Loading...
HomeMy WebLinkAboutRes 1444 - 2001-2006 Transportation Improvement Program �v4 k Q �vi`� l o c 1908 City Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years (2001- 2006); and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on June 5, 2000; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF KWILA, WASHINGTON, at a Regular Meeting thereof this .5' day of t e�r, 0 .2000. u e, a uncil Pre i ent ATTEST/ AUTHENTICATED: 1 2 g J6 E. Cantu, CMC, City Clerk APPROVED AS TO FORM: By: 7/f Office f the Cit Attorney Filed with the City Clerk: /"P Passed by the City Council: --5 9Z) Resolution Number TIP2001 -06 W' Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program WI Tukwila From 2001 to 2006 County No. 17 Hearing Date 06/5/2000 City No. 1320 Adoption Date 06/05/2000 MPO PSRC Resolution No. 1444 Project Identification Project Costs in i nousands of Dollars Federally Funded A. Federal Aid No. Expenditure Schedule Projects Only c r 2 Fund Source Information 1 Y 2-. B. Bridge No. E y H c (Local Agency) o H _0 C. Project Title n I v Federal Funding R/W c .9 .2 E D. Street/County Road Name or Number o N i• Phase Federal Federal State i 4th Required ii o 2 E. Beginning MP or road Ending MP or road E F Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date F. Describe Work to be Done Phase (mm/ddtyyyy) Code Phase Code Funds 'Funds Funds 6th Type Myy) 1 2 3 4 5 6 7 8 9 10 11 1 12 13 14 15 16 17 18 19 20 21 14 1 2 Phases in Project 03 S W PE 01/01/2001 STP(U) 959 TIA 660 81 1700 1100 600 CE T CN 01/01/2001 STP(U) 5655 OTHER 1510 18235 25400 7500 6700 5600 5600 No TUKWILA INT'L BLVD G S116ST to S152ST P Paving, curb and gutter, sidewalk, drainage, Totals 14 2 1 Phases in Project 01 S W CN 01/01/2001 1135 OTHER 9165 3200 135001 10500 3000 CE T No S 180 ST RR UNDERPASS (UP /BNSF) p Oaksdale Ave to 72 Ave S S Design and construct new separated grade O Totals 16 3 1 Phases in Project 01 P W PE 01/01/2001 STP(U) 200 UATA 150 31 381 1 381 T No 57 AVE S (S180 ST SCL) p S S 180 St to South City Limit Design and construct widening to 4 and lanes Totals 14 4 1 Phases in Project 03 p C PE 01/01/2001 STP(U) 396 62 458 1 458 S No INTERURBAN AVE S G S 143 Street to Fort Dent Way T Construct paving, curb and gutter, drainage, T Totals 16 5 1 Phases in Project 07 S I W ALL 01/01/2001 6650 66501 1050 1050 1050 3500 T No ANNUAL OVERLAY AND REPAIR PROGRAM G C various city streets to various city streets p Repair, rehabilitate and overlay. s Totals 16 6 1 Phases in Project 21 P T PE 01/01/2001 10 101 10 P No CBD TRANSIT CENTER W S Central Business District to Central Business District Construct transit center. Totals 19 7 1 Phases in Project 12 S ALL 01/01/2001 5 001 500 500 100 100 100 200 No PEDESTRIAN SAFETY PROGRAM Various City streets. to Various City streets. Pave and /or stripe shoulder for walkway. Totals Washington State Department of Transportation IOW Page 2 Six Year Transportation Improvement Program Agency Tukwila From 2001 to 2006 County No. 17 No. 17 Hearing Date 06/5/2000 City No. MPO PSRC Adoption Date 06/05/2000 Resolution No 1444 Project Identification Project costs in .1 nousanas of Dollars Federally Funded A. Federal Aid No. c z Fund Source Information Expenditure Schedule Projects Only T B. Bridge No. E y y a (Local Agency) o a ,n C. Project Title o a o w u Federal Funding R/W c E D. Street/County Road Name or Number a~ y 3 Phase Federal Federal State 4th Required E- Z E. Beginning MP or road Ending MP or road E io 5 Pro Start Fund Cost by Fund State Local Total Envir Date Thru Phase (mm /dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (iyhyyy F. Describe Work to be Done 1 2 3 4 5 6 7 8 9 10 11 12 13 1 15 16 17 18 19 2 0 21 14 8 1 Phases in Project 11 S ALL 01/01/2001 460 460 25 100 185 150 No ANNUAL BRIDGE PROGRAM Various locations in City to Various locations in City Perform load ratings and bi annual inspections, Totals 14 9 1 Phases in Project 09 p T PE 01/01/2001 450 4501 450 450 P No BOEING ACCESS RD BRIDGE REPLACE 0 Boeing Access Road to (1 -5 to Airport Way) Reconstruct bridge Totals 14 10 1 Phases in Project 12 S W CN 01/01/2001 STP(U) 1073 167 12401 1240 CE T No INTERURBAN AVENUE BRIDGE WIDENING G S'center Blvd to 1000 ft north Ft Dent W P S Construct additional northbound left turn lane for Totals 00 11 1 Phases in Project 01 S CN 01/01/2001 STP(E) 409 64 4731 473 CE No INTERURBAN TRAIL BIKE /PED BRIDGE Green River to Green River Construct bridge to cross Green River to connect Totals 14 12 1 Phases in Project 12 S T CN 01/01/2001 STP(U) 430 66 4961 496 CE P No WEST VALLEY HIGHWAY STRANDER BLVD 1000 feet north of to 1000 feet south of Construct additional northbound left turn lane from Totals 16 13 1 Phases in Project 12 S W CN 01/01/2001 97 971 97 T No SOUTHCENTER PARKWAY SIGNALS G P Strander Blvd 10 S 180 St Design and construct signals with pedestrian S Totals 14 14 1 Phases in Project 12 S CN 01/01/2001 CMAQ 147 i 23 1701 170 No GREEN RIVER VALLEY SIGNAL COORDINATION West Valley Corridor 10 S 180 St Corridor Evaluate existing signals and design signal Totals 4IIIIII■ Page 3 Six Year Transportation Improvement Program Washington State Department of Transportation From 2001 to 2006 Agency Tukwila County No. 17 ry Hearing Date 06/5/2000 City No. 1320 Adoption Date 06/05/2000 MPO PSRC Resolution No. 1444 Project Identification Project Costs m I housands of Dollars Federally Funded A. Federal Aid No. Expenditure Schedule Projects Only c t m Fund Source Information 1 Y B. Bridge No. m a (Local Agency) o 2 w a C. Project Title o m 7 d 0 Federal Funding RNV p J .0 m o E D. Street/County Road Name or Number te a N 5 Phase Federal Federal State 4th Required U o Z E. B mnin MP or road Endin MP or road E o Project State Local Total Envir. Date u_ 9 9 9 Phase Start Fund .Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) F. Describe Work to be Done (mm/ddiyyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 15 2 Phases in Project 12 P W PE 01/01/2002 70 70 70 CE CN 01/01/2003 780 780 780 No T CBD TRAFFIC SIGNAL INTERCONNECT G C CBD signals to CBD signals P Design and install hard wire interconnect system S Totals 16 16 1 Phases in Project 01 S W PE 01/01/2001 50 501 50 T No BNSF INTERMODAL YARD ACCESS G C S 129 St to Boeing Access Rd p Study and determine new access to intermodal S Totals 14 17 1 Phases in Project 05 p W ALL 01/01/2002 580 580 1 80 T No WEST VALLEY HIGHWAY G 1405 to Strander Blvd P Design and construct widening to 7 lanes including Totals ALL 01/01/2003 350 3501 30 320 16 18 1 Phases in Project 12 P W I No T S 133 ST /SR599 SB OFFRAMP INTERSECTION G C 500 feet on each leg to 500 feet on each leg p Design and construct intersection improvements s Totals 100 100 PE 01/01/2003 100 14 19 1 Phases in Project 04 P 1001 No PACIFIC HIGHWAY S 116 STREET Pacific Hwy Bridge to SR 599 Design and construct widening on Pacific Hwy and Totals 16 20 1 Phases in Project 03 p W PE 01/01/2003 35 351 35 T No E MARGINAL WAY p Boeing Access Road to S 112 Street S Design and construct widening to 3 lanes including Totals 14 21 1 Phases in Project 12 P T ALL 01/01/2004 725 7251 725 P No WEST VALLEY HIGHWAY S 156 STREET Southcenter Blvd to S 158 Street Construct additional northbound left turn lane at Totals Washington State Department of Transportation Page4 Six Year Transportation Improvement Program Agency Tukwila From 2001 to 2006 County No. 17 Hearing Date 06/5/2000 City No. 1320 Adoption Date 06/05/2000 MPO PSRC Resolution No. 1444 Project Identification Project Costs in i nousands of Dollars Federally Funded A. Federal Aid No. L y E Schedule Projects Only Fund Source Information 1 Y m B. Bridge No. g11- t' v (Local Agency) o 2n C. Project Title 0 v z. Federal Funding 12/W I E D. Street/County Road Name or Number o `a~ H Phase Federal Federal State 4th Required F. a z E. Beginning MP or road Ending MP or road E F P St art F und Cost by Fund State L Total Envir. Date u_ Ph ase Y Funds Funds Funds 1st 2nd 3rd T T e F. Describe Work to be Done (mmidd/yyyy) Code Phase Code 6tth h YP (44/14" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 22 1 Phases in Project 01 P W ALL 01/01/2004 775: 775 775 T No SOUTH 168 STREET P S Southcenter Parkway to Andover Park West Construct new roadway including paving, curb and Totals 17 23 1 Phases in Project 04 P ALL 01/01/2006 425 4251 425 No MINKLER BLVD Southcenter Pkwy to Andover Park W Construct remaining paving, curb and gutter, Totals 14 24 1 Phases in Project 05 P W PE 01/01/2006 50 501 50 P No PACIFIC HIGHWAY S Boeing Access Road to S 116 Way Deisgn and construct widening including paving, Totals 16 25 1 Phases in Project 12 P W ALL 01/01/2006 220 220 220 T No ANDOVER PARK E /INDUSTRY DR SIGNAL G Andover Pk E and Industry Drive P 500 feet on each leg to 500 feet on each leg S Design and construct intersection improvements O Totals 19 26 1 Phases in Project 03 P PE 1 01/01/2006 200 2001 200 No NELSEN PLACE S 156 St to S 158 St Design and construct paving, curb and gutter, Totals 00 27 1 Phases in Project 32 P PE 01/01/2006 35 351 35 No CBD INTERURBAN TRAIL CONNECTOR Interurban Trail to CBD Design and construct trail from Interurban trail to Totals 17 28 1 Phases in Project 03 p 1 W PE 1 01/01/2006 35 351 1 35 T No S 144 STREET C P Pacific Highway to Military Road S Design and construct widening including paving, Totals Alb. Page 5 Six Year Transportation Improvement Program W1 Washington State Department of Transportation Agency Tukwila From 2001 to 2006 County No. 17 Hearing Date 06/5/2000 City No. 1320 Adoption Date 06/05/2000 MPO PSRC Resolution No. 1444 Project Identification Project Costs in inousanas or Uouars Federally Funded A. Federal Aid No. Expenditure Schedule Pro ects Onl m B. Bridge No. 6— ro i Fund Source Information (Local Agency) y S N n C. Project Title m a Federal Funding RNV c 5 E D. Street/County Road Name or Number aF h m Phase Federal Federal State 4th Required a z E. Beginning MP or road Ending MP or road E o Pro Start Fund Cost by Fund State Local Total Envir. Date u_ Phase y Funds Funds Funds 1st 2nd 3rd T 6th h T ype F. Describe Work to be Done (mm/dd/yyyy) Code Phase Code lM� 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 21 18 16 29 1 Phases in Project 05 p PE 01/01/2006 50 50 50 No SOUTHCENTER PARKWAY 15 off ramp to S 168 St. Design and construct safety and capacity Totals Grand Totals for