HomeMy WebLinkAboutRes 1186 - 1992-1997 Transportation Improvement Program �WILA
1906'
CITY OF TUKWILA
WASHINGTON
RESOLUTION NO. 1186 A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a Comprehensive
Street Program and thereafter periodically modified said Comprehensive Street Program by
resolution, and
WHEREAS, the City Council has reviewed the work accomplished under said program,
determined current and future City street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar
years, and
WHEREAS, a public hearing has been held on the said Six -Year Transportation
Improvement Program.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transportation Improvement Program for
the City of Tukwila, as revised and extended for the ensuing six (6) calendar years (1992 -1997,
inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this
reference as if fully set forth, which program sets forth the project location, type of improvement
and the estimated cost thereof, is hereby adopted and approved.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a
copy of this resolution, together with the exhibit attached hereto, with the Secretary of
Transportation and the Transportation Improvement Board of the State of Washington.
PASSED BY THE CITY COUNCIL OF CITY OF TUKW LA, WASHINGTON,
at a regular meeting thereof this St day of 1 1991.
Dennis L. Robertson, Council President
ATTEST /AUTHENTICATED: 61 f
J "I e E. Cantu, City Clerk
APPROVED AS TO FORM:
Ad� 6_�
OFFICE OF TH CITY ATTORNEY:
Filed with the City Clerk: 7 1�j
Passed by the City Council: -7-,1- !F/
Resolution Number
June 27, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Page 1
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/24/91
CITY 110. 1320 ADOPTION DATE
COUNTY NO. 17 RESOLUTION NO.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D;------------------------------------------------ OBLIGATION PLAN
I U JO R 1;
0 NC OF R k1; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
I TA W TOTAL 0 FOR ALL FUNDING TYPES 2ND
T IS CO WORK V S; TOTAL 1ST YR;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;----------- THRU
N AK CODE R A; 3RD 5T4 ANNUAL;
N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94 -95 96 -97 YEARS
01 INTERURBAN AVENUE SOUTH 84 -RW41 14 2 ABDF 0.91 X P $3,270 $3,270 $1,406 $1,864 P.E. I
52nd Ave. S. 42nd Ave. S. R/W
Reconstruct to 5 lanes including curb and gutter, sidewalk, drainage, COSTT.
channelization, traffic signals, lighting, signs, landscaping.
1 TOTAL $0 $0
02 SOUTH 133RD STREET 86 -RWO1 17 2 ABDF 0.13 X F $525 $525 $525 P.E.
S. 134th Street Interurban Ave. R/W
Construct widening to 4 lanes including paving, drainage, curb and gutter, CDNST.
sidewalk, channelization, signal,lighting, signing.
1 TOTAL $0 $0
03 WEST VALLEY HWY (SR 181) S. 180TH STREET 84 -RW40 16 2 ABDF 0.42 X F $750 $8,000 $8,750 $2,183 $6,400 $167 F.E.
W. Valley Hwy S. 180th R/W
Short -term signal modification, channelization, bridge widening. Long -term CDNST. $334
urban interchange with W. Valley overpass over S. 180th.
1 TOTAL $334 $0
04 SOUTHCENTER BOULEVARD 85 -RW02 16 1 ABDF 0.28 X P $5,200 $4,150 $9,350 42,486 $3,029 $3,835 P.E. $250
68th Ave. S. Grady Way Bridge R/W $520
Widen to 5 lanes on new alignment with new bridge over GreenRiver, structure CDNST. $100 $3,065
undercrossing 1 -405 ramps, new signal and channelization at Interurban Ave.
1 TOTAL $100 $3,835
05 EAST MARGINAL WAY SOUTH 90 -RWO2 14 2 ABDF 1.93 X P $3,800 43,500 $7,300 $1,700 $5,600 P.E. $0
Boeing Access Rd North City Limit R/W $0
Design and construct widening, drainage, traffic signals, utility CONTT. $0
undergrounding; lighting, sidewalks, including Boeing Access Rd. intersection.
1 TOTAL $0 $U
06 EAST MARGINAL WAY SOUTH 89 -RWO5 14 2 ABDF 0.40 X P $350 $660 $1,010 $1,010 P.E.
Boeing Access Rd. S. 112th Street R/W
Reconstruct to 5-lanes with curb, gutter, sidewalk, drainage, landscape, and CDNST.
illumination.
1 TOTAL $0 $0
07 ANDOVER PARK WEST 88 -RWO4 17 2 ABDF 0.40 X P $1,372 $1,372 $977 $395 P.E.
Tukwila Parkway Strander Blvd R/W
Design and construct widening to 5 lanes including paving, drainage, curb and CDNST.
gutter, sidewalks, channelization,signals, lighting, signing.
1 TOTAL $0 $0
June 25, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Paoe 2
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/24/91
CITY NO. 1320 ADOPTION DATE
COUNTY NO. 11 RESOLUTION 110.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D;-------------------------------- OBLIGATION PLAN
I U JO R I;
0 HC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
1 TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND
T IS CO WORK V S; TOTAL 1ST YR;
Y PROJECT 1DENfIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;------------- iHP,U
N Ar, CODE R A; 3RO 5TH ANNUAL;
N A S T; 1ST 2NO 4111 6TH LOCAL ;RAP /UAB;FEDERAL 6TH
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94-95 96-97 YEARS
08 SOUTHCENTER PARKWAY /STRANDER BLVD 84 -RW19 16 2 ABDG 0.20 X P 1335 $335 $335 P.E. 2
West Mall Access S. 168th R/W
Design and construct safety and capacity iaprovements. CONST.
I TOTAL s0 10
09 42ND AVENUE S. AND 40TH AVENUE S. 90- 09 3 ABDF 1.93 X P $2,400 $1,175 11,070 $4,645 14,645 P.E.
S. 164th St. S. 131st Way R/W
Design and construct paving, drainage, curb and gutter, sidewalks, lighting, CONST.
utility undergrounding. Coordinate City of SeaTac.
I TOTAL $0 s0
10 SOUTH 160TH STREET 19 3 ABDF 0.50 X F 11,725 11,725 11,725 P.E.
42nd Ave. 51st Ave. R/W
Design and construct paving, drainage, curb and gutter, sidewalks, lighting, CONST.
utility undergrounding.
I TOTAL s0 $0
11 PACIFIC HIGHWAY SOUTH (HWY 991 14 2 ABOF 0.80 X P $1,000 $2,000 $3,000 $3,1700 P.E.
Boeing Access Road South 116th Way R/W
Design and construct paving, curb and gutter, drainage, sidewalks, lighting, CONST.
utility undergrounding.
I TOTAL $0 s0
12 PACIFIC HIGHWAY SOUTH (HWY 991 14 2 ABOF 2.71 X P $800 $4,600 $4,600 110,000 $10,000 P.E.
S. 116th Way S. 152nd R/W
Design and construct paving, curb and gutter, drainage, sidewalks, lighting, CONST.
utility undergrounding.
I TOTAL $0 $0
13 MINELER BLVD 84 -RW07 1 ABOF 0.38 X P $2,400 $1,950 $4,350 $4,350 P.E.
Soulhcenter Parkway Andover Park West R/W
New 4 -lane street w /traffic signals at SC Parkway and Andover Park West. CONST.
Construct paving, drainage, curb and gutter, sidewalks, lighting, signals.
I TOTAL $0 s0
14 CBD SIDEWALKS 05-RW05 9 AGN X P $375 1315 $375 11,125 $1,125 P.E.
Various CBD streets. R/W
Design, construct, and acquire easeaents for sidewalks on Southcenter Pkwy, COAST.
Andover Park W. E., W. Valley Hwy, BakerBlvd, Strander Blvd, Minkler Blvd,
S. 180th
I TOTAL $0 s0
June 15, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1991 Page 3
CITY /COUNTY CITY OF TUK,WILA HEARING DATE 06/24/91
CITY N0. 1310 ADOPTION DATE
COUNTY NO. 17 RESOLUTION NO.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D;---------------------------------------- OBLIGATION PLAN
I U JO R 1;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y 6; SOURCE OF FUNDS
I 1A W TOTAL 0 FOR ALL FUNDING TYPES 2110
T IS CO WORK V S; TOTAL 1ST YR;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;--------- THRU
N AK CODE R A; 3RD 6 5111 ANNUAL;
H A S T; 1ST 2ND 4111 61H LOCAL ;RAP /UAB;FEDERAL;; 6TH
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94 -95 96 -97 YEARS
15 INTERURBAN AVENUE SOUTH 84 -RWO6 14 4 ABDF 1.36 X P $500 44,000 54,500 $4,500 P.E. 3
S. 139th St. Southcenter Blvd. R/W
Design report, right- of-way,and reconstruction of 5 -lane improvements including CONST.
paving,curb and gutter, sidewalks, utility undergrounding, lighting,landscaping,
TOTAL $0 s0
16 OXBOW INTERCHANGE 14 1 ABDH 0.50 P $500 $2,500 $2,500 $5,500 $5,500 P.E.
SR 99 AND Norfolk Extension R/W
Design and construct southbound on and off ramps to SR 99. CONST.
I TOTAL $0 $0
17 MULTI -MODAL TRANSFER STATION 12 T P $150 $150 $150 P.E.
Interurban Avenue and 6rady Nay R/W
Design report and financing alternatives for site in City. CONST.
I TOTAL s0 10
18 SOUTH 156TH STREET 1 ABDF 0.30 P $150 $500 $6,500 $7,150 $7,150 P.E.
West Valley Highway SW 16th St (Renton) R/W
Design and construct new 5-lane arterial including paving, curb and gutter, CONST.
drainage, sidewalks, lighting
I TOTAL $0 f0
19 SOUTH I80TH STREET PEDESTRIAN OVERPASS 9 AND P $300 $1,500 $1,000 $1,800 P.E.
S. 180th St. at UPRR R/W
Design and construct pedestrian overpass CONS[.
I TOTAL f0 SO
20 TRAFFIC SIGNAL INTERCONNECT SYSTEM 88 -RW02 6 1 10.00 X P $50 1380 $740 $1,170 $1,170 P.E.
All traffic sia_nals R/W
Design report, design install signal interconnect system w /caster controller. CONST.
TOTAL $0 s0
21 SOUTHCENTER PARKWAY 87 -RWO3 16 6 HIK 1.00 X P $400 $200 $200 s800 $800 P.E.
S. 168th S. 180th St. R/W
Design and construct traffic signals, pedestrian crossings, and combine CONST.
driveways.
I TOTAL $0 f0
June 25, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Page 4
CITY /COUNTY CITY OF IUI.WILA HEARING DATE 06/14/91
CITY 110. 1320 ADOPTION DATE
COUNTY 110. 17 RESOLUTION NO.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D; OBLIGATION PLAN
I U JO R 1;
0 NC OF R 11; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
I TA M TOTAL 0 1 FOR ALL FUNDING TYPES 211D
T IS CO WORT, V S; TOTAL 1ST YR;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LHGTH E T;- THRU
N AC CODE R A; 3RD 11 5111 6 ANNUAL;
N A S T; 1ST 211D 4TH 6TH LOCAL ;RAP /UAB;FEDERAL;; 61H
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94 -95 96-91 YEARS
22 STRANDER BLVD. EXTENSION 86 -RNO3 1 ABOF 0.28 1 P 1SO 1500 (6,500 11,050 11,410 $5,641) P.E. 4
W. Valley Hwy (S.R. 181) Oakesdale (Renton) R/W
New 5 -lane arterial with separated grade crossing railroad tracks. (joint CONST.
project w /Renton)
1 TOTAL $0 10
23 16TH AYE. S. BRIDGE 89-RWOO 14 4 L 0.01 X P 1200 1200 $200 P.E.
16th Ave. S. bridge north pier R/W
Design of pier repair, CONST.
I TOTAL $0 $0
24 SOUTH 168TH STREET 84 -RWOB l ABOF 0.38 X P 125 $75 $700 1800 $000 P.E.
Southcenter Parkway Andover Park West R/W
New 4 -lane street including r-o -w acquisition and new signalat Andover Park COAST.
West.
1 TOTAL f0 10
25 WEST VALLEY HIGHWAY (SR 181) 84 -RW31 14 2 ABOF 0.42 X P $47 1230 1300 1577 1577 P.E.
I -405 Strander Blvd. R/W
Widen from 6 to 7 lanes with signal modifications e 2 inter sections. CONST.
1 TOTAL $0 10
26 LONGACRES DRIVE (S. 158TH ST.) 84 -RW13 19 4 ABOF 0.10 X P 1235 $235 $235 P.E.
West Valley Highway Nelsen Place R/W
Install curb and gutter, sidewalk, drainage on existing 4 -lane street., COAST.
I TOTAL 10 10
27 BRIDGE PROGRAM 89 -RW16 4 L X P $750 11,000 $1,000 $2,750 12,750 P.E.
Existing bridges in City. R/W
Evaluate, design, and contruct repairs and replacements. 42nd Ave.(S 133rd), CONST.
42nd Ave.(Duwamish River), 51st Ave (S. 154th), etc.
I TOTAL 10 $4
28 INTERURBAN AVENUE SOUTH 81 -RW18 14 2 ABDF 0.30 X P $200 $200 $200 F.E.
Southcenter Blvd. Grady Way R/W
Design and construct safety and capacity improvements. CONST.
1 TOTAL $0 SO
June 25, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Page 5
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/24/91
CITY NO. 1320 ADOPTION DATE
COUNTY NO. 17 RESOLUTION NO.
F;
U; PROJECT COSTS 111 THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D;------------------------------ OBLIGATION PLAN
I U JO R l;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
1 TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND
T IS CO WORK V S; TOTAL 1ST YR;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E 1;----- THRU
N AK. CODE R A; NO 6 5TH 6 ANNUAL;
N A S 1; 1ST 2ND 4111 6111 LOCAL ;RAP /UAB;FEDERAL;; 6TH
O L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94 -95 96 -97 YEARS
29 STREET OVERLAY AND REPAIR PROGRAM 5 ODE X P 51,000 11,000 $7,000 $2,000 16,000 16,000 P.E. 5
Various city streets. R/W
CONTT.
I TOTAL f0 f0
30 PEDESTRIAN PATHS 9 ABDN P 1560 1560 11,120 $560 $2,800 12,800. P.E.
Various locations R/W
Design and construct ped paths in various locations COSST.
I TOTAL f0 10
31 INTERSECTION IMPROVEMENTS 6 HIJK X P $450 1450 1900 1900 $2,700 12,700 P.E.
Various City locations. R/W
Design and construct improvements and new signals. Andover Park East 8 Baker. COSTT.
I TOTAL f0 10
32 TRAFFIC COIITROL UPGRADES 6 HJKN X P 1115 1115 1230 $230 $690 1690 P.E.
Various intersections. R/W
Design and construct left turn signals at various intersec- tions. COSST.
I TOTAL $0 10
33 STRANDER BOULEVARD 88 -RW03 17 9 6 0.38 X P 150 1575 1625 $625 P.E.
Southcenter Parkway Andover Park West R/W
Design and construct sidewalks CONS1.
I TOTAL $0 10
34 TUKWILA PARKWAY I ADFG 0.25 X U 150 150 $50 P.E.
Andover Park East West Valley Highway R/W
Design report for new 5 -lane arterial w /bridge across Green River. CONTT.
1 TOTAL $0 to
35 STRANDER BLVD /58TH AVE. 16 6 It I K 0.10 X U $155 $155 $155 P.E.
New intersection R/W
Design and construct new traffic signal, channelization. C0itS1.
I TOTAL 10 $it
June 25, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1997 Page 6
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06124191
CITY NO. 1320 ADOPTION DATE
COUNTY NO. 17 RESOLUTION NO.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D;----------------------------------- OBLIGATION PLAN
1 U JO R 1;
0 HC OF R H; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
I TA W TOTAL 0 FOR ALL FUNDING TYPES 2110
1 IS CO WORY, V S; TOTAL 1ST YP.;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNG IN E T;- TRRU
N Ah CODE R A; 3RD 6 5TH Jl ANNUAL;
H A S T; 1ST 211D 4111 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEM1.;
S; 1991 1993 94-95 96 -91 YEARS
36 58TH AVENUE SOUTH 84 -11$134 1 ABDF 0.26 X U $1,525 11,5 $1,525 P.E. 6
Strander Blvd S. 168th Street R/W
New 4 -lane street with new signal 8 Strander Blvd. CONST.
I TOTAL 10 10
37 SOUTH 135TH PLACE 19 6 ABOt( 0150 P 4158 5158 {158 P.E.
56th Ave. 50th Place S. R/W
Design and construct safety improvements. CONST.
1 TOTAL 10 10
38 SOUTH 178TH STREET 88 -RW07 16 I ABDF 0.46 X P $50 150 150 P.E.
Southcenter Parkway 1 -5 R/W
Widen to 5 -lanes on new alignment with paving, curb and gutter, sidewalks, CONST.
drainage, street lights.
I TOTAL 10 10
39 SOUTH 133RD STREET 17 2 ABDF 0.50 U 11,465 $1,465 11,465 P.E.
S. 134th st. S. 130th St. R/W
Design and construct widening including paving, drainage, curb and gutter, CONST.
sidewalks, lighting, channelization
I TOTAL $0 10
40 57th AVENUE SOUTH (SOUTHCENTER PARKWAY) 84 -RW37 16 2 ABDF 0.50 X U $675 $1,200 11,875 1375 11,500 P.E.
S. 180th St. South City Limits R/W
Design and construct widening to 4 or 5 lanes including paving, drainage, curb CONST.
and gutter, sidewalks, channelization, lighting, utility undergrounding.
1 TOTAL s0 $0
41 SOUTH 13419 STREET 94 -RW27 19 2 ABDF 0.23 X U 1543 $543 1543 P.E.
S. 133rd St. 48th Ave. S. R/W
Design and construct widening to 4 lanes including paving, drainage, curb and CONST.
gutter, sidewalks, channelization, lighting, signing.
I T01AL 10 $0
42 SOUTH 180111 STREET 42 6 HI 1,, 0.60 U 11 1121 1[12 P.E.
Southcenter Parkway Andover Park West R/W
Left and right turn modifications, access improvements that may include CONST.
signali.ation.
I TOTAL $0 s0
June 27, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Page 7
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/24/91
CITY NO. 1320 ADOPTION DATE
COUNTY NO. 17 RESOLUTION NO.
F'
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M •C N;
R F A A D;---------------------------------------- OBLIGATION PLAN
I U JO R 1;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
I TA W TOTAL 0 FOR ALL FUNDING TYPES 2ND
T IS CO WORK V S; TOTAL 1ST YR;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T;------ THRU
N AK CODE R A; 3RD k 5TH k ANNUAL;
N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB ;FEDERAL;; 6TH
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94 -95 96 -97 YEARS
43 NELSEN PLACE B8 -RW05 19 3 ABDF 0.11 X U $305 $305 $305 P.E. 7
S. 156th St. S. 158th St. R/W
Design and construct widening including paving, drainage, curb and gutter, CONST.
sidewalks, lighting.
I TOTAL $0 $0
44 SOUTH 152ND STREET 19 2 ABDF 0.25 U $500 $500 $500 P.E.
42nd Avenue South Pacific Highway South R/W
Design and construct paving, drainage, curb and gutter, sidewalks, lighting, CONST.
utility undergrounding.
1 TOTAL $0 $0
45 NORFOLK STREET I ABDF 0.61 X U $1,250 $1,250 $1,250 P.E.
East Marginal West Marginal (SR 99) R/W
Design and construct paving, drainage, curb and gutter, sidewalks, lighting, CONST.
bridge crossing Green River.
TOTAL $0 $0
46 ANDOVER PARK WEST 17 2 ABOF 1.00 P U $1,500 $1,500 $1,015 $485 P.E.
Strander Blvd S. 180th Street R/W
Design and construct widening to 5 -lanes including paving, drainage, curb and CONST.
gutter, sidewalks, channelization,signalslighting, signing
1 TOTAL $0 $0
47 SOUTHCENTER BLVD 16 2 ABDF 0.20 U $600 $900 $1,500 $1,500 P.E.
61st Ave Macadam Rd R/W
Design and construct widening to 7 -lanes CONST.
1 TOTAL $0 $0
48 STRANDER BOULEVARD 94-RW32 17 3 ABOF 0.50 U $39 $461 $500 $100 $400 P.E.
Andover Park West West Valley Highway R/W
Design and construct widening to 5 lanes including paving, drainage, curb and CONST.
gutter, sidewalks, lighting.
1 TOTAL $0 $0
49 SOUTH 180TH STREET /ANDOVER PARK WEST 16 6 ABDF 0.10 U $81 $81 $81 P.E.
Intersection R/W
Design and construct signal modifications and widen legs to intersection to CONST.
accomodate turn lanes
1 TOTAL $0 $0
June 25, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Page 8
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/24/91
CITY NO. 1320 ADOPTION DATE
COUNTY NO. 17 RESOLUTION 110.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D; OBLIGATION PLAN
I U JO R 1;
0 NC OF R N; EXPENDITURE PLAN
R CL k Y G; SOURCE OF FUNDS
I TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND
T IS CO WORT; V S; TOTAL 1ST YR;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORT. OS LR LNGTH E T;----------------------- THRU
N Ar, CODE R A; 3P.D 6 5TH 6 ANNUAL;
N A S T; 1ST 2ND 4TH 6TH LOCAL ;RAP /UAB;FEDERAL 61H
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT,;
S; 1992 1993 94 -95 96 -97 YEARS
50 SOUTH 143RD PLACE 84 -RW28 19 2 ABDF 0.19 X U 132 $217 $249 $249 P.E. 8
Interurban Avenue Duwatish River R/W
Design and construct widening including paving, curb and gutter, sidewalks, COSST.
lighting.
I TOTAL $0 SO
51 SOUTH 143RD STREET 84 -RW25 19 2 ABDF 0.20 X U $53 $358 $411 1411 P.E.
Interurban Avenue Duwamish River R/W
Design and construct widening including paving, curb and gutter, drainage, CONTT.
sidewalks, lighting
I TOTAL to 10
52 MINKLER BLVD 84-RW15 19 3 ABDF 0.17 X U 158 $706 1764 $764 P.E.
Andover Park W. Andover Park E. R/W
Widen to 5 lanes. COIIST.
I TOTAL $0 f0
53 TRECK DRIVE EXTENSION 87 -RWO6 19 1 ABDF 0.11 X U $32 1389 $421 $421 P.E.
Andover Park West exist. Treck Drive R/W
Design and construct new 3 -lane street on new alignment including paving, COSST.
drainage, curb and gutter, sidewalks, lighting.
I TOTAL $0 $0
54 SOUTH 140TH STREET 84 -RW26 19 2 ADDF 0.11 X U 124 $155 1179 1179 P.E.
Interurban Avenue Duwaaish River R/W
Design and construct widening including paving, curb and gutter, drainage, COSST,
sidewalks, lighting
I TOTAL $0 $0
55 GATEWAY DRIVE BRIDGE 85 -RWO1 1 ABDF 0.40 U 1805 $1,951 12,836 $2,036 P.E.
Gateway Drive 50th Place S. R/W
New 4 -lane arterial w /bridge crossing the Duwaaish River. COSTT.
1 TOTAL 10 10
56 SOUTH 151ST STREET 87-RWOO 19 3 ABDF 0.10 X U $155 $155 $155 P.E.
51st Ave. S. 52nd Ave. S. R/W
Design and construct street widening including paving, drainage, curb and CONST.
gutter, sidewalks, lighting.
1 TOTAL $0 10
June 25, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Page 9
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/24/91
CITY NO. 1320 ADOPTION DATE
COUNTY NO. 17 RESOLUTION NO.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D;----------------------------------------- OBLIGATION PLAN
I U JO R 1;
0 NC OF R N; EXPENDITURE PLAN
R CL P. Y G; SOURCE OF FUNDS
I TA N TOTAL 0 FOR ALL FUNDING TYPES 2ND
T IS CO WORK V S; TOTAL 151 YP.;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E I;--- THRU
N At,, CODE R A; 3RD 6 5111 6 ANNUAL;
N A S T; 1ST 211D 4Tit 6TH LOCAL ;RAP /UAB;FEDERAL;; 6TH
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94 -95 96 -97 YEARS
57 SOUTH 144TH STREET 84 -RW29 19 2 ABDF 0.11 X U $24 $155 $179 $179 P.E. 9
Interurban Ave. Duwaeish River R/W
Design and construct widening including paving, curb and gutter, drainage, CONST.
sidewalks, lighting
1 TOTAL So 10
58 51ST AVENUE MACADAM ROAD 42ND AVENUE 17 2 ABDF 1.80 U $3,250 $3,250 $3,150 P.E.
Interurban Avenue SR 518 R/W
Design and construct paving, curb and gutter, drainage, sidewalks, lighting, CONST.
utility undergrounding
1 TOTAL $0 $0
59 ANDOVER PARK EAST 90 -RW 16 2 ABDF 1.39 X U 1160 $1,900 $2,060 $2,060 P.E.
Tukwila Parkway S. 180th St. R/W
Design and construct widening to 5-lanes including paving, drainage, curb and CONST.
gutter, sidewalks, channelization, sig- nals, lighting, signing.
1 TOTAL $0 10
60 SOUTH 154TH STREET 16 2 ABDF 0.60 U $1,800 $1,000 $1,800 P.E.
52nd Ave. Pacific Highway R/W
Design and construct widening including paving, curb and gutter, sidewalk, calls I.
lighting,
I TOTAL $0 f0
61 SOUTH 180TH STREET RR OVERPASS 87 -RWO9 14 1 ADFG 0.20 X U $9,130 $9,230 11,846 $7,384 P.E.
S. 180th (SW 43rd) t UPRR-BNRR zing. R/W
New separated grade crossing of existing RR tracks (joint project w /Renton). COIlS1.
1 TOTAL f0 $0
61 SOUTH 168TH STREET 84 -RW35 1 ABDF 0.17 X U 1373 $373 $373 P.E.
Andover Park West Andover Park East R/W
Design and construct new 4 -lane street including right -of- way acquisition, CONST.
paving, drainage, curb and gutter, sidewalk,lighting.
I TOTAL 10 10
63 SOUTH 144TH STREET 17 2 ABDF 0.30 U 1500 $500 $500 P.E.
Pacific Highway Military Road R/W
Design and construct widening, drainage, curb and gutter, sidewalk, lighting, CONST.
utility undergounding.
1 TOTAL 10 f0
June 25, 1991
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 Page IU
CITY /COUNTY CITY OF TUI.WILA HEARING DATE 06/24/91
CITY NO. 1320 ADOPTION DATE
COUNTY NO. 17 RESOLUTION NO.
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A 0; OBLIGATION PLAN
I U JO R I;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
I TA W TOTAL 0 FOR ALL FUNDING TYPES 2ND
I IS CO WORK V S; TOTAL IS1 YR;
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK, OS LR LNGTH E T;----------------------- THRU
N AK. CODE R A;. 3RD 6 51H 6 ANNUAL:
N A S T; 1ST 2ND 4TH 61H LOCAL ;RAP /UAB;FEDERAL;; 61H
0 L S X U; YEAR YEAR YEARS YEARS FUNDS FUNDS FUNDS FUNDS ELEMT.;
S; 1992 1993 94 -95 96 -97 YEARS
64 MINQER BLVD 1 ABDF 0.50 X U 11,000 $7,000 $1,000 P.E. 1
0
West Palley Highway Oakesdale R/W
Vesign and construct new 5-;ane arterial with bridge cross- ing UPRR k BNRR CONST.
tracks.
I TOTAL $0 $0
65 ANDOVER PARK, NEST /MINKLER RR XING 17 6 1 0.10 U $148 $148 $148 P.E.
Andover Park Nest at Minkler Blvd R/W
Install railroad crossing signal. CONTT.
I TOTAL $0 $0