HomeMy WebLinkAboutUtilities 2012-05-30 COMPLETE AGENDA PACKETCity of Tukwila
Utilities Committee
Dennis Robertson, Chair
Joe Duffie
Kate Kruller
Distribution:
G. Labanara
D. Robertson
S. Kerslake
J. Duffie
Clerk File Copy
K. Kruller
2 Extra
V. Seal
Mayor Haggerton
A. Le (e -mail pkt. pdf
D. Cline
e -mail cover to:
K. Matej
C. O'Flaherty, D.
B. Giberson
Almberg, B. Saxton,
F. Iriarte
S. Norris, M. Hart,
R. Tischmak
S. Kirby, D. Robertson
E w e d"990Y
NoT AGENDA
WEDNESDAY, MAY 30 2012 (Due to holiday)
Time: 5:00 PM Place: Conference Room #1
Item
1. PRESENTATION(S)
2. BUSINESS AGENDA
a) Interurban Ave S Gravity Sewer Project
Project Completion and Acceptance
b) Water and Sewer Comprehensive Plans
Supplement No. 2
c) Utilities Committee CIP 102
Please Bring Your 2012 2017 CIP
3. ANNOUNCEMENTS
4. MISCELLANEOUS
1 Recommended Action Page
a) Forward to 6/4/12 Regular Pg. 1
Consent Agenda
b) Forward to 6/11/12 C.O.W. Pg. 3
and 6/18/12 Regular
c) Information Only Pg. 7
Future Agendas:
Cascade Water Alliance
JMUSA
Next Scheduled Meeting: Tuesday, June 12, 2012
S The City of Tukwila strives to accommodate individuals with disabilities
Please contact the Public Works Department at 206 433 -0179 for assistance.
x
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO:
Mayor Haggerton
Utilities Committee
FROM:
Bob Giberson, Public Works Director Z O
BY:
Michael Ronda, Construction Project Manager
DATE:
May 25, 2012
SUBJECT:
Interurban Avenue S. Gravitv Sewer Proiect
Project No. 90440208, Contract No. 11 -099
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of retainage.
BACKGROUND
The Notice to Proceed for Contract No. 11 -099 with R.L. Alia Construction of Renton, Washington,
was issued on August 19, 2011 for construction of the Interurban Avenue S. Gravity Sewer Project.
This project was designed to replace a failing sewer lift station with a series of gravity feed lines on
the west side of Interurban Avenue S. between Fort Dent Way and S 144 Street.
DISCUSSION
Construction was physically completed on May 10, 2012. Ten change orders were issued during
construction for a total of $28,580.38. The change orders can generally be summarized as minor
revisions that were offset by under -runs in quantities for various bid items. The largest change
order in the group ($13,146) was due to an unexpected subgrade condition which caused
problems with the trench when installing the new sewer main.
The total budget for this contract, with an 11 contingency, was $828,256.25. A retainage bond
was used, so no retainage amount was withheld.
Contract Award Amount 681,440.00
Change Order Nos. 1 10 28,580.38
Cost Under -runs (103,260.91)
Sales Tax 57.642.15
Total Amount 664.401.62
RECOMMENDATION
The Council is being asked for formal acceptance and retainage bond release authorization, subject
to standard claim and lien release procedures, for the contract with R.L. Alia Construction, in the
amount of $664,401.62 and to consider this item on the Consent Agenda at the June 4, 2012
Regular Council Meeting.
Attachments: Dept of Revenue Notice of Completion
W:IPW Eng1PROJECTSW SW Projectsllnterurban Gravity Sewer (90440208)IConstrucbon.200 Correspondence1010 -To Others\IU Sewer -INFO MEMO Closeout 05 -25 -12 sb.doc
%TATt
x
�if� 1Nr "9 i�ry
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Contractor's UBI Number: 600149378
Date: 05/23/12
Name Address of Public Agency Departme»t,Use "Only,
City of Tukwila Assigned to:
6200 Southcenter Blvd.
Tukwila WA 98188 Date Assigned:
UBI Number: 179 000 -208
Notice is hereby given relative to the completion of contract or project described below
Project Name Contract Number Job Order Contracting
Interurban Avenue South Gravity Sewer 11 -099 Yes [9 No
Description of Work Done /Include Jobsite Address(es)
Install replacement gravity feed sewer system from approximately 14900 to 14400 block, reroute existing
sewers to new system and remove the old pump station at approximately 14610 Interurban Avenue.
Federally funded road transportation project? Yes Vf No
Contractor's Name Telephone Number
R L Alia Company 425- 226 -8100
Contractor Address
107 William Ave. Renton WA 98055
If Retainage is Bonded, List Surety's Name (or attach a copy)
N/A
Surety Agent's Address
North American Specialty Insurance Company, Parker Smith and Feek Inc., 2233112th Ave NE, Bellevue WA 98004
Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted
7/14/11 8/19/11 05/10/12 XX /XX /XX
Contract Amount 681,440.00
Additions 28,580.38 Liquidated Damages 0.00
Reductions 103,260.91 Amount Disbursed 664,401.62
Sub -Total 606,759.47 Amount Retained 0.00
Amount of Sales Tax Paid at .095
(If various rates apply, please send a breakdown) 57.642.15
TOTAL 664,401.62 TOTAL 664,401.62
NOTE: These two totals must be equal
Please List all Subcontractors Below:
Subcontractor's Name:
National Concrete Cutting
Del -Mar Concrete Cutting Coring
ASPI Surveying
Krazan Testing
Ground Up Road Construction
Hot Mix Pavers
Apply -a -Line
NWCW LLC
F215- 038 -000 08 -2011
REV 31 0020e (08/25/11)
IUBI Number:
lAffidavit ID (if known)
600 195 813
No Work Performed
602 260 574
372139
601 778199
350994
601 498 409
N/A
602 790 246
No Work Performed
600 310 693
373269
600 553 941
602 813 492
374648
Continued on page 2
2
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director 10
BY: Mike Cusick, Senior Engineer
DATE: May 25, 2012
SUBJECT: Water and Sewer Comprehensive Plans
Project No. 91040101, Contract No. 10 -055
Supplement No. 2
ISSUE
Approve Supplement No. 2 to Contract No. 10 -055 with Carollo Engineers for the Water /Sewer Comprehensive Plan.
BACKGROUND
The Departments of Health and Ecology require the City of Tukwila to update the Water and Sewer Comprehensive Plans every
six years. In 2010, the City contracted with Carollo Engineers to update the Water and Sewer Comprehensive Plans.
DISCUSSION
Carollo Engineers completed the work draft of Chapter Two, "Demographic Analysis and Demand Projections," for the
Comprehensive Plan in October 2010 using current population data. In November 2010, DCD requested that the Public Works
department rerun the population study model with 4,800 new housing units and 15,500 net new jobs by the year 2031.
In the 2005 water model, most areas of the City had more than adequate fire flows in excess of 4,500 gpm. In May 2011, the
Tukwila Fire Marshal requested that the fire flows in the Commercial Business District (CBD) be increased from 6,000 gpm to
8,000 gpm. The increased fire flows resulted in most of the CBD not having adequate fire flows and would require costly upgrades
to existing water lines. In April 2012, the Fire Marshal revised the required fire flows in all areas of the CBD except north of
Strander Blvd to 6,000 gpm.
The Consultants scope of work was to prepare a sewer system map book for the Public Works field crews to carry in their vehicles.
The task went over budget due to City staff finding multiple discrepancies in the existing sewer pipe maps.
FINANCIAL IMPACT
Supplement No. 2 will increase the Consultant's scope of work for Task 300 Planning Considerations for $5,721.50, Task 700
Distribution System Analysis and Task 900 Capital Improvement Program for $10,000, and Task 060 Hydraulic Model and
Mapping for $6,000, for a total Supplement of $21,721.50. Funding for the additional work will come from the Interurban Water
Reuse Project, page 86, 2012 CIP.
EXPENDITURES
Fundina BudcLet
Original contract
$291,000.00
Water Comp Plan
160,000.00
Supplement No. 1
12,662.00
Sewer Comp Plan
143,000.00
Supplement No. 2
21,721.50
Interurban Water Reuse
25.000.00
Total
$325,383.50
$328,000.00
RECOMMENDATION
Council is being asked to approve Supplemental Agreement No. 2 to Contract No. 10 -055 with Carollo Engineers in the amount of
$21,721.50 and consider this item at the June 11, 2012 Committee of the Whole meeting and subsequent June 18, 2012 Regular
Council meeting.
Attachment: Supplemental Agreement No. 2
W:\PW Eng \PROJECTSW- WT Projects \Water Comprehensive Plan -Water (91040101) \InfoMemo -Water Comp Plan Sup #2 052512- sb.doc
SUPPLEMENTAL AGREEMENT NUMBER 2
to
CONSULTANT AGREEMENT NUMBER 10 -055
THIS SUPPLEMENTAL AGREEMENT is entered into between the Citv of Tukwila.
Washington, herein -after referred to as "the City and Carollo Engineers hereinafter referred to
as "the Consultant in consideration of the mutual benefits, terms, and conditions hereinafter
specified.
The City desires to supplement the agreement entered into with the Consultant and executed on,
May 19, 2010, and identified as Agreement No. 10 -055. All provisions in the basic agreement
remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
1. Scope of Services, for Supplemental Agreement 42 to the Comprehensive Sewer and
Water Plans (Plans) for the City of Tukwila. The purpose of this supplement is to add:
a. $5,721.50 for Task 300 Planning Considerations Section 304 Population. The
Consultant to rerun population growth model using revised data from the PSRC for
the year 2010.
b. $10,000.00 for Task 700 Distribution System Analysis and Task 900 Capital
Improvement Plan. The Consultant to reanalyze the water system in the CBD south of
Strander Boulevard for a reduced fire flow of 6,000 gpm and required Capital
Improvement Program.
c. $6,000.00 for Task 060 Hydraulic Modeling and Mapping of the Sanitary Sewer
System. The Consultant is to reconcile the existing pipe data with current piping
inventory.
2. Deliverables
a. Revised Chapter Two of the Comprehensive Plan with increased population
numbers based on November 2010 PSRC data.
b. Revised Chapter Six of the Comprehensive Plan "Distribution System Analysis" for
the CBD south of Strander Boulevard.
c. Revised Chapter Eight of the Comprehensive Plan "Capital Improvement Plan" for
the CBD south of Strander Boulevard.
d. Revise sanitary sewer map books.
3. Time for Performance, is amended to change the number of calendar days for
completion of the work to read an additional 90 days for a total of 980 days.
4. Payment, shall be amended as follows:
4
Payment for the work provided by the Consultant as part of this supplement shall be
made for an additional $21,721.50. The total amount for the Consultant for this contact
shall not exceed $325,383.50 without express written modification of the Agreement
sided by the City.
DATED this day of 2012.
CITY OF TUKWILA
Jim Haggerton, Mayor
CONSULTANT
By:
Printed Name:
Title:
5
x
Jim Haggerton, Mayor
Bob Giberson, P.E., Director
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
By: Gail Labanara, Public Works Analyst
DATE: May 25, 2012
SUBJECT: Utilities Committee CIP 102
Water, Sewer, Surface Water Attachments D, E F
ISSUE
Prepare for the 2013 -2014 Biennial Budget and the 2013 2018 Capital Improvement
Program (CIP)
DISCUSSION
As requested by the Utilities Committee, staff will review the annual CIP and specifically the
2012 CIP Attachments D, E, and F for the Water, Sewer, and Surface Water enterprise
funds. We will review the current 2012 CIP and Rate Matrix to prepare for the 2013
proposed utility rate increases which will be brought forth this summer.
The Water, Sewer, and Surface Water Comprehensive Plans are scheduled to be
completed this year and additional utility projects will be forthcoming, as well as an analysis
of each utility's financial stability.
RECOMMENDATION
For information only. Please bring your 2012 2017 Financial Planning Model and
Capital Improvement Program book.
Attachments: 2012 Rate Matrix
Resolution 1755 PW Fee Schedule, pages 1 -3
Water, Sewer, and Surface Water Rate Comparisons
WAPW Eng \OTHER \Gail Labanara\InfoMemo 2012 CIP 102 5 -25 -12 sb.docx
proposed utility rate increases
10% utility tax
monthly fees for residential customers
City of Tukwila
Washin
Resolution No. n�
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, ADOPTING A NEW PUBLIC WORKS
FEE SCHEDULE; AND REPEALING RESOLUTION NO. 1728.
WHEREAS, each year the City analyzes the rate model for the three utility
enterprise funds, which are water, sewer and surface water, to ensure revenues keep
pace with expenses, to update the traffic model, and to analyze the transportation
network to ensure continued compliance with the Growth Management Act and the
City's adopted Comprehensive Plan; and
WHEREAS, the City is authorized to impose fees to recoup the costs of services
rendered;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Public Works fees will be charged according to the following schedule,
which shall supersede any previously adopted Public Works Fee Schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
Type A (Short-Term Nonprofit)
Type B (Short -Term Profit)
Type C
(Infrastructure and Grading on Private Property
and City Right -of -Way and Disturbance of City
Right -of -Way)
Type D (Long -Term)
Type E (Potential Disturbance of
City Riqht- of -WaV)
Type F (Blanket Permits)
Additional Inspections
Franchise Telecommunications
I Franchise —Cable
Street Vacation
I FEE
1 50.00
1 $100.00
$250.00 application base fee, plus four components
based on construction value:
1) Plan Review
2) Construction Inspection
3) Pavement Mitigation
4) Grading Plan Review
1 $100.00
$100.00
$250.00 processing fee, plus $5,000.00 cash deposit,
withdraw $100.00 per instance for inspection
1 $60.00 per inspection
1 $5,000.00 administrative fee E
1 $5,000.00 plus 5% of total revenue
1 $1,200.00
WAWord Processing -City\Resolutions \PW Fee Schedule -2011 10 -27 -1 I.docx Page 1 of 5
PERMIT DESCRIPTION
Latecomer's Agreements
Flood Zone Control
Copy of City of Tukwila's Infrastructure Design
and Construction Standards
WATER RATES
Water Meter Installation
.75 inch
1 inch
1.5 inch
2 inch
3 inch
4 inch
6 inch
Water Meter Deduct
Water Base Charge (Monthly)
Single Family (one dwelling unit)
Multi- Family (more than one dwelling unit)
Commercial /Industrial Customers:
3/4 inch Service
1 inch Service
1 -1/2 inch Service
2 inch Service
3 inch Service
4 inch Service
6 inch Service
8 inch Service
10 inch Service
12 inch Service
Water Rates (Monthly)
Single and Multi Family (Jan -May)
Single and Multi Family (Jun -Sept)
Single and Multi Family (Oct -Dec)
Commercial /Industrial (Jan -May)
Commercial /Industrial (Jun -Sept)
Commercial /Industrial (Oct -Dec)
Fire Protection Service Charges (Monthly)
2 inch Service
3 inch Service
4 inch Service
6 inch Service
8 inch Service
10 inch Service
12 inch Service
FEE
$500.00 processing fee, plus 17% administrative fee,
plus $500.00 seqreqation fee
$50.00
$50.00
600.00
1,100.00
2,400.00
2,800.00
4,400.00
7,800.00
$12,500.00
FEE
I $25.00
In addition to the monthly water base charge, each
100 cubic feet of water used will be charged as
shown in "Water Rates (Monthly)."
12.00
12.00*
*each dwelling unit
40.00
50.00
75.00
$100.00
$145.00
$195.00
$290.00
$385.00
$480.00
$575.00
In addition to the monthly water base charge listed
above, each 100 cubic feet of water will be charged at
the following rates:
$2.79
$3.89
$2.79
$3.62
$4.98
$3.62
Per month based on size of service.
9.00
20.00
35.00
80.00
$120.00
$200.00
$260.00
W: \Word Processing- City\Resolutions \PW Fee Schedule -2011 10 -27 -1 I.docx
Page 2 of 5
10
WATER SERVICES
Water Turn On
After Hour Water Turn On additional fee for
customer requested after hours water turn on
Unauthorized Water Usage after shut -off for
non- payment
Special Meter Read customer requested
meter read outside normal read schedule
Shut -off notice
Change in owner, tenant, and /or third party
paying agent
Fire Hydrant per month
Emergency Conservation Sanction
Temporary Water Meter Deposit
.75" and 1" water meter
2.5" water meter
Temporary Water Meter Rental per minimum
60 days expiration
.75" and 1" water meter
2.5" water meter
WATER INTEREST CHARGE
On all water accounts 30 days in arrears from
the date of delinquency until paid
SEWER RATES
Residential Sewer Service
(single dwelling unit)
Residential Sewer Service (multiple dwelling
unit, permanent type)
Commercial and Industrial Sewage Service
I
SEWER INTEREST CHARGE
On all sewer accounts 30 days in arrears from
the date of delinquency until paid
SURFACE WATER RATES
Surface Water Utility Rates Per Year
Cateaorv:
FEE
50.00
$100.00
$100.00
30.00
30.00
20.00
20.00
$100.00
300.00
$1,500.00
75.00
150.00
RATE
8% per annum computed on a monthly basis
FEES
Flat rate of $19.26 per month
[TMC 14. 16.030 (1)]
Flat rate of $19.26 per month for each dwelling unit
[TMC 14.16.030 (2)]
Flat rate of $33.74 per month and, in addition, any
usage over 750 cubic feet of water per month shall
be at the rate of $33.74 per 750 cubic feet
[TMC 14.16.030 (4)]
RATE
8% per annum computed on a monthly basis
FEE PER YEAR
Service Charge Per Acre
1. Natural
123.17
2. 0 20% Developed Surface
267.77
3. 21 50% Developed Surface
490.77
4. 51 70% Developed Surface
732.29
5. 71 85% Developed Surface
882.21
6. 86 100% Developed Surface
$1,029.10
7. Single Family Residential Parcels
102.00 per parcel
W. Word Processing- City\Resolutions\PW Fee Schedule -2011 10- 27- 11.docx
Page 3 of 5
11
Residential Water Rate Comparison as of Oct 2011
Exhibit C -1
12
Summer
2011
City
Base
Rates
Consumption
2011
2010
2012
Ranking CITY
Rate
Per CCF
Assume 10 CCF
TOTAL
RATE
Difference TOTAL
1
SEATTLE
13.00
3.9
43.05
56.05 1
54.36
1.69 1$
61.10
2
BELLEVUE
27.44
2.74
27.40
54.84
53.07
1.77 1
59.21
3
KENT
11.99
3.77/4.86'
40.79
52.78
51.24
1.541
4
'ISSAQUAH
23.45
1.51/3.60
27.64
51.091
51.09
0.001
5
'HIGHLINE WATER DISTRICT
12.15
3.88 i
38.80
50.95 1
46.25
4.70 1
6
TUKWILA 2012
1
12.00
3.89
38.90
50.901
1
2 .00
50.90
7
TUKWILA 2011
1
10.00
3.89
38.90
48.901
46.90 j
2 .00
8
SKYWAY (CWA)
i
13.88
3.08/3.90
32.44
46.32 1
43.69 1
2.63
9
KING COUNTY WD #20
19.75
2.50
25.00
44.75 1
33.00
11.75 1
10
KING COUNTY WD #125
12.50
3.20
32.00
44.50 1
40.75
3.75 1
11
COVINTON (CWA) (every 2 mos.)
16.50
2.53/3.81
27.86
44.36
40.80
3.56 1
12
WOODINVILLE
13.43
3.08
30.80
44.23
42.35
1.881
46.40
13
COAL CRE
16.88
2.69
26.90
43.78
1
14
DUVALL
22.61
4.33
19.65
42.261
1
15
SODS CREEK
9.65
3.25
32.50
42.151
41.45
0.70 1
16
EDMONDS
19.16
1.99
19.90
39.061
36.32
2.741
17
WATER DISTRICT 119 (Duvall)
37.50
2.90
0.00
37.50 1
1
18
REDMOND (CWA)
12.67
1.55/3.10
24.80
37.47 1
35.72
1.751
19
RENTON
13.76
1.98/2.67
23.25
37.01 1
31.36
5.651
42.91
20
KIRKLAND
16.40
3.93
19.65
36.051
1
36.86
21
AUBURN
10.38
2.06/2.52
21.98
32.361
30.31
2.051
22
MERCER ISLAND
9.25
2.19
21.90
31.151
28.45
2.70
23
TACOMA
16.03
1.30/1.63
14.65
30.68 1
29.43
1.25
24
'LYNNWOOD
11
12.63
1.45
14.50
27.131
1
30.69
25
1 LAKEHAVEN (FEDERAL WAY)
13.11
1.11 j
11.10
24.21 1
18.62
5.59 1
Residential
Sewer Rate Comparison
as of July 2011
2011
2011 City
King County
2011
Ranking CITY
2010
Charge
Sewer
Total
2012
1
SEATTLE
KC
67.35
40.78
36.10
76.88
2
LAKEHAVEN
58.58
28.81
36.10
64.91
3
VASHON SEWER
KC
56.00
26.34
36.10
62.44
4
DUVALL
62.35
62.35
5
SKYWAY
KC
56.22
25.05
36.10
61.15
6
RENTON
KC
48.72
23.88
37.26
61.14
62.34
7
;SAMMAMISH PLATEAU
KC
52.17
23.00
36.10
59.10
8
WOODINV
KC
54.45
23.79
33.97
57.76
9
ENE SAMMAMISH
KC
51.93
20.63
36.10
56.73
10
j BELLEVUE
KC
41.84
20.33
36.10
56.43
11
TUKWILA 2012
IKC
19.26
36.10
55.36
12
CEDAR RIVER W S
i KC
49.65
18.64
36.10
54.74
13
BOTHELL
KC
49.56
18.17
36.10
54.27
14
ISSAQUAH
KC
48.18
18.01
36.10
54.11
15
COAL CREEK
KC
48.96
17.40
36.10
53.50
16
KENT
KC
48.26
16.61
36.10
52.71
17
ITUKWILA 2011
KC-
45.29
16.06_
36.10
52.16
18
MERCER ISLAND
KC
46.56
16.05
36.10
52.15
19
SODS CREEK
KC
47.45
16.0_5
36.10
52.15
20
BLACK DIAMOND
KC
51.06
15.29
36.10
51.39
21
LAKE FOREST PARK
KC
46.66
14.76
36.10
50.86
22
AUBURN
KC
44.05
13.36
36.10
49.46
23
ALDERWOOD
KC
46.03
12.57
36.10
48.67
24
REDMOND
KC
44.22
12.32
36.10
48.42
25
KIRKLAND
KC
47.65
12.03
36.10
48.13
48.79
26
VALLEY VIEW SEWER
KC
40.90
10.00
36.10
46.10
27
NORTHSHORE
KC
44.00
10.00
36.10
46.10
28
ALGONA
KC
41.02
9.12
36.10
45.22
29
SOUTHWEST Suburban Sewer
25.50
25.50
0.00
25.50
30
MIDWAY
22.00
22.00
0.00
22.00
AVERAGE
i
45.66
52.64
W
\PW Eng \OTHER \Gail Labanara \Water Sewer Documents \Utility Rate Surveys Water, Sewer SSWM.xlsx
12
Exhibit C -2
SINGLE FAMILY SURFACE WATER RATES
AS OF OCTOBER 2011
CITY
Seattle (range of fees)
Duvall
Redmond (range, minimum shown)
Mercer Island
Auburn
Issaquah
Newcastle
Sammamish
King County
Shoreline
Renton
Kent
Monthly Rate
19.58
16.92
16.56
14.96
14.95
14.08
13.28
12.50
11.08
11.50
10.37
10.06
2011 2012
Yearly Rate Yearly Rate
234.96 261.72
203.04 I
198.72 I
179.52 I
179.40 I
168.96 I
159.36 I
150.00 I
133.00'
138.01 I
124.44 I 138.12
120.72 I
Lynnwood I 7.20 I 86.40 I 90.24
Federal Way 7.10 I 85.15 I
Tukwila 20101 7.08 1 85.00
WAPW Eng \OTHER \Gail Labanara \Water Sewer Documents \Utility Rate Surveys Water, Sewer SSWM.xlsx
13