HomeMy WebLinkAboutRes 0800 - Declare Emergency to Repair Storm Drain Line on South 133rd (42nd Avenue Bridge)CITY OF TUKWILA
WASHINGTON
RESOLUTION NO. 800
A RESOLUTION OF THE CITY OF TUKWILA, WASHINGTON,
DECLARING AN EMERGENCY AND AUTHORIZING THE MAYOR
TO EXECUTE A CONTRACT FOR REPAIR SERVICES.
WHEREAS, heavy rain on October 5 and 6 caused a blockage in
the storm drain line on South 133rd under the 42nd Avenue Bridge, and
WHEREAS, the force of the water created a large hole between
the bridge abutment and the first pier, and
WHEREAS, the Public Works Director has declared an emergency as
further rain and continual washing could undermine the foundation of the
abutment and cause a total failure of the bridge, and
WHEREAS, King County has agreed to pay for the portion of
the storm drain line lying within the county service area.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO RESOLVE AS FOLLOWS:
Section 1. The Tukwila City Council hereby declares the
condition of the storm drain line on South 133rd Street under the 42nd
Avenue Bridge an emergency situation and authorizes the Mayor to execute a
construction contract with Gary Merlino Construction in the amount of
$24,313 to relocate the line.
Section 2. Estimated completion costs are shown on Exhibit
A and will be paid from the CITY STREET Fund.
Section 3. King County has agreed to fund the portion of the
storm drain line within the county service area as determined at completion
of the project.
at a regular meeting thereof this 27th day of October 1981
Apiroved as to Form
City Attorney Lawrence E. Hard
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
Mayor Frank Todd
City Clerk Maxine Anderson
Exhibit A
APPARENT LOW BIDDER COST REAKDOWN
City of Tukwi 1•a
South 133rd Street Storm Drain Replacement
October 27, 1981
Project Estimate: FROM 6 FT DIA. COUNTY MH TO DITCH OUTFALL
36" dia. CL II RCP
W /Bedding
30" dia. CL II RCP
W /Bedding
54" dia. MH
Pavement Removal
Conc /AC
Pavement Patch
9" AC
SUBTOTAL
Flow Diversion
Rip Rap
Bank Run
ITEM
Construction Estimate
P.O. Box 606 121 Lake Street S. Kirkland, Washington 98033 206/822 -8294
Engineering Monument Replacement
Engineering Construction
Subtotal
Contingency 10%
PROJECT ESTIMATE
(1) Assume 1 crew day construction staking
2 hr /day inspection for 5 days
QUANTITY UNIT COST
153 $79.00 /LF
34
48 $50.00 /LF
1 $1,500.00
1 (each)
110 6.00 /SY
30
110 $20.00 /SY
30
6.7 $10.00 /Ton
3.3
195 1.00 /Ton
105
GIAUDRONE
AND
ASSOCIATES
CONSULTING ENGINEERS
CITY COUNTY TOTAL
$12,087
-0-
$1500.00
660.00
$2,200.00
67.00
195.00
$2,686.00 $14,773.00
$2,400.00 $2,400.00
$1,500.00 $3,000.00
180.00 840.00
$600.00 $2,800.00
$16,447.00 $7,366.00 $23,813.00
0.67 $10.00 /LS 67.00
.33 33.00 100.00
33.00 100.00
105.00 300.00
$16,776.00 $7,537.00 $24,313.00
Engineering Design Through Inssuance of Notice to Proceed 3,000.00 $1,500.00 4,500.0C
300.00 -0- 300.00
667.00 333.00 1,000.0C
$20,743.00 $9,370.00 $30,113.00
2,074.00 937.00 3,011.0(
$22,817.00 $10,307.00 $33,124.0(
AN INTERLOCAL AGREEMENT
BETWEEN
KING COUNTY
THE CITY OF TUKWILA
j oq3
THIS AGREEMENT is made a-s of this 4th day of November
1981, by and between the CITY OF TUKWILA a municipal corporation
of the State of Washington, hereinafter referred to as "THE CITY
and KING COUNTY, a county in and of the State of Washington,
hereinafter referred to as "THE COUNTY
WHEREAS, the South 133rd Street storm drainage system, in
the vicinity of 42nd Avenue South, is in need of upgrading and
improment; and
WHEREAS, THE CITY is intending to replace their portion of
the storm system within the corporate limits of THE CITY on South
133rd Street; and
WHEREAS, THE COUNTY is desirious of having its portion of
the storm system on South 133rd Street replaced, and it is in the
best public interest to have the entire storm system constructed
at one time under the same contract;
NOW, THEREFORE, the parties hereto agree to the participa-
tion by THE COUNTY in the cost of said construction of the storm
drain system on South 133rd Street in accordance with the terms of
this agreement as follows:
I. SCOPE
THE CITY will include in its South 133rd Street Storm Drain
Replacement Contract the necessary standard plans and specifica-
tions, as approved by THE COUNTY, for the construction of that
portion of South 133rd Street outside the corporate limits of THE
CITY.
THE COUNTY will reimburse THE CITY for such costs of
construction, engineering and such other work as may be necessary
as shown on "Exhibit A" attached hereto. Exhibit A is an estimate
prepared prior to opening bids for construction. Final payment by
THE COUNTY to THE CITY will be based upon actual contract costs
incurred.
THE CITY will submit monthly invoices to THE COUNTY based
upon the monthly contractor's estimate.
IN WITNESS WHEREOF, the undersigned parties have executed
this agreement as of the day and year first above written.
ATTEST:
SA44 NA C`" 4,4. THE CITY OF TUKWILA
ATTEST:
C i t y 1
Resolution
Authorized by Tukwila fts0;iXt; ►7c7AC No. 800
Authorized by King County Council Motion No.
Attached: Exhibit A
KIN? COUNTY
\P:(1/
County Executive
d
Mayor rranK !odd
EXHIBIT A
CITY OF TUKWILA
South 133rd Street Storm Drain Replacement
October 20, 1981
PROJECT ESTIMATE: FROM 6FT DIA. COUNTY MH TO DITCH OUTFALL
ITEM
36" dia. CL II RCP
W /Bedding
30" dia. CL II RCP
54" dia. MH
Pavement Removal
Conc /AC
Pavement Patch
9" AC
Assume 1 crew day construction staking
2 hr /day inspection for 5 days
QUANTITY UNIT COST CITY COUNTY TOTAL
153 60 /LF 9,180
34
-0-
48 40 /LF
1 3,000 /EA 3,000
110 10 /SY 1,100
30
55 50 /TON 2,750
15
Monument Removal 1 500 /EA 500
Replacement
2,040 11,220
1,920 1,920
3,000 6,000
300 1,400
750 3,500
-0- 500
Construction Estimate 16,530 8,010 24,540
Engineering Design 1,684 816 2,500
Engineering Construction 606 294 900
SUBTOTAL 18,820 9,120 27,940
Contingency 10% 1,882 912 2,794
PROJECT ESTIMATE 20,702 10,032 30,734