Loading...
HomeMy WebLinkAbout26-169 - Contract - Mithun - Planning & Engineering Services: Lower Green Riverfront Master Plan26-169 Council Approval 6/22/26 City of Tukwila Standard Contract PROFESSIONAL SERVICES AGREEMENT (Includes consultants, architects, engineers, accountants, and other professional services) THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and Mithun, hereinafter referred to as "the Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified. Project Designation. The Consultant is retained by the City to perform Planning and Engineering services in connection with the project titled Lower Green Riverfront Master Plan. 2. Scone of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. The standard of care for Consultant's services shall be the care and skill ordinarily used by members of Consultant's profession practicing under the same or similar circumstances at the same time and in the same locality. 3. Duration of Agreement: Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending June 30, 2027 unless sooner terminated under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than June 30, 2027 unless an extension of such time is granted in writing by the City. 4. Payment, The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $380,000 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant within 30 days of receipt of Consultant's voucher in the amount approved. c. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request. 1 1II "' r u g Www:, 5. Ownership and Use of Documents. To the extent payment has been received, all documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement, or without the involvement of Consultant on this Project. Notwithstanding the above, Consultant shall retain ownership of all standard details, drawings, and specifications not specifically created for this Project, but the City shall have the right to use them to the extent that they are utilized or incorporated in the instruments of service. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated Ty this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. 7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. Insurance. The Consultant shall procure and maintain for the duration of the agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its representatives, consultants, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance with limits no less than 3. $2,000,000 each occurrence, $2,000,000 general aggregate. Commercial General Liability insurance shall be at least as broad as ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, stop -gap independent contractors and personal injury and advertising injury. The City shall be named as an additional insured under the am Consultant's Commercial General Liability insurance policy with respect to the work performed for the City using an additional insured endorsement at least as broad as ISO endorsement form CG 20 26. 4. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 5. Professional Liability with limits no less than $2,000,000 per claim and $2,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Public Entity Full Availability of Contractor Limits. If the Contractor maintains higher insurance limits than the minimums shown above, the Public Entity shall be insured for the full available limits of Commercial General and Excess or Umbrella liability maintained by the Contractor, irrespective of whether such limits maintained by the Contractor are greater than those required by this Contract or whether any certificate of insurance furnished to the Public Entity evidences limits of liability lower than those maintained by the Contractor. C. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain or be endorsed to contain that they shall be primary insurance with respect to the City. Any Insurance, self- insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. D. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. Upon request by the City, the Consultant shall furnish redacted copies of all required insurance policies, including endorsements, required in this Agreement and evidence of all subcontractors' coverage. F. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. G. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City. 9. Independent Contractor, The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Continaent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warranty, the City shall have the right to annul this contract without liability, 3 IC: ,;:;a g e or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. Contractor, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation, the presence of any disability, or any other protected class status under state or federal law, in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Aoolicable Law: Venue: Attorney's Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila then in effect at the time of the rendition of the services. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its reasonable attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 16. Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. 17. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: 4 1 IC: ,;:;a g e 18. Entire Aareement: Modification. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. 5 1 IC: ,;:;a g e DATED this 24th day of June, 2026. CITY OF TUKWILA [L� Signed by: Thomas McLeod, Mayor ATTEST/RUTH ENTICATED: Signed by: Jk Jennifer Marshall, Acting City Clerk APPROVED AS TO FORM: Signed by: nnr I Office of the City Attorney 6 a CONSULTANT: Mithun By: Printed Name: Anne Torney, FAIA Title: Partner June 12, 2026 M 1 iii 5 Ms. Sherry Edquid Levee and Floodplains Project Manager City of Tukwila — Public Works Tukwila, WA Re: Lower Green Riverfront Master Plan: Draft Scope of Work Mithun Project No. 2625800 Dear Sherry, Seat—de )(m ";0, Thank you for meeting with us to advance the Lower Green Riverfront ! M I Ake "Ihm vv(y;f"uo Master Plan scope, schedule, and budget. This revised draft clarifies what k,, WA `;'N 1Oil the Mithun team will do, where the work will focus, when decisions and deliverables are due, and how the work will be reviewed so the plan can scin u�`In:n�n:nSc be finalized in early May 2027 and positioned for Planning Commission and Y)") I kw,"iid ")h('H 81)00 Council adoption by June 2027. �_,rn honn',nO, C A `gni?0',) The scope follows the work plan structure in Mithun's RFQ submittal, Los Angeles integrates the Washington State Department of Ecology FCAAP grant /'18 N1, „, I i„ ph ", /t7 00B requirements, and incorporates your follow-up comments regarding adding Ami (,Iw,, (_,n 900 11 local artist -in -residence, Sarah Kavage, and review of the Lower Green River Corridor Visioning report. It assumes scope and contract confirmation will be completed in June 2026, with kickoff in mid/late July 2026. We have assumed the Park Commission will serve as the Commission Advisory Group (formerly resident learning sessions). rn G" i ii t &"s u n ,, alb aCu aV"p Sandra Girgis Senior Associate, and Project Manager Enclosure: Draft Scope of Work; Schedule cc: Deb Guenther, Partner in Charge, Mithun ""f11'II' HI, har::rrl""f1 I ow""r { rl`> > Y I 'I ✓""r[r 1'11 1"An' ""r Phi, i I.'rn[I S(;opi !1l"f1 ork U t�dJYY I'roj d Pkx W ',8'00 Geography The study area spans the Green River corridor through Tukwila from 1-405 to the southern Tukwila city limits, consistent with the Ecology grant description of Lower Green River levee and shoreline projects from S. 204th Street to 1-405. The client is the City of Tukwila Public Works Department. The Master Plan will address the river corridor, levee and shoreline edges, adjoining properties, public access, parks, transportation connections, and priority opportunity segments where multi -benefit implementation may be feasible. Study area context map. Background The City of Tukwila is advancing the Lower Green Riverfront Master Plan to establish a long-term, implementable vision for the Green River corridor between 1-405 and the southern city limits. The corridor is made up of complex intersections of flood risk management infrastructure, ecological systems, transportation networks, and adjacent urban development. Existing levee systems and floodplain conditions present both constraints and opportunities for future riverfront investment, requiring a coordinated approach that integrates flood risk reduction, habitat enhancement, public access and community priorities. ""fiiII' H1, I r::rrl""f1 ow""r { rl`> > Y I 'I ✓""rlro1'1'1 1"An' ""r Phi, i L'ufl l `,(;op"' of "Nork Uil�a.rrtiProj d Pkx W ',8'00 Overview May/June 2026 Mobilization / scope Finalize scope, fee, schedule, review protocol, confirmation SharePoint/file-transfer approach, and contract assumptions. Mid/Late July Kickoff 2026 Project kickoff and Interdepartmental Workshop #1 with key City departments and decision makers. Jul 2026 - Apr Task 2: Public Engagement Public engagement plan, commission advisory group 2027 and Agency Alignment sessions with Park Commission, online engagement, agency/stakeholder coordination, Tribal coordination support, one art -based making session and conversation, outreach documentation and storymap. Jul - Oct 2026 Task 3: Analysis, Synthesis Desktop analysis, prior plan synthesis, technical and Future Development baseline assumptions, zoning/economic baseline Considerations assumptions, and priority geography selection. Oct 2026 - Feb Task 4: Vision and Concept Vision, principles, programming -to -place exercises, 2027 Development alternatives, segment studies, visualizations, and preferred direction. Jan - Mar 2027 Task 5: Funding and Funding, governance, acquisition/easement Implementation Strategy screening, priority projects, phasing, and implementation framework. Mar - Jun 2027 Task 6: Draft/Final Master Draft Master Plan in April, one City/Ecology review, Plan and Adoption Support Final Master Plan by May, Planning Commission and Council support by May/June. ""fiiII'YH1, I :rel""f1 Iow""r{rl`>>Y i l'I✓"rlr1' 111"Af`J""r Phi,i L'ufll`,(;opi ol'"f1ork Uil�a.rrtiPrj d PIr,. W ',8'00 Team rales Mithun Prime consultant; project Manage scope, fee, schedule, meetings, QA/QC, and management; master subconsultants. Lead engagement strategy, resident planning; urban design; shared learning curriculum, vision, urban design, segment landscape architecture; studies, public realm, trails, access, zoning/design architecture; public integration, plan graphics, and Planning engagement lead; visual Commission/Council materials. storytelling; plan production. Community Park commission will be the advisory group. Engagement Partnerships Other engagement will occur through the City including Community Navigators, tabling at community events such as Salmon Saturday, Civics 101 group, and art making conversation. HDR Levee/flood-risk, habitat- Ground the plan in levee performance, floodplain adaptation, stormwater, behavior, regulatory thresholds, levee certification, cultural resources, habitat opportunity, stormwater, cultural resources, environmental permitting, constructability, and future permitting risk. Provide GIS/StoryMap, and technical technical QA for concepts and project cut sheets. feasibility lead. ECOnorthwest Economics, real Provide strategic light -touch implementation advisory: up estate/acquisition screening, to four stakeholder/client interviews, funding, governance, acquisition/easement screening criteria, funding/grant- phasing and implementation readiness scan for priority sites, governance options, and advisor. memo/slides for integration into the Master Plan. Sarah Kavage Plan and lead one participatory outdoor art build with Artist -in -Residence living willow along the Green River in the project area as part of community engagement. Includes administration/planning, willow harvest, public art build sessions with structured conversations, and wrap- up/reporting. City of Tukwila Project owner and decision Approve scope, schedule, deliverables, and decisions. maker. Lead grant administration/EAGL, public notice, adoption path, Tribal coordination protocols, and one consolidated comment log per deliverable. Ecology, KCFCD, Reviewers, partners and Provide technical, policy, funding, and implementation Tribes, residents, implementers. input. Ecology reviews outreach materials before businesses and distribution as applicable and reviews the Draft Master property stakeholders Plan. ""f1I'II' H1, II I ow""r ti rl`> > Y I l'1'/""rlr 1'1'I 1"An' ""r Phi, I L'ufl l `,(;op"' of "f1 ork Uil�a.rrtiPrj d 'Ir,, W ',8'00 Scapa of Work • Finalize consultant scope, fee, contingency reserve, schedule, meeting cadence and review protocol by the end of May 2026 for contract execution. • Set up a project SharePoint site or equivalent secure file -transfer folder for City uploads, subject to City/Mithun IT and security requirements. If a Mithun-hosted SharePoint is not feasible, Mithun will coordinate with the City on an approved City -hosted alternative. • Confirm the City decision path, including interdepartmental decision makers, Planning Commission public hearing/recommendation, City Council adoption path, and Ecology closeout requirements. • Confirm Ecology review points, EAGL deliverables, grant -eligible expense rules, outreach - material review requirements, and light -refreshment approval process. • Prepare data requests for prior plans, GIS layers, parcel/ownership data, zoning, parks, transportation, flood/levee information, capital projects, and the Lower Green River Corridor Visioning report. • Hold Interdepartmental Workshop #1 at kickoff to confirm shared opportunities, constraints, project goals, decision points, and cross -departmental roles. In person, with a virtual option. • Conduct up to 20 half-hour project manager check-in meetings and up to four budget/schedule health checks. r .. • Final workplan, fee, schedule • Data Request including previous relevant plans, and GIS layers including open -source layers • Up to one site visit by vehicle (organized by City) up to 2 hours, using City vehicle/trail access where feasible • Stakeholder, agency, department, Tribal coordination support, and engagement contact list. • Up to 4 budget/schedule health check notes • Up to 1 introductory City Council meeting presentation early in the process • Up to 3 Interdepartmental meetings (up to 2 hours) with agendas and summaries in Word; • Up to 20 -half hour project manager check -In meetings • Develop a public engagement plan, message framework, accessibility/language approach, and review protocol for all outreach materials. ""f ii I I' II..JYYI Iow""I"{.I`>>Y i l`1✓"Ir[ro1, 1'11"Af`J""I"Phi, i L'Aufll`(ro , ol'"f1fork, l/Ili'lun Prof r.:'I Hkx WO',8'00 • Create a facilitation guide to be used by community connectors, high school teachers, artist -in - residence that provides advocacy based materials and resident shared learning curriculum focused on river history, flood risk, habitat, public access, cultural use, and the programming -to - place question: "What experiences do people want to have along the river and where do they best fit?" "How do people want to get to know the river as a part of the culture of Tukwila?" • Coordinate with the City to use the existing Park Commission as the primary resident shared learning forum and, as directed. • Work with City community connectors and the Park Commission meeting schedule to support up to four commission advisory group; each session will include a short learning component, a mapping/programming exercise, and discussion questions tied to vision, segment studies, or preferred plan refinement. • Up to 2 community events such as the existing civics -group, or Vietnamese Church New Years celebration • Support City -led Tribal coordination by preparing meeting materials, maps, and technical/design context; City leads government -to -government protocols and invitations. • Document stakeholder, resident, business/property owner, department, agency and Tribal input and track how input changes the plan. • Develop storymap that can be used externally to share context and engagement with project and internally to document and information exchange regarding projects. • One art -making based conversation, in fall 2026 or spring 2027 Led by Sarah Kavage. • Public Engagement Plan • Project message framework, tagline/slogan, flyer template, email/banner, and QR code/online feedback link • Facilitation guide • Up to four commission advisory group sessions with agendas, materials and notes up to 2 hours • ArcGIS online Story Map both for internal and external purposes • One art -making based community event • Up to 2 community events for targeted engagement • Tribal coordination support materials. • Engagement summary in word • Complete a searchable literature review and synthesis of plans, studies, capital plans and regulatory context relevant to this project (in the last 10 years), including the Lower Green River Corridor Visioning report, and prepare a brief memo summarizing key takeaways for consideration in the Master Plan. ""f ii I I' Y H1, I I Iow""I"{.I`>> Yi l`1✓""Ir[ro1'1'11"A f`J""r Phi,i L'Aufll`(ro pi ol'"f1fork, l/Ili'd.JYY Prof r.:'I 'kx WO',8'00 • Prepare the grant -required desktop analysis of existing levees, watercourses, adjacent properties, critical areas and existing / planned transportation features for inclusion in the Draft Master Plan. • Document existing and planned (where applicable) conditions, including property ownership, public access to the river, parks, trail connections, utilities, shoreline conditions, zoning districts and allowable development type and intensity, street types, transit, redevelopment constraints, and capital projects. • ECOnorthwest will provide input on baseline market conditions, funding context and feasibility constraints. • Identify spatial opportunities and constraints to inform potential levee typologies. This includes constrained areas where levee enhancement would be most challenging, places where acquisitions or easements could be valuable, and opportunity areas with potential to provide multiple benefits. • HDR will identify levee typologies, flood -risk considerations, habitat -adaptation opportunities, fish/habitat enhancement opportunities, stormwater/cultural-resource flags and technical dependencies. • Develop an opportunities/constraints synthesis and gather precedents for levee typologies for discussion with departments and agencies. • Hold Interdepartmental Workshop #2 to review opportunities and constraints, discuss precedents, inform acquisition or easement criteria, and select up to 4 priority sites for further study. • Conduct Commission advisory group #1: current river use, desired future activities, barriers to river access, and discuss existing and future cultural relationships to the river. • Up to one meeting is included with King County, the King County Flood Control District, and WRIA stakeholders. Suggest grouping these stakeholders into a single workshop meeting if that works for the City and the partner agencies. r .. • Opportunities and Constraints presentation that summarizes desktop analysis and a brief prior - plan synthesis memo • Provide summary write-up of background material, focused on high level takeaways on baseline market conditions, funding context, and feasibility constraints. • Mithun and ECOnorthwest to co -facilitate a local business focus group (1 hour) to share the findings and risks; Eco will facilitate the discussion and questions needed to address concerns early on, • List of city department and community priorities for programming and amenities • HDR technical constraints/opportunities memo. • Up to 4 priority sites to study 0 1 workshop with Flood control/King County/WRIA Stakeholders ""fiiII' H1, I r::rrl""f1 Iow""r{rl`>>Y i l'I✓"rlr1' 1'11"Af'fai'r Phi,i L'ufll`(ropi ol'"f1ork Uil�a.rrtiPrj d 'kx W ',8'00 tasks • Develop draft vision, principles and community priorities from technical findings, stakeholder input and public engagement for discussion in commission advisory group. • Create a Programming Matrix and Map linking feedback on desired programmatic activities with specific sites along the Lower Green River. This matrix will answer questions such as: What experiences do people want to have here? Who is it for? What existing and future cultural/community activities should the riverfront support? How do people want to get to know the river as part of the culture of Tukwila? Where does each activity fit best? What technical, access, land use or maintenance conditions must be true for it to work? • Conduct Commission advisory group #2 to review vision/principles and identify what resonates, what is missing, and what cultural/programming needs should shape the plan. • ECOnorthwest will develop real estate/acquisition screening criteria to inform strategies regarding future development and property disposition. • Create corridor segment typologies and levee alignment concept alternatives that integrate flood protection, levee adaptation, habitat, trails, parks, public access, art, wayfinding, lighting, water access and adjoining property opportunities. • Prepare priority site studies focused on integrated site design and development opportunities at up to 4 priority sites. Priority site studies will be feasibility level of design and will not constitute design or engineering design, survey, hydraulic modeling or permitting documents. Each site study will include concept image, a conceptual site plan with circulation, open space, and building locations, and a land use summary. • Prepare an aerial district view, one urban design framework diagram, and up to six illustrative perspectives or vignettes. Visualizations will be used to support decision-making and engagement, not to imply final design / engineering proposals or commitments. • Screen concepts for permitting, constructability, real estate, zoning, economic viability and document potential implementation risks with HDR and ECOnorthwest. • Hold Interdepartmental Workshop #3 to discuss alternative strategies to achieve vision and redevelopment approaches • Conduct Commission advisory group #3 to review alternatives and segment concepts and identify what resonates, what is missing, and what may encourage greater community use. • Develop a preferred direction by January/February 2027 to support implementation strategy and plan production. • Up to one meeting is included with King County, the King County Flood Control District, and WRIA stakeholders. Suggest grouping these stakeholders into a single workshop meeting if that works for the City and the partner agencies. ""f ii I I' Y H1, I I Iow""I"{rl`>> Yi l`1✓""Ir[ro1'1'11"A f`J""r Phi,i L'Aufll`(ro pi ol'"f1fork, l/Ili'd.JYY Prof r.:'I Hkx WO',8'00 r .. • Provide draft and final evaluation criteria for opportunity site acquisition options • Technical review comments on alternatives and concepts by HDR • One aerial district view. • One urban design framework map. • Up to four perspectives/vignettes. • Up to four priority site studies with conceptual site plan, land use and development summary, and feasibility score developed by ECONorthwest • Public engagement summary for alternatives/preferred direction. • 1 workshop with Flood control/King County/WRIA Stakeholders u mo,/=o )o ;; Key tasks • Conduct Commission advisory group #4 to review the preferred plan and ask: What would bring you here? What would discourage you from coming here? What is high priority from your perspective? • ECOnorthwest will conduct up to four strategic stakeholder/client interviews, participate in up to three advisory meetings, and prepare strategic light -touch advice on acquisition/easement screening, priority site value, funding/grant-readiness and governance approaches. Interview targets may include affected businesses, property stakeholders, and implementation partners along the river corridor. • Develop screening criteria to help explain why some sites, adjoining -property investments, easements or acquisition opportunities may be higher value for flood protection, habitat, public access, cultural programming, funding competitiveness and implementation readiness. • Identify potential grant categories and funding pathways for priority sites and project types, including flood -risk reduction, habitat/salmon recovery, parks/trails/public access, climate resilience, private investments, lodging taxes, environmental justice and funding to support interagency collaboration. • Develop governance and implementation strategies for priority projects and long-term coordination among City departments, Ecology, KCFCD, parks, agencies, Tribes, property owners and implementation partners. • Explore preliminary concepts and cost estimates for up to three priority projects to be determined, with priority projects selected through the planning process and, where appropriate, aligned with current KCFCD CIP projects and levee segments. • HDR will confirm planning -level technical assumptions and identify future modeling, survey, geotechnical, design, permitting, environmental review and cultural -resource steps needed for implementation. • Mithun will integrate implementation strategy into the Master Plan narrative, priority project list, segment studies and adoption materials. ""f ii I I' Y H1, I I Iow""I"{rl`>> Yi l`1✓""Ir[ro1'1'11"A f`J""r Phi,i L'Aufll`(ro pi ol'"f1fork, l/Ili'd.JYY Prof r.:'I Hkx WO',8'00 r .. • ECOnorthwest Implementation and acquisition advisory memo. Providing a high-level assessment of real estate market conditions and high-level funding and implementation strategies for three projects. • 4 stakeholder interviews and summaries conducted by EcoNW • 4 meetings with EcoNW, City staff and Mithun • 1 additional site visit for HDR up to 3 hours, 1 staff • Planning level Cost estimate for up to three priority projects (Class 5 per AACE)by HDR • Assemble the Draft Master Plan with required desktop analysis results, engagement documentation, concepts, implementation strategy, priority investments, costs, priorities and timelines. • Submit Draft Master Plan to City and Ecology for one consolidated review cycle. • Incorporate comments once and prepare Final Master Plan • Prepare Planning Commission and Council presentation materials and adoption support materials. • Support one Planning Commission work session/briefing and one Planning Commission public hearing/recommendation, as directed by the City. • Support one Council committee/adoption presentation package, as directed by the City. • Support EAGL deliverables, including final digital educational products, meeting agendas/attendance logs and closeout materials. I .. • Draft Master Plan, • Final Master Plan. • Planning Commission / Council presentation deck and staff -support graphics. • Final digital outreach closeout support package for EAGL ""fiiII' H1, I r::rrl""f1 Iow""r{rl`>>Y i l'I✓"rlr1' 1'11"Af'""r Phi,i L'ufll`(ropi ol'"f1ork Uil�a.rrtiPrj d Pkx W ',8'00 Assumptions • One consolidated City review cycle per deliverable. City coordinates department, Ecology and stakeholder input and returns one reconciled comment log. • Standard review window: 5 business days for memos, engagement materials and interim packages; 10 business days for Draft Master Plan review. • Final Plan review is limited to confirmation that consolidated comments were addressed. • Additional review cycles, additional public meetings, new alternatives, additional project cut sheets, expanded cost estimating or deeper technical/economic testing draw from contingency or require amendment. Contingency reserve is intended solely for unforeseen conditions or City -authorized scope changes and shall not be utilized without prior written approval from the City. • Ecology review of education/outreach materials is built into the schedule before distribution as required by the grant agreement. • City will lead translation of materials for main languages relevant to the project area. • City will lead Tribal coordination protocols and invitations; the consultant team will support with materials, maps, issue tracking and integration of input. • City will lead and send mailed notices, unless separately authorized. • City will print materials, except for the $1,000 printing allowance identified in the budget. • City will upload each meeting attendance log and meeting agenda in EAGL and notify the Ecology Project Manager. • City will request written approval from Ecology before light -refreshment reimbursement is sought for public meetings. • The consultant team will create digital files and materials suitable for City/Ecology review, but the City is responsible for final public notice, hearing logistics and legislative procedures. ,.REV,7 • New hydraulic modeling, topographic survey or geotechnical investigation. The consultant team will request and review available existing modeling from the City, King County, HDR, NHC or other sources as part of the data request; new modeling is excluded. Updated hydraulic modeling results from NHC, if available during the planning process, may be reviewed and incorporated into the work. • 307o engineering design, construction documents or permit applications. • Formal SEPA documentation, detailed property appraisals, title review, acquisition negotiations or legal services. • Code amendment drafting beyond zoning/policy recommendations. • Detailed benefit -cost analysis or grant writing. • More than four commission advisory group sessions, two community events, one Planning Commission hearing/support meeting and one Council committee/adoption support package, unless substituted or authorized through contingency. • More than four segment framework diagrams or four perspectives/vignettes unless authorized through contingency. ""f ii I I' Y HI, I I I ow""I" { rl`> > Y i 11 1"An' ""I" Phi, i I.' rn[ I S(;opi !1l"Nork, /Ili'd.JYY 'roj r.:'I Hkx WO',8'00 Engagement assumptions Engagement plan, message Jul/Aug 2026 framework and review protocol Project look and feel Commission advisory group Tribal coordination support Up to 2 community events ..]1...11' I % %)W) Mithun defines audiences, materials, languages, accessibility, review path and how input informs decisions. Jul /Aug 2026 Mithun prepares tagline/slogan, flyer template, web/email banner and visual identity for engagement materials. Sep 2026 -Mar Mithun leads up to four sessions through the existing 2027 Park Commission. Jul 2026 -Apr City leads protocols/invitations; consultant team 2027 supports maps, materials, issue tracking and integration. Fall 2026 Winter Share alternatives and programming -to -place 2027 findings; gather comments without a large open house, supported by a QR code or online feedback pathway. Engagement documentation Nov 2026 -May Summaries, attendance logs, comment matrix and and comment integration 2027 response -to -input documentation. ""r1I'II' H1, II Iow""r 1'I 1"An'""r'Iffyi L'Aufil`(r ojpi ol'"f1ork l/Ili'iun Proj""(J 'ire, WO',8'00 Budget Table 1 - Budget Summary Milhun HDR 2CC7norihwest Sarch Krauage Prinfing Direct Expenses Stipends and Food Blase Scope Subtotal Contingency Reserve 107a,5 3114.,5 144.0 120.0 0.0 $211,175,20 $742k3.86 $1,904..15 $29,930.00 $11,520,00 $1,07OO.fJO $1,500.00 $7,00(),00 $326,834.06 $11,404.15 $21 ➢,175.20 $7,611.807 $83,729.80 $2,993.00 $32,423,00 $1,p52.00 $12,672.00 $1, 00n.00 $ B , 500.00 $7,000.0() $11',,756.80 $350,000.00 $211,175.20 $83,729.80 $32,723,00 $12672.00 $1, CiOL?.00 $1,5O0-00 $7.()00'00 $350,000.00 $30,000.00 $50,000.00 Conlingenc:v reserve is s0eY y for unforeseen condiflon.s ar sc or- changes and requires prier written City approval. *assumes City will lead the procurement of translation services for the relevant languages for the study area. Mithun team to provide the text and content to betranslated. Materials maybe printed on 11x17. See Table 3 for detailed staff, rate, hour, markup, direct expense, stipend, and contingency budget information. rlitI'1HI, I I o l ""I` (rl`a a Y l 11 l/f fr.lai'I" Phi, I I.'Aufl l `,(;> jp, of "f1 oi-k 1/Ili'1UYY 'ka. WO',8'00 Table 2-Task/Firm Summary Y Prgc a W"t UP Y unmjF i"",e i ."dl $1 MOM MA PI/Sri CjWirr,,jI'Ior) .. PJbIr E,,D.g—rd rtxrnJ AI gnm N $357,5'00.00 111 1"l�f7c'rrfrir , it, uru:3 H arilc;i�s 3 ✓nl rr•ihysh.. Sy,11,—, esis rand Future $73.1017.20 - $73, 10$.0r 4 wi,k, rrj,0 u�n�rrr nF'F fc FI sNund $7.194.00 C 1ancr~�t Caaae•eln,^.rnnini 5w1 ..Jnr7 "m i Irl Irlr rr1E7r1Yu11li 9trc1t1514y" $ Fn..ft P,m-frh r ton Final i„I JwntmrPh,, $11.1'2100 r;1Y1d Ad.pJi l 5,,pj3C]I"f SwtfMd Bsa--q--bf.1.1 C.M. C..Nw..Cy —.". ..J!...)1' I % %k%k $4'1 `215- FO $1A.54'"Q0 $1 MOM $251714.00 - $57,P1t}.:.140 $357,5'00.00 $19999.20 pr 108.00 $ 00 '.T $7,000.00 $73.1017.20 - $73, 10$.0r $17.100.00 $23.800.70 $7.194.00 $48.094.70 - ^$48,OW4..70 $'p','t,4flfidf(.P $10.fi'3,8. pt,N $11.1'2100 - .. $114. Oi5H, 1CI - $114,15 1'u $"fi31111000 $1,'U,60 30 $11„{"120).01(4 $27, 30,30 $2'1.4070.010 $4,09..30 $1,848.Y00 $1.188.00 $29,1.25.3f5 $29.1 ?sx) $217.175.29... $83,724.80... $32,923.99 $12,37299 $1,(193.99 $1.509.49 '$7,000,00 $350,999.00 - $350006Aa $34.094.00 $39.489,.92 nn11n[4crn_ p rc s:r,2x e dy for r.,n orr c n :,un¢i'd4r it or —pe. changos rind r gLIII.I Friar ',111.11 Ci'Iw npprc�r L 1'[ ii I I' H1, I I I ow""" ( 1 11 l"An'J""Ir Phi, I 'ArnH S(ojp,,, ol "Nork, KAHI'lun Proj""d Ht:x WO't8'00 Table 3 - combined consultant fee table J!)I, I %, %)W)6 Schedule ix, 'I', 11C 11, frL1 1., IOdi 1,),, 1"""' x $1,It "', Wct 1, MA, .......... ...... It :ptl 'It 511 111" 11:1 Ir It It :'o 011 sr -113 111 pe silv.ue wr 1, 13 t, '-I, X vl1U X C - 5 - 11 MR.. SAW.] SWIt.1 136,6 2540 lot IMS 170 102A 66"78 .5 3211, 1 mm $211,17620 It".11 b1 1ti 41 Rlp ,Pao" I I 11—i,x 1517 11 11 0 -fill .I.1 11", m-, 71111 It VI isk 115 1 il $111 1, . . ..... ..... I Tl —1, 1f 1., 14 it I N, 1, 0, W 1 It lic N.0 1.11 I.0 'A11 II OIt I t, :11, 171 1 0 C11 0,6tl�, HtllN.IdtlO�mm, wo-rt—M 8.bNW.1 Su M.1 6.0 6{4.4 No M 0 114.0 521.9W 0 58,51 666 SMM N ill. GO , CU "1 111, W 111 1,1 1, 1,113 ''f11.9: J,. 4* till yu li :Sl L— 52,W S, M 01 ill] 't'o, 71-,il If, m SuWRolal o ol oo 5" 1w - OB 132h 1111.6 =AMIA6 M IAN 16 W.11188' ssoon M Schedule I ow""r ( rl"/ / Y l l'1'// Ir[roP1'1 l/f fr, ""r Phi, I L'Aufl l `,r;r' p of "11fork, 1"AHI'dJPh Pr//j/d Hkx WO',8'00 Lower Green Riverfront Master Plan ae hil;lrrglul / Work N loll°'' 2026 2027 LIIIIIEGEND work prograu %np .idem snored 15­1,1sesslons VW Key Dec s un i KAk Olt/ Check n Meeling ��D aft defveroble r nc l r Commission ° Adoption may occur beyond June 2027 Stakeholder Outroach Slott review 'IM,derl rtment Worlohaos ,, Final dotivorable a V O O V o Z a G E z a Q F Z e 522$9 fi IR202] .4,p 175431 7142129 5121925 5121976 2 9 TA, 733417 11 2, 2B 4 11 1825 l 015 l 8 152229 512,826 3 1017243, 7,42125 DCSIGIV DRAFT DOCS nN4f' KI'il` it IEVIYEW 1 C1 Strzi10 111—InV90N-CONC[r'LS EVALa SLRAi EGY _ NFHVEMEM DOCS aside,, seuio ,o"' I In Phase 7 Project Start Up and Management le cope P',Ilpnment Rerenecf Plan Client Check-in meetings .... Phase 2 Community Engagement and Agency Alignment Engagement Plan Commiene Advisory Group Sessions%,tortc.orrs„Waty eve t Community Events CAG In: CAG kR: CAG#s: CAG R4: uses/cNNre wsron/program iew glierngtives Interdepartmental Workshops (10W) j- IDW ril: Kickoff IDW N]: Opp/ -s Alternatives /Goals/Vision antl Princi gls Constraints/Prelim A, ­ til vise antl retlevel. Phase 3 Analysis and Synthesis and Fut Dev Con Reference document synthesis matrix Opportunities and Constraints presentation. HDR technical constrains/opportunities memo. Phase 4 Vision, Alternatives and Concept Development Vision, Values and Planning Principles Package Draft Alternative Preferred Alt. native,�„ti, Phase 5 Funding and Implementation Strategy Acqu s t on advisory memo Funding Stratefy Memo Phase 6 Draft/Final Master Plan Draft Master Plan Final Master Plan Henning Commission presentation Council presentation Hearing Recommendation Adoption' LIIIIIEGEND work prograu %np .idem snored 15­1,1sesslons VW Key Dec s un i KAk Olt/ Check n Meeling ��D aft defveroble r nc l r Commission ° Adoption may occur beyond June 2027 Stakeholder Outroach Slott review 'IM,derl rtment Worlohaos ,, Final dotivorable