Loading...
HomeMy WebLinkAboutRes 1465 - 2002-2007 Transportation Improvement Program 1LA, °�qS ti t r gyp; ;p� 1908 it o Washington Resolution No. 1465 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years (2002- 2007); and WHEREAS, a public hearing was held on the said Six -Year Transportation Improvement Program on June 25, 2001; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Special Meeting thereof this day of ?ine_./ 2001. J n Hernandez, Council President ATTEST/AUTHENTICATED: 4'2 C H 4e .r J e E. Cantu, CMC, City Clerk APPROVED AS TO FORM: Office of tie City ttorney Filed with the City Clerk: &M Passed by the City Council: 25 1 6 Resolution Number TIP2002 -07 Mo Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program Aggency: Tukwila From 2002 to 2007 Co. No.: 17 Co. Name: King Co. City No.: 1320 MPO /RTPO: PSRC Supercedes previous editions Hearing Date: 6/25/2001 Adoption Date: 6/25/2001 Amend Date: Resolution No.: 1 Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. d o Fund Source Information Expenditure Schedule Projects Only o N C. Project Title a J o Federal Funding (Local Agency) RIVV- E D. Street/Road N Number v ree oa Name or umer CL 5 a Phase Federal Federal State Required u_ a Z E. Beginning MP or road Ending MP or road E Start Fund Cost by Fund State Local Total 4th Envir. Date F. Describe Work to be Done (mm/ddiyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (/NM7Y a 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 P STPUL TA96(097) 03 S 5,000 Ft C CN 1011/2001 STP(U) 4500 TPP 800 700 60001 6000 C Tukwila Int'I Blvd (Phase 1) G No P from: S 138 St to: S 152 St W 8!1/01 Paving, curb gutter, sidewalk, drainage, illumination, T S landscaping, and utility undergrounding. Totals 4500 800 700 6000 6000 14 2 HP 1998(024) CN 9/1/2001 DEMO 1135; TPP 4165 8200 13500 10500 3000 01 S 1,20o Ft W CE S 180 St RR Underpass (UP /BNSF) T No S from: Oakesdale Ave to: 72 Ave S P 6/29/01 Construct a new grade separated crossing at S 180 St and the O UPRR, BNSF RR, and Interurban Trail. Totals 1135 4165 8200 13500 10500 3000 16 3 07 S C AL 9/112001 6650 66501 1050 1050 1050 3500 Overlay and Repair Program G L No Various City Streets O from: to: P Repair, rehabilitate, and overlay City streets as needed in an S a nnual program. T Totals 6650 6650 1050 1050 1050 3500 16 4 21 P PE 111/2002 10 for 10 CBD Transit Center W No Central Business District P from: to: S Construct transit center. i Totals 10 10 10 19 S 12 5 AL 1/1/2002 600 6001 100 Pedestrian Safety Program L No Various City Streets from: to: Pave and /or stripe shoulder for walkway and other pedestrian safety improvements. Totals 600 600 100 100 100 300 14 6 11 S LL 1!1/2002 735 7351 100 !66 185 350 Bridge Program No Various City Streets from: to: Perform load ratings and bi- annual inspections as well as cons ruct necessary repairs and maintenance. Totals 735 735 100 100 350 AdUL Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program w7A# Agency: Tukwila From 2002 to 2007 Co. No.: 17 Co. Name: King Co. Supercedes previous editions Hearing Date: 6125/2001 Adoption Date: 612512001 City No.: 1320 MPOIRTPO: PSRC Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. z Expenditure Schedule Q) Fund Source Information Projects Only F 0 V) (Local Agency) C. 0 M Federal Fund 0 -C n C Project Title a 0 ng C RNV U 2 E D. Street/Road Name or Number Phase Federal Federal State Required CLF-- Z E. Beginning MP or road Ending MP or road Z 0 State Local Total 4th Envir. u- =3 a) Start Fund Cost by Fund Date ru Type (MA4/yy) (mmlddlyyyy) Code Phase Code 6th F. Describe Work to be Done Funds Funds Funds 1 st 2nd 3rd Th 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 14 7 STPUL-1027(004) 08541800 12 S 0.38 mi G CN 9/15/2001 STP(U) 1073 167 12401 1240 CE Interurban Ave Bridge Widening 0 No P from: 1,000 ft n10 Ft Dent to: Southcenter Blvd S 6129101 Construct additional northbound left turn lane for HOV from T Interurban Ave to SB 1-405. W Totals 1073 167 1240 1240 -25 Mi CN 9/15/2001 STP(E) 409 4 73 8TV 473 1 CE Do 8 E-11320(001j 01 S 0 1 64 Interurban Trail Bike/Ped Bridge No from: S Grady Way to: Green River 6129101 .Construct trail and trail connection (including bridge over the Green River) between the Interurban Trail and Green River Trail. Totals 409 64 473 473 14 9 08D02500 PE 1 T 1112002 06 faq I00 09 P 1,000 Ft' :Boeing Access Rd Bridge Replacement P No O from: Airport Way to: 1-5 'Reconstruct bridge. Totals 100 100 100 14 10 P-STPUL-TA96(157) S 2,000 Ft W -�-96T CE 12 CN 9/1512001 STP(U) 430 66 West Valley Hwy Strander Blvd P No S from: 1,000 Ft North to: 1,000 Ft South G 711101 s Construct additional northbound left turn lane from West Valley 0 'Hwy to Strander Blvd. T Totals 430 66 496 496 14 11 12 S AL 1/1&02 CMAQ 147 23 1701 0 CE Green River Valley Signal Coordination L No from: West Valley Corridor to: S 180 St Corridor Design and construct signal coordination improvements, monitoring equipment, and control upgrages. Totals 147 23 170 170 PE 9/112001 STP(U) 440 TPP 660 10465 i 1 I 1 10 46 14 12 03 P G 60 CE Tukwila Int'll Blvd (Phase 2) 0 No P from: S 116 St to: S 132 St S Construct overlay, curb gutter, sidewalks, illumination, T drainage, landscaping, and utility undergrounding. w Totals 440 660 10465 11565 1100 10465 Washington State Department of Transportation Page 3 Six Year Transportation Improvement Program T From 2002 to 2007 Agency: Tukwila Co. No.: 17 Co. Name: King Co. Supel'CedeS previous editions Hearing Date: 6/25/2001 Adoption Date: 6/25/2001 City No.: 1320 MPO /RTPO: PS RC Amend Date: Resolution No.: 1466 Project Identification Project Costs in Thousands of Dollars Federally Funded B. Bridge No. L d Fund Source Information Expenditure Schedule Projects Only A. Federal Aid No. 9 o, v (Local Agency) 1]5 C. Project Title m U t Federa{ Funding RNV .4 E D. Street/Road Name or Number Q� in t° Phase Federal Federal State 4 th nvi Required W L Z E. Beginning MP or road Ending MP or road E L) Start Local Total Thru E r Date a� Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3 rd T F. Describe Work to be Done (mm/ddlyyyy) Code Phase Code 6th T (MM/YY) o 1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 18 19 20 21 17 13 03 S ,1,650 Ft W CN 1/1/2002 1955 19551 1955 No S 144 St T S from: Tukwila Int'I Blvd to: Military Road P Design and construct paving, curb gutter, sidewalks, drainage, G illumination, and utility undergrounding. C Totals 1955 1955 1955 16 14 12 P W AL 1/1/2003 850 850 70' 780 L No CBD Traffic Signal Interconnect T .CBD Streets G from: to: C Design and install hard wire interconnect system between traffic P signals in the CBD. S Totals 850 850 70 780 14 15 05 P 0.5 Mi W AL 1%1%2003 580 560r 580 L No West Valley Highway T S from: 1 -405 to: Strander Blvd P Design and construct widening to 7 lanes including curb gutter, G sidewalks, illumination, and drainage. Totals 560 580 580 i AL 1/1/2003 350 16 16 12 P 1,000 Ft W L No S 133 St SR 599 Ramps Intersection T S from: 500 Ft on each leg to: 500 Ft on each leg G Design and construct intersection improvements including a new i C :traffic signal. P Totals 350 350 30 320 14 17 04 P AL 1/1/2003 100 100 100 L No Tukwila Int'I Blvd S 116 St from: SR99 Bridge to: SR599 Design and construct widening on Tukwila Int'I Blvd and t otal s intersection improvements at T.I.B. /S 116 St. Totals 100 100 100 16 18 03 P 1,500 Ft P PE 1%112003 35 351 35 No 'East Marginal Way S T from: Boeing Access Rd to: S 112 St W Design and construct widening to 3 lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Totals 35 35 35 Amikk T Washington State Department of Transportation Page 4 Six Year Transportation Improvement Program Agency: Tukwila From 2002 to 2007 Co. o.: 17 Co. Name: King Co. Supercedes previous editions Hearing Date: 6/25/2001 Adoption Date: 6/25/2001 City No.: 1320 MPO /RTPO: PSRC Amend Date: Resolution No.: 1465 Project Identification Project Costs in Thousands of Dollars Federally Funded g Expenditure A. Federal Aid No. B. Brid No. E dite Schedul m a Fund Source Information Local A ge nc y) 9 Y) Projects Only o y C. Project Title m o m enc n o v t Federal Funding R/W O E D. Street/Road Name or Number o.- rn o a a Phase Federal Federal State 4th Required UL a Z E. Beginning MP or road Ending MP or road Start Fund Cost by Fund State Local Total Envir. Date Funds Funds Funds 1st 2nd 3rd Thru F. Describe Work to be Done a Start Code Phase Code 6th Type (MM/yy) 2 3 4 5 6 7 8 9 13 14 15 I 16 17 18 19 20 21 16 19 12 P 1,000 Ft AL 1/1/2004 200 2001 200 Andover Park E Minkler Blvd. L No from: 500 Ft each leg to: 500 Ft each leg Design and construct intersection and traffic signal improvements and widening for left turn lanes. Totals 200 200 200 16 20 PE STP(U) 200 TPP 150 31 381 01 P 3,DD0 Ft W i 381 Southcenter Parkway T No S from: S 180 St to: S City Limits P Design and construct widening to 4 lanes and center turn lane G including curb &gutter, sidewalks, drainage, landscaping, and Totals is 200 150 31 381 381 -utility underground ing 16 21 01 P 2,000 Ft L 111/2005 P 775 S 168 St T No W from: Southcenter Pkwy to: Andover Park W S Construct new roadway including curb gutter, sidewalk, drainage, illumination, and landscaping. Totals 775 775 775 14 22 03 P 4,500 Ft W PE 1/1/2006 STP(U) 396 62 4581 458 Interurban Ave T No S from: S 143 St to: Ft Dent Way P Construct paving, curb gutter, drainage, illumination, sidewalk, G and landscaping. Totals 396 62 458 458 14 23 AL 1/1 /zoos 12 P 1,soo Ft T 725; 725 West Valley Hwy S 156 St P L No from: Southcenter Blvd to: S 158 St Construct additional northbound left turn lane at S 156 St for northbound HOV to northbound 1 -405. Totals 725 725 725 14 24 3 8035 80 AL 111/2006 8035 03 P 2,100 Ft G L 35 Tukwila Int'I Blvd (Phase 3) C No S from: S 132 St to: S 138 St P Reconstruct roadway including paving, curb gutter, sidewalks, T illumination, drainage, and utility undergrounding. W Totals 8035 8035 8035 4 Washington State Department of Transportation Page Six Year Transportation Improvement Program 7 Ag ency: Tukwila From 2002 to 2007 Co. No.: 17 Co. Name: King Co. SuperCedes previous editions Hearing Date: 6/25/2001 Adoption Date: 6/25/2001 City No.: 1320 MPO /RTPO: PSRC Amend Date: Resolution No.: 1465 Project identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. m Fund Source Information Expenditure Schedule Projects Only m c, N (Local Agency) d C. Project Title t Federal Funding RAN .o E D. Street/Road Name or Number a� N g Phase Federal Federai State 4th Envir. Required c o v State Local Total Date a' a Z E. Beginning MP or road Ending MP or road E Start Fund Cost by Fund 1st 2nd 3rd Thru F. Describe Work to be Done (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MAyyy) 3 -4 5 6 7 -8 9- 10.. 11 12 13 14 15 16 1 199 20 21 16 25 04 P 2,000 Ft W AL 1/1/2007 425 4251 425 Minkler Blvd T L No S from: Southcenter Pkwy to: Andover Park W p Consruct widening for 3 lanes inlcuding curb gutter, sidewalk, drainage, and landscaping. Totals 425 425 425 14 26 03 P 3,500 Ft P PE 1/1/2007 No 150 1501 150 Tukwila Int'I Blvd. (Phase 4) S W from: Boeing Access Rd to: S 116 St 'Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility Totals 150 150 150 undergrounding. AL- 1%1%2007 220 16 27 12 P 1,000 Ft W L No Andover Pk E Industry Signal T S from: 500 Ft on each leg to: 500 Ft on each leg P Design and construct a traffic signal and intersection G 'improvements. Totals 220 220 220 17 28 03 P soo Ft AL 111 /2007 l 200 20o j 200 L No Nelson Place from: S 156 St to: S 158 st Design and construct paving, curb gutter, sidewalks, drainage, and illumination. Totals 200 200 200 00 29 32 P PE 1/1/2007 35 351 35 CBD Interurban Trail Connector No from: Interurban Trail to: CBD Design and construct trail from Interurban Trail to CBD. Totals 35 35 35 16 30 05 P 1,500 Ft W PE 1/1/2007 50 50 50 Southcenter Pkwy T S from: 1 -5 Off Ramp to: S 168 St P Design and construct safety and capacity improvements. G Totals 50 50 50 Grand Totals fo Tukwila 8730 5775 42558 57063 23294 5065 2635 26069