HomeMy WebLinkAboutRes 0754 - CDBG Block Grant for Foster Bridge ReplacementCITY QF TUKWILA
WHEREAS, King County is an urban county applicant for
block grant funds under the Housing and Community Development
Act of 1974, L.L. 93 -383, to provide local matching funds for
the Foster Bridge Replacement; and
WHEREAS, the City of Tukwila has adopted a plan establishing
goals and strategies for projects funded by the Block Grant
Program which will provide for cooperation with King County
to provide for replacement of the bridge located at 56th Avenue
South "Foster Bridge and
WHEREAS, the City of Tukwila approves of and hereby joins
the County in submitting a 1981 Housing and Community Development
Project Application entitled "Foster Bridge Replacement
THE CITY COUNCIL OF THE CITY OF TUKWILA DOES RESOLVE AS FOLLOWS:
Section 1. City support of Foster Bridge replacement. The
City of Tukwila agrees to support and participate with King
County as a joint sponsor of the Foster Bridge Replacement
project block grant application.
Section 2. Notification of King County. The King County
Department of Public Works shall be notified that the City
of Tukwila will support and sponsor the project jointly with
King County.
ATTEST:
City Clerk
APPROVED AS TO FORM:
A RESOLUTION to support the Block Grant
Joint Application submitted by King County
for the Foster Bridge Replacement Program.
PASSED by the Council of the City of
Tukwila, Washington, at a regular meet-
ing thereof, this /g day of
1980.
Gity Attorney
WASHINGTON
RESOLUTION NO 754
MAYO
CITY OF TUKWILA
Department of Planning Community Development
1. PROJECT TITLE
2. PROJECT SUMMARY (brretly and clearly describe the project in the
space provided —see instructions on back)
To provide local matching funds for Foster Bridge Replacement.
This will provide a two lane road and pedestrian access to the
Foster Peninsula in the vicinity of 56th Avenue S Interurban
Avenue across the Duwamish River.
3. PROJECT BENEFITS
A. Document how project either benefits low and moderate income
people, and /or alleviates slum /blight.
On the Foster Peninsula there are 50 residences and one major
business. Access to the area is via a one lane 14' access road.
B Describe characteristics of benefiting population.
Low and moderate income; most are Senior Citizens.
C Where will project be located? (street address, and city or community)
Bridge across the Duwamish River in the vicinity of 56th Avenue S
and Interurban Avenue.
D Census Tract Number
4. FUNDS REQUESTED
A. County
(pop. or needs)
B City Pop.
C. City Needs
D Joint
TOTAL
Block Grant Funds
E. Funds from
other sources
F Total prc;ect cost
(same as lane 19 page 2
Housing Community
Development
1721 Smith Tower
Seattle Washington 98104
206) 344 -7605
FOSTER BRIDGE REPLACEMENT
262
5. A. How long will it take to complete this project? 18 months
B When will you begin incurring costs? .7/1/81
6. PROJECT APPLICANT (Name, address, phone)
J.W. GUENTHER, Director, Dept. Public Worl.s
900 King County Adm. Bldg.
1 P WA 98104 eN1( 206/344 -2517
7. IMPLEMENTING AGENCY (Name, address, phone)
J.W.GUENTHER, Director, Dept. Public Work;:
S 449.000.900 King County Adm. Bldg.
Seattle. WA 98104 206/344 -2517
449,000
$1046,000.
81495,000.
8.
£i=s, 7 s y
1981 Housing and Community Development
Project Application
Application Number Date Received Eligibility
y T W GUENTHER.
e and Title
_nature of Applicants
PAGE 1
Director.Dent.of Public.
Work
9. BUDGET SUMMARY
HOUSING COMMUNITY DEVELOPMENT
BUDGET CATEGCRIES
1 Personal Services
2 Off,ce cr Coerating Supplies
3 Ccnsuitar,t or Purchased Services
Ccnstr;ctrcn Contracts and /or
Rea! Procerty Acquisition
5 Cc^'mt:nicstior,s
6 Travel and Training
7 Intra County Support
8 CapitalOut:ay— Equipment
9 Other (detail below)
10 Total H &CD Funds Only
89,000.
35,000.
323,000.
2,000.
$449,000.
For construct•on contract, attach detailed cost breakdown.
10. BUDGET DETAILS OF CATEGORIES 9.1, 9.9 AND 9.11 -17 ABOVE
CATEGORY 9 1 Personal Services Records kept to substantiate costs /charges
List Employees by Position Title Annual Salary
King County Road Division: design,
Fringe Benefits of Total)
Category Total—
Should be the same as No 1 in Budget Summary
CATEGORY 9 9 Otner
Federal Aid Bridge Replacement Funds
CATEGORY 9.11 -17 OTHER SOURCES OF FUNDS
Indicate which of the sources listed are committed and which are
pending. Give the date funds become available.
OTHER SOURCES OF FUNDS
11 Federal
12 State
13 Local Cash— Private
14 Local Cash Public
15 In -Kind Match
16 Other County
17 Other (specify)
18 Total Other Funds
19 TOTAL PROJECT COST
Percent of
Time to Project
This joint project is shared with the City of Tukwila. Bridge
replacement funds will provide 70% match for project costs.
Item Total
Item Total
PAGE 2
$1046,000.
1 $1495,000.
survey and inspection 89,000.
70/30 Matching Funds 1046,000.
Total
1046,000.
11. FULL STATEMENT OF THE PROJECT
(See Instructions on cack of page.)
L GENERAL
A. Problem In the spring of 1980 the 56th Avenue Bridge (Foster Bridge)
collapsed. The bridge served 50 residences and one business. The only
access now is a 14' wide road. This single access is restricted by
piling for I- 5Freeway, the Duwamish River on the west sine and the
railroad and a hillside on the east side.
Several hazards exist to this one way access; an automobile
or truck accident, a railroad accident (possibly of hazardous materials),
a flood, etc. The existing road, if blocked for one reason or another,
would make fire protection, ambulance and emergency vehicle access or
evacuation impossible.
The existing traffic pattern is two miles longer than it
will be when the new bridge is built.
B. Purpose
To provide better vehicular and pedestrian access to Foster
Peninsula Area.
To provide alternative vehicular and pedestrian access to area.
To provide faster emergency vehicle access.
To provide access from the Peninsula Area to bus stops, school
bus routes and commercial areas.
II. PROJECT INTENT
A. Goals
To construct a new two lane bridge with pedestrian facilities
across the Duwamish River in the vicinity of 56th Avenue S
and Interurban Avenue.
PAGE 3
IV. PROJECT SCHEDULE
TASK COST START DATE ENO DATE SOURCE OF FUNDS
1. Survey Design 137,000. 7/1/81 3/82 $CD /FHWA
2. Construction 1076,000. 3/82 12/82 HCD /FHWA
3. Inspection' 276,000. 3/82 12/82 HCD /FHWA
4
5
6.
7
11. FULL STATEMENT OF THE PROJECT, Continued (See instructions on back of page 3)
8 Objectives
To complete the bridge design in 1981.
To complete the bridge constriction in 1982.
C. Resources
The lead agency will be King County; the project will be in
conjunction with the City of Tukwila.
111. PROJECT EVALUATION
The project will be completed when the bridge is opened.
W. Attach map showing Location of project and service area
ter efitting
on governrnental agencies must cornplete back sice of
t ^..s Rage
PAGE 4