HomeMy WebLinkAbout12-049 - Puget Sound Energy - Southcenter Parkway Extension12 -049 Council Approval 5/7112 PUGET SOUND ENERGY POTELCO INC A Quanta Services Company February 17, 2012 City of Tukwila 6300 Southcenter Blvd. Tukwila WA 98188 Re: Customer Agreement for Commercial Line Extensions PSE order No. 105069015 To Whom It May Concern: In accordance with Puget Sound Energy's (PSE) Tariff G, Rate Schedule 85 "Line Extensions on file with the Washington Utilities Transportation Commission, this agreement confirms our intention to provide electrical service to your project at SW corner of Southcenter Parkwav Seciale Park Dr. C Tukwila per the attached PSE design drawing. The delivery voltage of this electrical service is 120/240 volts. This cost information is valid for 90 days from the date of this letter, and is subject to being updated after that time. The payment of the total amount due and the return of signed documents as noted elsewhere in this letter is required prior to commencing our work. Please make checks payable to Puget Sound Energy and return to address listed below: Potelco: Attn, Scott Bostrom 8001 S 212 St Kent WA 98032 The cost for this work is determined as follows: Estimated Normal Construction Cost including transformation 11,657.06 Less: Applicable Margin Allowance 0.00 Total line extension charge 11,657.06 (1) Other charges- Redesign Temp Job close out. 0.00 Dedicated relocation of facilities 0.00 Total Other charges 0.00 (2) Total amount due under this letter 11,657.06 (1 2) Charges for temporary and permanent electric service lines for your project are not included in the above charges. To order these services and obtain costs, please contact PSE at 888 321 -7779 after electrical inspections have been approved. These additional charges will be billed after installation in accordance with Rate Schedule 85. These charges also do not include permitting fees or trenching and other excavation related work that is your responsibility. di 3538 9/06 Charges relating to your PSE- provided street lighting system in this project are not included in the above prices, and will come to you from PSE's IntoLight department under separate letter. Charges relating to Rate Schedule 73 "Conversion to Underground Service for Customers other than Government Entities" will be addressed under separate letter. This cost information reflects the work being performed during normal working hours. These charges do not include permitting fees or trenching and other excavation related work that is your responsibility to provide. Please review the attachments provided. The Excavation Requirements Final Grade Certification must be signed by the project owner or designee, and returned to me along with a signed copy of this letter prior to the start of construction. The work sketch document shows the proposed design, including the location of permanent, aboveground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project are noted on the work sketch drawing. Please notify me immediately if you believe there are conflicts between PSE's design and your project. Additional construction related information and information on metering and service entrance requirements is provided in PSE's Electric Service Handbook for commercial projects. If you do not have one of these handbooks, and would like one, please contact me. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any relevant information from this correspondence, it's attachments, and PSE's Handbook that applies to their work. Refunds associated with the line extension charge may be available for additional permanent service hook -ups not initially considered that are made within five (5) years of the date on which the electric distribution facilities installed for this project are initially energized. If no Margin Allowance has initially been provided, or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85, two (2) years after the line extension is energized. Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which the distribution facilities are initially energized. Your refund request should be directed to PSE's Customer Accounting Coordinators at 253 476 -6335 or 253 476 -6440. You will find it useful to retain this letter to use as a reference when making your refund request. All costs and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this letter and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this letter. The entirety of Rate Schedule 85 may be viewed at PSE's website www.Dse.com under the "Inside PSE" heading. Projects developed by Limited Liability Companies (LLC's) are required to provide contact information for all managing members in addition to a copy of your Master Business Application. This information too, must be provided prior to commencing construction on your project. Thank you for the opportunity to provide electrical service to your project. PSE will use reasonable diligence in commencing this work, but we will not be liable for any delays resulting from circumstances beyond our control, including but not limited to failure to receive necessary Operating Rights. If you have any questions, please call me at 253 606 -4552. Sincerely, Scott Bostrom Project Manager Potelco, Inc. I have read and agree to the terms and conditions outlined in this agreement and it's attachments. r Mt�tL 7 W OWNER DESIGN I NATl7RE P�T NAME DATE 7 3538 9/06 12 -049 Council Approval 5/7/12 PUGET SOUND POTELCO INC ENERGY GuaMa Services Compao, February 17, 2012 CITY OF TUKWILA 6300 SOUTHCENTER BLVD. TUKWILA WA Seattle WA 98188 RE: Non Residential secondary electric service to SW corner of Southcen�er Parkway Segale (PSE Job #104237901) Park Dr. C In accordance with Puget Sound Energy's Tariff G, Schedule 85, customers requesting electric Non Residential underground secondary voltage service connections are "subject to the Customer paying an estimated charge based on the Company's cost of making the connection (s)." The estimated cost for connecting the underground electric service at the above 429.00 This quote is based on the following information that was provided by you on your application for service. Base Fee for connection 429.00 Additional Runs $99.00 per run Additional Trip fee, for customer requested additional trip Complex engineering, outage coordination, switching orders $128.00 per hr._ Requested overtime,stand by fee,flagging charges or PSE Serviceman Sales Tax overheads (if applicable) If you request a change in the number of conductors that need to be connected, request that work be performed outside of normal working hours, request additional trips than those discussed or have other changed conditions not indicated by other information that you have provided, we reserve the right to adjust this quote based on those changed conditions. This quote is valid for 90 days from the above date. Upon your signed acceptance and return of this quote and completion of the connection work, you will receive an invoice for the above amount from Puget Sound Energy, which is payable in thirty days. If you have any questions please contact me at Sincerely, Scott Bostrom Project Manager Potelco /PSE Representative South King Service 8001 S. 212th St. Kent WA 98032 253 606 -4552 CustoMgoAnature I agr e the price and o ifiions as stated above. Billing address: Gv'drJ 5- B )Vrj SZ /o© iJ /tc (a 61A qd-I 9-X- n CIRCUIT FOOTAGE ADDED 10' NEW LOAD ADDED 14KVA LRC 65A MAIN PANEL 200A SQFT =O V -DROP HH1 2.1 V -FLICK HH1 2.5% FAULT CURRENT HH1 3,907A t t I "1 RUN 2/011 PH H CQNQUIT INSTALLED UNDEA -.105652358. 11,-111) HIT r./ r r r... -!,F SITE PLAN CURB OR EDGE OF PAVEMENT S MIN S 18' MIN W MIN MIN 3' SITE NOTES: MAPS AND RECORDS NOTE: ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, REFERENCE DESIGN /JOB 105052358. "ALL VAULT NUMBERS REFERENCE ABOVE JOB# AT VN16: JEXISTING) INSTALL (1) L/B ELBOWS AT VN17: (NEW TRF) EXISTING MP 10 TRF VAULT INSTALLED UNDER 105052358 **VAULT MATERIAL TO BE TRANSFERED. SET 25 KVA PM TRF 120/240V INSTALL UG 1/0 TPX SEC FROM HH01 INSTALL GRID NUMBER AT HH1 (EXISTING) EXISTING MP 10 HH VAULT INSTALLED UNDER 105052358 "VAULT MATERIAL TO BE TRANSFERED. INSTALL UG 4/0 TPX SEC FROM VN17 INSTALL (3) 4 POS SEC CONNECTION BARS CONNECT AND TAG CUSTOMER RAN UG SVC e'1 RUN 2 /01PH SEC AT VN16 TO VN17 INSTALL (130') 101/0 AL JK PRI. CABLE FT) AT VN17 TO HH01 INSTALL (±180') 1/0 SEC TPX CABLE. CABLE If FT) 36' I 6 3 L MIN J= ACCESS z I DOOR 1 a TYP. PAD o TRANS- 10' MIN FORMER ACCESS I o I COOLING DOOR I I FINS 18' MIN CONCRETE PAD O n r o REQUIRED 5' MIN ROAD OR m WORK SPACE I PARKING AREA N AREA f 0 1 CURB OR EDGE OF PAVEMENT MINIMUM CLEARANCES FOR PSE EQUIPMENT o Not to scale 6775.0035 x 1! N a Handhole 2430 lbs 3' m Excavated DIrt Pile ROADSIDE 42' 1950 IDS Steel Struts 42' 1 1 1 48" y e w 20' Min 24' Min r,�%y� �T Final Grade ri rT AL JKT. PRL o �Vi� r r v7 aw AO- AGCO48 a 36' Min NOTE: CO' AGG047 u 48' 12' Min Cover Backfll, Bedding, and CRY OF TUKWIIA 4 Max Separation Shading requirements are D FINd Clunaes REn1INEOw,A= u.uwlvElaFlEO emd cwwcES,mam PepKaak contingent upon the Soil DIAGRAM SCALE:NTS type present on ske, and Sae a PVC bell erne p Shah be Specified atthe ridamullfteooll o P"nstruction meeting after Composition of the Iwo m Cod D 11." Col Me.odk PSE•naamw one lvooed CD CD r J1 L�l. 7 1 a native material has been 85 N x determined. I ESTAWDEASEMENT ci Communlcatlon Primary Power (REAL (PERMIT NIA NIA Cables or Condult Pita Name JOINT TRENCH DETAIL $PROJECT MGR I Stmt Bosbam 1 253606-4552 1 2J1H2 u Nottoscale $ENGR -POWER I Sad Soseom 1 253 604552 1 215712 Utaviii INSTALLED: GRID: 316304164643 XFMR SIZE: 25 KVA ID M TESTED SEC VOLT: I FOREMAN PLEASE FILL IN CABLE AI AGG866 MANUFACTURER: YEAR MANUFACT: 6' TOP VIEW r- 2' Crushed 3. •S SIDE VIEW EXCAVATION: 4 -2/3 CUBIC YARDS VAULT EXCAVATION DETAIL Not to scale 6045.1000 I 4' TOP VIEW NEW 110 AL JKT. PRI. A0- AGCO32 13121- AGCO33 CO- AGCO34 EXIST 110 NEW 110 J RL JKT. PRI. AL JKT. PRI. 13 r. AO- AGCO29 AO- AGG866 130- AGO030 CO- AGCO31 LENGTH =30' J 14 PULL-FJD= 87.5 PULL -REV= 87.5 i E XIST 110 AL JKT. PRI. �r AO- AGCO35 BO- AGCO36 CO- AGCO37 POWER GENERAL NOTES COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this Work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foreman' Copy. 2. All switching a.. -ots and/or outage arrangements are to be made With the Project Manger at least three (3) working days In advance. 3. Contact the Utilities Underground Location Center (14100424 -5555) at least 48 hoes prior to commencing Work!o get the underground facilities located. 4. STAKING: The Oslomer will provide all staking (tranfomler, handhole, trench, grade, lot pole, sidewalk etc.). See sketch and details for location. Equipment locations must be approved by the Project Manager. 5: SITE PREPARATION: The work area will be at or now finished grade, clear of bench spolts or construction materials which would restrict construction and /or equipment access, before work can begin. 6. Roads shall be paved or have a Compacted, crushed rock base In place. 7. CLEARANCES: Transformers require a minimum of 6 feet tram fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and Windows, and a minimum of 5 feet from the back of curb (or guard posts will be regcred per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 root when crossing them. 8. All work is to be done in accordance with local municipal and County permit requirements as applicable. 9. CustomadDeveloper is responsible to provide. Install and maintain all secondary service Cables, Conduits and crossings from the individual unit's meter base to the designated connection point. 10. Inclement weather Conditions may cause delays in Construction times and dates. 11. EXCAVATION: The astonew is to provide all trenching, bac fill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36' is required over PSE§ primary voltage equipment and 24' is required of PSE's secondary voltage equipment The Customer will provide any and all shoring or they Will side slope the trench to 1:1. EXIST 110 i EXIST ip AL JKT. PRL AL JKT. PRI. V AO- AGCO48 BO- AGCO46 80- AGCO49 CO' AGG047 r CO- AGCOSO i CRY OF TUKWIIA 4 VN21 I 4' TOP VIEW NEW 110 AL JKT. PRI. A0- AGCO32 13121- AGCO33 CO- AGCO34 EXIST 110 NEW 110 J RL JKT. PRI. AL JKT. PRI. 13 r. AO- AGCO29 AO- AGG866 130- AGO030 CO- AGCO31 LENGTH =30' J 14 PULL-FJD= 87.5 PULL -REV= 87.5 i E XIST 110 AL JKT. PRI. �r AO- AGCO35 BO- AGCO36 CO- AGCO37 POWER GENERAL NOTES COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this Work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foreman' Copy. 2. All switching a.. -ots and/or outage arrangements are to be made With the Project Manger at least three (3) working days In advance. 3. Contact the Utilities Underground Location Center (14100424 -5555) at least 48 hoes prior to commencing Work!o get the underground facilities located. 4. STAKING: The Oslomer will provide all staking (tranfomler, handhole, trench, grade, lot pole, sidewalk etc.). See sketch and details for location. Equipment locations must be approved by the Project Manager. 5: SITE PREPARATION: The work area will be at or now finished grade, clear of bench spolts or construction materials which would restrict construction and /or equipment access, before work can begin. 6. Roads shall be paved or have a Compacted, crushed rock base In place. 7. CLEARANCES: Transformers require a minimum of 6 feet tram fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and Windows, and a minimum of 5 feet from the back of curb (or guard posts will be regcred per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 root when crossing them. 8. All work is to be done in accordance with local municipal and County permit requirements as applicable. 9. CustomadDeveloper is responsible to provide. Install and maintain all secondary service Cables, Conduits and crossings from the individual unit's meter base to the designated connection point. 10. Inclement weather Conditions may cause delays in Construction times and dates. 11. EXCAVATION: The astonew is to provide all trenching, bac fill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36' is required over PSE§ primary voltage equipment and 24' is required of PSE's secondary voltage equipment The Customer will provide any and all shoring or they Will side slope the trench to 1:1. EXIST 110 i EXIST ip AL JKT. PRL AL JKT. PRI. AO- AGCO45 AO- AGCO48 BO- AGCO46 80- AGCO49 CO' AGG047 r CO- AGCOSO i CRY OF TUKWIIA CIRCUIT: SOU -24 VN21 D FINd Clunaes REn1INEOw,A= u.uwlvElaFlEO emd cwwcES,mam PepKaak ONE LINE DIAGRAM SCALE:NTS NU Paaw 2'� FOREMAN (CHECK BOX WHEN COMPLETED) WaInlly Map CIRCUIT LOADING TABLE 6' CRUSHED CABLE I 1 3-4' ROCK CRY OF TUKWIIA CIRCUIT: SOU -24 Propct IN...a., ConWt lNanmeom 6COT STROM D FINd Clunaes REn1INEOw,A= u.uwlvElaFlEO emd cwwcES,mam PepKaak SIDE VIEW CPHASE EXCAVATION: 5-1/3 CUBIC YARDS NU Paaw SINGLE PHASE SECONDARY CONCRETE HANDHOLE Not to Scale 6050.20204 POTELCO DESIGN AND QUALITY ASSURANCE g This design complies With PSE DesignlEngmeering Standards. Anylail variations have been pre- approved/documented by tha appropriate PSE PPSER SlgnaNro �KiZ Pdnl Nam.++ Date &.1. EROSION SEDIMENT CONTROL REQUIREMENTS EROSION SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION SEDIMENT CONTROL ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) ST 25T /7 \J 1 30 I 1 25T I 2c 140T •L•`\ `X1682 e JOB SITE t J11 /1(6303 tOOT OVERHEAD 1 CIRCUI M APCIRC UIT MAP SCALE: 6' -1 MILE a.H 1} l5 R U2350 HP Main WA I WA FOREMAN (CHECK BOX WHEN COMPLETED) WaInlly Map CIRCUIT LOADING TABLE DPSEEptlpmoAtccKEGMECURFe &WMNU411NPEAN FCq,albn. THOMAS GUIDE PG685: F2 CABLE I 1 Owner Developer Contact Info Gd4Gala.ea SeAT marten leaTLLLEO&vERwtEO CRY OF TUKWIIA CIRCUIT: SOU -24 Propct IN...a., ConWt lNanmeom 6COT STROM D FINd Clunaes REn1INEOw,A= u.uwlvElaFlEO emd cwwcES,mam PepKaak AS OF 2010 APHASE S PHASE CPHASE D rem PalwtRr Gels ooteem Ae4s% Gmwmlolh REwROEO Uk ron.a lok.aon en ASNAK NU Paaw EXIST. PEAK LOAD as 88 85 D IMlralemmet FNSE S¢EaAeeWl&VERIFY Campo MUSE. curse oc cnednegd nvlewd. �CSwkune uw A.-kwL vernuoA CALL (800) 4244555 EST. NEW LOAD 1 0 01 Iwo m Cod D 11." Col Me.odk PSE•naamw one lvooed CD CD TOTAL 87 88 85 era oral Nl9aalaY n9Wmnmte memat O ESTAWDEASEMENT Fwertun's Slanekue (REAL (PERMIT NIA NIA 3 1 I I Pita Name 2 1 I 1 $PROJECT MGR I Stmt Bosbam 1 253606-4552 1 2J1H2 PROJECT PHASE 1 NOTIFa OROERli N $ENGR -POWER I Sad Soseom 1 253 604552 1 215712 I Pwit Superior xM0581491 1 IOWBW15 $ENGR•GAS I WA I WA I WA MAPS AND RECORDS NOTE: COUNTY Emer Seri Gee Wk Clr POWER WK CTR Penn. Sankt x44zz5838a az37a01 R ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS Removal WA I WA REFERENCE DESIGN /JOB 105052358. IF Temporary WA WA WA (PLAT SWIM SEC35 T23 ROTE IOP /A "ALL VAULT NUMBERS REFERENCE ABOVE JOB# Job Order WA WA GAB OteplSUan WA I WA IFOR -N2 I I I ST 25T /7 \J 1 30 I 1 25T I 2c 140T •L•`\ `X1682 e JOB SITE t J11 /1(6303 tOOT OVERHEAD 1 CIRCUI M APCIRC UIT MAP SCALE: 6' -1 MILE a.H 1} l5 R U2350 HP Main WA I WA HPSWMSA WA t WA CABLE I 1 Owner Developer Contact Info PHONE 1 I CRY OF TUKWIIA p) Propct IN...a., ConWt lNanmeom 6COT STROM 8300 SOUTHCENTER aLVO T AUK A 2553S O14" Coca Pllwr MI MICHHAEL EL MATWA 206431-2444 M TM k NU Paaw Fu contacs t Wow dial 1-888 -CALL PSE (2255773) CALL (800) 4244555 oeawmr Yea PSE 2 BUSINESS DAYS BEFORE YOU DIG 'taste. Re4uaeCl ND ei7 I Two ewitK KaT TOBE a1YEDlepK rpa FxALT Lpr ndi aF FAarNa rlmllfiEa 'Outages Re .me No ESTAWDEASEMENT 'Fleaalrpftgp s No (REAL (PERMIT NIA NIA 3 1 I I $FUNCTION I CONTACT I PHONE NO 1 DATE 2 1 I 1 $PROJECT MGR I Stmt Bosbam 1 253606-4552 1 2J1H2 s 1 1 1 1 $ENGR -POWER I Sad Soseom 1 253 604552 1 215712 I REVB I DATE I BY ,DESCRIPTION $ENGR•GAS I WA I WA I WA SEE U6 COUNTY Emer Seri Gee Wk Clr POWER WK CTR DRAWN BY I San Bmtrom 1 2536064552 1 ZV12 234 -14 KING I WA I WA I OCSO)iE (CHECKED BV J8l:'1Z7P r r. MAP MAPN IF WA (PLAT SWIM SEC35 T23 ROTE IOP /A I� U-MAP NO (POWER) CKT MAP G(T MAP IFOR -N2 I I I IOH IUG r-ITNO 2305Et24 2304E139 2TN 8 2304EI39 VARIES MAPPING I 1 I FACILITIES ARRANGEMENTS IfflLii7E5 WA I WA WA WA s CONTAC NU I WA I WA WA 1 PHONEY WA I oM WA i WA j INCIDENT MAOP PUGET SOUTHCENTER PARKWAY EXTENSION PROJ. I AA u Ga oma Eea r' 1 LINE EXTENSION 8 NH SET NIA .I 105069015 ENER Sw armor of SmilicanorPerkeray& Sagele Pack Dr. 6 Tukwila WA 981811, SCALE PAGE DE8NFA IG BY P PDTFICO INC- 1'=50' 1 OF 1 12 -049 Council Approval 5/7/12 PUGET SOUND ENERGY POTELCO INC A Quarrte Services company February 17, 2012 City of Tukwila 6300 Southcenter Blvd. Tukwila WA 98188 Re: Customer Agreement for Commercial Line Extensions PSE order No. 105069013 To Whom It May Concern: In accordance with Puget Sound Energy's (PSE) Tariff G, Rate Schedule 85 "Line Extensions on file with the Washington Utilities Transportation Commission, this agreement confirms our intention to provide electrical service to your project at SW corner of Southcenter Parkway S 190 St. Tukwila per the attached PSE design drawing. The delivery voltage of this electrical service is 120/240 volts. This cost information is valid for 90 days from the date of this letter, and is subject to being updated after that time. The payment of the total amount due and the return of signed documents as noted elsewhere in this letter is required prior to commencing our work. Please make checks payable to Puget Sound Energy and return to address listed below: Potelco: Attn, Scott Bostrom 8001 S212 th St Kent WA 98032 The cost for this work is determined as follows: Estimated Normal Construction Cost including transformation 8,934.68 Less: Applicable Margin Allowance 0.00 Total line extension charge 8,934.68 (1) Other charges- Redesign Temp Job close out. 0.00 Dedicated relocation of facilities 0.00 Total Other charges 0.00 (2) Total amount due under this letter 8,934.68 (1 2) Charges for temporary and permanent electric service lines for your project are not included in the above charges. To order these services and obtain costs, please contact PSE at 888 321 -7779 after electrical inspections have been approved. These additional charges will be billed after installation in accordance with Rate Schedule 85. These charges also do not include permitting fees or trenching and other excavation related work that is your responsibility. o 7" el6i/l/A-- 3538 9/06 Charges relating to your PSE- provided street lighting system in this project are not included in the above prices, and will come to you from PSE's IntoLight department under separate letter. Charges relating to Rate Schedule 73 "Conversion to Underground Service for Customers other than Government Entities" will be addressed under separate letter. This cost information reflects the work being performed during normal working hours. These charges do not include permitting fees or trenching and other excavation related work that is your responsibility to provide. Please review the attachments provided. The Excavation Requirements Final Grade Certification must be signed by the project owner or designee, and returned to me along with a signed copy of this letter prior to the start of construction. The work sketch document shows the proposed design, including the location of permanent, aboveground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project are noted, on the work sketch drawing. Please notify me immediately if you believe there are conflicts between PSE's design and your project. Additional construction related information and information on metering and service entrance requirements is provided in PSE's Electric Service Handbook for commercial projects. If you do not have one of these handbooks, and would like one, please contact me. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any relevant information from this correspondence, it's attachments, and PSE's Handbook that applies to their work. Refunds associated with the line extension charge may be available for additional permanent service hook -ups not initially considered that are made within five (5) years of the date on which the electric distribution facilities installed for this project are initially energized. If no Margin Allowance has initially been provided, or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85, two (2) years after the line extension is energized. Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which the distribution facilities are initially energized. Your refund request should be directed to PSE's Customer Accounting Coordinators at 253 476 -6335 or 253 476 -6440. You will find it useful to retain this letter to use as a reference when making your refund request. All costs and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this letter and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this letter. The entirety of Rate Schedule 85 may be viewed at PSE's website www.Dse.com under the "Inside PSE" heading. Projects developed by Limited Liability Companies (LLC's) are required to provide contact information for all managing members in addition to a copy of your Master Business Application. This information too, must be provided prior to commencing construction on your project. Thank you for the opportunity to provide electrical service to your project. PSE will use reasonable diligence in commencing this work, but we will not be liable for any delays resulting from circumstances beyond our control, including but not limited to failure to receive necessary Operating Rights. If you have any questions, please call me at 253 606 -4552. Sincerely, Scott Bostrom Project Manager Potelco, Inc. 1 have read and agree to the terms and conditions outlined in this agreement and it's attachments. eV O NER DESIGN GNATURE PRINT NAME 1 DATE 1 0 3538 9106 Al' 12 -049 Council Approval 5/7/12 PUGET SOUND ENERGY POTELCO INC A Quanta Services Company February 17, 2012 CITY OF TUKWILA 6300 SOUTHCENTER BLVD. TUKWILA WA Seattle WA 98188 RE: Non Residential secondary electric service to SW corner of Southcenbr Parkway S (PSE Job #104237898) 190th St. In accordance with Puget Sound Energy's Tariff G, Schedule 85, customers requesting electric Non Residential underground secondary voltage service connections are "subject to the Customer paying an estimated charge based on the Company's cost of making the connection (s)." The estimated cost for connecting the underground electric service at the above 429.00 This quote is based on the following information that was provided by you on your application for service. Base Fee for connection 429.00 Additional Runs $99.00 per run Additional Trip fee, for customer requested additional trip Complex engineering, outage coordination, switching orders $128.00 per hr._ Requested overtime,stand by fee,flagging charges or PSE Serviceman Sales Tax overheads (if applicable) If you request a change in the number of conductors that need to be connected, request that work be performed outside of normal working hours, request additional trips than those discussed or have other changed conditions not indicated by other information that you have provided, we reserve the right to adjust this quote based on those changed conditions. This quote is valid for 90 days from the above date. Upon your signed acceptance and return of this quote and completion of the connection work, you will receive an invoice for the above amount from Puget Sound Energy, which is payable in thirty days. If you have any questions please contact me at 253 606 -4552 Sincerely, Scott Bostrom Project Manager Potelco /PSE Representative South King Service 8001 S. 212th St. Kent WA 98032 Custome ature agree o e price and ns as I agree stated above. Billing address: 30� Say/ c� -15/V-d S7C-iQ� CIRCUIT FOOTAGE ADDED 10' NEW LOAD ADDED 14KVA LRC 65A MAIN PANEL 200A A/ SQFT =O V -DROP HH1 0.9 V -FLICK (9 1HH1 1.5% FAULT CURRENT HH1 14,000A SCALE: 1' 100' J \l� 6053 I 4554 I I 316096 164583 ,r- CURB OR EDGE OF PAVEMENT i >T t t. n 5' MIN C, o MIN 18' MIN 5' MIN A PHASE f l 2• Ji0'AGC2,9 3 o I MIN ACCESS o .ROdc DOOR I 0 VN37 TYP. PAD TRANS- 10' MIN °m EXCAVATION: 4 -2/3 CUBIC YARDS FORMER 6300SOUTHCENTFROLVU SCOTTSOSTROM TtIKWKA WA98188 253506 CIO Plwna ATTM MICHAEL MATHIA 206431.2"6 olfics ACCESS H I COOLING FINS I DOOR I 18' MIN CONCRETE PAD CALL (600) 424.5SM a REQUIRED V MIN ROAD OR D WORK SPACE PARKING AREA n AREA No ESTATEIEASEMENT f CURB OR EDGE OF PAVEMENT y MINIMUM CLEARANCES FOR PSE EQUIPMENT n Not to scale i 6775.0035 0 e Excavated Dirt Pile j ROADSIDE 3 Final Grade 20' Min 24' Min <�1 ✓i� KING NIA IORAWN OCSOKE CHECKED BY r I r f 7Pf- TI.O3'D I W i SWIM SEC35 T23 R04E WA (APPROVED WA FOREMAN 01 I I U-MAP NO (POWER) OH CKTMAP 12' Min 36' Min NOTE: i 48' Separation Cover Ball, Bedding, and 1 Max Shading requirements are UTILITIES! WA contingent upon the soil CONTACT WA I WA NIA I WA type present on site, and I WA I N/A I WA INCIDENT I MAOP PUGETSOUTHCENTER PARKWAY EXTENSION PROJ. AA shall be specified at the pre-construction meeting SW Dome, of Shro eul Pedowy 8 S 190 SL Tukwila WA 98188 SCALE PACE C" NE POTELCO21NC DESIGNED after composition of the AS NOTED 1 OF 1 native material has been �s Y determined. Communications Primary Power Cables or Conduit CUSTOMER- SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE SITE NOTES: MAPS AND RECORDS NOTE: ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, REFERENCE DESIGN /JOB 105052358. "ALL VAULT NUMBERS REFERENCE ABOVE JOB# AT VN37: 1EXISTING) INSTALL (1) L/B ELBOWS AT VN38: (NEW TRF) EXISTING MP 10 TRF VAULT INSTALLED UNDER 105052358 **VAULT MATERIAL TO BE TRANSFERED. SET 25 KVA PM TRF 120/240V INSTALL GRID NUMBER CONNECT AND TAG CUSTOMER RAN UG SVC 1 RUN 210 1PH SEC AT VN37 TO VN38 INSTALL ±30') 10 110 AL JK PRI. CABLE f FT) 1950lbs 42' 48' AT VN38 INSTALLED: GRID: 316077- 164574 XFMR SIZE: 25 KVA ID M TESTED SEC VOLT: i I FOREMAN PLEASE FILL IN CABLES: AO- AG8158 MANUFACTURER: YEAR MANUFACT: I 6 i >T t t. I 10023780 I EXIST. UO AS OF 2010 A PHASE TOP VIEW 2• VN32 Ji0'AGC2,9 •nil VN33 3 O G .Crushed 3'-6' .ROdc I 0 VN37 SIDE VIEW EXIST 1 AL 1111, PRI, AO- AGCO72 B0 -AGCW3 CO- AGCO74 EXCAVATION: 4 -2/3 CUBIC YARDS Pr J) M 2 Gmtect Ini —ell— VAULT EXCAVATION DETAIL Not to Scale 6045.1000 NEW to AL JKT PRL AO- AG815S LENGTH 311' PULLREV)- e 5 PuLL 7. (REVp 7.s I EXIST 1/0 AL JKT. PRI. AO. AGCO76 B0 AGC079 CO- AGCO80 EXIST fA AL JKT. PRI. AO- AGCO82 EXIST 110 BO- AGCO93 AL JIM PRO. C0- AGCO84 AO- AGCGS5 SO. AGCO86 CO- AGCO87 39 ONE LINE DIAGRAM SCALE: NTS EXIST 1N AL JKT PRC AO- AGC075 BO- AGC076 CO- AGO077 CIRCUIT LOADING TABLE i >T CIRCUIT: SOU -24 I 10023780 I EXIST. UO AS OF 2010 A PHASE *L JKT. PRO C PHASE VN32 Ji0'AGC2,9 I� VN33 3 O G 80- AGC219 C0- AGC220 1 0 0 VN37 yo VN36 r EXIST 1 AL 1111, PRI, AO- AGCO72 B0 -AGCW3 CO- AGCO74 EXIST fA AL JKT. PRI. AO- AGCO82 EXIST 110 BO- AGCO93 AL JIM PRO. C0- AGCO84 AO- AGCGS5 SO. AGCO86 CO- AGCO87 39 ONE LINE DIAGRAM SCALE: NTS EXIST 1N AL JKT PRC AO- AGC075 BO- AGC076 CO- AGO077 CIRCUIT LOADING TABLE I ORDERS W 1 105059013 CIRCUIT: SOU -24 I 10023780 Rektration NIA I WA AS OF 2010 A PHASE 8 PHASE C PHASE EXIST. PEAK LOAD 86 88 85 EST. NEW LOAD 1 0 0 TOTAL 87 88 85 MAPS AND RECORDS NOTE: ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, REFERENCE DESIGNNOB 105052358. "ALL VAULT NUMBERS REFERENCE ABOVE JOB# 1 1 x0 1 bnt H SHOOT 40T T. 1007 {I,., (X9207 l a 407 s A IDDT 1 i E CI n CJ LOCATION I Sl9f 30 )(8281 3Q S X8281 X3422 Y_ uzOS7. IODT 3p le p. r JJ7 cue: •p.� 30 3� J ee I 1 S J 65T, ST 1 I1m99 I4 OVERHEAD CIRCUIT MAP SCALE: V 1 MILE POWER GENERAL NOTES COMMERCIAL PROJECT 1. All materials to be installed In accordance with Puget Sound Energy's (PSE) standards. Any deviation from this wort sketch must be AUTHORIZED by Potelco's Project Manager and NOTED an the Fonrmans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) Grarking days in advance. 3. Contact his Utilities Underground Location Center (1- 800-024 -5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: the customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, 'etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shA be paved or have a Compacted, crushed rock base In place. 7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the light of way, and at least 1 foot when crossing them. 8. 'All work It to be done in accordance with local municipal and county permit requirements as applicable. 9. Customer /Developer is responsible to provide, Install and maintain all secondary service cables, conduits and crossings from the individual units meter base to the designated connection point 10. Inclement weather conditions may cause delays In construction times and dates. 11. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoratioh per this sketch and per PSE standards. A minimum protective cover of 36' is required over PSE's primary voltage equipment and 24' is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. POTELGO DESIGN AND QUALITY ASSURANCE D This design complies with PSE Design/Engineering Standards. Any /a0 variations have been pre approved /documented by the appropriate PSE Representative. Signature Prinl N.- caw EROSION SEDIMENT CONTROL REQUIREMENTS EROSION SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION SEDIMENT CONTROL ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) FOREMAN (CHECK BOX WHEN COMPLETED) ViclnnyMop r3 PSE Eq. 0eem LOCHE05ECUREO S Wait Annl e. aEaNRAFF COrWe4n. THOMAS GUIDE PG 685: F2 GdACe rwmW.01 -1 FO avERIFIEO FI.Id d.....e RFIfLwFam AtA4lt .Klentl VERiFIEU end CHANGES Mel an PolemVIL C o (MARYC n�edm Aa.pupt. Cenpeny Ip RESERVED SWroq D bVFRIERF WAe P RASE C—d Domed FUSE F 12E an ASWk 1A �FY pmpW P. omeee. Cle p3i. -A. b. l j d. D Oertation. rol on cite Abee amtbeu re.sm. tcenllr aW Me verk Mdormed meeb PSEY*d,Me we wo —rho aw ma ell gewity mgiLwre„h Memet. FWe_ SIP.— P. theme D.. O En O 0) UD O PROJECT PHASE I NOTIF# PWR &1P or X"05]6372 I ORDERS W 1 105059013 Penn. Service X442242110 I 10023780 Rektration NIA I WA Ft—al WA I WA Temporary WA I N/A Job Older 1 N/A I WA GAS Do"— 1 WA I WA HP Maw 1 WA j N/A HPS -MSA I WA 1 WA CASL TV i I Owner/ Developer ConfaclInfo PHONE I I GTYOFTUKw'ILA Pr J) M 2 Gmtect Ini —ell— 6300SOUTHCENTFROLVU SCOTTSOSTROM TtIKWKA WA98188 253506 CIO Plwna ATTM MICHAEL MATHIA 206431.2"6 olfics WA PegW For contact* below dlal 1468CALL PSE (2255173) CALL (600) 424.5SM D-- `W Yes PSE 2 BUSINESS DAYS SEFORE YOU DIG ioc.taa R..kr No �e] I 1t49F4ilSl Ner le eE flFLlE01AOx ieA EGC, IaI'Ai3Orl of P.V9,IrrplAGGnrf .Omegas Req, CYail No ESTATEIEASEMENT F1e99'up Rsquked Y IREAL (PERMIT No WA WA 3 I I IFUNCTION I CONTACT I PHONE NO I DATE 2 I I I IPROJECTMGR I Sma Bosagm 1 251504552 120t2 I I I 1 IENGR POWER I Scott BMIb I 25351164552 1 218112 REV# I DATE I BY .DESCRIPTION IENGR GAS I WA I WA I WA I Emer COUNTY Sep VJk I Ca* WA Ctr POWERWKCTR BY I Sooh Bostron 1 2535064552 1 2/8/12 KING NIA IORAWN OCSOKE CHECKED BY r I r f 7Pf- TI.O3'D I 1/4 SEC OP MAP PLAT MAP BY !lk� SWIM SEC35 T23 R04E WA (APPROVED WA FOREMAN 01 I I U-MAP NO (POWER) OH CKTMAP CKT MAP NO FOREMAN 02 IUG z30s6w 2304E139 22M104R ICIRCUR 2304E139 SOU24 MAPPING I I 1 JOINT FACILITIES ARRANGEMENTS UTILITIES! WA I WA I NM I WA CONTACT WA I WA NIA I WA PHONE#( WA I WA I N/A I WA INCIDENT I MAOP PUGETSOUTHCENTER PARKWAY EXTENSION PROJ. AA SOUND Ga I E.a ENERGY 10 LINE EXTENSION HH SET WA I I SW Dome, of Shro eul Pedowy 8 S 190 SL Tukwila WA 98188 SCALE PACE C" NE POTELCO21NC DESIGNED By AS NOTED 1 OF 1 r 12 -049 Council Approval 5/7/12 PUGET SOUND ENERGY February 17, 2012 City of Tukwila 6300 Southcenter Blvd. Tukwila WA 98188 Re: Customer Agreement for Commercial Line Extensions PSE order No. 105069011 To Whom It May Concern: POTELCO INC A Quanta Services Company In accordance with Puget Sound Energy's (PSE) Tariff G, Rate Schedule 85 "Line Extensions on file with the Washington Utilities Transportation Commission, this agreement confirms our intention to provide electrical service to your project at SW corner of Southcenter Parkwav S 194 St. Tukwila per the attached PSE design drawing. The delivery voltage of this electrical service is 1201240 volts. This cost information is valid for 90 days from the date of this letter, and is subject to being updated after that time. The payment of the total amount due and the return of signed documents as noted elsewhere in this letter is required prior to commencing our work. Please make checks payable to Puget Sound Energy and return to address listed below: Potelco: Attn, Scott Bostrom 8001 S212 1h St Kent WA 98032 The cost for this work is determined as follows: Estimated Normal Construction Cost including transformation Less: Applicable Margin Allowance Total line extension charge Other charges- Redesign Temp Job close out. Dedicated relocation of facilities Total Other charges Total amount due under this letter 11.978.65 0.00 11.978.65 (1) 0.00 0.00 0.00 (2) 11,978.65 (1 2) Charges for temporary and permanent electric service lines for your project are not included in the above charges. To order these services and obtain costs, please contact PSE at 888 321 -7779 after electrical inspections have been approved. These additional charges will be billed after installation in accordance with Rate Schedule 85. These charges also do not include permitting fees or trenching and other excavation related work that is your responsibility. o/ ne /6II/,K- 3538 9106 Charges relating to your PSE- provided street lighting system in this project are not included in the above prices, and will come to you from PSE's IntoLight department under separate letter. Charges relating to Rate Schedule 73 "Conversion to Underground Service for Customers other than Government Entities" will be addressed under separate letter. This cost information reflects the work being performed during normal working hours. These charges do not include permitting fees or trenching and other excavation related work that is your responsibility to provide. Please review the attachments provided. The Excavation Requirements Final Grade Certification must be signed by the project owner or designee, and returned to me along with a signed copy of this letter prior to the start of construction. The work sketch document shows the proposed design, including the location of permanent, aboveground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project are noted on the work sketch drawing. Please notify me immediately if you believe there are conflicts between PSE's design and your project. Additional construction related information and information on metering and service entrance requirements is provided in PSE's Electric Service Handbook for commercial projects. If you do not have one of these handbooks, and would like one, please contact me. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any relevant information from this correspondence, it's attachments, and PSE's Handbook that applies to their work. Refunds associated with the line extension charge may be available for additional permanent service hook -ups not initially considered that are made within five (5) years of the date on which the electric distribution facilities installed for this project are initially energized. If no Margin Allowance has initially been provided, or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85, two (2) years after the line extension is energized. Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the. date on which the distribution facilities are initially energized. Your refund request should be directed to PSE's Customer Accounting Coordinators at 253- 476 -6335 or 253- 476 -6440. You will find it useful to retain this letter to use as a reference when making your refund request. All costs and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this letter and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this letter. The entirety of Rate Schedule 85 may be viewed at PSE's website www.Dse.com under the "Inside PSE" heading. Projects developed by Limited Liability Companies (LLC's) are required to provide contact information for all managing members in addition to a copy of your Master Business Application. This information too, must be provided prior to commencing construction on your project. Thank you for the opportunity to provide electrical service to your project. PSE will use reasonable diligence in commencing this work, but we will not be liable for any delays resulting from circumstances beyond our control, including but not limited to failure to receive necessary Operating Rights. If you have any questions, please call me at 253 606 -4552. Sincerely, Scott Bostrom Project Manager Potelco, Inc. I have read and agree to the terms and conditions outlined in this agreement and it's attachments. 5 115 17- 7 M, A r OWNED OR ER DESIGN NATURE PRINT NAME V y r DATE 3538 9/06 12 -049 Council Approval 5/7/12 Ap PUGET SOUND ENERGY POTELCO INC A Qualls Sarrlcn C..P.Ay February 17, 2012 CITY OF TUKWILA 6300 SOUTHCENTER BLVD. TUKWILA WA Seattle WA 98188 RE: Non Residential secondary electric service to SW corner of SouthcAr Parkway 194TH (PSE Job #104237895) In accordance with Puget Sound Energy's Tariff G, Schedule 85, customers requesting electric Non Residential underground secondary voltage service connections are "subject to the Customer paying an estimated charge based on the Company's cost of making the connection(s)." The estimated cost for connecting the underground electric service at the above 429.00 This quote is based on the following information that was provided by you on your application for service. Base Fee for connection 429.00 Additional Runs $99.00 per run Additional Trip fee, for customer requested additional trip Complex engineering, outage coordination, switching orders $128.00 per hr._ Requested overtime,stand by fee,flagging charges or PSE Serviceman Sales Tax overheads (if applicable) If you request a change in the number of conductors that need to be connected, request that work be performed outside of normal working hours, request additional trips than those discussed or have other changed conditions not indicated by other information that you have provided, we reserve the right to adjust this quote based on those changed conditions. This quote is valid for 90 days from the above date. Upon your signed acceptance and return of this quote and completion of the connection work, you will receive an invoice for the above amount from Puget Sound Energy, which is payable in thirty days. If you have any questions please contact me at Sincerely, Scott Bostrom Project Manager Potelco /PSE Representative South King Service 8001 S. 212th St. Kent WA 98032 253 606 -4552 A L Custo nature I ag the price a conHffi e as stated above. Billing address: to� 56(A np, 3/Vd Src- -1(Z a nc G e— PSE ELECTRICAL FACILITIES EXCAVATION REQUIREMENTS FINAL GRADE CERTIFICATION PURPOSE This document is an agreement between Puget Sound Energy "PSE and the Owner/Representative and /or Developer "Developer who is providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction. EXCAVATION REQUIREMENTS The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a condition of receiving electrical service for your project. If you need additional information, please call the PSE contact person listed below. 1. Developer is responsible for acquiring utility locates by calling One -Call, 1- 800 424 -5555 at least 48 hours (two full working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative Code and Safety Standards. 2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation. 3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical facilities and other utilities within a joint trench. 4. All backfill must be free of sharp objects and construction debris. Developer shall provide and install bedding and shading material for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages caused by improper backfill or compaction. 5. Developer agrees to maintain a minimum of 5 feet of clearance between the electrical trench and buildings or other improvements on Developer's property, as required by PSE's Standards. 6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid level bottom with a 6 inch deep layer of crushed rock bedding. 7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall provide final grade and staking of property lines prior to installation of PSE's electrical facilities. 8. Developer will be financially responsible for the relocation of PSE's electrical facilities which are inadequately covered, and /or any damages resulting from dig -ins due to changes or variations in grade that are made after the installation of PSE's electrical facilities. FINAL GRADE CERTIFICATION By signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate within easement areas or rights -of -way, or from digging without adequate rights on adjoining properties. Date: Owner or Developer: 1� pease print Project Address: SW corner of Southcen'6 Parkway Si nature: S4 GL✓ 194th Tukw��98188 0511) /o)" o�t'G /AM-r- Cert. Letter Gas (Form No. 2807) 01/17/02 +Aw_ CURB OR EDGE OF PAVEMENT 3 5''AIN 5 1B'MIN 5 MIN i MIN y- ACCESS DOOR TYP. PAD &TRANS- 10'MW FORMER I ACCESS COOLING DOOR FINS Ifn MIN CONCRETE PAD REOUIREO J 5' NUN P O OR WORK SPACE AREA 1 CURB OR EDGE OF PAVEMENT Y MINIMUM CLEARANCES FOR PSE EQUIPMENT Nor to soak 6775.0035 Eeeavated Din Poe ROADSIDE Fina1 G2de 5 t16- In NOTE: 48' Seperalim Cover BatklJk Bpddlnp, and Mae C�ading rativI alranla On 1 ong tUpon Vresdl t prose. en $ee, end ,ar MO 00 sp0celed at NB nallve mataral has ben Communications) Prmi Powar Cables «Conduit •,-.a, r.- -1 n' x lril l rn0 sot n A A DV f`AAI F SITE NOTES: AT VN45A POWER GENERAL NOTES COMMERCIAL PROJECT I INSTALLED: 1 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from MAPS AND RECORDS NOTE GRID: 315999. 164529 this work sketch must be AUTHORIZED by Potelw's Project Manager and NOTED on the Foremane Copy. ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, XFMR SIZE: 25KVA NEW 1/0 EXIST 110 REFERENCE DESIGN /JOB 105052356. ID AL JKT. PRI. AL JKT. PRI. 2. All switchlhg arrangements andlor outage arrangements are to be made with the Project Manager at least ALL VAULT NUMBERS REFERENCE ABOVE JOB# TESTED SEC VOLT: AO- AGB156 80 AGC AO- AGCO89 Nree(3)workngdaysinadvance. CO- AGCO90 090 3. ContaR!Fie Utilities Underground location Center (1- 800.424.5555) at least 48 hours prier to commencing AT VN45: (EXISTING) LENGTH 30' work to gel the underground facilities Iocatod. INSTALL (1) LIB ELBOWS 4. STAKING: the customer wilt provide ad slaking (transformer, handhole, trench, grade, lot, pate, sidewalk, FOREMAN PLEASE FILL IN etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. AT VN45A: [NEW TRF) I PULL /FJD= 87.5 S. SITE PREPARATION: The work area will be at or near finished or construction INSTALL MP 10 TRF VAULT W/ GROUNDS CABLE AID• AG8156 PULL /REV= 87.5 N45 Q 9' ade. clear Of trench S e O IS SET 25 KVA PM TRF 120/240V MANUFACTURER: materials which would restrict construction and equipment access, before work can hegira. INSTALL (1) UB ELBOW (1) DUST CAP YEAR MANUFACT: 6. Roads shall be paved or have a compacted. crushed rack base in place. INSTALL UG 410 TPX SEC FROM HH1 INSTALL GRID NUMBER 7. CLEARANCES: Transformers require a minimum or 6 feet from bra fighting equipment, 10 feet from combustible walls, overhangs, dcom. and windows, and a minimum of 5 feet from the back of curb (or guard AT HH1 (EXISTING) O posts will be required per PSE standards). All conduits and Vaults are.to be at least 5 feet away if= water, storm and sewer lines when paralleling ,hem in the right of way, and at least 1 feet when crossing them. EXISTING IMP 10 HH VAULT INSTALLED UNDER 105052358 ED "VAULT MATERIAL TO BE TRANSFERED. N45 VN 45 j VN 42 B. All work ij to be Bono in accortlance w l'n local municipal and county permit requirements as applicable. INSTALL UG 4/0 TPX SEC FROM VN45A 9. Custorrioveloper is responsible to provide, install and maintain all secondary se'rv'ice cables. conduits INSTALL (3) 4 POS SEC CONNECTION BARS and crossings from the individual unit's meter base to the designated Connection point. CONNECT AND TAG CUSTOMER RAN UG SVC l 10. Inclement weather conditions may cause ••1 RUN2IOIPHSEC VN45 y de in construction times and dates. 11, EXCAVAtl6N: The customer is to provide all trenching. backfll, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36Ns required over EXIST 1/0 AT VN45 TO VN45A PSE's primary voltage equipment and 24' is required of PSE's secondary voltage equipment. The customer AL JKT. PRI: INSTALL ±10') 2" CONDUIT FT) AID- AGCO91 will provide any and all shoring or they will side slope the trench to 1:1. I CONDUIT KEY: 80- AGCO92 INSTALL (±30') 10 1/0 AL JK PRI. CABLE FT) NEW 2' J VN44 CO- AGCO93 POTELCO DESIGN AND NEW 3• I QUALITY ASSURANCE 6 AT VN45A TO HH1 desi g n complies with PSE INSTALL ±160') 3" CONDUIT I FT) Desi DesigNEngineenng Standards. Any /all variations have been INSTALL ±180') 4/0 SEC TPX CABLE. CABLE I FT) j pro approved /documented by the EXIST 110 appr PSE Representative. r AL JKT. PRI. st9namro �(k.lA��s EXIST 110 AID- AGCO94 'CONDUIT DIAGRAM AL JKT. PRI. 00- AGCO95 Print Name SCALE:NTS AID- AGCO97 CO- AGCO96 BID- AGCO98 Data /IN n CID•AGC099 EROSION SEDIMENT CONTROL REQUIREMENTS EROSION SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE T 50.3200 TECHNIQUES FOR TEMPORARY EROSION SEDIMENT CONTROL ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. ONE LINE DIAGRAM NOES ET JU MAY HAVE ADDITIONAL REQ E EROSION OR SEDIMENT CONTROL STRUCTURES SCALE: NTS ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) 4r 36' lose Ca 3 4r 6• Scats `��i I 6 I 6 r TOP VIEW r r 76.,, Ou Nee S- a .Rock 1_ SIDE NEW EXCAVATION: l-M CUBIC YARDS VAULT EXCAVATION DETAIL Not to ecak 6045.1000 CIRCUIT FOOTAGE. ADDED 10' NEW LOAD ADDED 14KVA ".a 0lbs 24701os J• -e' LRC 65A EXIST. PEAK LOAD MAIN PANEL 200A A/ SOFT =O w,40rovlW ben V -DROP HH1 2,1 of n:oaw`�' wa' n we.e V -FLICK HH1 2.5% FAULT CURRENT HH1 3,907A +Aw_ CURB OR EDGE OF PAVEMENT 3 5''AIN 5 1B'MIN 5 MIN i MIN y- ACCESS DOOR TYP. PAD &TRANS- 10'MW FORMER I ACCESS COOLING DOOR FINS Ifn MIN CONCRETE PAD REOUIREO J 5' NUN P O OR WORK SPACE AREA 1 CURB OR EDGE OF PAVEMENT Y MINIMUM CLEARANCES FOR PSE EQUIPMENT Nor to soak 6775.0035 Eeeavated Din Poe ROADSIDE Fina1 G2de 5 t16- In NOTE: 48' Seperalim Cover BatklJk Bpddlnp, and Mae C�ading rativI alranla On 1 ong tUpon Vresdl t prose. en $ee, end ,ar MO 00 sp0celed at NB nallve mataral has ben Communications) Prmi Powar Cables «Conduit •,-.a, r.- -1 n' x lril l rn0 sot n A A DV f`AAI F SITE NOTES: AT VN45A POWER GENERAL NOTES COMMERCIAL PROJECT I INSTALLED: 1 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from MAPS AND RECORDS NOTE GRID: 315999. 164529 this work sketch must be AUTHORIZED by Potelw's Project Manager and NOTED on the Foremane Copy. ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, XFMR SIZE: 25KVA NEW 1/0 EXIST 110 REFERENCE DESIGN /JOB 105052356. ID AL JKT. PRI. AL JKT. PRI. 2. All switchlhg arrangements andlor outage arrangements are to be made with the Project Manager at least ALL VAULT NUMBERS REFERENCE ABOVE JOB# TESTED SEC VOLT: AO- AGB156 80 AGC AO- AGCO89 Nree(3)workngdaysinadvance. CO- AGCO90 090 3. ContaR!Fie Utilities Underground location Center (1- 800.424.5555) at least 48 hours prier to commencing AT VN45: (EXISTING) LENGTH 30' work to gel the underground facilities Iocatod. INSTALL (1) LIB ELBOWS 4. STAKING: the customer wilt provide ad slaking (transformer, handhole, trench, grade, lot, pate, sidewalk, FOREMAN PLEASE FILL IN etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. AT VN45A: [NEW TRF) I PULL /FJD= 87.5 S. SITE PREPARATION: The work area will be at or near finished or construction INSTALL MP 10 TRF VAULT W/ GROUNDS CABLE AID• AG8156 PULL /REV= 87.5 N45 Q 9' ade. clear Of trench S e O IS SET 25 KVA PM TRF 120/240V MANUFACTURER: materials which would restrict construction and equipment access, before work can hegira. INSTALL (1) UB ELBOW (1) DUST CAP YEAR MANUFACT: 6. Roads shall be paved or have a compacted. crushed rack base in place. INSTALL UG 410 TPX SEC FROM HH1 INSTALL GRID NUMBER 7. CLEARANCES: Transformers require a minimum or 6 feet from bra fighting equipment, 10 feet from combustible walls, overhangs, dcom. and windows, and a minimum of 5 feet from the back of curb (or guard AT HH1 (EXISTING) O posts will be required per PSE standards). All conduits and Vaults are.to be at least 5 feet away if= water, storm and sewer lines when paralleling ,hem in the right of way, and at least 1 feet when crossing them. EXISTING IMP 10 HH VAULT INSTALLED UNDER 105052358 ED "VAULT MATERIAL TO BE TRANSFERED. N45 VN 45 j VN 42 B. All work ij to be Bono in accortlance w l'n local municipal and county permit requirements as applicable. INSTALL UG 4/0 TPX SEC FROM VN45A 9. Custorrioveloper is responsible to provide, install and maintain all secondary se'rv'ice cables. conduits INSTALL (3) 4 POS SEC CONNECTION BARS and crossings from the individual unit's meter base to the designated Connection point. CONNECT AND TAG CUSTOMER RAN UG SVC l 10. Inclement weather conditions may cause ••1 RUN2IOIPHSEC VN45 y de in construction times and dates. 11, EXCAVAtl6N: The customer is to provide all trenching. backfll, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36Ns required over EXIST 1/0 AT VN45 TO VN45A PSE's primary voltage equipment and 24' is required of PSE's secondary voltage equipment. The customer AL JKT. PRI: INSTALL ±10') 2" CONDUIT FT) AID- AGCO91 will provide any and all shoring or they will side slope the trench to 1:1. I CONDUIT KEY: 80- AGCO92 INSTALL (±30') 10 1/0 AL JK PRI. CABLE FT) NEW 2' J VN44 CO- AGCO93 POTELCO DESIGN AND NEW 3• I QUALITY ASSURANCE 6 AT VN45A TO HH1 desi g n complies with PSE INSTALL ±160') 3" CONDUIT I FT) Desi DesigNEngineenng Standards. Any /all variations have been INSTALL ±180') 4/0 SEC TPX CABLE. CABLE I FT) j pro approved /documented by the EXIST 110 appr PSE Representative. r AL JKT. PRI. st9namro �(k.lA��s EXIST 110 AID- AGCO94 'CONDUIT DIAGRAM AL JKT. PRI. 00- AGCO95 Print Name SCALE:NTS AID- AGCO97 CO- AGCO96 BID- AGCO98 Data /IN n CID•AGC099 EROSION SEDIMENT CONTROL REQUIREMENTS EROSION SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE T 50.3200 TECHNIQUES FOR TEMPORARY EROSION SEDIMENT CONTROL ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. ONE LINE DIAGRAM NOES ET JU MAY HAVE ADDITIONAL REQ E EROSION OR SEDIMENT CONTROL STRUCTURES SCALE: NTS ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) 4r 36' lose Ca 3 4r 6• Scats `��i I 6 I 6 r TOP VIEW r r 76.,, Ou Nee S- a .Rock 1_ SIDE NEW EXCAVATION: l-M CUBIC YARDS VAULT EXCAVATION DETAIL Not to ecak 6045.1000 CIRCUIT LOADING TABLE CIRCUIT: SOU -24 7' j AS OF 2010 ".a 0lbs 24701os J• -e' hj�\l ?Jr 6• EXIST. PEAK LOAD d TOP VI EW 88 EST. NEW LOAD w,40rovlW ben CRUSHED, of n:oaw`�' wa' n we.e ROCK t r 88 SIDE VIEW EXCAVATION: S -1/3 CUBIC YARDS SINGLE PHASE SECONDARY CONCRETE HANDHOLE 6050.2020.2 CIRCUIT LOADING TABLE CIRCUIT: SOU -24 AS OF 2010 A PHASE 8 PHASE EXIST. PEAK LOAD 86 88 EST. NEW LOAD 1 0 TOTAL 87 88 C PHASE 85 D� 85 MAPS AND RECORDS NOTE: FOREMAN (CHECK BOX WHEN COMPLETED) vicinity Map D PSEE4eipmenl LGCKEDISECURED&W4M IWIn CLENaVE Cau1Wn THOMAS GUIDE 665 F2 0 Grld,Csa.,wSwet 1oivs.NsTAkIEni Vlet IFe. 0 san VERI —CHAN no t4 0 MBkrY VERIFIEO.MC an PaP4tewk. 0 T4k1 PRI loss R EnGRGE i c n,VCWI 0 Company taxi FUSE SIZE to ®4o n N a 1P n Q mmtl FUSE 612E On AseN4 VERdY pper PHASE. 0 Coned Oe Chia In. N�bv,4 m -b— 0 Oevietlona nN mOdms M half naaen. 0 1 atn'ty WI as work Part.-" N. Pa daM4g4 aM poc4dwes $nit "I al 4"Lly ma:mnNm. an not Fonme146pneWn. Prnl Nall OW O (f O to O _O ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS PROJECT PHASE I NOTIF# I ORDER# I PWN Superior I x"usti5710 I 105069011 REFERENCE DESIGN /JOB 105052358. Perm. Sand I X447213539 I Ili •'ALL VAULT NUMBERS REFERENCE ABOVE JOB# R WA I NIA Removal I NIA I NIA Temporary I NIA NIA Job Orde( I NIA WA GAS Dlsldewm WA I NIA S HP M.;,, I WA I NIA HP S1dMSA NIA 1 NIA a '�•MaA ;U I PrfcdMne94rc4riNRmtmmatlm: I I �oso KWILA ewer ContaCtlnfo I B SCOTTBOSTROM TUKINKAWAIAIN Yf S 3B 2516064552 Coo Po.. A"N. MICHAEL MATHM 206 431.2446 o1fm i S •41•••• :�3p WA Pager a 7 X11007 PowcmUC belowdial1.68&CALLPSE(2255773) 11661 CALL (e00(424-5555 407 oovai4per Y4s PSE 2 BUSINESS DAYS BEFORE YOU DIG 't RN I mei FKF7CH xda tOeE aFUEp Wax roREtA 11—rltaYCi EAB7 --us$ X5563 X5584: g. 55 'LOCS:e$ Rsgu"vM' N" No Bsona Tie Corlduk -$00 mar k tree troll door$, sharp rocks. and r4cXl larger than 10' In IDOT IOOT y V U416 'Oumpas RO ifs• �y� No IREAL ESTATEIEASEMENT (PERMIT dtararar. BICKI shall not damage ma condu0. LtlL U493 S L Y R 5 'FIa0i R..kad• Y�a No NrA NIA Xlet 8 Q` y 3 1 I I ]FUNCTION I CONTACT I PHONE NO I DATE R gco WAR 7023 IS' 2 I I I IPROJECTMGR I SmN Gott— 1 2516064552 1 218/12 'Cr 12'7ypkzl Excavated On y 401 1 I I I IENGR -POWER I Soon Bpstram 1 2536064552 1 7 /8112 IB'M°'a q•��'j� D REV# I DATE I BY IDESCRfPRON IENGR -GAS I WA I NIA I NIA i``� r 24'Atin ^y t a COUNTY IEmer Seal IG.SWk Ctr IPOWERWKCTR IORAWN BY I Seon easlrom I 253- 6064552 1 718112 Fecal Grade i 657 p e JOB SITE KING NIA NIA OC60xE CHECKED BY 1•a -/G 30 1N SEC OP MAP APPO BY 11 A'i, 5" r- ya 24'Mln I 1 S J030 4'," SWIM SEC35 T23 RNEI WA I PLAT MAP N/A I t I I :30 I00T 30'••.,, 230 U44AP N0 POWER OHCKTMAP UGCKTMAP CIRCUITNO IFOREMAN#2 I I I I BeckGl roc COndull' X630] 313 L Lr 2305E12/ 3B"Maa (Sea DaMitlon A6ovel X1Y22 t'` 230aE739 I22ca W I 2304E139 I• FACILITIES ARRA SOU -24 (MAP JOINT PING I I I i y CC.— ii 1007 NOEMENTS UTILITIES NIA U23059 I NIA I NIA I W CONTACT( NIA 1 WA I WA I NIA 40' X4521 PHONE# NIA I NIA t N/A I NIA E Serrate CeWek Caneue 10bf 1 111MENf MAOP ""no 'ak4ocreywc y PUGETSOUTHCENTER PARKWAY EXTENSION PROJ. NIA NIA letldc Ges Omer Elea OMar r SOUND 10 LINE EXTENSION HH SET NIA 105069DII TRENCH DETAIL ENERGY SWmmerofSouNcmorPoAmy &194NTuMAlaWA9B168 SCALE PAGE Not to Beak OVERHEAD CIRCUIT MAP DESIGNED BY 3to_1 LCO0NC 1 11OF1 SCALE: 6' 1 MILE SITE PLAN 12 -049 Council Approval 5/7/12 PUGET SOUND ENERGY POTELCO INC A Quanta Services Company February 17, 2012 City of Tukwila 6300 Southcenter Blvd. Tukwila WA 98188 Re: Customer Agreement for Commercial Line Extensions PSE order No. 105069014 To Whom It May Concern: In accordance with Puget Sound Energy's (PSE) Tariff G, Rate Schedule 85 "Line Extensions on file with the Washington Utilities Transportation Commission, this agreement confirms our intention to provide electrical service to your project at SW corner of Southcenter Parkwav S 200 St. Tukwila per the attached PSE design drawing. The delivery voltage of this electrical service is 120/240 volts. This cost information is valid for 90 days from the date of this letter, and is subject to being updated after that time. The payment of the total amount due and the return of signed documents as noted elsewhere in this letter is required prior to commencing our work. Please make checks payable to Puget Sound Energy and return to address listed below: Potelco: Attn, Scott Bostrom 8001 S212 th St Kent WA 98032 The cost for this work is determined as follows: Estimated Normal Construction Cost including transformation 11,657.06 Less: Applicable Margin Allowance 0.00 Total line extension charge 11.657.06 (1) Other charges- Redesign Temp Job close out. 0.00 Dedicated relocation of facilities 0.00 Total Other charges 0.00 (2) Total amount due under this letter 11,657.06 (1 2) Charges for temporary and permanent electric service lines for your project are not included in the above charges. To order these services and obtain costs, please contact PSE at 888 321 -7779 after electrical inspections have been approved. These additional charges will be billed after installation in accordance with Rate Schedule 85. These charges also do not include permitting fees or trenching and other excavation related work that is your responsibility. a/ 0916 3538 9/06 Charges relating to your PSE- provided street lighting system in this project are not included in the above prices, and will come to you from PSE's IntoLight department under separate letter. Charges relating to Rate Schedule 73 "Conversion to Underground Service for Customers other than Government Entities" will be addressed under separate letter. This cost information reflects the work being performed during normal working hours. These charges do not include permitting fees or trenching and other excavation related work that is your responsibility to provide. Please review the attachments provided. The Excavation Requirements Final Grade Certification must be signed by the project owner or designee, and returned to me along with a signed copy of this letter prior to the start of construction. The work sketch document shows the proposed design, including the location of permanent, aboveground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project are noted on the work sketch drawing. Please notify me immediately if you believe there are conflicts between PSE's design and your project. Additional construction related information and information on metering and service entrance requirements is provided in PSE's Electric Service Handbook for commercial projects. If you do not have one of these handbooks, and would like one, please contact me. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any relevant information from this correspondence, it's attachments, and PSE's Handbook that applies to their work. Refunds associated with the line extension charge may be available for additional permanent service hook -ups not initially considered that are made within five (5) years of the date on which the electric distribution facilities installed for this project are initially energized. If no Margin Allowance has initially been provided, or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85, two (2) years after the line extension is energized. Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which the distribution facilities are initially energized. Your refund request should be directed to PSE's Customer Accounting Coordinators at 253 476 -6335 or 253 476 -6440. You will find it useful to retain this letter to use as a reference when making your refund request. All costs and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this letter and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this letter. The entirety of Rate Schedule 85 may be viewed at PSE's website www.ose.com under the "Inside PSE" heading. Projects developed by Limited Liability Companies (LLC's) are required to provide contact information for all managing members in addition to a copy of your Master Business Application. This information too, must be provided prior to commencing construction on your project. Thank you for the opportunity to provide electrical service to your project. PSE will use reasonable diligence in commencing this work, but we will not be liable for any delays resulting from circumstances beyond our control, including but not limited to failure to receive necessary Operating Rights. If you have any questions, please call me at 253 606 -4552. Sincerely, Scott Bostrom Project Manager Potelco, Inc. I have read and agree to the terms and conditions outlined in this agreement and it's attachments. OWN R OWNER DE SIGNATURE NAME DATE 3538 9/06 12 -049 Council Approval 5/7/12 PUGET SOUND P©?ELCOINC ENERGY Quanta services a mpany February 17, 2012 CITY OF TUKWILA 6300 SOUTHCENTER BLVD. TUKWILA WA Seattle WA 98188 RE: Non Residential secondary electric service to SW corner of Southcenlr Parkway S (PSE Job #104237899) 200th St. In accordance with Puget Sound Energy's Tariff G, Schedule 85, customers requesting electric Non Residential underground secondary voltage service connections are "subject to the Customer paying an estimated charge based on the Company's cost of making the connection (s)." The estimated cost for connecting the underground electric service at the above 429.00 This quote is based on the following information that was provided by you on your application for service. Base Fee for connection 429.00 Additional Runs $99.00 per run Additional Trip fee, for customer requested additional trip Complex engineering, outage coordination, switching orders $128.00 per hr._ Requested overtime,stand by fee,flagging charges or PSE Serviceman Sales Tax overheads (if applicable) If you request a change in the number of conductors that need to be connected, request that work be performed outside of normal working hours, request additional trips than those discussed or have other changed conditions not indicated by other information that you have provided, we reserve the right to adjust this quote based on those changed conditions. This quote is valid for 90 days from the above date. Upon your signed acceptance and return of this quote and completion of the connection work, you will receive an invoice for the above amount from Puget Sound Energy, which is payable in thirty days. If you have any questions please contact me at 253 606 -4552 Sincerely, Scott Bostrom Project Manager Potelco /PSE Representative South King Service 8001 S. 212th St. Kent WA 98032 Cus4o� nature I agre o t price and n i ions as stated above. Billing address: �3(x) wd I) V'w'i \c._. u I A q0 �T d f l Ok C6 a�,�t� a v O m N 0 0 a m O O 1 a m N O a a N a s m 0 0 0 w N 0 O N O 03 E r I N 0 CIRCUIT FOOTAGE ADDED 10' NEW LOAD ADDED 14KVA SITE NOTES: LRC 65A MAIN PANEL 200A MAPS AND RECORDS NOTE: SQ FT 0 ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, V -DROP HH1 2.1 REFERENCE DESIGN /JOB 105052358. V- FLICK HH1 2.5% **ALL VAULT NUMBERS REFERENCE ABOVE JOB# FAULT CURRENT HH1 3,907A I I AT VN69: SEXISTING) INSTALL (1) LIB ELBOWS n AT VN71: (NEW TRF) 1' I J I EXISTING MP 10 TRF VAULT INSTALLED UNDER 105052358 **VAULT MATERIAL TO BE TRANSFERED. A W 1 SET 25 KVA PM TRF 120/240V z D 7 INSTALL (1) LIB ELBOWS (1) DUST CAP Y ✓I� INSTALL UG 4/0 TPX SEC FROM HH02 :,QONDWT.INSTALLED� //x(11 i INSTALL GRID NUMBER 6NDER:105052358. AT HH02 EXISTING), 65�73 EXISTING MP 10 HH VAULT INSTALLED UNDER 105052358 **VAULT MATERIAL TO BE TRANSFERED. ^I 6 3)578{ INSTALL UG 4/0 TPX SEC FROM VN17 A (IIV? ✓764450 INSTALL (3) 4 POS SEC CONNECTION BARS r CONNECT AND TAG CUSTOMER RAN UG SVC 1 RUN 2/01 PH SEC 'b AT VN69 TO VN71 INSTALL (±30') 10 110 AL JK PRI. CABLE F77 AT VN71 TO HH02 165 INSTALL ±180') 4/0 SEC TPX CABLE. CABLE FT) 315771 515770 1 4 I I "1 R 2 /01PH SEC, SITE PLAN CURB OR EDGE OF PAVEMENT A" I 5'MIN 5 1B'MIN 5! MIN MIN 3 -1 ACCESS MIN I DOOR I TYP. PAD 8 TRANS 10' MIN FORMER C ACCESS COOLING DOOR 1 FINS 18'MIN CONCRETE PAD REQUIRED �V MIN ROAD OR WORK SPACE PARKING AREA AREA f CURB OR EDGE OF PAVEMENT MINIMUM CLEARANCES FOR PSE EQUIPMENT Not to scale 6775.0035 Excavated Dirt Pile ROADSIDE Lf 20' Min 24' Min i� Final Grade 12' Min 36' Min NOTE: 48' Separation Cover Backfill, Bedding, and Max N Shading requirements are Contingent upon the soil type present on site, and w'� shall be specified at the preconstruction meeting #her composition of the s native material has been determined. Communications J I -Primary Power r Cables or Conduit CUSTOMER SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE 42' 36' 19501bs 38• struts 42'\\�� �i 48' IGLtATI1 YA INSTALLED: GRID: 315770.164450 XFMR SIZE: 25 KVA ID M TESTED SEC VOLT: I FOREMAN PLEASE FILL IN CABLE# AO AGS157 MANUFACTURER YEAR MANUFACT: I 6 I G1_ 6 TOP VIEW 2' �i .g. Yi Crushed 3'•6' Y� ,R I SIDE VIEW EXCAVATION: 4 -2/3 CUBIC YARDS VAULT EXCAVATION DETAIL Not to scale 6045.1000 I A. 4 TOP VIEW 2' 1 FOREMAN (CHECK BOX WHEN COMPLETED) Handhole E 2430 Ibs EXIST 110 e• 6' I CRUSHED AL, KT. PRI. 11 ROCK F T I AO- AGC137 A I 80- AGC132 I CO- AGC133 I A. 4 TOP VIEW 2' 1 S zoorH sr. I 0 VN66 POWER GENERAL NOTES COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foreman' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager et least three (3) working days in advance. 3. Contact the Otilities Underground Location Center (14800.424 -5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot. pole, sidewalk, etc.). See sketch and details for locations. Equipment location must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or new finished grade. Gear of trench spots or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved or have a Compacted, crushed rock base In place. 7- CLEARANCES: Transferrers require a minimum of 6 feet from fire fighting equlpmenL 10 feet from windows and a minimum of 5 feet from the back of curb guard or combustible walls, overhangs, doors, and g posts will be required per PSE standards). All conduits and vaults are lobe at least 5 feel away from Water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.' All work ie to be done in accordance with local municipal and county permit requirements as applicable. B. Customer(Developer is responsible to provide, Install and maintain all secondary service cables, conduits and crossings from the individual units meter base to the designated connection point 10. Inclement weather condition may cause delays in ConsWction times and dales. 11. EXCAVATION: The astomer Is to provide all trenching, backfi4 vault excavations, compaction and restoration. per this sketch and per PSE standards. A minlmum protective cover of 36' is required over PSEs primary voltage equipment and 24' Is required of PSFs secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. POTELCO DESIGN AND QUALITY ASSURANCE CYTNs design complies with PSE 1 Any/all Standards. ll variations haw been pre- approved /documented by the appropriate PSE Representative. SlgneMre Print Name Dale z�lcjl2. EROSION SEDIMENT CONTROL REQUIREMENTS EROSION SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION SEDIMENT CONTROL I ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) I NEW 110 AL JKT. PRI. AO- AGB157 LENGTH 1 =30 VN71 I PULL(FWD)= 87.5 PULL(REV)= 87.5 I ONE LINE DIAGRAM SCALE: NTS r FOREMAN (CHECK BOX WHEN COMPLETED) I I t VN64 E D cm THOMAS GUIDE PG 685: F2 EXIST 110 164 M &I VERIF ED E6 CH ANGES I I VERIFI•MCHANGESIWedN P•pen+pY. 6' I CRUSHED AL, KT. PRI. EXIST. 110 ROCK F T I AO- AGC137 AL ACT. PRI. AO- AGC128 I 80- AGC132 I CO- AGC133 BO- AGC129 3 I EST. NEW LOAD 1 0 01 CO-AGC130 a i SINGLE PHASE SECONDARY CONCRETE HA Of I 6050.2020.2 W I PAM Neme nab O EXIST. 110 AL JKT. PRI. U I N66 i AO- AGC134 I 00- AGC135 O ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, C0-A C136 N REFERENCE DESIGN /JOB 105052358. S zoorH sr. I 0 VN66 POWER GENERAL NOTES COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foreman' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager et least three (3) working days in advance. 3. Contact the Otilities Underground Location Center (14800.424 -5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot. pole, sidewalk, etc.). See sketch and details for locations. Equipment location must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or new finished grade. Gear of trench spots or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved or have a Compacted, crushed rock base In place. 7- CLEARANCES: Transferrers require a minimum of 6 feet from fire fighting equlpmenL 10 feet from windows and a minimum of 5 feet from the back of curb guard or combustible walls, overhangs, doors, and g posts will be required per PSE standards). All conduits and vaults are lobe at least 5 feel away from Water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.' All work ie to be done in accordance with local municipal and county permit requirements as applicable. B. Customer(Developer is responsible to provide, Install and maintain all secondary service cables, conduits and crossings from the individual units meter base to the designated connection point 10. Inclement weather condition may cause delays in ConsWction times and dales. 11. EXCAVATION: The astomer Is to provide all trenching, backfi4 vault excavations, compaction and restoration. per this sketch and per PSE standards. A minlmum protective cover of 36' is required over PSEs primary voltage equipment and 24' Is required of PSFs secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. POTELCO DESIGN AND QUALITY ASSURANCE CYTNs design complies with PSE 1 Any/all Standards. ll variations haw been pre- approved /documented by the appropriate PSE Representative. SlgneMre Print Name Dale z�lcjl2. EROSION SEDIMENT CONTROL REQUIREMENTS EROSION SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION SEDIMENT CONTROL I ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) I NEW 110 AL JKT. PRI. AO- AGB157 LENGTH 1 =30 VN71 I PULL(FWD)= 87.5 PULL(REV)= 87.5 I ONE LINE DIAGRAM SCALE: NTS r FOREMAN (CHECK BOX WHEN COMPLETED) WcfnkyWp m end 0.0 Into 0 wg o co -dug D cm THOMAS GUIDE PG 685: F2 D OAAC•E1APId NnuAleen W5TA1 LFDAVFRrcmo 3 4 164 M &I VERIF ED E6 CH ANGES I I VERIFI•MCHANGESIWedN P•pen+pY. 6' I CRUSHED AS OF 2010 A PHASE B PHASE C PHASE hsn M— ROCK F T I .er sot ggn•t°l=kmM pt�° Wad I 1 1 EXIST. PEAK LOAD 86 88 85 I 3 C OC CMWid(•1 re.+•ea# oe,n•Dam on N. A. -odn.m Ndr b.ra,s SIDEVIEW I EST. NEW LOAD 1 0 01 nded EXCAVATION: 5.1/3 CUBIC YARDS TOTAL 87 88 85 SINGLE PHASE SECONDARY CONCRETE HA p Net to scale 6050.2020.2 t7 C) FOREMAN (CHECK BOX WHEN COMPLETED) WcfnkyWp CIRCUIT LOADING TABLE D cm THOMAS GUIDE PG 685: F2 D OAAC•E1APId NnuAleen W5TA1 LFDAVFRrcmo CIRCUIT: 5 164 M &I VERIF ED E6 CH ANGES I I VERIFI•MCHANGESIWedN P•pen+pY. I AS OF 2010 A PHASE B PHASE C PHASE C d PPIM o mF AabJx ComWn7 tar. S pl k t 6 WMFY F Indmte coned FUSE SIZE On AaW91 VE(eFY Paper PHASE. FUSE EXIST. PEAK LOAD 86 88 85 I 3 C OC CMWid(•1 re.+•ea# oe,n•Dam on N. A. -odn.m Ndr b.ra,s I EST. NEW LOAD 1 0 01 nded TOTAL 87 88 85 01 —st, tlm1lMwoM1 peAa Wme•b PSE14rd•de Pb P,aae4am end llut •p AaeMr �elwlsmeab.m cod. p Fen 1 SlPUeua t7 C) PAM Neme nab O PROJECT PHASE I NOTIFX I ORDER# •p FINFt Saaenor 1 Me]SeM66 I 10506901{ MAPS AND RECORDS NOTE: Pemn.S."I. I X"22-1°6''9 1""raw RebtHlion I WA I NIA ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, Rem0Ya1 I MA j NIA REFERENCE DESIGN /JOB 105052358. temporary I MA 1 MA "ALL VAULT NUMBERS REFERENCE ABOVE JOB# Job I MA i NIA GAS D,evWUeon 1 NIA 1 MA HP Main I MA I WA HPS,.WSA NIA NA cADLE TV i Owner Developer Contact Info fB 1 t J PNOnE Cm @I 5 ProHU Mnbger Mfptmatlon: THUNT SOU BLVD r 4 6COTTBO TUMiLA 9858 TUKML WA1 79/ 1 0"s52 2534084552 Ced Plww A7TN: MICHAEL MAlM01 206431 -2U6 o16ce MIC H A EL MA X8281 X3422 ,r Ij J 30 Iii J MA Paper For —I.M Debw dMl 1486 -CALL PSE (2255773) CALL (800) 4245355 A T I B,C L pe.ala) Yes PSE 2 BUSINESS DAYB BEFORE YOU OIG EFOR cFrrdrnu p T 3a V 3C I 'larwtea RpdreC No 1t. N •O,d°ge• Np roes aF.�Fn walroeuucr LOUnc« ESTATEIEASEMENT S A r 1 e/ .9 b9pep Rapwed Y No IREAL (PERMIT MA MA 3� ••1Jy�C 7 e j S 3 1 1 1 r2 I I I IFUNCTION I CONTACT I PHONE NO 1 DATE IPROJECT MGR I Scet Bastian 1 253-6084552 1 24112 ES TTI 1 I I 1 IENGR -POWER I Scot Boston I 2536064552 1 28172 1� W. L* 1 W s sT_ 4 HEW I DATE I BY 1DESCRIPTION IENGR -GAS I MA I NIA I MA i A 36.......y). /��s1�. COUNTY He IEm S. IGes W Ctr IPOWER�� :CHECKED BY I Sine13.t.. 1 2SM064� 1 x I14 SEC MAP BY erZii e.Jner 7 LOCATION M a X307G lOP IPLATMAP SWIRSEC35T23RD.E NIA MA U- MAPNO(POWER) CIR MAP NO oRROVEO FOREMAN 02 I JOHNMAP IUG ICIRCUR 2304EI39 S2peEMX 2304E139 SOU -24 MAPPING I 1 I 14/ i1 JOINT FACILITIES ARRANGEMENTS N Sr 30 'Q UTILITIES N/A I MA I MA I MA BBD 4851 OPEN �yq CONTACT MA 1 MA I MA I MA r 1 y'. U3255 1 PHONE# MA I MA I MA I NIA INCIDENT MAOP C �x3t IT PUGEfSOUTHCENTER PARKWAY SOUND EXTENSION PROJ. MA NIA Ges OnJN EMd Order 5P /F•' 10 LINE EXTENSION HH SET MA 1 105069014 EN OVERHEAD CIRCUIT MAP SW coma cif Soulb nw Pedwey& S POTELCO thIC 20M SL TIAwile WA 96188 SCALE PAGE SCALE: 6'= 1 MILE DESIGNED BY IP 1' w 10F 1' a 12 -049 Council Approval 517112 PUGET SOUND ENERGY March 14, 2012 City of Tukwila 6300 Southcenter Blvd. Tukwila WA 98188 Re: Customer Agreement for Commercial Line Extensions PSE order No. 105069012 To Whom It May Concern: POTELCO IHC A Quanta SerAcas Company In accordance with Puget Sound Energy's (PSE) Tariff G, Rate Schedule 85 "Line Extensions on file with the Washington Utilities Transportation Commission, this agreement confirms our intention to provide electrical service to your project at 18799 Southcenter Parkwav Tukwila WA per the attached PSE design drawing. The delivery voltage of this electrical service is 277/480 volts. This cost information is valid for 90 days from the date of this letter, and is subject to being updated after that time. The payment of the total amount due and the return of signed documents as noted elsewhere in this letter is required prior to commencing our work. Please make checks payable to Puget Sound Energy and return to address listed below: Potelco: Attn, Scott Bostrom 8001 S212 th St Kent WA 98032 The cost for this work is determined as follows: Estimated Normal Construction Cost including transformation 18,135.75 Less: Applicable Margin Allowance 0.00 Total line extension charge 18,135.75 (1) Other charges- Redesign Temp Job close out. 0.00 Dedicated relocation of facilities 5,920.32 Total Other charges 5,920.32 (2) Total amount due under this letter 24,056.07 (1 2) Charges for temporary and permanent electric service lines for your project are not included in the above charges. To order these services and obtain costs, please contact PSE at 888 321 -7779 after electrical inspections have been approved. These additional charges will be billed after installation in accordance with Rate Schedule 85. These charges also do not include permitting fees or trenching and other excavation related work that is your responsibility. /of (6�/U9� 3538 9/06 Charges relating to your PSE- provided street lighting system in this project are not included in the above prices, and will come to you from PSE's IntoLight department under separate letter. Charges relating to Rate Schedule 73 "Conversion to Underground Service for Customers other than Government Entities" will be addressed under separate letter. This cost information reflects the work being performed during normal working hours. These charges do not include permitting fees or trenching and other excavation related work that is your responsibility to provide. Please review the attachments provided. The Excavation Requirements Final Grade Certification must be signed by the project owner or designee, and returned to me along with a signed copy of this letter prior to the start of construction. The work sketch document shows the proposed design, including the location of permanent, aboveground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project are noted on the work sketch drawing. Please notify me immediately if you believe there are conflicts between PSE's design and your project. Additional construction related information and information on metering and service entrance requirements is provided in PSE's Electric Service Handbook for commercial projects. If you do not have one of these handbooks, and would like one, please contact me. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any relevant information from this correspondence, it's attachments, and PSE's Handbook that applies to their work. Refunds associated with the line extension charge may be available for additional permanent service hook -ups not initially considered that are made within five (5) years of the date on which the electric distribution facilities installed for this project are initially energized. If no Margin Allowance has initially been provided, or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85, two (2) years after the line extension is energized. Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which the distribution facilities are initially energized. Your refund request should be directed to PSE's Customer Accounting Coordinators at 253 476 -6335 or 253 476 -6440. You will find it useful to retain this letter to use as a reference when making your refund request. All costs and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this letter and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this letter. The entirety of Rate Schedule 85 may be viewed at PSE's website www.ose.com under the "Inside PSE" heading. Projects developed by Limited Liability Companies (LLC's) are required to provide contact information for all managing members in addition to a copy of your Master Business Application. This information too, must be provided prior to commencing construction on your project. Thank you for the opportunity to provide electrical service to your project. PSE will use reasonable diligence in commencing this work, but we will not be liable for any delays resulting from circumstances beyond our control, including but not limited to failure to receive necessary Operating Rights. If you have any questions, please call me at 253 606 -4552. Sincerely, Scott Bostrom Project Manager Potelco, Inc. I have read and agree to the terms and conditions outlined in this agreement and it's attachments. i OW R OWNER D E'S SIGNATURE `PRINT NAME f DATE V 3538 9/06 12 -049 Council Approval 5/7/12 PUGET SOUND ENERGY POTEILCOIINC p Quanta Services Company March 14, 2012 CITY OF TUKWILA 6300 SOUTHCENTER BLVD. TUKWILA WA Seattle WA 98188 RE: Non Residential secondary electric service to (PSE Job #104237896) 18799 Southcentr Parkway In accordance with Puget Sound Energy's Tariff G, Schedule 85, customers requesting electric Non Residential underground secondary voltage service connections are "subject to the Customer paying an estimated charge based on the Company's cost of making the connection(s)." The estimated cost for connecting the underground electric service at the above 429.00 This quote is based on the following information that was provided by you on your application for service. Base Fee for connection 429.00 Additional Runs $99.00 per run Additional Trip fee, for customer requested additional trip Complex engineering, outage coordination, switching orders $128.00 per hr._ Requested overtime,stand by fee,flagging charges or PSE Serviceman Sales Tax overheads (if applicable) If you request a change in the number of conductors that need to be connected, request that work be performed outside of normal working hours, request additional trips than those discussed or have other changed conditions not indicated by other information that you have provided, we reserve the right to adjust this quote based on those changed conditions. This quote is valid for 90 days from the above date. Upon your signed acceptance and return of this quote and completion of the connection work, you will receive an invoice for the above amount from Puget Sound Energy, which is payable in thirty days. If you have any questions please contact me at 253 606 -4552 Sincerely, Scott Bostrom Project Manager Potelco /PSE Representative South King Service 8001 S. 212th St. Kent WA 98032 Cus!IoFV gnature I ag e the price a itions as stated above. Billing address: 3 66 Svi i4E AJ l ]N v eQ t5r& 1 0 0 IU w'A5 Ix)A q3�lf& d l� I, CL(. t t` A-�-- PSE ELECTRICAL FACILITIES EXCAVATION REQUIREMENTS FINAL GRADE CERTIFICATION PURPOSE This document is an agreement between Puget Sound Energy "PSE and the Owner/Representative and/or Developer "Developer who is providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction. EXCAVATION REQUIREMENTS The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a condition of receiving electrical service for your project. If you need additional information, please call the PSE contact person listed below. 1. Developer is responsible for acquiring utility locates by calling One -Call, 1- 800 424 -5555 at least 48 hours (two full working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative Code and Safety Standards. 2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation. 3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum trench depth of 48 inches-The electric service trench shall be excavated to provide a minimum of 24 inches of facility coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical facilities and other utilities within a joint trench. 4. All backfill must be free of sharp objects and construction debris. Developer shall provide and install bedding and shading material for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages caused by improper backfill or compaction. 5. Developer agrees to maintain a minimum of 5 feet of clearance between the electrical trench and buildings or other improvements on Developer's property, as required by PSE's Standards. 6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid level bottom with a 6 inch deep layer of crushed rock bedding. 7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall provide final grade and staking of property lines prior to installation of PSE's electrical facilities. 8. Developer will be financially responsible for the relocation of PSE's electrical facilities which are inadequately covered, and/or any damages resulting from dig -ins due to changes or variations in grade that are made after the installation of PSE's electrical facilities. FINAL GRADE CERTIFICATION By signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate within easement areas or rights -of -way, or from digging without adequate rights on adjoining properties. Date: 5 I15I�y Owner or Developer: Jl� Signature: please pnnt 0 f Project Address: 18799 Southcen'�r Parkway Tukwila WA 98188. 5069012) d f 6l. 6WV -K-- Cert. Letter Gas (Form No. 2807) 01/17/02 PUGET SOUND ENERGY POTELCO INC A Ouanb Saniees Compmy REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT -OF -WAYS AND /OR ON PUGET SOUND ENERGY, INC. EASEMENTS The following outlines most local governmental guidelines and company standards for trenching on a public right -of -way or Puget Sound Energy, Inc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE permit or easement must comply with these requirements. 1. All trench construction must be performed by a Washington State licensed and bonded contractor. 2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated representative, and receive on -site approval by that representative, and local jurisdiction. 3. Right -of -way easement trenching and backfill must be performed during normal business hours, Monday through Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction is the responsibility of Potelco, Inc. Customer shall notify Potelco Project Manager three working days prior to trenching. Penalties for failure to comply with this requirement will be borne by the customer. 4. If the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements. 5. PSE, all participating utilities, and One -Call Locate, must be notified a minimum of 72 hours in advance of the date and time for right -of -way trenching and facility placement. The One -Call Locate number is 1- 800 424 -5555. State law requires locating service notification. 6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris shall be removed off -site each day, in accordance with local regulatory requirements. All erosion control requirements in accordance with local regulatory requirements are the responsibility of the customer. 7. Material excavated from the shoulder of the right -of -way shall be properly disposed, and replaced with select backfill material in accordance with local regulatory requirements. 8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction testing, the cost of said testing is the responsibility of the customer. 9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications and satisfaction. Page 1 of 2 Id l- 6V 61rv14-e— 10. In the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the company for costs should PSE perform the trenching. (initial) 11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable attorneys' fees) arising out of, or in connection with, the above mentioned trenching activities. (initial) Job Number 105069012 Trench Location 18799 Southcexr Parkway Tukwila WA 98188. Customer Name (print) -lye t& 10 I AGREE TO ADHERE TO THE ABOVE CONDITIONS Customer Signature Date �5 I Title Page 2 of 2 CIRCUIT FOOTAGE ADDED =10' NEW LOAD ADDED 48KVA LRC 232 A MAIN PANEL 200A SQFT =O V -DROP HH1 1.1% V -FLICK HH1 2.8% FAULT CURRENT HH1 12,600A 2 SCALE: 1' 100' CURB OR EDGE OF PAVEMENT f f shall be Specified at the V MIN 0 AS OF 2010 5' 8' MIN 6' MIN p i MIN 1 I ACCESS 65 DOOR 2 2 )3' TYP. PAD 88 TRANS- 10' MIN 87 FORMER N WA CABLE TV I ACCESS COO DOOR FINS f. 11007 �XI1322 1007 D T Prefect Mmaaer ConMdln%mutfm SCOTT aOSTROM 18•MIN CONCRE'TEPAD N 253-608.4552 c" F WA Pager ATTN: MICHAEL MAT/11A 206431 -2446 Calm below dial"88CALL PSE (22S 5' MIN ROAD OR ,+X REQUIRED ro WORK SPACE PARKING AREA o AREA 4ar4 wa RagdwC I W •Outpe+ReguheT a a PAVEMENT •-291,9 R. 1 1 I CURB OR EDGE OF MINIMUM CLEARANCES FOR PSE EQUIPMENT N Not to scale 6775.0035 Excavated Dirt Pile ROADSIDE 20• Min 24' Min Final Grade 48' 12' Min Max N SePareiOn 36' Min NOTE: Cover BaL14'ill, Bedding, and Shading requirements are contingent upon the soil type present on site, and CIRCUIT: SOU -24 shall be Specified at the POSSIBLE CUSTOMER ENTRY LOCATION Ina-construction meeting after do the AS OF 2010 a native e material erial has s been n v w� determined. SITE NOTES: MAPS AND RECORDS NOTE: ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, REFERENCE DESIGNMOB 105052358. "ALL VAULT NUMBERS REFERENCE ABOVE JOB# AT VN31: (EXISTING) INSTALL (3) L/B ELBOWS AT VN31A: )NEW TRF) INSTALL 4'8"X 4B' VAULT W/ ACCESS COVER SET 150 KVA 30 PM TRIP 2771480V INSTALL (3) L/B ELBOWS INSTALL (4) 1 POS SEC.CONNECTION BLOCKS INSTALL GRID NUMBER CONNECT AND TAG CUSTOMER RAN UG SVC ee1 RUN 2/01 PH SEC AT VN31 TO VN31a INSTALL (t10') 4a PRI. COND. FT) INSTALL (7:30') 301/0 AL JK PRI. CABLE FT) AT V31 I INSTALLED: GRID: 316148- 164587 XFMR SIZE: 150 KVA ID M TESTED SEC VOLT: FOREMAN PLEASE FILL IN CABLE AFT731 -A CABLEM AFT732 -8 CABLE AFT733 -C MANUFACTURER YEAR MANUFACT: VAULT DETAIL VN31A SCALE: NONE 1.657 lbs 20' 4. o 3,600lbs—� 3' -6' 4' -8' i 4 -8 Y Communication -Primary Power Cables ar Conduit CUSTOMER SUPPLIED TRENCH FOR PRIMARY CABLE VAULT EXCAVATION DETAIL SCALE: NONE Not to scale 6045.50041 I I EXISTING IA 28 AO- SO- AGCO54 EIISTNO IN CO- GC065 AL JKT. PRI. A0-A� a BO- AGC0S7 I CO- AGCO88 7 7 r VN31 NEW to AL JKT. PRI. A0- AM31 SO- AFT732 CO- AFT733 LENGTH 30 3 I 4 r ti W h J I I VN32 VN33 O ONE LINE DIAGRAM SCALE: NTS Q� 4� NEW 1A AL JKT. PRI. 90- AGC138 LENGTH 280 31 XOSTING 1A AL JKT. PAL A0- AGCO69 30- AGC07O :0- AGCO71 I EXOST.IA AL JKT. PRI- AO AGC21B BO- AGC219 CO- AGC220 CIRCUIT LOADING TABLE. POSSIBLE CUSTOMER CIRCUIT: SOU -24 ENTRY LOCATION I POSSIBLE CUSTOMER ENTRY LOCATION PSE O C— z AS OF 2010 A PHASE B PHASE C PHASE VAULT DETAIL VN31A SCALE: NONE 1.657 lbs 20' 4. o 3,600lbs—� 3' -6' 4' -8' i 4 -8 Y Communication -Primary Power Cables ar Conduit CUSTOMER SUPPLIED TRENCH FOR PRIMARY CABLE VAULT EXCAVATION DETAIL SCALE: NONE Not to scale 6045.50041 I I EXISTING IA 28 AO- SO- AGCO54 EIISTNO IN CO- GC065 AL JKT. PRI. A0-A� a BO- AGC0S7 I CO- AGCO88 7 7 r VN31 NEW to AL JKT. PRI. A0- AM31 SO- AFT732 CO- AFT733 LENGTH 30 3 I 4 r ti W h J I I VN32 VN33 O ONE LINE DIAGRAM SCALE: NTS Q� 4� NEW 1A AL JKT. PRI. 90- AGC138 LENGTH 280 31 XOSTING 1A AL JKT. PAL A0- AGCO69 30- AGC07O :0- AGCO71 I EXOST.IA AL JKT. PRI- AO AGC21B BO- AGC219 CO- AGC220 CIRCUIT LOADING TABLE. PROJECT PHASE I NOTIFN CIRCUIT: SOU -24 PWR Superior x440557357 I 105069012 III AS OF 2010 A PHASE B PHASE C PHASE EXIST. PEAK LOA) 66 88 65 EST. NEW LOAD 2 2 2 TOTAL 88 90 87 POWER GENERAL NOTES COMMERCIAL PROJECT 1. All materials to be installed In accordance with Puget Sound Energy's (PSE) standards. Any deviation from this Work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foreman' Copy. 2. AI switch hd arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) Wolking days in advance. 3. Contact t4s, Utilities Underground Location Center (i4WO -424 -5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, IoL pole, sidewalk. etc.). Sea sketch and details for location. Equipment locations must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or near finished grade. clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved o have a compacted. crushed rock base In place. 7. CLEAR/WCES: Transformers require a minimum of 6 feet from fire fighting equipment. 10 feet from combustiUle walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts red required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, stoRn end.aewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. a. All work IB td be done in accordance With local municipal and county permit requirements as applicable. 9. Customepaveloper Is responsible to provide. Install and maintain all secondary service cables, conduits aid from the Individual units meter base to the designated wrinecUm polnL cros 10. Incleman) weather conditions may cause delays In construction times and dates. 11. EXCAVAtK)N: The customer Is to provide all trenching, baddXll, vault excavations, compaction and restoravA par this sketch and per PSE standards. A minimum protective cover of 36' Is required over PSE§ pridl'ely voltage equipment and 24• Is required of PSE's Secondary voltage equipment. The customer will provide tiny and all shoring o they will side slope the trench to 1:1. POTELCO DESIGN AND QUALITY ASSURANCE This design complies with PSE Design/Englneering Standards. Any /all variations have been pre- approved /documented by the appropriate PSE Representative. Signature PIW Name Dale EROSION SEDIMENT CONTROL REQUIREMENTS EROSION at SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION SEDIMENT CONTROL 8 ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETALS OF THE TYPICAL EROSION STRUCTURES, 8 SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) FOREMAN (CHECK BOX WHEN COMPLETED) V/clnity Help D PSEEgWv- 1tnc- WECUaEDA Work Me MNL1FnN5AFE CUtlaon THOMAS GUIDE PG 685: F2 W4CC.tu,gi,,geMSwMA nun6mE IN9TAllFDAVER61En. FME e gE04nNFnm AaheL T"P VERIFIEDW I,olea en Papnwk O TMeI PRIMARY fA O ADFO m Ae4k4t l CCmperry 113s. RECORDFO N OOC E 1 a M C Mh/x c—a mmH F­ SIZE en/u -pMIIa VEwFY pmpu PHhSE ca,eax crmdJlN(eliwm�aee. DavlatlmeroWOn an ASlxJa antl eieilluaon. 1 pmay trot tint nC,k pedameE meets PSE'e mnaaNa W plme0,ro end NN ell queliy reguMnwib enmK Pe s,,— PNa Name DeP, al O M (O C? N PROJECT PHASE I NOTIFN r OROERA PWR Superior x440557357 I 105069012 III MAPS AND RECORDS NOTE: Pa m. SNv*- xs4222136T 1e4237&9B ALL FACILITY NOT MAPED AT TIME OF DESIGN. FOR DETAILS, R R� i WA i WA REFERENCE DESIGWJOB 105052358. T- -Y WA 1 WA **ALL VAULT NUMBERS REFERENCE ABOVE JOB# Job D WA G118 Ixmawlen I WA WA t WA HP Main II WA j WA HP SvdMSA I WA WA CABLE TV I I Owner/ Developer Contact Into PHONE I I 1 CAWOFTUKWnA f. 11007 �XI1322 1007 D T Prefect Mmaaer ConMdln%mutfm SCOTT aOSTROM WOO SOUTHGENTER BLVD TUKWIlA WA 98186 T `A ;6 ^itt 253-608.4552 c" F WA Pager ATTN: MICHAEL MAT/11A 206431 -2446 Calm below dial"88CALL PSE (22S Im 'A 1 CALL (800) 42455 58 YOU PSE j C/ 4ar4 wa RagdwC I W •Outpe+ReguheT �Yoe CF) I mg a NRTCIn NDT teaE AEUEOUPoxrOR LOGIIpx OFDOSfNa FA2mEe No REAL ESTATE/EASEMENT PERMR O •-291,9 R. 1 1 I NC REQUIRED I WA IFUNC110N I CONTACT I PHONENO I DATE `l 3 1 (PROUECT MGR I Sma Boaban I 2516064552 1 2/5/12 LOCATION I■ 3/ 2 1 I i 1 1 I IENGR -POWER I Sma BOSt— I 253x"552 1 2/5172 A 6 S WA I WA REV# I DATE I BY IDESCRIPTION IENGR -CAS WA l 253-6064552 I 2 NUA X3422 T 30r IOW W NIA KING I OP 92.9r,Zi It. /.vr�/� OKE �CCHECKEEDBV i PIA 30. 114 SEC SEC MAP I I MAP /e#S I JFOREMANIH 1 I� J 3# 3�. 2 L•••• SW1/4 SEC35 T23 R04E WA L;-MAP NO (POWER) CKT MAP WA CKT MAP NO (FOREMAN X2 1 1 w l2� Y i5 30••• IOH JUG 2304EI39 9 .a it1 (CIRCUIT 23e4E139 SOUQ4 `MAPPING I I 1 JOINT FACILITIES ARRANGEMENTS 657 S UTIUTXES NIA I WA I WA 1 WA 1 1 W S KA7 J7 CONTACT WA PHONE# WA I WA 1 WA I WA I WA I WA I WA A gpgg z 30 14 ff PUGS INCIDENT MAOP N /A TUKWILA SOUTH DEVELOPMENT W G. Other E 9012 110 SOUND 30 LINE EXTENSION WA (70 50 69m2 ENERGY 18799Southrener Partway Tek*9aw"Be1W PAGE .OVERHEAD CIRCUIT MAP DE810KED BY Ya/�ro INC s AS NOTED I 1 OF i SCALE: 6' =1 MILE