Loading...
HomeMy WebLinkAboutOrd 2376 - Land Acquisition for Tukwila Transit Center See following reference in relation to Ordinance 2376. Ordinance 2377 Ordinance No. 2376 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, AUTHORIZING AND PROVIDING FOR THE ACQUISITION OF INTERESTS IN LAND FOR THE PURPOSE OF COMPLETING THE TUKWILA TRANSIT CENTER PROJECT; PROVIDING FOR CONDEMNATION, APPROPRIATION, TAKING OF LAND AND PROPERTY RIGHTS NECESSARY THEREFORE; PROVIDING FOR PAYMENT THEREOF; AND DIRECTING THE INITIATION OF APPROPRIATE PROCEEDINGS IN THE MANNER PROVIDED BY LAW FOR SAID CONDEMNATION; REPEALING ORDINANCE NO. 2364; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, on December 5, 2011, the City Council adopted Ordinance No. 2364, which provided for the acquisition of land and property rights associated with the Tukwila Transit Center project; and WHEREAS, an additional temporary construction easement area, beyond that which was identified in Ordinance No. 2364, is necessary to facilitate construction of the Tukwila Transit Center project; and WHEREAS, on December 5, 2005, the City Council amended the Transportation Element of the Comprehensive Plan, by Ordinance No. 2108, which included the Tukwila Urban Center Transit Center Project as a high priority project necessary to provide quality transit service and complement adjacent land uses; and WHEREAS, the City Council has found that the public health, safety, necessity and convenience demand that said project be undertaken at this time and that in order to carry out the project it is necessary at this time for the City to acquire interests and rights to the properties described herein; and WHEREAS, the City Council finds and declares it necessary and in the best interest of the public that interests in the land and property rights hereinafter described be condemned, appropriated, and taken for public use, subject to the making or paying of just compensation to the owners thereof in the manner provided by law; and W: Word Processing \OrdinancesWquisition of land- Transit Center project -rvsd 4 -23 -12 CK:bjs Page 1 of 3 WHEREAS, the Tukwila Transit Center project and the Andover Park West Widening project are being designed concurrently because of the overlapping project limits making distinct project limits difficult to define; and WHEREAS, notice of the planned final action was handled in accordance with RCW 8.25.290 to include publication in "The Seattle Times" and "Daily Journal of Commerce" on May 7 and May 14, 2012; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. Repealer. Ordinance No. 2364 is hereby repealed in its entirety. Section 2. The land and property rights within the City of Tukwila, King County, Washington, commonly known as a portion of Andover Park West near Baker Boulevard and further described in the attached Exhibits A through E, are necessary for construction of the Tukwila Urban Center Transit Center Project described above, subject to making or paying just compensation to the owners thereof in the manner provided by law. Section 3. The City of Tukwila specifically finds construction of the project to be a public use, specifically the lengthening of the existing bus pull -out on the west side of Andover Park West, widening a portion of Andover Park West to accommodate a new bus pull -out, and construction of an improved on- street transit center including the improvement or installation of custom bus shelters, street furniture, pedestrian plazas, and the related construction or addition of curb, gutter and sidewalk, signalization, illumination, landscaping, irrigation, storm drainage and storm detention. The City Council specifically finds construction of the project to be necessary and in the best interests of the citizens. Section 4. The cost and expense of acquiring said property rights shall be paid from the 2011 -2013 Regional Mobility Grant awarded to the City of Tukwila by the Washington State Department of Transportation, from general funds of the City of Tukwila, and from other monies applicable thereto that the City may have available or may obtain. The Director of the Public Works Department or his designee is hereby authorized to negotiate with and make offers to the owners of said land or property for the purposes of making or paying just compensation, and to approve the payment of just compensation as negotiated with said owners or as ordered by the Court. Section 5. In the absence of negotiated purchases with the affected property owners, the City Attorney is hereby authorized and directed to undertake proceedings provided by law to condemn, appropriate, and take the property necessary to carry out the provisions of this ordinance. The City Attorney is further authorized to approve and enter into any and all such agreements, stipulations, and orders necessary to carry out the provisions of this ordinance, including for the payment of just compensation as agreed to with the property owners or as ordered by the Court. W: Word Process ing \Ord in ances\Aquisition of land- Transit Center project -rvsd 4 -23 -12 CK:bjs Page 2 of 3 Section 6. Corrections by City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; references to other local, state or federal laws, codes, rules, or regulations; or ordinance numbering and section /subsection numbering. Section 7. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. Section 8. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force five days after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of M" 2012. ATTEST /AUTHENTICATED: Christy O'Flahierty, MMC, City perk 11 k Z44'7'V' Jin gerton, NW APPROVED AS TO FORM BY: S elle Kerslake, GN"ttorney Attachments: Exhibit A (6 pages) Filed with the City Clerk: /6 /�L Passed by the City Council: -iJL Published: Effective Date: ,3- J L Ordinance Number: Andover Park West Right -of -Way Take Legal Description and Map Northbound Transit Temporary Construction Easement Legal Description and Map Andover Park West Temporary Construction Easement Legal Description and Map Exhibit B (6 pages) Southbound Transit Easement Legal Description Southbound Transit Center Temporary Construction Easement Legal Description and Map Exhibit C (2 pages) Temporary Construction Easement Legal Description and Map Exhibit D (4 pages) Temporary Construction Easement Legal Description and Map Exhibit E (2 pages) Canopy Easement Legal Description and Map W: Word Processing \OrdinancesWquisition of land- Transit Center project -rvsd 4 -23 -12 CK:bjs Page 3 of 3 EXHIBIT A City of Tukwila Tax Parcel No. 02231000010 Andover Park West Right of Way Take That portion of Lot 2 of City of Tukwila Boundary Line Adjustment No. L05 -025, recorded under Recording No. 20050928900006, records of King County, Washington, described as follows: Commencing at the northwest corner of said Lot 2; Thence South 00 °11'38" East, along the west line thereof and the east margin of Andover Park West, a distance of 12.04 feet to the POINT OF BEGINNING; Thence continuing along said east margin through the following courses: South 00 °11'38" East a distance of 23.21 feet; Thence South 89 °48'22" West a distance of 5.50 feet; Thence South 00 °11'38" East a distance of 250.50 feet to the beginning of a tangent curve concave to the northeast and having a radius of 50.00 feet; Thence southeasterly along the are of said curve through a central angle of 55 °28'55" a distance of 48.42 feet; Thence leaving said east margin, North 00 °11'38" West a distance of 314.91 feet; Thence South 89 °48'22" West a distance of 16.17 feet to the POINT OF BEGINNING. Situate in the City of Tukwila, County of King, State of Washington, The above described easement areas contain 6,429 square feet, more or less. :Kr Nil u c+v'� 4 PA\P09 \09603.13 Final Design \docs\IBI Tukwila APW Right of Way Take.doc k EXHIBH MAP TUKWILA TRANSIT CENTER ANDOVER PARK WEST RIGHT OF WAY TAKE LINE TABLE I LINE BEARING I LENGTH I L34 S00 1'38 "E 12.04 1 L351 S89 16.171 1 L361 S00 1'38"E 1 23.211 1 L371 S89 1 5.501 0 Co rn PARCEL 0223100020 POB— NW COR. LOT 2 L351 CONC. DR. 37 r PARCEL 0223100010 rzj ti b z 0 C C ASPH, BLDG. CURVE TABLE I CURVE I LENGTH I RADIUS DELTA I I C211 48.421 50.001 55 AREA OF RIGHT OF WAY TAKE I I CONC L LAIo BAKER J S89 °42'31 "E BL FD, 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 f. 425.827.5043 SCALE: 1" 50' WhAft0% I FILE: \EASEMENT EXHIBIT.DWG I Structural Planning Survey DATE: 11/16/11 BY: FW I An Engineering Services Company paceengrs.com PROJ. NO.: 09603.13 City of Tukwila Northbound Transit Stop Temporary Construction Easement Description Tax Parcel No. 0223 1 000 10 That portion of Lot 2, City of Tukwila Boundary Line Adjustment No. L05 -025, recorded under Recording No. 20050928900006, records of King County, Washington, described as follows: BEGINNING at the northwest corner of said Lot 2; Thence South 00 °1 1'38" East, along the west line thereof and the east margin of Andover Park West, a distance of 12.04 feet; Thence North 89 °48'22" East, at right angles to said west line and east margin, a distance of 16.17 feet; Thence South 00'11'38" East, parallel with said west line and cast margin, a distance of 297.29 feet to the North line of an existing City of Tukwila sidewalk and traffic signal easement recorded under King County Recording No. 9511300537; Thence North 89 °48'22" East, along said north easement line, a distance of 3.71 feet to an angle point in said easement; 'thence South 00 °17'49" West, along the east line of said easement, a distance of 9.37 feet to the northerly line of an existing City of Tukwila sidewalk and street light easement recorded under King County Recording No. 20080305001758 and the beginning of a non- tangent curve concave to the northeast from which the radius point bears North 41'03'1.7" East a distance of 35.61 feet; Thence southeasterly along the are of said curve and northerly line through a central angle of 33 °21'03" a distance of 20.73 feet; Thence South 89 °37'17" East along said easement line, a distance of 13.35 feet; Thence North 00'11'38" West parallel with said west Iine of Lot 2 and east margin of Andover Park West a distance of 22.84 feet; Thence North 36 SS'29" West a distance of 30.89 feet; Thence North 00 °1 P38" West, parallel with said west line and cast margin a distance of 277.01 feet to the north line of said Lot 2; Thence North 89 °42'31" West along said north line a distance of 34.17 feet to the POINT OF BEGINNING. Situate in the City of Tukwila, County of King, State of Washington, The above described easement areas contain 6,590 square feet, more or less �e���. 1� 2�t�_ !NJ �t' •IZ��I iii o�;tL 1,r,•aD P:\1'09 Final Design \docs\tBl -Tukwila Northbound Transit 'ferry) Esmt.doc EXHIBIT MAP TUKWILA TRANSIT CENTER NORTHBOUND STOP TEMPORARY CONSTRUCTION EASEMENT 30' LINE TABLE 0223100010 1 LINE I BEARING i LENGTH L1J S00'11'38 "E1 12.04 1 L21 N89'48'22 "E 1 16.17 L31 N89'48'22 "E 1 3.711 1-41 S00'17'49 "W1 9.371 L51 S89'37'1 7"E 13.35 L61 N00 1'38 "W 22.84 L71 N36'58'29 "WI 30.89 L81 N89'42'31 "W 1 34.171 CURVE TABLE l CURVE I LENGTH RADIUS DELTA C11 20.73 1 35.611 3.3'21'03"1 TEMPORARY CONSTRUCTION EASEMENT AREA DETAIL 1" 20' r----- t 1 1 1 1 r 1 1 1 1 1 r 1 1 1 f 1 1 1 1 1 30' i r r L3 /�N t e r I t r L5 f 1 EXIST. ESM'T 20080305001758; 1 f 1 i EXIST. ESM'T 9511300537�� An Engineering Services Company P. 8. NW COR LOT i 11 Co o o� V) ,d I,� t 9a 6 PARCE 0223000020 \PARCEL 0223100010 L2 V y CONC. DR. 0 18.00' 0 C� o 1z O rn 0 O N N A y 0 z 0 0 F. o a z o ASPH. BLDG. o X\ W N i O i O /Z Illl 0 d l Cit 2 Q 40' ANJJV>rFd i CO NC f UVLlU51F11t1L -PARK 2 i� s SEE DETAIL Q OPPOSITE BAKER J S89'42'31 "E BL VD, co r7 I 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 1 f. 425.827.5043 Civil Structural I Planning I Survey paceengrs.com SCALE: 1 50' FILE: \EASEMENT EXHIBIT.DWG DATE: 03/17/12 BY: FW PROD. NO.:09603.13 City of Tukwila Andover Park West Temporary Construction Easement Description Tai Parcel No. 0223000020 That portion of Lot 1, City of Tukwila Boundary Line Adjustment No. L05 -025, recorded under Recording No. 20050928900006, records of King County, Washington, described as follows: BEGINNING at the northwest corner of said Lot l; 1 IlencC South 00 °14'09" East, along the west line thereof and the east margin of Andover Park West, a distance of 359.68 feet; Thence continuing along said west line and east margin, South 00'11'38" East a distance of 89.04 feet to the south line of said Lot 1; Thence North 89 °42'31 Ea.st along said south line, a distance of 34.17 feet; Thence northerly, parallel with or at right angles to, said west line and east margin through the following courses: North 00 °11'38" West a distance of 51.90 feet; Thence South 89 °48'22" West a distance of 19.17 feet; Thence North 00 °1 1'38" West a distance of 37.45 feet: Thence North 00 °1409" West a distance of 359.53 feet to the north line of said Lot 1; Thence North 89 °42'31 West along said north line, a distance of 15.00 feet to the POINT OF BEGINNING. Situate in the City of Tukwila, County of King, State of Washington, The above described easement areas contain 7,724 square feet, more or less. 2, 040/ Z P:U'09109603.13 Final DcsigMdors9B1 -Tukwila I'mrcel 02230000201'ernp Esna.duc EXHIBIT MAP ANDOVER PARK WEST PARCEL 0223000020 TEMPORARY CONSTRUCTION EASEMENT TEMPORARY CONSTRUCTION EASEMENT AREA SCALE: 1" 50' FILE: \EASEMENT EXHIBIT,DWG DATE: 02/23/12 BY: FW PROJ. NO.: 09603.13 iE An Engineering Services Company 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 1 f. 425.827.5043 Civil I Structural I Planning I Survey 30. 40' f j 'i PARCEL 0223000020 I i P.O.B. N89'42'31 "W 15.00' I 11 W 1 T f`�AJ LF) I� ON./ r U CL i CONC. WALK o iz RD f' _1 C) Ctl I CL- i TF?AC'( 1 co J S89'48'22 "W M �00I�19.17' M oil i z; 0 rn j LO �o 0 i 3) 40 z I /34.17' P 0223000 i IN89'42'31 "E PARCEL 0223100010 EiiT City of Tukwila Parcel A and G Binding Site Plan #L10 -032 Tax Parcel No. 9202470010 and 9202470070 Southbound Transit Easement Description That portion of Parcels A and G of City of Tukwila Binding Site Improvement Plan No. L10 -032, recorded in volume 256 of Plats, Pages 1 through 9, under Recording No. 20101021000765, records of King County, Washington, described as follows: Commencing at the northeast corner of said Parcel G; Thence North 00 °11'38" West along the east line of said Parcels G and A, and the west margin of Andover Park West, a distance of 288.32 feet; Thence South 89 °46'20" West a distance of 29.76 feet to the beginning of a tangent curve concave to the south and having a radius of 125.00 feet; Thence westerly along the arc of said curve through a central angle of 3 °47'32" a distance of 8.27 feet; Thence South 00 °1 1'38" East a distance of 14.75 feet to the beginning of a non- tangent curve concave to the south from which the center point bears South 05 °48'17" East a distance of 95.00 feet; Thence westerly along the arc of said curve through a central angle of 27 °43'16" a distance of 45.96 feet; Thence South 33 °53'21" East a distance of 35.87 feet to the beginning of a tangent curve concave to the northeast and having a radius of 8.00 feet; Thence southeasterly along the arc of said curve through a central angle of 56 °20'23" a distance of 7.87 feet; Thence North 89 °46'16" East a distance of 18.79 feet; Thence South 00 °04'14" East a distance of 219.23 feet; Thence South 00 °19'53" East a distance of 163.62 feet to the beginning of a tangent curve concave to the east and having a radius of 8.25 feet; Thence southerly along the are of said curve through a central angle of 44 °07'53" a distance of 6.35 feet to the beginning of a compound curve concave to the north and having a radius of 13.00 feet; Thence easterly along the are of said curve through a central angle of 48 °27'27" a distance of 10.99 feet; Thence North 89 °48'22" East a distance of 23.40 feet to the east line of said Parcel A and west margin of Andover Park West; Thence North 00 °11'38" West along said east line of Parcels A and G and west margin of Andover Park West, a distance of 167.81 feet to the POINT OF BEGINNING. Together with that portion of said Parcel A described as follows: Commencing at northeast corner of said Parcel G; Thence North 00 °11'38" West along the east lines of said Parcels G and A and said west margin of Andover Park West, a distance of 317.54 feet to the POINT OF BEGINNING of the easement area herein described; Thence continuing North 00 °11'38" West along said east line of Parcel A and west margin, a distance of 44.57 feet; Thence North 89'10'47" West a distance of 29.34 feet to the beginning of a tangent curve concave to the southeast and having a radius of 2.00 feet; Thence southwesterly along the arc of said curve through a central angle of 90 °02'27" a distance of 3.14 feet; Thence South 00 °46'46" West a distance of 43.13 feet; PAP09\09603. l3 Final Design \does \lBI Tukwila Southbound Transit Easement.doc Thence North 89 East a distance of 32,11 feet to the POINT OF BEGINNING; Situate in the City Of Tukwila, COL"'t) of King, State of Washington, The above described easement areas contain 18,580 square feet, more or less. 132 S fl:\1 Final Dcsign\docs\1Bi Tukwila Southbound Transit Easement.doc City of Tukwila Parcel A and G Binding Site Plan 4L10 -032 Tax Parcel No. 9202470010 and 9202470070 Southbound Transit Center Temporary Construction Easement Description That portion of Parcels A and G of City of Tukwila Binding Site Improvement Plan No. L10 -032, recorded in volume 256 of Plats, Pages 1 through 9, under Recording No. 20101021000765, records of King County, Washington, described as follows: Commencing at the northeast corner of said Parcel G; Thence North 00'I V38" West along the east line of said Parcels G and A, and the west margin of Andover Park West, a distance of 288.32 feet to the POINT OF BEGINNING of the easement herein described; Thence South 89 °46'20" West a distance of 29.76 feet to the beginning of a tangent curve concave to the south and having a radius of 125.00 feet; Thence westerly along the arc of said curve through a central angle of 3 °47'32" a distance of 8.27 feet; Thence South 00 °11'38" East a distance of 14.75 feet to the beginning of a non- tangent curve concave to the south from which the center point bears South 05'48'17" East a distance of 95.00 feet; Thence westerly along the are of said curve through a central angle of 27 °43'16" a distance of 45.96 feet; Thence South 33 °53'21" East a distance of 35.87 feet to the beginning of a tangent curve concave to the northeast and having a radius of 8.00 feet; Thence southeasterly along the arc of said curve through a central angle of 56 °20'23" a distance of 7.87 feet; Thence North 89 °46'16" East a distance of 18.79 feet; Thence South 00'04'14" East a distance of 219.23 feet; Thence South 00'] 9'53" East a distance of 163.62 feet to the beginning of a tangent curve concave to the east and having a radius of 8.25 feet; Thence southerly along the arc of said curve through a central angle of 44 °07'53" a distance of 6.3 5 feet to the beginning of a compound curve concave to the north and having a radius of 13.00 feet; Thence easterly along the are of said curve through a central angle of 48 °27'27" a distance of 10.99 feet; Thence North 89 °48'22" East a distance of 23.40 feet to said west margin of Andover Park West; Thence South 00 °11'38" East along said west margin a distance of 5.00'; South 89 °48'22" West a distance of 23.40 feet to the beginning of a tangent curve concave to the northeast and having a radius of 18.00 feet; Thence northwesterly along the are of said curve through a central angle of 48 °27'27" a distance of 15.22 feet to the beginning of a compound curve having a radius of 13.25 feet; Thence northerly along the arc of said curve through a central angle of 44 °0753" a distance of 10.21 feet Feet; Thence North 00'19'53 West a distance of 6.27 feet; Thence South 89 °40'07" West a distance of 4.00 feet; Thence North 00'19'53" West a distance of 15.88 feet; Thence North 89 °40'07" East a distance of 4.00 feet; Thence North 00 °19'53" West a distance of 112.51 feet; Thence South 90 °00'00" West a distance of 13.00 feet; Thence North 00'16'56" West a distance of 243.16 feet to the beguuiing of a non tangent curve concave to the northeast from which the radius point bears North 00'13'44" West a distance of 13.00 feet; Thence northwesterly along the are of said curve through a central angle of 56 °20'23" a distance of 12.78 feet; PAP09\09603.13 Final Desi.-n\docsiIBl Tukwila Southbound Temp Easement.doc Thence North 33 °53'21 West a distance of 40.78 feet to the beginning of a non tangent curve concave to the southeast fi which the radius point bears South 36 °24'35" East a distance of 100.00 feet; Thence northeasterly along the arc of said curve through a central angle of 28 °00'04" a distance of 48.87 feet; Thence North 00° 11'38" Vilest a distance of 14.60 feet to the beginning of a non- tangent curve concave to the south from which the center point bears South 07 °28'49" East a distance of 130.00 feet; Thence easterly along the arc of said curve through a central angle of 5 °48'36" a distance of 13,18 feet; Thence North 89 °46'20" .East a distance of 29.76 feet to said west margin of Andover Park West; Thence South 00° 1 1'38" East, along said west margin, a distance of 5.00 feet to the POINT OF BEGINNING. Together with that portion of said Parcel A described as follows; Commencing at northeast corner of said Parcel G; Thence North 00° 11'38" West along the east lines of said Parcels G and A and said west margin of Andover Park West, a distance of 362.11 feet to the POINT OF BEGINNING of the easement area herein described; Thence North 89 °1 0'47" West a distance of 29.34 feet to the beginning of a tangent curve concave to the southeast. and having a radius of 2.00 feet; Thence southwesterly along the arc of said curve through a central angle of 90 °02'27" a distance of 3.14 feet. Thence South 00 °46'46" West a distance of 43.1 3 feet; Thence North 89 °48'22" East a distance of 32.11 feet to said west margin of Andover Park West; Thence South 00 °11.'38" East along said west margin a distance of 5.00 feet; Thence South 89 °48'22" West a distance of 37.19 feet; Thence North 00 °46'46" East a distance of 48.22 feet to the beginning of a tangent curve concave to the southeast and having a radius of 7.00 feet; Thence northeasterly along the arc of said curve through a central angle of 90 02'27" a distance of 11.00 feet; Thence South 89° 10'47" East a distance of 29.25 feet to said west margin of Andover Park West; Thence South 00° 11'3 8" East along said west margin a distance of 5.00 feet to the POINT OF BEGINNING; Situate in the City of Tukwila, County of King, State of Washington, The above described easement areas contain 6,850 square feet, more or less i P SP09\09603 13 Final Design \docs\1131 rukmila Southbound Temp C_asement.doc EXHIBIT MAP TUKWILA TRANSIT CENTER EASEMENT WESTFIELD PARCEL LEGEND: HORIZONTAL DATUM CITY OF TUKWILA BINDING SITE IMPROVEMENT PLAN NO. L10 -032 NEW TRANSIT EASEMENT HATCHED AREAS BSIP PARCEL LINES CENTERLINE RIGHT OF WAY LINE PAGE 2 II c2o C14 30' 40' t f N N NORTHI AREA BAKER BL VD. 30' 1 3 J' 'x N CO 1 0 I,N CONTINUED FROM PAGE 1 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 1 f. 425.827.5043 Civil I Structural I Planning I Survey paceengrs.com DATE: 03/19/12 BY: FW I 1 I CURVE TABLE 1 CURVE I LENGTH I RADIUS 1 DELTA 1 C31 45.961 95.001 27 °1 C41 7.871 8.00( 56'20'23 "1 C71 6.351 8.251 44'07'53" 1 C81 10.991 13.00 48'27'27 I 1 C111 3.141 2.001 90'02'27 "1 1 C14 8.271 125.001 3'47'32 "1 C151 13.181 130.001 5'48'36" 1 C161 48.871 100.001 28'00'04"1 1 C171 12.781 13.001 56'20'23 "1 C181 10.211 13.251 44'07'53" 1 C191 15.221 18.001 48 1 C201 11.001 7.001 90'02'27 "1 LEGEND: HORIZONTAL DATUM CITY OF TUKWILA BINDING SITE IMPROVEMENT PLAN NO. L10 -032 NEW TRANSIT EASEMENT HATCHED AREAS BSIP PARCEL LINES CENTERLINE RIGHT OF WAY LINE PAGE 2 II c2o C14 30' 40' t f N N NORTHI AREA BAKER BL VD. 30' 1 3 J' 'x N CO 1 0 I,N CONTINUED FROM PAGE 1 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 1 f. 425.827.5043 Civil I Structural I Planning I Survey paceengrs.com DATE: 03/19/12 BY: FW I 1 I PAGE 1 EXHIBIT MAP TUKWILA TRANSIT CENTER EASEMENT WESTFIELD PARCEL SEE PAGE 2 FOR CURVE TABLE TRANSIT EASEMENT TEMPORARY. CONSTRUCTION EASEMENT TE� Y.R CONTINUED ON PAGE 2 \4 zt Co ip 1 -j O� o .0 /O l OD 9 Z w z i lo I j I �L1 I l 30' I \--POB E F SOUTHI \C�� L24 AREAN i p L24 TYP. 111 F LJ O F- W w� I I Q w ✓z Q i I. 0 z L25�O 2 p�� 310 30 i rn C18 L29� C1 C8� i 5 1 30.00� 1 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 mom p. 425.827.2014 1 f. 425.827.5043 Civil Structural I Planning I Survey An Engineering Services Company paceengrs.com SCALE: 1" 50' FILE: \EASEMENT EXHIBIT.DWG DATE: 03/19/12 BY: FW PROJ. NO.: 09603-13 LINE TABLE 1 LINE I BEARING I LENGTH I L2 S00'1 1'38 "E I 14.751 L31 S33 "E I 35.871 L41 N89'46 16 E I 18.791 L71 N00'1 1'38 "W I 44.571 L81 N89'10'47 "WI I 29.341 I 1 L101 S00'46'46 "W I 43.131 1-121 S89 46'20 "W 1 29.761 L131 N89'48'22 11 E 1 23.401 L141 N89'48'22 "E I 32.111 L151 N89'46'20 "E I 29.761 L161 N00'1 1'38 "W I 14.601 L171 N33 "W 40.781 L181 S89 6 13.771 L191 589'59'26 "W 1 12.0 L201 S00'00'00 "E I 21.871 L211 N89'59'37 "E I 3.661 L221 SO4'20'21 "E I 63.361 L231 S00'0034 "W 1 53.581 L24 S90 Do wI 13.001 L251 N89'40'07 "E I 4.001 L261 N00'1 9'53 "W I 15.881 L271 S89'40'07 "W I 4.001 L281 N00'19'53 "WI 6.271 L291 S89'48'22 "WI 23.401 L30 S89 0'47 29.251 1 L321 I S00'46'46 "WI 48.221 L331 S89 48 22 "W1 37.191 SEE PAGE 2 FOR CURVE TABLE TRANSIT EASEMENT TEMPORARY. CONSTRUCTION EASEMENT TE� Y.R CONTINUED ON PAGE 2 \4 zt Co ip 1 -j O� o .0 /O l OD 9 Z w z i lo I j I �L1 I l 30' I \--POB E F SOUTHI \C�� L24 AREAN i p L24 TYP. 111 F LJ O F- W w� I I Q w ✓z Q i I. 0 z L25�O 2 p�� 310 30 i rn C18 L29� C1 C8� i 5 1 30.00� 1 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 mom p. 425.827.2014 1 f. 425.827.5043 Civil Structural I Planning I Survey An Engineering Services Company paceengrs.com SCALE: 1" 50' FILE: \EASEMENT EXHIBIT.DWG DATE: 03/19/12 BY: FW PROJ. NO.: 09603-13 EXHIBIT C� City of Tukwila Andover Park West Temporary Construction Easement Description Tax :Parcel No. 0223100070 That portion of Tract 7, Andover Industrial Part; No. 2, according to the plat thereof recorded in Volume 71 of Plats, pages 68 and 69, in King County Washington, lying southerly of a line drawn parallel with the south line of Baker Boulevard, and 459 feet southerly thereof, as measured at right angles to said south line, said easement being more particularly described as follows: Commencing at the northwest corner of the above described parcel; Thence South 89 42'31" East along said north line a distance of 1.0.00 feet to the east line of existing 1.0.00 foot utility easement per said plat of Andover Industrial Park. No. 2 and the POINT OF BEGINNING; "Thence South 00° 11'38" East, along said easement, a distance of 304.89 feet to the beginning of a tangent curve concave to the northeast and having a radius of 40.00 feet; Thence southeasterly along the are of said curve and easement line, through a central angle of 25 °50'29" a distance of 1.8.04 feet; ".Thence northerly, parallel with or at right angles to, the centerline of said Andover Park West, through the following courses: North 00 °11'38" West a distance of 233.83 feet; Thence North 89 °48'22" East a distance of 22.50 feet; Thence North 00'11'38" West a distance of 59.85 feet; Thence South 89 °48'22" West a distance of 19.50 feet; Thence North 00° 11'38" West: a distance of 28.59 feet to the north line of the above described parcel; Thence North 89 °42'31 West: along said north line a distance of 7.00 feet to the POINT OF BEGINNING. Situate in the City of Tukwila, County of King, State of Washington, The above described easement: areas contain 2,700 square feet, more or less. v' 1 ^'`r``gt n 242:1 1, PV09109603.13 final Desi.on`docs\1B1 '1'uJovila Parcel 0223100070 Temp Gsmt•doc EXHIBIT MAP I PARCEL 0223100075 ANDOVER PARK WEST PARCEL 0223100070 PARCEL 0223100070 CONIC. TEMPORARY CONSTRUCTION POB L3 EASEMENT E co n 11 I I U) 1 LINE TABLE 0223100070 I 3 /j 1, 11 LINE BEARING I LENGTH 11 1-111 589'42'31 "E 1 10.0011 I L211 NB9'48'22 "EI 11 L311 S89 48'22 "W 1 19 -5 0 1 I 6 11 w( i I L41 N00'1 1'38 "W 1 28.5911 d 00 11 L51 N89 42'31 "W I 7.001 g o m t M 11 t� l i p Q] UJ l W M i _O._....... w 011z G o o l 4.00' TEMPORARY TEMPORARY CONSTRUCTION tt I�I EASEMENT AREA I o cli r� 10.00' ASPH. PARKING l r 1 30' 30' D= 25'50'29" E 1 R= 40.00' 10.00' ESM'T L= 18.04' PER PLAT —o 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 f, 425.827.5043 Civii 11 Structural Planning 11 Survey An Engineering Services Company paceengrs.com STRANDER BL VD. j 8189'32' 46 "W SCALE: 1" 50' FILE: \EASEMENT EXHIBIT.DWG DATE: 03/17/12 BY: FW PROJ. NO.: 09603.13 EXHIBIT City of Tukwila Andover Park West Temporary Construction Easement Description Tax Parcel No. 0223100075 That portion of Tract 7, Andover Industrial Park No. 2, according to the plat thereof recorded in Volume 71 of Plats, pages 68 and 69, in King County Washington, lying north of a line drawn parallel with the south line of Baker Boulevard, and 459 feet southerly thereof, as measured at right angles to said south line, said easement being more particularly described as follows: Commencing at the southwest corner of the above described parcel; Thence North 89 °42'31" West along said south line a distance of 10.00 feet to the east line of existing utility easement per said plat of Andover Industrial Park No. 2 and the POINT OF BEGINNING; Thence North 00 °11'38" West, along the east line thereof, a distance of 408.67 feet to the beginning of a tangent curve concave to the southeast and having a radius of 40.00 feet; Thence northeasterly along said east line and the arc of said curve, through a central angle of 34 °24'41" a distance of 24.02 feet; Thence parallel with or at right angles to the centerline of Andover Park West, through the following courses: South 00 °1198" East a distance of 125.41 feet; Thence North 89 °48'22" East a distance of 21.00 feet; Thence South 00 °11'38" East a distance of 33.90 feet; Thence South 89 °48'22" West a distance of 21.00 feet; Thence South 00 °11'38" East a distance of 198.09 feet; Thence North 89 °48'22" East a distance of 20.50 feet; Thence South 00 °11'38" East a distance of 33.59 feet; Thence South 89 °48'22" West a distance of 20.50 feet; Thence South 00°11'38" East a distance of 40.35 feet to the south line of the above described parcel; Thence North 89 °42'31" West along said south line a distance of 7.00 feet to the POINT OF BEGINNING. Together with the following describe easement area; Commencing at the southwest corner of the above described parcel; Thence North 89 °42'31" West along said south line a distance of 10.00 feet to the east line of existing utility easement per said plat of Andover Industrial Park No. 2; Thence North 00 0 11'38" West, along the east line thereof, a distance of 408.67 feet to the beginning of a tangent curve concave to the southeast and having a radius of 40.00 feet; Thence northeasterly along said east line and the are of said curve, through a central angle of 57 °21'45" a distance of 40.04 feet to the POINT OF BEGINNING of the easement area herein described and the beginning of a compound curve concave to the south and having a radius of 40.00 feet; Thence easterly along said curve and existing utility easement through a central angle of 33 °07'23" a distance of 23.12 feet; PAP09109603.13 Final DesignldocsVBI Tukwila Parcel 0223100075 Temp Esmt.doc Thence continuing along said easemen t South 89 °479 d East,a distance of1O6.48 feet; encce South 00 °1229' West at right angles said caserne G a distance of 6.50 G2; Thence North 89'42'3 y Wes !al Q!el lwitl! said easement, a distance of 127.95 6J to Ae POINT OF BEGINNING. Situate in the Cityo{TuleRG County of King, State of Washington, T above JgJ±ed easement areas contain 5,155 sggam fee! more less. �.ea�� xovnK 32 42 H I K70,1 W6�to b:2o»i gawm.I' &am yad Dg,m34Temp G«a* EXHIBIT MAP SHEET 1 OF 2 ANDOVER PARK WEST PARCEL 0223100075 CONTINUED ON SHEET 2 TEMPORARY CONSTRUCTION EASEMENT 30 I 3D III L2 11�lOJS �1��� w Z rilUJ �w o m j p�1 r�'rC I�IJ UJ v t r (n I.( r/ 14 I� TEMPORARY CONSTRUCTION y/ 1 EASEMENT AREA 3 I r- a, I °�j rn BUILDING SEE SHEET 2 FOR LINE TABLE L14 J( cc I N N 7.00' -'-i 10 00' ESM'T j q PER PLAT Q s I I 3.0 30' L7� �co P03 P ARCEL 022310 I L1 L9 PARCEL 0223100070 CONC. 11255 Kirkland Way, Suite 300 i Kirkland, WA 98033 p. 425.827.2014 f. 425.827.5043 SCALE: 1" 50' (01PPACE FILE: EASEMENT EXHIBIT.DWG DATE: 03/17/12 BY: FW Civic (Structural I Planning I Survey PROD. NO.: 09603.13 An Engineering Services Company pace engrs,com ANDOVER PARK WEST PARCEL 0223100075 TEMPORARY CONSTRUCTION EASEMENT TEMPORARY CONSTRUCTION EASEMENT AREA EE 7 CURVE TABLE 0223100075 1 CURVE I LENGTH I RADIUS I DELTA 1 C11 24.021 40.001 34'24'41 "1 C21 16.021 40.001 22 I C31 23.121 40.001 33 SHEET 2 OF 2 LINE TABLE 0223100075 LINE 1 BEARING I LENGTH L 11 S89'42'31 "E I 10.001 1 L21 N89'48'22 "E 1 21.001 1 L31 S00'1 1'38 "E I 33.901 1 1-41 589'48'22 "W 21.001 L51 N89'48'22 "E 20.501 1 L61 S001 1'38 "E 33.591 1 L71 S89'48'22 "WI 20.501 1 L81 SO0'11'38 "E i 40.35 1 L91 N89'42'31 "W 1 7.00 1 L101 N00'1 7'29 I 6.501 I I z 0 BAKER I S89'42'31 "E BL VD. o 0 oM 10.00' ESM'T F PER PLAT CON-L—W r y N �C 106.48' TT�T�'T/71717T/7 7 d Q I 89 42 31 W 1 12 7.85' L10 pc L q Imo'_ i I Uj f PARCEL 0223100075 i o- �V) 30' I 3b' f CONTINUED FROM SHEET 1 OF 2 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 I f, 425.827.5043 SCALE: 1" 50' FILE: \EASEMENT EXHIBIT.DWG Civi l DATE: 02/29/12 BY: FW Civil 1 Structural 1 Planning 1 Survey PROD. NO.: 09603.13 An Engineering Services Company paceengrs.com EXHIBIT 6 City of Tukwila Parcels A and G Binding Site Plan #L10 -032 Tax Parcel No.'s 9202470010 and 9202470070 Canopy Easement Description That portion of Parcels A and G of City of Tukwila Binding Site Improvement Plan No. Ll 0 -032, recorded in volume 256 of Plats, Pages l through 9, under :Recording No. 20101021000765, records of King County, Washington, described as follows: Commencing at the northeast corner of said Parcel G; Thence South 00 °11'38" East along the east line thereof and the west margin of Andover Park West a distance of 42.73 feet to the POINT OF BEGINNING; Thence continuing South 00'1 V38" East along said west margin a distance of 68.17 feet; Thence North 89 °54'34" West a distance of 62.85 feet; Thence North 009 9'59" East a distance of 68.15 feet; Thence South 89 °56'07" East a distance of 62.27 feet; to the POINT OF BEGINNING. Situate in the City of Tukwila, County of King, State of Washington, The above described easement areas contain 4,264 square feet, more or less. f 20 /f �S jlI �IS'I'LIZ� PAP09 \09603.13 Final DesignWoes\IBI -Tukwila Canopy Easement2.doc r EXI-IIQ IT MAP FIRESTONE CANOPY EASEMENT PARCEL G BSIP L10 -032 I NE COR. T PARCEL G I I N d' CANOPY N89'56'07 "W 62.27 7-7 �i POB w U w 17 V) V) LLJ x a) a, �;o 0 56'31 N m 145.00' I O —2 31' N89'54'34 "W 62.85 LEGEND: HORIZONTAL DATUM CITY OF TUKWILA BINDING SITE IMPROVEMENT PLAN NO. L10 -032 NEW CANOPY EASEMENT HATCHED AREA PARCEL G WEA SOUTHCENTER LLC BSIP -VOL 24977 -84 ",)PARCEL A 30.)0' BSIP PARCEL LINES CENTERLINE RIGHT OF WAY LINE SCALE: 1" 30' rPACE DATE: 11/15/11 BY: FW An Engineering Services Company PROJ. NO.: 09603.13 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 I f. 425.827.5043 Civil I Structural I Planning I Survey paceengrs.com 0 I-� 30 00' -I I W ro cc N I w o 0 N ,W I Q City of Tukwila Public Notice of Ordinance Adoption for Ordinances 2375 -2377. On May 21, 2012 the City Council of the City of Tukwila, Washington, adopted the following ordinances, the main points of which are summarized by title as follows: Ordinance 2375: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, UPDATING AND EXPANDING THE SIGN CODE, AS CODIFIED IN TUKWILA MUNICIPAL CODE TITLE 19, TO RESPOND TO THE NEEDS OF BUSINESSES AND TO ADDRESS THE CHANGING URBAN LANDSCAPE OF THE CITY; AMENDING ORDINANCE NO. 2303; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. Ordinance 2376: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, AUTHORIZING AND PROVIDING FOR THE ACQUISITION OF INTERESTS IN LAND FOR THE PURPOSE OF COMPLETING THE TUKWILA TRANSIT CENTER PROJECT; PROVIDING FOR CONDEMNATION, APPROPRIATION, TAKING OF LAND AND PROPERTY RIGHTS NECESSARY THEREFORE; PROVIDING FOR PAYMENT THEREOF; AND DIRECTING THE INITIATION OF APPROPRIATE PROCEEDINGS IN THE MANNER PROVIDED BY LAW FOR SAID CONDEMNATION; REPEALING ORDINANCE NO. 2364; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. Ordinance 2377: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, AUTHORIZING AND PROVIDING FOR THE ACQUISITION OF INTERESTS IN LAND FOR THE PURPOSE OF COMPLETING THE ANDOVER PARK WEST WIDENING PROJECT; PROVIDING FOR CONDEMNATION, APPROPRIATION, TAKING OF LAND AND PROPERTY RIGHTS NECESSARY THEREFORE; PROVIDING FOR PAYMENT THEREOF; AND DIRECTING THE INITIATION OF APPROPRIATE PROCEEDINGS IN THE MANNER PROVIDED BY LAW FOR SAID CONDEMNATION; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. The full text of these ordinances will be provided upon request. Christy O'Flaherty, MMC, City Clerk Published Seattle Times: May 24, 2012 o Cl of Tukwl NOTICE OF FINAL ACTION NOTICE IS HEREBY GIVEN that the Tukwila City Council is considering final action on Monday, May 21, 2012 beginning at 7:00 p.m. in the Council Chambers at Tukwila City Hall, 6200 Southcenter Blvd., Tukwila, WA on the following: An ordinance authorizing the acquisition of land, including authorization of potential condemnation of property. The properties considered are located in the City of Tukwila and identified as parcel numbers 022300 -0020 and 022310 -0020 (ACME Bowling) at 100 Andover Park West, 022310 -0010 (California Pizza Kitchen) at 150 Andover Park West, 022310 -0075 (Acura) at 301 Baker Boulevard; 920247 -0070 (Firestone) at 215 Andover Park West, and 920247 -0010 (Southcenter Mall) at 2800 Southcenter Mall; 022310 -0070 (Guitar Center, REI, Bed Bath and Beyond) at 240 Andover Park W. The full title of the ordinance is as follows: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, AUTHORIZING AND PROVIDING FOR THE ACQUISITION OF INTERESTS IN LAND FOR THE PURPOSE OF COMPLETING THE TUKWILA TRANSIT CENTER PROJECT; PROVIDING FOR CONDEMNATION, APPROPRIATION, TAKING OF LAND AND PROPERTY RIGHTS NECESSARY THEREFORE; PROVIDING FOR PAYMENT THEREOF; AND DIRECTING THE INITIATION OF APPROPRIATE PROCEEDINGS IN THE MANNER PROVIDED BY LAW FOR SAID CONDEMNATION; REPEALING ORDINANCE NO. 2364; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. The public is invited to attend all meetings of the Tukwila City Council. Tukwila City Hall is wheelchair accessible. The City strives to accommodate people with disabilities. Reasonable accommodations are available at the meeting with advance notice. This notice is also available in alternate formats for individuals with disabilities. Please contact the City Clerk's Office at TukwilaCityClerk @Tukwilawa.gov for assistance. Melissa Hart, CMC, Deputy City Clerk Published: Seattle Times May 7, 2012 and May 14, 2012 Published Daily Journal of Commerce May 7, 2012 and May 14, 2012 CERTIFICATION I, Cyndy Knighton, Senior Engineer, City of Tukwila, Public Works Department, do hereby certify that I adhered to the requirements in RCW 8.25.290 as outlined below as they relate to: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, AUTHORIZING AND PROVIDING FOR THE ACQUISITION OF INTERESTS IN LAND FOR THE PURPOSE OF COMPLETING THE TUKWILA TRANSIT CENTER PROJECT, PROVIDING FOR CONDEMNATION, APPROPRIATION, TAKING OF LAND AND PROPERTY RIGHTS NECESSARY THEREFORE; PROVIDING FOR PAYMENT THEREOF; AND DIRECTING THE INITIATION OF APPROPRIATE PROCEEDINGS IN THE MANNER PROVIDED BY LAW FOR SAID CONDEMNATION; REPEALING ORDINANCE NO. 2364; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. Requirements of RCW 8.25.290: Notice of the planned final action shall be mailed by certified mail to each and every property owner of record as indicated on the tax rolls of the county to the address provided on such tax rolls, for each property potentially subject to condemnation, at least fifteen days before the final action. If no address is provided for a property on the tax rolls of the county, the potential condemnor shall conduct a diligent inquiry for the address for each and every property owner of record and send the notice to that address. In case the property sought to be appropriated is school or county land, such notice shall be mailed to the auditor of the county in which the property sought to be acquired and appropriated is situated. The notice must contain a general description of the property such as an address, lot number, or parcel number and specify that condemnation of the property will be considered during the final action. The notice must also describe the date, time, and location of the final action at which the potential condemnor will decide whether or not to authorize the condemnation of the property. Said mailing occurred on May 4, 2012. The address list is attached. ;Cyj d�_K t kn *The Notice of Final Action was published in the Seattle Times on May 7 and May 14, 2012 and in the Daily Journal of Commerce on May 7 and May 14, 2012 and was also posted in the lobby of City Hall and placed on the City's website and faxed to community organizations. Christy OTIahert. From: Cyndy Knighton Sent: Friday, May 04, 2012 10:27 AM To: Christy O'Flaherty Subject: Mailing Everybody got everything. Only one property owner would have gotten just one ordinance and it just seemed easier to notify with the same packet. Certified mailing went to the property owners of record and courtesy copies went to the much larger list. Cyndy Knighton Senior Transportation Engineer 206.431.2450 Direct 206.433.0179 Main 206.431.3665 Fax cvndv.knighton @tukwilawa.Rov 1 Company Salutation Street Address CiY State Zip Open Frame LLC Sir or Madam PO Box 654 Kirkland WA 98083 BETA Holdings LTC Sir or Madam 18827 Bothell Way NE Bothell WA 98011 OB Fife Property II LLC Sir or Madam PO Box 726 Bellevue WA 98009 Garfield Southcenter LLC Sir or Madam 388 Pearl St Eugene OR 97401 Westfield Property Tax Dept Sir or Madam PO Box 130940 Carlsbad CA 92013 JCPenney Inc. Sir or Madam PO Box 10001 Dallas TX 75301 -1217 Postage Certified Fee Ml Posimsrk Return Receipt Fee Here m (Endorsement Required) Ej Restricted Delivery Fee Q (Endorsement Required) KWUMM. 3VTIJA j, p g JR, DonSestrc" arl�Qnly .M 7nsur�n�c �o�rer�cfe�ProvrdeNJ pip 1`; t -t1.7 a 7'$• r- VV r' ^,�ih'S` F� .J•? I S+t '�r t9Y' rf {'QIr �ir' ti� j 3h �i 1 t v'` EI k'r `���+iy,F 4 y *5 J�'�r` mex�tk7rnr J OB dbrfW r(Do a'r%s lvP 'y h may. v Q 1 rytY� .i' f+`iv �;+1 i4 '�t z'Y� f .Iiti4 F��"1 °��q�Y �fiYv n�.., .4.a.� m,5. *'1*�v *.itr' i C�R`I�I�D,i1L�RE:�GEFI n a't'S'13 ,k`�.a��.�a s a�• rr b f r �r (D�� ��n�a» F,LL# s y t o s n c o,. �Pr�fdJ mest► ��a���Only�� ry' �HM- j "��'�'f ,ar: u n J�; R. �tr +_'4 t TM.m V y ..ti<..s.,, x rrR`t e;�i.k t .."'.�,.t�±n .ems May 4, 2012 K 6200 Southcenter Boulevard a Tukwila, Washington 48188 J.C. Penney Inc. PO Box 10001 Dallas, TX 75301 -1217 Subject: Tukwila Urban Center: Transit Center Project Andover Park West Widening Project Property Acquisition Proposed Project Nos. 90610402, 98810404 Dear Property Owner: Jim Haggerton, Mayor In accordance with 8.25.290 Revised Code of Washington, you are hereby being notified that the City of Tukwila will be considering two ordinances authorizing the acquisition of right -of -way and easements (permanent and temporary) for the above reference roadway projects. The ordinances include language that would authorize condemnation of property should it become necessary. You are being notified of this action because according to the King County Tax Records, you are the property owner of a potentially affected parcel. The property being considered is: Property Address Parcel Number Structure Required Temporary Construction Easement Required 215 Andover Park W 9202470070 Firestone Canopy 1 4,264 sf As with previous projects that have involved acquiring additional property, the City will do everything possible to work cooperatively with you. However, State law requires the City to inform property owners that if a cooperative agreement cannot be reached within a reasonable timeframe that condemnation procedures may be used. The City Council will be discussing the Tukwila Urban Access Improvement Project and the property acquisition process, including the consideration of condemnation, at the May 14, 2012 Committee of the Whole Meeting in Council Chambers at 6200 Southcenter Boulevard, Tukwila Washington. The following week the Council will be considering approving the ordinance during the Regular Council Meeting on May 21, 2012. Both meetings begin at 7:00 p.m. You are invited to attend the meetings and address the Council. You are invited to review the attached ordinance. The engineering plans for the proposed project are also available at the Public Works counter for review. If you have any questions, please do not hesitate to call Cyndy Knighton at (206) 431- 2450 or myself at (206) 433 -0179 at your convenience. With your cooperation, I am confident that we can successfully negotiate a fair purchase agreement of the necessary property for this roadway improvement project. Sincerely, Bob Giberson, P.E. Director, Public Works Cc: Mayor Haggerton City Attorney May 4, 2012 ""'ty of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Westfield Tax Department PO Box 130940 Carlsbad, CA 92013 Subject: Tukwila Urban Center: Transit Center Project Andover Park West Widening Project Property Acquisition Proposed Project Nos. 90610402, 98810404 Dear Property Owner: Jim Haggerton, Mayor VIA Certified trail In accordance with 8.25.290 Revised Code of Washington, you are hereby being notified that the City of Tukwila will be considering two ordinances authorizing the acquisition of right -of -way and easements (permanent and temporary) for the above reference roadway projects. The ordinances include language that would authorize condemnation of property should it become necessary. You are being notified of this action because according to the King County Tax Records, you are the property owner of a potentially affected parcel. The property being considered is: Property Address Parcel Number Structure Required Temporary Construction Permanent Easement Easement Required Required 215 Andover Park W I 9202470070 I Firestone Canopy I 4,264 sf I 2800 Southcenter Mall 9202470010 I Firestone Canopy 6,850 sf 1 18,580 sf As with previous projects that have involved acquiring additional property, the City will do everything possible to work cooperatively with you. However, State law requires the City to inform property owners that if a cooperative agreement cannot be reached within a reasonable timeframe that condemnation procedures may be used. The City Council will be discussing the Tukwila Urban Access Improvement Project and the property acquisition process, including the consideration of condemnation, at the May 14, 2012 Committee of the Whole Meeting in Council Chambers at 6200 Southcenter Boulevard, Tukwila Washington. The following week the Council will be considering approving the ordinance during the Regular Council Meeting on May 21, 2012. Both meetings begin at 7:00 p.m. You are invited to attend the meetings and address the Council. You are invited to review the attached ordinance. The engineering plans for the proposed project are also available at the Public Works counter for review. If you have any questions, please do not hesitate to call Cyndy Knighton at (206) 431- 2450 or myself at (206) 433 -0179 at your convenience. With your cooperation, I am confident that we can successfully negotiate a fair purchase agreement of the necessary property for this roadway improvement project. Sincerely, Bob Giberson, P.E. Director, Public Works Cc: Mayor Haggerton City Attorney B T 6200 Southcenter Boulevard Tukwila, Washington 98188 May 4, 2012 BETA Holdings LTC 18827 Bothell Way NE Bothell, WA 98011 Subject: Tukwila Urban Center: Transit Center Project Andover Park West Widening Project Property Acquisition Proposed Project Nos. 90610402, 98810404 Dear Property Owner: Jim Haggerton, Mayor In accordance with 8.25.290 Revised Code of Washington, you are hereby being notified that the City of Tukwila will be considering two ordinances authorizing the acquisition of right -of -way and easements (permanent and temporary) for the above reference roadway projects. The ordinances include language that would authorize condemnation of property should it become necessary. You are being notified of this action because according to the King County Tax Records, you are the property owner of a potentially affected parcel. The property being considered is: Property Address Parcel Number Temporary Construction Permanent Easement Easement Required Required 301 Tukwila Parkway 0223000010 2,215 sf As with previous projects that have involved acquiring additional property, the City will do everything possible to work cooperatively with you. However, State .law requires the City to inform property owners that if a cooperative agreement cannot be reached within a reasonable timeframe that condemnation procedures may be used. The City Council will be discussing the Tukwila Urban Access Improvement Project and the property acquisition process, including the consideration of condemnation, at the May 14, 2012 Committee of the Whole Meeting in Council Chambers at 6200 Southcenter Boulevard, Tukwila Washington. The following week the Council will be considering approving the ordinance during the Regular Council Meeting on May 21, 2012. Both meetings begin at 7:00 p.m. You are invited to attend the meetings and address the Council. You are invited to review the attached ordinance. The engineering plans for the proposed project are also available at the Public Works counter for review. If you have any questions, please do not hesitate to call Cyndy Knighton at (206) 431- 2450 or myself at (206) 433 -0179 at your convenience. With your cooperation, I am confident that we can successfully negotiate a fair purchase agreement of the necessary property for this roadway improvement project. Sincerely, E Bob Giberson, P.E. Director, Public Works Cc: Mayor Haggerton City Attorney May 4, 2012 City o f 6200 Southcenter Boulevard e Tukwila, Washington 98188 Garfield Southcenter LLC 388 Pearl St Eugene, OR 97401 Subject: Tukwila Urban Center: Transit Center Project Andover Park West Widening Project Property Acquisition Proposed Project Nos. 90610402, 98810404 Dear Property Owner: Jim Haggerton, Mayor In accordance with 8.25.290 Revised Code of Washington, you are hereby being notified that the City of Tukwila will be considering two ordinances authorizing the acquisition of right -of -way and easements (permanent and temporary) for the above reference roadway projects. The ordinances include language that would authorize condemnation of property should it become necessary. You are being notified of this action because according to the King County Tax Records, you are the property owner of a potentially affected parcel. The property being considered is: Property Address Parcel Number Temporary Construction Easement Required 240 Andover Park W 0223100070 2,700 sf As with previous projects that have involved acquiring additional property, the City will do everything possible to work cooperatively with you. However, State law requires the City to inform property owners that if a cooperative agreement cannot be reached within a reasonable timeframe that condemnation procedures may be used. The City Council will be discussing the Tukwila Urban Access Improvement Project and the property acquisition process, including the consideration of condemnation, at the May 14, 2012 Committee of the Whole Meeting in Council Chambers at 6200 Southcenter Boulevard, Tukwila Washington. The following week the Council will be considering approving the ordinance during the Regular Council Meeting on May 21, 2012. Both meetings begin at 7:00 p.m. You are invited to attend the meetings and address the Council. You are invited to review the attached ordinance. The engineering plans for the proposed project are also available at the Public Works counter for review. If you have any questions, please do not hesitate to call Cyndy Knighton at (206) 431- 2450 or myself at (206) 433 -0179 at your convenience. With your cooperation, I am confident that we can successfully negotiate a fair purchase agreement of the necessary property for this roadway improvement project. Sincerely, 6 W Bob Giberson, P.E. Director, Public Works Cc: Mayor Haggerton City Attorney May 4, 2012 6200 Southcenter Boulevard Tukwila, Washington 98188 OB Fife Property LLC PO Box 726 Bellevue, WA 98009 Subject: Tukwila Urban Center: Transit Center Project Andover Park West Widening Project Property Acquisition Proposed Project Nos. 90610402, 98810404 Dear Property Owner: Jim Haggerton, Mayor VIA Certified Mail In accordance with 8.25.290 Revised Code of Washington, you are hereby being notified that the City of Tukwila will be considering two ordinances authorizing the acquisition of right -of -way and easements (permanent and temporary) for the above reference roadway projects. The ordinances include language that would authorize condemnation of property should it become necessary. You are being notified of this action because according to the King County Tax Records; you are the property owner of a potentially affected parcel. The property being considered is: Property Address Parcel Number Temporary Construction Easement Required 301 Baker Blvd 0223100075 I 5,155 sf As with previous projects that have involved acquiring additional property, the City will do everything possible to work cooperatively with you. However, State law requires the City to inform property owners that if a cooperative agreement cannot be reached within a reasonable timeframe that condemnation procedures may be used. The City Council will be discussing the Tukwila Urban Access Improvement Project and the property acquisition process, including the consideration of condemnation, at the May 14, 2012 Committee of the Whole Meeting in Council Chambers at 6200 Southcenter Boulevard, Tukwila Washington. The following week the Council will be considering approving the ordinance during the Regular Council Meeting on May 21, 2012. Both meetings begin at 7:00 p.m. You are invited to attend the meetings and address the Council. You are invited to review the attached ordinance. The engineering plans for the proposed project are also available at the Public Works counter for review. If you have any questions, please do not hesitate to call Cyndy Knighton at (206) 431- 2450 or myself at (206) 433 -0179 at your convenience. With your cooperation, I am confident that we can successfully negotiate a fair purchase agreement of the necessary property for this roadway improvement project. Sincerely, Bob Giberson, P.E. Director, Public Works Cc: Mayor Haggerton City Attorney May 4, 2012 Open Frame LLC PO Box 654 Kirkland, WA 98083 m 6200 Southcenter Boulevard 0 Tukwila, Washington 98188 Subject: Tukwila Urban Center: Transit Center Project Andover Park West Widening Project Property Acquisition Proposed Project Nos. 90610402, 98810404 Dear Property Owner: Jim Haggerton, Mayor VIA Certified Mail In accordance with 8.25.290 Revised Code of Washington, you are hereby being notified that the City of Tukwila will be considering two ordinances authorizing the acquisition of right -of -way and easements (permanent and temporary) for the above reference roadway projects. The ordinances include language that would authorize condemnation of property should it become necessary. You are being notified of this action be according to the King County Tax Records, you are the property owner of a potentially affected parcel. The property being considered is: Property Address Parcel Number ROW Required Temporary Construction Easement Required 150 Andover Park W I 0223100010 I 6,429 sf I 6,590 sf 100 Andover Park W I 0223000020 I I 7,724 As with previous projects that have involved acquiring additional property, the City will do everything possible to work cooperatively with you. However, State law requires the City to inform property owners that if a cooperative agreement cannot be reached within a reasonable timeframe that condemnation procedures may be used. The City Council will be discussing the Tukwila Urban Access Improvement Project and the property acquisition process, including the consideration of condemnation, at the May 14, 2012 Committee of the Whole Meeting in Council Chambers at 6200 Southcenter Boulevard, Tukwila Washington. The following week the Council will be considering approving the ordinance during the Regular Council Meeting on May 21, 2012. Both meetings begin at 7:00 p.m. You are invited to attend the meetings and address the Council. You are invited to review the attached ordinance. The engineering plans for the proposed project are also available at the Public Works counter for review. If you have any questions, please do not hesitate to call Cyndy Knighton at (206) 431- 2450 or myself at (206) 433 -0179 at your convenience. With your cooperation, I am confident that we can successfully negotiate a fair purchase agreement of the necessary property for this roadway improvement project. Sincerely, Bob Giberson, P.E. Director, Public Works cc: Mayor Haggerton City Attorney