HomeMy WebLinkAboutRes 0917 - 1985-1990 Transportation Improvement Program
RESOLUTION NO. 917
A RESOLUTION OF THE CITY OF TUKWILA, WA,
ADOPTING A REVISED AND EXTENDED 6 -YEAR TRANSPORTATION
ITIRROVEMENT PROGRAM IN ACCORDANCE 'WITH RCW
35.77 and RCW 36.81.
WHEREAS, the City of Tukwila, each year, adopts a 6 -Year Transportation
Improvement Program pursuant to RCW 35.77 and RCW 36.81, and
WHEREAS, the City is required annually to review the work accomplished
under said program and to revise the current plan to meet City street needs, and
WHEREAS, a public hearing was held by the City Council at a Regular
Meeting called on Monday, June 18, 1984, at 7:00 P.M. to consider the 1985 -1990
6 -Year Transportation Improvement Program.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
DO RESOLVE AS FOLLOWS:
Section 1. Pursuant to RCW 35.77 and RCW 36.81 and the public hearing held
on June 18, 1964, the attached documents, incorporated herein by reference as Exhibit
A, are declared and adopted as the Revised Six -Year Transportation Improvement Program
for the City of Tukwila.
Section 2. This Resolution and Exhibit A shall be filed with the Director
of Transportation of the State of Washington no later than July 30, 1984, after its
adoption.
Section 3. This Resolution and Exhibit A shall be submitted to the Urban
Arterial Board as required by RCW 35.77.
Section 4. This Resolution and Exhibit shall be submitted to the Puget
Sound Council of Governments as the designated Metropolitan Planning Organization
pursuant to the FHWA Federal -Aid Highway Program Manual Vol. 4, Chapter 4, Sec. 6.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a
Regular Meeting thereof this day of 1984.
Six Year Transportation Improvement District
1985 to 1990
Grady Way Bridge Replacement
Joint project with Renton 10% Federal 80% Tukwila 10%
Southcenter Boulevard
62nd Avenue South to Grady Way. Widen to 4 lanes, bridges
over river and I-405 ramps
T-Line Bridge
Southcenter Boulevard top Tukwila Parkway, bridge replacement by WSDOT
56th Avenue South Bridge Replacement
Joint with King County
South 188th Connector
4 land connected to 57th Avenue South. 57th widen to 5 lanes. Install signal at
57th including signal mods channelization
Interurban Avenue South
From Southcenter Boulevard to I-5 new design with sidewalks, right-of-way
acquisition and basin drainage
Minkler Boulevard
Andover Park West to Southcenter Parkway, new street, 4 lane, 2 signals
Andover Park West and Southcenter Parkway
South 168th Street
Southcenter Parkway to Andover Park West. New 3 lane street, 2 new signals
at Andover Park West to Southcenter Parkway
Six Year Transportation Improvement District
1985 to 1990
Andover Park West
Strander Boulevard. 1000 to south drainage modifications. Raising
Andover Park West
Macadam Road
From Southcenter Boulevard to South 150th Street overlay, curb sidewalks,
channelization
Tukwila Parkway Extension
from Andover Park East to South 158th Street
Metro Regional Transit Center
Transit Center in CBD (Central Business District). Metro Program
Macadam Road
From South 150th Street to South 144th Street, overlay, curb sidewalks,
channelization
Minkler Boulevard
Andover Park West to Andover Park East widen from 4 to 5 lanes, one new
signal at Andover Park East
Longacres Way
Highway 181 to east widen from 2 to 4 lanes provide sidewalks for
pedestrian access
Tukwila Parkway
S-Line to Andover Park West. Signal coordination and right turn
at east approach to I-405 on ramp
Six Year Transportation Improvement District
1985 to 1990
Highway 181
at Strander Boulevard, right turn for north approach
Tukwila Parkway
at Andover Park East, new signal and channelization
Highway 181 and South 180th Street
Signal modification
andover Park West
Construct transit stops
South 180th Street
57th Avenue South to Andover Park West left and right turn modifications
Andover Park West
STrander Boulevard to South 180th Street construct transit stops
Strander Boulevard
at Andover Park West. Left turn channelization and signal modifications
South 180th Street
At Andover Park West. Widen at intersection only, signal modification
Six Year Transportation Improvement District
1985 to 1990
South 143rd Street
Interurban Avenue South to the river drainage and street improvements
South 140th Street
Interurban Avenue South to the river drainage and street improvements
South 134th Street
South 133rd to 48th Avenue South. Drainage and street improvements
South 143rd Place
Interurban Avenue South to river drainage and street improvements
South 154th Street
From 53rd to city limits, street improvements, city/county coordinated project
beyond city limits
Highway 181
I-405 to Strander Boulevard, widen from 5 to 7 lanes, signal modification at 2
intersections
Strander Boulevard
Andover Park West to the bridge, widen from 4 to 5 lanes, signal revision.
coordinated with Renton's Southwest 27th Street improvements
Six Year Transportation Improvement Program
1985 to 1990
Minkler Boulevard
Andover Park East to Highway 181 5 lane bridge crossing Green River, 1 new signal
Highway 181
South 140th Street
55th to 53rd Street, street improvements with sidewalk
55th Avenue South
South 140th to South 147th Streets, street improvements with sidewalk
South 141st Street
56th to 57th street improvements with sidewalks
56th Avenue South
139th to 141st Street street improvements with sidewalk
South 160th Street
51st to 53rd Avenue South street improvements with sidewalk
Six Year Transportation Improvement District
1985 to 1990
Southcenter Parkway
I-5 Southbound off ramp to Minkler Boulevard, widen from 5 to 6 and 7 lanes
56th Avenue South
Strander Boulevard to 168th Street, new 3 lane street, 1 new signal at Strander Boulevard
South 168th Street
Andover Park West to Andover Park East, new 3 lane street
Interurban Avenue South
Highway 599 off ramp, install 3 new signals and interconnect. Joint project with WSDOT
Interurban Avenue South
From I-5 North to 42nd Avenue South
57th Avenue South
188th Connector to city limits, widen from 2 to 5 lanes
Baker Boulevard
Andover Park West to Christensen Road provide secondary arterial street improvements
Six Year Transportation Improvement Program
1985 to 1990
53rd Avenue South
South 160th to Klickitat Drive
(By developer extension or LID)
56th Place
139th to 141st Street improvement with sidewalk
56th Avenue
South 137th to South 139th street improvements with sidewalk
South 144th
59th Avenue South to East Terminus, street improvement with sidewalk
58th Avenue South
South 149th Street to South Terminus, west to 57th Avenue South, new
street construction
54th Avenue South
Slade Way to South 166th, LID / Street improvement
Slade Way
(By LID)
(By developer extension or LID)