Loading...
HomeMy WebLinkAboutRes 0824 - 1983-1988 Transportation Improvement Program OF TUK WILA Approved as to Form WASHINGTON RESOLUTION NO. 824 A RESOLUTION OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A REVISED AND EXTENDED COMPREHENSIVE TRANSPORTATION PROGRAM IN ACCORDANCE WITH RCW 35.77 AND RCW 36.81 WHEREAS, the City of Tukwila has previously adopted a Compre- hensive Transportation Program pursuant to RCW 35.77 and RCW 36.81, and WHEREAS, the City is required annually to review the work ac- complished under said program and to determine current City street needs, and WHEREAS, a public hearing was held on the Comprehensive Trans- portation Program on Tuesday, June 8, 1982, at 7:00 P.M. in the Tukwila City Hall before the Tukwila City Council. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO RESOLVE AS FOLLOWS: Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public hearing on June 8, 1982, the attached documents, incorporated herein by reference as Exhibit A, are declared and adopted as the Revised Six -Year Transportation Improvement Program for the City of Tukwila. Section 2. This Resolution and Exhibit shall be filed with the Director of Transportation of the State of Washington no later than July 30, 1982, after its adoption as required by RCW 35.77 and RCW 36.81. Section 3. This Resolution and Exhibit shall be submitted to the Urban Arterial Board as required by RCW 35.77. Section 4. This Resolution and Exhibit shall be submitted to the Puget Sound Council of Governments as the designated Metropolitan Planning Organization pursuant to the FHWA Federal -Aid Highway Program Manual Vol. 4, Chapter 4, Section 6. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this 22nd day of June 1982 Published Record Chronicle ATTEST: City Attorney, daniel D. Wu Mayor Frank Todd City Clerk Maxine Anderson TABLE 1 CITY OF TUKWILA 1983 TRANSPORTATION IMPROVEMENT PROGRAM ($000 Omitted) ITEM NO. 1983 OBLIGATION COST (From 1983 Source of Funds TOTAL 6 -Year Annual City of PROJECT TIP) PROJECT TITLE Element BRM FAUS UAB Tukwila COSTS IC 1 Grady Way Bridge $4,405 $3,524 $400* 8,801 2 Southcenter Boulevard 420 $349 71 6,158 3 188th Street Connector 60 50 10 5,910 4 Southcenter Parkway Signals 45 45 45 5 180th Street at Andover Park W. Signal 80 80 80 6 Macadam Road 24 $22 2 416 7 Southcenter Parkway at 180th Street Signal 48 48 48 8 Minkler Boulevard 190 158 32 2,073 9 Tukwila Parkway Signals 148 148° 148 10 SR -181 at Strander Boulevard 13 13 13 34 56th Street Bridge 145 145 1,210 $5,578 $3,524 $878 $22 $673 $24,902 Other contributions from Renton, WSDOT, BNRR. Special signal coordination program. Includes King County share. Six Year Transportation Improvement Program 1983 to 1988 Grady Way Bridge Replacement Joint project with Renton 10% Federal 80% Tukwila 10% Southcenter Boulevard 62nd Avenue South to Grady Way Widen 4 lanes bridges over river and I-405 ramps 188th Connector 4 lane connected to 57th wident o 5 lanes install signal at 57th Avenue South Southcenter Parkway I-5 Ramp to Strander Boulevard Interconnect 3 signals at I-5 ramp Klickitat and Strander Boulevard 180th Street and Andover Park East Signalization. New signal and channelization Macadam Road from Southcenter Boulevard to 144th STreet Overlay curb sidewalks channelization South 168th Street Southcenter Parkway to Andover Park West New 3 lane street 2 new signals at Andover Park West and Southcenter Parkway Minkler Boulevard Andover Park East to Highway 181 5 lane bridge crossing Green River 1 new signal Highway 181 Six Year Transportation Improvement Program 1983 to 1988 Tukwila Parkway S-Line to Andover Park West signalization coordination and right turn at east approach I-405 on ramp Highway 181 at Strander Boulevard right turn for north approach Minkler Boulevard Andover Park West to Southcenter Parkway New street 4 lanes 2 signals Andover Park West and Southcenter Parkway Southcenter Parkway at South 180th Street Signal modifications channelization Interurban Avenue from Southcenter Boulevard to I-5 New design with sidewalks T-Line Southcenter Boulevard to Tukwila Parkway Bridge replacement relocation ref State HOV project on I-405 Tukwila Parkway at Andover Park East new signal and channelization Minkler Boulevard Andover Park West to Andover Park East Widen from 4 to 5 lanes 1 new signal at Andover Park East Six Year Transportation Improvement Program 1983 to 1988 Andover Park West Tukwila Parkway to STrander Boulevard Construct transit stops South 180th Street 57th Avenue to Andover Park West Left and right turn modifications Andover Park West Strander Bouelvard to South 180th Construct transit stops Strander Boulevard at Andover Park West Left turn channelization and signal modifications South 180th Street at Andover Park West Widen at intersection only signal modification Southcenter Parkway I-5 southbound off ramp to Minkler widen from 5 and 6 to 7 lanes 143rd - Interurban Avenue South to the river Drainage and street improvements South 154th from 53rd to city limits Street improvements Six Year Transportation Improvement Program 1983 to 1988 Highway 181 I-405 to Strander Boulevard Widen from 5 to 7 lanes signal modification at 2 intersections Strander Boulevard Andover Park West to bridge Widen from 4 to 5 lanes signal revision 58th Avenue South Strander to 168th New 3 lane street 1 new signal at Strander Boulevard South 168th Street Andover Park West to Andover Park East New 3 lane street Interurban Avenue South Highway 599 Off ramp install 3 new signals and interconnect. Joint project with WSDOT 57th Avenue 188th Connector to city limits Widen from 2 to 5 lanes Baker Boulevard Andover Park West to Christensen Road Longacres Way Highway 181 to east, widen from 2 to 4 lanes provide sidewalks for pedestrian access Six Year Transportation Improvement Program 1983 to 1988 New access at S-Line Bridge to Southcenter Shopping Mall New access / signal modification / walkways 56th Avenue Bridge Replacement Joint with King County 53rd Avenue South, 166th to 170th Street improvement with sidewalk 166th, 53rd Avenue South to 54th Avenue South Street improvement with sidewalk 140th, 55th Avenue South to 53rd Avenue South Street improvement with sidewalk 55th Avenue South, 140th to 144th Street improvement with sidewalk 160th, 51st Avenue South to 53rd Avenue South Street improvement with sidewalk 54th, Slade Way to 166th Street improvement with sidewalk Six Year Transportation Improvement Program 1983 to 1988 53rd Avenue South, 160th to Klickitat By developer extension or LID Slade Way, 54th Avenue to 160th By LID 57th Avenue South, 141st to 147th Street improvement with sidewalk 141st, 56th Avenue to 57th Avenue Street improvement with sidewalk 56th Avenue, 139th to 141st Street improvement with sidewalk 56th Place, 139th to 141st Street improvement with sidewalk 139th, 56th Avenue to 56th Place 56th, 137th to 139th Street improvement with sidealk Six Year Transportation Improvement Program 1983 to 1988 144th, 59th to East Terminus Street improvement with sidewalks 58th Avenue South, 59th to East Terminus to 500 South new street construction