HomeMy WebLinkAboutRes 1401 - 1999-2004 Transportation Improvement Program k ,fir
1908
City
Washington
Resolution No. /4
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE
STATE SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended,
the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program
and thereafter periodically modified said Comprehensive Street Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said program,
determined current and future City street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar
years; and
WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement
Program on July 6, 1998;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a
copy of this resolution, together with the exhibit attached hereto, with the Secretary of
Transportation and the Transportation Improvement Board of the State of Washington.
PASSED BY THE CITY COUNCIL OF THE TY OF TUKWILA, WASHINGTON, at a
regular meeting thereof this 6 day of 1998.
J a 1
?G,,,--,..L LL
Pamela Linder, Council President
ATTEST /AUTHENTICATED:
.-CLC7 G -e))/
Jae E. Cantu, City Clerk
APPROVED AS TO FORM:
2
By:
Office oft Citf At ney
Filed with the City Clerk: 9 9r
Passed by the City Council: 7 -La i'
Resolution Number /90
TIP99- 04.DOC 7/2/1998
v71 4W Page 1 Six Year Transportation Improvement Program
Washington State Department of Transportation
Agge Tukwila From 1999 to 2004
County No. 17 Hearing Date 07/06/1998
City No. 1320
MPO PSRC Adoption Date 07/06/1998
Resolution No.
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. N
Expenditure Schedule
c B. Bridge No. E N y c o i Fund Source Information P Projects Only
o ya C. Project Title v m 8 d Federal Funding (Local Agency) R/W
u m E D. Str ee t/Count y Road Name or Number T J 4th Required
v n� u) Phase Fe deral Federal State
i a. z E. Terminal Beginning and End E Pro ject Start Fund Cost by Fund State Local Total Envir. Date
P hase y Funds Funds Funds 1st 2nd 3rd Thru T e
F. Describe Work to be Done i (mm /dd/yyyy) Code Phase Code 6th YF (M>)
1 I 2 3 4 1 5 6 1 7 8 I 9 1 10 11 I 12 I 13 14 15 I 16 I 17 I 18 I 19 I 20 I 21
14 1 3 Phases in Project 03 1 S W CN 01/01/1999 STP(U) 2816 1 484 3300 33001 Progr
PE 01/01/2002 STP(U) 1 920 920 920 No
PACIFIC HIGHWAY T CN 06/01/2002 TIA 1 2500; 2705 5205 5205 amm
G atic
S 116 ST S 152 ST CE
S
Paving, curb and gutter, sidewalk, drainage, illumination, S
Totals 2816 2500 4109 9425 3300 61251
00 1 2 1 Phases in Project 31 1 S PE I 01/01/1999 50 1 50 50
No
TRANSPORTATION PLAN
Citywide
I Forecast traffic for year 2015 using new comprehensive plan Totals 50 50 50
16 1 3 1 Phases in Project 21 P w PE 1 01/01/1999 1 1 1 1 1 10 1 101 101
CBD TRANSIT CENTER T No
P
Central Business District S
Construct trtansit center Totals 0 10 10 10
14 14 1 Phases in Project i 21 i P W 1 No
PE 01/01/1999 1000 25' 1025 1025
T
1405 MULTIMODAL CENTER S 156 Street 1 G
Interurban Avenue Grady Way P
Design and construct a multimodal center serving transit, S
Totals 0 1000 25 1025 1025
16 5 1 Phases in Project 01 S w ALL 1 01/01/1999 1 1 24001 1 600, I 30001 30001
T No
BNSF INTERMODAL YARD ACCESS G
S 129 St to Boeing Access Rd C
t Study and determine new access to intermodal yard at north P
1 s Totals 2400 600 3000 3000
16 6 1 Phases in Project 01 1 P w PE 1 01/01/1999 1 STP 1 44 1 1 i 6 1 501 SO
No
57 AVENUES T
P
S 180 St South City Limit S
Design and construct widening to 4 and 5 lanes including Totals 44 6 50 50
14 7 1 Phases in Project 01 P W ALL 01/01/1999 1 1 9000 1 1000: 9001 109001 49001 60001
T No
S 180 STREET RAILROAD CROSSING j
P
S 180 St at UP /BN RR crossing j S
Design and construct new separated grade crossing of 1 i O Totals 9000 1000 900 10900 4900 6000
IAT TA 1H WWMT...DE ,41afl1
Washington State Department of Transportation Paget Six Year Transportation Improvement Program
A ge ncy Tukwila From 1999 to 2004
County No. 17 Hearing Date 07/06/1998
City No. 1320 Adoption Date 07/06/1998
MPO PSRC Resolution No.
Project Identification 1 I Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. 1 Ex Schedule Projects Only
c L H F und S ource Informat 1 Y
1 B. Bridge No. E i W c v (Local Agency)
o N C. Project Title a Federal Funding 1 1 RM/
t 19 E D. Street/County Road Name or Number aF y 3 D 1 Phase 1 Federal Federal State 1 i 4th Required
S v 0 Z E T Beginning and End E o 1 Project State Local Total Envir. Date
9 9 r St Fund ;Cost b Fund 1st 1 2nd 3rd Thru
F. Describe Work to be Done Ph I (mm /dd/yyyy) Code i Phase Code Funds Funds Funds 1 1 6th Type (MM/YV)
1 2 3 1 4 1 5 6! 7 1 8 9 10 11 12 1 13 14 1 15 1 16 1 17 1 18 19 1 20 1 21
16 8 2 Phases in Project 06 S W ALL 01/01/1999 1 100 6250 6350 16501 1000! 850 2850 Progr
i CN STP(U)
amm No
ANNUAL OVERLAY AND REPAIR PROGRAM G atic
C CE
various city streets
1
Repair, rehabilitate and overlay. S Totals 100 6250 6350 1650 1000 850 2850
19 9 1 Phases in Project 12 S ALL 3/1/98 1 IM 1 1 TIA 1 3001 3001 6001 100: 1001 1001 300 P rogr
amm No
PEDESTRIAN SAFETY PROGRAM 1 atic
CE
Various City streets. j
Pave and /or stripe shoulder for walkway. Totals 300 300 600 .100 100 100 3001
16 10 1 Phases in Project 12 S CN 04/01/1999 420 1 4201 701 701 701 210
No
ANNUAL TRAFFIC SIGNAL PROGRAM
Various intersections.
Install traffic signal controllers with minor signal modifications Totals 0 420 420 70 70 70 210
14 11 2 Phases in Project 11 S PE 01/01/1999 1 120 120 201 201 20 60
CN 06/01 /1999 1 1145 1145 1451 280 1801 540 No
ANNUAL BRIDGE PROGRAM
Various locations in City
Perform load ratings and bi- annual inspections, paint, repair, I Totals 0 1265 1265 165 300 200 6001
14 12 1 Phases in Project 1 09 S G CN 10/01/1997 I BR 1 4070 1 I 1 1176 1 52461 40001 12461 I Progr
P amm Yes
PACIFIC HIGHWAY BRIDGE (DUWAMISH) atic
CE
S 112 St- S 116 Way
1 Replace and widen existing bridge 1 Totals 4070 1176 5246 4000 1246
14 13 1 Phases in Project 1 12 I S i 1 W CN 05/01/1998 STP(U) 1 435 1 1 1 65 1 5001 5001 1 Progr
I i T amm Yes
INTERURBAN AVENUE BRIDGE WIDENING i G atic
CE
S'center Blvd to 1000 ft north Ft Dent W I 1 S
Construct additional northbound left turn lane for HOV from I Totals 435 65 500 500 1
00 14 1 Phases in Project I 01 j s i CN 05/01/1998 1 STP(E) 160 1 1 1 401 2001 200, 1 Progr
amm No
INTERURBAN TRAIL BIKE /PED BRIDGE atic
CE
Green River
Construct bridge to cross Green River to connect Interurban 1 Totals 160 40 200 200 1
4111116. Page 3 Six Year Transportation Improvement Program
Washington State Department of Transportation P P g
From 1999 to 2004
Agency Tukwila
County No. 17 Hearing Date 07/06/1998
City No. 1320 Adoption Date 07/06/1998
MPO PSRC Resolution No.
Project Identification 1 Project Costs in Thousands of Dollars
1 Federally Funded
A. Federal Aid No. L w Fund Source Information Expenditure Schedule Projects Only
B. Bridge No. m 1 m v (Local Agency)
o N C. Project Title a a Federal Funding R/VV
m .4 D. Street/County Road Name or Number aF 3 Phas F ed eral Federal State 1 4th Required
O n Z E T Beginning and End E o D Projec Start F und Co by Fund State Local Total Envir. D ate
u Phase y Funds Funds Funds 1st 2nd 3rd Thru T pe
F. Describe Work to be Done (mm /dd/yyyy) Code Phase Code I 6th Ty P.
1 1 2 1 3 I 4 1 5 6 7 I 8 9 10 1 11 12 I 13 1 14 15 I 16 I 17 18 I 19 1 20 1 21
1 14 15 1 Phases in Project 03 p W ALL 07/01/1998 I 1001 60 1601 10j 100 50
T No
INTERURBAN AVENUE G
S 139 Street Fort Dent Way C
Construct paving, curb and gutter, drainage, sidewalk, P
S Totals 100 60 160 10 100 50
14 16 1 Phases in Project 12 S T CN 04/01/1998 1 STP(U) 1 87 1 1 1 131 1001 1001 1 Progr
p amm Yes
WEST VALLEY HIGHWAY STRANDER BLVD atic
CE
1000 feet north and south of intersectio
1 Construct additional northbound left turn lane from WVH to Totals 87 13 100 100
16 17 1 Phases in Project 12 P W CN 01/01/1998 too 1001 1001 1 Progr
T amm No
SOUTHCENTER PARKWAY SIGNALS G atic
Strander Blvd S 180 St P CE
Design and construct signals with pedestrian crossings at i S Totals 100 100 100
14 18 I 2 Phases in Project j 12 1 S CN 06/01/1998 1 CMAQ 120 1 60 1 180 2501 50
CN 06/01/1999 i STP(U) 120 1 1201 No
GREEN RIVER VALLEY SIGNAL COORDINATION
Arterial Traffic Signals in GR Valley
Evaluate existing signals and design signal coordination on i 'Totals 240 60 300 250 50
14 19 2 Phases in Project 12 P W PE 1 01/01/1998 I STP(U) 80 20 I 100 1001 Progr
PE 01/01/2002 STP(U) 20 1 7801 8001 1 1 800 amm No
CBD TRAFFIC SIGNAL INTERCONNECT I G atic
CBD signalized intersections 1 C CE
Design and install hard wire interconnect system with central i S Totals 100 800 900 100 800
14 20 2 Phases in Project 09 1 S PE 1 01/01 /1999 1
1 I 100: 1001 1001
CN 01/01/2000 1 1 1 7501 750 50 1001 600 1 No
16 Avenue S Bridge
Duwamish River crossing
Design and reconstruct bridge Totals 0 850 850 100 50 100 600
14 21 2 Phases in Project 12 1 P T 1 1
PE 01/01/2000 STP 20 j 5 25 25• I
CN 01 /01/2001 1 STP 240 60: 300 300 No
WEST VALLEY HIGHWAY S 156 STREET P I
Southcenter Blvd S 158 Street
i
Construct additional northbound left turn lane at intersection 1 Totals 260 65 325 25 300 1
ANL Washington State Department of Transportation Page Six Year Transportation Improvement Program
v7ii Agency Tukwila From 1999 to 2004
County No. 17 Hearing Date 07/06/1998
City No. 1320 Adoption Date 07/06/1998
MPO PSRC Resolution No.
Project Identification Pro Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. c 1 .c Fund Source Information Expenditure Schedule Projects Only
T, 9
B. Bridge No. m Em co E' v (Local Agency)
o
o y .y C. Project Title a 3 3 O Federal Funding 1 1 RNV
6 .o E D. Street/County Road Name or Number n I y Phase I Federal I Federal State j 4th Required
v a o Proj State Local Total Envir. j Date ii I z E. Terminal Beginning and End E Start Fund Cost by Fund 1st 2nd 3rd Thru Type
F. Describe Work to be Done P hase i (mm /dd/yyyy) Code Phase Code Funds Funds Funds 6th (M
1 2 3 4 5 6 7 1 8 9 10 11 12 I 13 14 15 1 16 17 18 19 I 20 21
17 22 1 Phases in Project 04 p i W ALL 01/01/2002 j j 425 4251 425
T No
MINKLER BLVD G
Southcenter Pkwy Andover Park W S i
Construct remaining paving, curb and gutter, drainage, i Totals 0 425 425 425
17 1 23 2 Phases in Project 1 01 P W PE 01/01/2002 1 1 751 75 75
CN 04/01/2002 1 1 700: 700 700 No
T
SOUTH 168 STREET j p
S
Southcenter Parkway Andover Park West
C onstruct new roadway including paving, curb and gutter, Totals 0 775 775 775
16 1 24 2 Phases in Project 1 PE 01/01/2001 STP(U) 1 25 i 5 1 30 30
12 P W PE 01/01/2002 STP(U) 175 1 45 220 1 220 NO
1 T
S 133 ST /SR599 SB OFFRAMP INTERSECTION G
1
C
1 500 feet from intersection on each leg
1 Design and construct intersection improvements including 3 Totals 200 50 250 250
ALL 01/01/2003 1 5801 580 580
14 25 1 Phases in Project 05 p W 1
T No
WEST VALLEY HIGHWAY
I G
1405 Strander Blvd P
Design and construct widening to 7 lanes including paving, S Totals 0 580 580 580
14 26 1 Phases in Project 04 P PE 01/01/2004 1 1 100 1001 1 1 100
No
PACIFIC HIGHWAY S 116 STREET
Pacific Hwy Bridge SR 599
Design and construct widening on Pacific Hwy and SR 599 Totals 0 100 100 100 I
16 27 1 Phases in Project 03 p W PE 01/01/2004 1 50 501 50
No
E MARGINAL WAY P
S i
Boeing Access Road S 112 Street
Design and construct widening to 3 lanes including paving, 1 T otals 0 5 0 50 50
14 28 1 Phases in Project 05 P W 50 501 50
PE 01/01/2004
No
PACIFIC HIGHWAY 1 S
Boeing Access Road S 116 Way
Deisgn and construct widening including paving, curb and Totals 0 50 50 50
Washington State Department of Transportation Page 5 Six Year Transportation Improvement Program
Agency Tukwila From 1999 to 2004
County No. 17 Hearing Date 07/06/1998
City No. 1320 Adoption Date 07/06/1998
MPO PSRC Resolution No.
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. t Fund Source Information Expenditure Schedule Projects Only
B. Bridge No. m m a (Local Agency)
u, 2 o
To v C. Project Title m m Federal Funding R/W
:41 v a E. Ter Beginning E D. Street/County Road Name or Number Phase Federal I Federal State 1 4th Required
z E~ a N o k Project ect' Start Fund I State Local T Envir. Date
g and End 1 g Cost by Fund 1st 2nd 3rd Thru e
LL Phase; Funds Funds Funds TyP (MM/yy)
F. Describe Work to be Done (mm /dd /yyyy) Code I Phase ,Code 6th
1 1 2' 3 4 5 6 7 1 8 9 1 10 11 l 12 13 I 14 I 15 I 16 17 18 1 19 I 20 1 21
16 1 29 1 Phases in Project 12 P W PE 01/ 50 50I 50
No
ANDOVER PARK E /INDUSTRY DR SIGNAL G
Andover Pk E and Industry Drive P
500 feet from intersection on each leg
Design and construct intersection improvements including S Totals 50 50 50 1
19 30 I 1 Phases in Project 03 p PE 01/01/2004 j 50 1 501
50 No
NELSEN PLACE
S156St- S158St
1 Design and construct paving, curb and gutter, drainage, I ITotals 0 50 50 50
00 31 1 1 Phases in Project 01 P PE 01/01/2004 I l 35 351 I I 35
No
CBD INTERURBAN TRAIL CONNECTOR
1
Interurban Trail to CBD
Design and construct trail from Interurban trail to CBD Totals 0 35 35 35
i
17 32 1 Phases in Project 03 P w PE 1 01/01/2004 1 1 1 1 35 I 351 1
1 1 j 35
T No
S 144 STREET C
Pacific Highway Military Road
P
Design and construct widening including paving, curb and s Totals 0 35 35 35 1
19 1 33 1 Phases in Project 03 P l i W PE 1 01/01/2004 1 I 50 1 501 I 50
T No
S 134 STREET P
i S 133 St 48 Ave S S
Design and construct widening including paving, curb and Totals 0 50 50 50
14I 34 1 Phases in Project 01 P I w PE 01/01/2004 1 I I 50 501 I I 50
T No
S 180 STREET PED UNDERPASS @UPRR 1 G
S180 StatUPRR P
Design and construct separated grade crossing for Interurban S Totals 0 50 50 50
16 35 1 Phases in Project 05 P PE 01/01/2004 I I 1 1 50 I 501 I 50
No
SOUTHCENTER PARKWAY
15 off ramp S 168 St.
Design and construct safety and capacity improvements Totals 0 50 50 50
/lb. Page6 Six Year Transportation Improvement Program
Washington State Department of Transportation
Agge en ncy Tukwila From 1999 to 2004
County No. 17 Hearing Date 07/06/1998
City No. 1320 Adoption Date 07/06/1998
MPO PSRC Resolution No.
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. Ex Schedule Projects Onl y
I Fund Source Information J
B. Bridge No. E y N o (Local Agency)
o y a C. Project Title i 5 J Federal Funding j R/W
15 E D. Street/County Road Name or Number r 3 I Phase i Federal Federal State 4th
c Required
U D. i n r 3 Envir.
u. 0 Z E. Terminal Beginning and End E F 5 P roject Start Fund Cost by Fund State Local Total Date
v Phasel y 1st 2nd 3rd Thru
Funds Funds Funds Type (M M/YY)
F. Describe Work to be Done (mm /dd/yyyy) Code Phase Code 1 i 6th
1 2 I 3 4 5• 6 7 8 9 I 10 I 11 I 12 I 13 1 14 15 I 16 17 I 18 I 19 20 1 21
14 36 1 1 Phases in Project i 09 p T PE 01/01/2004 1 50 I 501 50
i I P No
1 BOEING ACCESS RD BRIDGE REPLACEMENT O
Boeing Access Rd
1 -5 to Airport Way
Reconstruct bridge i Totals 50 50 50
Grand Totals for Tukwila 19912 5560 18904 44376 19680 8941 1620 14135