HomeMy WebLinkAboutRes 0872 - 1984-1989 Transportation Improvement ProgramCITY OF TUKWILA
WASHINGTON
RESOLUTION NO 872
A RESOLUTION OF THE CITY OF TUKWILA, WASHINGTON,
ADOPTING A REVISED AND EXTENDED COMPRHENSIVE
TRANSPORTATION PROGRAM IN ACCORDANCE WITH RCW
35.77 AND RCW 36.81.
WHEREAS, the City of Tukwila has previously adopted a Comprehensive
Transportation Program pursuant to RCW 35.77 and RCW 36.81, and
WHEREAS, the City is required annually to review the work accomplished
under said program and to determine current City street needs, and
WHEREAS, a public hearing was held by the City Council at a Special
Meeting called on Monday, June 27, 1983 at 7:00 P.M. to consider the Comprehensive
Transportation Program.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
DO RESOLVE AS FOLLOWS:
Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public hearing
on June 27, 1983, the attached documents,incorporated herein by reference as Exhibit
A, are declared and adopted as the Revised Six -Year Transportation Improvement Program
for the City of Tukwila.
Section 2. This Resolution and Exhibit shall be filed with the Director
of Transportation of the State of Washington no later than July 30, 1983, after its
adoption as required by RCW 35.77 and RCW 36.81.
Section 3. This Resolution and Exhibit shall be submitted to the Urban
Arterial Board as required by RCW 35.77.
Section 4. This Resolution and Exhibit shall be submitted to the Puget
Sound Council of Governments as the designated Metropolitan Planning Organization
pursuant to the FHWA Federal -Aid Highway Program Manual Vol. 4, Chapter 4, Section 6.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a special meeting thereof this 27th day of June 1983.
Aprnoved as to Form
City Attorney Lawrence E. Hard
Mayor Gary Van Dusen
City Clerk Maxine Anderson
Six Year Transportation Improvement Program
1984 to 1989
Grady Way Bridge Replacement
Joint project with Renton 10% Federal 80% Tukwila 10%
Southcenter Boulevard 62nd Avenue South to Grady Way
Widen to 4 lanes bridges over river and I-405 ramps
T-Line Bridge Phase II Southcenter Boulevard to Tukwila Parkway
Bridge widening Phase I bridge replacement by WSDOT (Ref HOV
projects on I-405) City / FAUS funding
188th Connector - 4 lane connected to 57th - 57th widen
to lanes install signal at 57th Avenue South include signal modifications
channelization at Southcenter Parkway South 180th
56th Avenue South Bridge Replacement
Joint with King County
Interurban Avenue from Southcenter Boulevard to I-5
New design with sidewalks right-of-way acquisition and basin drainage study
South 168th Street Southcenter Parkway to Andover Park West
new 3 lane street 2 new signals at Andover Park West and Southcenter Parkway
Minkler Boulevard Andover Park West to Southcenter Parkway
New street 4 lane 2 signals Andover Park West and Southcenter
parkway
Six Year Transportation Improvement Program
1984 to 1989
Minkler Boulevard Andover Park West to Andover Park East
Widen from 4 to 5 lanes 1 new signal at Andover Park East
macadam Road from Southcenter Boulevard to South 144th Street
Overlay Curb sidewalks channelization
Tukwila Parkway Extension - from Andover Park East to South 158th Street
Longacres Way Highway 181 to east widen from 2 to 4 lanes provide
sidewalks for pedestrian access
Transit Center in CBD (Central Business District) - METRO program
Tukwial Parkway S-Line to Andover Park West - Signalization coordination
and right turn at east approach I-405 on ramp or alternate solutins coordinated
with adjacent PD's
Highway 181 at Strander Boulevard
Right turn for north approach
Tukwila Parkway at Andover Park East new signal and channelization
Six Year Transportation Improvement Program
1984 to 1989
Southcenter Parkway I-5 southbound off ramp to Minkler Boulevard
widen from 5 to 6 and 7 lanes
Andover Park West Tukwila Parkway to Strander Boulevard
Construct transit stops
South 180th Street 57th Avenue to Andover Park West
Left and right turn modifications
Andover Park West STrander Boulevard to South 180th Street
Construct transit stops
Strander Boulevard at Andover Park West
Left turn channelization and signal modifications
South 180th Street at Andover Park West
Widen at intersection only signal modification
South 143rd Interurban Avenue South to the river
Drainage and street improvements
South 140th Interurban Avenue South to the river
drainage and street improvements
Six Year Transportation Improvement Program
1984 to 1989
South 134th Street - South 133rd to 48th Avenue South
Drainage and street improvements - LID
South 143rd Place Interurban Avenue South to river
Drainage and street improvements
South 144th Street - Interurban Avenue South to river
Drainage and street improvements
South 154th from 53rd to city limits
Street improvements - City / County coordinated project beyond city limits
Highway 181 I-405 to Strander Boulevard
Widen from 5 to 7 lanes signal modification at 2 intersections
Strander Boulevard Andover Park West to Bridge
Widen from 4 to 5 lanes signal revision - Coordinated with Renton's Southwest
27th Street improvements
Minkler Boulevard Andover Park East to Highway 181
5 lane bridge crossing Green River 1 new signal Highway 181
58th Avenue South Strander to 168th
New 3 lane street 1 new signal at Strander Boulevard
Six Year Transportation Improvement Program
1984 to 1989
South 168th Street Andover Park West to Andover Park East
New 3 lane street
Interurban Avenue South Highway 599 off ramp install 3 new signals and
interconnect. Joint project with WSDOT
57th Avenue 188th Connector to city limits
Widen from 2 to 5 lanes
Baker Boulevard Andover Park West to Christensen Road
New access at S-Line Bridge to Southcenter Shopping Mall
New access signal modification / walkways
Residential
South 140th 55th to 53rd
Street improvement with sidewalk
55th 140th to 144th
Street improvement with sidewalk
Six Year Transportation Improvement Program
1984 to 1989
57th Avenue 141st to 147th
Street improvement with sidewalk
South 141st 56th to 57th
Street improvement with sidewalk
56th Avenue 139th to 141st
Street improvement with sidewalk
56th Place 139th to 141st
Street improvement with sidewalk
South 139th 56th Avenue to 56th Place
56th Avenue 137th to 139th
Street improvement with sidewalk
South 144th 59th to East Terminus
Street improvement with sidewalks
58th Avenue 59th to East Terminus to 500 South
New street construction
Six Year Transportation Improvement Program
1984 to 1989
South 160th 51st to 53rd
Street improvement with sidewalk
54th Slade Way to South 166th
Street improvement with sidewalk. LID / street improvement
53rd 160th to Klickitat
By developer extension of LID
Slade Way 54th to 160th
By LID. By developer extension or LID