HomeMy WebLinkAboutRes 0963 - 1986-1991 Transportation Improvement Program RESOLUTION NO 963 A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE URBAN
ARTERIAL BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters
35.77 and 47.26, as amended, the City Council of the City of
Tukwila has previously adopted a Comprehensive Street Program and
thereafter periodically modified said Comprehensive Street
Program by resolution, and
WHEREAS, the City Council has reviewed the work accomp-
lished under the said program, determined current and future City
street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the
next ensuing six (6) calendar years, and
WHEREAS, a public hearing has been held on the said
Six -Year Transportation Improvement Program, and
WHEREAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
or implementation of the Six -Year Transportation Improvement
Program, now, therefore,
THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
HEREBY RESOLVE AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transporta-
tion Improvement Program for the City of Tukwila, as revised and
extended for the next ensuing six (6) calendar years (1986 -1991,
inclusive) a copy of which is attached hereto as Exhibit A and
incorporated herein by this reference as if fully set forth,
which program sets forth the project location, type of improve-
ment and the estimated cost thereof, is hereby adopted and
approved.
Section 2. Filing of Program. The City Clerk is here-
by authorized and directed to file a copy of this Resolution,
together with the exhibit attached hereto, with the Secretary of
Transportation and the Urban Arterial Board for the State of
Washington.
RESOLVED BY THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, at their regular meeting this day of
1985.
v APPROVED:
pxafl v
COUNCIVIPRESIDENT, EDGAR D. BAUCH
ATTEST /AUTHENTICATED:
CITY CILERK, MAXINE ANDERSON
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
BY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL: 85
RESOLUTION NO. Q� 3
2
Date: 7/1/85
6 -YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION Total OBLIGATION SCHEDULE FUNDING SOURCE
City Ave. /St. Name or Number County Work Length Y E A R I Federal R.A.P.
Rd. Number or Road Name Beginning and Code (Mi.) 4,5 or Total
Ending Termini, Desc. Work to Be Comp. 1st 2nd 3rd 6 AmouJ Prograai U.A.B. Local Funds
1 1 2 1 3 1 4 I 5 1 678 1 9 1 10 1 11 1 12 1 13 1 14 15 1 16 1 17
GRADY WAY BRIDGE REPLACEMENT 1 11 BDGLI 00.30 1 16X 1 5821 I I 1 7048 1 BRM 1 845 1 8810
1 Joint Project /Renton 10 Fed. 80% AFHJ Renton (801)
Tukwila 10% KM WSDOT (11.0)
BRM (25)
SOUTHCENTER BOULEVARD i 2 1 BDIL 1 00.60 1 16X 1 8431 3226 1 3220 1 1 5415 1 FAUS 1 1 1109 i 6524
2 62nd to Grady Way widen to 4 lanes, AFGH Consti
bridges over river and I -405 ramps JKM
T -LINE BRIDGE PHASE II 1 1 1 BDGL 1 00.10 1 16X 1 506 1 1 I 1 1430 4 -R 1 i 70 i 1500 I
3 SC Blvd. top Tukwila Parkway, widening AFHJ
Phase I, Bridge Replacement by WSDOT KM
56TH AVE. SO. BRIDGE REPLACEMENT 1 41 L 00.04 1 19X1 I I I 1 1000 1 BRM 1 1 125 1 1125 j
4 Joint with King County King
County
SOUTH 188TH CONNECTOR 1 1 ABDG 1 00.90 1 16X 1 190 1 690 1 2185 1 21851 4437 1 FAUS 1 1 1094 1 5531 1
5 4 -lane connected to 57th Ave. So; 57th 1 FHJK PS &E ROW Const]
Widen to 5 lanes, install signal at 57t I
inclu. signal mods channelization
MINKLER BOULEVARD 1 11 ABDG 1 00.38 1 19X 1 2100 1 515 1 1488 1 1 1 1 1 4275 1 4275 1
6 Andover Park West to Southcenter Pkwy,
New st., 4 -lane, 2 signals A.P.W. and
Southcenter Parkway
INTERURBAN AVENUE SOUTH 1 2 1 DGHM 1 01.70 1 14X 1 158 1 4041 1 1 1 1 3736 1 940 1 4676
7 from S/C Blvd. to I -5; new design with ABFJ
sidewalks; r/w acq; basin drainage KMNO
study P
MACADAM ROAD 1 2 1 DFGJ 1 00.65 1 17X 1 575 1 6361 1 1 1 1 968 1 323 1 1291
8 Southcenter Blvd to South 144th Avenue ABHK Constl Constl
1 1 2 1 3 1 4 5 1 678 1 9 1 10 1 11 112 I 13 I 14 I 15 I 16 I 17
SOUTH 168TH STREET 1 1 1 ABDG 00.38 1 19X 1 1050 1 3221 1073 1 1 1 1 2570 1 2570
9 S/C Pkwy. to Andover Park West; new 3- FHIJ
lane street, 2 new signals at Andover K
Park West to Southcenter Pkwy.
TUKWILA PARKWAY EXTENSION 1 6 I IBDL 1 00.25 1 16X 1 496 1 1050 1 2654 1 26541 3735 1 FAUS 1 1 765 1 4500
1 Andover Park East to South 158th AFGH PS &E ROW Con Con
Street JKM
I LONGACRES WAY 1 2 1 BDFG 1 00.20 1 19X 1 184 1 I I I f 1 201 1 201
111 SR -181 to east; widen from AHTK Con
2 to 4 lanes
1 TUKWILA PARKWAY 1 6 1 HI 1 00.20 1 16X I I I I I I I 1 298 1 298
121 S -Line to Andover Park West signal
coordination and right turn at east
approach to I -405 on -ramp
SR -181 S. 180th STREET I 6 I HIK 1 00.10 1 14 1 188 1 50 1 155 1 1208) 1129 1 BRM 1 150 1 322 1 1619
1 Signal Modifications, Rechannelization L
SR -181 1 6 1 ADH 1 00.10 1 14X I I I I I 1 I I 32 1 32
14 at Strander Boulevard, right turn for
north approach
INTERURBAN AVENUE SOUTH 1 2 ABDF 1 00.60 1 14 1 158 1 262 1 1570 1 1 I I I 1990 1 1990
1 I -5 to north City limit GJKL
MN
SR -181 (AT TODD) 1 6 1 HI 1 00.10 1 14 1 1 25 1 276 1 1 1 I I 301 1 301
1 Signal Improvements
1 1 2 13 14 5 678 9 1 10 I 11 112 13 I 14 I 15 I 16 1 17
INTERURBAN AVENUE SOUTH 16 I IH I 114 I 1 403 I I I I I 403 1 403 I
17 SR -599 Off -ramp, install 3 new signals
and interconnect. Joint project with
WSOOT
I CHRISTENSEN ROAD 13 I ABDF 1 00.10 1 19X 1 1 231 I I I I I I 256 1 256
19 Improvements at T -Line Bridge GN
I MINKLER BOULEVARD 1 2 I DFGI 1 00.38 1 19 1 1 1 47 1 543 1 I 590 1 590
19 Andover Park West to Andover Park East ABHK
Widen from 4 to 5 lanes, one new signal
at Andover Park East
TUKWILA PARKWAY 1 6 1 HI 1 00.16 1 16 1 1 111 1 124 1 I I I 135 1 135
2( at Andover Park East, new signal and
channelization
ANDOVER PARK WEST 16 I HIP 1 00.50 117 1 1 111 1 124 I I I I 135 1 135
21 Tukwila Parkway to Strander Blvd.
Construct transit stops
SOUTH 180th STREET 16 I HI 1 00.30 116 I I 1 8 191 I I I I 99 199
22 57th Avenue South to Andover Park West
left and right turn modifications
ANDOVER PARK WEST 13 1 P 1 1.00 1 17 1 1 1 28 1 316 1 I I 344 1 344
2 Strander Blvd. to South 180th Street
Construct Transit Stops
STRANDER BOULEVARD 16 1 HI 1 00.10 1 17 I I 1 6 172 I I I I 78 I 78
2 at Andover Park West; left turn
channelization and signal modifications
I
11 2 31 4 1 5 1 678 1 9 1 10 1 11 1 12 1 13 i 14 I 15 1 16 1 17
A I SOUTH 180th STREET 1 6 1 HI 1 00.10 1 16 1 1 1 6 1 63 1 I I I 69 1 69
2 at Andover Park West; widen at inter-
section only, signal modification
1 SR -181 1 2 1 DFGI 1 00.42 1 14 1 I 1 99 1 11341 I I 1 1233 1 1233
20 I -405 to Strander Blvd; widen from 5 ABHJ
to 7 lanes, signal modification at 2 K
intersections
SOUTH 143rd STREET 1 4 1 ABDF 1 00.20 1 19 1 i 24 1 275 1 I I 1 299 1 299
27 Interurban Avenue South to the river
Drainage and street improvements
SOUTH 140th STREET I I ABDF 1 00.11 1 19 1 I 111 1 119 1 I I 130 1 130
2E Interurban Avenue South to the river
drainage and street improvements
1 SOUTH 134th STREET 1 1 ABDF 1 00.22 1 19 1 1 140 1 I 1 1 I I 140 1 140
29 South 133rd to 48th Avenue South L.I.D.
Drainage and street improvements
L.I.D.
3J SOUTH 143rd PLACE I ABDF 1 00.19 1 19 1 1 1 1 140 1 I I I 140 1 140
Interurban Avenue South to river L.I.D.
Drainage and street improvements
SOUTH 144th STREET I I ABDF 1 00.11 1 19 1 I I 1 100 1 I I I 100 1 100
31 Interurban Avenue South to river L.I.D.
Drainage and street improvements
I TRANSIT CENTER 1 6 1 ABDG I 1 16 1 1 1000 1 1000 1 1 2000 1 METRO 1 I 1 2000
321 Transit Center in CBD METRO Program FHIJ
K
SOUTH 154th STREET 1 2 1 BDFG 1 00.20 1 16 1 I 1 388 1 1 1 349 1 39 1 388
331 from 53rd to City Limits; street AHJK U.A.B.
improvements City /County coordinated
project beyond City Limits
11 2 1 3 1 4 1 5 1 678 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17
STRANDER BOULEVARD 1 2 1 DFGI 1 00.38 1 17 1 1 1 1 314 1 1 1 1 314 1 314
34 Andover Pk. W. to the bridge; widen fro ABHJ L.I.D.
4 to 5 lanes, signal revision coordin K
ated with Renton's SW 27th st. imps.
SOUTHCENTER PARKWAY 1 2 1 DFGJ 1 00.28 1 16 1 1 1 218 1140a I I I 1618 1 1618
3 I I -5 southbound off -ramp to Minkler Blvd. ABHK L.I.D.
widen from 5 to 6 7 lanes
45th AVENUE SOUTH 1 11 ABDF 1 00.40 1 19 1 I I 1 22161 1 I I 2216 1 2216
3 from Interurban Avenue to 50th Place So. GJKL
58th AVENUE SOUTH 1 2 1 ABDG 1 00.26 1 19 1 1 1 9591 I I I 959 1 959
3? Strander Blvd. to 168th Street; new 3- L.I.D.
lane street, 1 new signal at Strander
Boulevard
SOUTH 168th STREET I 11 BDFGI 00.85 1 19 1 1 1 1 1 I I I 257 1 257 1
36 Andover Park West to Andover Park East L.I.D.
new 3 -lane street
57th AVENUE SOUTH 1 2 1 BDFG 1 00.50 1 16 1 1 1 1 13841 I 1 1 1384 1 1384 1
3 188th Connector to City Limits; widen AHJK L.I.D.
from 2 to 5 lanes
BAKER BOULEVARD 1 4 1 CFG 1 00.30 1 19 1 1 1 1 581 1 1 1 58 1 58 1
4 Andover Park West to Christensen Road L.I.D
i
NEW ACCESS 1 6 1 HI 1 1 19 1 1 1 1 1491 1 1 1 149 1 149
41 at S -Line Bridge to S/C Shopping Mall L.I.D.
New access signal modification /walkways
11 2 31 4 1 5 1 678 I 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1
1 MINKLER BOULEVARD 1 1 1 DIJL 1 00.12 1 191 1 1 299 1 17541 1704 1 FAUS 1 1 349 1 2053 1
421 Andover Pk. E. to SR -181, 5 lane bridge ABFG PS &E 349 2053
crossing Green River, 1 new signal SR H
181 ROW
I I I I I I I i I I I I
RESIDENTIAL
SOUTH 140th STREET 1 4 1 ABCD 1 0.20 1 19X 1 131 1 I I I I i I 131 1 131
R1 55th to 53rd Street; street improve- EFGJ
ments with sidewalk K
55th AVENUE SOUTH 1 4 1 ABCD 1 0.20 1 19X 311 1 I I I I I I 311 1 311
R South 140th to South 144th, street EFGJ
improvements with sidewalk K
57th AVENUE SOUTH 14 I ABCD 1 00.38 119X 1 436 I I 1 I I 436 1 436
R South 141st to South 147th Streets EFGJ
Street improvements with sidewalk K
158th STREET 1 4 1 GJ 1 00.10 1 19X 1 I I I I I I I 38 1 38
R Lights and sidewalk
SOUTH 141st STREET 1 4 1 ABCD 1 00.07 1 19 1 1 105 1 I I I I I 105 1 105
RE 56th to 57th; street improvements with EFGJ
sidewalks K
11 2 1 31 4 1 5 1 678 1 9 1 10 11 112 1 13 14 I 15 I 16 I 17
56th AVENUE SOUTH 1 4 1 ABCD 1 00.20 1 1 I I 191 1 1 I I 191 I 191
R 139th to 141st Street, street improve- EFGJ
ments with sidewalk K
SOUTH 139th STREET 1 4 1 ABCD 1 00.05 119 1 I I 1 821 1 I I 82 1 82
R7 56th Avenue South to 56th Place South EFGJ
K
RJ SOUTH 160th STREET 1 4 1 ABCDI 00.15 19 1 I 1961 I I 196 I 196
51st to 53rd Avenue South street improve EFGJ
ments with sidewalk K
53rd AVENUE SOUTH 1 1 1 ABCD 1 00.18 1 19 1 I I I 2271 I I I 227 1 227
R South 160th to Klickitat Drive EFGJ L.I.D.
9� (By developer extension or L.I.D.) K
I SOUTH 158th STREET 1 11 ADFG 1 00.15 1 19 1 55 1 100 1 550 1 1 I I 1 705 I 705
R 46th Avenue So. to 51st Avenue South J
iC
57th AVENUE SOUTH 1 21 ABDF 1 00.10 1 19 1 7 1 70 I I I I I 77 I 77
R to Reservoir site GJ
11 1
56th PLACE 1 41 ABCD 1 00.13 1 19 1 1 1 191 1 1 1 I I 191 1 191
R 139th to 141st Street, street improve- EFGJ
12 ment with sidewalk K
56th AVENUE 1 4 1 ABCD 1 00.15 1 19 1 I 1 1 19Q I I 1 196 1 196
R South 137th to South 139th, street EFGJ
11 improvements with sidewalk K
1 1 2 1 31 4 j 5 j 678 1 9 1 10 1 11 1 12 1 13 j 14 1 15 1 16 1 17
SOUTH 144th 1 4 1 ABCD 1 00.07 1 191 I I I 871 I 87 1 87 1
R 59th Avenue South to East Terminus EFGJ
14 street improvement with sidewalk K
58th AVENUE SOUTH 1 1 1 ABCD 1 00.24 1 191 1 1 1 3271 1 I 1 327 1 327
R 59th Avenue South to E. Terminus to EFGJ L.I.D.
1E 500 South, new street construction K
54th AVENUE SOUTH 1 4 1 ABCD 1 00.19 1 19I I I I 2451 I I i 245 1 245
R Slade Way to South 166th DFGJ
11 LID /street improvement K
SLADE WAY 14 I ABCD 1 00.19 1 191 I I 1 2451 1 j 1 245 1 245 I
R (By L.I.D.) EFGJ
17 (By developer extension or L.I.D.) K
I I I I I I I I f I I 1
I I I I I I I I I I i