HomeMy WebLinkAboutRes 0740 - 1981-1986 Comprehensive Transportation Improvement ProgramCOUNCIL ACTION
MEETING I DATE I AG T MA I ACTION
WASHINGTON
RESOLUTION NO 740
A RESOLUTION ADOPTING A REVISED AND EXTENDED
COMPREHENSIVE TRANSPORTATION PROGRAM IN ACCOR-
DANCE WITH RCW 35.77 AND RCW 36.81.
WHEREAS, the City of Tukwila has previously adopted a Compre-
hensive Transportation Program pursuant to RCW 35.77 and RCW 36.81, and
WHEREAS, the City is required annually to review the work
accomplished under said program and to determine current City street
needs, and
WHEREAS, a public hearing was held on the Comprehensive Trans-
portation Program on Monday, June 16, 1980, at 7:00 P.M. in the Tukwila
City Hall before the Tukwila City Council,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO RESOLVE AS FOLLOWS:
Section 1. Pursuant to RCW 35.77 and RCW 36,81 and the public
hearing on June 16, 1980, the attached documents, incorporated
herein by reference as Exhibit A, are declared and adopted as
the Revised Six Year Transportation Program for the City of
Tukwila.
Section 2. This Resolution and Exhibit shall be filed with the
Director of Transportation of the State of Washington no later
than July 30, 1980 after its adoption as required by RCW 35.77
and RCW 36,81,
Section 3. This Resolution and Exhibit shall be submitted to
the Urban Arterial Board as required by RCW 35.77.
Section 4. This Resolution and Exhibit shall be submitted to
the Puget Sound Council of Governments as the designated Metro-
politan Planning Organization pursuant to the FHWA Federal -Aid
Highway Program Manual Vol. 4, Chapter 4, Section 6.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a regular meeting thereof this //ti day of 1980.
ATTEST:
Appyoved to For
Deputy City Attor y, Carl J Carlson
'ayo r
/o
Six Year Transportation Improvement Program 1981 to 1986
Major roadway bridge projects
Grady Way bridge and roadway improvements
Preliminary engineering, surveying, construction (joint project with
Renton lead agency)
Grady Way - bridge to Southcenter Boulevard
Extension of new bridge west over I-405 ramps to SOuthcenter Boulevard
(potential joint project with Renton)
188th Connector I-5 to 57th Avenue
Location study, right-of-way, preliminary engineering, surveying,
construction (LID, joint project with King County and Kent)
Southcenter Boulevard - 62nd Avenue to T-Line
Grading, drainage, illumination, paving, sidewalks (Phase II and III)
Minkler - Andover Park West to Southcenter Parkway
Right-of-way, grading, draiange, paving, curbs and gutters,
sidewalks, channelization, signalization, lighting, landscaping
Interurban - Southcenter Boulevard to I-5
Grading, drainage, paving, curbs and gutters, sidewalks, channelization,
lighting, signing, landscaping, bikeways
57th Avenue - 180th Street to city limit
Grading, drainage, paving, curbs and gutters, sidewalks, channelization,
signalization, lighting, signing
HEADING
City /County•
County Number:
City Number:
Hearing (fate:
Adoption*
Resolution Number:
COLUMN NO.
1. Item No
2. Project Identification
5. Total Length in Miles
6. Functional Class
7. Rural Urban
8. Carryover Project
14. Program
INSTRUCTIONS FOR PREPARING SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
NOTE: This form is set up in "Elite" typewriter format (12 characters per inch) for coding computer input Only that informator
appearing in the coding blocks will be entered on the computer. Additional information may be included on the form fa,
the Agency's convenience but will not be placed on the computer file.
A. An obligation program indicated the allocation of funds to major phases of project development i.e. preliminary engineering
right -of -way and construction. Show the funding amount for the entire phase or phases in the expected year of obligation ever
though the expenditure of funds may take place over several years.
B. Include all proposed projects regardless of location or source of funds, however, urban arterial trust fund projects need to bi
included only in six -year transportation improvement programs beginning in odd numbered years.
C. Complete the form for the six -year program in accordance with the following instructions:
Enter name of local agency and appropriate county.
Enter the O.F.M. assigned number in code blocks 7 8.
Enter the O.F.M. assigned number in code blocks 3 thru 6.
Enter the date of action by the City Council or County Legislative Authority.
Enter the date of action by the City Council or County Legislative Authority.
Enter City Council or Co. Legislative Auth. resolution number (if applicable).
Enter local agency project identifying numbers in chronological order.
Enter appropriate information noted in column heading. Enter Route Name ar
termini in code blocks 9 thru 35.
3. Major Class of Work Enter the appropriate code number(s). Enter major code in block 36.
1. New construction on new alignment 6. Traffic control
2. Major widening (additional lanes) 7. Capital purchases
3. Minor widening (increase lane width, add shoulders) 8. Non capital improvements
4. Rehabilitation /reconstruction 9. Non Motor Vehicle use
5. Resurfacing
4. Work Codes Enter appropriate code letter(s). Enter major items of work in code blocks 37 thru 4
A. Grading L. Bridge
B. Draining M. Landscaping
C. Light Bituminous Surface N. Paths Trails
D. A.C. or P.C.C. Pavement O. Bikeways
E. Sealcoat P. Transit Facility
F. Curbs Gutters Q. Commuter Pool
G. Sidewalks R. High Occupancy Vehicle Lanes
H. Channelization S. Surveillance Control Driver Information
I. Signalization T. Ferry Facility
J. Lighting U. Project Studies
K. Signing
Enter Length of project to nearest hundredth in code blocks 41 thru 44.
Enter one appropriate code letter in code block 45.
M Major Arterial (Principal) S Secondary Arterial (Minor) C Collector Arterial (Collector) A Acc
Enter the appropriate letter: R Rural U Urban in code block 46.
Enter (x) if project is carried over from previous years annual element. (Funds vv
not obligated during previous year). Enter in code block 47.
9. 1st Year (Annual Element) Enter total project costs to be obligated in the first calendar year of the six -1
program in code blocks 48 thru 51.
10 12. (2nd, 3rd, 4, 5 6th years) Enter estimated project costs to be obligated in each year or years in code blc
52 thru 55.
13, 15, 16. Funding by Source Enter the dollar amount to be obligated under applicable funding source coium
appropriate code blocks.
Enter the funding source program. (FAUS, FAS, SOS, etc.) in code blocks 68 thru
17. Total Funds Enter total project cost in code blocks 80 thru 85.
4
Six Year Transportation Improvement Program 1981 to 1986
Major roadway, bridge projects
Grady Way bridge and roadway improvements
Preliminary engineering, surveying, construction (joint project with Renton lead
agency)
Grady Way Bridge to Southcenter Boulevard
Extension of new bridge west over I-405 ramps to
Southcenter Bouelvard (potential joint project with Renton)
188th Connector I-5 to 57th Avenue
Location study, right-of-way, preliminary engineering, surveying,
construction (LID, joint project with King County and Kent)
Southcenter Bouelvard - 62nd Avenue to T-Line
Grading, drainage, illumination, paving, sidewalks (Phase II and III)
Minkler - Andover Park West to Southcenter Parkway
Right-of-way, grading, drainage, paving, curbs and gutters,
sidewalks, channelization, signalization, lighting, landscaping
Interurban - Southcenter Boulevard to I-5
Grading, drainage, paving, curbs and gutters, sidewalks, channelization,
lighting, signing, landscaping, bikeways
57th Avenue - 180th Street to city limits
Grading, drainage, paving, curbs and gutters, sidewalks, channelization,
signalization, lighting, signing
INSTRUCTIONS FOR PREPARING SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
NOTE: This form is set up in "Elite" typewriter format (12 characters per inch) for coding computer input Only that informatio
appearing in the coding blocks will be entered on the computer. Additional information may be included on the form fc
the Agency's convenience but will not be placed on the computer file.
A. An obligation program indicated the allocation of funds to major phases of project development i.e. preliminary engineerir
right -of -way and construction. Show the funding amount for the entire phase or phases in the expected year of obligation eve
though the expenditure of funds may take place over several years.
B. Include all proposed projects regardless of location or source of funds, however, urban arterial trust fund projects need to t
included only in six -year transportation improvement programs beginning in odd numbered years.
C. Complete the form for the six -year program in accordance with the following instructions:
HEADING
City /County Enter name of local agency and appropriate county.
County Number: Enter the O.F.M. assigned number in code blocks 7 8.
City Number: Enter the O.F.M. assigned number in code blocks 3 thru 6.
Hearing Date: Enter the date of action by the City Council or County Legislative Authority.
Adoption Enter the date of action by the City Council or County Legislative Authority.
Resolution Number: Enter City Council or Co. Legislative Auth. resolution number (if applicable).
COLUMN NO.
1. Item No Enter local agency project identifying numbers in chronological order.
2. Project Identification Enter appropriate information noted in column heading. Enter Route Name a
termini in code blocks 9 thru 35.
3. Major Class of Work Enter the appropriate code number(s). Enter major code in block 36.
1. New construction on new alignment 6. Traffic control
2. Major widening (additional lanes) 7. Capital purchases
3. Minor widening (increase lane width, add shoulders) 8. Non capital improvements
4. Rehabilitation /reconstruction 9. Non Motor Vehicle use
5. Resurfacing
4. Work Codes Enter appropriate code letter(s). Enter major items of work in code blocks 37 thru
A. Grading L. Bridge
B. Draining M. Landscaping
C. Light Bituminous Surface N. Paths Trails
D. A.C. or P.C.C. Pavement O. Bikeways
E. Sealcoat P. Transit Facility
F. Curbs Gutters Q. Commuter Pool
G. Sidewalks R. High Occupancy Vehicle Lanes
H. Channelization S. Surveillance Control Driver Information
I. Signalization T. Ferry Facility
J. Lighting U. Project Studies
K. Signing
5. Total Length in Miles Enter Length of project to nearest hundredth in code blocks 41 thru 44.
6. Functional Class Enter one appropriate code letter in code block 45.
M Major Arterial (Principal) S Secondary Arterial (Minor) C Collector Arterial (Collector) A Ac
7. Rural Urban Enter the appropriate letter: R Rural U Urban in code block 46.
8. Carryover Project Enter (x) if project is carried over from previous years annual element. (Funds
not obligated during previous year). Enter in code block 47.
9. 1st Year (Annual Element) Enter total project costs to be obligated in the first calendar year of the six
program in code blocks 48 thru 51.
10 12. (2nd, 3rd, 4, 5 6th years) Enter estimated project costs to be obligated in each year or years in code bI
52 thru 55.
13, 15, 16. Funding by Source Enter the dollar amount to be obligated under applicable funding source colun
appropriate code blocks.
14. Program Enter the funding source program. (FADS, FAS, SOS, etc.) in code blocks 68 thr
17. Total Funds Enter total project cost in code blocks 80 thru 85.
Six Year Transportation Improvement Program 1981 to 1986
Chartwell - Southcenter Parkway to Andover Park West
Grading, drainage, paving, curbs and gutters, sidewalks, signalization, lighting
(LID/developer project)
178th Street - Southcenter Parkway to I-5
Right-of-way, grading, drainage, paving, curbs and gutters, sidewalks,
channelization, lighting, signing
Minkler - East End to Highway 181
New bridge crossing Green River
Macadam Road - Southcenter Boulevard to 144th Street
Grading, drainage, paving, curbs and gutters, sidewalks, channelization, lighting,
signing
154th Street - 53rd Avenue to city limit
Grading, drainage, paving, curbs and gutters, sidewalks, channelization, lighting,
signing (potential extension to Highway 99 with King County)
Six Year Transportation Improvement Program 1981 to 1986
Signal / Channelization projects
Highway 181 at 180th Street
Signal modifications channelization, one-lane widening along Highway 181
(joint project with Renton and Kent)
Southcenter Parkway at 180th Street
Signal modifications, channelization
Southcenter Parkway - I-5 ramp to Strander
Interconnect 3 traffic signals on Southcenter Parkway. I-5 ramp, Klickitat,
Strander (joint project with WSDOT)
Tukwila Parkway at Andover Park West
New installation for signalization, channelization
180th Street at Andover Park East
New installation for singlization, channelization
Highway 181 at Strander Boulevard
Provide right-turn lane for southbound approach. Channelization
Strander Boulevard at Andover Park West
Provide left-turn channelization and signalization for north and south approaches
Six Year Transportation Improvement Program 1981 to 1986
Tukwila Parkway at S-Line
Signal and pedestrian modifications, channelization
Southcenter Boulevard at S-Line
signal and pedestrian modifications
Strander Boulevard at Andover Park East
Provide left-turn channelization and signalization for north and south approaches
180th Street at Andover Park West
Signal modification to 6-phase system
Tukwila Parkway at I-405 on Ramp
Provide right-turn lane for west bound approach, ramp metering, signalization
(join project with WSDOT)
Tukwila Parkway at Andover Park East
New installation for signalization (potential join project with WSDOT when
I-405 corridor improved)
Interurban at Highway 599 off
New installation for signalization (joint project with WSDOT)
Six Year Transportation Improvement Program 1981 to 1986
Andover Park West transit corridor
Provide transit stops and transfer sections at Southcenter and Chartwell
sites (joint Metro / Allied Stores / Chartwell project)
I-405 Corridor Access
HOV / Transit study for I-405 corridor improvements between I-5 and
Highway 181 (joint project with WSDOT)
T-Line - SOuthcenter Boulevard to Tukwila Parkway
Pedestrian bridge parallel to existing T-line bridge
Foster Golf Links Bridge
Preliminary engineering, construction of bridge over Green River for golf
carts and pedestrians
Six Year Transportation Improvement Program 1981 to 1986
Chartwell Impact Projects
Economic Development (EDA) projects for Phase I and II - Local shares
by developer / LID
Southcenter Parkway - Klickitat to Chartwell Road
Widening from Klickitat to new Chartwell Road, intersection / signal
improvements at Strander
Strander - SOuthcenter Parkway to Highway 181
Widening from Southcenter Parkway to Green River, intersection / signal inputs
at new access roads and Highway 181
andover Park West - Strander to Chartwell Road
Widening from 300 North of Strander to new Chartwell Road, Intersection / signal
inputs at Strander / new access road.
Andover Park East at Strander Boulevard
Widening from 300' North to 300' south of Strander, intersection / signal inputs
at Strander
Six Year Transportation Improvement Program 1981 to 1986
COMM / TND District Projects
Andover Park West - Tukwila Parkway to Strander
Planning, curbs, overlay, sidewalks, channeliztion (in conjunction with
intersection modification)
Andover Park East - Tukwila Parkway to STrander
Planning, curbs, overlay, sidewalks, channelization (in conjunction with
intersection modification)
Southcenter Parkway - Tukwila Parkway to 180th Street
Planning, curbs, overlay
Strander - Andover Park West to Southcenter Parkway
Planning, curbs, overlay, sidewalks, widening
Andover Park East - Tukwila Parkway to 180th Street
Planning, curbs, overlay
Christensen Road - tukwila Parkway and South
Grading, drainage, paving, curbs and gutters, sidewalks, lighting (to 600'
south of Tukwila Parkway)
Baker Boulevard - Andover Park West to Christensen Road
Planning, curbs, overlay, sidewalks
Six Year Transportation Improvement Program 1981 to 1986
Residential Street Projects
59th Avenue - 147th Street to 58th Avenue
Lighting, grading, paving, curbs and gutters, sidewalks
166th Street - 54th Avenue to North 53rd Avenue
Grading, drainage, lighting, sanitary sewer, paving, sidewalks (LID 28)
57th Avenue - 152nd Street to 350' South
Grading, drainage, lighting, paving, sidewalks (LID 28)
58th Avenue - South terminus to 500' north
New street (potential LID)
53rd Avenue - Southcenter Boulevard to terminus
Grading, drainage, lighting, paving, curbs and gutters, sidewalks (potential LID)
160th Street - 51st Avenue to 53rd Avenue
Grading, drainage, paving, curbs and gutters, sidewalks (by LID)
Six Year Transportation Improvement Program 1981 to 1986
54th Avenue - Slade Way to 166th Street
Grading, drainage, paving, curbs and gutters, sideawlks (by LID)
143rd Street - Interurban to River
Grading, drainage, paving, curbs and gutters, sidewalks (by LID)
slade Way - 54th Avenue to 160th Street
Grading, drainage, paving, curbs and gutters, sidewalks (by LID)
56th Place - 141st Street to 139th Street
Lighting, curbs and gutters, drainage, sidewalks, paving
57th Avenue - 141st Street to 147th Street
Drainage, curbs and gutters, sidewalks, overlay
141st Street - 58th Avenue to 57th Avenue
Grading, drainage, paving, curbs and gutters, sidewalks
142nd Street - 58th Avenue to 57th Avenue
Grading, paving, sidewalks, curbs and gutters, drainage
Six Year Transportation Improvement Program 1981 to 1986
114th Street - 58th Avenue to East terminus
Grading, paving, sidewalks, curbs and gutters, drainage
53rd Avenue - 166th Street ot 168th Street
Grading, paving, sidewalks, curbs and gutters, drainage
55th Avenue - 144th Street ot 140th Street
Lighting, curbs and gutters, drainage, sidewalks, paving (some ROW in
city Light franchise area)
140th Street - 55th Avenue to 53rd Avenue
Lighting, curbs and gutters, drainage, sidewalks, paving (some ROW in
City Light franchise area)
139th Street - 56th Avenue to 56th Place
Lighting, curbs and gutters, drainage, sidewalks, paving
56th Avenue - 139th Street to 137th Street
Lighting, curbs and gutters, drainage, sidewalks, paving
53rd Avenue - 160th Street to North terminus
Grading, drainage, paving, lighting, curbs and gutters, sidewalks
Six Year Transportation Improvement Program 1981 to 1986
Miscellaneous Projects
Miscellaneous Traffic Control Projects
Miscellaneous Street Improvement Projects
Miscellaneous Street Maintenance projects