HomeMy WebLinkAboutReg 2012-06-04 Item 3E - Final Acceptance - Interurban Avenue South Gravity Sewer by RL Alia Construction for $664,401.62COUNCIL AGENDA SYNOPSIS
Initials ITEM NO.
Meeting Date Prepared by Mayor's review Council review
06/04/12 BG
3.E.
ITEM INFORMATION
CAS NUMBER: STAFF SPONSOR: BOB GIBERSON I ORIGINAL AGENDA DATE: 06/04/12
AGENDA ITI ='M TITLE Interurban Ave S Gravity Sewer Project
Project Completion and Acceptance
CATI41GORY Discussion Motion Resolution Ordinance Bid Award Public Hearin
g ❑Other
Mt g Date Mtg Date 06/04/12 Mtg Date Mtg Date Mtg Date Mtg Date Mt Date
SPONSOR Council Mayor HR DCD Finance .Fire IT P &R Police PW/
SPONSOR'S The contract with R.L. Alia Company of Renton, WA is complete for the Interurban Ave S
SUMMARY Gravity Sewer Project. This project replaced a failing sewer lift station with a series of
gravity feed sewer lines on Interurban Ave S. Construction began August 19, 2011 and was
completed on May 10, 2012. Ten change orders were issued for $28,580.38 and under -runs
credited $103,260.91. Council is being asked to accept and finalize the contract with R.L.
Alia Company in the amount of $664,401.62.
REVIEWED BY COW Mtg. CA &P Crate F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 05/30/12 COMMITTEE CHAIR: DENNIS ROBERTSON
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMPITEE Unanimous Approval; Forward to Regular Consent Agenda.
COST IMPACT FUND SOURCE
EXPI= -NDI'rURI? REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$664,401.62 $828,256.25 $0.00
Fund Source: 402 SEWER (PG 117, 2012 CIP)
Comments:
MTG.DATEI RECORD OF COUNCIL ACTION
06/04/12 1
J MTG. DATE J ATTACHMENTS
06/04/12 Informational Memorandum dated 05/25/12
State of WA Depart of Revenue Notice of Completion 11 -099
Minutes from the Utilities Committee meeting of 05/30/12
35
36
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Michael Ronda, Construction Project Manager
DATE: May 25, 2012
SUBJECT: Interurban Avenue S. Gravitv Sewer Proiect
Project No. 90440208, Contract No. 11 -099
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of retainage.
BACKGROUND
The Notice to Proceed for Contract No. 11 -099 with R.L. Alia Construction of Renton, Washington,
was issued on August 19, 2011 for construction of the Interurban Avenue S. Gravity Sewer Project.
This project was designed to replace a failing sewer lift station with a series of gravity feed lines on
the west side of Interurban Avenue S. between Fort Dent Way and S 144 Street.
DISCUSSION
Construction was physically completed on May 10, 2012. Ten change orders were issued during
construction for a total of $28,580.38. The change orders can generally be summarized as minor
revisions that were offset by under -runs in quantities for various bid items. The largest change
order in the group ($13,146) was due to an unexpected subgrade condition which caused
problems with the trench when installing the new sewer main.
The total budget for this contract, with an 11 contingency, was $828,256.25. A retainage bond
was used, so no retainage amount was withheld.
Contract Award Amount 681,440.00
Change Order Nos. 1 10 28,580.38
Cost Under -runs (103,260.91)
Sales Tax 57,642.15
Total Amount 664.401.62
RECOMMENDATION
The Council is being asked for formal acceptance and retainage bond release authorization, subject
to standard claim and lien release procedures, for the contract with R.L. Alia Construction, in the
amount of $664,401.62 and to consider this item on the Consent Agenda at the June 4, 2012
Regular Council Meeting.
Attachments: Dept of Revenue Notice of Completion
WAPW Eng\PROJECTSW SW Projects \Interurban Gravity Sewer (90440208)\ConstructionW.200 Correspondence\010 -To OlhersW Sewer INFO MEMO Closeout 05 -25 -12 sb.doc
37
m
"TA 9 t.
NOTICE OF COMPLETION OF PUBLIC WORDS CONTRACT
Contractor's UBI Number: 600149378
Date: 05/23/12
.Name;& Address of Public', Agency Degartment.Use Only
City of Tukwila Assigned to:
6200 Southcenter Blvd.
Tukwila WA 98188 Date Assigned:
UBI Number: 179 000 -208
Notice is Hereby given relative to the completion of contract or project described below
Project Name Contract Number Job Order Contracting
Interurban Avenue South Gravity Sewer 11 -099 Yes No
Description of Work Done/include Jobsite Address(es)
Install replacement gravity feed sewer system from approximately 14900 to 14400 block, reroute existing
sewers to new system and remove the old pump station at approximately 14610 Interurban Avenue.
Federally funded road transportation project? Yes No
Contractor's Name Telephone Number
R L Alia Company 425 226 -8100
Contractor Address
107 William Ave. Renton WA 98055
If Retainage is Bonded, List Surety's Name (or attach a copy)
N/A
Surety Agent's Address
North American Specialty Insurance Company, Parker Smith and Feek Inc., 2233 112th Ave NE, Bellevue WA 98004
Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted
7/14/11 8/19/11 05/10/12 XX/XX /XX
Contract Amount 681,440.00
Additions 28,580.38 Liquidated Damages 0.00
Reductions 103,260.91 Amount Disbursed 664,401.62
Sub -Total 606,759.47 Amount Retained 0.00
Amount of Sales Tax Paid at .095
(If various rates apply, please send a breakdown)
TOTAL
57,642.15
664,401.62
NOTE: These two totals must be equal
Please List all Subcontractors Below:
Subcontractor's Name:
National Concrete Cutting
Del -Mar Concrete Cutting Coring
ASPI Surveying
Krazan Testing
Ground Up Road Construction
Hot Mix Pavers
Apply -a -Line
NWCW LLC
UBI Number:
600 195 813
602 260 574
601 778199
601 498 409
602 790 246
600 310 693
600 553 941
602 813 492
TOTAL 664,401.62
Affidavit ID (if known)
No Work Performed
WARI.
350994
N/A
No Work Performed
373269
F215 -038 -000 08 -2011
REV 31 0020e (08/25/11) Continued on page 2
w
Please List all Subcontractors Below:
p Subcontractor's Nalne:
I
I
J
i
I
comments:
UBI Number
Affidavit ID (if known)
Contact Name: Diane Jaber Title: Fiscal Specialist
Email Address: Diane Jaber @TukwilaWA.gov Phone Number: (206) 433 -1871 x1871
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form to all three agencies below. For a faster response, please submit by e -mail.
Washington State
Washington State
Washington State
Department of Revenue
Department of Labor and Industries
Employment Security Department
Public Works Section
Contract Release
Specialized Collections Unit
PO Box 47474
PO Box 44274
PO Box 9046
Olympia WA 98504 -7474
Olympia, WA 98504 -4272
Olympia WA 98507 -9046
(360)725 -7588
(360)902 -4754
(360) 902 -9780
FAX (360) 664 -4159
FAX (360) 902 -6897
Fax (360) 902 -9287
PWC @dor_wra.gov
ContractReiease @lni.wa.gov
publicworks @esd.wa gov
For tax assistance or to request this document in an alternate format, visit http: /doi or call 1-800-647-7706.
Teletype (TTY) users may call (360) 705 -6718.
F215- 038 -000 08 -2011
REV 31 0020e (08/25/11)
40
UTILITIES COMMITTEE
Meeting Minutes
Mczl^ 30, 2012 5:001).n7. C'onlerenee Roon7 I
Citv of Tukwila
Utilities Committee
"Wecrnesckol Dare to Holickol
PRESENT
Councilmembers: Dennis Robertson, Chair; Joe Duffle and Bate Kitiller
Staff: Bob Giberson, Frank Iriarte, Robin Tisclmiak, Mike Cusick, Mike Ronda, and Gail Labanara
CALL TO ORDER: The meeting was called to order at 5:04 p.m.
I. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. Proiect Completion and Acceptance: Interurban Avenue South Gravity Sever
Staff is seeking Council approval for project completion, closeout and release of retainage to R. L. Alia
Construction of Renton in the amount of $664,401.62 for the construction of the Interurban Avenue South
Gravity Serer Project. This project replaced a failing serer lift station with a gravity feed serer line.
Ten (10) change orders in the amount of $28,58038 were issued during this project, but were offset by
under rums. The project was completed under budget by approximately $17,000 without using the
contingency. Photos from the project syere presented to the Committee in order to understand the need for
the changes orders. UNANIMOUS APPROVAL. FORWARD TO JUNE 4 CONSENT AGENDA.
B. Water and Sesser Comprehensive Plans: Consultant SUDDlement No. 2 with Carolla Engineers
Staff is seeking Council approval for Supplement No. 2 with Carollo Engineers in the amount of $21,721.50
for updates relative to the 2010 Water and Sewer Comprehensive Plans, specifically 30u0, 70a0, Stu)
and 060 of the Water Comprehensive Plan.
The consultant's scope of work needs to be increased due to multiple discrepancies in existing sewer pipe
maps; over estimation of the multi family population results in the Commercial Business District, and
changes to the fire flow requirements. Also part of the Water Comprehensive Plan is that the Department of
Health has notified us of their concern with the size of our water storage capacity UNANIMOUS
APPROVAL. FORWARD TO JUNE 11 COW FOR DISCUSSION.
C. Educational Ouuortunity: CIP 102
Per the request of Committee Chair Robertson (see Utilities Committee minutes dated 02 /28/12), staff
utilized extra time at the Committee meeting to review the Capital Improvement Program (CIP) and
accompanying Attachments D, E and F, including the rate matrix. Committee Members will find this
information useful when utility rate increases are brought to Committee later this year. INFORMATION
ONLY.
III. MISCELLANEOUS Meeting adjourned at 6:20 p.m.
Next meeting: A "ext meeting: Tuesday, June 12, 2012 5:00 p.m. Conf. Room No. 1.
1
Committee Chair Approval
Minutes by ,GL. Reviewed by KAM.