Loading...
HomeMy WebLinkAboutRes 1147 - 1991-1996 Transportation Improvement Program ILA 1908 CITY OF TUKWILA WASHING T ON RESOLUTION NO. 1147 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWIL A, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM, AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE URBAN ARTERIAL BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWH A, WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Tukwila, as revised and extended for the ensuing six (6) calendar years (1991- 1996), inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filine of Proa am. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Urban Arterial Board of the State of Washington. PASSED BY THE CITY COUNCIL OF THE OF TUKWILA, WASHINGTON, at a regular meeting thereof this o day of 1990. oan Hernandez, Council President ATTEST /AUTHENTICATED: Ja antu, City Clerk APPROVED AS TO FORM: OFFICE Off' THE CITY ATTbRNEY: Filed with the City Clerk: ;?.5 a Passed by the City Council: 4 _,,'75 70 Resolution Number 114#7 June 20, 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PR06RAN 1991 TO 1996 Page 1 CITY /COUNTY CITY OF TUKWILA HEARING DATE i CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F; U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C N; R F A A D; OBLIGATION PLAN 1 U JO R i; 0 NC OF R N; EXPENDITURE PLAN R CL R Y 6; SOURCE OF FUNDS I TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND T IS CO WORK V S; TOTAL 1ST YR; Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;----------------------- THRU N AK CODE R A; 3RD 5TH ANNUAL; N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH 0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.; S; 1991 1992 93 -94 95 -96 YEARS 01 SOUTHCENTER BOULEVARD 85-RNO2 16 1 ABDF 0.28 X P $2,350 $3,775 $2,051 $8,176 $1,312 $3,029 $3,835 P.E. $18 $250 1 68th Ave. S. Grady Nay Bridge R/W $520 Widen to 5 lanes on new alignment with new bridge over GreenRiver, structure COSST. $100 $3,065 undercrossing 1 -405 rasps, new signal and channelization at Interurban Ave. 02 WEST VALLEY HWY !SR 1811 8 S. 180TH STREET 84 -RW40 16 2 ABDF 0.42 X P 400 $8000 (9400 $1916 $7 i TOTAL $118 $3,835 $1,,,,,150 $334 P.E. W. Valley Hwy E S. 180th R/W Short -ten signal modification, channelization, bridge widening. Long -ten CONST. $334 urban interchange with W. Valley overpass over S. 180th. TOTAL $334 $0 03 INTERURBAN AVENUE SOUTH 84 -RN41 14 2 ABDF 0.91 X P 12,956 62,956 $916 $2,040 P.E. 52nd Ave. S. 42nd Ave. S. R/W Reconstruct to 5 lanes including curb and gutter, sidewalk, drainage, CONTT. channelization, traffic signals, lighting, signs, landscaping. TOTAL $0 $0 04 EAST MARGINAL NAY SOUTH 90 -RWO2 14 2 ABDF 1.93 X P $1,000 $3,500 $2,500 $7,000 $1,400 $5,600 P.E. $0 Boeing Access Rd North City Limit R/W $0 Design and construct widening, drainage, traffic signals, utility CDNST. $0 undergrounding, lighting, sidewalks, including Boeing Access Rd. intersection. OS KIICKITAT DRIVE 86 -RNO2 19 3 ABDF 0.30 X P 6185 TOTAL $0 $0 $185 $185 P.E. 53rd Ave. 1-5 Overpass R/W Design and construct southbound left turn lane,new sidewalk,drainage, and CONTT. lighting. TOTAL $0 $0 06 42ND AVENUE S. AND 40TH AVENUE S. 90- 17 3 ABDF 1.93 P $255 02,950 $3,205 $641 12,564 P.E. S. 164th St. S. 131st Nay R/W Design and construct paving, drainage, curb and gutter, sidewalks, lighting, CONTT. utility undergrounding. Coordinate City of SeaTac. TOTAL f0 $0 07 SOUTHCENTER BLVD AT 1 -5/1 -405 RAMPS 88-RWOO 16 6 HIK 0.50 P 135 $300 $335 $95 $240 P.E. 61st Ave. 1 -5 R/W Design and construct channelization, intersection, and free -way ramp CONTT. improvements. Coordinate with WSOOT HOV project. TOTAL $0 $0 June 20, 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 2 CITY /COUNTY CITY OF TUKWILA HEARING DATE CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F; U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C N; R F A A D;--------------------------------- OBLIGATION PLAN I U JO R I; O NC OF R N; EXPENDITURE PLAN R CL R Y 6; SOURCE OF FUNDS I TA W TOTAL 0 FOR ALL FUNDING TYPES 2ND T IS CO WORK V S; TOTAL 1ST YR; Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;--------- THRU N AK CODE R A; 3RD k 5TH ANNUAL; N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH 0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.; S; 1991 1992 93 -94 95 -96 YEARS 08 BRIDGE REPAIR /REPLACEMENT 89-RW16 4 L X P $100 $400 $1,180 $1,200 $2,880 $2,880 P.E. 2 Existing bridges in City. R/W Evaluate, design, and contruct repairs and replacements. 42nd Ave.(S 133rd), CONST. 42nd Ave.(Duwamish River), 51st Ave (S. 154th), etc. 1 TOTAL $0 $0 09 INTERSECTION IMPROVEMENTS 6 HIJK X P $120 $480 $960 $960 $2,520 $1,920 $600 P.E. $18 $90 Various City locations. R/W Design and construct improvements and new signals. Andover Park E Minkler, CONST, $82 $410 Andover Park East Baker, S. 130th SR 99, etc. 1 TOTAL $100 $500 10 STREET OVERLAY AND REPAIR PROGRAM 5 BDE P $750 $750 $1,500 11,500 $4,500 $4,500 P.E. Various city streets. R/W CONST. 1 TOTAL $0 $0 11 TRAFFIC SIGNAL CONTROLLER REPLACEMENT 89 -RW09 6 1 P $115 $115 $230 $230 $690 $690 P.E. Various existing signal controller locations R/W CONST. 1 TOTAL $0 $0 12 SIDEWALK PROGRAM 85 -RW05 9 AGN X P $375 $375 $375 $1,125 $1,125 P.E. Various city streets. R/W Design and construct sidewalk and pedestrian walkway improvements throughout CONST. city. 1 TOTAL $0 $0 13 TRAFFIC SIGNAL INTERCONNECT SYSTEM 88 -RW02 6 I 10.00 X P $50 $380 $740 $1,170 $1,170 P.E. All traffic signals R/W Install signal interconnect system w /master controller. CONST. 1 TOTAL $0 $0 14 TRAFFIC SAFETY IMPROVEMENTS 6 HJKN X P $150 $150 $300 $300 $900 $900 P.E. Various city streets. R/W Barrier, channelization, signing, minor widening, lighting S. 135th Place, 50th CONST. Place S. 124th, S. 178th, etc. 1 TOTAL $0 $0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1941 TO 1996 dune 20, 1990 Paqe 3 CITY /COUNTY CITY OF TUKWILA HEARING DATE CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F; U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C N; R F A A D: OBLISATION PLAN I U JO R I; 0 NC OF R N; EXPENDITURE PLAN R CL R Y 6; SOURCE OF FUNDS I TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND T IS CO WORK V S; TOTAL IST YR; Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;----------------------- THRU N AK CODE R A; 3RD 5TH k ANNUAL; N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH 0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.; S; 1991 1992 93 -94 95 -96 YEARS 15 INTERURBAN AVENUE SOUTH 84 -RWO6 14 4 ABDF 1.36 X U $2,430 $2,174 $4,604 $921 $3,683 P.E. 3 S. 139th St. Southcenter Blvd. R/W Design and reconstruct 5 -lane improvements including paving,curb and gutter, COSTT. sidewalks, utility undergrounding, lightinglandscaping, bikepath. I TOTAL $0 $0 16 EAST MARGINAL NAY SOUTH 84 -RWO5 14 2 ABDF 0.40 X P $20 $25 $800 $845 $169 $676 P.E. Boeing Access Rd. S. 112th Street R/W Reconstruct to 5 -lanes with curb, gutter, sidewalk, drainage,landscape, and CONTT. illumination. f TOTAL $0 $0 17 INTERURBAN AVENUE SOUTH 87 -RW18 14 2 ABDF 0.30 P $20 $345 $365 $89 $276 P.E. Southcenter Blvd. Brady Way R/W Design and construct safety and capacity improvements. CONST. TOTAL $0 $0 18 RAILROAD XING RESURFACING PROGRAM 87 -RW14 5 AGO 0.04 X P $94 $30 $65 $189 $189 P.E. All RR xings in COD. R/W Design and construct at -grade surface improvements of exist -ing RR zings. COSTT. t TOTAL $0 $0 19 SOUTHCENTER PARKWAY 84 -RW19 16 2 ABD6 0.20 X P $60 $345 $405 $81 $324 P.E. West Mall Access S. 168th R/W Design and construct safety and capacity improvements. CONTT. I TOTAL $0 $0 20 CHRISTENSEN ROAD 84 -RW44 19 3 ABDF 0.17 X P $265 $265 $265 P.E. Andover Park East 900 feet south. R/W Design and construct street and trail improvements including cul -de -sac in CONTT. conjunction with T-Line bridge replacement and Green River dike improvements. 1 TOTAL $0 $0 21 NEST VALLEY HIGHWAY (SR 181) 84 -RW31 14 2 ABDF 0.42 X P $47 $230 $300 $577 $577 P.E. 1 -405 Strander Blvd. R/W Widen from 6 to 7 lanes with signal modifications 2 inter sections. CONTT. I TOTAL $0 $0 June 20, 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 4 CITY /COUNTY CITY OF TUKWILA HEARING DATE CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F; U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C N; R F A A D;---------------------------- OBL16ATION PLAN 1 U JO R 1; 0 NC OF R N; EXPENDITURE PLAN R CL R Y 6; SOURCE OF FUNDS I TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND T IS CO WORK V S; TOTAL 1ST YR; Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LN6TH E T;--------- THRU N AK CODE R A; 3RD k 5TH ANNUAL; N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAI;; 6TH 0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT,; S; 1991 1992 93 -94 95 -96 YEARS 22 ANDOVER PARK EAST 90 -RW 16 2 ABDF 1.39 U $150 11,900 $2,050 $410 $1,640 P.E. 4 Tukwila Parkway S. 180th St. R/W Design and construct widening to 5 -lanes including paving, drainage, curb and COSTT. gutter, sidewalks, channelization, sig- nals, lighting, signing. I TOTAL $0 $0 23 STRANDER BLVD. EXTENSION 86 -RNO3 1 ABDF 0.2B X P $5 $561 $8,039 $8,605 $1,725 $6,880 P.E. W. Valley Hwy (S.R. 181) Oakesdale (Renton) R/W New 5 -lane arterial with separated grade crossing railroad tracks. (joint COSTT. project w /Renton) TOTAL $0 $0 24 58TH AVENUE SOUTH 84 -RW34 1 ABDF 0.26 X U $25 $1,800 $1,825 $1,025 P.E. Strander Blvd S. 168th Street R/W New 4 -lane street with new signal 2 Strander Blvd. CONTT, TOTAL $0 $0 25 57th AVENUE SOUTH (SOUTHCENTER PARKWAY) 84 -RW37 16 2 ABDF 0.50 X U $79 $1,890 $1,969 $394 $1,575 P.E. S. 180th St. South City Limits R/W Design and construct widening to 4 or 5 lanes including paving, drainage, curb CONTT. and gutter, sidewalks, channeiization, lighting, utility undergrounding. TOTAL $0 $0 26 SOUTHCENTER PARKWAY 87 -RW03 16 6 HIK 1.00 X P $150 $243 $150 $543 $543 P.E. S. 168th S. 180th St. R/W Design and construct traffic signals, pedestrian crossings, and combine CONTT. driveways. TOTAL $0 $0 27 ANDOVER PARK WEST 88 -RW04 17 2 ABDF 1.39 X P $150 $900 $1,000 $2,050 $410 $1,640 P.E. Tukwila Parkway S. 180th st. R/W Design and construct widening to 5 lanes including paving, drainage, curb and CONTT. gutter, sidewalks, channelization,signals, lighting, signing. TOTAL $0 $0 28 SOUTH 168TH STREET 84 -RWOO 1 ABDF 0.38 X U $25 $1,488 $1,987 $3,500 $3,500 P.E. Southcenter Parkway Andover Park West R/W New 4 -lane street including r -o -w acquisition and new signalat Andover Park CONTT. West. TOTAL $0 $0 June 20, 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PR06RAM 1991 TO 1996 Page 5 CITY /COUNTY CITY OF TUKNILA HEARING DATE CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F; U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C Ni R F A A D;--------------------------- OBLIGATION PLAN I U JO R I; O NC OF R N; EXPENDITURE PLAN R CL R Y 6; SOURCE OF FUNDS 1 TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND T 15 CO WORK V S; TOTAL 1ST YR; Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;----- THRU N AK CODE R A; 3RD 5TH 6 ANNUAL; N A S T; 1ST 2ND 1 4TH 67H LOCAL ;RAP /UAB;FEDERAL;; 6TH O L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.; S; 1991 1992 93 -94 95 -96 YEARS 29 SOUTH 133RD STREET 8b -RW01 17 2 ABDF 0.13 X P $338 $338 $338 P.E. 5 S. 134th Street Interurban Ave. R/W Design and construct widening to 4 lanes including paving, drainage, curb and COSTT. gutter, sidewalk, channelization, signal, lighting, signing. I TOTAL SO $0 30 16TH AYE. S. BRI06E 89 -RWOB 14 8 L 0.01 X 0 $208 $208 $208 P.E. 16th Ave. S. bridge north pier R/W Exasine foundation sails CONST. I TOTAL $0 f0 31 MINKLER BLVD 84 -RN07 1 ABDF 0.38 X U $2,919 $2,919 $2,919 P.E. Southcenter Parkway Andaver'Park West R/W New 4-lane street w /traffic signals at SC Parkway and Andover Park West. COSTT. t TOTAL f0 $0 32 PACIFIC HIGHWAY SOUTH (HNY 99) 14 2 ABDF 3.51 U $560 $6,440 $7,000 $1,400 $5,600 P.E. Boeing Access Road South 152nd Street R/W Design and construct paving, curb and gutter, drainage, sidewalks, lighting, COSTT. utility undergrounding. I TOTAL $0 f0 33 51ST AVENUE MACADAM ROAD 42ND AVENUE 17 2 ABDF 1.80 U $240 $2,760 $3,000 6600 $2,400 P.E. Interurban Avenue SR 518 R/W Design and construct paving, curb and gutter, drainage, sidewalks, lighting, CONTT. utility undergrounding I TOTAL f0 $0 34 SOUTH 184TH STREET 16 4 ADD 0.60 U $50 $575 $625 $125 $500 P.E. Southcenter Parkway Sperry Drive R/W Reconstruct and resurface roadway CONTT. I TOTAL $0 $0 35 LONGACRES DRIVE (S. 158TH ST.) 84 -RW13 19 4 ABDF 0.10 X P $235 $235 $235 P.E. Nest Valley Highway Nelsen Place R/W Install curb and gutter, sidewalk, drainage on existing 4-lane street. COSTT. I TOTAL $0 $0 June 20, 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 6 CITY /COUNTY CITY OF TUKWILA HEARING DATE CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F, U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C N; F A A D; OBLIGATION PLAN I U JO R I; 0 NC OF R N; EXPENDITURE PLAN R CL R Y 6; SOURCE OF FUNDS I TA W TOTAL 0 FOR ALL FUNDING TYPES 2ND T IS CO WORK V S; TOTAL 1ST YR; Y PROJECT IDENTIFICATION /DESCRIPTION'DF WORK AS LR LNGTH E T;----------------------- THRU N AK CODE R A; 3RD k 5TH k ANNUAL; N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH 0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.; S; 1991 1992 93 -94 95-96 YEARS 36 SOUTH 134TH STREET 84 -RW27 19 2 ABDF 0.23 X U $230 $230 $230 P.E. 6 S. 133rd St. 48th Ave. S. R/W Design and construct widening to 4 lanes including paving, drainage, curb and CONST. gutter, sidewalks, channelization, lighting, signing. I TOTAL $0 $0 37 STRANDER BOULEVARD 08-RW03 17 2 ABDF 0.38 X U $2,500 $2,500 $500 $2,000 P.E. Southcenter Parkway Andover Park East R/W Design and construct widening to 7 lanes including paving, drainage, curb and CONST. gutter, sidewalks, channelization, signali_zation, lighting, signing. t TOTAL $0 $0 38 TUKWILA PARKWAY E S -LINE BRI06E 84 -RV39 16 1 ADFG 0.10 X U $231 $231 $231 P.E. Tukwila Parkway (1 S -Line Bridge R/W New access to Mall at existing Intersection. CONST. I TOTAL $0 $0 39 STRANDER BOULEVARD 84 -RW32 17 3 ABDF 0.38 X U $42 $493 $535 $107 $428 P.E. Andover Park West Lois 1. Newton Bridge. R/W Design and construct widening to 5 lanes including paving, drainage, curb and CONST. gutter, sidewalks, lighting M t TOTAL $0 $0 40 SOUTH 178TH STREET 88-RW07 16 1 ABDF 0.46 X U $3,248 $3,248 $649 $2,599 P.E. Southcenter Parkway 1-5 R/W Widen to 5 -lanes on new alignsent with paving, curb and gutter, sidewalks, CONST. drainage, street lights. t TOTAL $0 $0 41 S. 133RD STREET BRID6E"85 -RUOl i ABDF 0.40 X U $2,887 $2,887 $2,887 P.E. Gateway Drive 50th Place S. R/W New 4 -lane arterial */bridge crossing the Duwaaish River. CONST. t TOTAL $0 $0 42 SOUTH 180TH STREET RR XING 87-RWO9 14 1 ADF6 0.20 X U $9,230 $9,230 $1,846 $7,384 P.E. S. 180th (SW 43rd) E UPAR -BNRR ring. R/W New separated grade crossing of existing'RR tracks (joint project w /Renton). CONST. I TOTAL $0 $0 June 20, 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 7 CITY /COUNTY CITY OF TUKWILA HEARING DATE CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F, U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C N; R F A A D; OBLIGATION PLAN I U JO R I; O NC Of R N; EXPENDITURE PLAN R CL R Y 6; SOURCE OF FUNDS I TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND T IS CO WORK V S; TOTAL iST YR; Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS CIO LNGTH E T;----- THRU N AK CODE R A; 3RD b 5TH ANNUAL; N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH 0 L S X U; YEAR. YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.; S; 1991 1992 93 -94 95 -96 YEARS 43 MINKLER BLVD 84 -RW15 19 3 ABDF 0.17 X U $778 $778 $778 P.E. 7 Andover Park W. Andover Park E. R/W Widen from 4 to 5 lanes. CONST. I TOTAL $0 i0 44 TRECK DRIVE EXTENSION 87 -RW06 19 1 ABDF 0.11 X U $429 $429 $429 P.E. Andover Park Nest exist. Treck Drive R/W Design and construct new 3 -lane street on new alignment including paving, CONTT. drainage, curb and gutter, sidewalks, lighting. I TOTAL $0 $0 45 SOUTH 151ST STREET 87-RN0B 19 3 ABDF 0.10 X U $158 $158 $158 P.E. 51st Ave. S. 52nd Ave. S. R/W Design and construct street widening, including,'paving, drainage, curb and COSTT. gutter, sidewalks, lighting. I TOTAL $0 $0 46 NELSEN PLACE 88 -RO05 19 3 ABDF 0 11 1.U. $310 $310 $310 P.E. S. 156th St. S. 158th St. R/W Design and construct widening including paving, drainage, curb and gutter, COSTT. sidewalks, lighting• I TOTAL $0 $0 47 SOUTH 168TH STREET 84 -RW35 1 ABDF 0.17 X U $373 $373 $373 P.E. Andover Park Nest Andover Park East R/W Design and construct new 4 -lane street including right -of- way acquisition, CONTT. paving, drainage, curb and gutter, sidewalk,lighting, I TOTAL $0 $0 48 SOUTH 144TH STREET 84 -RW29 19 2 ABDF 0.11 X U $182 $182 $182 P.E. Interurban Ave. Duwasish River R/W Design and construct widening including paving, curb and gutter, drainage, CONTT. sidewalks, lighting I TOTAL $0 $0 49 SOUTH 143RD STREET 84 -RW25 19 2 ABDF 0.20 X U $418 $418 $418 P.E. Interurban Avenue Duwasish River R/W Design and construct widening including paving, curb and gutter, drainage, COSST. sidewalks, lighting I TOTAL $0 $0 June 20, 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 8 CITY /COUNTY CITY OF TUKWILA HEARING DATE CITY NO. 1320 ADOPTION DATE COUNTY NO. 17 RESOLUTION NO. F; U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL P M C N; R F A A D; OBLIGATION PLAN I U JO R I; O NC OF R N; EXPENDITURE PLAN R CL R Y G; SOURCE Of FUNDS I TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND T IS CO WORK V S; TOTAL 1ST YR; Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LN6TH E T; THRU N AK CODE R A; 3RD ✓4 5TH k ANNUAL; N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB'FEDERAL;; 6TH O L S U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS LEMT.; S; 1991 1992 93 -94 95 -96 YEARS 50 SOUTH 140TH STREET 84 -RW26 19 2 ABDF 0.11 X U $182 $182 $182 P.E. 8 Interurban Avenue Duwaeish River R/W Design and construct widening including paving, curb and gutter, drainage, COSTT. sidewalks, lighting 1 TOTAL $0 f0 51 SOUTH 143RD PLACE 84 -RW28 19 2 ABDF 0.19 X U $253 1253 $253 P.E. Interurban Avenue Duwaeish River R/W Design and construct widening including paving, curb and gutter, sidewalks, tONST. lighting. 1 TOTAL $0 $0 52 MINKLER BLVD 1 ABDF 0.50 X U $7,000 $7,000 $7,000 P.E. Nest Valley Highway Oakesdale R/W Design and construct new 5 -lane arterial with bridge cross- ing UPRR k BNRR COSTT. tracks. 1 TOTAL f0 $0 53 PACIFIC HIGHWAY SOUTH AND SOUTH 130TH INTERSECTION 14 6 ABDH 0.28 U $200 $200 $200 P.E. 500 feet north, south, and east of intersection R/W Design and construct traffic signal, channelization, lighting, and approach CONTT. improvements. t TOTAL $0 $0 54 SOUTH 152ND STREET 19 2 ABDF 0.25 U $40 $460 $500 1500 P.E. 42nd Avenue South Pacific Highway South AIN Design and construct paving, drainage, curb and gutter, sidewalks, lighting, COSTT. utility undergrounding. 1 TOTAL f0 so 55 NORFOLK STREET 1 ABDF 0.61 U $100 $1,150 $1,250 $1,250 P.E. East Marginal Nest Marginal R/W Design and construct paving, drainage, curb and gutter, sidewalks, lighting, COSST. bridge crossing Green River. 1 TOTAL $0 $0 56 SOUTH 144TH STREET 17 2 ABDF 0.30 U WO $500 $500 P.E. Pacific Highway Military Road RIO Design and construct widening, drainage, curb and gutter, sidewalk, lighting, COSTT. utility undergounding. 1 TOTAL $0 $0