Resolution No. 1354 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended,
the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program
and thereafter periodically modified said Comprehensive Street Program by resolution, and
WHEREAS, the City Council has reviewed the work accomplished under said program,
determined current and future City street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar
years, and
WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement
Program on May 20,1996;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the
City of Tukwila, as revised and extended for the ensuing six (6) calendar years (1997 -2002,
inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this
reference as if fully set forth, which program sets forth the project location, type of improvement
and the estimated cost thereof, is hereby adopted and approved.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a
copy of this resolution, together with the exhibit attached hereto, with the Secretary of
Transportation and the Transportation Improvement Board of the State of Washington.
PASSED BY THE CITY C UNCIL OF H� OF TUKWILA, WASHINGTON, at a
regular meeting thereof this day of ,1996.
V
Pam Carter, Council President
ATTEST /AUTHENTICATED:
C�L'Zc_t
ne E. Cantu, City Clerk
AP OVED AST ORM:
l
OFFICE OFT CIT�ATTC�RNEY
Filed with the City Clerk:
Passed by the City Council: �l%3% iF
Resolution Number
RESTIP.DOC 5129196
Six Year Transportation Improvement Program
In Order by County, Agency, City, TIP Year Priority, Funding Status
Projects seperated by County, Agency
Printed 05/30/96
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 Page
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency :Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total LIM Start Federal RAP,etc. Local/ (Local Agency Use)
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 03 1.340 1G P S T W I Funding Secured Revision: 0 PE 400 150 150 600
14 1 PACIFIC HIGHW,,Y RW 0 0 0 0
S 116 ST S 152 ST CN 0 1,490 1,555 5,525
Paving, curb and gutter, sidewalk, drainage, illumination, utility relocation, traffic signal modifications including Total 400 1,640 1,705 6,125
interconnect, landscaping. Phase 1 PE (S 140 -S 152) and Const (S 142 -S 148) funded in 1997/98.
PE 1/1997 STP(U) 258 0 40 298
CN 1/1998 STP(U) 1,483 0 232 1,715
PROJECT TOTAL 1,741 0 272 2,013
City Tukwila 06 0.000 P C P S T W II Funding Secured Revision: 0 PE 100 100 100 300
16 2 ANNUAL OVERLAY RW 0 0 0 0
various city streets CN 0 800 800 2,700
Repair, rehabilitate and overlay. Total 100 900 900 3,000
PE 111997 0 0 600 600
CN 4/1998 STP(U) 141 0 4,159 4,300
PROJECT TOTAL 141 0 4,759 4,900
City Tukwila 12 0.000 1 1 Subject to Selection Revision: 0 PE 30 15 15 45
19 3 PEDESTRIAN PA RW 0 0 0 0
Various City streets. CN 0 135 85 255
Pave and /or stripe shoulder for walkway. Total 30 150 100 300
PE 1/1997 0 0 105 105
CN 3/1998 0 0 475 475
PROJECT TOTAL 0 0 580 580
City Tukwila 12 0.000 1 I Funding Secured Revision: 0 PE 100 46 150 450
14 4 GREEN RIVER V AL COORDINATION RW 0 0 0 0
Arterial Traffic Signals in GR Valley CN 180 171 0 0
Evaluate existing signals and design signal coordination on major arterials to reduce congestion and improve air Total 280 217 150 450
quality. Phase 1 is W Valley Hwy and
PE 111997 CMAQ 71 0 29 100
CN 6/1997 CMAQ 129 0 51 180
PE 1/1998 STP(U) 41 0 5 46
CN 5/1998 STP(U) 151 0 20 171
PE 111999 STP(U) 560 0 40 600
PROJECT TOTAL 952 0 145 1,097
i i ies Legeno
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX SAN Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002
(Project Costs in Thousands of Dollars) Page 2
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 12 0.000 I I Fundin g Secured Revision: 0 PE 0 0 0 10
16 5 ANNUAL TRAFFIC �ACPRUGRAM RW 0 0 0 0
Various intersections. CN 100 70 70 210
Install traffic signal controllers with minor signal modifications such as left turns and coordination. Total 100 70 70 210
CN 4/1997 0 0 450 450
PROJECT TOTAL 0 0 450 450
City Tukwila 09 0.500 I I Funding Secured Revision: 0 PE 30 30 50 500
14 6 16 Avenue S Bridge RW 0 0 0 0
Duwamish River crossing CN 70 70 0 0
Design and reconstruct bridge Total 100 100 50 500
PE 1/1997 0 0 610 610
CN 6/1997 0 0 140 140
PROJECT TOTAL 0 0 750 750
City Tukwila 11 0.000 I I Funding Secured Revision: 0 PE 20 20 20 60
14 7 BRIDGE PROGRAM RW 0 0 0 0
Various locations in City CN 390 145 280 540
Perform load ratings and bi- annual inspections, paint, repair, and rehabilitate. Total 410 165 300 600
PE 1/1997 0 0 120 120
CN 611997 0 0 1,355 1,355
PROJECT TOTAL 0 0 1,475 1,475
City Tukwila 12 1.000 P P S T W I Planning Purposes Revision: 0 PE 20 20 0 0
16 8 SOUTHCENTER PATUMAY bIUNAUS RW 0 0 0 0
Strander Blvd S 180 St CN 70 70 0 0
Design and construct signa'is with pedestrian crossings at various locations. Total 90 90 0 0
PE 1/1997 0 0 20 20
CN 611997 0 0 70 70
PE 111998 0 0 20 20
CN 6/1998 0 0 70 70
PROJECT TOTAL 0 0 180 180
unuues Legena
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 Page 3
(Project Costs In Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency :Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Wit Start Federal RAP,etc. Local/ (Local Agency Use)
CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 31 0.000 I I Funding Secured Revision: 0 PE 90 0 0 0
00 9 TRANSPORTATI RW 0 0 0 0
Citywide CN 0 0 0 0
Forecast traffic for year 2015 using new comprehensive plan zoning Total 90 0 0 0
PE 1/1997 0 0 90 90
PROJECT TOTAL 0 0 90 90
City Tukwila 01 0.000 I P S T W I Planning Purposes Revision: 0 PE 35 75 0 0
17 10 SOUTH 168 STREET RW 0 0 0 0
Southcenter Parkway Andover Park West CN 0 0 350 350
Construct new roadway including paving, curb and gutter, drainage, sidewalk, illumination, traffic signals with Total 35 75 350 350
interconnect.
PE 1/1997 0 0 110 110
CN 7/1999 0 0 700 700
PROJECT TOTAL 0 0 810 810
City Tukwila 21 0.000 I P S T W I Planning Purposes Revision: 0 PE 50 0 0 0
16 11 CBD TRANSIT CENTErc RW 0 0 0 0
Central Business District CN 0 0 0 0
Construct trtansit center Total 50 0 0 0
PE 1/1997 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 12 0.400 I P T I Subject to Selection Revision: 0 PE 45 80 0 0
14 12 WEST VALLEY HIGHWAY 5 I"RANDER BLVD RW 0 0 0 0
1000 feet north and south of intersectio CN 0 0 495 0
Construct additional northbound left turn lane from WVH to Strander. Paving, drainage, sidewalk, traffic signal Total 45 80 495 0
modifications.
PE 5/1996 0 0 45 45
PE 3/1997 STP(U) 60 0 20 80
CN 4/1998 STP(U) 340 0 155 495
PROJECT TOTAL 400 0 220 620
i i ies Legena
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX SAM Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 Page 4
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc, Local/ (Local Agency Use)
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 21 0.000 IG PST W II Planning Purposes Revision: 0 PE 25 0 0 0
14 13 GRN RIVER VALLuTOI3ACCENTER RW 0 0 0 0
Interurban Avenue Grady Way CN 0 0 0 0
Design and construct a multimodal center serving transit, future rail, bike, pedestrian and HOV traffic. Total 25 0 0 0
PE 1/1997 0 0 25 25
PROJECT TOTAL 0 0 25 25
City Tukwila 12 0.200 I P l I Planning Purposes Revision: 0 PE 0 25 0 0
14 14 WEST VALLEY HIGHWAY/ f56 RW 0 0 0 0
Southcenter Blvd S 158 Street CN 0 0 300 0
Construct additional northbound left turn lane at intersection for HOV. Paving, drainage, sidewalk, traffic signal Total 0 25 300 0
modifications.
PE 7/1998 STP 17 0 8 25
CN 111999 STP 203 0 97 300
PROJECT TOTAL 220 0 105 325
City Tukwila 04 0.380 IG S T W I Planning Purposes Revision: 0 PE 0 0 0 30
17 15 MINKLER BLVD RW 0 0 0 0
Southcenter Pkwy Andover Park W CN 0 0 0 395
Construct remaining paving, curb and gutter, drainage, sidewalk with development and RR track removal. Total 0 0 0 425
ALL 1/2000 0 0 425 425
PROJECT TOTAL 0 0 425 425
City Tukwila 12 0.000 P C P ST W II Planning Purposes Revision: 0 PE 0 0 0 100
14 16 TRAFFIC SIGNAL INTERCONNECT RW 0 0 0 0
CBD signalized intersections CN. 0 0 0 800
Design and install hard wire interconnect system with central master controller. Total 0 0 0 900
PE 1/2000 STP(U) 80 0 20 100
CN 1/2001 STP(U) 640 0 160 800
PROJECT TOTAL 720 0 180 900
uuuties Legena
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Wafer
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 p age 5
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency :Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Start Federal RAP,etc. Local/ (Local Agency Use)
Func Project Imp Total Util
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 12 0.200 C P 5 T W II Planning Purposes Revision: 0 PE 0 0 0 30
16 17 S 133 ST /SR599 89 OFFRAMF IN I ERSECTION RW 0 0 0 0
500 feet from intersection on each leg CN 0 0 0 220
Design and construct intersection improvements including signalization, lighting, crosswalks, and drainage. Total 0 0 0 250
PE 112000 STP(U) 25 0 5 30
CN 1/2001 STP(U) 175 0 45 220
PROJECT TOTAL 200 0 50 250
City Tukwila 05 0.450 P S T W I Planning Purposes Revision: 0 PE 0 0 0 45
14 18 WEST VALLEY HIGHWAY RW 0 0 0 0
1405 Strander Blvd CN 0 0 0 535
Design and construct widening to 7 lanes including paving, curb and gutter, sidewalk, illumination. Total 0 0 0 580
ALL 1/2001 0 0 580 580
PROJECT TOTAL 0 0 580 580
City Tukwila 04 0.500 I 1 Planning Purposes Revision: 0 PE 0 0 0 100
14 19 PACIFIC HIGHWAY b i RW 0 0 0 0
Pacific Hwy Bridge SR 599 CN 0 0 0 0
Design and construct widening on Pacific Hwy and SR 599 on -ramp for HOV improvements including paving, Total 0 0 0 100
illumination, signal modifications.
PE 1/2002 0 0 100 100
PROJECT TOTAL 0 0 100 100
City Tukwila 01 0.500 I P S T W I Planning Purposes Revision: 0 PE 0 0 0 50
16 20 57 AVENUE S RW 0 0 0 0
S 180 St South City Limit CN 0 0 0 0
Design and construct widening to 4 and 5 lanes including paving, curb and gutter, drainage, sidewalks, Total 0 0 0 50
illumination, overhead utility relocation.
PE 1/2002 0 0 50 50
PROJECT TOTAL 0 0 50 50
uunoes Legeno
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 Page 6
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency :Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Start Federal RAP,etc. Local/ (Local Agency Use)
Func Project Imp Total Util
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 03 0.400 I P S T W I Planning Purposes Revision: 0 PE 0 0 0 50
16 21 E MARGINAL WAY RW 0 0 0 0
Boeing Access Road S 112 Street CN 0 0 0 0
Design and construct widening to 3 lanes including paving, curb and gutter, sidewalks, drainage, illumination, Total 0 0 0 50
overhead utility relocation.
PE 1/2002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 03 0.000 C P S T W I Planning Purposes Revision: 0 PE 0 0 0 50
14 22 INTERURBAN AVrNUt RW 0 0 0 0
S 139 Street Fort Dent Way CN 0 0 0 0
Construct paving, curb and gutter, drainage, sidewalk, illumination, landscaping, traffic signal modifications, Total 0 0 0 50
underground overhead utilities.
PE 112002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 05 0.800 I P S vv Planning Purposes Revision: 0 PE 0 0 0 50
14 23 PACIFIC HIGHWi-a RW 0 0 0 0
Boeing Access Road S 116 Way CN 0 0 0 0
Deisgn and construct widening including paving, curb and gutter, sidewalks, illumination, drainage, overhead utility Total 0 0 0 50
relocation.
PE 1/2002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 09 0.300 P P I Funding Secured Revision: 0 PE 0 0 0 0
14 24 PACIFIC HIGHWAt RW 0 0 0 0
S 112 St S 116 Way CN 2,970 2,430 0 0
Replace and widen existing bridge Total 2,970 2,430 0 0
CN 111997 BR 4,320 0 1,060 5,400
PROJECT TOTAL 4,320 0 1,080 5,400
R i ResLegeno
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/17196 Form Rev Date: 07/25/95
1997 to 2002
(Project Costs in Thousands of Dollars) Page 7
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 12 0.500 P P S T W I Funding Secured Revision: 0 PE 98 0 0 0
14 25 INTERURBAN AV WIDENING RW 0 0 0 0
S'center Blvd to 1000 ft north Ft Dent W CN 1,110 0 0 0
Construct additional northbound left turn lane for HOV from Interurban to 1405 southbound on -ramp. Total 1,208 0 0 0
PE 6/1996 STP(U) 85 0 13 98
CN 5/1997 STP(U) 960 0 150 1,110
PROJECT TOTAL 1,045 0 163 1,208
City Tukwila 03 1.330 IG C P S T W I Funding Secured Revision: 0 PE 300 0 0 0
17 26 40/42 AVENUE S RW 0 0 0 0
S131 -S160 CN 0 0 1,816 0
Design and reconstruct street including paving, curb and gutter, drainage, sidewalk, underground overhead utilities, Total 300 0 1,816 0
traffic signal at S 154 St.
PE 1/1997 0 0 300 300
CN 4/1999 0 0 1,816 1,816
PROJECT TOTAL 0 0 2,116 2,116
City Tukwila 01 0.000 I P Funding Secured Revision: 0 PE 0 0 0 0
BAN TRA
00 27 INTERURIL RW 0 0 0 0
Strander Blvd 1405 CN 300 0 0 0
construct trail Total 300 0 0 0
CN 4/1997 STP(E) 240 0 60 300
PROJECT TOTAL 240 0 60 300
City Tukwila 01 0.000 I I Funding Secured Revision: 0 PE 0 0 0 0
00 28 INTERURBAN TRAIL BWEMEDBRIDGE RW 0 0 0 0
Green River CN 780 0 0 0
Construct bridge to cross Green River to connect Interurban trail to the Green River Trail. Total 780 0 0 0
CN 111997 STP(E) 640 0 140 780
PROJECT TOTAL 640 0 140 780
uwnies Legena
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 Page 8
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
Cl PH Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 01 0.000 �G W I Funding Secured Revision: 0 PE 0 0 0 0
00 29 INTERURBAN TRAIL RW 0 0 0 0
1405 Interurban Avenue CN 25 0 0 0
Construct trial Total 25 0 0 0
CN 4/1996 0 0 25 25
PROJECT TOTAL 0 0 25 25
City Tukwila 01 0.000 LG P S T W OJ Funding Secured Revision: 0 PE 0 0 0 0
16 30 CBD SIDEWALKS RW 0 0 0 0
Various streets in the Central Business CN 500 0 0 0
Construct sidewalks and landscaping Total 500 0 0 0
CN 7/1996 STP(U) 250 0 250 500
PROJECT TOTAL 250 0 250 500
City Tukwila 09 0.250 P C P S T W I Funding Secured Revision: 0 PE 0 0 0 0
17 31 MACADAM ROADDGt RW 0 0 0 0
S 133 St overcrossing CN 200 0 0 0
Reconstruct bridge Total 200 0 0 0
CN 9/1996 0 0 200 200
PROJECT TOTAL 0 0 200 200
City Tukwila 09 0.000 C P 5 T W I Funding Secured Revision: 0 PE 0 0 0 0
16 32 51 AVENUE BRIDdL RW 0 0 0 0
Overcrossing S 154 St and Gilliam Creek S151 St to SR518 onramp CN 200 0 0 0
reconstruct bridge Total 200 0 0 0
CN 5/1996 0 0 200 200
PROJECT TOTAL 0 0 200 200
utilities Legeno
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX SIW Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 Page 9
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Locall (Local Agency Use)
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 03 1.930 IG P S T W I Funding Secured Revision: 0 PE 0 0 0 0
14 33 EAST MARGINAL vvAY RW 0 0 0 0
Boeing Access Rd North City Limit CN 4,000 0 0 0
Paving, curb and gutter, drainage, sidewalk, illumination, utility relocation, traffic signal modifications including Total 4,000 0 0 0
interconnect, landscaping.
CN 711996 0 TIA 1,600 2,400 4,000
PROJECT TOTAL 0 1,600 2,400 4,000
City Tukwila 03 0.110 I Planning Purposes Revision: 0 PE 0 0 0 50
19 34 NELSEN PLACE RW 0 0 0 0
S 156 St S 158 St CN 0 0 0 0
Design and construct paving, curb and gutter, drainage, sidewalks, illumination. Total 0 0 0 50
PE 112002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 01 0.500 I Planning Purposes Revision: 0 PE 0 0 0 35
00 35 CBD INTERURBAN TRAIL CON�OR RW 0 0 0 0
Interurban Trail to CBD CN 0 0 0 0
Design and construct trail from Interurban trail to CBD between Strander Blvd and S 180 St. Total 0 0 0 35
PE 112002 0 0 35 35
PROJECT TOTAL 0 0 35 35
City Tukwila 03 0.300 I C P S T W I Planning Purposes Revision: 0 PE 0 0 0 35
17 36 S 144 STREET RW 0 0 0 0
Pacific Highway Military Road CN 0 0 0 0
Design and construct widening including paving, curb and gutter, drainage, sidewalks, illumination, overhead utility Total 0 0 0 35
relocation.
PE 112002 0 0 35 35
PROJECT TOTAL 0 0 35 35
hies egena
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Wafer
6YRTIP.FRX SM/ Rev: 2.16b3 4!12!96 Form Rev Date: 07/25/95
1997 to 2002 P age 10
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency :Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc, Local/ (Local Agency Use)
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 03 0.230 I P S T W I Planning Purposes Revision: 0 PE 0 0 0 50
19 37 S 134 STREET RW 0 0 0 0
S 133 St 48 Ave S CN 0 0 0 0
Design and construct widening including paving, curb and gutter, drainage, sidewalks, illumination, overhead utility Total 0 0 0 50
relocation.
PE 1/2002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 01 0.200 I P S 'f W O Planning Purposes Revision: 0 PE 0 0 0 50
14 38 S 180 STREET RAICROA6GKuabiNG RW 0 0 0 0
S 180 St at UP /BN RR crossing CN 0 0 0 0
Design and construct new separated grade crossing of existing railroad tracks. Total 0 0 0 50
PE 1/2002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 05 0.500 I I Planning Purposes Revision: 0 PE 0 0 0 50
16 39 SOUTHCENTER I'ARI WAY RW 0 0 0 0
15 off ramp Ss 168 St. CN 0 0 0 0
Design and construct safety and capacity improvements including widening Southcenter Pkwy. Total 0 0 0 50
PE 1/2002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 01 0.100 P S T W I Planning Purposes Revision: 0 PE 0 0 0 50
14 40 S 180 STREET P�DERt Aba (c_v JPRR RW 0 0 0 0
S 180 St at UPRR CN 0 0 0 0
Design and construct separated grade crossing for Interurban trail. Total 0 0 0 50
PE 1/2002 0 0 50 50
PROJECT TOTAL 0 0 50 50
i i ies Legena
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX SIW Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1997 to 2002 p age 11
(Project Costs in Thousands of Dollars)
Hearing Date 05/20/96
MPO ALL Adoption Date 06/03/96
Agency :Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 09 0.400 I P T O I Planning Purposes Revision: 0 PE 0 0 0 50
14 41 BOEING ACCESS RD ER@GEREPLACEMENT RW 0 0 0 0
Boeing Access Rd 1 -5 to Airport Way CN 0 0 0 0
Reconstruct bridge Total 0 0 0 50
PE 112002 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 12 0.200 P S T W OI Planning Purposes Revision: 0 PE 0 0 0 50
16 42 ANDOVER PARK E71NDUSTRY SIGNAL RW 0 0 0 0
Andover Pk E and Industry Drive 500 feet from intersection on each leg CN 0 0 0 0
Design and construct intersection improvements including signal, crosswalks, illumination Total 0 0 0 50
PE 112002 0 0 50 50
PROJECT TOTAL 0 0 50 50
TOTAL for the Agency of Tukwila 10,869 1,600 18,500 30,9691
TOTAL for the County of King County 10,869 1,600 18,500 30,9691
GRAND TOTAL 10,869 1,600 18,500 30,969 12,238 5,942 6,236 14,410