Loading...
HomeMy WebLinkAboutTrans 2012-05-21 Item 2B - Grant Applications - State and Federal FundsCity of Tukwila TO: FROM BY: DATE: Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director Robin Tischmak, City Engineer May 18, 2012 SUBJECT: Grant Applications for State Federal Funds ISSUE Puget Sound Regional Council Federal Funds 2012 Cal! for Projects Grant applications for State and Federal funds. BACKGROUND The Puget Sound Regional Council (PSRC) has announced its Call for Projects for the 2012 Federal Funding Programs. Full applications for candidate projects in the Countywide Competition were due by 5:00 p.m. on May 11, 2012. Per CIP policy, appropriate Committees must approve grant application submittals. The May 11 submittal deadline for PSRC was recognized too late to include the grant submittal approvals on any Committee agenda before the applications were due. DISCUSSION The following projects are recommended and applications were submitted for 2012 PSRC Federal Funding Countywide grants for Surface Transportation Program (STP) and Congestion Mitigation Air Quality (CMAQ), Preservation funds, and Non Motorized funds. We would also like Committee approval to apply for grant funding with the State Transportation Improvement Board for the Interurban Ave S Project, which will be applied for this summer. Pro'lect Funding Lk,gency Interurban Ave S Federal STP Interurban Ave S State TIB Overlay Repair E Marginal Wy Preservation Walk Roll Tukwila MIC Street Smart Non motorized Amount Amount Available Requested $30.27m $5,000,000.00 4,000,000.00 $13.54m 1,000,000.00 8.24m 736,080.00 RECOMMENDATION The Committee is being asked to approve the submittal of four (4) grant applications for Interurban Ave South, Overlay Repair for East Marginal Way South, and the Walk Roll Plan for the North Tukwila Manufacturing /Industrial Center (MIC). Attachments: CIP Page 20, Interurban Ave S, Draft 2013 CIP PSRC Application for E Marginal Wy S PSRC Application for Tukwila MIC Walk Roll Segment Design Report for Tukwila MIC WAPW Eng10THEMRobin TischmakVnfo Memo 2012 Grant Apps TC 05- 21- 12.docx 3 CITY OF TUKWILA CAPITAL PROJECT SUMMARY x Project Location 2013 2018 Capital Improvement Program 20 4 2013 to 2018 PROJECT: Interurban Ave S (S 143 St Fort Dent Way) Project No. 90310402 DESCRIPTION: Design and construct sidewalks, pavement restoration, drainage, and lighting. Pedestrian traffic is forced to walk in traveled way, lighting is substandard, drainage is poor and JUSTIFICATION: pavement failure is accelerating. Completed 90% of design in 2010. State TIB grant to be submitted in 2012. Federal STP construction grant STATUS: submitted in 2012 and the City will also apply for a PWTF loan. MAINT. IMPACT: Reduce annual pavement repairs and increase pedestrian safety. COMMENT: Federal Hwy STP Grant of $389,000 for design only. Proposed grants are Federal and State TIB. FINANCIAL Through Estimated (in $000's) 2011 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL EXPENSES Design 464 250 714 Land (RM) 150 150 Const. Mgmt. 1,300 1,300 Construction 9,400 9,400 TOTAL EXPENSES 464 0 400 10,700 0 0 0 0 0 11,564 FUND SOURCES Awarded Grant 389 389 Proposed Grant STP 5,000 5,000 Proposed Grant TIB 4,000 4,000 Impact Fees 0 City Oper. Revenue 75 0 400 1,700 0 0 0 0 0 2,175 TOTAL SOURCES 464 0 400 10,700 0 0 0 0 0 11,564 x Project Location 2013 2018 Capital Improvement Program 20 4 PSRC's 2012 STP /CMAQ Countywide Process Screening Form Due date: Completed screening forms should be submitted along with your full countywide application packet by the deadline assigned in your countywide Call for Projects. Each countywide chair will then submit all screening forms to PSRC. Who should complete this form? This screening form must be completed for all projects submitted in countywide processes to compete for PSRC's STP /CMAQ funds. Please ensure that any projects submitted after the countywide process deadline also have a completed screening form sent to PSRC. Why is this form being requested? PSRC staff will screen all projects to help ensure minimum requirements have been met. If potential problems are identified, staff will be able to follow up with sponsors BEFORE countywide funding recommendations, to avoid possible complications after recommendations have been made. Project title: East Marginal Way South (S 81 Place to S Norfolk Street) For roadway project titles: list facility name, limits, and any other identifying words. E.g., SR -520 HOV (104th Ave NE to 124th Ave NE). 2 Transportation 2040 ID This project is consistent with Transportation 2040. In order to be eligible for federal funding, a project must be in, or consistent with, Transportation 2040, the region's long range Metropolitan Transportation Plan (MTP). To confirm if your project is specifically listed in Transportation 2040, refer to htti): /www.osrc.ora /assets /4889/T2040 AopendixM FINAL.odf. For assistance or questions regarding these issues, contact Kimberly Scrivner at 206 971 -3281 or kscrivner @psrc.org. 3 Sponsoring agency: City of Tukwila Co- sponsor(s) if applicable: N/A Does sponsoring agency have "Certification Acceptance" status from WSDOT? Yes No If not, which agency has agreed to serve as your CA sponsor? N/A 4 Project contact person: Robin Tischmak, City Engineer Address: 6300 Southcenter Boulevard, Suite 100, Tukwila, WA 98188 Phone: (206) 431 -2455 E -Mail: Robin.Tischmak @TukwilaWA.gov 5 Project description. Please be as clear and concise as possible, but include all elements included in the scope of work. Construct pavement preparation and an asphalt overlay of East Marginal Way South between S 81 Place and S Norfolk Street, including new pavement markings. Project location: East Marginal Way South a. County(ies) in which project is located: King Answer the following questions if applicable: b. Crossroad /landmark nearest to beginning of project (identify landmark if no crossroad): S 81 Place c. Crossroad /landmark nearest to end of project (identify landmark if no crossroad): S Norfolk Street Section. V. Countywide Screening Form Pagel of 2 5 7 Federal functional classification code: Please select oniv one code using the table below. For assistance determining functional classification, contact Stephanie Rossi at 206 -971 -3054 or srossi @psrc.org. Imaortant: A roadway must be approved on the federally classified roadway system before projects on it may use federal transportation funds (this includes proposed new facilities). Projects on a roadway with a functional classification of 09, 19, 29, or 39 are not eligible to use federal transportation funds unless they are one of the exceptions listed below. If your project is an exception, identify its functional class code as "00 Examples of exceptions: Any bicycle and /or pedestrian project. Projects not on a roadway and using CMAQ or other funds Any transit project, including equipment purchase and park- and -ride lot projects. Rural Functional Classifications "Under 5,000 population" (Outside federal -aid urbanized and federal -aid urban areas) 00 Exception 01 Principal Arterial Interstate 02 Principal Arterial 06 Minor Arterial 07 Major Collector 08 Minor Collector 09 Local Access 21 Proposed Principal Arterial Interstate 22 Proposed Principal Arterial 26 Proposed Minor Arteria( 27 Proposed Major Collector 28 Proposed Minor Collector 29 Proposed Local Access Urban Functional Classifications "Over 5,000 population" (Inside federal -aid urbanized and federal -aid urban areas) 00 Exception 11 Principal Arterial Interstate 12 Principal Arterial Expressway 14 Principal Arterial 16 Minor Arterial 17 Collector 19 Local Access 31 Proposed Principal Arterial Interstate 32 Proposed Principal Arterial Expressway 34 Proposed Principal Arterial 36 Proposed Minor Arterial 37 Proposed Collector 39 Proposed Local Access 8 a. Is the project specifically identified in a local comprehensive plan? Yes. Indicate the (1) plan name, (2) relevant section(s), and (3) page number where it can be found: No. Describe how the project is consistent with the applicable local comprehensive plan, citing soecific local policies and provisions the project supports. Please include the actual text of all relevant policies or information on where it can be found, e.g. the policy document name and page number. City of Tukwila Comprehensive Land Use Plan; Page 33; Economic Development Focused public infrastructure investment 9 What is the PSRC Funding Source being requested? Choose only one: STP CMAQ Will the PSRC funds complete the project or a phase of the project? Yes No Section. V. Countywide Screening Form Page 1 of 2 6 PSRC's 2012 STP /CMAQ Countywide Process Screening Form Due date: Completed screening forms should be submitted along with your full countywide application packet by the deadline assigned in your countywide Call for Projects. Each countywide chair will then submit all screening forms to PSRC. Who should complete this form? This screening form must be completed for all projects submitted in countywide processes to compete for PSRC's STP /CMAQ funds. Please ensure that any projects submitted after the countywide process deadline also have a completed screening form sent to PSRC. Why is this form being requested? PSRC staff will screen all projects to help ensure minimum requirements have been met. If potential problems are identified, staff will be able to follow up with sponsors BEFORE countywide funding recommendations, to avoid possible complications after recommendations have been made. Project title: Tukwila Manufacturing Industrial Center "Street Smart" Non motorized Project For roadway project titles: list facility name, limits, and any other identifying words. E.g., SR -520 HOV (104th Ave NE to 124th Ave NE). 2 Transportation 2040 ID Exempt In order to be eligible for federal funding, a project must be in, or consistent with, Transportation 2040, the region's long range Metropolitan Transportation Plan (MTP). To confirm if your project is specifically listed in Transportation 2040, refer to httD: /www.Dsrc.ora /assets /4889/T2040 ApaendixM FINAL.ndf. For assistance or questions regarding these issues, contact Kimberly Scrivner at 206- 971 -3281 or kcrivner@psrc.org. 3 Sponsoring agency: City of Tukwila Co- sponsor(s) if applicable: Does sponsoring agency have "Certification Acceptance" status from WSDOT? M Yes No If not, which agency has agreed to serve as your CA sponsor? 4 Project contact person: Robin Tischmak Address: 6300 Southcenter Boulevard Phone: 206 431 2455 E -Mail: robin.tischmak @tukwilawa.gov 5 Project description. Please be as clear and concise as possible, but include all elements included in the scope of work. Two part project: 1. Planning and engineering study of non motorized options for Boeing Access Road corridor; and 2. PE /Design and Construction of bike facilities on East Marginal Way S. between Boeing Access Road and SR 599 and bike lanes and shared use path from Boeing Access Road/ East Marginal Way S. intersection along Airport Way to northern City limits. Section. V. Countywide Screening Form 7 Project location: a. County(ies) in which project is located: King County Part 1: Boeing Access Road Corridor Part 2: Airport Way to East Marginal Way S. Answer the following questions if applicable: b. Crossroad /landmark nearest to beginning of project (identify landmark if no crossroad): Part 1: 51 Avenue S.; Part 2: Northern Tukwila City limits on Airport Way c. Crossroad /landmark nearest to end of project (identify landmark if no crossroad): Part 1: East Marginal Way S. Part 2: SR 599 7 Federal functional classification code: Please select only one code using the table below. For assistance determining functional classification, contact Stephanie Rossi at 206 971 -3054 or srossi @psrc.org. Important: A roadway must be approved on the federally classified roadway system before projects on it may use federal transportation funds (this includes proposed new facilities). Projects on a roadway with a functional classification of 09, 19, 29, or 39 are not eligible to use federal transportation funds unless they are one of the exceptions listed below. If your project is an exception, identify its functional class code as "00 Examples of exceptions: Any bicycle and /or pedestrian project. Projects not .on a roadway and using CMAQ or other funds Any transit project, including equipment purchase and park- and -ride lot projects. Rural Functional Classifications "Under 5,000 population" (Outside federal -aid urbanized and federal -aid urban areas) [:100 Exception 01 Principal Arterial Interstate 02 Principal Arterial 06 Minor Arterial 07 Major Collector 08 Minor Collector 09 Local Access 21 Proposed Principal Arterial Interstate 22 Proposed Principal Arterial 26 Proposed Minor Arterial 27 Proposed Major Collector 28 Proposed Minor Collector 29 Proposed Local Access Urban Functional Classifications "Over 5,000 population" (Inside federal -aid urbanized and federal -aid urban areas) 00 Exception 11 Principal Arterial Interstate 12 Principal Arterial Expressway 14 Principal Arterial 16 Minor Arterial 17 Collector 19 Local Access 31 Proposed Principal Arterial Interstate 32 Proposed Principal Arterial Expressway 34 Proposed Principal Arterial 36 Proposed Minor Arterial 37 Proposed Collector 39 Proposed Local Access Section. V. Countywide Screening Form 8 8 a. Is the project specifically identified in a local comprehensive plan? Yes. Indicate the (1) plan name, (2) relevant section(s), and (3) page number where it can be found: Tukwila Comprehensive Plan; Manufacturing Industrial Center Element, Policy 11.1.9 "Reduce reliance on the single- occupancy vehicle for transportation of employees in and out of the MIC." (page 47) Tukwila Comprehensive Plan; Transportation Element, Policy 13.3.6 states, "Include as a priority increased transportation choices such as transit use; rideshare measures, such as carpooling as capacity mitigation measures; and pedestrian and bicycle facilities. After consideration of these priority improvements, consider signal improvements, other street capacity improvements, and street widening as a last resort." (page 75) Tukwila Comprehensive Plan Transportation Element Policy 13.5.3 says, "Include bicycle improvements in street improvement projects on designated bicycle friendly streets." (page 78) City of Tukwila Walk and Roll Plan, Tukwila Adopted Bicycle friendly Routes map Figure 5. Ryan Way, Boeing Access Road and East Marginal Way are on the (pages 19, 55- 56, 58 -60; adopted 2009) Tukwila Bicycle Friendly Routes and Sidewalk Segments High Priority Projects, (May 2010) Schematic design sheets for East Marginal Way and the on and off ramps to Airport Way via the Boeing Access Road from East Marginal Way. (Tukwila Design Report, pages 1 -11, 1 -12, 1 -17; 2 -11, 2 -21) No. Describe how the project is consistent with the applicable local comprehensive plan, citing specific local policies and provisions the project supports. Please include the actual text of all relevant policies or information on where it can be found, e.g. the policy document name and page number. 9 What is the PSRC Funding Source being requested? Choose only one: STP CMAQ Will the PSRC funds complete the project or a phase of the project? Yes No Section. V. Countywide Screening Form 9 Boeing Access Road / South Ryan Way from East Marginal Way South to 51st Avenue South On and off ramps to / from airport way and boeing access road C4 N T "pal tm LU co a 40- ij m U- 0 z fn A r CU) r[8 z EL W CL d) U) 16 O it co 1�5 Lm CL E co 0 I M�ggina� W a� T 0) z ui c co 12 Q� LO tt7 a U) O Y N V a O t t) 0 O CO (m O CL S 0 r 0 J cn m O G N o. N U Q ca mom mom 0) 5 W N N N m 0.. 13 O O N 4ka N L N a r R N 7 U V -j Q LL LU II O Z Fa- tC LLI 0- U7 Q� y O p O G m 0 0 _,4 Y (Y U, R T U V C U) C R O r U (n 0 ca m U) Q p ui ter` N N 3 a o w c Q w `o m v N fn N N b S] N t h U al O }r m w U) v v c s '00 u, 2Q N u y s' y a 0 a a� 3 Ea r an d 0 o m m .�.0 CL C 9 p E N N c m E_ U N r T cc p p p 0 C w N T U) T C N C '6 N O 6 O p`� 0 T N p U T E C 0 M b D j C 'y O L U7 C a r Z v 0 C 7i N N M N R UJ 13 Cr 0 J P -O o m r 0 y 7w 0 LM LU o CM LL LLJ 4) CL Q) Lo U LL (D ca 0 —i 1 la 0 Q 52 EN F 0 Im 0! CA (0 a, LL Im -D CL I 0) 14 si- 1%, 16, pu 11 Q 52 EN F 0 Im 0! CA (0 a, LL Im -D CL I 0) 14