Loading...
HomeMy WebLinkAboutRes 0789 - 1982-1987 Comprehensive Transportation ProgramCITY OF TUKWIL AA roved as to For A RESOLUTION ADOPTING A REVISED AND EXTENDED COMPREHENSIVE TRANSPORTATION PROGRAM IN ACCOR DANCE WITH RCW 35.77 and RCW 36.81. WHEREAS, the City of Tukwila has previously adopted a Compre- hensive Transportation Program pursuant to RCW 35.77 and RCW 36.81, and WHEREAS, the City is required annually to review the work accomplished under ssaid program and to determine current City street needs, and WHEREAS, a public hearing was held on the Comprehensive Trans portation Program on Tuesday, June 9, 1981, at 7:00 P.M. in the Tukwila City Hall before the Tukwila City Council. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO RESOLVE AS FOLLOWS: Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public hearing on June 9, 1981, the attached documents, incorporated herein by reference as Exhibit A, are declared and adopted as the Revised Six -Year Transportation Improvement Program for the City of Tukwila. Section 2. This Resolution and Exhibit shall be filed with the Director of Transportation of the State of Washington no later than July 30, 1981 after its adoption as required by �7 RCW 35.77 and RCW 36.81. Section 3. This Resolution and Exhibit shall be submitted to the Urban Arterial Board as required by RCW 35.77. Section 4. This Resolution and Exhibit shall be submitted to the Puget Sound Council of Governments as the designated Metro politan Planning Organization pursuant to the FHWA Federal -Aid Highway Program Manual Vol. 4, Chapter 4, Section 6. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this 15th day of June 1981 ATTEST: City Attorney, Lawrence E. Hard WASHINGTON RESOLUTION NO. 789 Frank Todd Mayor Maxine Anderson City Clerk Lawrence Hard City Attorney 1982 to 1987 Six Year Transportation Improvement Program Grady Way Bridge replacement. Joint project with Renton Southcenter Boulevard 62nd Avenue South to Grady Way Bridge Widen to 4 lanes, construct bridges over river and I-405 ramps. Joint project with WSDOT. 188th Street Connector from I-5 to 180th Construct new 5 lane connector to 57th Avenue South. Widen 57th Avenue South to 5 lanes from South 188th Street to South 180th Street. Install signal at 57th Avenue. Minkler Boulevard Andover Park West to Southcenter Parkway 5 lanes. 2 new signals at Andover Park West and Southcenter Parkway Interurban Avenue from Southcenter Boulevard to I-5 Street improvements with sidewalks 168th Street Southcenter Parkway to Andover Park West New 5 lane street. 2 new signals at Southcenter Parkway and Andover Park West 58th Avenue Strander to 168th South New 5 lane street. 1 new signal at Strander Boulevard Minkler East end to Highway 181 5 lane bridge crossing Green River. 1 new signal at Highway 181 1982 to 1987 Six Year Transportation Improvement Program Minkler Boulevard Andover Park West to East Widen from 4 to 5 lanes. 1 new signal at Andover Park East Tukwila Parkway S-line to Andover Park West Widen from 5 to 7 lanes. Signal and pedestrian modifications at S-line. New signal and right turn lane for east approach at I-405 on ramp. Andover Park West Tukwila Parkway to Strander Bouelvard Widen from 4 to 5 lanes. Construct transit stops. 180th Street 57th Avenue to Andover Park West Widen from 5 to 7 lanes. Signal modification to 6-phase at Andover Park West. Andover Park West Strander Bouelvard to 180th Street Widen from 4 to 5 lanes. Construct transit stops Southcenter Parkway at 180th Street Signal modifications. Channelization 180th Street at Andover Park East New signal and channelization Southcenter Parkway I-5 Ramp to STrander Boulevard Interconnect 3 signals at I-5 ramp, Klickitat and Strander Boulevard. Join project with WSDOT 1982 to 1987 Six Year Transportation Improvement Program Highway 181 at Strander Boulevard Construct right turn lane for north approach Strander Boulevard at Andover park West Provide left turn channelization and signal modifications for north and south approaches Tukwila parkway at Andover Park East New signal and channelization 180th Street Andover Park West to Highway 181 Widen from 4 to 7 lanes. Signal modification, channelization and one-lane widening along Highway 181. Joint project with Renton and Kent. Southcenter Parkway Southcenter entrance to Minkler Widen from 5 and 6 to 7 lanes. Signal modification at Strander Boulevard Strander Boulevard Southcenter Parkway to Andover Park West Widen from 4 to 7 lanes 57th Avenue 188th Connecting to C limit Widen from 2 to 5 lanes Southcenter Parkway Minkler to 180th Street Widen from 5 to 7 lanes 1982 to 1987 Six Year Transportation Improvement Program Southcenter Parkway Southcenter entrance to Tukwila Parkway Widen from 5 to 7 lanes. Strander Boulevard Andover Park West to bridge Widen from 4 to 5 lanes. Signal modification and left turn channelization for north and south approaches at Andover Park East Andover Park East Tukwila Parkway to Strander Boulevard Widen from 4 to 5 lanes Andover Park East Strander Boulevard to 180th Street Widen from 4 to 5 lanes 168th Avenue Andover Park West to Andover Park East New 5 lane street Macadam Road Southcenter Bouelvard to 144th Street Street improvements with sidewalks 154th Street 53rd Avenue to City Limit Includes trail system Interurban at Highway 599 off ramp Install 3 new signals and interconnect. Joint project with WSDOT 1982 to 1987 Six Year Transportation Improvement Program T-line Southcenter Boulevard to Tukwila Parkway Pedestrian bridge parallel to existing T-Line bridge Christensen Tukwila Parkway and South Install new signal at Tukwila Parkway Baker Bouelvard Andover Park West to Christensen 1982 to 1987 Six Year Transportation Improvement Program 59th 144th to 58th Intersection Street improvement with sidewalks 143rd - Interurban to River Street improvements with sidewalks (by LID) 166th - 53rd to 54th Street improvements with sidewalks 58th - South term to 500' south New street construction (developer's extension or LID) 160th - 51st to 53rd Avenue Street improvement with sidewalks (by LID) 54th - Slade Way to 166th Street improvement with sidewalks (by LID) 53rd - 160th to Klickitat By developer extension or LID 1982 to 1987 Six Year Transportation Improvement Program Slade Way - 54th to 160th By LID 56th Place - 139th to 141st Street improvements with sidewalks 56th Avenue - 139th to 141st Street improvements with sidewalks 57th - 141st to 147th Street improvements with sidewalks 141st - 57th to 58th Street improvements with sidewalks 144th - 59th to East terminus Street improvements with sidewalks 53rd - 166th to 168th Street improvement project with sidewalk 55th - 140th to 144th Street improvement project with sidewalk 1982 to 1987 Six Year Transportation Improvement Program 140th - 55th to 53rd Street improvement project with sidewalk 139th - 56th to 56th Place 56th - 137th to 139th Street improvement project with sidewalk