Loading...
HomeMy WebLinkAboutRes 0872 - 1984-1989 Transportation Improvement ProgramCITY OF TUKWILA WASHINGTON RESOLUTION NO 872 A RESOLUTION OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A REVISED AND EXTENDED COMPRHENSIVE TRANSPORTATION PROGRAM IN ACCORDANCE WITH RCW 35.77 AND RCW 36.81. WHEREAS, the City of Tukwila has previously adopted a Comprehensive Transportation Program pursuant to RCW 35.77 and RCW 36.81, and WHEREAS, the City is required annually to review the work accomplished under said program and to determine current City street needs, and WHEREAS, a public hearing was held by the City Council at a Special Meeting called on Monday, June 27, 1983 at 7:00 P.M. to consider the Comprehensive Transportation Program. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO RESOLVE AS FOLLOWS: Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public hearing on June 27, 1983, the attached documents,incorporated herein by reference as Exhibit A, are declared and adopted as the Revised Six -Year Transportation Improvement Program for the City of Tukwila. Section 2. This Resolution and Exhibit shall be filed with the Director of Transportation of the State of Washington no later than July 30, 1983, after its adoption as required by RCW 35.77 and RCW 36.81. Section 3. This Resolution and Exhibit shall be submitted to the Urban Arterial Board as required by RCW 35.77. Section 4. This Resolution and Exhibit shall be submitted to the Puget Sound Council of Governments as the designated Metropolitan Planning Organization pursuant to the FHWA Federal -Aid Highway Program Manual Vol. 4, Chapter 4, Section 6. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a special meeting thereof this 27th day of June 1983. Aprnoved as to Form City Attorney Lawrence E. Hard Mayor Gary Van Dusen City Clerk Maxine Anderson Six Year Transportation Improvement Program 1984 to 1989 Grady Way Bridge Replacement Joint project with Renton 10% Federal 80% Tukwila 10% Southcenter Boulevard 62nd Avenue South to Grady Way Widen to 4 lanes bridges over river and I-405 ramps T-Line Bridge Phase II Southcenter Boulevard to Tukwila Parkway Bridge widening Phase I bridge replacement by WSDOT (Ref HOV projects on I-405) City / FAUS funding 188th Connector - 4 lane connected to 57th - 57th widen to lanes install signal at 57th Avenue South include signal modifications channelization at Southcenter Parkway South 180th 56th Avenue South Bridge Replacement Joint with King County Interurban Avenue from Southcenter Boulevard to I-5 New design with sidewalks right-of-way acquisition and basin drainage study South 168th Street Southcenter Parkway to Andover Park West new 3 lane street 2 new signals at Andover Park West and Southcenter Parkway Minkler Boulevard Andover Park West to Southcenter Parkway New street 4 lane 2 signals Andover Park West and Southcenter parkway Six Year Transportation Improvement Program 1984 to 1989 Minkler Boulevard Andover Park West to Andover Park East Widen from 4 to 5 lanes 1 new signal at Andover Park East macadam Road from Southcenter Boulevard to South 144th Street Overlay Curb sidewalks channelization Tukwila Parkway Extension - from Andover Park East to South 158th Street Longacres Way Highway 181 to east widen from 2 to 4 lanes provide sidewalks for pedestrian access Transit Center in CBD (Central Business District) - METRO program Tukwial Parkway S-Line to Andover Park West - Signalization coordination and right turn at east approach I-405 on ramp or alternate solutins coordinated with adjacent PD's Highway 181 at Strander Boulevard Right turn for north approach Tukwila Parkway at Andover Park East new signal and channelization Six Year Transportation Improvement Program 1984 to 1989 Southcenter Parkway I-5 southbound off ramp to Minkler Boulevard widen from 5 to 6 and 7 lanes Andover Park West Tukwila Parkway to Strander Boulevard Construct transit stops South 180th Street 57th Avenue to Andover Park West Left and right turn modifications Andover Park West STrander Boulevard to South 180th Street Construct transit stops Strander Boulevard at Andover Park West Left turn channelization and signal modifications South 180th Street at Andover Park West Widen at intersection only signal modification South 143rd Interurban Avenue South to the river Drainage and street improvements South 140th Interurban Avenue South to the river drainage and street improvements Six Year Transportation Improvement Program 1984 to 1989 South 134th Street - South 133rd to 48th Avenue South Drainage and street improvements - LID South 143rd Place Interurban Avenue South to river Drainage and street improvements South 144th Street - Interurban Avenue South to river Drainage and street improvements South 154th from 53rd to city limits Street improvements - City / County coordinated project beyond city limits Highway 181 I-405 to Strander Boulevard Widen from 5 to 7 lanes signal modification at 2 intersections Strander Boulevard Andover Park West to Bridge Widen from 4 to 5 lanes signal revision - Coordinated with Renton's Southwest 27th Street improvements Minkler Boulevard Andover Park East to Highway 181 5 lane bridge crossing Green River 1 new signal Highway 181 58th Avenue South Strander to 168th New 3 lane street 1 new signal at Strander Boulevard Six Year Transportation Improvement Program 1984 to 1989 South 168th Street Andover Park West to Andover Park East New 3 lane street Interurban Avenue South Highway 599 off ramp install 3 new signals and interconnect. Joint project with WSDOT 57th Avenue 188th Connector to city limits Widen from 2 to 5 lanes Baker Boulevard Andover Park West to Christensen Road New access at S-Line Bridge to Southcenter Shopping Mall New access signal modification / walkways Residential South 140th 55th to 53rd Street improvement with sidewalk 55th 140th to 144th Street improvement with sidewalk Six Year Transportation Improvement Program 1984 to 1989 57th Avenue 141st to 147th Street improvement with sidewalk South 141st 56th to 57th Street improvement with sidewalk 56th Avenue 139th to 141st Street improvement with sidewalk 56th Place 139th to 141st Street improvement with sidewalk South 139th 56th Avenue to 56th Place 56th Avenue 137th to 139th Street improvement with sidewalk South 144th 59th to East Terminus Street improvement with sidewalks 58th Avenue 59th to East Terminus to 500 South New street construction Six Year Transportation Improvement Program 1984 to 1989 South 160th 51st to 53rd Street improvement with sidewalk 54th Slade Way to South 166th Street improvement with sidewalk. LID / street improvement 53rd 160th to Klickitat By developer extension of LID Slade Way 54th to 160th By LID. By developer extension or LID