Loading...
HomeMy WebLinkAboutRes 0784 - Intent to Accept Water and Sanitary Mains at Sunwood Development RESOLUTION NO 784 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA STATING THEIR INTENT TO ACCEPT WATER AND SANITARY MAINS AT THE SUNWOOD DEVELOPMENT ADJACENT TO 62ND AVENUE SOUTH AT SUCH TIME AS CERTAIN ACTIONS ARE COMPLIED WITH. WHEREAS, the Developer has requested the turnover of water and sanitary mains for Sections I and II (including the four unit short plat) of the Sunwood Development to the City, and does not include Section III (Exhibit A attached), and WHEREAS, the revenues from the water and sewer systems provide for the operation and maintenance of the utilities. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA DO STATE AS FOLLOWS: It is the City's intent to take over the sanitary sewer mains and water mains, including hydrants, by Sections, for Section I and Section II of the Development, per Exhibit B attached (Section II includes the four unit subdivision adjacent to 62nd Avenue South and South 151st Street). The Developer shall request the turnover of these utilities to the City at the completion of construction of each Section of the Sunwood Development upon meeting the following conditions of turnover: A. Utilities to be turned over shall be constructed in accordance with utility design drawings approved by the Public Works Department. B. The following items shall be turned over to the City: (1) One set of reproducible as -built plans of the complete site facilities. (2) Bills of sale for water mains and sewer mains to be turned over, including unit cost breakdowns of the installed cost for the water and sanitary mains. (3) Permanent maintenance easements for the purpose of allowing the City to monitor, repair, replace and maintain the subject utiltiies. Where utility work is required by the City, the City's restoration work within the easement shall be limited to the condition existing at the time of utility acceptance by the City, with the exception of any structures or other improvements located within the easement area. (4) For utilities in Section I, a certificate from a registered civil engineer will be submitted to the City to verify that the facilities were constructed in conformance with the utility drawings approved by the Public Works Department. (5) A performance or maintenance bond for the value of the utility installations in the City's behalf to be in effect for one year from the date of acceptance by the City. As soon as the Public Works Department and the City Clerk receive the above items and verify their adequacy for each Section, the City Clerk will place an Ordinance for acceptance of the utility turnover before the City Council. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this day of 1981. Exhibit A Water and Sewer Plan Map for Sunwood Development Sunwood II Section 1 and 2 with 4 unit plat See hard copy for full print Water and Sewer Plan Map for Sunwood Development