HomeMy WebLinkAboutRes 0824 - 1983-1988 Transportation Improvement Program
OF
TUK WILA
Approved as to Form
WASHINGTON
RESOLUTION NO. 824
A RESOLUTION OF THE CITY OF TUKWILA, WASHINGTON,
ADOPTING A REVISED AND EXTENDED COMPREHENSIVE
TRANSPORTATION PROGRAM IN ACCORDANCE WITH RCW
35.77 AND RCW 36.81
WHEREAS, the City of Tukwila has previously adopted a Compre-
hensive Transportation Program pursuant to RCW 35.77 and RCW 36.81, and
WHEREAS, the City is required annually to review the work ac-
complished under said program and to determine current City street needs,
and
WHEREAS, a public hearing was held on the Comprehensive Trans-
portation Program on Tuesday, June 8, 1982, at 7:00 P.M. in the Tukwila
City Hall before the Tukwila City Council.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO RESOLVE AS FOLLOWS:
Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public
hearing on June 8, 1982, the attached documents, incorporated herein by
reference as Exhibit A, are declared and adopted as the Revised Six -Year
Transportation Improvement Program for the City of Tukwila.
Section 2. This Resolution and Exhibit shall be filed with the
Director of Transportation of the State of Washington no later than July
30, 1982, after its adoption as required by RCW 35.77 and RCW 36.81.
Section 3. This Resolution and Exhibit shall be submitted to
the Urban Arterial Board as required by RCW 35.77.
Section 4. This Resolution and Exhibit shall be submitted to
the Puget Sound Council of Governments as the designated Metropolitan
Planning Organization pursuant to the FHWA Federal -Aid Highway Program
Manual Vol. 4, Chapter 4, Section 6.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a regular meeting thereof this 22nd day of June 1982
Published Record Chronicle
ATTEST:
City Attorney, daniel D. Wu
Mayor Frank Todd
City Clerk Maxine Anderson
TABLE 1
CITY OF TUKWILA
1983 TRANSPORTATION IMPROVEMENT PROGRAM
($000 Omitted)
ITEM NO. 1983 OBLIGATION COST
(From 1983 Source of Funds TOTAL
6 -Year Annual City of PROJECT
TIP) PROJECT TITLE Element BRM FAUS UAB Tukwila COSTS
IC
1 Grady Way Bridge $4,405 $3,524 $400* 8,801
2 Southcenter Boulevard 420 $349 71 6,158
3 188th Street
Connector 60 50 10 5,910
4 Southcenter Parkway
Signals 45 45 45
5 180th Street at
Andover Park W.
Signal 80 80 80
6 Macadam Road 24 $22 2 416
7 Southcenter Parkway
at 180th Street
Signal 48 48 48
8 Minkler Boulevard 190 158 32 2,073
9 Tukwila Parkway
Signals 148 148° 148
10 SR -181 at Strander
Boulevard 13 13 13
34 56th Street Bridge 145 145 1,210
$5,578 $3,524 $878 $22 $673 $24,902
Other contributions from Renton, WSDOT, BNRR.
Special signal coordination program.
Includes King County share.
Six Year Transportation Improvement Program
1983 to 1988
Grady Way Bridge Replacement
Joint project with Renton 10% Federal 80% Tukwila 10%
Southcenter Boulevard 62nd Avenue South to Grady Way
Widen 4 lanes bridges over river and I-405 ramps
188th Connector
4 lane connected to 57th wident o 5 lanes install signal at 57th Avenue South
Southcenter Parkway I-5 Ramp to Strander Boulevard
Interconnect 3 signals at I-5 ramp Klickitat and Strander Boulevard
180th Street and Andover Park East
Signalization. New signal and channelization
Macadam Road from Southcenter Boulevard to 144th STreet
Overlay curb sidewalks channelization
South 168th Street Southcenter Parkway to Andover Park West
New 3 lane street 2 new signals at Andover Park West and Southcenter Parkway
Minkler Boulevard Andover Park East to Highway 181
5 lane bridge crossing Green River 1 new signal Highway 181
Six Year Transportation Improvement Program
1983 to 1988
Tukwila Parkway S-Line to Andover Park West signalization
coordination and right turn at east approach I-405 on ramp
Highway 181 at Strander Boulevard right turn for north approach
Minkler Boulevard Andover Park West to Southcenter Parkway
New street 4 lanes 2 signals Andover Park West and Southcenter Parkway
Southcenter Parkway at South 180th Street
Signal modifications channelization
Interurban Avenue from Southcenter Boulevard to I-5
New design with sidewalks
T-Line Southcenter Boulevard to Tukwila Parkway
Bridge replacement relocation ref State HOV project on I-405
Tukwila Parkway at Andover Park East new signal and channelization
Minkler Boulevard Andover Park West to Andover Park East
Widen from 4 to 5 lanes 1 new signal at Andover Park East
Six Year Transportation Improvement Program
1983 to 1988
Andover Park West Tukwila Parkway to STrander Boulevard
Construct transit stops
South 180th Street 57th Avenue to Andover Park West
Left and right turn modifications
Andover Park West Strander Bouelvard to South 180th
Construct transit stops
Strander Boulevard at Andover Park West
Left turn channelization and signal modifications
South 180th Street at Andover Park West
Widen at intersection only signal modification
Southcenter Parkway I-5 southbound off ramp to Minkler
widen from 5 and 6 to 7 lanes
143rd - Interurban Avenue South to the river
Drainage and street improvements
South 154th from 53rd to city limits
Street improvements
Six Year Transportation Improvement Program
1983 to 1988
Highway 181 I-405 to Strander Boulevard
Widen from 5 to 7 lanes signal modification at 2 intersections
Strander Boulevard Andover Park West to bridge
Widen from 4 to 5 lanes signal revision
58th Avenue South Strander to 168th
New 3 lane street 1 new signal at Strander Boulevard
South 168th Street Andover Park West to Andover Park East
New 3 lane street
Interurban Avenue South Highway 599 Off ramp install 3 new
signals and interconnect. Joint project with WSDOT
57th Avenue 188th Connector to city limits
Widen from 2 to 5 lanes
Baker Boulevard Andover Park West to Christensen Road
Longacres Way Highway 181 to east, widen from 2 to 4 lanes
provide sidewalks for pedestrian access
Six Year Transportation Improvement Program
1983 to 1988
New access at S-Line Bridge to Southcenter Shopping Mall
New access / signal modification / walkways
56th Avenue Bridge Replacement
Joint with King County
53rd Avenue South, 166th to 170th
Street improvement with sidewalk
166th, 53rd Avenue South to 54th Avenue South
Street improvement with sidewalk
140th, 55th Avenue South to 53rd Avenue South
Street improvement with sidewalk
55th Avenue South, 140th to 144th
Street improvement with sidewalk
160th, 51st Avenue South to 53rd Avenue South
Street improvement with sidewalk
54th, Slade Way to 166th
Street improvement with sidewalk
Six Year Transportation Improvement Program
1983 to 1988
53rd Avenue South, 160th to Klickitat
By developer extension or LID
Slade Way, 54th Avenue to 160th
By LID
57th Avenue South, 141st to 147th
Street improvement with sidewalk
141st, 56th Avenue to 57th Avenue
Street improvement with sidewalk
56th Avenue, 139th to 141st
Street improvement with sidewalk
56th Place, 139th to 141st
Street improvement with sidewalk
139th, 56th Avenue to 56th Place
56th, 137th to 139th
Street improvement with sidealk
Six Year Transportation Improvement Program
1983 to 1988
144th, 59th to East Terminus
Street improvement with sidewalks
58th Avenue South, 59th to East Terminus to 500 South new street
construction