HomeMy WebLinkAboutRes 1354 - 1997-2002 Transportation Improvement Program ILA.. rso$ City o u la Washington Resolution No. 1354 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar years, and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on May 20,1996; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Tukwila, as revised and extended for the ensuing six (6) calendar years (1997 -2002, inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY C UNCIL OF H� OF TUKWILA, WASHINGTON, at a regular meeting thereof this day of ,1996. V Pam Carter, Council President ATTEST /AUTHENTICATED: C�L'Zc_t ne E. Cantu, City Clerk AP OVED AST ORM: l OFFICE OFT CIT�ATTC�RNEY Filed with the City Clerk: Passed by the City Council: �l%3% iF Resolution Number RESTIP.DOC 5129196 Six Year Transportation Improvement Program In Order by County, Agency, City, TIP Year Priority, Funding Status Projects seperated by County, Agency Printed 05/30/96 6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 Page (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency :Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total LIM Start Federal RAP,etc. Local/ (Local Agency Use) Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 03 1.340 1G P S T W I Funding Secured Revision: 0 PE 400 150 150 600 14 1 PACIFIC HIGHW,,Y RW 0 0 0 0 S 116 ST S 152 ST CN 0 1,490 1,555 5,525 Paving, curb and gutter, sidewalk, drainage, illumination, utility relocation, traffic signal modifications including Total 400 1,640 1,705 6,125 interconnect, landscaping. Phase 1 PE (S 140 -S 152) and Const (S 142 -S 148) funded in 1997/98. PE 1/1997 STP(U) 258 0 40 298 CN 1/1998 STP(U) 1,483 0 232 1,715 PROJECT TOTAL 1,741 0 272 2,013 City Tukwila 06 0.000 P C P S T W II Funding Secured Revision: 0 PE 100 100 100 300 16 2 ANNUAL OVERLAY RW 0 0 0 0 various city streets CN 0 800 800 2,700 Repair, rehabilitate and overlay. Total 100 900 900 3,000 PE 111997 0 0 600 600 CN 4/1998 STP(U) 141 0 4,159 4,300 PROJECT TOTAL 141 0 4,759 4,900 City Tukwila 12 0.000 1 1 Subject to Selection Revision: 0 PE 30 15 15 45 19 3 PEDESTRIAN PA RW 0 0 0 0 Various City streets. CN 0 135 85 255 Pave and /or stripe shoulder for walkway. Total 30 150 100 300 PE 1/1997 0 0 105 105 CN 3/1998 0 0 475 475 PROJECT TOTAL 0 0 580 580 City Tukwila 12 0.000 1 I Funding Secured Revision: 0 PE 100 46 150 450 14 4 GREEN RIVER V AL COORDINATION RW 0 0 0 0 Arterial Traffic Signals in GR Valley CN 180 171 0 0 Evaluate existing signals and design signal coordination on major arterials to reduce congestion and improve air Total 280 217 150 450 quality. Phase 1 is W Valley Hwy and PE 111997 CMAQ 71 0 29 100 CN 6/1997 CMAQ 129 0 51 180 PE 1/1998 STP(U) 41 0 5 46 CN 5/1998 STP(U) 151 0 20 171 PE 111999 STP(U) 560 0 40 600 PROJECT TOTAL 952 0 145 1,097 i i ies Legeno G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX SAN Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 (Project Costs in Thousands of Dollars) Page 2 Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use) Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 12 0.000 I I Fundin g Secured Revision: 0 PE 0 0 0 10 16 5 ANNUAL TRAFFIC �ACPRUGRAM RW 0 0 0 0 Various intersections. CN 100 70 70 210 Install traffic signal controllers with minor signal modifications such as left turns and coordination. Total 100 70 70 210 CN 4/1997 0 0 450 450 PROJECT TOTAL 0 0 450 450 City Tukwila 09 0.500 I I Funding Secured Revision: 0 PE 30 30 50 500 14 6 16 Avenue S Bridge RW 0 0 0 0 Duwamish River crossing CN 70 70 0 0 Design and reconstruct bridge Total 100 100 50 500 PE 1/1997 0 0 610 610 CN 6/1997 0 0 140 140 PROJECT TOTAL 0 0 750 750 City Tukwila 11 0.000 I I Funding Secured Revision: 0 PE 20 20 20 60 14 7 BRIDGE PROGRAM RW 0 0 0 0 Various locations in City CN 390 145 280 540 Perform load ratings and bi- annual inspections, paint, repair, and rehabilitate. Total 410 165 300 600 PE 1/1997 0 0 120 120 CN 611997 0 0 1,355 1,355 PROJECT TOTAL 0 0 1,475 1,475 City Tukwila 12 1.000 P P S T W I Planning Purposes Revision: 0 PE 20 20 0 0 16 8 SOUTHCENTER PATUMAY bIUNAUS RW 0 0 0 0 Strander Blvd S 180 St CN 70 70 0 0 Design and construct signa'is with pedestrian crossings at various locations. Total 90 90 0 0 PE 1/1997 0 0 20 20 CN 611997 0 0 70 70 PE 111998 0 0 20 20 CN 6/1998 0 0 70 70 PROJECT TOTAL 0 0 180 180 unuues Legena G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 Page 3 (Project Costs In Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency :Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Wit Start Federal RAP,etc. Local/ (Local Agency Use) CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 31 0.000 I I Funding Secured Revision: 0 PE 90 0 0 0 00 9 TRANSPORTATI RW 0 0 0 0 Citywide CN 0 0 0 0 Forecast traffic for year 2015 using new comprehensive plan zoning Total 90 0 0 0 PE 1/1997 0 0 90 90 PROJECT TOTAL 0 0 90 90 City Tukwila 01 0.000 I P S T W I Planning Purposes Revision: 0 PE 35 75 0 0 17 10 SOUTH 168 STREET RW 0 0 0 0 Southcenter Parkway Andover Park West CN 0 0 350 350 Construct new roadway including paving, curb and gutter, drainage, sidewalk, illumination, traffic signals with Total 35 75 350 350 interconnect. PE 1/1997 0 0 110 110 CN 7/1999 0 0 700 700 PROJECT TOTAL 0 0 810 810 City Tukwila 21 0.000 I P S T W I Planning Purposes Revision: 0 PE 50 0 0 0 16 11 CBD TRANSIT CENTErc RW 0 0 0 0 Central Business District CN 0 0 0 0 Construct trtansit center Total 50 0 0 0 PE 1/1997 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 12 0.400 I P T I Subject to Selection Revision: 0 PE 45 80 0 0 14 12 WEST VALLEY HIGHWAY 5 I"RANDER BLVD RW 0 0 0 0 1000 feet north and south of intersectio CN 0 0 495 0 Construct additional northbound left turn lane from WVH to Strander. Paving, drainage, sidewalk, traffic signal Total 45 80 495 0 modifications. PE 5/1996 0 0 45 45 PE 3/1997 STP(U) 60 0 20 80 CN 4/1998 STP(U) 340 0 155 495 PROJECT TOTAL 400 0 220 620 i i ies Legena G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX SAM Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 Page 4 (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RAP,etc, Local/ (Local Agency Use) Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 21 0.000 IG PST W II Planning Purposes Revision: 0 PE 25 0 0 0 14 13 GRN RIVER VALLuTOI3ACCENTER RW 0 0 0 0 Interurban Avenue Grady Way CN 0 0 0 0 Design and construct a multimodal center serving transit, future rail, bike, pedestrian and HOV traffic. Total 25 0 0 0 PE 1/1997 0 0 25 25 PROJECT TOTAL 0 0 25 25 City Tukwila 12 0.200 I P l I Planning Purposes Revision: 0 PE 0 25 0 0 14 14 WEST VALLEY HIGHWAY/ f56 RW 0 0 0 0 Southcenter Blvd S 158 Street CN 0 0 300 0 Construct additional northbound left turn lane at intersection for HOV. Paving, drainage, sidewalk, traffic signal Total 0 25 300 0 modifications. PE 7/1998 STP 17 0 8 25 CN 111999 STP 203 0 97 300 PROJECT TOTAL 220 0 105 325 City Tukwila 04 0.380 IG S T W I Planning Purposes Revision: 0 PE 0 0 0 30 17 15 MINKLER BLVD RW 0 0 0 0 Southcenter Pkwy Andover Park W CN 0 0 0 395 Construct remaining paving, curb and gutter, drainage, sidewalk with development and RR track removal. Total 0 0 0 425 ALL 1/2000 0 0 425 425 PROJECT TOTAL 0 0 425 425 City Tukwila 12 0.000 P C P ST W II Planning Purposes Revision: 0 PE 0 0 0 100 14 16 TRAFFIC SIGNAL INTERCONNECT RW 0 0 0 0 CBD signalized intersections CN. 0 0 0 800 Design and install hard wire interconnect system with central master controller. Total 0 0 0 900 PE 1/2000 STP(U) 80 0 20 100 CN 1/2001 STP(U) 640 0 160 800 PROJECT TOTAL 720 0 180 900 uuuties Legena G Gas P Power T Telephone O Other C Cable TV S Sewer W Wafer 6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 p age 5 (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency :Tukwila Resolution Number County King County Phase Data Expenditure Schedule Start Federal RAP,etc. Local/ (Local Agency Use) Func Project Imp Total Util Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 12 0.200 C P 5 T W II Planning Purposes Revision: 0 PE 0 0 0 30 16 17 S 133 ST /SR599 89 OFFRAMF IN I ERSECTION RW 0 0 0 0 500 feet from intersection on each leg CN 0 0 0 220 Design and construct intersection improvements including signalization, lighting, crosswalks, and drainage. Total 0 0 0 250 PE 112000 STP(U) 25 0 5 30 CN 1/2001 STP(U) 175 0 45 220 PROJECT TOTAL 200 0 50 250 City Tukwila 05 0.450 P S T W I Planning Purposes Revision: 0 PE 0 0 0 45 14 18 WEST VALLEY HIGHWAY RW 0 0 0 0 1405 Strander Blvd CN 0 0 0 535 Design and construct widening to 7 lanes including paving, curb and gutter, sidewalk, illumination. Total 0 0 0 580 ALL 1/2001 0 0 580 580 PROJECT TOTAL 0 0 580 580 City Tukwila 04 0.500 I 1 Planning Purposes Revision: 0 PE 0 0 0 100 14 19 PACIFIC HIGHWAY b i RW 0 0 0 0 Pacific Hwy Bridge SR 599 CN 0 0 0 0 Design and construct widening on Pacific Hwy and SR 599 on -ramp for HOV improvements including paving, Total 0 0 0 100 illumination, signal modifications. PE 1/2002 0 0 100 100 PROJECT TOTAL 0 0 100 100 City Tukwila 01 0.500 I P S T W I Planning Purposes Revision: 0 PE 0 0 0 50 16 20 57 AVENUE S RW 0 0 0 0 S 180 St South City Limit CN 0 0 0 0 Design and construct widening to 4 and 5 lanes including paving, curb and gutter, drainage, sidewalks, Total 0 0 0 50 illumination, overhead utility relocation. PE 1/2002 0 0 50 50 PROJECT TOTAL 0 0 50 50 uunoes Legeno G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 Page 6 (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency :Tukwila Resolution Number County King County Phase Data Expenditure Schedule Start Federal RAP,etc. Local/ (Local Agency Use) Func Project Imp Total Util Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 03 0.400 I P S T W I Planning Purposes Revision: 0 PE 0 0 0 50 16 21 E MARGINAL WAY RW 0 0 0 0 Boeing Access Road S 112 Street CN 0 0 0 0 Design and construct widening to 3 lanes including paving, curb and gutter, sidewalks, drainage, illumination, Total 0 0 0 50 overhead utility relocation. PE 1/2002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 03 0.000 C P S T W I Planning Purposes Revision: 0 PE 0 0 0 50 14 22 INTERURBAN AVrNUt RW 0 0 0 0 S 139 Street Fort Dent Way CN 0 0 0 0 Construct paving, curb and gutter, drainage, sidewalk, illumination, landscaping, traffic signal modifications, Total 0 0 0 50 underground overhead utilities. PE 112002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 05 0.800 I P S vv Planning Purposes Revision: 0 PE 0 0 0 50 14 23 PACIFIC HIGHWi-a RW 0 0 0 0 Boeing Access Road S 116 Way CN 0 0 0 0 Deisgn and construct widening including paving, curb and gutter, sidewalks, illumination, drainage, overhead utility Total 0 0 0 50 relocation. PE 1/2002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 09 0.300 P P I Funding Secured Revision: 0 PE 0 0 0 0 14 24 PACIFIC HIGHWAt RW 0 0 0 0 S 112 St S 116 Way CN 2,970 2,430 0 0 Replace and widen existing bridge Total 2,970 2,430 0 0 CN 111997 BR 4,320 0 1,060 5,400 PROJECT TOTAL 4,320 0 1,080 5,400 R i ResLegeno G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX S/W Rev: 2.16b3 4/17196 Form Rev Date: 07/25/95 1997 to 2002 (Project Costs in Thousands of Dollars) Page 7 Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use) Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 12 0.500 P P S T W I Funding Secured Revision: 0 PE 98 0 0 0 14 25 INTERURBAN AV WIDENING RW 0 0 0 0 S'center Blvd to 1000 ft north Ft Dent W CN 1,110 0 0 0 Construct additional northbound left turn lane for HOV from Interurban to 1405 southbound on -ramp. Total 1,208 0 0 0 PE 6/1996 STP(U) 85 0 13 98 CN 5/1997 STP(U) 960 0 150 1,110 PROJECT TOTAL 1,045 0 163 1,208 City Tukwila 03 1.330 IG C P S T W I Funding Secured Revision: 0 PE 300 0 0 0 17 26 40/42 AVENUE S RW 0 0 0 0 S131 -S160 CN 0 0 1,816 0 Design and reconstruct street including paving, curb and gutter, drainage, sidewalk, underground overhead utilities, Total 300 0 1,816 0 traffic signal at S 154 St. PE 1/1997 0 0 300 300 CN 4/1999 0 0 1,816 1,816 PROJECT TOTAL 0 0 2,116 2,116 City Tukwila 01 0.000 I P Funding Secured Revision: 0 PE 0 0 0 0 BAN TRA 00 27 INTERURIL RW 0 0 0 0 Strander Blvd 1405 CN 300 0 0 0 construct trail Total 300 0 0 0 CN 4/1997 STP(E) 240 0 60 300 PROJECT TOTAL 240 0 60 300 City Tukwila 01 0.000 I I Funding Secured Revision: 0 PE 0 0 0 0 00 28 INTERURBAN TRAIL BWEMEDBRIDGE RW 0 0 0 0 Green River CN 780 0 0 0 Construct bridge to cross Green River to connect Interurban trail to the Green River Trail. Total 780 0 0 0 CN 111997 STP(E) 640 0 140 780 PROJECT TOTAL 640 0 140 780 uwnies Legena G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 Page 8 (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use) Cl PH Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 01 0.000 �G W I Funding Secured Revision: 0 PE 0 0 0 0 00 29 INTERURBAN TRAIL RW 0 0 0 0 1405 Interurban Avenue CN 25 0 0 0 Construct trial Total 25 0 0 0 CN 4/1996 0 0 25 25 PROJECT TOTAL 0 0 25 25 City Tukwila 01 0.000 LG P S T W OJ Funding Secured Revision: 0 PE 0 0 0 0 16 30 CBD SIDEWALKS RW 0 0 0 0 Various streets in the Central Business CN 500 0 0 0 Construct sidewalks and landscaping Total 500 0 0 0 CN 7/1996 STP(U) 250 0 250 500 PROJECT TOTAL 250 0 250 500 City Tukwila 09 0.250 P C P S T W I Funding Secured Revision: 0 PE 0 0 0 0 17 31 MACADAM ROADDGt RW 0 0 0 0 S 133 St overcrossing CN 200 0 0 0 Reconstruct bridge Total 200 0 0 0 CN 9/1996 0 0 200 200 PROJECT TOTAL 0 0 200 200 City Tukwila 09 0.000 C P 5 T W I Funding Secured Revision: 0 PE 0 0 0 0 16 32 51 AVENUE BRIDdL RW 0 0 0 0 Overcrossing S 154 St and Gilliam Creek S151 St to SR518 onramp CN 200 0 0 0 reconstruct bridge Total 200 0 0 0 CN 5/1996 0 0 200 200 PROJECT TOTAL 0 0 200 200 utilities Legeno G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX SIW Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 Page 9 (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RAP,etc. Locall (Local Agency Use) Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 03 1.930 IG P S T W I Funding Secured Revision: 0 PE 0 0 0 0 14 33 EAST MARGINAL vvAY RW 0 0 0 0 Boeing Access Rd North City Limit CN 4,000 0 0 0 Paving, curb and gutter, drainage, sidewalk, illumination, utility relocation, traffic signal modifications including Total 4,000 0 0 0 interconnect, landscaping. CN 711996 0 TIA 1,600 2,400 4,000 PROJECT TOTAL 0 1,600 2,400 4,000 City Tukwila 03 0.110 I Planning Purposes Revision: 0 PE 0 0 0 50 19 34 NELSEN PLACE RW 0 0 0 0 S 156 St S 158 St CN 0 0 0 0 Design and construct paving, curb and gutter, drainage, sidewalks, illumination. Total 0 0 0 50 PE 112002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 01 0.500 I Planning Purposes Revision: 0 PE 0 0 0 35 00 35 CBD INTERURBAN TRAIL CON�OR RW 0 0 0 0 Interurban Trail to CBD CN 0 0 0 0 Design and construct trail from Interurban trail to CBD between Strander Blvd and S 180 St. Total 0 0 0 35 PE 112002 0 0 35 35 PROJECT TOTAL 0 0 35 35 City Tukwila 03 0.300 I C P S T W I Planning Purposes Revision: 0 PE 0 0 0 35 17 36 S 144 STREET RW 0 0 0 0 Pacific Highway Military Road CN 0 0 0 0 Design and construct widening including paving, curb and gutter, drainage, sidewalks, illumination, overhead utility Total 0 0 0 35 relocation. PE 112002 0 0 35 35 PROJECT TOTAL 0 0 35 35 hies egena G Gas P Power T Telephone O Other C Cable TV S Sewer W Wafer 6YRTIP.FRX SM/ Rev: 2.16b3 4!12!96 Form Rev Date: 07/25/95 1997 to 2002 P age 10 (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency :Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RAP,etc, Local/ (Local Agency Use) Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 03 0.230 I P S T W I Planning Purposes Revision: 0 PE 0 0 0 50 19 37 S 134 STREET RW 0 0 0 0 S 133 St 48 Ave S CN 0 0 0 0 Design and construct widening including paving, curb and gutter, drainage, sidewalks, illumination, overhead utility Total 0 0 0 50 relocation. PE 1/2002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 01 0.200 I P S 'f W O Planning Purposes Revision: 0 PE 0 0 0 50 14 38 S 180 STREET RAICROA6GKuabiNG RW 0 0 0 0 S 180 St at UP /BN RR crossing CN 0 0 0 0 Design and construct new separated grade crossing of existing railroad tracks. Total 0 0 0 50 PE 1/2002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 05 0.500 I I Planning Purposes Revision: 0 PE 0 0 0 50 16 39 SOUTHCENTER I'ARI WAY RW 0 0 0 0 15 off ramp Ss 168 St. CN 0 0 0 0 Design and construct safety and capacity improvements including widening Southcenter Pkwy. Total 0 0 0 50 PE 1/2002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 01 0.100 P S T W I Planning Purposes Revision: 0 PE 0 0 0 50 14 40 S 180 STREET P�DERt Aba (c_v JPRR RW 0 0 0 0 S 180 St at UPRR CN 0 0 0 0 Design and construct separated grade crossing for Interurban trail. Total 0 0 0 50 PE 1/2002 0 0 50 50 PROJECT TOTAL 0 0 50 50 i i ies Legena G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX SIW Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95 1997 to 2002 p age 11 (Project Costs in Thousands of Dollars) Hearing Date 05/20/96 MPO ALL Adoption Date 06/03/96 Agency :Tukwila Resolution Number County King County Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use) Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th City Tukwila 09 0.400 I P T O I Planning Purposes Revision: 0 PE 0 0 0 50 14 41 BOEING ACCESS RD ER@GEREPLACEMENT RW 0 0 0 0 Boeing Access Rd 1 -5 to Airport Way CN 0 0 0 0 Reconstruct bridge Total 0 0 0 50 PE 112002 0 0 50 50 PROJECT TOTAL 0 0 50 50 City Tukwila 12 0.200 P S T W OI Planning Purposes Revision: 0 PE 0 0 0 50 16 42 ANDOVER PARK E71NDUSTRY SIGNAL RW 0 0 0 0 Andover Pk E and Industry Drive 500 feet from intersection on each leg CN 0 0 0 0 Design and construct intersection improvements including signal, crosswalks, illumination Total 0 0 0 50 PE 112002 0 0 50 50 PROJECT TOTAL 0 0 50 50 TOTAL for the Agency of Tukwila 10,869 1,600 18,500 30,9691 TOTAL for the County of King County 10,869 1,600 18,500 30,9691 GRAND TOTAL 10,869 1,600 18,500 30,969 12,238 5,942 6,236 14,410 GM ies egeno G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX SNV Rev: 2.16b3 4112/96 Form Rev Date: 07125195