Loading...
HomeMy WebLinkAboutRes 0917 - 1985-1990 Transportation Improvement Program RESOLUTION NO. 917 A RESOLUTION OF THE CITY OF TUKWILA, WA, ADOPTING A REVISED AND EXTENDED 6 -YEAR TRANSPORTATION ITIRROVEMENT PROGRAM IN ACCORDANCE 'WITH RCW 35.77 and RCW 36.81. WHEREAS, the City of Tukwila, each year, adopts a 6 -Year Transportation Improvement Program pursuant to RCW 35.77 and RCW 36.81, and WHEREAS, the City is required annually to review the work accomplished under said program and to revise the current plan to meet City street needs, and WHEREAS, a public hearing was held by the City Council at a Regular Meeting called on Monday, June 18, 1984, at 7:00 P.M. to consider the 1985 -1990 6 -Year Transportation Improvement Program. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO RESOLVE AS FOLLOWS: Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public hearing held on June 18, 1964, the attached documents, incorporated herein by reference as Exhibit A, are declared and adopted as the Revised Six -Year Transportation Improvement Program for the City of Tukwila. Section 2. This Resolution and Exhibit A shall be filed with the Director of Transportation of the State of Washington no later than July 30, 1984, after its adoption. Section 3. This Resolution and Exhibit A shall be submitted to the Urban Arterial Board as required by RCW 35.77. Section 4. This Resolution and Exhibit shall be submitted to the Puget Sound Council of Governments as the designated Metropolitan Planning Organization pursuant to the FHWA Federal -Aid Highway Program Manual Vol. 4, Chapter 4, Sec. 6. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 1984. Six Year Transportation Improvement District 1985 to 1990 Grady Way Bridge Replacement Joint project with Renton 10% Federal 80% Tukwila 10% Southcenter Boulevard 62nd Avenue South to Grady Way. Widen to 4 lanes, bridges over river and I-405 ramps T-Line Bridge Southcenter Boulevard top Tukwila Parkway, bridge replacement by WSDOT 56th Avenue South Bridge Replacement Joint with King County South 188th Connector 4 land connected to 57th Avenue South. 57th widen to 5 lanes. Install signal at 57th including signal mods channelization Interurban Avenue South From Southcenter Boulevard to I-5 new design with sidewalks, right-of-way acquisition and basin drainage Minkler Boulevard Andover Park West to Southcenter Parkway, new street, 4 lane, 2 signals Andover Park West and Southcenter Parkway South 168th Street Southcenter Parkway to Andover Park West. New 3 lane street, 2 new signals at Andover Park West to Southcenter Parkway Six Year Transportation Improvement District 1985 to 1990 Andover Park West Strander Boulevard. 1000 to south drainage modifications. Raising Andover Park West Macadam Road From Southcenter Boulevard to South 150th Street overlay, curb sidewalks, channelization Tukwila Parkway Extension from Andover Park East to South 158th Street Metro Regional Transit Center Transit Center in CBD (Central Business District). Metro Program Macadam Road From South 150th Street to South 144th Street, overlay, curb sidewalks, channelization Minkler Boulevard Andover Park West to Andover Park East widen from 4 to 5 lanes, one new signal at Andover Park East Longacres Way Highway 181 to east widen from 2 to 4 lanes provide sidewalks for pedestrian access Tukwila Parkway S-Line to Andover Park West. Signal coordination and right turn at east approach to I-405 on ramp Six Year Transportation Improvement District 1985 to 1990 Highway 181 at Strander Boulevard, right turn for north approach Tukwila Parkway at Andover Park East, new signal and channelization Highway 181 and South 180th Street Signal modification andover Park West Construct transit stops South 180th Street 57th Avenue South to Andover Park West left and right turn modifications Andover Park West STrander Boulevard to South 180th Street construct transit stops Strander Boulevard at Andover Park West. Left turn channelization and signal modifications South 180th Street At Andover Park West. Widen at intersection only, signal modification Six Year Transportation Improvement District 1985 to 1990 South 143rd Street Interurban Avenue South to the river drainage and street improvements South 140th Street Interurban Avenue South to the river drainage and street improvements South 134th Street South 133rd to 48th Avenue South. Drainage and street improvements South 143rd Place Interurban Avenue South to river drainage and street improvements South 154th Street From 53rd to city limits, street improvements, city/county coordinated project beyond city limits Highway 181 I-405 to Strander Boulevard, widen from 5 to 7 lanes, signal modification at 2 intersections Strander Boulevard Andover Park West to the bridge, widen from 4 to 5 lanes, signal revision. coordinated with Renton's Southwest 27th Street improvements Six Year Transportation Improvement Program 1985 to 1990 Minkler Boulevard Andover Park East to Highway 181 5 lane bridge crossing Green River, 1 new signal Highway 181 South 140th Street 55th to 53rd Street, street improvements with sidewalk 55th Avenue South South 140th to South 147th Streets, street improvements with sidewalk South 141st Street 56th to 57th street improvements with sidewalks 56th Avenue South 139th to 141st Street street improvements with sidewalk South 160th Street 51st to 53rd Avenue South street improvements with sidewalk Six Year Transportation Improvement District 1985 to 1990 Southcenter Parkway I-5 Southbound off ramp to Minkler Boulevard, widen from 5 to 6 and 7 lanes 56th Avenue South Strander Boulevard to 168th Street, new 3 lane street, 1 new signal at Strander Boulevard South 168th Street Andover Park West to Andover Park East, new 3 lane street Interurban Avenue South Highway 599 off ramp, install 3 new signals and interconnect. Joint project with WSDOT Interurban Avenue South From I-5 North to 42nd Avenue South 57th Avenue South 188th Connector to city limits, widen from 2 to 5 lanes Baker Boulevard Andover Park West to Christensen Road provide secondary arterial street improvements Six Year Transportation Improvement Program 1985 to 1990 53rd Avenue South South 160th to Klickitat Drive (By developer extension or LID) 56th Place 139th to 141st Street improvement with sidewalk 56th Avenue South 137th to South 139th street improvements with sidewalk South 144th 59th Avenue South to East Terminus, street improvement with sidewalk 58th Avenue South South 149th Street to South Terminus, west to 57th Avenue South, new street construction 54th Avenue South Slade Way to South 166th, LID / Street improvement Slade Way (By LID) (By developer extension or LID)