HomeMy WebLinkAboutRes 0789 - 1982-1987 Comprehensive Transportation ProgramCITY OF TUKWIL
AA roved as to For
A RESOLUTION ADOPTING A REVISED AND EXTENDED
COMPREHENSIVE TRANSPORTATION PROGRAM IN ACCOR
DANCE WITH RCW 35.77 and RCW 36.81.
WHEREAS, the City of Tukwila has previously adopted a Compre-
hensive Transportation Program pursuant to RCW 35.77 and RCW 36.81, and
WHEREAS, the City is required annually to review the work
accomplished under ssaid program and to determine current City street
needs, and
WHEREAS, a public hearing was held on the Comprehensive Trans
portation Program on Tuesday, June 9, 1981, at 7:00 P.M. in the Tukwila
City Hall before the Tukwila City Council.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO RESOLVE AS FOLLOWS:
Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public
hearing on June 9, 1981, the attached documents, incorporated
herein by reference as Exhibit A, are declared and adopted as
the Revised Six -Year Transportation Improvement Program for
the City of Tukwila.
Section 2. This Resolution and Exhibit shall be filed with
the Director of Transportation of the State of Washington no
later than July 30, 1981 after its adoption as required by
�7 RCW 35.77 and RCW 36.81.
Section 3. This Resolution and Exhibit shall be submitted to
the Urban Arterial Board as required by RCW 35.77.
Section 4. This Resolution and Exhibit shall be submitted to
the Puget Sound Council of Governments as the designated Metro
politan Planning Organization pursuant to the FHWA Federal -Aid
Highway Program Manual Vol. 4, Chapter 4, Section 6.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a regular meeting thereof this 15th day of June 1981
ATTEST:
City Attorney, Lawrence E. Hard
WASHINGTON
RESOLUTION NO. 789
Frank Todd Mayor
Maxine Anderson City Clerk
Lawrence Hard City Attorney
1982 to 1987 Six Year Transportation Improvement Program
Grady Way Bridge replacement. Joint project with Renton
Southcenter Boulevard 62nd Avenue South to Grady Way Bridge
Widen to 4 lanes, construct bridges over river and I-405 ramps. Joint
project with WSDOT.
188th Street Connector from I-5 to 180th
Construct new 5 lane connector to 57th Avenue South. Widen 57th Avenue South
to 5 lanes from South 188th Street to South 180th Street. Install signal at
57th Avenue.
Minkler Boulevard Andover Park West to Southcenter Parkway
5 lanes. 2 new signals at Andover Park West and Southcenter Parkway
Interurban Avenue from Southcenter Boulevard to I-5
Street improvements with sidewalks
168th Street Southcenter Parkway to Andover Park West
New 5 lane street. 2 new signals at Southcenter Parkway and Andover Park West
58th Avenue Strander to 168th South
New 5 lane street. 1 new signal at Strander Boulevard
Minkler East end to Highway 181
5 lane bridge crossing Green River. 1 new signal at Highway 181
1982 to 1987 Six Year Transportation Improvement Program
Minkler Boulevard Andover Park West to East
Widen from 4 to 5 lanes. 1 new signal at Andover Park East
Tukwila Parkway S-line to Andover Park West
Widen from 5 to 7 lanes. Signal and pedestrian modifications at S-line.
New signal and right turn lane for east approach at I-405 on ramp.
Andover Park West Tukwila Parkway to Strander Bouelvard
Widen from 4 to 5 lanes. Construct transit stops.
180th Street 57th Avenue to Andover Park West
Widen from 5 to 7 lanes. Signal modification to 6-phase at Andover Park West.
Andover Park West Strander Bouelvard to 180th Street
Widen from 4 to 5 lanes. Construct transit stops
Southcenter Parkway at 180th Street
Signal modifications. Channelization
180th Street at Andover Park East
New signal and channelization
Southcenter Parkway I-5 Ramp to STrander Boulevard
Interconnect 3 signals at I-5 ramp, Klickitat and Strander Boulevard.
Join project with WSDOT
1982 to 1987 Six Year Transportation Improvement Program
Highway 181 at Strander Boulevard
Construct right turn lane for north approach
Strander Boulevard at Andover park West
Provide left turn channelization and signal modifications for north and south
approaches
Tukwila parkway at Andover Park East
New signal and channelization
180th Street Andover Park West to Highway 181
Widen from 4 to 7 lanes. Signal modification, channelization and
one-lane widening along Highway 181. Joint project with Renton and Kent.
Southcenter Parkway Southcenter entrance to Minkler
Widen from 5 and 6 to 7 lanes. Signal modification at Strander Boulevard
Strander Boulevard Southcenter Parkway to Andover Park West
Widen from 4 to 7 lanes
57th Avenue 188th Connecting to C limit
Widen from 2 to 5 lanes
Southcenter Parkway Minkler to 180th Street
Widen from 5 to 7 lanes
1982 to 1987 Six Year Transportation Improvement Program
Southcenter Parkway Southcenter entrance to Tukwila Parkway
Widen from 5 to 7 lanes.
Strander Boulevard Andover Park West to bridge
Widen from 4 to 5 lanes. Signal modification and left turn
channelization for north and south approaches at Andover Park East
Andover Park East Tukwila Parkway to Strander Boulevard
Widen from 4 to 5 lanes
Andover Park East Strander Boulevard to 180th Street
Widen from 4 to 5 lanes
168th Avenue Andover Park West to Andover Park East
New 5 lane street
Macadam Road Southcenter Bouelvard to 144th Street
Street improvements with sidewalks
154th Street 53rd Avenue to City Limit
Includes trail system
Interurban at Highway 599 off ramp
Install 3 new signals and interconnect. Joint project with WSDOT
1982 to 1987 Six Year Transportation Improvement Program
T-line Southcenter Boulevard to Tukwila Parkway
Pedestrian bridge parallel to existing T-Line bridge
Christensen Tukwila Parkway and South
Install new signal at Tukwila Parkway
Baker Bouelvard Andover Park West to Christensen
1982 to 1987 Six Year Transportation Improvement Program
59th 144th to 58th Intersection
Street improvement with sidewalks
143rd - Interurban to River
Street improvements with sidewalks (by LID)
166th - 53rd to 54th
Street improvements with sidewalks
58th - South term to 500' south
New street construction (developer's extension or LID)
160th - 51st to 53rd Avenue
Street improvement with sidewalks (by LID)
54th - Slade Way to 166th
Street improvement with sidewalks (by LID)
53rd - 160th to Klickitat
By developer extension or LID
1982 to 1987 Six Year Transportation Improvement Program
Slade Way - 54th to 160th
By LID
56th Place - 139th to 141st
Street improvements with sidewalks
56th Avenue - 139th to 141st
Street improvements with sidewalks
57th - 141st to 147th
Street improvements with sidewalks
141st - 57th to 58th
Street improvements with sidewalks
144th - 59th to East terminus
Street improvements with sidewalks
53rd - 166th to 168th
Street improvement project with sidewalk
55th - 140th to 144th
Street improvement project with sidewalk
1982 to 1987 Six Year Transportation Improvement Program
140th - 55th to 53rd
Street improvement project with sidewalk
139th - 56th to 56th Place
56th - 137th to 139th
Street improvement project with sidewalk