835 37TH AVE S PHAM NGOC-NU Tt 3829 S 132ND PL Occupant 4002 S 126TH ST HOANG KHA+CHRIS 4006 S 126TH ST Occupant 4012 S 126TH ST NGUYEN STELLATH 5138 NE 8TH ST DU BOPHARY+HUN'4018 S 126TH ST NGUYEN CAM TU TI4024 S 126TH ST WENDE THU T+RUS 4028 S 126TH ST NGUYEN BILL D 1366 BENT DR KC METRO TRANSIT 201 S JACKSON ST., MS KSC-TR-0431 KC DEPARTMENT 0 201 S JACKSON ST., STE 600 KC DIV & ENVIRON : 35030 SE Douglas Street, Ste 210 WASHINGTON DEP1 PO BOX 48300 SEATTLE WA 98168 SEATTLE WA 98168 SEATTLE WA 98168 TUKWILLA WA 98168 YELM WA 98597 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 SEATTLE WA 98138 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 RENTON WA 98056 TUKWILA WA 98168 SEATTLE WA 98168 SEATTLE WA 98118 TUKWILA WA 98168 BURIEN WA 98166 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98178 TUKWILA WA 98168 RENTON WA 98059 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 CAMPBELL CA 95008 SEATTLE WA 98104 SEATTLE WA 98104 SNOQUALMIE 98065 OLYMPIA WA 98504 AddrSourcc CRWAddre KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-002; KCA Table TukwilaAdc ADDR-047( TukwilaAdc ADDR-086( KCA Table TukwilaAdc ADDR-002£ KCA Table KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-128: KCA Table KCA Table KCA Table TukwilaAdc ADDR-0861 KCA Table TukwilaAdc ADDR-002£ KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-002£ KCA Table TukwilaAdc ADDR-047f KCA Table KCA Table TukwilaAdc ADDR-047f KCA Table KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-003: KCA Table TukwilaAdc ADDR-047; TukwilaAdc ADDR-047; TukwilaAdc ADDR-047; TukwilaAdc ADDR-047; TukwilaAdc ADDR-047; TukwilaAdc ADDR-047£ TukwilaAdc ADDR-047£ TukwilaAdc ADDR-1221 TukwilaAdc ADDR-003: TukwilaAdc ADDR-003: KCA Table KCA Table KC-AdddressPoints KCA Table TukwilaAdc ADDR-046( KCA Table TukwilaAdc ADDR-045� TukwilaAdc ADDR-046( KCA Table TukwilaAdc ADDR-045� KCA Table TukwilaAdc ADDR-086E KCA Table TukwilaAdc ADDR-086E KC-AdddressPoints TukwilaAdc ADDR-129£ KCA Table TukwilaAdc ADDR-087z KCA Table KCA Table TukwilaAdc ADDR-087: TukwilaAdc ADDR-086; TukwilaAdc ADDR-129£ TukwilaAdc ADDR-086; TukwilaAdc ADDR-129£ KCA Table TukwilaAdc ADDR-086; KCA Table TukwilaAdc ADDR-0871 TukwilaAdc ADDR-087z TukwilaAdc ADDR-0871 TukwilaAdc ADDR-087i KCA Table TukwilaAdc ADDR-087: KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-086£ KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-002; KCA Table KCA Table TukwilaAdc ADDR-003; KCA Table KCA Table TukwilaAdc ADDR-003; KCA Table TukwilaAdc ADDR-003; KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-045� KCA Table KCA Table KCA Table KCA Table TukwilaAdc ADDR-0871 KCA Table TukwilaAdc ADDR-0875 KCA Table KCA Table KCA Table KCA Table KCA Table MUCKLESHOOT Fisheries Progr Karen Walter TUKWILA HISTORICAL SOCIETY TUKWILA HISTORICAL SOCIETY rb�i![ci/ gip AbYAIL WA FISHERIES & WILDLIFE LARRY FISHER 1775 12 AVE NW, STE 1 ISSAQUAH WA WA DEPT OF ECOLOGY SEPA REVIEW PO BOX 47703 OLYMPIA WA KC ASSESSOR'S OFFICE ACCOUNTING DIVISION 500 4th AVE, RM# 709A SEATTLE WA WRIA 9 - SALMON RECOVERY T ELISSA OSTERGAARD - 201 SOUTH JACKSON Si SEATTLE WA 39015 172nd AVE SE AUBURN WA 98027 Larry.Fisher@dfw.wa.gov 98504 sepaunit@ecy.wa.Rov 98104 Christie.Most@kingcountv.gov 98104 elissa.ostergaard@kingcounty.gov 98092 KWalter@muckleshoot.nsn.us tukwilahistsociety@tukwilahistory.org rcwieser@comcast.net ana.le@tukwilawa.gov City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director Affidavit of Distribution Project Name: Rezone West Half of Parcel 7345600766 Project Number: PL18-0099 Associated File Number(s): L18-0114 and E18-0016 Date Mailed: 01/23/2019 Mailing requested by: MAX BAKER Mailer's signature: SM ❑ Board of Adjustment Agenda Packet ❑ Board of Appeals Agenda Packet ❑ Determination of Non -Significance ❑ Determination of Significance & Scoping Notice ❑ Mitigated Determination of Non - Significance ❑ Notice of Action ❑ Notice of Application Parties of Record: ❑ Notice of Application for Shoreline Mgmt Permit ❑ Notice of Decision ❑ Notice of Public Hearing ❑ Notice of Public Meeting ❑ Official Notice ❑ Other: SEPA CHECKLIST ❑ Shoreline Mgmt Permit ❑ Short Subdivision Agenda I 28th St City of Tukwila Notice of Application Rezone West Half of Parcel 7345600766 from Low Density Residential (LDR) to Commercial/Light Industrial (CLI) Project #: PL18-0099 File #: L18-0114 (Rezone) and E18-0016 (SEPA) Applicant: Gillian Zacharias obo King County Metro Property Owner: Blue Nile Holdings LLC Project Description: Request to rezone west half of parcel 7345600766 from LDR to CLI. King County Metro proposes to use site for construction office employees and mechanic training activities for transit employees. Your written comments on the project are requested and can be delivered to Dept. of Community Development, 6300 Southcenter Blvd, Suite 100, Tukwila WA 98188. Comments must be received by 5:OOpm on February 12, 2019. You may view the application, request a copy of any decision, comment on the project, and learn your appeal rights by contacting the project planner Max Baker at 206.431.3683 or Max.Baker@Tukwilawa.gov, or by visiting our offices Monday through Friday, 8:30 am to 5:00 pm. 4�'�0.A he 40 City of Tukwila o 1Department of Community Development _° 6300 Southcenter Blvd., Ste 100 9o15Tukwila, WA. 98188 Interpreter (206) 431-3651 Intorpretes Turjubaan Ilepeeog4NK fepeKnaAa`+ g-Ol Af TA NKr% MX* Thong Dich YAn ffiza tza You are receiving this notice because you are a property owner or tenant within 500ft of this project. 1' ParcelNumber 7340600681 7340600686 7345600580 7345600530 7945200055 7345600580 7345600545 7345600555 7345600565 7345600670 7345600670 7345600670 7345600670 7340600662 7340600640 7345600675 7340600661 7340600640 7345600812 7345600825 7345600830 7340600681 7345600840 7345600766 7340600767 7340600782 7340600785 7340600766 7359600035 7359600040 7340600781 7340600764 7359600030 7340600784 7359600056 7340600760 2384200055 7340600774 ToLine Attnline KONG WING-HO OUYANG XIAN INTERNATIONAL GATEWAY EAST Occupant Occupant Occupant Occupant Occupant Occupant Occupant Occupant Occupant Occupant STREBINGER MARTI SANZERE JOSEPH Occupant Occupant LIU KENNETH+CHEATH MONICA M UTILITIES SERVICE C ATTN MOLA ED/FEP BALZARINI THOMAS J KURTTI JOHN A COSTELLO CHERYL M Occupant HIBBS PHILLIP A Occupant Occupant Occupant Occupant RAUNIG ALAN JAMES Occupant PALOMA ORLANDO R Occupant Occupant DUCKERING RUTHANN L Occupant JOHSON LOWELL+GLENNA HALL LARRY D+B BELINDA Occupant Occupant AddrLine 11510 17TH AVE NE 12010 76TH AVE 5 12201 TUKWILA INTRNTNL BL 4TH F 12449 E MARGINAL WAY S 12450 40TH AVE S 12501 E MARGINAL WAY S 12525 E MARGINAL WAY S 12529 E MARGINAL WAY S 12539 E MARGINAL WAY S 12601 E MARGINAL WAY S 100 12601 E MARGINAL WAY S 110 12601 E MARGINAL WAY 5 200 12601 E MARGINAL WAY S 210 12604 40TH AVE 5 12604 E MARGINAL WAY 5 12607 E MARGINAL WAY 5 12608 40TH AVE 5 12608 E MARGINAL WAY 5 12611 37TH AVE S 12615 37TH AVE 5 12621 37TH AVE 5 12623 42ND AVE 5 12633 37TH AVE 5 12677 E MARGINAL WAY 5 12800 E MARGINAL WAY S 12802 37TH AVE 5 12812 37TH AVE S 12812 E MARGINAL WAY 5 12815 37TH AVE 5 12817 37TH AVE S 12822 37TH AVE S 12822 E MARGINAL WAY 5 12825 37TH AVE S 12830 37TH AVE S 12835 37TH AVE S 12902 E MARGINAL WAY 5 12909 E MARGINAL WAY 5 12910 E MARGINAL WAY 5 100 CityState SEATTLE WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILLA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA ZipCode 98125 98178 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98118 98168 98168 98168 98168 98168 AddrSourcc CRWAddre TukStatus PropUse KCA Table NA NA KCA Table NA NA KCA Table NA NA TukwilaAdc ADDR-086E ACTIVE-ML None TukwilaAdc ADDR-086= ACTIVE-ML None TukwilaAdc ADDR-086E ACTIVE-ML None TukwilaAdc ADDR-086E ACTIVE-ML None KC-AdddressPoints NA NA TukwilaAdc ADDR-129f ACTIVE-ML None TukwilaAdc ADDR-086; ACTIVE-ML None TukwilaAdc ADDR-129f ACTIVE-ML None TukwilaAdc ADDR-086; ACTIVE-ML None TukwilaAdc ADDR-129f ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-086) ACTIVE-ML None TukwilaAdc ADDR-086; ACTIVE-ML None KCA Table NA NA KCA Table NA NA KCA Table NA NA KCA Table NA NA KCA Table NA NA TukwilaAdc ADDR-086L ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-086f ACTIVE-ML None TukwilaAdc ADDR-047E ACTIVE-ML None TukwilaAdc ADDR-045S ACTIVE-ML None TukwilaAdc ADDR-045S ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-045S ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-046( ACTIVE-ML None TukwilaAdc ADDR-047E ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-046( ACTIVE-ML None KCA Table NA NA KCA Table NA NA TukwilaAdc ADDR-047E ACTIVE-ML None TukwilaAdc ADDR-1221 ACTIVE-ML None 7340600774 7340600774 7340600774 7340600774 7340600774 7340600774 7345601000 7340600775 7340600775 7340600775 7340600762 7945200055 7345600722 7345601005 7359600035 7345600935 7345600750 7345600695 7340600540 7340600764 7340600784 7340600668 7345600670 7340600781 7340600767 7345600565 7345600811 7359600020 7359600025 7345600810 7345600766 7345600720 7345600715 7345600945 7345600740 7345600580 7345600947 7345600705 7345600935 Occupant Occupant Occupant Occupant Occupant Occupant SCHNEEBELI R Occupant Occupant Occupant DEMPERE JACKIE NGUYEN BILL D SARANTOS GREGORY S & PETER LIN XIULAN WONG KELVIN & LI FAYE CLEAVELAND CURTIS ALLEN WONG JEFFREY M CAMPBELL BRIE NGUYEN VUI BOSTEDER D COOPER PAUL D LAM DAVID MARGINAL ISLAND PROPERTIES BOLTON CHERYL LIANG BAOYU ROSSO GENE J+ROBERTA L DOOPER DIANA M SAENGPRASEUTH C SAENGPRASEUTH SAENGPRASEUTH SOMSACK TOCHER JAMES LIONEL+BRUCKER BLUE NILE HOLDINGS LLC Occupant BEUSLINCH THOMAS RL SANCHEZ JULIAN QUEALEY DARRELL LEE Occupant EVELYN SHAWN D+KALYANA CARBONATTO TINA M Occupant 12910 E MARGINAL WAY S 101 12910 E MARGINAL WAY 5 110 12910 E MARGINAL WAY S 201 12910 E MARGINAL WAY S 202 12910 E MARGINAL WAY S 301 12910 E MARGINAL WAY S 302 12923 E MARGINAL WAY S 12924 E MARGINAL WAY 5 12930 E MARGINAL WAY 5 12930 E MARGINAL WAY 5 BASEMENT 13217 40TH AVE 5 1366 BENT DR 1415 196TH ST SE 1432 MONTEREY AVE NE 16215 9TH AVE SW 16910 PLEASANT BEACH DR SE 1821 ROLLING-HLS AVE SE 19950 REDWING ST 205 5 112TH ST 21326 5TH AVE S 2225 S 132ND 24320 118TH AVE SE 2514 LAKE PARK DR S 28010 NE 153RD PL 3012 5 OTHELLO ST 3359 LAKEWOOD AVE SO 3525 S 126TH ST D 3525 S 128TH ST 3531 S 128TH ST 3535 S 126TH ST 3623 6TH AVE SW 3703 S 126TH ST 3709 S 126TH ST 3712 S 130TH ST 3714 S 128TH ST 3716 S 126TH ST 3716 S 130TH ST 3717 S 126TH ST 3717 S 128TH ST TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA CAMPBELL CA BOTHELL WA RENTON WA BURIEN WA YELM WA RENTON WA WOODLAND HILL SEATTLE WA DES MOINES WA SEATTLE WA KENT WA SEATTLE WA DUVALL WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA 98168 TukwilaAdc ADDR-047, ACTIVE-ML None 98168 TukwilaAdc ADDR-122L ACTIVE-ML None 98168 TukwilaAdc ADDR-047i ACTIVE-ML None 98168 TukwilaAdc ADDR-047; ACTIVE-ML None 98168 TukwilaAdc ADDR-047; ACTIVE-ML None 98168 TukwilaAdc ADDR-047/ ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-047E ACTIVE-ML None 98168 TukwilaAdc ADDR-047E ACTIVE-ML None 98168 TukwilaAdc ADDR-1221 ACTIVE-ML None 98168 KCA Table NA NA 95008 KCA Table NA NA 98012 KCA Table NA NA 98056 KCA Table NA NA 98166 KCA Table NA NA 98597 KCA Table NA NA 98055 KCA Table NA NA 91364 KCA Table NA NA 98168 KCA Table NA NA 98198 KCA Table NA NA 98168 KCA Table NA NA 98030 KCA Table NA NA 98144 KCA Table NA NA 98109 KCA Table NA NA 98108 KCA Table NA NA 98144 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98134 KCA Table NA NA 98168 TukwilaAdc ADDR-087_ ACTIVE-ML None 98188 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-087; ACTIVE-ML None 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-002 ; ACTIVE-ML None 1' 7345600750 7345600950 7345600696 7345600690 7345600690 7345600690 7345600755 7345600690 7345600566 7345600955 2384200005 2384200008 2384200008 2384200006 7345600965 2384200007 7345600970 7345600975 7345600975 7345600980 7345600985 7945200020 7345600990 7345600995 7340600540 7945200020 7945200025 7340600775 7340600775 7945200035 7340600666 7340600773 7945200040 7340600664 7340600770 7340600667 7340600772 7945200042 7340600771 Occupant Occupant Occupant Occupant Occupant Occupant DIMOND ANNE M+SEAN C Occupant Occupant NGUYEN HELEN HANG JACKSON ANTHONY C+EVELYN U RASMUSSEN CARLOS+VERONICA Occupant ROBERTS BERNARD+MENDI 5 Occupant GRAVES JAMES W+YVONNE C BUTTERFIELD SHEILA ANN+JORD Occupant ALVARADO TONY DELREAL JUAN DE PALMA ELIZABETH PHAM NGOC-NU T+TU M NGUYEN QUIROZ JASMINE WYBLE DAVID+MEGAN J Occupant Occupant HOANG KHA+CHRISTY TRAN Occupant Occupant Occupant ARMSTRONG BONITA+GARDON Occupant DU BOPHARY+HUNG STAUDACHER ROBERT N BRACKEN RONDA Occupant WHITEZEL VIRGINIA M NGUYEN CAM TU THI WILLMORE SEAN P 3720 5 128TH ST 3720 5 130TH ST 3723 5 126TH ST 3725 S 126TH ST A 3725 S 126TH ST B 3725 S 126TH ST C 3726 S 128TH ST 3727 S 126TH ST D 3732 S 126TH ST 3802 S 130TH ST 3803 S 128TH ST 3805 128TH ST 3805 5 128TH ST 3807 5 128TH ST 3808 S 130TH ST 3809 S 128TH ST 3810 S 130TH ST 3816 S 130TH ST 3816 SW 130TH ST 3820 5 130TH ST 3826 S 130TH ST 3829 S 132ND PL 3832 S 130TH ST 3836 S 130TH ST 3850 S 126TH ST 4002 5 126TH ST 4006 5 126TH ST 4008 S 130TH ST 4010 S 130TH ST 4012 S 126TH ST 4015 S 126TH ST 4016 S 130TH ST 4018 S 126TH ST 4020 S 128TH ST 4020 S 130TH ST 4021 S 126TH ST 4021 S 128TH ST 4024 S 126TH ST 4026 5 130TH ST TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98178 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 TUKWILA WA 98168 KC-AdddressPoints NA NA TukwilaAdc ADDR-003; ACTIVE-ML None TukwilaAdc ADDR-087_ ACTIVE-ML None TukwilaAdc ADDR-087L ACTIVE-ML None TukwilaAdc ADDR-087i ACTIVE-ML None TukwilaAdc ADDR-087z ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-087L ACTIVE-ML None TukwilaAdc ADDR-087L ACTIVE-ML None KCA Table NA NA KCA Table NA NA KCA Table NA NA TukwilaAdc ADDR-002; ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-003: ACTIVE-ML None KCA Table NA NA KCA Table NA NA TukwilaAdc ADDR-003; ACTIVE-ML None KCA Table NA NA KCA Table KCA Table KCA Table KCA Table KCA Table NA NA NA NA NA NA NA NA NA NA TukwilaAdc ADDR-086E ACTIVE-ML None TukwilaAdc ADDR-0871 ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-003_ ACTIVE-ML None TukwilaAdc ADDR-003_ ACTIVE-ML None TukwilaAdc ADDR-087! ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-003: ACTIVE-ML None KCA Table KCA Table KCA Table NA NA NA NA NA NA TukwilaAdc ADDR-128; ACTIVE-ML None KCA Table NA NA KCA Table NA NA KCA Table NA NA 7340600668 7340600763 7945200045 7340600762 7340600669 7340600660 7340600777 7340600665 7340600777 7340600686 7340600744 7340600761 7340600769 7340600775 2384200010 7945200035 7345600530 7340600776 7345600720 7340600665 7340600785 7345600675 7345600566 7345600696 7345600950 7340600773 Occupant BRENNER MICHAEL K+LISA K WENDE THU T+RUSSEL A Occupant JONES CLINTON RICHARD Occupant Occupant Occupant NGUYEN KHIEM+THANH-HIEN T Occupant TUCCI JACK F+REGINA M SMITH ALICE R JENSEN RANDY L+KATHY RIVERTON HOLDING LLC TUKWILA SCHOOL DISTR #406 NGUYEN STELLA THAO+DUC-THAN CAPELOUTO ISAAC S TRUST CHAMPA ASSOCIATION INC PATAPOFF WILMA M - TUKWILA RENEWAL LLC DUNNE DENNIS M+YVONNE L ERITREAN KIDISTI MARIAM ORT ROSSO GENE JULIUS JR+GENE J CAMPBELL BRIE CLINGMAN TIM EGASHIRA GREGORY I WASHINGTON DEPI 1011 PLUM STREET KC DIV & ENVIRON : SEPA INFO CENTER KC METRO TRANSIT ENVIRONMENTAL P KC DEPARTMENT OF NAT'L RESOURCES 4027 S 126TH ST 4027 S 128TH ST 4028 5 126TH ST 4033 S 128TH ST 4035 S 126TH ST 4036 S 128TH ST 4037 S 128TH ST 4040 5 128TH ST 40415 128TH ST 4044 S 128TH ST 4049 S 128TH ST 4102 S 130TH ST 4106 S 130TH ST 4632 NE 89TH ST 4640 S 144TH ST 5138 NE 8TH ST 5509 5 BRANDON ST 6304 47TH AVE S 815 W MARION 910 MARKET ST P.O. BOX 69641 PO BOX 27481 PO BOX 80345 PO BOX 869 PO BOX 88087 PO BOX 94485 PO BOX 48300 35030 SE Douglas Street, Ste 210 2015 JACKSON ST., MS KSC-TR-0431 201 S JACKSON ST., STE 600 TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA SEATTLE WA TUKWILA WA RENTON WA SEATTLE WA SEATTLE WA ABERDEEN WA KIRKLAND WA TUKWILA WA SEATTLE WA SEATTLE WA WOODLAND HILL SEATTLE WA SEATTLE WA OLYMPIA WA SNOQUALMIE SEATTLE WA SEATTLE WA 98168 TukwilaAdc ADDR-128; ACTIVE-ML None 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-0021 ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-002f ACTIVE-ML None 98168 KC-AdddressPoints NA NA 98168 TukwilaAdc ADDR-002f ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-002f ACTIVE-ML None 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98115 KCA Table NA NA 98168 KCA Table NA NA 98059 KCA Table NA NA 98118 KCA Table NA NA 98118 KCA Table NA NA 98520 KCA Table NA NA 98033 KCA Table NA NA 98168 KCA Table NA NA 98165 KCA Table NA NA 98108 KCA Table NA NA 91365 KCA Table NA NA 98138 KCA Table NA NA 98168 KCA Table NA NA 98504 98065 98104 98104 Project # PL18-o114 ( Metro to Blue Nile property) Dear Tukwila and Metro, RECEIVED iE3052019 COMMI JNI ry of VI I01'MI .HI My name is Brian Kennedy. I live at 12802 37th Ave S. Tukwila 98168. I have dealt with trucking companies at this site for about 40 years. They have dropped their dock plates, honked their horns, blocked and parked on the street and cut through our residential streets for all of these years. The current owners even had a pitbull that barked for weeks nonstop. Here are some of my proposals and concerns about this project: 1. More trees and a fence blocking the neighbors on the west side of the property from noise and visual distraction. 2. Reasonable limit on hours of operation. 3. Landscape maintanence and indigenous plants. 4.No noise, like air conditoners, generators and trucks. 5. Open up the east entrance to East Marginal and close off the south entrance. 6. Clear the southeast corner of the lot, so that you can see traffic coming from the north when pulling out from 128th. 7. Limit street parking to about 5 hours per day. 8. No Metro vehicles west on 128th. Thank You Very much, Brian Kennedy graften@comcast.net 206 619 6990 City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director Affidavit of Distribution Project Name: REZONE W 1/2 OF PARCEL Project Number: PL18-0099 Associated File Number(s): L18-0114, E18-0016 Date Mailed: 01/23/2019 Mailing requested by: MAX BAKER Mailer's signature: SM ❑ Board of Adjustment Agenda Packet ❑ Board of Appeals Agenda Packet ❑ Determination of Non -Significance ❑ Determination of Significance & Scoping Notice ❑ Mitigated Determination of Non - Significance ❑ Notice of Action ❑x Notice of Application Parties of Record: ❑ Notice of Application for Shoreline Mgmt Permit ❑ Notice of Decision ❑ Notice of Public Hearing ❑ Notice of Public Meeting ❑ Official Notice ❑ Other: SEPA CHECKLIST ❑ Shoreline Mgmt Permit 0 Short Subdivision Agenda Parcel Number ToLine AttnLine AddrLine 7340600681 KONG WING-HO 11510 17TH AVE NE 7340600686 OUYANG XIAN 12010 76TH AVE 5 7345600580 INTERNATIONAL GATEWAY EAST 12201 TUKWILA INTRNTNL BL 4TH F 7345600530 Occupant 12449 E MARGINAL WAY S 7945200055 Occupant 12450 40TH AVE S 7345600580 Occupant 12501 E MARGINAL WAY S 7345600545 Occupant 12525 E MARGINAL WAY S 7345600555 Occupant 12529 E MARGINAL WAY S 7345600565 Occupant 12539 E MARGINAL WAY S 7345600670 Occupant 12601 E MARGINAL WAY S 100 7345600670 Occupant 12601 E MARGINAL WAY S 110 7345600670 Occupant 12601 E MARGINAL WAY S 200 7345600670 Occupant 12601 E MARGINAL WAY S 210 7340600662 STREBINGER MARTI SANZERE JOSEPH 12604 40TH AVE 5 7340600640 Occupant 12604 E MARGINAL WAY S 7345600675 Occupant 12607 E MARGINAL WAY S 7340600661 LIU KENNETH+CHEATH MONICA M 12608 40TH AVE S 7340600640 UTILITIES SERVICE C ATTN MOLA ED/FEP 12608 E MARGINAL WAY S 7345600812 BALZARINI THOMAS J 7345600825 KURTTI JOHN A 7345600830 COSTELLO CHERYL M 7340600681 Occupant 7345600840 HIBBS PHILLIP A 7345600766 Occupant 7340600767 Occupant 7340600782 Occupant 7340600785 Occupant 7340600766 RAUNIG ALAN JAMES 7359600035 Occupant 7359600040 PALOMA ORLANDO R 7340600781 Occupant 7340600764 Occupant 7359600030 DUCKERING RUTHANN L 7340600784 Occupant 7359600056 JOHSON LOWELL+GLENNA 7340600760 HALL LARRY D+B BELINDA 2384200055 Occupant 7340600774 Occupant 1261137TH AVE S 12615 37TH AVE S 12621 37TH AVE S 12623 42ND AVE S 12633 37TH AVE S 12677 E MARGINAL WAY S 12800 E MARGINAL WAY S 12802 37TH AVE S 12812 37TH AVE S 12812 E MARGINAL WAY S 12815 37TH AVE S 12817 37TH AVE S 12822 37TH AVE S 12822 E MARGINAL WAY S 12825 37TH AVE 5 12830 37TH AVE 5 12835 37TH AVE 5 12902 E MARGINAL WAY S 12909 E MARGINAL WAY S 12910 E MARGINAL WAY S 100 CityState SEATTLE WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILLA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA ZipCode Add rSourcl CRWAddre TukStatus PropUse 98125 KCA Table NA NA 98178 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-086E ACTIVE-ML None 98168 TukwilaAdc ADDR-0862ACTIVE-ML None 98168 TukwilaAdc ADDR-086E ACTIVE-ML None 98168 TukwilaAdc ADDR-086E ACTIVE-ML None 98168 KC-AdddressPoints NA NA 98168 TukwilaAdc ADDR-129f ACTIVE-ML None 98168 TukwilaAdc ADDR-086; ACTIVE-ML None 98168 TukwilaAdc ADDR-129f ACTIVE-ML None 98168 TukwilaAdc ADDR-086, ACTIVE-ML None 98168 TukwilaAdc ADDR-129f ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-086i ACTIVE-ML None 98168 TukwilaAdc ADDR-086; ACTIVE-ML None 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-086' ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-086f ACTIVE-ML None 98168 TukwilaAdc ADDR-047E ACTIVE-ML None 98168 TukwilaAdc ADDR-045E ACTIVE-ML None 98168 TukwilaAdc ADDR-045ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-045E ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-046( ACTIVE-ML None 98168 TukwilaAdc ADDR-047E ACTIVE-ML None 98118 KCA Table NA NA 98168 TukwilaAdc ADDR-046( ACTIVE-ML None 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-047E ACTIVE-ML None 98168 TukwilaAdc ADDR-1221 ACTIVE-ML None 7340600774 7340600774 7340600774 7340600774 7340600774 7340600774 7345601000 7340600775 7340600775 7340600775 7340600762 7945200055 7345600722 7345601005 7359600035 7345600935 7345600750 7345600695 7340600540 7340600764 7340600784 7340600668 7345600670 7340600781 7340600767 7345600565 Occupant Occupant Occupant Occupant Occupant Occupant SCHNEEBELI R Occupant Occupant Occupant DEMPERE JACKIE NGUYEN BILL D SARANTOS GREGORY 5 & PETER LIN XIULAN WONG KELVIN & LI FAYE CLEAVELAND CURTIS ALLEN WONG JEFFREY M CAMPBELL BRIE NGUYEN VUI BOSTEDER D COOPER PAUL D LAM DAVID MARGINAL ISLAND PROPERTIES BOLTON CHERYL LIANG BAOYU ROSSO GENE J+ROBERTA L 7345600811 DOOPER DIANA M 7359600020 SAENGPRASEUTH C SAENGPRASEUTH 7359600025 SAENGPRASEUTH SOMSACK 7345600810 TOCHERJAMES LIONEL+BRUCKER 7345600766 BLUE NILE HOLDINGS LLC 7345600720 Occupant 7345600715 BEUSLINCH THOMAS RL 7345600945 SANCHEZ JULIAN 7345600740 QUEALEY DARRELL LEE 7345600580 Occupant 7345600947 EVELYN SHAWN D+KALYANA 7345600705 CARBONATTO TINA M 7345600935 Occupant 12910 E MARGINAL WAY S 101 12910 E MARGINAL WAY S 110 12910 E MARGINAL WAY 5 201 12910 E MARGINAL WAY S 202 12910 E MARGINAL WAY S 301 12910 E MARGINAL WAY S 302 12923 E MARGINAL WAY S 12924 E MARGINAL WAY 5 12930 E MARGINAL WAY S 12930 E MARGINAL WAY S BASEMENT 13217 40TH AVE S 1366 BENT DR 1415 196TH ST SE 1432 MONTEREY AVE NE 16215 9TH AVE SW 16910 PLEASANT BEACH DR SE 1821 ROLLING-HLS AVE SE 19950 REDWING ST 205 5 112TH ST 21326 5TH AVE S 2225 5 132 N D 24320 118TH AVE SE 2514 LAKE PARK DR 5 28010 NE 153RD PL 3012 S OTHELLO ST 3359 LAKEWOOD AVE SO 3525 5 126TH ST D 3525 S 128TH ST 3531 S 128TH ST 3535 S 126TH ST 3623 6TH AVE SW 3703 5 126TH ST 3709 S 126TH ST 3712 S 130TH ST 3714 S 128TH ST 3716 5 126TH ST 3716 S 130TH ST 3717 S 126TH ST 3717 S 128TH ST TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA CAMPBELL CA BOTHELL WA RENTON WA BURIEN WA YELM WA RENTON WA WOODLAND HILL SEATTLE WA DES MOINES WA SEATTLE WA KENT WA SEATTLE WA DUVALL WA SEATTLE WA SEATTLE WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA SEATTLE WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA 98168 TukwilaAdc ADDR-047/ ACTIVE-ML None 98168 TukwilaAdc ADDR-1221 ACTIVE-ML None 98168 TukwilaAdc ADDR-047i ACTIVE-ML None 98168 TukwilaAdc ADDR-047, ACTIVE-ML None 98168 TukwilaAdc ADDR-047, ACTIVE-ML None 98168 TukwilaAdc ADDR-047; ACTIVE-ML None 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-047Z: ACTIVE-ML None 98168 TukwilaAdc ADDR-047f ACTIVE-ML None 98168 TukwilaAdc ADDR-122L ACTIVE-ML None 98168 KCA Table NA NA 95008 KCA Table NA NA 98012 KCA Table NA NA 98056 KCA Table NA NA 98166 KCA Table NA NA 98597 KCA Table NA NA 98055 KCA Table NA NA 91364 KCA Table NA NA 98168 KCA Table NA NA 98198 KCA Table NA NA 98168 KCA Table NA NA 98030 KCA Table NA NA 98144 KCA Table NA NA 98109 KCA Table NA NA 98108 KCA Table NA NA 98144 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98134 KCA Table NA NA 98168 TukwilaAdc ADDR-087_ ACTIVE-ML None 98188 KCA Table NA NA 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-087_ ACTIVE-ML None 98168 KCA Table NA NA 98168 KCA Table NA NA 98168 TukwilaAdc ADDR-002 i ACTIVE-ML None lf 7345600750 7345600950 7345600696 7345600690 7345600690 7345600690 7345600755 7345600690 7345600566 7345600955 2384200005 2384200008 2384200008 2384200006 7345600965 2384200007 7345600970 7345600975 7345600975 7345600980 7345600985 7945200020 7345600990 7345600995 7340600540 7945200020 7945200025 7340600775 7340600775 7945200035 7340600666 7340600773 7945200040 7340600664 7340600770 7340600667 7340600772 7945200042 7340600771 Occupant Occupant Occupant Occupant Occupant Occupant DIMOND ANNE M+SEAN C Occupant Occupant NGUYEN HELEN HANG JACKSON ANTHONY C+EVELYN U RASMUSSEN CARLOS+VERONICA Occupant ROBERTS BERNARD+MENDI 5 Occupant GRAVES JAMES W+YVONNE C BUTTERFIELD SHEILA ANN+JORD Occupant ALVARADO TONY DELREAL JUAN DE PALMA ELIZABETH PHAM NGOC-NU T+TU M NGUYEN QUIROZ JASMINE WYBLE DAVID+MEGAN J Occupant Occupant HOANG KHA+CHRISTY TRAN Occupant Occupant Occupant ARMSTRONG BONITA+GARDON Occupant DU BOPHARY+HUNG STAUDACHER ROBERT N BRACKEN RONDA Occupant WHITEZEL VIRGINIA M NGUYEN CAM TU THI WILLMORE SEAN P 3720 5 128TH ST 3720 5 130TH ST 3723 5 126TH ST 3725 S 126TH ST A 3725 S 126TH ST B 3725 5 126TH ST C 3726 5 128TH ST 3727 5 126TH ST D 3732 5 126TH ST 3802 5 130TH ST 3803 5 128TH ST 3805 128TH ST 3805 S 128TH ST 3807 5 128TH ST 3808 5 130TH ST 3809 5 128TH ST 3810 S 130TH ST 3816 S 130TH ST 3816 SW 130TH ST 3820 S 130TH ST 3826 S 130TH ST 3829 5 132ND PL 3832 S 130TH ST 3836 5 130TH ST 3850 5 126TH ST 4002 S 126TH ST 4006 S 126TH ST 4008 5130TH ST 4010 S 130TH ST 4012 S 126TH ST 4015S126THST 4016 S 130TH ST 4018 S 126TH ST 4020 S 128TH ST 4020 S 130TH ST 4021 S 126TH ST 4021 S 128TH ST 4024 S 126TH ST 4026 S 130TH ST TUKWILA WA 98168 KC-AdddressPoints NA NA TUKWILA WA 98168 TukwilaAdc ADDR-003; ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-0872ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-087L ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-0871 ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-087L ACTIVE-ML None TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 TukwilaAdc ADDR-087z ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-0871 ACTIVE-ML None TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 KCA Table NA NA TUKWILA WA • 98168 KCA Table NA NA TUKWILA WA 98168 TukwilaAdc ADDR-002i ACTIVE-ML None TUKWILA WA 98168 KCATable NA NA TUKWILA WA 98168 TukwilaAdc ADDR-003; ACTIVE-ML None TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 TukwilaAdc ADDR-003; ACTIVE-ML None TUKWILA WA 98168 KCATable NA NA TUKWILA WA 98168 KCATable NA NA TUKWILA WA 98168 KCATable NA NA TUKWILA WA 98168 KCATable NA NA TUKWILA WA 98168 KCATable NA NA TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 TukwilaAdc ADDR-086E ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-0871 ACTIVE-ML None TUKWILA WA 98178 KCA Table NA NA TUKWILA WA 98168 TukwilaAdc ADDR-0032 ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-003E ACTIVE-ML None TUKWILA WA 98168 TukwilaAdc ADDR-0875 ACTIVE-ML None TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 TukwilaAdc ADDR-003E ACTIVE-ML None TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 TukwilaAdc ADDR-128; ACTIVE-ML None TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 KCA Table NA NA TUKWILA WA 98168 KCA Table NA NA 7340600668 7340600763 7945200045 7340600762 7340600669 7340600660 7340600777 7340600665 7340600777 7340600686 7340600744 7340600761 7340600769 7340600775 2384200010 7945200035 7345600530 7340600776 7345600720 7340600665 7340600785 7345600675 7345600566 7345600696 7345600950 7340600773 Occupant BRENNER MICHAEL K+LISA K WENDE THU T+RUSSEL A Occupant JONES CLINTON RICHARD Occupant Occupant Occupant NGUYEN KHIEM+THANH-HIEN T Occupant TUCCI JACK F+REGINA M SMITH ALICE R JENSEN RANDY L+KATHY - RIVERTON HOLDING LLC TUKWILA SCHOOL DISTR #406 NGUYEN STELLA THAO+DUC-THAN CAPELOUTO ISAAC S TRUST CHAMPA ASSOCIATION INC PATAPOFF WILMA M TUKWILA RENEWAL LLC DUNNE DENNIS M+YVONNE L ERITREAN KIDISTI MARIAM ORT ROSSO GENE JULIUS JR+GENE 1 CAMPBELL BRIE 4027 S 126TH ST 4027 S 128TH ST 4028 S 126TH ST 4033 S 128TH ST 4035 S 126TH ST 4036 5 128TH ST 4037 S 128TH ST 4040 S 128TH ST 4041 S 128TH ST 4044 S 128TH ST 4049 S 128TH ST 4102 S 130TH ST 4106 5 130TH ST 4632 NE 89TH ST 4640 S 144TH ST 5138 NE 8TH ST 5509 S BRANDON ST 6304 47TH AVE 5 815 W MARION 910 MARKET ST P.O. BOX 69641 PO BOX 27481 PO BOX 80345 PO BOX 869 CLINGMAN TIM PO BOX 88087 EGASHIRA GREGORY I PO BOX 94485 WASHINGTON DEPI 1011 PLUM STREET PO BOX 48300 KC DIV & ENVIRON : SEPA INFO CENTER 35030 SE Douglas Street, Ste 210 KC METRO TRANSIT ENVIRONMENTAL P 201 S JACKSON ST., MS KSC-TR-0431 KC DEPARTMENT OF NAT'L RESOURCES 201 S JACKSON ST., STE 600 TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA TUKWILA WA SEATTLE WA TUKWILA WA SEATTLE WA TUKWILA WA RENTON WA SEATTLE WA SEATTLE WA ABERDEEN WA KIRKLAND WA TUKWILA WA SEATTLE WA SEATTLE WA WOODLAND HILL SEATTLE WA SEATTLE WA OLYMPIA WA SNOQUALMIE SEATTLE WA SEATTLE WA 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98168 98115 98168 98059 98118 98118 98520 98033 98168 98165 98108 91365 98138 98168 98504 98065 98104 98104 TukwilaAdc ADDR-128; ACTIVE-ML None KCA Table NA NA KCA Table NA NA TukwilaAdc ADDR-002f ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-002F ACTIVE-ML None KC-AdddressPoints NA NA TukwilaAdc ADDR-002f ACTIVE-ML None KCA Table NA NA TukwilaAdc ADDR-002F ACTIVE-ML None KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table KCA Table NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1 L7 IRV i 7W i r/ dip 'pat WA FISHERIES & WILDLIFE LARRY FISHER 1775 12 AVE NW, STE 1 ISSAQUAH WA WA DEPT OF ECOLOGY SEPA REVIEW PO BOX 47703 OLYMPIA WA KC ASSESSOR'S OFFICE ACCOUNTING DIVISION 500 4th AVE, RM# 709A SEATTLE WA WRIA 9 - SALMON RECOVERY T ELISSA OSTERGAARD - \ 201 SOUTH JACKSON S1 SEATTLE WA MUCKLESHOOT Fisheries Progr Karen Walter 39015 172nd AVE SE AUBURN WA TUKWILA HISTORICAL SOCIETY TUKWILA HISTORICAL SOCIETY 98027 Larry.Fisher@dfw.wa.gov 98504 sepaunit@ecy.wa.gov 98104 Christie.Most@kingcounty.gov 98104 elissa.ostergaard@kingcountv.gov 98092 KWalter@muckleshoot.nsn.us tukwilahistsociety@tukwilahistory.or rcwieser@comcast.net ana.Ie@taukwilawa.gov TO: City of Tukwila Department of Community Development LAND ® Planning Land Use File Number(s) PL18-0099 L18-0114 REZONE E18-0016 SEPA CHECKLIST USE PERMIT ROUTING FORM ® Public Works ® Fire Dept. ❑ Police Dept. ❑ Parks/Rec Project: REZONE W HALF OF PARCEL 7345600766 FROM LDR TO C/LI Address: 12677 E MARGINAL WAY S Date transmitted: 12/14/2018 Response requested by: 12/28/2018 Staff coordinator: Date response received: REVIEWERS: Please specify how the attached plans conflict with your ADOPTED development regulations, including citations. Be specific in describing the types of changes you want made to the plans. When referencing codes, please identify the actual requirement and plan change needed. The Planning Division review does not supplant each department's ability to administer its own regulations and permits. However, project consistency at the Planning review stage is important to minimize significant later design changes. More than minimal design changes require further Planning Commission review, even if alteration is required to satisfy a City requirement. This further review is typically a minimum 60-day process. Requirements based on SEPA (e.g., not required by an adopted development regulation) MUST identify the impact being mitigated, the policy basis for requiring mitigation, and the method used to calculate the mitigation required. Calculations of project impacts and the mitigation required (e.g., water capacity, road level of service analyses, or turning analyses) may be required of the applicant. COMMENTS (Attach additional comment sheets and/or support materials as needed.) Plan check date: Comments prepared by: Update date: TO: ® Buildin City of Tukwila Department of Community Development Land Use File Number(s) PL18-0099 L18-0114 REZONE E18-0016 SEPA CHECKLIST LAND USE PERMIT ROUTING FORM ® Public Works ® Fire Dept. ❑ Police Dept. ❑ Parks/Rec Project: REZONE W HALF OF PARCEL 7345600766 FROM LDR TO C/LI Address: 12677 E MARGINAL WAY S Date transmitted: 12/14/2018 Response requested by: 12/28/2018 Staff coordinator: Date response received: REVIEWERS: Please specify how the attached plans conflict with your ADOPTED development regulations, including citations. Be specific in describing the types of changes you want made to the plans. When referencing codes, please identify the actual requirement and plan change needed. The Planning Division review does not supplant each department's ability to administer its own regulations and permits. However, project consistency at the Planning review stage is important to minimize significant later design changes. More than minimal design changes require further Planning Commission review, even if alteration is required to satisfy a City requirement. This further review is typically a minimum 60-day process. Requirements based on SEPA (e.g., not required by an adopted development regulation) MUST identify the impact being mitigated, the policy basis for requiring mitigation, and the method used to calculate the mitigation required. Calculations of project impacts and the mitigation required (e.g., water capacity, road level of service analyses, or turning analyses) may be required of the applicant. COMMENTS (Attach additional comment sheets and/or support materials as needed.) Plan check date: Comments prepared by: Update date: RECEIVED City of Tukwila DEC 14 2018 Department of Community Development TUKWILA PUBLIC WORKS Land Use File Number(s) PL18-0099 L18-0114 REZONE E18-0016 SEPA CHECKLIST LAND USE PERMIT ROUTING FORM TO: ® Building ® Planning ® Public Works ® Fire Dept. ❑ Police Dept. ❑ Parks/Rec Project: REZONE W HALF OF PARCEL 7345600766 FROM LDR TO C/LI Address: 12677 E MARGINAL WAY S Date transmitted: 12/14/2018 Response requested by: 12/28/2018 Staff coordinator: M b9x 13/41,6/, Date response received: REVIEWERS: Please specify how the attached plans conflict with your ADOPTED development regulations, including citations. Be specific in describing the types of changes you want made to the plans. When referencing codes, please identify the actual requirement and plan change needed. The Planning Division review does not supplant each department's ability to administer its own regulations and permits. However, project consistency at the Planning review stage is important to minimize significant later design changes. More than minimal design changes require further Planning Commission review, even if alteration is required to satisfy a City requirement. This further review is typically a minimum 60-day process. Requirements based on SEPA (e.g., not required by an adopted development regulation) MUST identify the impact being mitigated, the policy basis for requiring mitigation, and the method used to calculate the mitigation required. Calculations of project impacts and the mitigation required (e.g., water capacity, road level of service analyses, or turning analyses) may be required of the applicant. COMMENTS (Attach additional comment sheets and/or support materials as needed.) t7 moved W/Gon al41 ow %✓d2-IC 7T pp Plan check date: Comments �(70n Update date: r 3// 9 prepared by: 6 I City of Tukwila Department of Community Development Land Use File Number(s) PL18-0099 L18-0114 REZONE E18-0016 SEPA CHECKLIST LAND USE PERMIT ROUTING FORM TO: ® Building ® Planning ® Public Works® Fire Dept ❑ Police Dept. ❑ Parks/Rec Project: REZONE W HALF OF PARCEL 7345600766 FROM LDR TO C/LI Address: 12677 E MARGINAL WAY S Date transmitted: 12/14/2018 Response requested by: 12/28/2018 Staff coordinator: Date response received: REVIEWERS: Please specify how the attached plans conflict with your ADOPTED development regulations, including citations. Be specific in describing the types of changes you want made to the plans. When referencing codes, please identify the actual requirement and plan change needed. The Planning Division review does not supplant each department's ability to administer its own regulations and permits. However, project consistency at the Planning review stage is important to minimize significant later design changes. More than minimal design changes require further Planning Commission review, even if alteration is required to satisfy a City requirement. This further review is typically a minimum 60-day process. Requirements based on SEPA (e.g., not required by an adopted development regulation) MUST identify the impact being mitigated, the policy basis for requiring mitigation, and the method used to calculate the mitigation required. Calculations of project impacts and the mitigation required (e.g., water capacity, road level of service analyses, or turning analyses) may be required of the applicant. COMMENTS (Attach additional comment sheets and/or support materials as needed.) ertiv-td tAl/ Atzt eig-oot7 15-44 54 Plan check date: Comments Update date: prepared by: King County Metro Transit APPLICATION FOR APPROVAL OF A COMPREHENSIVE PLAN & ZONING MAP CHANGE Applicant: Project Name: Request: Location: Comprehensive Plan Designation: Zoning Designation: SEPA Review: Existing Conditions: King County Metro Transit (Metro) Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Change Comprehensive Plan and zoning designation from Low Density Residential (LDR) to Commercial/Light Industrial (C/LI) 12677 E Marginal Way South Parcel no. 7345600766 West Portion: Low Density Residential (LDR) East Portion:, Commercial/Light Industrial (C/LI) LDR and C/LI Metro typically issues its own threshold determinations but prefers that the City issue the determination and noticing. Metro prepared a SEPA checklist, and believes the project qualifies for a determination of non -significance. The site is generally flat with curb cuts on E Marginal Way S and developed with a trucking operation consisting predominantly of buildings and parking areas. There is vegetation along the street frontages, and along the west property boundary, where a mapped Type 2 stream flows primarily in underground pipes, but surfaces for approximately 25 feet on the subject site. Application Attachments: Exhibits/Referenced Documents Exhibit A: Exhibit B: Exhibit C: Exhibit D: Exhibit E: Exhibit F: Exhibit G: Exhibit H: Exhibit I: Application Checklist Application Form Affidavit of Ownership and Hold Harmless Permission to Enter Property SEPA Environmental Checklist Assessor's Map Showing Location of Property within 500 Feet Project and Decision Criteria Narrative Critical Areas Assessment and Proposed Rezoning Review: 12677 E Marginal Way S, by Otak, Inc., dated December 10, 2018 Map of Surrounding Land Uses within 1,000 Foot Radius Conceptual Site Plan for Future Metro Use — 12677 E Marginal Way S Application Fees Comprehensive Plan and Zoning Map Amendment Fee — $3,888.15 SEPA Fee - $1,903.65 Public Notice Materials Fast Signs for Notice Board Fee of $379.50 paid directly to Fast Signs. Mailing Labels (DVD) Public Notice Mailing Fee - $111.00 RECE%V ED OEC 13 20 111 Community Development • • Exhibit F: Project and Decision Criteria Narrative Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Summary of Request King County Metro Transit (Metro) requests amendment of the City of Tukwila Comprehensive Plan & Zoning Map to change the comprehensive plan and zoning designations of a portion of parcel no. 7345600766 from Low Density Residential (LDR) to Commercial/Light Industrial (C/LI) consistent with the zoning on the eastern portion of the site. A contiguous parcel owned by the same property owner (no. 7345600685) and used as part of the development on parcel no. 7345600766 is already zoned C/LI and is not included in this request. RECEIVED EC 13 2016 Community Development Summary of the Reason for the Request As part of its long-range plans for growth of transit service in the region, Metro needs to purchase additional property for indoor mechanical training activities and construction offices. For that purpose, Metro is seeking to purchase property at 12677 E Marginal Way S (parcel no. 7345600766) and 12633 E Marginal Way S (parcel no. 7345600685) from Blue Nile Holdings, LLC (see Figure 1). 7341 60069S Parcel no. 7345600766, subject of request 00675 734560 G 5 Parcel no. 7345600685, excluded from request Figure 1: Becker Transfer properties outlined in red. Source: King County iMap. The smaller parcel is zoned Commercial Light Industrial (C/LI). The larger parcel is split -zoned; the eastern portion fronting on E Marginal Way S is zoned C/LI and the western portion is zoned Low Density Residential (LDR). The site is ideal for Metro's intended future use of the site, but the split -zoned condition creates uncertainty about how the site could be developed to meet Metro's needs. Metro is pursuing the rezone to rectify this uncertainty for immediate short-term use and potential redevelopment. Metro understands that approval of rezones is considered within the Page 1 of 15 • • Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative larger planning context and must be consistent with the vision for Tukwila, and for the surrounding neighborhoods. Metro believes that the rezone is consistent with the vision and character for this area, and that in the long term will provide opportunities for enhancement of the boundary between the residential and commercial areas. The use of the site since at least 1975 has been light industrial, specifically a truck terminal use with accessory warehouse and parking. Truck terminal use is nonconforming to the existing LDR zoning and conforming to the existing C/LI zoning (see Figure 2). Parcel no. 7345600766, subject of request r Parcel no. 7345600685, excluded from request Figure 2: Excerpt of City of Tukwila Comprehensive Plan & Zoning Map, subject properties outlined in red. Purple zoning is C/LI, yellow zoning is LDR. Split -zoning is discouraged by the City of Tukwila's Comprehensive Plan and tends to create uncertainty for future development or redevelopment. A history of the land use and zoning on the property is included in this application. Rezoning the property will strengthen the boundary between the LDR zone to the west and C/LI zone along E Marginal Way S. It will provide certainty for Metro by ensuring that the office uses can continue and that the site can be developed efficiently for those uses. To the extent that rezoning will remove confusion around applicability of zoning to the site and its nonconforming status, future redevelopment would be encouraged and that would offer opportunities to make the site development more conforming to existing regulations. Metro's Intended Use of the Site and a Conceptual Plan If the rezone is approved, Metro's current thoughts for use of the site are for office and indoor training activities that currently occur on the nearby South Base facilities. Metro has provided a drawing of what a potential layout for office and training use could look like (see Exhibit I), but is not seeking any review or approval of that layout at this time. Before Metro can realistically create a plan for specific uses that addresses applicable development standards, the rezone would need to be approved. Any future changes to the site to allow redevelopment would be subject to review by the City of Tukwila through Design Review because of the proximity to the LDR zone. At the time of a proposed redevelopment of the site, Metro would work with the City of Tukwila to ensure compliance with site development standards. Site Description The properties are collectively identified in the King County Assessor's records as "Becker Transfer." Parcel no. 7345600766 is approximately 1.64 acres (71,440 square feet) in size. Parcel no. 7345600685 is approximately 0.26 acres (11,490 square feet) in size. Parcel no. 7345600766 is split -zoned: the eastern portion fronting on E Marginal Way S is zoned Commercial/Light Industrial (C/LI), and the western portion is zoned Low Density Residential (LDR). Parcel no. 7345600685 is zoned C/LI. Refer to Figure 2. Page 2 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative The parcels are used as a single property that serves as the base of operations for Blue Nile Trucking, LLC. The site is accessed by one driveway on E Marginal Way S and two driveways on S 128th Street. Permanent structures include a service garage, distribution warehouse, loading dock, and fuel pump built in 1975; the remainder of the parcels are paved and/or graveled. Vehicles and trailers of varying sizes are stored along the north and west property lines. Surrounding land uses include a mix of single-family residential, commercial, and industrial. The east branch of Riverton Creek is present in the vicinity of and on the property. The creek flows through an open ditch and onto the northwest corner of the property for approximately 25 feet before entering an underground pipe. The creek flows through approximately 195 feet of underground pipe and daylights into another open ditch (see Exhibit G). The existing stream and buffer are significantly degraded due to undergrounding and surrounding development. Request Requests for changes in zoning are made pursuant to Chapter 18.84 TMC. Granting a rezone and accompanying Comprehensive Plan map change is allowed when consistency with the following criteria can be demonstrated: 1. The proposed amendment to the Zoning Map is consistent with the goals, objectives, and policies of the Comprehensive Plan. The proposed amendment is consistent with the applicable goals, objectives, and policies of the City's Comprehensive Plan. The proposed change from LDR to C/LI will clarify the boundary between the two zones at the subject location; facilitate future redevelopment consistent with the character of E Marginal Way S; and eliminate a nonconformity. Community Image and Identity Element The Community Image and Identity element of the Comprehensive Plan establishes a framework to celebrate the City's history and environment, build on diversity, foster civic engagement, and accommodate growth that furthers the community's vision.' The proposed rezone will contribute to this framework by improving consistency of the property's designation with the following goals and policies: • Goal 1.1— A community of inviting neighborhoods and vibrant business districts. The subject property is accessed from E Marginal Way S and S 128th Street. The parcel is situated at the boundary between commercial and industrial uses on E Marginal Way S and residential uses further west and south in the area. The property is split - zoned, leading to a lack of clarity in the use and development of the site. Rezoning the property will help create a consistent expectation about land use on the lot and will clearly define the residential neighborhood as distinct from the commercial and industrial uses along E Marginal Way S. The proposed rezone will expand the C/LI zoning boundary to be consistent with the property boundary and the current use of the property. The proposed rezone is not expected to impact the character of the residential area for several reasons. The residential neighborhood has grown up around this industrial use that has been in continual operation since at least 1975 (see response to criterion 2, below, for additional property history). Additionally, given that a portion of the property is already zoned C/LI, 1 Tukwila Comprehensive Plan, Community Image and Identity Element, page 1-2. Page 3 of 15 • • Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative the rezone will not invite new uses that are not already allowed adjacent to the residential neighborhood. Finally, the east branch of Riverton Creek, located along the west side of the subject property and approximately coincident with the proposed rezone, serves as a natural boundary or buffer between different land uses. The rezone will encourage the potential redevelopment of the site which may provide an opportunity to enhance the aesthetics of the site, clearly define the boundary to adjacent land uses, and provide capital investment into the neighborhood. • Policy 1.1.2 — Strengthen the image and character of Tukwila's distinct areas and neighborhoods. The subject property takes primary access from E Marginal Way S and is part of a node of C/LI and Neighborhood Commercial (NCC) zoning along this arterial that is one lot deep (except on the subject parcel) (see Figure 3). Rezoning the west side of the subject property to be consistent with this district will strengthen the image and character of the node by clarifying the uses allowed on the site, creating a consistent expectation about development on the property, and establishing clear definition between the residential neighborhood to the west and the commercial/light industrial uses along E Marginal Way S. Figure 3 Excerpt of City of Tukwila Comprehensive Plan & Zoning Map, subject properties outlined in red. Economic Development Element The overall goal of the Economic Development element is to enhance the economic well- being of the community, including stimulating economic improvement for individual businesses and the community. The proposed rezone is consistent with this purpose and addresses the following goals and policies: • Goal 2.1— Tukwila has a strong role as a regional business and employment center which allows it to enhance and promote the community's well-being. The proposed rezone is supportive of the continued business use of the subject property (and, as described above, is not detrimental to the residential neighborhood to the west). Page 4 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative The rezone will eliminate a confusing split -zoning condition, which will clarify how the property can be used and support future redevelopment of the site as a commercial/light industrial property similar to other uses along E Marginal Way S. This contributes to Tukwila's image as a regional business center. The proposal is consistent with policies intended to implement this goal, as described below. • Policy 2.1.16 — Promote and preserve economic use of industrial lands outside the Manufacturing Industrial Center (MIC) through appropriate buffering requirements and use restrictions. The subject property is located just south of the MIC boundary, along E Marginal Way S, and has been in continual use as a commercial/light industrial property since before the neighborhood was annexed in 1989. The proposed rezone supports this policy by preserving the existing C/LI zoning and expanding it slightly to be consistent with the existing parcel boundary and other similar properties. Additionally, the proposed rezone will eliminate a confusing split -zoning condition, ultimately clarifying how the property can be used and supporting future redevelopment of the property. The C/LI zone and the landscaping requirements in Table A of TMC 18.52.030 establish appropriate buffering requirements and use restrictions to ensure that commercial or light industrial development is compatible with nearby residential uses. Table A in the code shows the standard buffer depths of 6 feet and 0 feet for side and rear yards, respectively, are increased to 15 feet, and the intensity of buffer plantings raised from Type II to Type III for new development within 50 feet of a residential zone. Design review is required for new development within 300 feet of a residential zone. These standards are protective of residential development and ensure commercial and light industrial development is compatible with surrounding land uses while also promoting viable and attractive commercial and industrial areas. In addition, the requirement for a stream buffer also provides a natural division between the two types of uses. • Policy 2.1.17 — Include standards in the development regulations for industrial uses that adequately mitigate potential adverse impacts on surrounding properties and public facilities and services. In addition to the use and buffering requirements described above, development in the C/LI zone is subject to performance standards, including standards adopted by the Puget Sound Air Pollution Control Agency for odor, dust, smoke, and airborne pollutants; noise standards adopted in TMC Chapter 8.22; and State and Federal standards for water quality and hazardous materials. Review under the State Environmental Policy Act (SEPA) provides substantive authority to mitigate potential adverse environmental impacts. Natural Environment Element The Natural Environment element guides future development in a manner to protect the community's environment, improve quality of life within the City, and protect residents from natural hazards. The proposed rezone addresses the following goals and policies in this element: • Goal 4.1— The City's air, land, and water resources are restored and protected for future generations and Policy 4.1.5 — Develop and implement programs that encourage Tukwila residents and businesses to take active measures to protect Page 5 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative and enhance Tukwila's natural environment. Such measures could include the use of Low Impact Development (LID) techniques, natural streambank restoration, non -toxic lawn care, composting, and recycling, among others. The proposed rezone will clarify applicable use requirements and position the property for redevelopment, which presents an opportunity to implement forward -thinking development techniques such as Low Impact Development (LID) and environmental enhancement and remediation (if necessary), consistent with this goal. The City has adopted a Critical Areas Ordinance in TMC Chapter 18.45, "Environmentally Sensitive Areas." The purpose of this chapter is to protect the environment, human life, and property; identify and classify ecologically sensitive areas; and protect these areas and their functions while allowing for reasonable use of public and private property. New development on the subject parcel is required to comply with applicable critical areas requirements to minimize development impacts using best available science. The east fork of Riverton Creek flows across the northwest corner of the property through an underground pipe, and redevelopment of the property presents an opportunity to address this sensitive area. The subject property has already had some environmental remediation and cleanup related to its historic use as a trucking facility. Contamination from leaking underground storage tanks was addressed in 1999 and periodic review by the Department of Ecology confirms that the remedial actions continue to eliminate exposure to contaminated soils by ingestion and contact. Work was performed under the Model Toxics Control Act and the Voluntary Cleanup Program (codified in Chapter 173-340 WAC). A restrictive covenant is recorded on the property documenting the contamination and cleanup work and prohibiting work that could disturb contaminated soils without review and approval by the Department of Ecology. Future work on the property is required to coordinate with the Department of Ecology and address the restrictive covenant on the property. Substantial disturbance of the property could result in expanded cleanup efforts to eliminate contamination. • Goal 4.4 — Water resources that function as a healthy, integrated system; provide a long-term public benefit from enhanced environmental quality; and have the potential to reduce public infrastructure costs. The east fork of Riverton Creek flows across the northwest corner of the property primarily through an underground pipe. Approximately 25 feet of the creek flows through an open ditch before entering an underground pipe, where it travels for approximately 195 feet before daylighting into another open ditch (see Exhibit G). Redevelopment encouraged by the proposed rezone would provide opportunities to address this water resource, including improving surface water quality and quantity, restoring degraded buffer areas, and/or daylighting the stream. All of these opportunities would improve the health of water resources at and downstream of the subject stream and provide public benefits. • Goal 4.6 — Watercourses and their buffers, wetlands and wetland buffers protected from encroachment and degradation and improved through mitigation, enhancement restoration projects. The east fork of Riverton Creek has a significantly degraded buffer and is low - functioning due to being undergrounded in the property's vicinity. Redevelopment Page 6 of 15 4 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative encouraged by the proposed rezone would provide an opportunity to improve buffer and watercourse conditions. • Policies 4.6.1 through 4.6.4 — Policies related to regulation of land use and development, mitigation requirements, and sensitive areas studies. The City of Tukwila has adopted a comprehensive Critical Areas Ordinance (TMC Chapter 18.45) to regulate development in and adjacent to sensitive areas. The regulations ensure development is located and designed to achieve no net loss of sensitive areas functions through mitigation sequencing and compensatory mitigation. Redevelopment encouraged by the proposed rezone is required to comply with these regulations and provides an opportunity to improve conditions for the largely undergrounded stream. • Goal 4.7 — The water quality in Tukwila's wetlands, watercourses, fish and wildlife habitat areas and the Green/Duwamish River is improved over time. The stream has a significantly degraded buffer and is low -functioning due to being undergrounded at and in the property's vicinity. Redevelopment encouraged by the proposed rezone would provide an opportunity to improve buffer and watercourse conditions. • Policy 4.7.1— Improve surface water management and ensure provision of water quality treatment where required. Redevelopment encouraged by the proposed rezone would be required to conform to applicable stormwater and surface water management techniques and the King County Surface Water Design Manual 2016 (2016 KCSWDM) adopted by the City of Tukwila. • Goal 4.8 — Surface water generated by urban development does not exceed pre - development discharge rates The subject parcel is almost entirely covered with impervious surfaces. While the re- zone application will not modify the percentage of impervious surfaces on the site, future redevelopment encouraged by the proposed rezone will be required to comply with development standards that will reduce the amount of impervious surface coverage and detain, treat, and discharge surface water. Residential Neighborhoods Element The Residential Neighborhoods element focuses on neighborhood sustainability to preserve and enhance the sense of community in each residential neighborhood. The proposed rezone will occur adjacent to an existing single-family residential neighborhood. Because the rezone would affect land currently zoned for single-family residential use, Goal 7.1 and Policy 7.1.1 appear to be most applicable to the proposed rezone and are addressed below: • Goal 7.1— Residential Land Use Pattern: A land use pattern that encourages a strong sense of community by grouping compatible and mutually supportive uses and separating incompatible uses. The existing property is split -zoned, with the western portion zoned LDR and the eastern portion zoned C/LI. Since at least 1975, the property has been used for trucking operations, which is nonconforming to use requirements in the LDR zone. The split - zone condition creates confusion in the application of development requirements and therefore does not tend to encourage a sense of community at that location. In fact, it Page 7 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative tends to blur the boundary between the residential community and commercial operations. The proposed rezone will clarify the expectation for the use and development of the property in the future, which will solidify the character of the neighborhood in the immediate vicinity of the rezone and exclude incompatible uses. from the LDR zone. The east branch of Riverton Creek creates a natural boundary to define residential uses from the commercial and industrial uses fronting along E Marginal Way S. • Policy 7.1.1— Maintain a comprehensive land use map that supports the preservation and enhancement of single-family and stable multi -family neighborhoods; eliminates incompatible land uses; and clearly establishes applicable development requirements through recognizable boundaries. The split -zone condition is confusing and does not provide a clear and recognizable boundary between land uses. The proposed rezone will establish a recognizable boundary and eliminate a confusing split -zone condition for the subject property. It will also make the boundary of the C/LI node around the intersection of E Marginal Way S and S 128th Street consistent on this parcel by expanding the C/LI zone to the property boundary. The rezone is likely to encourage redevelopment of the site and meet applicable development regulations which are designed to enhance the buffer between commercial and residential uses. 2. The proposed amendment to the Zoning Map is consistent with the scope and purpose of TMC Title 18, "Zoning Code," and the description and purpose of the zone classification applied for. The proposed rezone is broadly consistent with the scope and purpose of Title 18 TMC, "Zoning Code." The zoning code implements the City's Comprehensive Plan and, as discussed above, the proposed rezone is consistent with numerous goals and policies therein. More specifically, the proposed rezone is consistent with the description and purpose of the C/LI zone. Pursuant to TMC 18.30.010, the C/LI district "is intended to provide for areas characterized by a mix of commercial, office, or light industrial uses. The standards are intended to promote viable and attractive commercial and industrial areas." The properties around the intersection of E Marginal Way S and S 128th Street are a mix of primarily commercial and industrial uses consistent with the purpose of the C/LI zone, including the subject property which is used as a trucking facility. The subject property is similar in character to commercially- and industrially -zoned property in the immediate vicinity (see Figure 4). Properties with frontage along E Marginal Way S tend to be zoned and used as commercial and industrial businesses. Uses transition from much more intense industrial activities with large warehouses and significant vehicular traffic in the north to lighter industrial and commercial uses further south. E Marginal Way S is a high -volume arterial with excellent connectivity to local and regional transportation networks. Along E Marginal Way S, the C/LI zoning serves as a logical transition between the Manufacturing Industrial Center (MIC) and industrial zoning (L) to the north and the neighborhood commercial zoning (NCC) to the south (see Figure 3, above). Page 8 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative • ,il A—v Figure 4: Vicinity map, subject property outlined in red. Source: King County iMap. ,--F,_, -:-'••Ap'1,,,:,' '- ri-.7'-2-0.',4 1 —I . `.i sfir 1i 74 r a. I LDR zoning is not appropriate for the subject site. The purpose of the LDR zone is "to provide low -density family residential areas together with a full range of urban infrastructure services in order to maintain stable residential neighborhoods, and to prevent intrusions by incompatible land uses." The property has been in continual operation as a trucking facility since prior to its annexation into the City of Tukwila. A trucking facility is nonconforming to the use provisions of the LDR zone. Chapter 18.70 TMC, "Nonconformity," allows legally established nonconforming uses to continue and sets forth limitations on any expansion of nonconforming uses. A lapse or change in the use would cause abandonment of rights to nonconformity and any new use established is required to comply with current use regulations. In this way, TMC Chapter 18.70 seeks to reduce nonconformity as much as possible. The proposed rezone would bring the nonconforming portion of the trucking facility (that portion located in the LDR zone) into conformance with the zoning code. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Page 9 of 15 • . a 22v • ••••• Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative 3. There are changed conditions since the previous zoning became effective to warrant the proposed amendment to the Zoning Map. Conditions have changed considerably since the previous zoning became effective. The proposal to rezone the western portion of parcel no. 7345600766 is reasonable and warranted by the change in circumstances. The subject properties were created in unincorporated King County as Riverton, a replat of a portion of Riverside Interurban Tracts, on June 15, 1906 (see Figure 5).2 Contemporary legal descriptions also refer to this area as "Riverton Addition." Thereafter, Lots 4 and 18-25 of Block 9 of Riverton were acquired by a single owner and a trucking operation was established on the property.' The Becker family owned the property at the time it was developed with the current service garage, distribution warehouse, loading dock, and related improvements in 1975. > /e7csd'--j'22O •'r 6J • �' \w I a. l 1 •1• i 0 ti C. i d q3 1 v /(P,.3J 13 Po7.do • IS 16 17 Is .50 19 9 ta �,¢- yfti o i a h 4f 1. H .3-6-1•ro a x .f ,r dm ` s � •'- - -1 j al N - ' I 29 i 1 G 9 43 52O 4 60 160 •/ 40 Figure 5: Excerpt of Riverton, a replat of part of Riverside Interurban Tracts, recorded in Volume 13 of Plats, Page 36, records of King County, Washington. Image shows all of Block 9, lots forming the subject property outlined in red. NOTE: The orientation of this map is such that north is to the right. Alder Street became S 126th Street and Herkimer Street became S 128th Street. 2 Plat of Riverton, King County Recording No. 400820, recorded June 15, 1906 in Volume 13 of Plats, Page 36, Records of King County, WA. 3 The lots were likely purchased by the Becker family, who likely also established the trucking business. Two businesses (Becker Trucking Inc. and Becker Transfer Co.) appear to have grown from this startup. Becker Trucking Inc. has been in operation since 1925 and operates out of Tukwila. Becker Transfer Co. bills itself as a fourth - generation transportation company and operates out of Issaquah. Page 10 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative Riverton was identified as the Riverton Annexation Area by the City of Tukwila. In preparation for annexation, the City adopted ordinances no. 1479, 1480, and 1481 to apply future land use designations and zoning designations to the Riverton area. Ordinance no. 1479 amended the Comprehensive Land Use Policy Plan Map and applied the Heavy Industry designation to Lots 1-4 and 22-25 of Block 9. Lots 18-21 were designated Low Density Residential. Refer to Figure 6. EXHIBIT B ATTACHMENT 0 LEGEND IOW DENSITY RESOENTIAL UEDARM DENSITY RESIDENTIAL • "Col DENSITY RESOfNTIAL Eo PARKS AND OPEN SPACE COMMERCIAL LIGHT NOUSTPY ® HEAVY INDUSTRY Q OFFICE r ▪ =AiKt R�wPitil'1� _' �C I --.� TUKWILA AMENDED COMPREHENSIVE LAND US MAD Figure 6: Exhibit B, Attachment H of City of Tukwila Ord. No. 1479. Map shows Riverton Annexation Area boundaries and approved comprehensive land use policy plan designations. Subject property is outlined in red. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Page 11 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative Ordinance no. 1480 amended the zoning map (see Figure 7). Lots 4 and 22-25 of Block 9 were zoned Industrial Park (C-M). Lots 18-21 were zoned Single Family Residence (R-1). Ord. 1481 adopted zoning code text amendments related to the Riverton Annexation. t Ilh l SIh ■• .6.111 tlmmapo # ••a•• .• rara—lr. awlrt rtr1 • w. •.•• • ».+IOW mg wm1E1R Irmo _ • ,t '' W'r/i.aiWWI ems M. • w. tg • • YOU li'''Sabi Mti• d R-1 I R-1 - R-4 :1RMH c-1 :3 C-2 C-M F-L) ® M-1 LIGHT INDUSTRY M-2 HEAVY INDUSTRY SINGLE FAMILY RE SIDENCE112.000; SINGLE FAMILY RESIDENCE (7200 S.F )1 LOW APARTMENTS MULTIPLE RESIDENCE HIGH DENSITY COMMUNITY RETAIL BUSINESS REGIONAL RETAIL BUSINESS INDUSTRIAL PARK I Urrwt Figure 7: Excerpt of Riverton Annexation Area zoning from City of Tukwila Ord. No. 1480. Subject property is outlined in red. Lots 18-21 are zoned R-1 and lots 22-25 are zoned C-M. On March 27, 1989 the Tukwila City Council voted to approve ordinance no. 1508 to annex the Riverton Annexation Area effective April 15, 1989. A zoning map was included with this ordinance confirming the zoning classifications applied in ordinance no. 1480 for the subject property (see Figure 8). I 1 R-1 SINGLE FAMILY RESIDENCE 7200I R-1 SINGLE FAMILY HESIUENUE 12,00 R-4 LOW APARTMENTS RMH MULTIPLE RESIDENCE HIGH DENSITY C-1 COMMUNITY RETAIL BUSINESS SINESS C-M INDUSTRIAL PARK 1&\\\�1` F-L) ® M-1 LIGHT INDUSTRY M-2 HEAVY INDUSTRY Figure 8: Excerpt of Riverton Annexation Area zoning map from City of Tukwila Ord. No. 1508. Subject property is outlined in red. Lots 18-21 are zoned R-1 and lots 22-25 are zoned C-M. In 1995, the City of Tukwila began to rewrite its comprehensive plan and zoning code to conform to the recently -adopted Growth Management Act. Ordinance no. 1757 repealed ordinance no. 1479 (among others) and adopted the 1995 Comprehensive Land Use Plan and Map for the City of Tukwila. Ordinance no. 1758 repealed ordinance no. 1481 (among others) and overhauled Title 18 TMC (Zoning Code) and adopted a new zoning map. The zoning code amended the number and names of zoning districts in the city. R-1 became LDR (Low Density Residential) and C-M became C/LI (Commercial/Light Industrial). Lots 18-25 appear to have been consolidated between the Riverton annexation in 1989 and the zoning map adoption in 1995. The lot consolidation did not affect the zoning boundary, resulting in a split -zoned lot. The zoning boundary was not changed in 1995, and the property remains split -zoned today. The existing trucking operation is nonconforming to the LDR use requirements in Table 18-6, TMC 18.09, and TMC 18.10.020. Page 12 of 15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative The Becker family sold the property in 2005 to C&D Wells, LLC. C&D Wells, LLC sold the property to Blue Nile Holdings, LLC in 2016. Blue Nile Trucking, LLC continues to operate a trucking business from the property. The initial zoning districts applied in 1988-1989 do not appear to have been based on existing conditions or uses. The trucking business was in active operation on the site (having completed improvements in the mid-1970s) at the time. The character of the neighborhood has changed dramatically since zoning was initially applied and continues to evolve to this day. Industrial uses have spread southward from the Duwamish Manufacturing Industrial Center (MIC) and SR-599. As a result, residential development has occurred generally further to the south of the site. E Marginal Way S has become increasingly used for freight and other large vehicles. The evolution of neighborhood character is a changed condition warranting an amendment to the zoning map. The amendment will also eliminate a split -zone condition, bring a legally -established nonconforming use into conformance with the TMC, and establish zoning more consistent with the conditions along E Marginal Way S. 4. The proposed amendment to the Zoning Map will be in the interest of furtherance of the public health, safety, comfort, convenience, and general welfare, and will not adversely affect the surrounding neighborhood, nor be injurious to other properties in the vicinity in which the subject property is located. The request would extend the Commercial/Light Industrial (C/LI) boundary from the approximate center of a parcel to include the full boundaries of the parcel. The C/LI zone allows a number of commercial and light industrial uses that are consistent with the character of E Marginal Way S and nearby industrial uses. Impacts to neighboring residential properties are not anticipated. The residential neighborhood has grown up around the existing commercial/industrial business and the eastern portion of the property is already zoned C/LI. The rezone will not invite new uses that are not already allowed adjacent to the residential area. Development requirements set forth in TMC Chapter 18.30, "Commercial/Light Industrial (C/LI) District," establish appropriate buffers, increase setbacks compared to those required under the LDR zone, require landscaping screening to separate the C/LI uses from residential development, and require a stream buffer from the east branch of Riverton Creek. See Table 1, below, for a comparison of C/LI and LDR dimensional standards. In addition to dimensional requirements, new developments must demonstrate adherence to performance standards, including standards adopted by the Puget Sound Air Pollution Control Agency for odor, dust, smoke, and airborne pollutants; nose standards adopted in in Chapter 8.22 TMC; and State and Federal standards for water quality and hazardous materials. Review under the State Environmental Policy Act (SEPA) provides substantive authority to mitigate potential adverse environmental impacts for future development. Design review is required for any new development within 300 feet of a residential zoning district, which would apply to the subject property. Design review is intended to create well - designed developments that are harmonious with the natural and manmade environments. Review criteria for C/LI developments are related to the following topics: • Relationship of structure to site; • Relationship of structure and site to adjoining area; • Landscaping and site treatment; Page 13of15 Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative • Building design; and • Miscellaneous structures and street furniture. Chapter 18.60 TMC sets forth design review criteria that will protect the residential neighborhood. Design review is completed either administratively by the Director of Community Development or quasi judicially by the Board of Architectural Review. Design review can include conditions of approval to address any potential issues that arise during review. Table 1: Comparison of C/LI and LDR dimensional requirements. Zoning Standard C/LI Zone LDR Zone Development Area None 45% Setbacks to Yards, • Front • Second Front • Sides • Rear minimum • 25 feet • 15 feet (near LDR) • 15 feet (1st floor near LDR) 20 feet (2nd floor near LDR) 30 feet (3rd floor near LDR) • 15 feet (1st floor near LDR) 20 feet (2nd floor near LDR) 30 feet (3rd floor near LDR) • 20 feet • 10 feet • 5 feet • 10 feet Height, maximum 4 stories or 45 feet 30 feet Landscape Requirements • Front • Sides • Rear • 15 feet (near LDR) • 15 feet (near LDR) • 15 feet (near LDR) None Environmental remediation has been completed on the site and any land -disturbing activities are required to be coordinated with the Department of Ecology to ensure any remaining contamination is appropriately remediated. A restrictive covenant has been recorded on the property to limit activities on the site to protect the environment and the public health, safety, and welfare. Conclusion The request, if approved, will rezone the western portion of parcel no. 7345600766 from Low Density Residential (LDR) to Commercial/Light Industrial (C/LI), thus removing the split -zone condition and recognizing the use that has occupied the site since at least the 1970s. Metro is seeking the rezone to facilitate its use of the property. The responses to the decision criteria set forth in TMC 18.84.020 consider the rezone within the larger context of the City's plan for this area, including the full scope of allowable uses within the C/LI zone. The same range of uses is currently allowed on the east portion of the subject property and, with buffers, setbacks, and landscaping requirements, redevelopment to a conforming use would offer opportunities to address site conditions or potential impacts and result in a net benefit to the neighborhood. • The proposal is consistent with the Tukwila Comprehensive Plan, including goals in the Community Image and Identity, Economic Development, Natural Environment, and Residential Neighborhoods elements. The proposal protects existing commercial/light industrial land and positions it for future redevelopment. Redevelopment of the property will occur in conformance with development and environmental regulations, and presents Page 14 of 15 • Rezone West Portion of Parcel No. 7345600766 from LDR to C/LI Exhibit F: Project and Decision Criteria Narrative significant opportunities to protect, enhance, or restore natural features. The rezone will eliminate a split -zone condition and create a clearly defined boundary between residential and non-residential uses. • The proposal is consistent with Title 18 TMC in general and the purpose and intent of the C/LI zone set forth in Chapter 18.30 TMC. The property is in an area characterized by a mix of commercial and light industrial uses and fronts along E Marginal Way S, a busy arterial. • Conditions have changed since zoning was applied in 1988-1989 and updated in 1995. The character of the neighborhood has changed dramatically: industrial uses have expanded to the north, especially with the establishment of the Duwamish Manufacturing Industrial Center (MIC). Residential development has occurred to the south and west, migrating away from the MIC. E Marginal Way S has become increasingly used for freight and other large vehicles. • The proposal is protective of the public health, safety, and welfare and will not adversely affect the surrounding neighborhood. Basic development standards, performance standards, and critical areas requirements mitigate potential adverse impacts to the residential neighborhood. Design review is required when new development occurs within 300 feet of a residential zone, which will ensure the use and site design is fully compatible with existing residential neighborhoods. Metro believes that this application demonstrates that a rezone is consistent with and satisfies the approval criteria in TMC 18.84.020. Metro therefore respectfully requests approval of the rezone request. Page 15 of 15 Otak EXHIBIT G Technical Memorandum To: Gillian Zacharias and Tom Paine, King County Metro Transit From: Jeff Gray, Senior Wetland Biologist Stephanie Modjeski, Biologist Copies: Otak: Chad Weiser, Cristina Haworth Date: December 10, 2018 Subject: Critical Areas Assessment and Proposed Rezoning Review: 12677 E Marginal Way S Project No.: 32870.E Introduction King County's Department of Transportation (Metro Transit) requested Otak, Inc. (Otak) to identify and characterize critical areas at 12677 E Marginal Way S (Parcels #7345600766 and #73456100685) to support the potential acquisition of the properties. Metro Transit is also planning to submit a rezoning request to the City of Tukwila for parcel #7345600766. This technical memorandum presents the findings of the reconnaissance level critical areas study and Tukwila Municipal Code (TMC) review. The environmental impacts of the proposed rezoning are also assessed to support the State Environmental Policy Act (SEPA) compliance process for the non -project action by the City of Tukwila. Critical areas reviewed for this memorandum include wetlands, watercourses, and fish and wildlife habitat conservation areas (FWHCAs) as regulated by TMC Chapter 18.45 (Environmentally Sensitive Areas). The two parcels, herein referred to as the project site, are located at the corner of S 128th Street and E Marginal Way in the City of Tukwila, King County, Washington (Figure 1 — Vicinity Map). Otak biologists completed a field survey to identify and characterize critical areas and their buffers on the project site on November 29, 2018. Site photographs and figures are included with this memorandum. Methods Methods to complete the reconnaissance level critical areas assessment included reviewing published environmental documentation and completing a field visit to investigate the presence and extent of watercourses, wetlands, FWHCAs, and associated buffers on site. The presence of wetlands was investigated using the three -parameter approach detailed in the Corps of Engineers Wetlands Delineation Manual (USACE 1987) and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region (Version 2.0) (USACE 2010). Wetland boundaries were estimated for the purpose of the reconnaissance -level field survey. Wetland habitats were classified according to the Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, et al. 1979), and the hydrogeomorphic (HGM) wetland classification as adopted by Hruby (2004). Wetland functions were rated using the 2004 Washington State Wetland Rating System for Western Washington (Hruby 2004), and preliminary wetland buffer widths were determined by wetland rating per TMC 18.45.080 (Wetlands Designations, Ratings and Buffers). k:lproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum_2018-1210.docx RECEIVED DEC 13 2018 2731 Wetmore Avenue, Suite 300 Everett, WA 98201 • Phone (425)493-5221 otak.com Community Development Page 2 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 Watercourses were identified based on indicators of flowing water and an ordinary high-water mark (OHWM), and classified according to TMC 18.45.100 (Watercourses Designations, Ratings and Buffers). Identification of OHWM was based on the evaluation of stream physical characteristics, such as: the natural line impressed on the bank, change in sediment and vegetation characteristics, wracking, erosion/scour, and silt deposits. The presence of FWHCAs in or near the project site was assessed by visual observation during the field visit in combination with reviewing available published information. Background Review Background information reviewed prior to completing the site investigation included the following resources: • City of Tukwila Comprehensive Plan & Zoning Map (City of Tukwila 2015) • City of Tukwila Sensitive Areas Map (City of Tukwila 2015a) • King County iMap (King County 2018) • U.S. Fish and Wildlife (USFWS) —National Wetland Inventory (NWI) (USFWS 2018) • Washington Department of Natural Resources (DNR) — Forest Practices Application Mapping Tool (WDNR 2018) • WDFW — Priority Habitats and Species (PHS) on the Web (WDFW 2018) • Washington Department of Fish and Wildlife (WDFW) — SalmonScape (WDFW 2018a) The City of Tukwila Sensitive Areas Map (attached) identifies one Type 2 stream within the project site, herein referred to as the east branch of Riverton Creek. The east branch of Riverton Creek is mapped as an open channel west and north of the project site boundaries and piped on site. The stream is piped downstream of the project site along E Marginal Way S from approximately S 126'h Street to State Route (SR) 599. Type 2 streams are defined as Type F (fish) watercourses per TMC 18.45.100 and have a 100-foot-wide buffer. 100-foot-wide stream buffers are shown extending from the open portions of the stream channel onto the project site. No other wetlands or watercourses are mapped on or near the project site by King County, USFWS, WDNR or WDFW. WDNR and WDFW map the east branch of Riverton Creek up to SR 599 north of S 120th Place, but no watercourse is shown south of that intersection. WDNR types the east branch of Riverton Creek as a Type N (non -fish) watercourse. The west branch of Riverton Creek is shown flowing parallel to SR 99 approximately 1,000 feet west of the project site. The west branch of Riverton Creek is Type F (fish) per WDNR and a Type 2 watercourse per the City of Tukwila's Sensitive Areas Map. Per the City's Sensitive Areas Map, no FWHCAs are mapped on or within the vicinity of the project site. No areas of geologic instability or abandoned coal mines, two additional types of regulated environmentally sensitive areas, are mapped on the project site as well. Findings Site Description The project site is located within amongst residential and commercial properties. Single-family residential neighborhoods are generally located west of the project site, and commercial properties are located to the north and south along E Marginal Way S. The two parcels combined are approximately 1.85 acres in size and currently used to store small motor vehicles and semi -truck trailers in a partially paved storage yard operated by the Blue Nile Trucking. Commercial buildings are in the southeast corner. The western and northern edges of the project site are bordered by coniferous trees with herbaceous plants in the understory and a chain -link fence. Patches of invasive, non-native Himalayan blackberry (Rubus armeniacus) are also located along the fence lines. In general, k:Iproject132800132870Iprojectdocs132870b bluenile_criticalareaslca memoltechnical memorandum_2018-1210.docx Page 3 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 the western half of the storage yard is gravel and the eastern half is paved. A catch basin is present within the gravel lot in the northwest corner of Parcel #7345600766 that provides access to a piped stream underground. Watercourses The east branch of Riverton Creek was identified on the project site. The stream emanates from a culvert immediately west of the chain -link fence bordering the western edge of parcel #7345600766. The stream has an approximately 7-foot wide bank full width and flows for approximately 25 feet through a rock -lined channel before entering a 36-inch corrugated metal pipe culvert at the edge of the gravel storage yard. Concrete chunks and other debris was observed in the channel. The stream is piped approximately 135 feet to the northeast beneath the gravel lot and turns north for approximately 60 feet before discharging at the northern edge of the property into an open channel. The east branch of Riverton Creek is a Type 2 (fish) watercourse per TMC 18.45.100 (Watercourse Designations, Ratings, and Buffers). Open, Type 2 watercourses have a standard 100-foot-wide buffer per TMC 18.45.100.C. The TMC does not state explicitly whether piped portions of streams have standard buffers or not, but the piped stream on site does not appear to have a standard buffer width per the City's Sensitive Areas Map. All commercial and industrial buildings are required to have a 15-foot set -back and all other development shall have a 10-foot set -back from the buffer's edge. Buffer conditions are degraded and low functioning due to the existing gravel and paved lot and minimal vegetation cover. The stream buffer overlaps the gravel lot as shown on Figure 2 (Critical Areas). Per DNR's typing methodology, watercourses with perennial flows that have defined channel two feet or greater within the bank full width and have a gradient of 16 percent or less are considered Type F streams unless the stream has been proven not to contain fish using methods described in Forest Practices Board Manual Section 13. Due to the perennially flowing water, channel characteristics, and approximate three percent grade downstream of 37th Avenue South and through the project site, the east branch of Riverton Creek is classified a Type 2 (Fish) watercourse. Wetlands Two riverine wetlands (Wetlands A and B) were identified off -site along the east branch of Riverton Creek. Estimated wetland boundaries are shown on Figure 2 (Critical Areas). Wetland A is located north of the subject property between the northern property edge and S 126th Street and is situated between residential and commercial land uses. Wetland A is classified as palustrine forested habitat under the Cowardin classification system, and as riverine under the HGM system as adopted by Hruby (2004). Dominant vegetation in Wetland A includes black cottonwood (Populus balsamifera spp. trichocarpa), Pacific willow (Salix lucida), Sitka willow (Salix sitchensis), salmonberry (Rubus spectabilis), and creeping buttercup (Ranunculus repens). Wetland B is located west of the subject property within the back yard of the abutting residential property. Wetland B is classified as palustrine emergent habitat under the Coward classification system, and as riverine under the HGM system as adopted by Hruby (2004). Dominant vegetation in Wetland B includes broadleaved cattail (Typha latifolia) and creeping buttercup. Wetlands A and B were preliminarily classified as Category III wetlands. Both wetlands have a standard buffer width of 80 feet per TMC 18.45.080.D. Wetland buffers on the subject property are superseded by the 100-foot- wide stream buffer as shown on Figure 2 (Critical Areas). k:lproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum_2018-1210.docx Page 4 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 Proposed Zoning Changes and Code Review The following section includes an assessment of the potential environmental impacts of the proposed rezoning relative to TMC Chapter 18.45 (Environmentally Sensitive Areas). This assessment is intended to support the SEPA compliance process for the proposed rezoning. An Endangered Species Act Screening Checklist is also enclosed with this memorandum and is expected to accompany the non -project action SEPA checklist for the proposed rezoning. Proposed Rezoning Parcel #7345600685 and the eastern half of Parcel #7345600766 is zoned Commercial Light Industrial (CLI). The western half of parcel #7345600766 is zoned Low Density Residential (Figure 3 — Existing Zoning). Metro Transit proposes to re -zone Parcel #7345600766 entirely as CLI for consistency with the existing and proposed future land use. Environmental Impacts and Redevelopment Opportunities Redevelopment with either residential or commercial/light industrial uses could create substantial opportunities for environmental improvements and enhancements of ecological functions that are currently degraded. The project site is currently used for commercial/light industrial purposes, and re -zoning the western portion of parcel #7345600766 would have no noticeable effects to the existing low functioning watercourse and wetland/stream buffers on site or adjacent to this area due to the existing legal, non -conforming use. Under new development proposals, existing legal and nonconforming land uses within the current wetland/stream buffer areas could be removed, and new developments would be required to conform to the provisions of TMC Chapter 18.45 (Environmentally Sensitive Areas) that limit or do not allow development within critical areas or critical area buffers. For example, standard watercourse buffers may be reduced only where the buffer is significantly degraded due to existing development within the prescribed buffer, provided that the existing buffer is enhanced in accordance with an approved buffer enhancement plan (TMC 18.45.100.E). The standard buffer width cannot be reduced by more than 50 percent under any land use proposal. Per TMC 18.45.100.E, any buffer reduction proposal must demonstrate that it will not result in direct, indirect or long-term adverse impacts to watercourses, and that an on - site buffer enhancement plan is prepared. Due to the currently degraded buffer conditions on site, a buffer reduction request would likely be justified and approved under any future development proposal. Allowed development or other activities within critical areas and critical area buffers —and any potential exemptions for such alterations —would pertain to both LDR and CLI zoned lands. The City of Tukwila's environmentally sensitive areas code will pertain to all zoning areas and does not differ between LDR and CLI land uses. Redevelopment may provide opportunities for mitigation and/or wetland and stream buffer enhancement in the disturbed buffer areas using best available science, with an anticipated improvement of ecological functions provided by the critical area and its buffer. Any proposed development plan within watercourse buffers would need to include a buffer mitigation plan per TMC 18.45.110 (Watercourse Alterations and Mitigation) and buffers would need to be restored to an enhanced state (TMC 18.45.110.D.2). Because all land uses and proposed development must comply with the City of Tukwila's environmentally sensitive areas code, significant impacts to environmentally sensitive areas and their buffers are not expected to result from the proposed zoning change. kAproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum 2018-1210.docx Page 5 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 References City of Tukwila (City). 2015. Comprehensive Plan & Zoning Map. Available online at http://www.tukwilawa.qov/wp-content/uploads/Comp-Plan Zoninq-Map.pdf. -2015a. Sensitive Areas Map. Available online at http://www.tukwilawa.qov/wp-content/uploads/2015/11 /Sensitive -Areas -Map. pdf. Cowardin, L.M., V. Carter, F. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deepwater habitats of the United States. FWS/OBS-70/31. 131 pp. Washington, D.C: U.S. Fish & Wildlife Service, Office of Biological Services. Hruby, T. 2004. Washington State wetland rating system for western Washington — Revised. Washington State Department of Ecology Publication # 04-06-025. Olympia, Washington. King County. 2018. GIS Center: King County iMap Interactive Mapping Tool. Available online at https://www.kinqcounty.qov/services/gis/Maps/imap.aspx. U.S. Army Corps of Engineers (USACE). 1987. Corps of Engineers Wetland Delineation Manual. Technical Report. Y-87-1. Vicksburg, Mississippi: U.S. Army Corps of Engineers Environmental Laboratory. -2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region, Version 2.0, ed. J.S. Wakeley, R.W. Lichvar, and C.V. Noble. ERDC/EL TR- 10-3. Vicksburg, Mississippi: U.S. Army Engineer Research and Development Center. U.S. Fish and Wildlife Service (USFWS). 2018. National Wetlands Inventory website. U.S. Department of the Interior, Washington D.C. Available online at http://www.fws.qov/wetlands. Washington Department of Fish and Wildlife (WDFW). 2018. PHS on the Web. Available online at http://apps.wdfw.wa.qov/phsontheweb/. -2018a. SalmonScape. Available online at http://apps.wdfw.wa.gov/salmonscape/. Washington Department of Natural Resources (WDNR). 2018. Forest Practices Application Mapping Tool. Available online at https://fortress.wa.qov/dnr/protectiongis/fpamt/default.aspx. Enclosures: • Figures: 1 (Vicinity Map), 2 (Critical Areas), 3 (Existing Zoning) • City of Tukwila Sensitive Areas Map • City of Tukwila Endangered Species Act Screening Checklist k:Iproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum 2018-1210.docx Otak Site Photographs East branch of Riverton Creek emanates from a culvert along the western boundary of parcel #7345600766 and flows northwest for approximately 25 feet before flowing underground through a 36-inch corrugated metal pipe (see Photo 2) and discharging into an open channel north of the northern boundary of parcel #7345600685. k. project1328001328701projectdocs132870b bluenile_criticalareaslca memoltechnical memorandum 2018-1210.docx 2731 Wetmore Avenue, Suite 300 Everett, WA 98201 • Phone (425)493-5221 otak.com Page 7 Critical Areas Assessment and Proposed Rezoning Review December 10, 2018 2. East branch Riverton Creek enters a 36-inch wide corrugated metal pipe culvert beneath the gravel lot near the western property boundary of parcel #7345600766. 3. View of the east branch of Riverton Creek where it discharges off -property north of parcel #73456000685. k:Iproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum 2018-1210.docx Critical Areas Assessment and Proposed Rezoning Review Page 8 December 10, 2018 4. Typical buffer conditions within the gravel lot in the northwest corner of the project site View south west. 5. View of general site conditions in the storage yard and the separation of gravel and asphalt cover. View east. k:lproject1328001328701projectdocs132870b bluenile criticalareaslca memoltechnical memorandum 2018-1210.docx 5 110`" Gt -0 v n i f s 't S 12ti1h .iI Y N i L Y i •i _, 1.7 _ .4 .11 lird Ave S t a 4 c PROJECT LOCATION R c f1 c 11 n tr. 5 124Ih SI TuAmb Commune, CJ rWri Il Nth St 42d ri Ave S v S 130th St m /, c N - m Y fi 4 a Q O •! Y .c 7 y G 11,, 51 DQ • , , Sr a�! r v I:risrbn Park Q • F St FIGURE 1 VICINITY MAP BLUE NILE TRUCKING, LLC 12677 E MARGINAL WAY S TUKWILA, WASHINGTON LEGEND ION Project Boundary Parcels FEE 0 500 1,000 Otak K/PROJECP,3280U2870,CADDIGIS/MXDS1ENVIRONMENTAL_VICINITYMAPMXD DATE. 12/5/2018 • • FIGURE 2 CRITICAL AREAS BLUE NILE TRUCKING, LLC 12677 E MARGINAL WAY S TUKWILA, WASHINGTON Parcel#7345600685 Parcel #7345600766 S 128th Street Legend OProject Boundary Type 2 Stream -Estimated ----- Edge of Pavement Wetland Buffer (80ft) Stream Type Parcels Wetland -Estimated --- - Open Direction of Flow Stream Buffer (100ft) Piped 100 FEET 200 200 Otak K IPROJECM28001728701CADDIZISMXDSENNRONMENTAI._CAS2.MXD • • Parcel #7345600766 FIGURE 3 EXISTING ZONING BLUE NILE TRUCKING, LLC 12677 E MARGINAL WAY S TUKWILA, WASHINGTON Legend OProject Boundary Zoning Type Parcels Commercial Light Industrial Low Density Residential Neighborhood Commercial Center 0 so 100 ■ Feet 200 irk Otak K:IPROJECT13280B132B701CADDIGISIMXDSZONINGMAP M X0 • • City of Tukwila Sensitive Areas Map Legend Tukwila City Limits • Potential Watercourse Daylighting Sites Type 2 Stream — Type 2 Stream in Pipe Type 3 Stream Type 3 Stream in Pipe Type 4 Stream Type 4 Stream in Pipe Type 2 Watercourse Buffer (100') Type 3 Watercourse Buffer (80') Type 4 Watercourse Buffer (50') Potential Wetlands II Category 1 & II Wetland Category III Wetland • Category IV Wetland E Category I & II Wetland Buffer (100') Category III Wetland Buffer (80') Category IV Wetland Buffer (50') Slope Classifications 2 Landshde potential is moderate: slope is between 15% and 40w and underpn by retetrrey permeable sods _andshde paternal a h.pn: slops is between 15% and CO:. and 3 rMenam by relatively even. able sails or by bedroct aao incLdn al: areas slapmg more than 405s . Landslide potential Is very high: ncfvdea :wino areas arts maopable 4.... groundwer seepage end canting mappable landslide deposltsregardesa of abpe. • Approximate locatzna of coal mums from Waldron. 1942 e t Jn Jk • 1 rt. 1,&_4r*JI 2. • 4. I fr EXHIBIT I Page 1 • ,*.igrtrtR!r:-7.•f"kk.M.WEMNraiiNMMPINIMIIIIrc- • . ' 6442/12.111. ,SAFxrpro J ar•O‘ IP „ . —4 a a a. r-F —11 4 ---- STORM DRA.iNi EASEMENT --15' STREAM SETBACK 100' STREAM BUFFER 0 F F CE 71,4111V",111.-- 1,1 111P OFFICE WAREHOUSE 2*. TRAJNLNG PAY OFFICESPACE gaPi- ApP 4.11,,r.21t AIL 25' FRONT SETBACK 12677 E. MARGINAL WAY S. EXAMPLE OF POTENTIAL USE & LAYOUT 4•• = ACK PARCEL LINE SCALE:Ye TO 1' c 0 2 SHEET: RE OEC 1.3 2013 Commun ty DeyelilprnDnt co g 5 re a a. 0 z w 0 cNi SC-BN-CP-1B , 15-.:., .. ' SI DE SETBACK REVISIONS \0 0 . / / / / . I 25' FRONT SETBACK i a . . . . rue," k sTosEFtmmE.NRAT iN • OFFICE , A DECCommun : - 1...... • roe% 0 \ Developm 1 / . V' I . OFFICE / . \ . X % -7/ LAI King County TRANSIT CAPITAL PROGRAMS I ...fr Pix • ...::::::. •:. .•:•:-.:::.• • . ..:•:•.- \ \ • k.) • V -- / TRAINING BAY <St PROGRAM MGR JEFF ARBUCKLE PERIMETER FENCE 0 \\\ \ 0 0 OFFICE SPACE 111410GRAK OPERATIONAL CAPACITY GROWTH AREA SOUTH CAMPUS MU: 12677 E MARGINAL WAY S CONCEPTUAL PLAN I: .-. ... .. . o 11 ,' A*. ;illtiV. :: *OK •:: ::: ::ir ''--- ttc:Ix ;t.*: ] •:::: ... . . _ _ _ . _.--- 25' FRONT SETBACK 15' STREAM SETBACK PARCEL LINE ' EXHIBIT I 100' STREAM BUFFER Page 2 EXAMPLE 12677 OF' E. MARGINAL POTENTIAL WAY USE S. & LAYOUT N . A . SHEET SC-BN-CP-1A _ r SCALE: Y32. TO 1' SCALE CHECK 0111 ity ent • • City of Tukwila - Proposal to Rezone West Half of Parcel 7345600766 from LDR to C/LI - Existing Land Use w/in 1,000 feet ty_ T 11 The information included on this map has been compiled by King County staff tom a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 12/14/2018 EXHIBIT H Page 1 OEC 13 20 4�, Comm meet f)evelop N � A King County 1 Tukwila Comp Plan and Zoning Map Change Proposal - Non -Conforming Land Uses in the Vicinity of Parcel 7345600756 skr, parcel 2063600020 Present use: Single Family (C/I Zone) Address: 12527 35TH AVE S 98168 Parcel 206360003: Present use Single Family (C/I Zone) Address: 3418 S 126TH ST 98168 1 Parcel 7345600675 Present use: Single Farnil /Church (Res Use/Zone) ddr-ss: 2607 EAST .r4MINAL WAY S 98168 Parcel 7359600075 Present use; Duplex (LDR Zone) Address: 3528 S 130TH ST 98168 The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product King County shall not be liable for any general, special, indirect, incidental, or consequential damages including. but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Parcel 00 1.1 Present use: Office aui ding/Bus Parking (NCC Zone) Address: 3825 S 128TH ST ParFl 2384200055 Present use: Single F ily (C/I Zone) Address: 12909 EAST ARGINAL WAY S 98168 Date: 12/14/2018 EXHIBIT H Page 2 A A 1 {{1}}} » Nf ''.1'' i • , Kti j ia/ .,L1rt � 7 Cnmmriniiv r,, King County • • City of Tukwila - Proposal to Rezone West Half of Parcel 7345600766 from LDR to C/LI - Vicinity Map I)NVamist' 4-1 In V'Ti'i1 Tukwila .1t 115tt st r V, r4. TI t hernS 1201 ilE sc _1llLntuwn �P Subject Property et V I-11dltc S < Pa R y c tN P r`1 G. rth �' a Tao 1 320 at rk RiVt:►'tui' , 133rt5 `'' Lat 0 n a s t:ittt =t tttytaNtt- ' 138th 5t Tat: b.-3tati ICA 17 rrd r n S 142nd St SeaTac llverton lath Ave r i r h 1 e Mr • !4LT' t 4.7 146th St 02C t.0tt7 COftlrim' n tl 14E3th Develop_ nt tl1 S 124th St 1" Jh% U:t ottlRtt11tItyf Pnte'�t LP / C S i 3 31' (9 • rr'/4 Es L' 4)Ste1 Fu�t;i Golf Links t :t h •rr .1 riith Ave 5 King County As se �o s ���.cei n CTIo lty GIS Center, King County, K ing county Assess ors .e1ffl - of ithg u Y IL Center The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or w arranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or Information on this map is prohibited except by written permission of King County. Date: 12/14/2018 King County City of Tukwila - Proposal to Rezone West Half of Parcel 7345600766 from LDR to C/LI - Properties w/in 500 feet 1 0 230 49082 734 0600 602 1 206310000 5.1063 60002 0 1 20-W10351 2 0636000 36 20 6360092 5 12063600030 1 1 1 7340600623 734060062C 7 3 4 56 00 :-.y, -; 1I5 w I 7 34 0600620 7.456110g.:2101 . ....„. 40600,9i 71../___________-1 35 q600160 CP 735960031 0 7 3 59 600 350 73 59 600 35 5 • .3 59 600 37 5 7 34 06006 22 73 45600 385 7340600480 7345 600850 7 35 96 0027 359001 85 73519600280 73 59600k 5 60 07 73.59600270 7;3 7 .3.59 600250 / 3596002,1 5 7 359600240 73596:00235 7 3 9 7359600155 7 3596001 50 73596( 7345600580 • ,325 i • 9600( 35 0 40 7 35 9800 1 4 5 7359600/4C (359601'1' 7 3596001 35 7359600056 7,3456 ()I') :::456005,D 45 t300 5. 5 2384 20001 0 73596001:30 P7359600D46 734 7 359600125 73-596000/5 7-3196 .001095 7 3594' 0 00 65 7 35960011 5 I I 7 35 96000 7 5734 0600 750 59800230, 3"5960 01 1 0 7 9 452)01 7 94 2 0 ' 94 20(102 C.) 4 52 00 c 20,:. )3., 941320, 045 7 94 20( • 9 4 2 . 4 / 3406006 7 34,0/3007, 7410 60 7 4060 0761 ....340800 1060077 r. 734 160c \\7 59600 .38) 73 40600 8'12— 7340 800 8277 .3416002151 n 4 C 6 00 821 7 34060081 11 912080001 05 1- CO C72. • 7340600682 r.; '10 Goo 7.340 60074 0 Cr) 7:3406(3.1080 Ill I 1 1 11 1 1 , II \ li \ I 111 11 I TZ \\.C: 73 40 6006 ),,,8 ••• I • 73 40 600 687 - 't ‘4) 734060n748 co f,C5 7 340 60 084 6 ;-c co r40 600 8A3 7 34 060 0845 7 .345 60 10.0 734.,-)r.orv4 73456010 75 -L 73406 0074 57340 60074 2 1340600 72 0 7-34 5601 085 +;..0 7 34 10 00 08 \ 734560 1 Od 0 I teliNVVIIL Commun Center 01 79003 239 1 02,304 D R 000 4800 003 „in 2 7 1 6.000030 000 -46 4 c\I (-3 , Dri =4.0 OEC 201B Community Development 06 wo41 jm Kg ® mom ffRe Ring c 0 Centerunly IS /34 16002051 N. 73,4560 1105N • , :•••7 359600140735 a6 007-601 7 3 59 600•3:2,- - • - - 213 ;v.: 73 596 00 \-.) • - " ' 3 7 3 .32400 0507 3 40600 80 3 4'7 6008-1.31 The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 12/14/2018 EXHIBIT E L41 King County Name (resorted) ANTHONY C and EVELYN U JACKSON BERNARD and MENDI S ROBERTS JAMES W and YVONNE C GRAVES CARLOS and VERONICA RASMUSSEN TUKWILA SCHOOL DISTR #406 XIULAN LIN VUI NGUYEN UTILITIES SERVICE CO INC TUKWILA RENEWAL LLC KENNETH LIU and MONICA CHEATH MARTHA STREBINGER TUKWILA RENEWAL LLC ROBERT STAUDACHER TUKWILA RENEWAL LLC BONITA and GARDON ARMSTRONG DAVID LAM TRI NGUYEN CLINTON RICHARD JONES WING-HO KONG XIAN OUYANG JACK and REGINA TUCCI LARRY D HALL ALICE R SMITH JACKIE DEMPERE MICHAEL and LISA BRENNER D BOSTEDER ALAN JAMES and TOMOMI RAUNIG BAO YU LIANG LILIAN K and DEXTER CHAMBERS RANDY L and KATHY JENSEN RONDA BRACKEN SEAN P WILLMORE VIRGINIA M WHITEZEL GREGORY I EGASHIRA SUFIAN and ABEER HAMAD TENANT UNIT 110 TENANT UNIT 100 TENANT UNIT 101 TENANT UNIT 201 Mailing Address 3803 S 128TH ST 3807 S 128TH ST 3809 S 128TH ST 3805 S 128TH ST 3825 S 128TH ST 12909 EAST MARGINAL WAY S 3850 S 126TH ST 12608 EAST MARGINAL WAY S 4036 S 128TH ST 12608 40TH AVE S 12604 40TH AVE S 910 MARKET ST 4020 S 128TH ST 910 MARKET ST 4015 S 126TH ST 4021 S 126TH ST 4027 S 126TH ST 4035 S 126TH ST 12623 42ND AVE S 4044 S 128TH ST 4049 S 128TH ST 12902 EAST MARGINAL WAY S 4102 S 130TH ST 4033 S 128TH ST 4027 S 128TH ST 12822 EAST MARGINAL WAY S 12812 EAST MARGINAL WAY S 12800 EAST MARGINAL WAY S 4037 S 128TH ST 4106 S 130TH ST 4020 S 130TH ST 4026 S 130TH ST 4021 S 128TH ST 4016 S 130TH ST 4055 S 130TH ST 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S City, St, Zip TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 KIRKLAND, WA 98033 TUKWILA, WA 98168 KIRKLAND, WA 98033 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 RECEIVED DEC 131018 Community Development TENANT UNIT 202 TENANT UNIT 301 TENANT UNIT 302 SAFIAN and ABEER HAMAD CHAMPA ASSOCIATION INC KHIEM and THANH-HIEN T NGUYEN CHERYL BOLTON BRIAN P KENNEDY MARK and PAIGE BAUMGARTEN DENNIS M and YVONNE L DUNNE ISAAC S CAPELOUTO TRUST GENE JULIUS JR and GENE J ROSSO GENE JULIUS JR and GENE J ROSSO GENE J and ROBERTA LROSSO GENE JULIUS JR and GENE J ROSSO INTERNATIONAL GATEWAY EAST MARGINAL ISLAND PROPERTIES TENANT UNIT 210 TENANT UNIT 110 TENANT UNIT 200 TENANT UNIT 100 ERITREAN KIDISTI MARIAM ORT BLUE NILE HOLDINGS LLC BRIE R CAMPBELL TENANT UNIT A TENANT UNIT B TENANT UNIT C TENANT UNIT D BRIE CAMPBELL JONATHAN and BRIE CRABILL TINA M CARBONATTO THOMAS RL BEUSLINCH WILMA M PATAPOFF TUKWILA CITY OF DARRELL LEE QUEALEY JEFFREY M WONG ANNE M and SEAN C DIMOND BLUE NILE HOLDINGS LLC JAMES LIONEL and BRUCKER TOCHER DIANA M DOOPER 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 12910 EAST MARGINAL WAY S 4010 S 130TH ST 6304 47TH AVE S 4041 S 128TH ST 12822 37TH AVE S 12802 37TH AVE S 12830 37TH AVE S 12812 37TH AVE S 12449 EAST MARGINAL WAY S EAST MARGINAL WAY S 12521 EAST MARGINAL WAY S 12539 EAST MARGINAL WAY S 3732 S 126TH ST 3716 S 126TH ST 2514 LAKE PARK DR S 12601 EAST MARGINAL WAY S 12601 EAST MARGINAL WAY S 12601 EAST MARGINAL WAY S 12601 EAST MARGINAL WAY S 12607 EAST MARGINAL WAY S 12633 EAST MARGINAL WAY S 3725 S 126TH ST 3725 S 126TH ST 3725 S 126TH ST 3725 S 126TH ST 3727 S 126TH ST 3723 S 126TH ST 3721 S 126TH ST 3717 S 126TH ST 3709 S 126TH ST 3703 S 126TH ST 6200 SOUTHCENTER BLVD 3714 S 128TH ST 3720 S 128TH ST 3726 S 128TH ST 12677 EAST MARGINAL WAY S 3535 S 126TH ST 3525 S 126TH ST TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 SEATTLE, WA 98118 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 SEATTLE, WA 98144 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98188 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 THOMAS J BALZARINI JOHN A KURTTI CHERYL M COSTELLO PHILLIP A HIBBS CURTIS ALLEN CLEAVELAND JULIAN SANCHEZ SHAWN D and KALYANA EVELYN TIM CLINGMAN HELEN HANG NGUYEN SHEILA ANN and JORD BUTTERFIELD SHEILA ANN and JORD BUTTERFIELD TONY ALVARADO JUAN DELREAL ELIZABETH DE PALMA JASMINE QUIROZ DAVID and MEGAN J WYBLE R SCHNEEBELI XIULAN LIN CHAMNONG SAENGPRASEUTH SOMSACK SAENGPRASEUTH RUTHANN L DUCKERING KELVIN and LI FAYE WONG ORLANDO R PALOMA LOWELL and GLENNA JOHSON BILL D NGUYEN DAVID V LAM KHA and CHRISTY TRAN HOANG STELLA THAO and DUC-THAN NGUYEN BOPHARY and HUNG DU CAM TU THI NGUYEN THU T and RUSSEL A WENDE BILL D NGUYEN 12611 37TH AVE S 12615 37TH AVE S 12621 37TH AVE S 12633 37TH AVE S 3717 S 128TH ST 3712 S 130TH ST 3716 S 130TH ST 3720 S 130TH ST 3802 S 130TH ST 3808 S 130TH ST 3810 S 130TH ST 3816 S 130TH ST 3820 S 130TH ST 3826 S 130TH ST 3832 S 130TH ST 3836 S 130TH ST 12923 EAST MARGINAL WAY S 1432 MONTEREY AVE NE 3525 S 128TH ST 3531 S 128TH ST 12829 37TH AVE S 12815 37TH AVE S 12817 37TH AVE S 12835 37TH AVE S 1366 BENT DR 4002 S 126TH ST 4006 S 126TH ST 4012 S 126TH ST 4018 S 126TH ST 4024 S 126TH ST 4028 S 126TH ST 1366 BENT DR TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 CAMPBELL, CA 95008 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 TUKWILA, WA 98168 CAMPBELL, CA 95008 The materials listed below must be submitted with your application unless specifically waived by the Department of Community Development (DCD.) Please contact the DCD if you think that certain items are not applicable to your project and should be waived, or should be submitted at a later date for use at the public hearing (e.g. colored renderings). Application review will not begin until your submittal is determined to be complete. ADDITIONAL MATERIALS MAY BE REQUIRED. The initial application materials allow project review to start and vesting the applicant's rights; however, these initial requirements in no way limit the City's ability to require additional information, as needed, to establish consistency with the decision criteria. DCD staff are available to answer questions about application materials at 206-431-3670. Check items submitted with application Information Required. May be waived in unusual cases, upon approval by the Planning Division of the DCD. APPLICATION MATERIALS: EXHIBIT A Submitted 1. Application Checklist (1 copy) indicating items submitted with application. Submitted 2. Completed Application Form (1 copy) 3. Completed and notarized Affidavit of Ownership and Hold Harmless Permission to Enter Property (1 copy) Submitted 4. Map Change Application Fee : See Land Use Fee Schedule Submitted 5. SEPA Environmental Checklist and fee PUBLIC NOTICE MATERIALS: Will complete once application is complete 6. Payment of notice board fee (see Land Use Fee Schedule) to Fast Signs Kent OR provide a 4' x 4' public notice board on site within 14 days of the DCD determining that a complete application has been received (see Public Notice Sign Specifications Handout) Submitted 7. Fee as established by the Land Use Fee Schedule for generating mailing labels; OR an excel spreadsheet of mailing labels for all property owners and tenants (residents and businesses) within 500 feet of the subject property. Each unit in multiple family buildings e.g. apartments, condos, trailer parks --must be included. Once your project is assigned to a planner, you will be required to provide an electronic copy of the mailing label spreadsheet in the following format: Name, Street Address, City State Zip, with each of these fields as an individual column: Name Street Address City, St, Zip Mr. Smith 1234 Park Ave S Tukwila WA 98188 PLEASE NOTF,: Regardless of whether you pay the City to generate the mailing labels or you provide them, there is an additional fee for postage and material as listed under Public Notice Mailing Fee on the Land Use Fee Schedule. You will receive a separate bill for this fee and payment is due prior to issuance of the decision. Submitted 8. If providing own labels, include King County Assessor's map(s) that shows the location of each property within 500 ft. of the subject lot. RECEIVED DEC 13 2010 Community Development Check items submitted with application Information Required. May be waived in unusual cases, upon approval by Planning Division of the DCD. PROJECT DESCRIPTION AND ANALYSIS: Submitted 9. Written response to the Decision Criteria (TMC 18.84.020) that is included in this application packet. (One copy) Submitted 10. Sensitive area studies such as wetland or geotechnical reports, if needed, per Tukwila's Sensitive Areas Ordinance (TMC 18.45). See Geotechnical Report Guidelines and Sensitive Area Special Study Guidelines for additional information. (Four copies) Submitted 11. Map of surrounding existing land uses to 1,000 foot radius. (Map size limitation is below under Site Plan.) . SITE PLAN: Seven copies plus 1 set of all plans reduced to either 8 1/2" x 11" or 11" x 17" X 12. (a) The site plan must include a graphic scale, north arrow and project name. Maximum size 24" x 36" X (b) Existing and proposed building footprints X (c) Vicinity Map with site location, does not have to be to scale X (d) Landscape areas sufficient to meet Zoning Code requirements, planting plan is not required X (e) Parking lots, driveways and access roads X (f) Loading and service areas X (g) Fences, rockeries and retaining walls X (h) Proposed lot and tract lines if applicable N/A (i) Location of all tracts to be dedicated to any public or private purpose with notes stating their purpose X (j) Plan showing the location of all sensitive areas (e.g. streams, wetlands, slopes over 15%, coal mine areas and important geological and archaeological sites) and their buffers and setbacks X (k) Dash in setback distances required under proposed zoning from all parcel lot lines OTHER: Will submit with BP App. 13. Scalable building elevations of proposed structures with keyed colors and materials. Show mechanical equipment and/or any proposed screening. Will submit with BP App. 14. A color and materials board representing the proposed project is optional. Will submit with BP App. 15. A rendering is optional. If submitted, it must accurately show the project and be from a realistic perspective (5 to 6 feet above the sidewalk). RECEIVED DEC 132018 Community Development CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 EXHIBIT B COMPREHENSIVE PLAN & ZONING MAP CHANGE APPLICATION FOR STAFF USE ONLY Planner: File Number: L. l g — Q / / z/ Application Complete Date: Project File Number: 'CZ_ /11-00 9 9 Application Incomplete Date: Other File Numbers: This application requires public notice. Please refer to Public Notice Materials section of the application checklist. NAME OF PROJECT/DEVELOPMENT: Rezone West Half of Parcel 7345600766 from LDR to C/LI LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. 12677 E. Marginal Way South, Tukwila WA 98168 LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement). #7345600766 DEVELOPMENT COORDINATOR: The individual who: • has decision making authority on behalf of the owner/applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City, to whom all notices and reports will be sent. Name: Gillian Zacharias Address: KSC-TR-0431, 201 South Jackson Street, Seattle, WA 98104 Phone: 206-477-7915 FAX: 206-684-1803 E-mail: gillian.za arias@kingcounty.gov Signature: erG/j Date: RECEIVED DEC 1.3 2018 Community Development 7 A. COMPREHENSIVE PLAN LAND USE MAP DESIGNATION: Existing: Low Density Residential (approximately the west half) and Commercial/Light Industrial (approximately the east half) Proposed: Commercial/Light Industrial for the west half B. ZONING CODE MAP DESIGNATION: Existing: LDR and C/LI Proposed: C/LI for the west half ...C. LAND USE(S): Existing: Trucking operation Proposed: Offices and warehouse D. GENERAL DESCRIPTION OF SURROUNDING LAND USES: Describe and provide a map of the existing uses located within 1,000 feet in all directions from the property or area for which a change is proposed. SR 599 and Tukwila International Boulevard are approximately 1,000 to the east and west of the site. Parcels within 300 feet to the north and northeast are zoned for, and occupied by, light industrial and/or commercial uses. Further north is a large area zoned for heavy industrial use and is occupied by office and industrial uses. To the south the parcel is zoned for Neighborhood Commercial but is currently used by the Tukwila School District as a school bus base Immediately east, southeast, and west of the parcel, single family residential development predominates. E. DECISION CRITERIA (TMC 18..84.020) The burden of proof that a change to the Comprehensive Plan and Zoning Maps are warranted lies solely upon the proponent. The greater the degree of change proposed, the greater will be the burden of showing that the change is justified. This is a type 5 decision. It is a quasi-judicial decision made by the City Council who will decide your request using the criteria listed below. It is essential that you describe in a clear and precise manner why the change should be approved. You may submit other documentation in support of your proposal. Provide a written response that demonstrates how each of the following circumstances justifies a map change for your property: 1. The proposed amendment to the [Comprehensive Plan and ] Zoning map is consistent with the goals, objectives, and policies of the Comprehensive Plan; 2. The proposed amendment to the [Comprehensive Plan and ] Zoning map is consistent with the scope and purpose of the TMC Title 18, Zoning Code, and the description and purpose of the zone classification applied for; 3. There are changed conditions since the previous zoning became effective to warrant the proposed amendment to the [Comprehensive Plan and ] Zoning Map; and 4. The proposed amendment to the [Comprehensive Plan and] Zoning map will be in the interest of and furtherance of the public health, safety, comfort, convenience, and general welfare; and will not adversely affect the surrounding neighborhood; nor be injurious to other properties in the vicinity in which the subject property is located.