Loading...
HomeMy WebLinkAboutRes 2148 - 2027-2032 Transportation Improvement ProgramCity of Tukwila Washington Resolution No. 2148 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2027- 2032), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2027-2032); and WHEREAS, on June 8, 2026, a public hearing was held regarding the City's Six -Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2027 to 2032, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this 15th day of June, 2026. ATTEST/AUTHENTICATED: kA i nd o -Barnett, CIVIC, City Clerk A O D AS TO FORM BY: Office of the City Attorney Arme Papyan, Council President Filed with the City Clerk: _ Passed by the City Council Resolution Number: 06/09/2026 06/15/2026 2148 Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2027 to 2032 2026 Legislation: 2027-2032 TIP Version: 04/30/2026 Staff: C. Knighton Page 2 of 2 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 / 1037(004) TUK-62 06/08/26 06/15/26 2148 11 0.100 DCE Yes 42nd Ave S Bridge Replacement 42nd Ave S over the Duwamish River Interurban Ave S to Northern end of bridge Replace the existing 42nd Ave S steel truss bridge. The replacement will require preliminary engineer design, and construction phases. The new structure will meet current road and bridge design standards. The replacement structure configuration will be two through -lanes, possibly a turn pocket, and include sidewalks. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 500,000 500,000 S RW 2027 0 0 100,000 100,000 P CN 2028 BR 13,000,000 0 0 13,000,000 S CN 2028 BR 10,599,306 MAW 17,000,000 3,900,000 31,499,306 Totalsl 23,599,3061 17,000,000 4,500,0001 45,099,306 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 500,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 17,500,000 17,500,000 0 0 Totals 600,000 17,500,000 17,500,000 0 0 Resolution 2148 Attachment A Page 1 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-15812 06/08/26 06/15/26 2148 28 C G P S T No W 42nd Avenue S Bikeway 42nd Avenue S Southcenter Blvd to S 150th Street Develop a traffic -calmed bikeway along 42nd Ave S between S 150th St and Southcenter Blvd. On the west side of the street, add striped southbound bike lane between Southcenter Blvd and S 150th St. On the east side of the street, add striped bike lane between Southcenter Blvd and S 151st St. Remove on -street parking to widen the sidewalk on the east side of the street between S 151st St and S 150th St, creating a shared path; add shared lane markings to the roadway Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 0 0 295,000 295,000 Totals 0 0 295,000 295,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 295,000 0 0 0 0 Totals 295,000 0 0 0 0 Resolution 2148 Attachment A Page 2 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 19 WA-11113 06/08/26 06/15/26 2148 05 C G P S T 0.370 Yes W 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 SRTS 170,000 80,000 250,000 P RW 2027 0 SRTS 65,000 10,000 75,000 P CN 2028 0 SRTS 1,660,000 410,000 2,070,000 Totals 0 1,895,000 500,000 2,395,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 250,000 0 0 0 0 RW 75,000 0 0 0 0 CN 0 2,070,000 0 0 0 Totals 325,000 2,070,000 0 0 0 Resolution 2148 Attachment A Page 3 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 TUK-71 06/08/26 06/15/26 2148 05 0.380 CE No Airport Way Overlay Airport Way S Boeing Access Road to North Tukwila City Limit Plane, pavement repair, pave; channelization, and repair of curb and gutter, sidewalk, and guardrail, as necessary. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 NHFP 564,000 0 10,000 574,000 S CN 2028 NHFP 3,424,000 0 0 3,424,000 Totals 3,988,000 0 10,000 3,998,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 574,000 0 0 0 0 CN 0 3,424,000 0 0 0 Totals 574,000 3,424,000 0 0 0 Resolution 2148 Attachment A Page 4 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 00 WA-05405 06/08/26 06/15/26 2148 06 No Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2027 0 0 366,000 366,000 Totals 0 0 366,000 366,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 61,000 61,000 61,000 61,000 122,000 Totals 61,000 61,000 61,000 61,000 122,000 Resolution 2148 Attachment A Page 5 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 16 WA-07746 06/08/26 06/15/26 2148 03 C G O P S No TW Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 275,000 275,000 S RW 2027 0 0 100,000 100,000 P CN 2028 0 TIB 1,900,000 500,000 2,400,000 Totals 0 1,900,000 875,000 2,775,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 275,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 2,400,000 0 0 0 Totals 375,000 2,400,000 0 0 0 Resolution 2148 Attachment A Page 6 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 04 WA-15107 06/08/26 06/15/26 2148 03 C G P S T 0.100 Yes W Andover Park East/industry Dr Intersection Andover Park E Industry Drive to Design and construct traffic signal with Andover Park East left turn lanes and crosswalks. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 190,000 190,000 S RW 2027 0 0 75,000 75,000 P CN 2028 0 0 2,400,000 2,400,000 Totals 0 0 2,665,000 2,665,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 190,000 0 0 0 0 RW 75,000 0 0 0 0 CN 0 2,400,000 0 0 0 Totals 265,000 2,400,000 0 0 0 Resolution 2148 Attachment A Page 7 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17047 06/08/26 06/15/26 2148 04 0.390 No Andover Park W (Strander to Tukwila Parkway) Andover Park W Strander Boulevard to Tukwila Parkway Construct driveway access improvements, provide bus lanes, install RRFB's, and improve signal timing Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2030 0 0 923,000 923,000 Totals 0 0 923,000 923,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 923,000 0 Totals 0 0 0 923,000 0 Resolution 2148 Attachment A Page 8 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 3 i 0 o � ' i n c m o 'm_ E. Begin & End Termini c 1< a N F. Project Description G. Structure ID to a m N s m a 14 WA-03731 06/08/26 06/15/26 2148 06 No Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2027 0 0 1,447,000 1,447,000 Totals 0 0 1,447,000 1,447,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 232,000 237,000 242,000 242,000 494,000 Totals 232,000 237,000 242,000 242,000 494,000 Resolution 2148 Attachment A Page 9 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 16 WA-03733 06/08/26 06/15/26 2148 06 C G O P S No TW Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2027 0 0 16,790,000 16,790,000 Totals 0 0 16,790,000 16,790,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 2,520,000 2,520,000 2,720,000 2,720,000 6,310,000 Totals 2,520,000 2,520,000 2,720,000 2,720,000 6,310,000 Resolution 2148 Attachment A Page 10 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 00 WA-15104 06/08/26 06/15/26 2148 44 P No Annual Traffic Signal Program Varies to Design and construct traffic signal upgrades and repairs of signals that exceed routine maintenance work;loop replacement, head replacement, and controllers. Replace direct bury cable for existing lighting system. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2027 0 0 1,060,000 1,060,000 Totals 0 0 1,060,000 1,060,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 160,000 160,000 170,000 190,000 380,000 Totals 160,000 160,000 170,000 190,000 380,000 Resolution 2148 Attachment A Page 11 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 / 1380(005) TUK-68 06/08/26 06/15/26 2148 05 0.560 CE No Boeing Access Road Overlay Boeing Access Road East Marginal Way S to Martin Luther King Jr Way S Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF railway. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 NHPP 564,000 0 0 564,000 S CN 2027 NHPP 3,426,000 0 0 3,426,000 Totals 3,990,000 0 0 3,990,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 3,426,000 0 0 0 0 Totals 3,526,000 0 0 0 0 Resolution 2148 Attachment A Page 12 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17026 06/08/26 06/15/26 2148 28 No Buffered Shared Path on 42nd Ave S Section 3 42nd Ave S S 150th St to S 144th St Remove parking on one side and widen sidewalk to create shared -use path Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2030 0 0 550,000 550,000 Totals 0 0 550,000 550,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 550,000 0 Totals 0 0 0 550,000 0 Resolution 2148 Attachment A Page 13 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 04 WA-15109 06/08/26 06/15/26 2148 03 C G O P S 0.270 Yes TW E Marginal Way S (BAR - S 112 St) E Marginal Way S Boeing Access Road to S 112th St Planning phase to determine project parameters. Goal is to design and construct full street improvements and traffic control. Could include additional lanes and bike lanes to support the new Sound Transit Link Light Rail infill station. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PL 2028 0 0 75,000 75,000 Totals 0 0 75,000 75,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 0 75,000 0 0 0 Totals 0 75,000 0 0 0 Resolution 2148 Attachment A Page 14 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-17053 06/08/26 06/15/26 2148 04 CPS 1.900 CE No E Marginal Way S (N City Limit to S Boeing Access Rd) Boeing Access Road to Northern City Limit Widen and extend asphalt paving on E Marginal Way S north of S Boeing Access Road. Bike facilities may be desired here, pending BAR Infill station and area redevelopment, could connect to bike facilities on Airport Way if Seattle/Tukwila install, connecting via Norfolk to EMWS If this project moves forward, need to update bike network. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2032 0 0 6,917,000 6,917,000 Totals 0 0 6,917,000 6,917,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 6,917,000 Totals 0 0 0 0 6,917,000 Resolution 2148 Attachment A Page 15 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 TUK-70 06/08/26 06/15/26 2148 05 0.960 CE No E Marginal Way S Overlay E Marginal Way S Interurban Avenue S to MP 2.27 Plane, pavement repair, pave, channelization, and repair of curb and gutter and sidewalk, as necessary. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 NHPP 685,000 0 0 685,000 S CN 2028 NHPP 5,058,000 0 0 5,058,000 Totals 5,743,000 0 0 5,743,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 685,000 0 0 0 0 CN 0 5,058,000 0 0 0 Totals 685,000 5,058,000 0 0 0 Resolution 2148 Attachment A Page 16 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17043 06/08/26 06/15/26 2148 28 0.140 No E Marginal Way S Section 2 Sidewalk E Marginal Way S Interurban Ave S to S 120th PI Construct sidewalk on both sides of road segment. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 803,000 803,000 Totals 0 0 803,000 803,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 803,000 Totals 0 0 0 0 803,000 Resolution 2148 Attachment A Page 17 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-17049 06/08/26 06/15/26 2148 28 0.270 No Interurban Ave (140th St to S 144th St) Interurban Ave S 140th St to 144th St Construct two landscape medians, install RRFB's, and a new pedestrian crossing Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 1,484,000 1,484,000 Totals 0 0 1,484,000 1,484,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,484,000 Tota Is 0 0 0 0 1,484,000 Resolution 2148 Attachment A Page 18 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 / 1391(004) TUK-66 06/08/26 06/15/26 2148 05 2.250 CE No Interurban Avenue S Overlay Interurban Avenue S E Marginal Way S to S 143rd Street Complete pavement repairs, overlay, and curb and gutter repair. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 NHPP 4,561,000 0 0 4,561,000 Totals 4,561,000 0 0 4,561,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 356,100 0 0 0 0 Totals 356,100 0 0 0 0 Resolution 2148 Attachment A Page 19 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 05 WA-17054 06/08/26 06/15/26 2148 28 0.410 CE No Klickitat Dr (53rd Ave S to Southcenter Pkwy) 53rd Ave S to Southcenter Pkwy Multimodal improvements to improve connectivity and accessibility of existing path wayfinding, signage, width improvements, etc. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 582,000 582,000 Totals 0 0 582,000 582,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 582,000 0 0 Totals 0 0 582,000 0 0 Resolution 2148 Attachment A Page 20 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 17 WA-11110 06/08/26 06/15/26 2148 04 0.350 CE No Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 Ped/Bike Program 350,000 50,000 400,000 P RW 2028 0 Ped/Bike Program 10,000 0 10,000 P CN 2029 0 Ped/Bike Program 2,800,000 300,000 3,100,000 Totals 0 3,160,000 350,000 3,510,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 300,000 100,000 0 0 0 RW 0 100,000 0 0 0 CN 0 0 3,100,000 0 0 Totals 300,000 200,000 3,100,000 0 0 Resolution 2148 Attachment A Page 21 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17028 06/08/26 06/15/26 2148 28 0.340 No Macadam Rd S Section 1 Sidewalk 42nd Ave S and Macadam Rd S S 124th St to S 130th St Construct sidewalk on west side of 42nd Ave S from S 124th St to entrance of 42nd Ave S Bridge, construct sidewalk on both sides of 42nd Ave S from entrance of 42nd Ave S Bridge to Interurban Ave S. Construct sidewalk on both sides of Macadam Rd S from Interurban Ave S to S 130th St. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 992,000 992,000 Totals 0 0 992,000 992,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 992,000 Totals 0 0 0 0 992,000 Resolution 2148 Attachment A Page 22 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 04 WA-17027 06/08/26 06/15/26 2148 28 No Minkler Blvd Section 2 Sidewalk Minkler Boulevard Andover Park W to Andover Park E Construct sidewalk on both sides of road segment Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 1,430,000 1,430,000 Totals 0 0 1,430,000 1,430,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 1,430,000 0 0 Tota Is 0 0 1,430,000 0 0 Resolution 2148 Attachment A Page 23 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 / 1230(007) TUK-67 06/08/26 06/15/26 2148 05 0.640 CE No Orillia Road South Overlay Orillia Road S S 200th Street to S 188th Street/WSDOT ROW Complete pavement repairs; overlay; and curb and gutter, sidewalk, and guardrail repair. Make minor improvements to channelization and improve safety near the 188th street intersection. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 NHPP 1,204,000 0 0 1,204,000 Totals 1,204,000 0 0 1,204,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,204,000 0 0 0 0 Totals 1,204,000 0 0 0 0 Resolution 2148 Attachment A Page 24 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-17025 06/08/26 06/15/26 2148 03 0.000 No S 115th SUE Marginal Way Intersection Improvements E Marginal Way 300' South of S 115th St to 300' North of S 115th St Design and construct a new traffic signal, lighting, and pedestrian facilities, including crosswalks and pedestrian push buttons. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 2,000,000 2,000,000 Totals 0 0 2,000,000 2,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 2,000,000 0 0 Totals 0 0 2,000,000 0 0 Resolution 2148 Attachment A Page 25 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 00 WA13494 06/08/26 06/15/26 2148 06 0.040 No S 119th St Pedestrian Bridge Painting S 119th Street Bridge West bank Duwamish River to East bank Duwamish River Ongoing maintenance of the S 119th Street Pedestrian Bridge in the Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance needed. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 0 0 200,000 200,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 200,000 0 0 0 0 Totals 200,000 0 0 0 0 Resolution 2148 Attachment A Page 26 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-16476 06/08/26 06/15/26 2148 21 0.140 No S 124th St/50th PI S Reconfiguration S 124th Street 49th Ave S to 51 st PI S Reconfigure intersection to remove EB slip lane, new c/g/s on S 124th from 49th to 51st, new paved shoulder walkway on south side of 124th connecting to existing walkway on west side of 50th Pk, new stormwater treatment/rain garden in old slip Zane ROW. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 TIB 101,000 29,000 130,000 S CN 2028 0 TIB 796,300 225,200 1,021,500 Totals 0 897,300 254,200 1,151,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 0 CN 0 1,021,500 0 0 0 Totals 50,000 1,021,500 0 0 0 Resolution 2148 Attachment A Page 27 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-15108 06/08/26 06/15/26 2148 03 C G O P S 0.100 Yes TW S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 SB Ramp to Design and construct intersection improvements, which could include a new traffic signal or a roundabout, lighting, pedestrian facilities, and drainage. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 0 400,000 400,000 P RW 2028 0 0 150,000 150,000 P CN 2029 0 TIB 1,620,000 1,080,000 2,700,000 Totals 0 1,620,000 1,630,000 3,250,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 400,000 0 0 0 RW 0 150,000 0 0 0 CN 0 0 2,700,000 0 0 Totals 0 550,000 2,700,000 0 0 Resolution 2148 Attachment A Page 28 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 07 WA-17045 06/08/26 06/15/26 2148 28 0.120 No S 141st St Section 1 Sidewalk S 141st 37th Ave S to Tukwila International Boulevard Construct sidewalk on both sides of road segment Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 0 510,000 510,000 Totals 0 0 510,000 510,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 510,000 0 0 Totals 0 0 510,000 0 0 Resolution 2148 Attachment A Page 29 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 07 WA-17044 06/08/26 06/15/26 2148 28 0.130 No S 142nd St Sidewalk S 142nd St 37th Ave S to Tukwila International Boulevard Construct sidewalk on both sides of road segment Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 541,000 541,000 Totals 0 0 541,000 541,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 541,000 0 0 Totals 0 0 541,000 0 0 Resolution 2148 Attachment A Page 30 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17041 06/08/26 06/15/26 2148 04 C G P S T 0.500 CE No W S 144th St Complete Street 42nd Ave S to 51 st Ave S Restripe and remove parking on one side to accommodate 2-1 Oft lanes, 1-2ft buffer, and 1-10ft two-way cycle track. Construct sidewalk facilities on the south side of the street. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2030 0 0 869,000 869,000 Totals 0 0 869,000 869,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 869,000 0 Totals 0 0 0 869,000 0 Resolution 2148 Attachment A Page 31 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17046 06/08/26 06/15/26 2148 28 0.310 No S 144th St Improvements (Military to TIB) S 144th St Military Rd S to Tukwila International Boulevard Construct sidewalk improvments, curb and gutter, install RRFB's, and a pedestrian refuge island Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2028 0 0 580,000 580,000 Totals 0 0 580,000 580,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 580,000 0 0 0 Totals 0 580,000 0 0 0 Resolution 2148 Attachment A Page 32 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 19 WA-11112 06/08/26 06/15/26 2148 05 C G O P S 0.300 CE Yes TW S 152nd Street Pedestrian and Bike Improvements S 152nd Street Tukwila International Blvd to 42nd Avenue S Install curb, gutter, sidewalks on S 152nd Street, including widening pavement and construction of a buffer between the roadway and sidewalk on the south side. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 300,000 300,000 S RW 2027 0 0 230,000 230,000 P CN 2028 0 TIB 3,960,000 990,000 4,950,000 Totals 0 3,960,000 1,520,000 5,480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 300,000 0 0 0 0 RW 230,000 0 0 0 0 CN 0 4,950,000 0 0 0 Totals 530,000 4,950,000 0 0 0 Resolution 2148 Attachment A Page 33 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 04 WA-17048 06/08/26 06/15/26 2148 28 0.280 No S 180th St (Sperry Drive to Interurban Trail) S 180th St Sperry Drive to Interurban Trail Construct shared use path on the north side and stall no turn on red phasing at 180th and Sperry Dr. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2030 0 0 806,000 806,000 Totals 0 0 806,000 806,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 806,000 0 Totals 0 0 0 806,000 0 Resolution 2148 Attachment A Page 34 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17021 06/08/26 06/15/26 2148 28 P S T W 0.140 CE No S Norfolk St Bike Facilities S Norfolk Street E Marginal Way S to East city limit Add bike facilities on S Norfolk St Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 497,000 497,000 Totals 0 0 497,000 497,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 497,000 0 0 Totals 0 0 497,000 0 0 Resolution 2148 Attachment A Page 35 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 04 WA-15829 06/08/26 06/15/26 2148 06 C G P S T 0.500 No W S Ryan Way SR 900 to 51 st Ave S Resurface and rechannel S Ryan Way to improve failing pavement and improve safety. Add pedestrian and bicycle facilities where appropriate. Signalize intersection with 47th Avenue S to accommodate future growth and improve safety. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 1,275,000 1,275,000 P RW 2028 0 TIB 200,000 100,000 300,000 P CN 2028 0 TIB 8,650,000 4,131,000 12,781,000 Totals 0 8,850,000 5,506,000 14,356,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 1,275,000 0 0 0 0 RW 0 300,000 0 0 0 CN 0 12,760,000 0 0 0 Totals 1,275,000 13,060,000 0 0 0 Resolution 2148 Attachment A Page 36 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 04 WA-15813 06/08/26 06/15/26 2148 28 C G P S T No W Southcenter Blvd Bikeway and Pedestrian Crossing Upgrades Southcenter Boulevard International Boulevard to 42nd Avenue S Improve the existing bike lanes and crosswalks on Southcenter Blvd within a half - mile of Tukwila International Boulevard Station (TIBS). Re-channelize to 11 ft general purpose lanes to accommodate separated bike lanes. Tighten intersection with 40th Ave S to shorten crossing distance. Add bike channelization and upgrade to high -visibility crosswalk markings at Southcenter Blvd/TIBS station entrance and Southcenter Blvd/42nd Ave S intersections. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 0 0 325,000 325,000 Totals 0 0 325,000 325,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 325,000 0 0 0 0 Totals 325,000 0 0 0 0 Resolution 2148 Attachment A Page 37 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-17128 06/08/26 06/15/26 2148 21 DCE No Southcenter Blvd Road Diet (with Lake to Sound Regional Trail) Southcenter Boulevard S 66th Ave to 53rd Ave S As part of the King County led Lake to Sound Regional Trail F1 Phase, narrow Southcenter Blvd from 5 lanes to 3 lanes between approx. 62nd Ave S and 66th Ave S. Reconfigure signal operations at 66th Ave S to include dual WB left turn lanes and a single WB thru lane. All lanes will generally shift to the south of the existing ROW to allow for construction of the Lake to Sound trail and trail buffering. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 135,000 135,000 P CN 2029 0 TIB 2,400,000 600,000 3,000,000 Totals 0 2,400,000 735,000 3,135,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 135,000 0 0 0 0 CN 0 0 3,000,000 0 0 Totals 135,000 0 3,000,000 0 0 Resolution 2148 Attachment A Page 38 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c D. Road Name or Number c a 3 0 � n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a O5 WA-17022 06/08/26 06/15/26 2148 03 P S W 0.020 CE No SR 518 EB Off-ramp/Klickitat Dr Intersection Improvements Klickitat Drive 51st Ave S to Klickitat Drive Design and construct a new traffic signal, lighting, and pedestrian facilities including crosswalks and pedestrian push buttons. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2030 0 0 850,000 850,000 Totals 0 0 850,000 850,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 850,000 0 Totals 0 0 0 850,000 0 Resolution 2148 Attachment A Page 39 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 04 WA-17029 06/08/26 06/15/26 2148 28 0.200 No Strander Blvd Sidewalk Strander Blvd and SW 27th St Christensen Rd to Interurban Trail Construct sidewalk on south side of Strander Blvd from Christensen Rd to W Valley Hwy. Construct sidewalk on both sides of Strander Blvd from W Valley Hwy to east boundary of Tukwila city limits Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 467,000 467,000 Totals 0 0 467,000 467,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 467,000 0 0 Totals 0 0 467,000 0 0 Resolution 2148 Attachment A Page 40 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-17039 06/08/26 06/15/26 2148 28 C G P S T 0.260 CE No W TIB Section 2 Sidewalk (North) Tukwila International Blvd S 112th Ave to SR99 Construct sidewalk on east side of Tukwila International Blvd from S 112th St to the HW 99 Exit Ramp. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 377,200 377,200 Totals 0 0 377,200 377,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 377,200 0 0 Totals 0 0 377,200 0 0 Resolution 2148 Attachment A Page 41 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-17040 06/08/26 06/15/26 2148 28 C G P S T 0.440 CE No W TIB Section 2 Sidewalk (South) SR 99 to 12400 Block Construct sidewalk on both sides of Tukwila International Blvd from the HW 99 Exit Ramp to 12400 Block. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 1,672,800 1,672,800 Totals 0 0 1,672,800 1,672,800 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 1,672,800 0 0 Tota Is 0 0 1,672,800 0 0 Resolution 2148 Attachment A Page 42 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 00 WA-13491 06/08/26 06/15/26 2148 44 0.000 No Transportation Demand Management Implementation to Provision of TDM services to Commute Trip Reduction -affected employment sites. Facilitate employer reporting and records associated with biennial CTR survey. Engage CTR employment sites with opportunities for improvement and remain connected via technical meetings with other CTR jurisdictional representatives. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2027 0 WSDOT 103,200 0 103,200 P ALL 2028 0 WSDOT 258,000 0 258,000 Totals 0 361,200 0 361,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 51,600 51,600 51,600 51,600 103,200 Totals 51,600 51,600 51,600 51,600 103,200 Resolution 2148 Attachment A Page 43 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 3 i 0 o � ' i n c m o 'm_ E. Begin & End Termini c 1< a N F. Project Description G. Structure ID to a m N s m a 00 WA-17063 06/08/26 06/15/26 2148 18 No Tukwila and South King County TDM to Provide TDM services to help people use sustainable transportation options that increase access to opportunity, and reduce drive -alone travel and traffic congestion in Tukwila and South King County. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2027 0 OTHER 832,000 208,000 1,040,000 Totals 0 832,000 208,000 1,040,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 260,000 260,000 130,000 0 0 Totals 260,000 260,000 130,000 0 0 Resolution 2148 Attachment A Page 44 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title = y 3 °_ 3 °—' n» c B D. Road Name or Number c a 3 i 0 o � i n c m o E. Begin & End Termini 3 1< a ' N 'm_ F. Project Description G. Structure ID to a c m N s m a 00 TUK-69 06/08/26 06/15/26 2148 24 0.000 CE No Tukwila and South King County TDM Tukwila and South King County N/A to N/A This project will provide TDM programming and services to help people access sustainable transportation options that reduce drive -alone travel and traffic congestion in Tukwila and South King County. Tukwila's TDM Program reaches people regionally at employment centers, community hubs, multifamily housing complexes, and educational institutions. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2027 CMAQ 550,000 WSDOT 85,838 0 635,838 Totals 550,000 85,838 0 635,838 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 158,959 158,959 158,960 158,960 0 Totals 158,959 158,959 158,960 158,960 0 Resolution 2148 Attachment A Page 45 Washnoun e Six Year Transportation Improvement Program From 2027 to 2032 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside N Outside m 3 '< T G m A. PIN/Project No. B. STIP ID 3 0 3 3 3 Z C. Project Title y 3 °_ 3 n» c D. Road Name or Number = c a 3 0 � °—' n m o B E. Begin & End Termini 3 i 1< o a ' i c N 'm_ F. Project Description G. Structure ID to a c m N s m a 03 WA-17042 06/08/26 06/15/26 2148 04 C P S W 0.530 CE No Tukwila International Boulevard (S 152nd St to S 144th St) S 152nd St to S 144th St Construct landscape median, refine corridor access, roadway diet, and multimodal lanes. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2030 0 0 4,347,000 4,347,000 Totals 0 0 4,347,000 4,347,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 4,347,000 0 Totals 0 0 0 4,347,000 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 43,635,306 142,961,338 66,509,200 153,105,844 Resolution 2148 Attachment A Page 46 From: Jennifer Marshall To: amarklev(a)Dsrc.ora Cc: Anna Lieck; Andy Youn-Barnett; Cvndv Knighton; Adam Cox Subject: Tukwila - Transportation Improvement Program 2027-2032 Date: Wednesday, June 24, 2026 5:38:06 PM Attachments: imaae001.Dna imaae003.Dna June 24, 2026 TO: PUGET SOUND REGIONAL COUNCIL RE: CITY OF TUKWILA 2027-2032 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to the city of Tukwila Resolution #2148 passed June 16, 2026 adopting the Transportation Improvement Program for 2027-2032. IRes 2148- 2027-2032 T r ire m. rt f iii in III m m r m m ir�f Ill rya .r m Regards, )ennifer Marshall, CMC/CPRO Acting City Clerk I Office of the City Clerk 6200 Southcenter Blvd I Tukwila WA 98188 Phone: 206 433-7189 NOTICE: ALL emails and attachments sentto and from the City of Tukwila are public records and may be subjectto disclosure pursuant to the Public Records Act (Chapter 42.56 RCW). From: Jennifer Marshall To: areaa(a)tib.wa.aov Cc: Anna Lieck; Andy Youn-Barnett; Cvndv Knighton; Adam Cox Subject: Tukwila - Transportation Improvement Program 2027-2032 Date: Wednesday, June 24, 2026 5:38:08 PM Attachments: imaae001.Dna imaae003.Dna June 24, 2026 TO: TRANSPORTATION IMPROVEMENT BOARD RE: CITY OF TUKWILA 2027-2032 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to the city of Tukwila Resolution #2148 passed June 16, 2026 adopting the Transportation Improvement Program for 2027-2032. IRes 2148- 2027-2032 T r ire m. rt f iii in III m m r m m ir�f Ill rya .r m Regards, )ennifer Marshall, CMC/CPRO Acting City Clerk I Office of the City Clerk 6200 Southcenter Blvd I Tukwila WA 98188 Phone: 206 433-7189 NOTICE: ALL emails and attachments sentto and from the City of Tukwila are public records and may be subjectto disclosure pursuant to the Public Records Act (Chapter 42.56 RCW). From:Jennifer Marshall To:julie.meredith@wsdot.wa.gov Cc:Anna Lieck; Adam Cox; Cyndy Knighton Subject:Tukwila - Transportation Improvement Program 2027-2032 Date:Thursday, June 25, 2026 8:36:54 AM Attachments:image001.png image002.png June 25, 2026 TO: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION RE: CITY OF TUKWILA 2027-2032 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to the city of Tukwila Resolution #2148 passed June 16, 2026 adopting the Transportation Improvement Program for 2027-2032. Res 2148 - 2027-2032 Transportation Improvement Program Regards, Jennifer Marshall, CMC/CPRO Acting City Clerk | Office of the City Clerk 6200 Southcenter Blvd | Tukwila WA 98188 Phone: 206 433-7189 NOTICE: All emails and attachments sent to and from the City of Tukwila are public records and may be subject to disclosure pursuant to the Public Records Act (Chapter 42.56 RCW).