HomeMy WebLinkAboutRes 1068 - Unclassified Use Permit for Incinerator and Waste Heat Boiler InstallationCITY OF TUKWILA WASHINGTON RESOLUTION NO. 1068 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, APPROVING AN UNCLASSIFIED USE PERMIT FOR SEATTLE RENDERING WORKS, INC., TO INSTALL AN INCINERATOR AND WASTE -HEAT BOILER. WHEREAS, Seattle Rendering Works, Inc., has filed an application with the City Planning Department for an Unclassified Use Permit to install an incinerator and waste -heat boiler to the existing processing plant on the Applicant's property located at 5795 South 130th Place, Tukwila, and WHEREAS, pursuant to the provisions of Section 18.66.050 of the Tukwila Municipal Code, the City Planning Commission held a public hearing to consider the permit application, and at the conclusion of said hearing adopted findings, conclusions, and a recommendation to the City Council to approve the permit, and WHEREAS, the City's SEPA Responsible Official has issued a Determina- tion of Nonsignificance (DNS) for the project, and WHEREAS, the City Council considered the permit application at a regular City Council meeting on March 7, 1988, and determined to defer the matter until the application could supply additional information, and WHEREAS, on March 14, 1988, at a Special Meeting of the City Council, additional information supplied by the applicant was considered, and lem, and WHEREAS, air pollution from the Applicant's premises has been a prob- WHEREAS, previous owners have been granted unclassified use permits for the specific purpose of remedying the pollution problem, without solving the problem, and WHEREAS, the City Council advised the applicant that the applicant would assume all risk that the proposed equipment might not solve the pollu- tion problem, and WHEREAS, the City determined to adopt the findings, conclusions and recommendations of the Planning Commission with certain conditions and pro- cedures. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS: Section 1. Unclassified Use Permit Approved. Pursuant to Section 18.66.050 of the Tukwila Municipal Code, the City Council hereby approves the issuance of an unclassified use permit for Seattle Rendering Works, Inc., to install an incinerator and waste -heat boiler at the existing processing plant located at 5795 So. 130th Place, Tukwila, Washington, as shown on drawings submitted with the application. Section 2. Installation and Testing. The system that is the subject matter of this application will be fully installed and operational no later than June 1, 1988. Within sixty (60) days of installation of the system sub- ject to this permit, applicant shall provide the City with written certifi- cation from an independent testing agency approved by the City that the operation of the system meets or exceeds standards as promulgated by the Puget Sound Air Pollution Control Agency for odor units; provided, that if there are no such local standards for odor units, the system meets or exceeds standards for odor units as promulgated by the United States Environmental Protection Agency or the standards for odor units of the California South Coast Air Management District as attached to this resolution. Section 3. Verified Maintenance. Applicant shall supply the City with a copy of any maintenance manual or maintenance instruction provided by the manufacturer of the incinerator and waste -heat boiler and shall, at the City's request from time to time, provide verification that all recommended maintenance procedures are complied with. Section 4. Record Keeping. Applicant shall keep a record of all events that cause the system to shut down and the length of time of the shut down. All shut downs shall be immediately reported to the Puget Sound Air Pollution Control Agency and to the City. Section 5. Complaints. If a verified complaint leads to a citation from the Puget Sound Air Pollution Control Agency, applicant will supply the City with a detailed explanation of the cause of the odor and the action taken to correct a problem. Section 6. Investigation of Odor Sources. If there is one citation for which there is no explainable cause or three citations regardless of explanation in any ninety (90) day period, applicant will have thirty days to conduct an in -house investigation of the problem and arrive at a corrective procedure which shall be immediately implemented. If at the end of thirty days, applicant has not determined the source of the problem and determined an effective remedy, applicant will have an additional ninety days to determine, at its cost, the source of the problem and the remedy therefore through the services of an independent engineering company. Failure to promptly employ such an independent engineering company or failure to implement the remedy within sixty (60) days shall be a violation of this condition. The results of all in -house or independent investigations shall be immediately provided to the City. Section 7. Future Council Review. The City Council shall hold a public hearing six months from the date of this resolution, or on such earlier date as shall be determined by the City Council if air pollution complaints shall be received from residents of the City, to consider the effectiveness of the equipment which is the subject of this permit. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this 14th day of March 1988. Off c: of the C ,ty At of ney Filed with the City Clerk: .3 7 -P8 Passed by the City Council: 3 Mabel J. Harris, Council President Attest /Authenticated Maxine Anderson, City Clerk