Loading...
HomeMy WebLinkAboutTrans 2012-05-21 Item 2A - Discussion - Tukwila Urban Center Pedestrian-Bicycle BridgeCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: FROM BY: DATE: Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director Cyndy Knighton, Senior Engineer May 18, 2012 SUBJECT: Tukwila Urban Center (TUC) Pedestrian /Bicycle Bridae Project No. 90510403 Twin Tied Arch Bridge Architectural Selection ISSUE Present the TUC Pedestrian /Bicycle Bridge Architectural style selections for discussion. BACKGROUND In 2005, Tukwila received a $200,000 grant to begin the design of a new signature bridge across the Green River as a key pedestrian and bicyclist connection between the Sounder's Tukwila Longacres Station and the Tukwila Transit Center along the TUC Urban Core. KPFF was retained and, in October 2011, Council considered the Type, Size, and Location (TS &L) report on the Pedestrian /Bicycle Bridge. After discussions on the merits of each bridge type and location, as well as public input during the Council discussions and an online poll, Council directed staff to proceed with the final design of the Twin Tied Arch bridge on a straight alignment without a future accommodation of a second bridge over West Valley Highway. An additional $1,250,833 in grants was awarded in 2011 to complete the design and environmental work with completion scheduled by the end of 2013. DISCUSSION The design team has developed design options for the bridge and wayfinding approaches. Public Works, Planning, Parks and Recreation, and Economic Development have all participated in two staff workshops that discussed specific architectural style options available, trail approach options, as well as considered right -of -way impacts and park opportunities. Staff will be presenting the trail approach and architectural design options with a scale model. All options are within the same cost estimate that was presented in October, 2011 with the TS &L report. Cost estimates from the TS &L report include a 50% design contingency. A new cost estimate will be prepared this year to include more details from the preliminary engineering currently underway. No right -of -way cost estimates are available yet. Mobilization 819,900.00 ..I Bridge 4,629,300.00 West Landin g 642,000.00 East Landing 1,799,100.00 Total (2008 7,890,300.00 RECOMMENDATION For information only. W: \PW Eng \PROJECTS\A- RW RS Projects \TUC Ped Bicycle Bridge (90510403) \Info Memo Arch Styles Discussion 5 -18 -12 sb.docx