A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Comprehensive Street Program and thereafter periodically modified said
Comprehensive Street Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs, and based upon
these findings has prepared a Six -Year Transportation Improvement Program for the
ensuing six (6) calendar years (2001- 2006); and
WHEREAS, a public hearing was held on the said Six -Year Transportation
Improvement Program on June 5, 2000;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF KWILA, WASHINGTON,
at a Regular Meeting thereof this .5' day of t e�r, 0 .2000.
u e, a uncil Pre i ent
ATTEST/ AUTHENTICATED:
1 2 g
J6 E. Cantu, CMC, City Clerk
APPROVED AS TO FORM:
By: 7/f
Office f the Cit Attorney
Filed with the City Clerk: /"P
Passed by the City Council: --5 9Z)
Resolution Number
TIP2001 -06
W' Washington State Department of Transportation
Page 1 Six Year Transportation Improvement Program
WI
Tukwila From 2001 to 2006
County No. 17 Hearing Date 06/5/2000
City No. 1320 Adoption Date 06/05/2000
MPO PSRC
Resolution No. 1444
Project Identification Project Costs in i nousands of Dollars Federally Funded
A. Federal Aid No. Expenditure Schedule Projects Only
c r 2 Fund Source Information 1 Y
2-. B. Bridge No. E y H c (Local Agency)
o H _0 C. Project Title n I v Federal Funding R/W
c .9 .2 E D. Street/County Road Name or Number o N i• Phase Federal Federal State i 4th Required ii o 2 E. Beginning MP or road Ending MP or road E F Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date
F. Describe Work to be Done Phase (mm/ddtyyyy) Code Phase Code Funds 'Funds Funds 6th Type Myy)
1 2 3 4 5 6 7 8 9 10 11 1 12 13 14 15 16 17 18 19 20 21
14 1 2 Phases in Project 03 S W PE 01/01/2001 STP(U) 959 TIA 660 81 1700 1100 600 CE
T CN 01/01/2001 STP(U) 5655 OTHER 1510 18235 25400 7500 6700 5600 5600 No
TUKWILA INT'L BLVD G
S116ST to S152ST P
Paving, curb and gutter, sidewalk, drainage, Totals
14 2 1 Phases in Project 01 S W CN 01/01/2001 1135 OTHER 9165 3200 135001 10500 3000 CE
T No
S 180 ST RR UNDERPASS (UP /BNSF) p
Oaksdale Ave to 72 Ave S S
Design and construct new separated grade O Totals
16 3 1 Phases in Project 01 P W
PE 01/01/2001 STP(U) 200 UATA 150 31 381 1 381
T
No
57 AVE S (S180 ST SCL) p
S
S 180 St to South City Limit
Design and construct widening to 4 and lanes Totals
14 4 1 Phases in Project 03 p C
PE 01/01/2001 STP(U) 396 62 458 1 458
S
No
INTERURBAN AVE S G
S 143 Street to Fort Dent Way T
Construct paving, curb and gutter, drainage, T Totals
16 5 1 Phases in Project 07 S I W ALL 01/01/2001 6650 66501 1050 1050 1050 3500
T No
ANNUAL OVERLAY AND REPAIR PROGRAM G
C
various city streets to various city streets p
Repair, rehabilitate and overlay. s Totals
16 6 1 Phases in Project 21 P T PE 01/01/2001 10 101 10
P No
CBD TRANSIT CENTER W
S
Central Business District to Central Business District
Construct transit center. Totals
19 7 1 Phases in Project 12 S ALL 01/01/2001 5
001 500 500 100 100 100 200
No
PEDESTRIAN SAFETY PROGRAM
Various City streets. to Various City streets.
Pave and /or stripe shoulder for walkway. Totals
Washington State Department of Transportation
IOW Page 2 Six Year Transportation Improvement Program
Agency Tukwila From 2001 to 2006
County No. 17
No. 17 Hearing Date 06/5/2000
City No.
MPO PSRC Adoption Date 06/05/2000
Resolution No 1444
Project Identification Project costs in .1 nousanas of Dollars Federally Funded
A. Federal Aid No. c z Fund Source Information Expenditure Schedule Projects Only
T B. Bridge No. E y y a (Local Agency)
o a ,n C. Project Title o a o w u Federal Funding R/W
c E D. Street/County Road Name or Number a~ y 3 Phase Federal Federal State 4th Required
E- Z E. Beginning MP or road Ending MP or road E io 5 Pro Start Fund Cost by Fund State Local Total Envir Date Thru Phase (mm /dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (iyhyyy
F. Describe Work to be Done
1 2 3 4 5 6 7 8 9 10 11 12 13 1 15 16 17 18 19 2 0 21
14 8 1 Phases in Project 11 S ALL 01/01/2001 460 460 25 100 185 150
No
ANNUAL BRIDGE PROGRAM
Various locations in City to Various locations in City
Perform load ratings and bi annual inspections, Totals
14 9 1 Phases in Project 09 p T PE 01/01/2001 450 4501 450 450
P No
BOEING ACCESS RD BRIDGE REPLACE 0
Boeing Access Road to (1 -5 to Airport Way)
Reconstruct bridge Totals
14 10 1 Phases in Project 12 S W CN 01/01/2001 STP(U) 1073 167 12401 1240 CE
T No
INTERURBAN AVENUE BRIDGE WIDENING G
S'center Blvd to 1000 ft north Ft Dent W P
S
Construct additional northbound left turn lane for Totals
00 11 1 Phases in Project 01 S CN 01/01/2001 STP(E) 409 64 4731 473 CE
No
INTERURBAN TRAIL BIKE /PED BRIDGE
Green River to Green River
Construct bridge to cross Green River to connect Totals
14 12 1 Phases in Project 12 S T CN 01/01/2001 STP(U) 430 66 4961 496 CE
P No
WEST VALLEY HIGHWAY STRANDER BLVD
1000 feet north of to 1000 feet south of
Construct additional northbound left turn lane from Totals
16 13 1 Phases in Project 12 S W CN 01/01/2001 97 971 97
T No
SOUTHCENTER PARKWAY SIGNALS G
P
Strander Blvd 10 S 180 St
Design and construct signals with pedestrian S Totals
14 14 1 Phases in Project 12 S CN 01/01/2001 CMAQ 147 i 23 1701 170
No
GREEN RIVER VALLEY SIGNAL COORDINATION
West Valley Corridor 10 S 180 St Corridor
Evaluate existing signals and design signal Totals
4IIIIII■ Page 3 Six Year Transportation Improvement Program
Washington State Department of Transportation
From 2001 to 2006
Agency Tukwila
County No. 17
ry Hearing Date 06/5/2000
City No. 1320 Adoption Date 06/05/2000
MPO PSRC Resolution No. 1444
Project Identification Project Costs m I housands of Dollars Federally Funded
A. Federal Aid No. Expenditure Schedule Projects Only
c t m Fund Source Information 1 Y
B. Bridge No. m a (Local Agency)
o 2 w a C. Project Title o m 7 d 0 Federal Funding RNV
p J
.0 m o E D. Street/County Road Name or Number te a N 5 Phase Federal
Federal State 4th Required
U o Z E. B mnin MP or road Endin MP or road E o Project State Local Total Envir. Date
u_ 9 9 9 Phase Start Fund .Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY)
F. Describe Work to be Done (mm/ddiyyyy) Code Phase Code 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 15 2 Phases in Project 12 P W PE 01/01/2002 70 70 70 CE
CN 01/01/2003 780 780 780 No
T
CBD TRAFFIC SIGNAL INTERCONNECT G
C
CBD signals to CBD signals P
Design and install hard wire interconnect system S Totals
16 16 1 Phases in Project 01 S W PE 01/01/2001 50 501 50
T No
BNSF INTERMODAL YARD ACCESS G
C
S 129 St to Boeing Access Rd p
Study and determine new access to intermodal S Totals
14 17 1 Phases in Project 05 p W ALL 01/01/2002 580 580 1 80
T
No
WEST VALLEY HIGHWAY G
1405 to Strander Blvd P
Design and construct widening to 7 lanes including Totals
ALL 01/01/2003 350 3501 30 320
16 18 1 Phases in Project 12 P W I No
T
S 133 ST /SR599 SB OFFRAMP INTERSECTION G
C
500 feet on each leg to 500 feet on each leg p
Design and construct intersection improvements s Totals
100 100 PE 01/01/2003 100
14 19 1 Phases in Project 04 P
1001 No
PACIFIC HIGHWAY S 116 STREET
Pacific Hwy Bridge to SR 599
Design and construct widening on Pacific Hwy and Totals
16 20 1 Phases in Project 03 p W PE 01/01/2003 35 351 35
T
No
E MARGINAL WAY p
Boeing Access Road to S 112 Street S
Design and construct widening to 3 lanes including Totals
14 21 1 Phases in Project 12 P T
ALL 01/01/2004 725 7251 725
P
No
WEST VALLEY HIGHWAY S 156 STREET
Southcenter Blvd to S 158 Street
Construct additional northbound left turn lane at Totals
Washington State Department of Transportation
Page4 Six Year Transportation Improvement Program
Agency Tukwila From 2001 to 2006
County No. 17 Hearing Date 06/5/2000
City No. 1320 Adoption Date 06/05/2000
MPO PSRC Resolution No. 1444
Project Identification Project Costs in i nousands of Dollars Federally Funded
A. Federal Aid No. L y E Schedule Projects Only
Fund Source Information 1 Y
m B. Bridge No. g11- t' v (Local Agency)
o 2n C. Project Title 0 v z.
Federal Funding 12/W I E D. Street/County Road Name or Number o `a~ H Phase Federal Federal State 4th Required F. a z E. Beginning MP or road Ending MP or road E F P St art F und Cost by Fund State L Total Envir. Date
u_ Ph ase Y Funds Funds Funds 1st 2nd 3rd T T e
F. Describe Work to be Done (mmidd/yyyy) Code Phase Code 6tth h YP (44/14"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 22 1 Phases in Project 01 P W ALL 01/01/2004 775: 775 775
T No
SOUTH 168 STREET P
S
Southcenter Parkway to Andover Park West
Construct new roadway including paving, curb and Totals
17 23 1 Phases in Project 04 P
ALL 01/01/2006 425 4251 425
No
MINKLER BLVD
Southcenter Pkwy to Andover Park W
Construct remaining paving, curb and gutter, Totals
14 24 1 Phases in Project 05 P W PE 01/01/2006 50 501 50
P No
PACIFIC HIGHWAY S
Boeing Access Road to S 116 Way
Deisgn and construct widening including paving, Totals
16 25 1 Phases in Project 12 P W
ALL 01/01/2006 220 220 220
T No
ANDOVER PARK E /INDUSTRY DR SIGNAL G
Andover Pk E and Industry Drive P
500 feet on each leg to 500 feet on each leg S
Design and construct intersection improvements O Totals
19 26 1 Phases in Project 03 P PE 1 01/01/2006 200 2001 200
No
NELSEN PLACE
S 156 St to S 158 St
Design and construct paving, curb and gutter, Totals
00 27 1 Phases in Project 32 P PE 01/01/2006 35 351 35
No
CBD INTERURBAN TRAIL CONNECTOR
Interurban Trail to CBD
Design and construct trail from Interurban trail to Totals
17 28 1 Phases in Project 03 p 1 W PE 1 01/01/2006 35 351 1 35
T No
S 144 STREET C
P
Pacific Highway to Military Road
S
Design and construct widening including paving, Totals
Alb. Page 5 Six Year Transportation Improvement Program
W1 Washington State Department of Transportation
Agency Tukwila From 2001 to 2006
County No. 17 Hearing Date 06/5/2000
City No. 1320 Adoption Date 06/05/2000
MPO PSRC
Resolution No. 1444
Project Identification Project Costs in inousanas or Uouars Federally Funded
A. Federal Aid No. Expenditure Schedule Pro ects Onl
m B. Bridge No. 6— ro i Fund Source Information (Local Agency) y
S N n C. Project Title m a Federal Funding RNV
c 5 E D. Street/County Road Name or Number aF h m Phase Federal Federal State 4th Required
a z E. Beginning MP or road Ending MP or road E o Pro Start Fund Cost by Fund State Local Total Envir. Date
u_ Phase y Funds Funds Funds 1st 2nd 3rd T 6th h T ype
F. Describe Work to be Done (mm/dd/yyyy) Code Phase Code lM�
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 21 18
16 29 1 Phases in Project 05 p PE 01/01/2006 50 50 50
No
SOUTHCENTER PARKWAY
15 off ramp to S 168 St.
Design and construct safety and capacity Totals
Grand Totals for