HomeMy WebLinkAboutRes 1421 - 2000-2005 Transportation Improvement Program o lfr City Washington Resolution No. /4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years (2000- 2005); and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on June 21, 1999; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY F TUKWILA, WASHINGTON, at a regular meeting thereof this '4/ St day of ,1999. Dave Fenton, Council President ATTEST /AUTHENTICATED: (41-41L- 6.-c— ,jar e E. Cantu, CMC, City Clerk APPROVED AS TO FORM: Office of the City Attorney Filed with the City Clerk: C 7- Passed by the City Council: h, 9 Resolution Number TIP2000 -05 6/17/99 ANA Page 1 Six Year Transportation Improvement Program Fe/ Washington State Department of Transportation From 2000 to 2005 Agency Tukwila County No. 17 Hearing Date 6/21/1999 City No. 1320 Adoption Date to a y y MPO PSRC Resolution No. f V Project Identitication Project Costs in 't nousands of Dollars Federally Funded A. Federal Aid No. ffi Fund Source Information Expenditure Schedule Projects Only 'm m B. Bridge No. g Federal Funding (Local Agency) o y .p C. Project Title rs ii B 3 v R W 1 u E D Street/County Road Name or Number to Phase Federal Federal State 4th Required S Z E a'" to o 3 p roject Start Fund Cost State Local Total 1 Envir. Date i a E. Terminal Beginning and End E Phase a Fund Funds Funds Funds 1s T th Type osi yy) F. Describe Work to be Done (mMdd�yyy) C ode Phase Code t 2nd 3rd 6th 1 2 1 3 4 i 5 6 7 1 8 1 9 1 10 I 11 12 1 13 1 14 I 15 16 17 18 19 1 20 1 21 14 1 2 Phases in Project 03 S W CN 011012000 I STP(U) 6500 TIA 1 570 3401 7410 5410 20001 Progr T ALL 01/01/2002 I STP(U) 80001 8000 1920 6080 amm No TUKWILA INTL BLVD G atic p CE S 116 ST S 152 ST Paving, curb and gutter, sidewalk, drainage, illumination, S ,Totals 8500 570 8340 15410 5410 2000 1920 6080 14 2 1 Phases in Project 12 S T ALL 1 01/01/2000 I STP(S) 1 1451 I 1 151 1601 1 1601 1 Progr p amm No S 180 STREET RR XING HES G atic o CE BNRR and UPRR crossings east of 72 Ave S Improvements to RR signal, signing, and channelization Totals 145 15 160 160 14 3 2 Phases in Project 01 p W PE 00110120000 1300 200 1500 1500 T CN 1 09!012000 1 97001 TIA 1 20001 800 12500 6500, 6000 I No S 180 ST RR UNDERPASS (UP /BNSF) p S S /80 St at UPBN RR crossing Design and construct new separated grade crossing of 0 Totals 11000 2000 1000 14000 1500 6500 6000 16 4 1 Phases in Project 01 P W PE 1 01/01/2000 1 STP(U) 1 200 1 UATA 1 150 1 30 1 3801 31101 1 T No 57 AVE S (S180 ST SCL) p S S 180 St South City Limit Design and construct widening to 4 and lanes including 'Totals 200 150 30 380 380 1 14 5 1 Phases in Project 03 p C PE 1 01/012000 1 STP(U) 1 570 1 1 1 901 6601 6601 1 1 S No INTERURBAN AVE S G P S 143 Street Fort Dent Way T Construct paving, curb and gutter, drainage, sidewalk, w Totals 570 90 660 660 16 6 1 Phases in Project 01 S W ALL 1 01/01/2000 1 STP 1 2400 1 TIA 1 400 1 200 1 30001 30001 1 1 T Yes BNSF INTERMODAL YARD ACCESS G C S 129 St to Boeing Access Rd Study and determine new access to interrnodal yard at north S Totals 2400 400 200 3000 3000 16 7 Phases in Project 07 s w ALL 1 011012000 1 1 1 1 1 62701 62701 5701 12001 12001 3300 T No ANNUAL OVERLAY AND REPAIR PROGRAM G various city streets C Repair, rehabilitate and overlay. s 'Totals o 6270 6270 570 1200 1200 3300 4W Page 2 Six Year Transportation Improvement Program Washington State Department of Transportation il Agency Tukwila From 2000 to 2005 County No. 17 Hearing Date 06/21/1999 City No. 1320 Adoption Date MPO PSRC Resolution No. Project Identihcation Project Costs in thousands of Dollars 1 I Federally Funded A. Federal Aid No. Expenditure Schedule Projects Only B. Bridge No. 1 m Fund Source Information 1 y c Te 2 2' at e m 8 F ederal Funding (Local Agency) o y C Project Title 8 v 9 R/W '0 13 .o_ E D. Street/County Road Name or Number n� N 9 g Ph ase Federal Federal State 4th Required i a z E. Terminal Beginning and End E F g (Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru 6th Envir. Date F. Describe Work to be Done Phase (mm/ddryyyy) Code Phase Code Funds Funds Funds Type M J fl 1 1 2 3 4 1 5 6 7 1 8 1 9 1 10 1 11 I 12 1 13 1 14 1 15 1 16 1 17 I 18 19 1 20 21 16 1 8 1 Phases in Project 21 P T PE 1 01/012000 I I 1 1 1 10 1 101 101 1 p No CBD TRANSIT CENTER W Central Business District S Construct transit center. (Totals 10 10 10 19 9 1 Phases in Project 12 P ALL I 01/01/2000 I 1 I I 1 600 1 6001 1001 100 1001 300 No PEDESTRIAN SAFETY PROGRAM Various City streets. Pave and/or stripe shoulder for walkway. Totals 600 600 100 100 100 300 1 14 I 10 1 Phases in P r o j e c t 1 1 S ALL 1 01/01/2000 1 I 1 1200 1 12001 2001 200 2001 600 No ANNUAL BRIDGE PROGRAM Various locations in City Perform load ratings and bi- annual inspections, paint, repair, Totals 0 1200 1200 200 200 200 600 14 I 11 1 Phases in Project 09 p T PE 1 01/01/2000 1 1 I I 1 501 501 501 1 P No I BOEING ACCESS RD BRIDGE REPLACE O Boeing Access Road (1 -5 to Airport Way) Reconstruct bridge Totals 50 50 50 14 12 1 Phases in Project 09 S G CN 1 01/012000 1 BR 1 5601 I 1 1401 7001 7001 1 I Progr p amm Yes PACIFIC HIGHWAY BRIDGE (DUWAMISH) atic CE S 112 St- S 116 Way Replace and widen existing bridge Totals 560 140 700 700 14 13 1 Phases in Project 12 S W CN 1 01/01/2000 1 STP(U) 1 435 1 I 1 651 5001 5001 1 1 Progr T amm No INTERURBAN AVENUE BRIDGE WIDENING G atic S'center Blvd to 1000 ft north Ft Dent W P CE S Construct additional northbound left tum lane for HOV from Totals 435 85 500 500 00 14 1 Phases in Project 01 S CN 1 01/01/2000 1 STP(E) 1 1601 1 1 401 2001 200 I 1 Progr amm No INTERURBAN TRAIL BIKE/PED BRIDGE atic Green River CE ConsWd bridge to cross Green River to connect Interurban Totals 160 40 200 200 I Page 3 Six Year Transportation Improvement Program Washington State Department of Transportation Ageolcy Tukwila From 2000 to 2005 County No. 17 Hearing Date 06/21/1999 City No. 1320 Adoption Date MPO PSRC Resolution No. Project Identification Project costs in i nousands of Douars 1 Federally Funded A. Federal Aid No. c t 2 Fund Source Information Expenditure Schedule Projects Only Ti B. Bridge No. IF. b c "8 (Local Agency) o n C. Project Title i 3 Q Federal Funding RNV a Ti m E D. Street/County Road Name or Number nP H 3 Phase Federal Federal State 1 1 4th Required c v Pro State Local Total Envir. Date i n z E. Terminal Begin and End E Phase Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd I Thru Type (Myyyy) F. Describe Work to be Done (mm/ddyyyy) Code Phase Code 6th 1 2 3 14 5 6 I 7 8 I 9 10 1 11 12 13 I 14 15 1 16 17 I 18 1 19 j 20 21 14 15 1 Phases in Project 12 S T CN 1 01/01/2000 1 STP(U) 1 87 I I 13 1001 1001 Progr p amm Yes WEST VALLEY HIGHWAY STRANDER BLVD atic CE 1000 feet north and south of intersectio Construct additional northbound left turn lane from WVH to (Totals 87 13 100 100 16 16 1 Phases in Project 01 p p PE I 01/01/2000 1 I 1 1 1 10 1 101 101 T No TRANSVALLEY CORRIDOR 0 Study transvalley corridors for potential improvements (i.e. (Totals 10 10 10 I 16 17 1 Phases in Project I 12 P w CN 1 01/01/2000 1 I I I 1 302 1 3021 205 971 T No SOUTHCENTER PARKWAY SIGNALS G Strander Blvd S 180 St I P S Design and construct signals with pedestrian crossings at Totals 302 302 205 97 14 18 1 Phases in Project 12 S CN 1 01/01/2000 I CMAQ 1 240 1 1 60 1 1. 3001 250 501 No GREEN RIVER VALLEY SIGNAL COORDINATION Arterial Traffic Signals in GR Valley Evaluate existing signals and design signal coordination on ITOtaIS 240 60 300 250 50 14 19 2 Phases in Project 12 P W PE 01/012000 STP(U) 100 100 100 Progr T CN STP(U) 100 700 8001 800 amm No CBD TRAFFIC SIGNAL INTERCONNECT G atic C CE CBD signalized intersections I p Design and install hard wire interconnect system with central S Totals 100 800 900 100 800 14 20 1 Phases in Project 10 S I ALL 1 01/01/2000 1 I 1 1 1 900 1 9001 150 1501 150 450 No 16 Avenue S Bridge Duwamish River crossing Design and reconstruct bridge Totals 0 900 900 150 150 150 450 14 21 2 Phases in Project 12 P T PE 01/01/2000 STP 20 CN 01/01/2001 I STP 240 60 5 30025 25 1 300 P No WEST VALLEY HIGHWAY S 156 STREET Southcenter Blvd S 158 Street Construct additional northbound left turn lane at intersection (Totals 260 65 325 25 300 I r 71 Washington State Department of Transportation Page4 Six Year Transportation Improvement Program Agency Tukwila From 2000 to 2005 County No. 17 Hearing Date 06/21/1999 City No. 1320 MPO PSRC Adoption Date Resolution No. Project identification 1 Project Costs in'1 nousands of Uollars Federally Funded A. Federal Aid No. a Expenditure Schedule l B. Bridge No. Fund Source Information p Projects Only c D E c (Local Agency) o n C. Project Title Federal Funding R/VV c 0 .2. E D. Street/County Road Name or Number i.,,:: 2 8 P Phase Federal Federal State 4th Required u. n z E. Terminal Beginning and End E 1° y'roted Start Fund Cost by 1 Fund State Local Total 1st 2nd 3rd j Thru Envir. Date F. Describe Work to be Done (Phase (mm/ddyyyy) Code Phase Code Funds Funds Funds 1 6� Type 1 (MhVyy) 1 2 3 4 5 6 1 X 8 1 9 10 1 11 12 1 13 I 14 I 15 1 16 17 18 j 19 1 20 1 21 17 22 2 Phases in Project 01 p w PE 01/012003 751 75 75 T CN 04/01/2004 7001 7001 I 700 SOUTH 168 STREET No P Southcenter Parkway Andover Park West S Construct new roadway including paving, curb and gutter, Totals 0 775 775 775 I 16 23 2 Phases in Project 12 P W PE 1 01/01/2003 STP(U) 1 25 I 5 30 30 T CN 01/01/2004 STP(U) I 175 45 2201 1 220 No S 133 ST /SR599 SB OFFRAMP INTERSECTION G I C 500 feet from intersection on each leg P Design and construct intersection improvements including s Totals 200 50 250 250 14 24 1 Phases in Project 05 p 1 w ALL 1 01/01/2004 1 1 1 1 1 5801 5801 j 1 580 T No WEST VALLEY HIGHWAY G P 1405 Strander Blvd S Design and construct widening to 7 lanes including paving, i !Totals 0 580 580 580 17 25 1 Phases in Project 04 P ALL 1 01/01/2005 1 1 1 1 1 4251 4251 1 425 No MINKLER BLVD Southcenter Pkwy Andover Park W Construct remaining paving, curb and gutter, drainage, for 3rd 1 !Totals 425 425 425 14 26 1 Phases in Project 04 P PE 1 01/01/2005 1 1 1 1 1°°1 1001 1 1 1 100 No PACIFIC HIGHWAY S 116 STREET Pacific Hwy Bridge SR 599 Design and construct widening on Pacific Hwy and SR 599 Totals 0 100 100 100 16 27 1 Phases in Project 03 P w PE 1 01/012005 1 1 1 1 1 50 1 501 1 1 1 50 E MARGINAL WAY T No P Boeing Access Road S 112 Street S Design and construct widening to 3 lanes including paving, !Totals 0 50 50 50 14 28 1 Phases in Project 05 P w PE 1 01/012005 1 1 1 1 1 50 1 501 1 1 I 50 PACIFIC HIGHWAY P No S Boeing Access Road S 116 Way Deisgn and construct widening including paving, curb and Totals 0 50 50 50 Washington State Department of Transportation Page Six Year Transportation Improvement Program From 2000 to 2005 Agency Tukwila County No. 17 Hearing Date 06/21/1999 City No. 1320 Adoption Date MPO PSRC Resolution No. Project ItlenUhcaUOn I Project Costs in t nousands of Dollars Federally Funded A. Federal Aid No. a t 2 Fund Source Information Expenditure Schedule Projects Only TO B. Bridge No. m m e c R (Local Agency) o N •1.n C. Project Title a 3 Federal Funding I 1 R/W T 1° o E D. Street/County Road Name or Number 2 S 9 Phase Federal Federal State 4th Required LL 0 E Terminal Beginning v E F 8 pro ect Start 1 Fund Cost by Fund State Local Total 1st 2nd 3rd Thal Type Date z E. ermnaand End E l F. Describe Work to be Done Phase (mm/ddfYyyy) Code Phase Code Funds Funds Funds 6th Type (MM YY) 1 1 2 I 3 4 5 I 6 1 7 1 8 1 9 I 10 11 12 13 1 14 I 15 1 16 I 17 18 1 19 I 20 21 16 29 I 1 Phases in Project 12 P w PE 1 01/012005 1 1 I 1 50 1 551 I 50 T No ANDOVER PARK E/INDUSTRY DR SIGNAL G Andover Pk E and Industry Drive P 500 feet from intersection on each leg s Design and construct Intersection improvements including Totals 50 50 50 19 30 1 Phases in Project 03 P PE I 01/01/2005 1 1 1 1 1 501 501 I 1 50 No NELSEN PLACE S156St- S158St Design and construct paving, curb and gutter, drainage, Totals 0 50 50 50 I 00 31 1 Phases in Project 32 P PE 1 01/01/2005 I 1 1 1 1 35 1 351 1 1 35 I No CBD INTERURBAN TRAIL CONNECTOR Interurban Trail to CBD Design and construct trail from Interurban trail to CBD !Totals 0 35 35 3 5 17 i 32 1 Phases in Project 103 i P 1 w PE 1 01/01/2005 1 1 1 1 1 351 351 I 1 35 No T S 144 STREET C Pacific Highway Military Road P S Design and construct widening including paving, curb and Totals 0 35 35 35 16 33 1 Phases in Project 05 P PE 1 01/01/2004 1 1 1 1 1 501 501 1 1 50 No SOUTHCENTER PARKWAY 15 off ramp S 168 St. Design and construct safety and capacity Improvements Totals 0 50 50 50 Grand Totals for Tukwila 22287 3180 21805 47272 13525 10322 9870 135551