HomeMy WebLinkAboutRes 1379 - 1998-2003 Transportation Improvement Program ("keg mo
esti O
r9o8
it of
Washington
Resolution No. /3 7 9
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the
City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and
thereafter periodically modified said Comprehensive Street Program by resolution, and
WHEREAS, the City Council has reviewed the work accomplished under said program,
determined current and future City street and arterial needs, and based upon these findings has prepared
a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar years, and
WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement
Program on August 4, 1997;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO. HEREBY RESOLVE AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City
of Tukwila, as revised and extended for the ensuing six (6) calendar years, 1998 -2003, inclusive), a copy
of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth,
which program sets forth the project location, type of improvement and the estimated cost thereof, is
hereby adopted and approved.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of
this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the
Transportation Improvement Board of the State of Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a
regular meeting thereof this day of ausitd 1997.
im Hagen, Council President
ATTEST /AUTHENTICATED:
Jane E. Cantu, City Clerk
APPRO H'AA O FORM:
FICE OF TH ITY ATTORNEY
Filed with the City Clerk: 7- 3 O- g 7
Passed by the City Council: 8- 97
Resolution Numbers 3 7�
DRAFT 1998 2003 TIP SUMMARY 1 17/10/97
1 1 1 I 1 1 1 I
I I I 1 I 1 I 1 I
97 -02 98 -03 PROJECT TITLE 1998 1999 2000 2001 2002 2003 TOTAL FUNDING SOURCES
TIP TIP 1 federal uata 1 tia developer city
1 1 I Pac Hwy (S 116 St S 152 St) 750 2,506 2,015 1 2,015 2,095 9,381 1 2,816 (2,500) 6,565
9 2 ITransportation Plan 100 100 1 100
11 3 I CBD Transit Center 10 10 1 10
13 4'Green Rvr Vly Multimodal Center 25 25 (1,000) 25
5 I BNSF Intermodal Yard Access 30 30 (9,600) (2,400) 30
20 6 157 Ave S (S 180 St SCL) 231 231 200 (1,000) (1,200) (200) 31
38 7 IS 180 St RR Underpass (UP /BNSF) 600 900 1,500 (12,000) (3,000) 1,500
2 8'Overlay Repair Program 450 1,650 1,000 850 850 1,000 5,800 100 5,700
3 9 IPedestrian Safety Program 100 100 100 100 100 100 600 (300) 600
5 10 'Annual Traffic Signal Program 70 70 70 70 70 70 420 420
7 11 IBridge Program 165 300 200 200 200 200 1,265 1,265
24 12 Pac Hwy Bridge (Duwamish) 4,000 1,246 5,246 4,070 1,176 0
25 13 Interurban Ave Bridge Widen 1,208 1,208 960 240 i 8
28 14 Interurban Trail Bike /Ped Bridge 780 780 640 1 140
22 15 Interurban Ave (S 139 St -Ft Dent) 10 100 50 160 1 1 100 1 60
12 16 W Valley Hwy /Strander 450 450 390 1 1 60
8 17 Southcenter Pkwy Signals 100 1 100 _1 100
4 18 Green Rvr Vly Signal Coordination 200 18 1 387 L 335 52 0
16 19 CBD Traffic Signal Interconnect 100 100 700 1 900 1 100 800
6 20 16 Ave S Bridge 100 50 100 200 200 1 200 1 850 1 850
14 21 W Valley Hwy /S 156 St 25 300 1 325 1 (260) 4 1 325
15 22 Minkler Blvd (SC Pkwy APW) 1 425 1 425 1 1 1 (425) 425
10 23 S 168 St (SC Pkwy APW) 75 350 1 350 1 775 1 (775) 775
17 24 IS 133 St/SR 599 off ramp signal 30 1 220 1 250 (200) 250
18 25 W Valley Hwy (1405 Strander) I 580 1 580 1 (530) 1 580
19 26 Pacific Hwy /S 116 St I 1 100 1 100 1 1 1 100
21 27 E Marginal Way (BAR S 112 St) 1 50 1 50 1 50
23 28 Pacific Hwy (BAR S 116) 50 1 50 1 50
42 29 APE /Industry Signal 50 1 50 (160) (30) 50
34 30 Nelsen PI (S 156 S 158) 50 50 50
35 31 CBD- Interurban Trail Connector 35 35 1 1 1 35
36 32 S 144 St (Pac Hwy Military Rd) 35 35 35
37 33 S 134 St (S 133 48 Ave) 50 50 50
40 34 S 180 St Ped Xing UPRR 50 50 50
39 35 Southcenter Pkwy (15 off S 168) 50 50 1 1 1 50
41 36 'Boeing Access Rd Bridge Replace 1 1 50 50 1 1 1 50
TOTAL 9,4791 7,134 1,770 4,065 5,285 4,635 32,368 9,611 0 1521 1,416 21,189
1 1 UNSECURED FUNDING
1997 -2002 TIP PROJECTS REMOVED: 1 1 1 1 1 1 1 1
26 140/42 Ave S (S 160 S 131) 1 1 1 1 1 1 1 1
27 I Interurban Trail (Strndr -1405) 1 1 1 1 1
29 Interurban Trail (1405- Interurban) 1 1 1 1 1 1 1 1
30 CBD Sidewalks 1 1 1 1 1
31 Macadam Bridge
32 51 Ave Bridge
33 E Maginal Way (BAR NCL) 1 1 I 1 1 1 1
Six Year Transportation Improvement Program
In Order by County, Agency, City, TIP Year Priority, Funding Status
Projects seperated by County, Agency
Printed 08/01/1997
6YRTIP.FRX SAN Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003 Page 1
(Project Costs in Thousands of Dollars)
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 03 1.340 IG P S T W 1 Funding Secured Revision: 0 PE 300 0 0 600
14 1 PACIFIC HIGHW /,r RW 0 0 0 0
S 116 ST S 152 ST CN 450 2,506 0 5,525
Paving, curb and gutter, sidewalk, drainage, illumination, utility relocation, traffic signal modifications including Total 750 2,506 0 6,125
interconnect, landscaping. Phase 1 PE (S 140 -S 152) and Const (S 142 -S 148) funded in 1997/98.
PE 1/1998 STP(U) 258 0 40 298
CN 10/1998 STP(U) 2,558 0 399 2,957
PROJECT TOTAL 2,816 0 439 3,255
City Tukwila 31 0.000 1 1 Funding Secured Revision: 0 PE 100 0 0 0
00 2 TRANSPORTATION RW 0 0 0 0
Citywide CN 0 0 0 0
Forecast traffic for year 2015 using new comprehensive plan zoning Total 100 0 0 0
PE 1/1998 0 0 100 100
PROJECT TOTAL 0 0 100 100
City Tukwila 21 0.000 1 P S T W l Planning Purposes Revision: 0 PE 10 0 0 0
16 3 CBD TRANSIT CENTEK RW 0 0 0 0
Central Business District CN 0 0 0 0
Construct trtansit center Total 10 0 0 0
PE 1/1998 0 0 10 10
PROJECT TOTAL 0 0 10 10
City Tukwila 21 0.000 G P S T W 1 Planning Purposes Revision: 0 PE 25 0 0 0
14 4 GRN RIVER VALLEYMULTIMODALCENTER RW 0 0 0 0
Interurban Avenue Grady Way CN 0 0 0 0
Design and construct a multimodal center serving transit, future rail, bike, pedestrian and HOV traffic. Total 25 0 0 0
PE 1/1998 0 0 25 25
PROJECT TOTAL 0 0 25 25
Utilities Legena
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003
{Project Costs in Thousands of Dollars) Page 2
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
ci Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 01 0.500 p C P S T W 01 Funding Secured Revision: 0 PE 30 0 0 0
16 5 BNSF INTERMODAL YARD RW 0 0 0 0
S 129 St to Boeing Access Rd CN 0 0 0 0
Study and determine new access to intermodal yard at north or south end in order to close the existing access on Total 30 0 0 0
S 124 St.
PE 1/1998 0 0 30 30
PROJECT TOTAL 0 0 30 30
City Tukwila 01 0.500 I P S T W I Planning Purposes Revision: 0 PE 231 0 0 0
16 6 57 AVENUES RW 0 0 0 0
S 180 St South City Limit CN 0 0 0 0
Design and construct widening to 4 and 5 lanes including paving, curb and gutter, drainage, sidewalks, Total 231 0 0 0
illumination, overhead utility relocation.
PE 1/1998 STP 200 0 31 231
PROJECT TOTAL 200 0 31 231
City Tukwila 01 0.200 P S T W 01 Planning Purposes Revision: 0 PE 600 900 0 0
14 7 S 180 STREET RAILROAD CROSSING RW 0 0 0 0
S 180 St at UP /BN RR crossing CN 0 0 0 0
Design and construct new separated grade crossing of existing railroad tracks. Total 600 900 0 0
PE 1/1998 0 0 1,500 1,500
PROJECT TOTAL 0 0 1,500 1,500
City Tukwila 06 0.000 I p C P S T W I Funding Secured Revision: 0 PE 50 150 100 400
16 8 ANNUAL OVERLAYAND REPAIR PROGRAM RW 0 0 0 0
various city streets CN 400 1,500 900 2,300
Repair, rehabilitate and overlay. Total 450 1,650 1,000 2,700
PE 1/1998 0 0 700 700
CN 4/1998 STP(U) 100 0 5,000 5,100
PROJECT TOTAL 100 0 5,700 5,800
utwties t-egena
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003 P age 3
(Project Costs in Thousands of Dollars)
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 12 0.000 I J Subject to Selection Revision: 0 PE 10 10 10 20
19 9 PEDESTRIAN SAFETY PROGRAM RW 0 0 0 0
Various City streets. CN 90 90 90 280
Pave and /or stripe shoulder for walkway. Total 100 100 100 300
PE 1/1998 0 0 50 50
CN 3/1998 0 0 550 550
PROJECT TOTAL 0 0 600 600
City Tukwila 12 0.000 l I Funding Secured Revision: 0 PE 0 0 0 0
16 10 ANNUAL TRAFFI S IGNAL PROGRAM RW 0 0 0 0
Various intersections. CN 70 70 70 210
Install traffic signal controllers with minor signal modifications such as left turns and coordination. Total 70 70 70 210
CN 4/1998 0 0 420 420
PROJECT TOTAL 0 0 420 420
City Tukwila 11 0.000 I I Funding Secured Revision: 0 PE 20 20 20 60
14 11 ANNUAL BRIDGE PROGRAM RW 0 0 0 0
Various locations in City CN 145 280 180 540
Perform load ratings and bi- annual inspections, paint, repair, and rehabilitate. Total 165 300 200 600
PE 1/1998 0 0 120 120
CN 6/1998 0 0 1,145 1,145
PROJECT TOTAL 0 0 1,265 1,265
City Tukwila 09 0.300 G P Funding Secured Revision: 0 PE 0 0 0 0
14 12 PACIFIC HIGHWAYBRIDGE RW 0 0 0 0
S 112 St S 116 Way CN 4,000 1,246 0 0
Replace and widen existing bridge Total 4,000 1,246 0 0
CN 10/1997 BR 4,070 0 1,176 5,246
PROJECT TOTAL 4,070 0 1,176 5,246
utmties Legena
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003 Page 4
(Project Costs in Thousands of Dollars)
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
(Local Agency Use)
Func Project Imp Total Util
Start Federal RAP,etc. Local/
CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 12 0.500 P S T W I Funding Secured Revision: 0 PE 0 0 0 0
14 13 INTERURBAN AV RW 0 0 0 0
S'center Blvd to 1000 ft north Ft Dent W CN 1,208 0 0 0
Construct additional northbound left turn lane for HOV from Interurban to 1405 southbound on -ramp. Total 1,208 0 0 0
PE 6/1996 STP(U) 85 0 13 98
CN 5/1998 STP(U) 960 0 248 1,208
PROJECT TOTAL 1,045 0 261 1,306
City Tukwila 01 0.000 1 Funding Secured Revision: 0 PE 0 0 0 0
00 14 INTERURBAN TRAIL BIKEIPED BRIDGE RW 0 0 0 0
Green River CN 780 0 0 0
Construct bridge to cross Green River to connect Interurban trail to the Green River Trail. Total 780 0 0 0
CN 5/1998 STP(E) 640 0 140 780
PROJECT TOTAL 640 0 140 780
City Tukwila 03 0.000 G C P S T W 1 Planning Purposes Revision: 0 PE 10 0 0 50
14 15 INTERURBAN AV=NUt RW 0 0 0 0
S 139 Street Fort Dent Way CN 0 100 0 0
Construct paving, curb and gutter, drainage, sidewalk, illumination, landscaping, traffic signal modifications, Total 10 100 0 50
underground overhead utilities.
PE 1/1998 0 0 60 60
CN 4/1999 0 0 100 100
PROJECT TOTAL 0 0 160 160
City Tukwila 12 0.400 1 P T I Subject to Selection Revision: 0 PE 0 0 0 0
14 16 WEST VALLEY HIGHWAYTSTRANDER BLVD RW 0 0 0 0
1000 feet north and south of intersectio CN 450 0 0 0
Construct additional northbound left turn lane from WVH to Strander. Paving, drainage, sidewalk, traffic signal Total 450 0 0 0
modifications.
PE 5/1996 0 0 45 45
PE 3/1997 STP(U) 60 0 20 80
CN 411998 STP(U) 390 0 60 450
PROJECT TOTAL 450 0 125 575
utiuues Legena
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003
(Project Costs in Thousands of Dollars) Page 5
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
ci Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 12 tamp P S T W 1 Planning Purposes Revision: 0 PE 0 0 0 0
16 17 SOUTHCENTER PARKWAY-SIGNALS RW 0 0 0 0
Strander Blvd S 180 St CN 100 0 0 0
Design and construct signals with pedestrian crossings at various locations. Total 100 0 0 0
PE 1/1997 0 0 20 20
CN 1/1998 0 0 100 100
PE 1/1998 0 0 20 20
CN 1/1998 0 0 100 100
PROJECT TOTAL 0 0 240 240
City Tukwila 12 0.000 I J Funding Secured Revision: 0 PE 20 20 0 0
14 18 GREEN RIVER VALLEY COORDINATION RW 0 0 0 0
Arterial Traffic Signals in GR Valley CN 180 167 0 0
Evaluate existing signals and design signal coordination on major arterials to reduce congestion and improve air Total 200 187 0 0
quality. Phase 1 is W Valley Hwy and
PE 1/1998 CMAQ 17 0 3 20
CN 6/ 1998 CMAQ 156 0 24 180
PE 1/1999 STP(U) 17 0 3 20
CN 5/1999 STP(U) 145 0 22 167
PE 1/1999 STP(U) 560 0 40 600
PROJECT TOTAL 895 0 92 987
City Tukwila 12 0.000 9CPSTW 1 Planning Purposes Revision: 0 PE 20 0 0 100
14 19 CBD TRAFFIC SIGNAL RW 0 0 0 0
CBD signalized intersections CN 80 0 0 700
Design and install hard wire interconnect system with central master controller. Total 100 0 0 800
PE 1/2001 0 0 100 100
CN 1/2002 0 0 700 700
CN 1/ 1998 STP(U) 80 0 0 80
PE 7/1998 STP(U) 20 0 0 20
PROJECT TOTAL 100 0 800 900
utmties Legend
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003 Page 6
(Project Costs in Thousands of Dollars)
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 09 0.500 I I Funding Secured Revision: 0 PE 30 50 30 600
14 20 16 Avenue S Bridge RW 0 0 0 0
Duwamish River crossing CN 70 0 70 0
Design and reconstruct bridge Total 100 50 100 600
PE 1/1998 0 0 710 710
CN 6/1997 0 0 140 140
PROJECT TOTAL 0 0 850 850
City Tukwila 12 0.200 P T II Planning Purposes Revision: 0 PE 0 25 0 0
14 21 WEST VALLEY HI RW 0 0 0 0
Southcenter Blvd S 158 Street CN 0 0 300 0
Construct additional northbound left turn lane at intersection for HOV. Paving, drainage, sidewalk, traffic signal Total 0 25 300 0
modifications.
PE 7/1999 STP 20 0 5 25
CN 1/2000 STP 240 0 60 300
PROJECT TOTAL 260 0 65 325
City Tukwila 04 0.380 p S T W I Planning Purposes Revision: 0 PE 0 0 0 30
17 22 MINKLER BLVD RW 0 0 0 0
Southcenter Pkwy Andover Park W CN 0 0 0 395
Construct remaining paving, curb and gutter, drainage, sidewalk with development and RR track removal. Total 0 0 0 425
ALL 1/2001 0 0 425 425
PROJECT TOTAL 0 0 425 425
City Tukwila 01 0.000 I P S T W I Planning Purposes Revision: 0 PE 0 0 75 0
17 23 SOUTH 168 STREET RW 0 0 0 0
Southcenter Parkway Andover-Park West CN 0 0 0 700
Construct new roadway including paving, curb and gutter, drainage, sidewalk, illumination, traffic signals with Total 0 0 75 700
interconnect.
PE 1/2001 0 0 75 75
CN 4/2002 0 0 700 700
PROJECT TOTAL 0 0 775 775
utmties Legend
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX SAN Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003 Page 7
(Project Costs in Thousands of Dollars)
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
ci Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 12 0.200 p C P S T W Planning Purposes Revision: 0 PE 0 0 0 30
16 24 S 133 ST /SR599 5B OFFRAMF TNTEFSECTION RW 0 0 0 0
500 feet from intersection on each leg CN 0 0 0 220
Design and construct intersection improvements including signalization, lighting, crosswalks, and drainage. Total 0 0 0 250
PE 1/2001 STP(U) 25 0 5 30
CN 1/2002 STP(U) 175 0 45 220
PROJECT TOTAL 200 0 50 250
City Tukwila 05 0.450 iG P S T W 1 Planning Purposes Revision: 0 PE 0 0 0 45
14 25 WEST VALLEY HIGHWAY RW 0 0 0 0
1405 Strander Blvd CN 0 0 0 535
Design and construct widening to 7 lanes including paving, curb and gutter, sidewalk, illumination. Total 0 0 0 580
ALL 1/2002 0 0 580 580
PROJECT TOTAL 0 0 580 580
City Tukwila 04 0.500 1 1 Planning Purposes Revision: 0 PE 0 0 0 100
T
14 26 PACIFIC HIGHWA S1 STREE RW 0 0 0 0
Pacific Hwy Bridge SR 599 CN 0 0 0 0
Design and construct widening on Pacific Hwy and SR 599 on -ramp for HOV improvements including paving, Total 0 0 0 100
illumination, signal modifications.
PE 1/2003 0 0 100 100
PROJECT TOTAL 0 0 100 100
City Tukwila 03 0.400 I P S T W 1 Planning Purposes Revision: 0 PE 0 0 0 50
16 27 E MARGINAL WAY RW 0 0 0 0
Boeing Access Road S 112 Street CN 0 0 0 0
Design and construct widening to 3 lanes including paving, curb and gutter, sidewalks, drainage, illumination, Total 0 0 0 50
overhead utility relocation.
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
Utilities Legend
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003
(Project Costs in Thousands of Dollars) Page 8
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 05 0.800 1 P S W 1 Planning Purposes Revision: 0 PE 0 0 0 50
14 28 PACIFIC HIGHWi- r RW 0 0 0 0
Boeing Access Road S 116 Way CN 0 0 0 0
Deisgn and construct widening including paving, curb and gutter, sidewalks, illumination, drainage, overhead utility Total 0 0 0 50
relocation.
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 12 0.200 G P S T W 01 Planning Purposes Revision: 0 PE 0 0 0 50
16 29 ANDOVER PARK E /INDUSTRYDR SIGNAL RW 0 0 0 0
Andover Pk E and Industry Drive 500 feet from intersection on each leg CN 0 0 0 0
Design and construct intersection improvements including signal, crosswalks, illumination Total 0 0 0 50
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 03 0.110 I I Planning Purposes Revision: 0 PE 0 0 0 50
19 30 NELSEN PLACE RW 0 0 0 0
S 156 St S 158 St CN 0 0 0 0
Design and construct paving, curb and gutter, drainage, sidewalks, illumination. Total 0 0 0 50
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 01 0.500 I I Planning Purposes Revision: 0 PE 0 0 0 35
00 31 CBD INTERURBANTRAILCONNECTOR RW 0 0 0 0
Interurban Trail to CBD CN 0 0 0 0
Design and construct trail from Interurban trail to CBD between Strander Blvd and S 180 St. Total 0 0 0 35
PE 1/2003 0 0 35 35
PROJECT TOTAL 0 0 35 35
utmnes Legena
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003 Page 9
(Project Costs in Thousands of Dollars)
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Utii Start Federal RAP,etc. Local/ (Local Agency Use)
CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 03 0.300 1 C P S T W I Planning Purposes Revision: 0 PE 0 0 0 35
17 32 S 144 STREET RW 0 0 0 0
Pacific Highway Military Road CN 0 0 0 0
Design and construct widening including paving, curb and gutter, drainage, sidewalks, illumination, overhead utility Total 0 0 0 35
relocation.
PE 1/2003 0 0 35 35
PROJECT TOTAL 0 0 35 35
City Tukwila 03 0.230 I P S T W 1 Planning Purposes Revision: 0 PE 0 0 0 50
19 33 S 134 STREET RW 0 0 0 0
S133St- 48AveS CN 0 0 0 0
Design and construct widening including paving, curb and gutter, drainage, sidewalks, illumination, overhead utility Total 0 0 0 50
relocation.
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 01 0.100p P S T W 1 Planning Purposes Revision: 0 PE 0 0 0 50
14 34 S 180 STREET PED @UPRR RW 0 0 0 0
S 180 St at UPRR CN 0 0 0 0
Design and construct separated grade crossing for Interurban trail. Total 0 0 0 50
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
City Tukwila 05 0.500 1 I Planning Purposes Revision: 0 PE 0 0 0 50
16 35 SOUTHCENTER ARKWM RW 0 0 0 0
15 off ramp S 168 St. CN 0 0 0 0
Design and construct safety and capacity improvements including widening Southcenter Pkwy. Total 0 0 0 50
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
utilities t-egena
G Gas P Power T Telephone 0 Other
C Cable TV S Sewer W Water
6YRTIP.FRX S/W Rev: 2.16b3 4/12/96 Form Rev Date: 07/25/95
1998 to 2003 P age 10
(Project Costs in Thousands of Dollars)
Hearing Date 08/04/1997
MPO ALL Adoption Date
Agency Tukwila Resolution Number
County King County
Phase Data Expenditure Schedule
Func Project Imp Total Util Start Federal RAP,etc. Local/ (Local Agency Use)
ci Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total 1st 2nd 3rd 4th -6th
City Tukwila 09 0.400 P T 01 Planning Purposes Revision: 0 PE 0 0 0 50
14 36 BOEING ACCESS RD BRIDGEREPIACEMENT RW 0 0 0 0
Boeing Access Rd 1 -5 to Airport Way CN 0 0 0 0
Reconstruct bridge Total 0 0 0 50
PE 1/2003 0 0 50 50
PROJECT TOTAL 0 0 50 50
TOTAL for the Agency of Tukwila 10,776 0 16,429 27,205
TOTAL for the County of King County 10,776 0 16,429 27,205
GRAND TOTAL 10,776 0 16,429 27,205 9,479 7,134 1,845 13,910