Loading...
HomeMy WebLinkAboutRes 0963 - 1986-1991 Transportation Improvement Program RESOLUTION NO 963 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE URBAN ARTERIAL BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomp- lished under the said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, now, therefore, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVE AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transporta- tion Improvement Program for the City of Tukwila, as revised and extended for the next ensuing six (6) calendar years (1986 -1991, inclusive) a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which program sets forth the project location, type of improve- ment and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. The City Clerk is here- by authorized and directed to file a copy of this Resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Urban Arterial Board for the State of Washington. RESOLVED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at their regular meeting this day of 1985. v APPROVED: pxafl v COUNCIVIPRESIDENT, EDGAR D. BAUCH ATTEST /AUTHENTICATED: CITY CILERK, MAXINE ANDERSON APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: 85 RESOLUTION NO. Q� 3 2 Date: 7/1/85 6 -YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 PROJECT COSTS IN THOUSANDS OF DOLLARS PROJECT IDENTIFICATION Total OBLIGATION SCHEDULE FUNDING SOURCE City Ave. /St. Name or Number County Work Length Y E A R I Federal R.A.P. Rd. Number or Road Name Beginning and Code (Mi.) 4,5 or Total Ending Termini, Desc. Work to Be Comp. 1st 2nd 3rd 6 AmouJ Prograai U.A.B. Local Funds 1 1 2 1 3 1 4 I 5 1 678 1 9 1 10 1 11 1 12 1 13 1 14 15 1 16 1 17 GRADY WAY BRIDGE REPLACEMENT 1 11 BDGLI 00.30 1 16X 1 5821 I I 1 7048 1 BRM 1 845 1 8810 1 Joint Project /Renton 10 Fed. 80% AFHJ Renton (801) Tukwila 10% KM WSDOT (11.0) BRM (25) SOUTHCENTER BOULEVARD i 2 1 BDIL 1 00.60 1 16X 1 8431 3226 1 3220 1 1 5415 1 FAUS 1 1 1109 i 6524 2 62nd to Grady Way widen to 4 lanes, AFGH Consti bridges over river and I -405 ramps JKM T -LINE BRIDGE PHASE II 1 1 1 BDGL 1 00.10 1 16X 1 506 1 1 I 1 1430 4 -R 1 i 70 i 1500 I 3 SC Blvd. top Tukwila Parkway, widening AFHJ Phase I, Bridge Replacement by WSDOT KM 56TH AVE. SO. BRIDGE REPLACEMENT 1 41 L 00.04 1 19X1 I I I 1 1000 1 BRM 1 1 125 1 1125 j 4 Joint with King County King County SOUTH 188TH CONNECTOR 1 1 ABDG 1 00.90 1 16X 1 190 1 690 1 2185 1 21851 4437 1 FAUS 1 1 1094 1 5531 1 5 4 -lane connected to 57th Ave. So; 57th 1 FHJK PS &E ROW Const] Widen to 5 lanes, install signal at 57t I inclu. signal mods channelization MINKLER BOULEVARD 1 11 ABDG 1 00.38 1 19X 1 2100 1 515 1 1488 1 1 1 1 1 4275 1 4275 1 6 Andover Park West to Southcenter Pkwy, New st., 4 -lane, 2 signals A.P.W. and Southcenter Parkway INTERURBAN AVENUE SOUTH 1 2 1 DGHM 1 01.70 1 14X 1 158 1 4041 1 1 1 1 3736 1 940 1 4676 7 from S/C Blvd. to I -5; new design with ABFJ sidewalks; r/w acq; basin drainage KMNO study P MACADAM ROAD 1 2 1 DFGJ 1 00.65 1 17X 1 575 1 6361 1 1 1 1 968 1 323 1 1291 8 Southcenter Blvd to South 144th Avenue ABHK Constl Constl 1 1 2 1 3 1 4 5 1 678 1 9 1 10 1 11 112 I 13 I 14 I 15 I 16 I 17 SOUTH 168TH STREET 1 1 1 ABDG 00.38 1 19X 1 1050 1 3221 1073 1 1 1 1 2570 1 2570 9 S/C Pkwy. to Andover Park West; new 3- FHIJ lane street, 2 new signals at Andover K Park West to Southcenter Pkwy. TUKWILA PARKWAY EXTENSION 1 6 I IBDL 1 00.25 1 16X 1 496 1 1050 1 2654 1 26541 3735 1 FAUS 1 1 765 1 4500 1 Andover Park East to South 158th AFGH PS &E ROW Con Con Street JKM I LONGACRES WAY 1 2 1 BDFG 1 00.20 1 19X 1 184 1 I I I f 1 201 1 201 111 SR -181 to east; widen from AHTK Con 2 to 4 lanes 1 TUKWILA PARKWAY 1 6 1 HI 1 00.20 1 16X I I I I I I I 1 298 1 298 121 S -Line to Andover Park West signal coordination and right turn at east approach to I -405 on -ramp SR -181 S. 180th STREET I 6 I HIK 1 00.10 1 14 1 188 1 50 1 155 1 1208) 1129 1 BRM 1 150 1 322 1 1619 1 Signal Modifications, Rechannelization L SR -181 1 6 1 ADH 1 00.10 1 14X I I I I I 1 I I 32 1 32 14 at Strander Boulevard, right turn for north approach INTERURBAN AVENUE SOUTH 1 2 ABDF 1 00.60 1 14 1 158 1 262 1 1570 1 1 I I I 1990 1 1990 1 I -5 to north City limit GJKL MN SR -181 (AT TODD) 1 6 1 HI 1 00.10 1 14 1 1 25 1 276 1 1 1 I I 301 1 301 1 Signal Improvements 1 1 2 13 14 5 678 9 1 10 I 11 112 13 I 14 I 15 I 16 1 17 INTERURBAN AVENUE SOUTH 16 I IH I 114 I 1 403 I I I I I 403 1 403 I 17 SR -599 Off -ramp, install 3 new signals and interconnect. Joint project with WSOOT I CHRISTENSEN ROAD 13 I ABDF 1 00.10 1 19X 1 1 231 I I I I I I 256 1 256 19 Improvements at T -Line Bridge GN I MINKLER BOULEVARD 1 2 I DFGI 1 00.38 1 19 1 1 1 47 1 543 1 I 590 1 590 19 Andover Park West to Andover Park East ABHK Widen from 4 to 5 lanes, one new signal at Andover Park East TUKWILA PARKWAY 1 6 1 HI 1 00.16 1 16 1 1 111 1 124 1 I I I 135 1 135 2( at Andover Park East, new signal and channelization ANDOVER PARK WEST 16 I HIP 1 00.50 117 1 1 111 1 124 I I I I 135 1 135 21 Tukwila Parkway to Strander Blvd. Construct transit stops SOUTH 180th STREET 16 I HI 1 00.30 116 I I 1 8 191 I I I I 99 199 22 57th Avenue South to Andover Park West left and right turn modifications ANDOVER PARK WEST 13 1 P 1 1.00 1 17 1 1 1 28 1 316 1 I I 344 1 344 2 Strander Blvd. to South 180th Street Construct Transit Stops STRANDER BOULEVARD 16 1 HI 1 00.10 1 17 I I 1 6 172 I I I I 78 I 78 2 at Andover Park West; left turn channelization and signal modifications I 11 2 31 4 1 5 1 678 1 9 1 10 1 11 1 12 1 13 i 14 I 15 1 16 1 17 A I SOUTH 180th STREET 1 6 1 HI 1 00.10 1 16 1 1 1 6 1 63 1 I I I 69 1 69 2 at Andover Park West; widen at inter- section only, signal modification 1 SR -181 1 2 1 DFGI 1 00.42 1 14 1 I 1 99 1 11341 I I 1 1233 1 1233 20 I -405 to Strander Blvd; widen from 5 ABHJ to 7 lanes, signal modification at 2 K intersections SOUTH 143rd STREET 1 4 1 ABDF 1 00.20 1 19 1 i 24 1 275 1 I I 1 299 1 299 27 Interurban Avenue South to the river Drainage and street improvements SOUTH 140th STREET I I ABDF 1 00.11 1 19 1 I 111 1 119 1 I I 130 1 130 2E Interurban Avenue South to the river drainage and street improvements 1 SOUTH 134th STREET 1 1 ABDF 1 00.22 1 19 1 1 140 1 I 1 1 I I 140 1 140 29 South 133rd to 48th Avenue South L.I.D. Drainage and street improvements L.I.D. 3J SOUTH 143rd PLACE I ABDF 1 00.19 1 19 1 1 1 1 140 1 I I I 140 1 140 Interurban Avenue South to river L.I.D. Drainage and street improvements SOUTH 144th STREET I I ABDF 1 00.11 1 19 1 I I 1 100 1 I I I 100 1 100 31 Interurban Avenue South to river L.I.D. Drainage and street improvements I TRANSIT CENTER 1 6 1 ABDG I 1 16 1 1 1000 1 1000 1 1 2000 1 METRO 1 I 1 2000 321 Transit Center in CBD METRO Program FHIJ K SOUTH 154th STREET 1 2 1 BDFG 1 00.20 1 16 1 I 1 388 1 1 1 349 1 39 1 388 331 from 53rd to City Limits; street AHJK U.A.B. improvements City /County coordinated project beyond City Limits 11 2 1 3 1 4 1 5 1 678 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 STRANDER BOULEVARD 1 2 1 DFGI 1 00.38 1 17 1 1 1 1 314 1 1 1 1 314 1 314 34 Andover Pk. W. to the bridge; widen fro ABHJ L.I.D. 4 to 5 lanes, signal revision coordin K ated with Renton's SW 27th st. imps. SOUTHCENTER PARKWAY 1 2 1 DFGJ 1 00.28 1 16 1 1 1 218 1140a I I I 1618 1 1618 3 I I -5 southbound off -ramp to Minkler Blvd. ABHK L.I.D. widen from 5 to 6 7 lanes 45th AVENUE SOUTH 1 11 ABDF 1 00.40 1 19 1 I I 1 22161 1 I I 2216 1 2216 3 from Interurban Avenue to 50th Place So. GJKL 58th AVENUE SOUTH 1 2 1 ABDG 1 00.26 1 19 1 1 1 9591 I I I 959 1 959 3? Strander Blvd. to 168th Street; new 3- L.I.D. lane street, 1 new signal at Strander Boulevard SOUTH 168th STREET I 11 BDFGI 00.85 1 19 1 1 1 1 1 I I I 257 1 257 1 36 Andover Park West to Andover Park East L.I.D. new 3 -lane street 57th AVENUE SOUTH 1 2 1 BDFG 1 00.50 1 16 1 1 1 1 13841 I 1 1 1384 1 1384 1 3 188th Connector to City Limits; widen AHJK L.I.D. from 2 to 5 lanes BAKER BOULEVARD 1 4 1 CFG 1 00.30 1 19 1 1 1 1 581 1 1 1 58 1 58 1 4 Andover Park West to Christensen Road L.I.D i NEW ACCESS 1 6 1 HI 1 1 19 1 1 1 1 1491 1 1 1 149 1 149 41 at S -Line Bridge to S/C Shopping Mall L.I.D. New access signal modification /walkways 11 2 31 4 1 5 1 678 I 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 1 MINKLER BOULEVARD 1 1 1 DIJL 1 00.12 1 191 1 1 299 1 17541 1704 1 FAUS 1 1 349 1 2053 1 421 Andover Pk. E. to SR -181, 5 lane bridge ABFG PS &E 349 2053 crossing Green River, 1 new signal SR H 181 ROW I I I I I I I i I I I I RESIDENTIAL SOUTH 140th STREET 1 4 1 ABCD 1 0.20 1 19X 1 131 1 I I I I i I 131 1 131 R1 55th to 53rd Street; street improve- EFGJ ments with sidewalk K 55th AVENUE SOUTH 1 4 1 ABCD 1 0.20 1 19X 311 1 I I I I I I 311 1 311 R South 140th to South 144th, street EFGJ improvements with sidewalk K 57th AVENUE SOUTH 14 I ABCD 1 00.38 119X 1 436 I I 1 I I 436 1 436 R South 141st to South 147th Streets EFGJ Street improvements with sidewalk K 158th STREET 1 4 1 GJ 1 00.10 1 19X 1 I I I I I I I 38 1 38 R Lights and sidewalk SOUTH 141st STREET 1 4 1 ABCD 1 00.07 1 19 1 1 105 1 I I I I I 105 1 105 RE 56th to 57th; street improvements with EFGJ sidewalks K 11 2 1 31 4 1 5 1 678 1 9 1 10 11 112 1 13 14 I 15 I 16 I 17 56th AVENUE SOUTH 1 4 1 ABCD 1 00.20 1 1 I I 191 1 1 I I 191 I 191 R 139th to 141st Street, street improve- EFGJ ments with sidewalk K SOUTH 139th STREET 1 4 1 ABCD 1 00.05 119 1 I I 1 821 1 I I 82 1 82 R7 56th Avenue South to 56th Place South EFGJ K RJ SOUTH 160th STREET 1 4 1 ABCDI 00.15 19 1 I 1961 I I 196 I 196 51st to 53rd Avenue South street improve EFGJ ments with sidewalk K 53rd AVENUE SOUTH 1 1 1 ABCD 1 00.18 1 19 1 I I I 2271 I I I 227 1 227 R South 160th to Klickitat Drive EFGJ L.I.D. 9� (By developer extension or L.I.D.) K I SOUTH 158th STREET 1 11 ADFG 1 00.15 1 19 1 55 1 100 1 550 1 1 I I 1 705 I 705 R 46th Avenue So. to 51st Avenue South J iC 57th AVENUE SOUTH 1 21 ABDF 1 00.10 1 19 1 7 1 70 I I I I I 77 I 77 R to Reservoir site GJ 11 1 56th PLACE 1 41 ABCD 1 00.13 1 19 1 1 1 191 1 1 1 I I 191 1 191 R 139th to 141st Street, street improve- EFGJ 12 ment with sidewalk K 56th AVENUE 1 4 1 ABCD 1 00.15 1 19 1 I 1 1 19Q I I 1 196 1 196 R South 137th to South 139th, street EFGJ 11 improvements with sidewalk K 1 1 2 1 31 4 j 5 j 678 1 9 1 10 1 11 1 12 1 13 j 14 1 15 1 16 1 17 SOUTH 144th 1 4 1 ABCD 1 00.07 1 191 I I I 871 I 87 1 87 1 R 59th Avenue South to East Terminus EFGJ 14 street improvement with sidewalk K 58th AVENUE SOUTH 1 1 1 ABCD 1 00.24 1 191 1 1 1 3271 1 I 1 327 1 327 R 59th Avenue South to E. Terminus to EFGJ L.I.D. 1E 500 South, new street construction K 54th AVENUE SOUTH 1 4 1 ABCD 1 00.19 1 19I I I I 2451 I I i 245 1 245 R Slade Way to South 166th DFGJ 11 LID /street improvement K SLADE WAY 14 I ABCD 1 00.19 1 191 I I 1 2451 1 j 1 245 1 245 I R (By L.I.D.) EFGJ 17 (By developer extension or L.I.D.) K I I I I I I I I f I I 1 I I I I I I I I I I i