WHEREAS, the Developer has requested the turnover of water and sanitary
mains for Sections I and II (including the four unit short plat) of the Sunwood
Development to the City, and does not include Section III (Exhibit A attached), and
WHEREAS, the revenues from the water and sewer systems provide for the
operation and maintenance of the utilities.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA DO STATE AS
FOLLOWS:
It is the City's intent to take over the sanitary sewer mains and water
mains, including hydrants, by Sections, for Section I and Section II of the Development,
per Exhibit B attached (Section II includes the four unit subdivision adjacent to
62nd Avenue South and South 151st Street).
The Developer shall request the turnover of these utilities to the City
at the completion of construction of each Section of the Sunwood Development upon meeting
the following conditions of turnover:
A. Utilities to be turned over shall be constructed in accordance with
utility design drawings approved by the Public Works Department.
B. The following items shall be turned over to the City:
(1) One set of reproducible as -built plans of the complete site
facilities.
(2) Bills of sale for water mains and sewer mains to be turned over,
including unit cost breakdowns of the installed cost for the water and sanitary mains.
(3) Permanent maintenance easements for the purpose of allowing the
City to monitor, repair, replace and maintain the subject utiltiies. Where utility
work is required by the City, the City's restoration work within the easement shall be
limited to the condition existing at the time of utility acceptance by the City, with
the exception of any structures or other improvements located within the easement area.
(4) For utilities in Section I, a certificate from a registered
civil engineer will be submitted to the City to verify that the facilities were
constructed in conformance with the utility drawings approved by the Public Works
Department.
(5) A performance or maintenance bond for the value of the utility
installations in the City's behalf to be in effect for one year from the date of
acceptance by the City.
As soon as the Public Works Department and the City Clerk receive the
above items and verify their adequacy for each Section, the City Clerk will place an
Ordinance for acceptance of the utility turnover before the City Council.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular
meeting thereof this day of 1981.
Exhibit A
Water and Sewer Plan Map for Sunwood Development
Sunwood II
Section 1 and 2 with 4 unit plat
See hard copy for full print
Water and Sewer Plan Map for Sunwood Development