HomeMy WebLinkAboutRes 0771 - Street Improvements on South 180th Street�1
CITY OF T
WASHINGTON
RESOLUTION NO 771
RESOLUTION APPROVING AGREEMENT BETWEEN THE
CITY OF TUKWILA AND THE WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION TO PROVIDE
STREET IMPPOVEMENTS ON S. 180TH STREET AT
ANDOVER PARK EAST AND SOUTHCENTER PARKWAY
FROM I -5 OFF- RAMP TO STRANDER BOULEVARD
AND AUTHORIZING THE MAYOR ON BEHALF OF THE
CITY OF TUKWILA TO EXECUTE NECESSARY DOCUMENTS.
WHEREAS, State and Federal funds are available to
provide needed traffic improvements consisting of channelization
and traffic control devises on S. 180th Street at Andover Park
East and Southcenter Parkway from I -5 Off -Ramp to Strander
Boulevard, which requires agreements between the City of Tukwila
and the Washington State Department of Transportation.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA
RESOLVE AS FOLLOWS:
That Frank Todd, Mayor be and he is hereby authorized
to enter into an agreement on behalf of the City of Tukwila with
the Washington State Department of Transportation to obtain funds
to pay the cost of channelization and traffic controls.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, And approved by the Mayor at a regular meeting thereof
this /7 .0 day of November, 1930.
Attest:
City Clerk
COUNCIL ACTION
METYPETING E DATE I AGEITENDM A I ACTION
caw1 I)I RM
I
I
I
AGENCY
DATE
Termini
City of Tukwila
November 17, 1980
The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S.
Code Highways, (2) the regulations issued pursuant thereto, (3) the policies and procedures promulgated by the Washington
State Department of Transportation and, (4) the Federal -aid Project Agreement entered into between the State and Federal
Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency
to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed
the amount shown herein, without written authority by the State, subject to the approval of the Federal Highway Administrator.
The balance of the total project cost shall be the obligation of the Local Agency.
Name Signalization Southcenter Parkway from I -5 Off -Ramo to Strander Length 25 mi.
Description of Work
Signalization: Interconnect signals along Southcenter
Parkway at I -5 northbound off -ramp,
Klickitat Drive and Strander Boulevard.
Install lane control signing.
ESTIMATE OF FUNDING
TYPE OF WORK (1) (2) (3)
Estimated Total Estimated Estimated
Project Funds Agency Funds Federal Funds
P.E. a. Agency Work incl. consult, 4500 4500
b. State Services 500 500
c. Other
d. Total Prelim. Eng. Costs Estimate 5000 5000
Right -of -Way e. Agency Work
t. State Services
g. Other
h. Total R/W Cost Estimate 0 0
Construction i. Contract 46750 46750.
Engineering 51. Agency Force 6750 575.0.
'I k. State Force 75.0 750.
I. Audit 750.... 750.
m. Other
AGENCY OFFICIO
V CHAIRMAN. Chat 8 ars /Mayor
FOR1t' 140-039
DOT REVISED 12/78
From 1 -5 Off -Ramp to Strander Blvd.
WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION
CITY /COUNTY AGREEMENT
PROJECT DESCRIPTION
FEDERAL AID
I�CG`I PROD T O 4 I
AGREEMENT NUMBER
CAM 4
Frog.
FHWA PE
Aoor• Date
FHWA RW
Aver. Date
FHWA Constr.
ADpr. Date
t
ate Aid Engin
DEC 2 2
i2 4 NUMBER
oPTukwi /a
W.S.D.O.T. USE ONLY
Work Order Ro L
Accounting
Plan RW❑ oo
Date Executed
No.
AUIn.
By
Date
Auth.
By
Date
No.
Auth.
By
Date
No.
Auth.
By
n. Other
o. Total Construction Cost Estimate 55000 55000
p. TOTAL C OST ESTIMATE OF THE 60000 I 60000
The Federal-aid deral -aid participation rate in this project will be determined by the Federal Government. The parties expect that it will be
however, it is understood that the rate may vary. The Local Agency agrees that this agreement is entered without relying
upon any representation by the State made outside of this contract, or contained herein, as to what the Federal participation rate will
be. It further agrees that it will not condition any future actions with respect to the project Covered by this agreement upon past,
current, or future representations as to the Federal participation rate. The dollar amount of Federal participation cannot exceed the
amount shown in column (3) Costs exceeding the Federally funded portion of this agreement will be provided by the Local Agency.
CONSTRUCTION METHOD OF FINANCING
Date
STATE AD AWARD
METHOD A Advance Payment Agency Share of Total Construction Cost (Based on Contract Award)
METHOD B Withhold From Gas Tax the Agency's Share of Total Construction Cost (line o., col.2)
in the amount of c at per month for months
LOCAL FORCE OR LOCAL AD AWARD
METHOD C X Agency Cost Incurred with Partial Reimbursement
WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION
(Check Method Selected)
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligveic, it accepts and will comply wit the applicable provisions set forth on the reverse
hereof. Adopted by official action on i/ /2"e-hr fi t /'7 19 U Resolution /Ordinance No 7'2/
City of Tukwila
DATE
Name
November 17, 1980
Termini
n. Other
COT s_
WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION
CITY /COUNTY AGREEMENT
PROJECT DESCRIPTION
Signalization Andover Park East at S. 180th Street
Description of Work
Intersection of Andover Park East and South 180th Street
Channelization and traffic control devices.
ESTIMATE OF FUNDING
TYPE OF WORK (1) (2) (3)
Estimated Total Estimated Estimated
Project Funds Agency Funds Federal Funds
P.E. a. Agency Work inc consult. 9000 9000
b. State Services 1000 1QOQ
c. Other
d. Total Prelim. Eng. Costs Estimate 10000 1 OOOO
Right -of -Way e. Agency Work
f State Services
g. Other
h. To:al R/W Cost Estimate 0
Construction i. Contract 55250
Encineering I j. Agency Force 8100
(k. State Force 900
I. Audit 75Q
m. Other
o. Total Construction Cost Estimate
o TCTAL COST ESTIMATE OF THE
P =OJECT
AG =NC OFFICIAL f
e.-
CHAIRMAN =:fxars.Mayor
'tis'
J
65000
75000
LOCAL FORCE OR LOCAL AD AWARD
ETHCJ C X Agency Cost Incurred with Partial Reimbursement
FEDERAL AID PliOJECT NUMBER
M ^iflS3
AGREEMENT NUMBER
Prog.
FHWA PE
Actor. Date
FHWA RW
Appr. Date
FHWA Constr
Appr Date
Work Order
Accounting
Plan
750
W.S.D.O.T. USE ONLY
I F.C. I C.S.
(No.
j Auth.
ay
!Date
(No.
Auth.
By
Date
0
5 INo
S 10.Q IBy
900,,, (Date
No
Auth
By
65000 I oate
75000
&4 /U!clt), /a
WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION
S:ate Aid ing.neer
nn r-
Date Erec.,tet
i
The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S.
Code Highways, (2) the regulations issued pursuant thereto, (3) the policies and procedures promulgated by the Washington
State Department of Transportation and, (4) the Federal -aid Project Agreement entered into between the State and Federal
Governrr.ent, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency
to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed
the amount shown herein, without written authority by the State, subject to the approval of the Federal Highway Administrator.
The balance of the total project cost shall be the obligation of the Local Agency.
Length 0- 02mi
RO ❑L
RW❑OO❑
Tha F.derai -aid participation rate in this project will be determined by the Federal Government. The parties expect that it will be
10 however, it is understood that the rate may vary The Local Agency agrees that this agreement is entered without relying
upon any representation by the State made outside of this contract, or contained herein, as to what the Federal participation rate will
be. It `urther agrees that it will not condition any future actions with respect to the project Covered by this agreement upon past,
curre or future representations as to the Federal participation rate. The dollar amount of Federal participation cannot exceed the
amou —t shown in column (3) Costs exceeding the Federally funded portion of this agreement will be provided by the Local Agency
CONSTRUCTION METHOD OF FINANCING
(Check Method Selected)
STATE AD AWARD
METHOD A Advance Payment Agency Share of Total Construction Cost (Based on Contract Award)
METHOD B Withhold From Gas Tax the Agency's Share of Total Construction Cost (line o., col.2)
in the amount of at per month for months
The Loca' Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions set forth on the reverse
hereof Adopted by official action on 7?-0 -6 4 7 Ci` 7 ;y 19 $2h` Resolution /As e No. 7?/