HomeMy WebLinkAboutRes 1010 - 1987-1992 Transportation Improvement Program
RESOLUTION NO. 1010
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECT-
ING THE SAME TO BE FILED WITH THE STATE SECRE-
TARY OF TRANSPORTATION AND THE URBAN ARTERIAL
BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters
35.77 and 47.26, as amended, the City Council of the City of
Tukwila has previously adopted a Comprehensive Street Program and
thereafter periodically modified said Comprehensive Street
Program by resolution, and
WHEREAS, the City Council has reviewed the work accom-
plished under the said program, determined current and future
City street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the
next ensuing six (6) calendar years, and
WHEREAS, a public hearing has been held on the said
Six -Year Transportation Improvement Program, and
WHEREAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
or implementation of the Six -Year Transportation Improvement
Program, now, therefore,
THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
HEREBY RESOLVE AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transporta-
tion Improvement Program for the City of Tukwila, as revised and
extended for the ensuing six (6) calendar years (1987 -1992,
inclusive) a copy of which is attached hereto as Exhibit A and
incorporated herein by this reference as if fully set forth,
which program sets forth the project location, type of improve-
1
ment and the estimated cost thereof, is hereby adopted and
approved.
Section 2. Filing of Program. The City Clerk is
hereby authorized and directed to file a copy of this resolution,
together with the exhibit attached hereto, with the Secretary of
Transportation and the Urban Arterial Board for the State of
Washington.
RESOLVED BY THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, at their regular meeting this day of
1986.
APPROVED:
A P
q 1-I? 1RE i SI DF j� tr 1 L J JOE H. DUFFIE
ATTEST /AUTHENTICATED:
CITY CLERK, AAXINE ANDERSON
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
BI
FILED WITH THE CI Y CLERK:
PASSED BY THE CITY COUNCI.
RESOLUTION NO. ,P�j U If DATE MAILED 0 /1
3 �'�f�
MAILED COPIES TO:
1. Pu et Sound Council of Government
?PSCOG)
216 1st Avenue South
Seattle, WA 98104
2. Urban Arterial Board (UAB)
Highway Aaministration Blag.
Olympia, WA 98504
3. Washington Department of Trans.
Highway Administration Bldg.
Olympia, WA 98504
1
2
City/County Tukw ]a/Kiog_____ Hearing Date jme lb, 1986
City No. 1320 Adoption Date (b
County No. D Resolution 0.00
P PROJECT IDENTIFICATION m T F C| PROJECT COSTS IN THOUSANDS OF DOLLARS
r a 0 U A|
i DESCRIPTION OF WORK jo work T L N k| 08L[8ATl0N FUNDING SOURCE !TOTAL
o f code A C K| SCHEDULE
r (Street name or number, c (s) L N TC Y| Y A K :FEDERAL HAP :FUNDS
i Co. road name or number, IN G NL 0| or !Local!
t termini beginning end. au T LA V11st 2nd 3rd 4 Pro-!ANT UAB
y Describe work to he done.) sr H S [|Aool 6th MT gram!
No sk S K|Elmt
1 2 J 4 5 6 1 8 9 0 11 O 13 14 15 16 17
I MlNKL[R BOULEVARD 1 1A8UG 0.38 19 |X12618 1564 14349 4349
Andover Park West to Southceoter Pkwy, New Street, O
4-lane, 2-signals. A.P.W. and S.C. Pkwy O
O|
2 F1]N[ BRIDGE 1 |806L 0.10 16 |X|1430 1430 4-8| 05 1515
S.C.0vd. to Tukwila Pkwy, widening Phase l, |AFHJ O
Bridge Replacement by WSDUT |KM O
O|
3 S0UTHC[NTER BOULEVARD 2 :0D[L 0,35 16 |X| B44 701 FAUS| 143 844
62nd to T-L me Bridge |AFHH O
Widen to 5 lanes |JKM O
O|
4 G0UTHC[NT[K BOULEVARD |88lL 0,25 16 |X| I391 3554 5958 FAUS| 11205 7163
T-Line Bridge to Grady Way Bridge |AFGH 441 O
Widen to 5 lanes |JKM O
O|
i O>
5 INTERURBAN AVENUE SOUTH 2 |U8HM 1.70 14 |X|4045 3892 FAUS| 788 4680
From S.C. Blvd. to 1-5; new design with sidewalks; |A8F] O
Right-of-Way acquisition; aid basin drainage study. |KMNO O
iP O
O|
6 INTERURBAN AVENUE SOUTH 2 1A88F 0.60 14 |X| 262 1650 |1720 UA@ 350 2070
1-5 to the north City limits. |GJKL O
|MN O
O|
7 INTERURBAN AVENUE SOUTH 6 |0 14 |X| 134 299 431 431
S,8.599 0{{-ramp, install J new signals and 0
interconnect. O
O|
O|
8 57TH AVENUE SOUTH 2 |80F6 0.50 16 |X| 98 170 11871 071
S. 180t St. to South City Limits; |AHQX O
video from 2 to 5 lanes. O
0|
O|
9 SOUTH 168 STREET 1 |A8D6 0.38 19 |X|1101 338 1184 |2748 2748
S.C.Pkwy to Andover Park West; new 3-lane street, 1FHQ O
2 new signals Andover Park West S.C. Pkwy. |K O
0
1 1 0 1
10 S.R. 1131 SOUTH 180TH STREET 6 :HIK 0.10 14 1X1 215 667 700 1 14$7 FADS: 1 301 1 1788 1
Signal modification and rechannelization. 11. 1 1 1 1 1 0 1
t t O k
11 SOUTH IBBTH CONNECTOR 1 1ABD6 0.90 16 1X1 725 2411 2532 1 5105 FAUS1 11034 1 6139 1
4 -lane connected to 57th Avenue South; 57th Avenue 1FHJK 1 1 1 1 1 1 1
widened to 5 lanes; install new signal at 57th incl. :I 1 1 1 1 1 1 1
signal modifications and channelization. 1 1 1 1 1 1 1 1
1 1 1 I 1 1 t
12 CHRISTENSEN ROAD IMPROVEMENTS 3 ;ABDF 0.10 19 1X1 255 1 1 1 279 1 279 1
Road improvements T -Line Bridge. 16N 1 1 1 1 1 0:
i t 0 l
13 S.R. 181 2 :DF6I 0.42 14 1X1 1014 1 1 11234 1 1234
I -405 to Strander Boulevard: widen from 5 to 7 1ABHJ 1 1 1 0 1
lanes with signal modifications 2 intersections. 1K 1 1 1 0 1
14 MINKLER BOULEVARD 2 :DF61 0.3B 19 1 651 1 1 1 651 1 651 1
From Andover Park Nest to Andover Park East, Widen :ABHK 1 1 1 1 1 0 1
from 4 to 5 lanes; one new signal at A.P.E. 1 1 1 0 1
0
15 TUKWILA PARKWAY 6 1HI 0.10 16 1 1 149 1 1 149 1 149 1
At Andover Park East, new signal and channelization. 1 1 1 1 1 0 1
0 t
0,
1 f k 1 1 1 1 1
16 SOUTH IBBTH STREET 6 :HI 0.30 16 1 1 115 1 1 115 1 115 1
Southcenter Parkway to Andover Park West; 1 1 1 1 0 1
left and right turn modifications. 1 1 1 It 0 1
I l t 1 1 1 f 0 l
1 1! t 1 1
17 STRANDER BOULEVARD 6 1HI 0.10 17 1 90 1 1 1 90 1 90 1
At Andover Park West: left turn channelization 1 1 1 1 1 1 0
and signal modifications. 1 1 1 1 1 0:
0 1
1 t
18 SOUTH :BOTH STREET 6 1HI 0.10 16 1 1 80 1 1 1 80 1 80 1
At Andover Park West: widen at intersection only; 1 1 1 1 0 1
signal modifications. 1: 1 1 1 1 0 1
0:
19 SOUTH 143RD STREET 4 1ABDF 0.20 19 1 1 346 1 1 1 346: 346 1
Interurban Avenue South to the Breen River; 1 1 1 1 1 1 0 1
drainage and street improvements. 1 1: 1 1 1 0 1
0 1
20 SOUTH 140TH STREET 4 :ABDF 0.11 19 1 151 1 151 1 151 1
Interurban Avenue South to the 6reen River; 1 1: 1 1 1 1 0 1
drainage and street improvements. 1 1 1 1 0
O t
21 SOUTH 134TH STREET 4 :ABDF 0.22 19 1 1 211 1 1 211 1 211 1
South 133rd St. to 4Bth Ave. S.; drainage and 1 1 1 1 1 1 0 1
street improvements. 1 1 1 1 1 0 1
22 SOUTH 143RD PLACE 4 1ABDF 0.19 19 1 1 211 1 211: 211 1
Interurban Avenue South to the 6reen River; 1 1 1 1 1 1 1 0 1
drainage and street improvements. 1 1 1 1 1 0 1
0:
23 SOUTH 144TH STREET 4 1ABDF 0.11 19 1 151 1 1 1 151 1 151 1
Interurban Avenue South to the 6reen River; 1 1 1 1 1 0
drainage and street improvements. 1 1 1 0
1 1 0 t
24 METRO TRANSIT CENTER 6 !ABDO 16 177 2132 2349 METR; 2349
Transit Center in CBD Metro Program. ;FHIJ 4
;K
It 0
i 0 1
25 SOUTH 154TH STREET 2 ;BDFG 4.24 16 31B 286 UAB 32 318
From 53rd Ave. S. to the City Limits; street ;AHJK 0
improvements City /County coordinated project. 0
0
26 STRANDER BOULEVARD 2 ;DFGI 4.38 17 493 493 493
Andover Park Nest to the bridge; widen from 4 to 5 ;ABHJ 0
lanes; signal revision coordinated with Renton's ;K 0
SW 27th Street improvements. 0
27 SOUTHCENTER PARKWAY 2 ;DFGJ 0.28 16 2540 12540 2544
I -5 southbound off -ramp to Minkler Boulevard; ;ABHK 0
widen from 5 to 6 7 lanes. 0
0
28 GATEWAY DRIVE 1 ;ABDF 0.40 19 ;X; 2B31 12831 2831
From Interurban to 50th Place South. 'GJKL 4
0;
29 58TH AVENUE SOUTH 2 ;ABDG 4.26 19 1582 ;1582 1582
Strander Boulevard to South 168th St.; new 3 -lane 4
street and one new signal at Strander Boulevard. 0
1 1
1 of
30 SOUTH 16BTH STREET 1 ;BDFG 0.85 19 32B 328 328
Andover Park West to Andover Park East= new 3 -lane
1 t
1 f 1 f 1 1 4!
31 BAKER BOULEVARD 4 1CF6 4.30 19 98 98 9B
Andover Park Nest to Christensen Road. 0
32 NEW ACCESS TO SOUTHCENTER 6 ;HI 19 247 247 247
At S -Line Bridge to Southcenter Shopping Mall; 0
new access, signal modifications /walkways. 0
t i t I 1 1 t 4 t
33 TUKWILA PARKWAY EXTENSION 6 ;IBDL 0.25 16 9194 7747 FAUS; 11447 9194
From Andover Park East across Green River to S.158th ;AFGH 0
0
4 1
*RESIDENTIAL 0
RI 56TH PLACE SOUTH 4 ;ABCD 0.13 19 ;X; 232 254 254
139th to 141st Street; ;EFGJ 0
street improvements with sidewalks. ;K 0
1 1 E
R2 56TH AVENUE SOUTH 4 ;ABCD 4.15 19 ;X; 238 25B 258
South 137th Street to South 139th Street; ;EF6J 1 0 1
street improvements with sidewalks. ;K 0
1 1 1 1
4 1 E
i
R3 SOUTH 141ST STREET 4 ;ABCD 4.44 19 ;X; 74 80 8o
From 56th Pl. to 57th Ave., street Improvements ;EF6J
with sidewalks. 1 1 K It
R4 SOUTH 158TH STREET 1 :ADF6 0.15 19 :XI 711 i 766 766
46th Avenue South to 51st Avenue South :J 1 1 I I 0 i
R5 56TH AVENUE SOUTH, S. 141ST ST., S. 139TH ST. 4 :ABCD 0.21 19 I 66 366 I i 432 I 432
139th to 141st Street; 56th Ave. to 56th P1.; :EFGJ I I I
street improvements with sidewalks. :K
R6 SOUTH 160TH STREET 4 :ABCD 0.65 19 194 1032 i :1226 1226
From 42nd to 53rd Avenue South; street :EFGJ i
improvements with sidewalks. :K i
R7 53RD AVENUE SOUTH 1 :ABCD 0.18 19 1 56 290 1 346 I 346
South 160th Street to Klickitat Drive. :EFGJ i i
(By developer extension or L.F.D.) :K i i
R8 SOUTH 144TH STREET 4 :ABCD 0.07 19 I 138 I 138 I 138 i
59th Avenue South to easterly terminus; IEF6J I i 0 i
street improvements with sidewalks. IK i 0
i i i 0i
R9 58TH AVENUE SOUTH 1 :ABCD 0.24 19 523 I I 1 523 523
59th Avenue South to easterly terminus to IEF6J I I
500 ft. south; new street construction. :K i i
RID 54TH AVENUE SOUTH 4 :ABCD 0.19 19 391 i 391: 391
Slade Nay to South 166th Street; :EF6J
L.I.D. /street improvement. :K i i
R11 SLADE WAY 4 IABCD 0.19 19 411 1 411 411 I
(By developer extension or L.I.D.) IEF6J i I I I
R12 51ST AVENUE SOUTH 4 :ABED 0.35 19 570 1 570 I 570
S. 160th to S. 166th :EFGJ i
R13 MACADAM ROAD 2 IDFGJ 0.30 17 IXI 787 i 787: 787
150th to 144th IABHK i
Joint with County