Loading...
HomeMy WebLinkAboutRes 1770 - 2013-2018 Transportation Improvement ProgramC l ty of u la Washington Resolution No. 1770 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2013- 2018), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2013- 2018); and WHEREAS, on June 18, 2012, a public hearing was held regarding the City's Six Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2013 -2018 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W: \Word Process ing- City \Resolutions \TIP 2013 -2018 5 -30 -12 CK:bjs Page 1 of 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this Vrµ day of 7T 2012. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk TUj Verna Seal, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: n Passed by the City Council: j? ctSG�Q�Q� U� ';r Resolution Number: I TA D Shelley M. Kerslake, City Attorney Exhibit: City of Tukwila Six -Year Transportation Improvement Program from 2013 to 2018 W: \Word Processing- City \Resolutions \TIP 2013 -2018 5 -30 -12 CK:bjs Page 2 of 2 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila I Phase Start Year (YYYY) I Federal Fund Code m State Fund Code I County: King Local Funds I Total Funds S I PE 1 2013 I MPO /RTPO: PSRC Y Inside N Outside I 01 100,0001 v C 0 o -n A. PIN /Project No. B. STIP ID 575,0001 D o z C. Project Title n D m m n D. Road Name or Number m c a o' U 0 a E. Begin End Termini m -'a z v, E F. Project Description G. Structure ID a M c 16 WA -03766 06/18/12 06/18/12 0.190 CE 1770 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code m State Fund Code I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 100,0001 M C 0 o 0 1 1 01 575,0001 575,000 n 01 y m 675,0001 675,000 Expenditure Schedule c -'a m -'a m M N 3 M G. 05 CGOPS 0.190 CE No 01 TW 01 0 Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 100,0001 100,000 P I CN 1 2018 1 1 0 1 1 01 575,0001 575,000 Totals) 01 1 01 675,0001 675,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 100,0001 01 01 01 0 CN 1 01 01 01 01 575,000 Totals) 100,0001 01 01 01 575,000 Report Date: June 20, 2012 Page 1 vU Wai�hiin g t d h Y N T* Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside v Federal Fund Code Federal Funds I o' State Funds I T m A. PIN /Project No. 1 2013 I z z C. Project Title I c D. Road Name or Number n sv 0 a E. Begin End Termini v, ELF. 0 1 Project Description 16 20,0001 20,000 P I CN 1 2018 1 Andover Park E /Minkler Blvd. Intersection B. STIP ID 1 Andover Park E c M Minkler Blvd to o Design and construct intersection and traffic signal improvements and widening for 1 01 left turn pockets Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I m S I PE 1 2013 I I 01 I 120,0001 120,000 P I PE 1 2018 1 1 0 1 1 01 20,0001 20,000 P I CN 1 2018 1 1 B. STIP ID 1 01 c M C o 01 1 01 742,0001 c Expenditure Schedule 9; Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th G. Structure ID a PE 1 c m vi 01 m a WA -03764 06/18/12 06/18/12 01 1770 03 01 602,000 0.190 CE No Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 120,0001 120,000 P I PE 1 2018 1 1 0 1 1 01 20,0001 20,000 P I CN 1 2018 1 1 0 1 1 01 602,0001 602,000 Totals) 01 1 01 742,0001 742,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 75,0001 45,0001 01 01 20,000 CN 1 01 01 01 01 602,000 Totals 1 75,0001 45,0001 01 01 622,000 Report Date: June 20, 2012 Page 2 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 16 WA -03760 06/18/12 06/18/12 1770 04 C G O P S 0.400 CE No TW Andover Park West Widening Andover Park West Strander Blvd to Tukwila Pkwy Complete widening for center turn pockets and landscape median for access control, widen sidewalks, upgrade ADA facilities, modify signal operation, upgrade street lighting, install pedestrian lighting. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I CN 1 2013 I I 01 TIB 1 1,420,0001 339,0001 1,759,000 Totals) 01 1 1,420,0001 339,0001 1,759,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th CN 1 1,759,0001 01 01 01 0 Totals 1,759,0001 01 01 01 0 Report Date: June 20, 2012 Page 3 Report Date: June 20, 2012 Page 4 M T v A. PIN /Project No. B. STIP ID D C o m 0 z C. Project Title D m m D. Road Name or Number M c a 0 r E 0 H a E. Begin &End Termini m Z m v, F. Project Description G. Structure ID �c a c m H m a 14 WA -03731 06/18/12 06/18/12 1770 06 No Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I ALL 1 2013 I I 0 1 I 01 1,555,0001 1,555,000 Totals) 01 1 01 1,555,0001 1,555,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th ALL 1 205,0001 270,0001 270,0001 270,0001 540,000 Totals 205,0001 270,0001 270,0001 270,0001 540,000 Report Date: June 20, 2012 Page 4 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 16 WA -03733 06/18/12 06/18/12 1770 06 C G O P S No T Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I ALL 1 2013 I I 0 1 I 01 9,380,0001 9,380,000 Totals) 01 1 01 9,380,0001 9,380,000 Expenditure Schedule Phase 1 ALL 1 Totals 1 1st 1 1,450,0001 1,450,0001 2nd 1 1,500,0001 1,500,0001 3rd 1 1,550,0001 1,550,0001 4th 1 1,560,0001 1,560,0001 5th 6th 3,320,000 3,320,000 Report Date: June 20, 2012 Page 5 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE County: King BR 1 1,100,0001 I 01 200,0001 1,300,000 P 1 RW 1 2013 1 MPO /RTPO: PSRC Y Inside N Outside 1 01 80,0001 100,000 P 1 CN 1 2014 1 BR 1 8,880,0001 1 01 2,220,0001 11,100,000 m 10,000,0001 1 01 2,500,0001 12,500,000 v Phase 1 c 2nd 1 3rd 1 0 5th 6th -n A. PIN /Project No. B. STIP ID D o m 01 01 0 z C. Project Title D m 01 m 01 9 D. Road Name or Number 0 a 01 n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 14 WA -03732 06/18/12 06/18/12 1770 04 O P T No Boeing Access Road Bridge Rehabilitation Boeing Access Road Airport Way to 1 -5 Reconstruct bridge 08002500 Funding Status Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2013 I BR 1 1,100,0001 I 01 200,0001 1,300,000 P 1 RW 1 2013 1 BR 1 20,0001 1 01 80,0001 100,000 P 1 CN 1 2014 1 BR 1 8,880,0001 1 01 2,220,0001 11,100,000 Totals) 10,000,0001 1 01 2,500,0001 12,500,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 1,300,0001 01 01 01 0 RW 1 100,0001 01 01 01 0 CN 1 01 11,100,0001 01 01 0 Totals 1,400,0001 11,100,0001 01 01 0 Report Date: June 20, 2012 Page 6 vU Wai�hiin g t d h Y N T* Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside v I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I o' P I T m A. PIN /Project No. WSDOT z z C. Project Title 1 2013 I c D. Road Name or Number n sv 0 a E. Begin End Termini v, ELF. WSDOT Project Description 19 1 2018 I I 01 WSDOT Cascade View Safe Routes to School B. STIP ID Totals I 0 S 140th St /33rd Ave S c M to o Construct an off- street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code P I PE m I 01 WSDOT P I RW 1 2013 I WSDOT P I CN 1 2013 I I 01 WSDOT P I ALL 1 2018 I I 01 WSDOT B. STIP ID Totals I 0 c M C o c 9; G. Structure ID a c m vi m a WA -03795 06/18/12 06/18/12 1770 28 0.190 CE No Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code P I PE 1 2013 I I 01 WSDOT P I RW 1 2013 I I 01 WSDOT P I CN 1 2013 I I 01 WSDOT P I ALL 1 2018 I I 01 WSDOT Totals I 0 Expenditure Schedule Phase 1st I 2nd I 3rd I 4th PE 1 41,0001 14,0001 01 01 RW 1 78,0001 01 01 01 CN 1 01 295,0001 01 01 ALL 1 01 01 01 01 Totals) 119,0001 309,0001 01 01 State Funds I Local Funds I Total Funds 55,0001 0 1 55,000 78,0001 0 1 78,000 295,0001 0 1 295,000 750,0001 89,0001 839,000 1,178, 000 89,000 1,267, 000 Fiiii: -g 0 0 0 839,000 839,000 Report Date: June 20, 2012 Page 7 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v -n A. PIN /Project No. B. STIP ID D c o m 0 z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 16 WA -03770 06/18/12 06/18/12 1770 03 P S T W 0.280 CE No East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb gutter, sidewalks, drainage, landscaping, and utility undergrounding. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2014 I I 01 I 01 50,0001 50,000 P I PE 1 2018 1 1 0 1 1 01 170,0001 170,000 P I RW 1 2018 1 1 0 1 1 01 700,0001 700,000 P 1 CN 1 2018 1 STP 1 1,300,0001 1 01 1,130,0001 2,430,000 Totals 1,300,0001 1 01 2,050,0001 3,350,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 50,0001 01 01 170,000 RW 1 01 01 01 01 700,000 CN 1 01 01 01 01 2,460,000 Totals) 01 50,0001 01 01 3,330,000 Report Date: June 20, 2012 Page 8 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 00 WA -03783 06/18/12 06/18/12 1770 28 CE No Greenbelt Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 312,0001 312,000 S I CN 1 2017 1 1 0 1 1 01 230,0001 230,000 Totals) 01 1 01 542,0001 542,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 50,0001 01 01 01 50,000 CN 1 01 01 01 01 230,000 Totals 50,0001 01 01 01 280,000 Report Date: June 20, 2012 Page 9 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila State Funds I Local Funds I m P I PE 1 2013 I I 01 I County: King 250,0001 250,000 P I RW 1 2013 1 1 0 1 1 01 MPO /RTPO: PSRC Y Inside N Outside P 1 CN 1 2014 1 STP 1 5,000,0001 TIB 1 4,000,0001 1,700,0001 v C 0 o -n A. PIN /Project No. B. STIP ID D o z C. Project Title n D m m n D. Road Name or Number m c a o' U 0 a E. Begin End Termini m -'a z v, E F. Project Description G. Structure ID a M c 14 WA -03771 06/18/12 06/18/12 0.850 CE 1770 Interurban Ave S Interurban Ave S S 143rd St to Fort Dent Way Reconstruct street including paving, curb gutter, drainage, illumination, sidewalk, and landscaping Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I m P I PE 1 2013 I I 01 I 250,0001 250,000 P I RW 1 2013 1 1 0 1 1 01 150,0001 150,000 P 1 CN 1 2014 1 STP 1 5,000,0001 TIB 1 4,000,0001 1,700,0001 M C 0 o 11,100,000 n y m c -'a m -'a m M N 3 M G. 03 C G O P S 0.850 CE Yes TW Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2013 I I 01 I 01 250,0001 250,000 P I RW 1 2013 1 1 0 1 1 01 150,0001 150,000 P 1 CN 1 2014 1 STP 1 5,000,0001 TIB 1 4,000,0001 1,700,0001 10,700,000 Totals 1 5,000,0001 1 4,000,0001 2,100,0001 11,100,000 Expenditure Schedule Phase 1st I 2nd I 3rd I 4th I 5th 6th PE 1 250,0001 01 01 01 0 RW 1 150,0001 01 01 01 0 CN 1 01 10,700,0001 01 01 0 Totals 400,0001 10,700,0001 01 01 0 Report Date: June 20, 2012 Page 10 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 17 WA -03763 06/18/12 06/18/12 1770 03 0.190 CE No Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 17,0001 17,000 P I PE 1 2018 1 1 0 1 1 01 90,0001 90,000 P I RW 1 2018 1 1 0 1 1 01 90,0001 90,000 P I CN 1 2018 1 1 0 1 1 01 430,0001 430,000 Totals) 01 1 01 627,0001 627,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 17,0001 01 01 01 90,000 RW 1 01 01 01 01 90,000 CN 1 01 01 01 01 430,000 Totals 17,0001 01 01 01 610,000 Report Date: June 20, 2012 Page 11 vU Wai�hiin g t d h Y N T* Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside v Federal Fund Code T o' A. PIN /Project No. Local Funds I Total Funds z z C. Project Title I c D. Road Name or Number n sv 0 a E. Begin End Termini v, ELF. 1 Project Description 17 01 865,0001 865,000 Minkler Blvd 01 1 Minkler Blvd B. STIP ID Expenditure Schedule Southcenter Pkwy to Andover Park W c M Construct widening for 3 lanes including curb gutter, sidewalk, drainage and o landscaping Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds m 1 2018 I I 01 I 01 P I CN 1 2018 1 1 0 1 1 01 865,0001 865,000 Totals) 01 1 01 B. STIP ID Expenditure Schedule c M C o Phase 1 1st 1 2nd 1 3rd 1 c 5th 6th 9; 01 01 01 01 75,000 CN 1 01 01 01 01 G. Structure ID a Totals) c m vi 01 m a WA -03773 06/18/12 06/18/12 1770 03 P S T W 0.400 CE No Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 75,0001 75,000 P I CN 1 2018 1 1 0 1 1 01 865,0001 865,000 Totals) 01 1 01 940,0001 940,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 75,000 CN 1 01 01 01 01 865,000 Totals) 01 01 01 01 940,000 Report Date: June 20, 2012 Page 12 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside Report Date: June 20, 2012 Page 13 m v C 0 T A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 1< C E. v, E F. Project Description G. Structure ID a c m H 3 m a 19 WA -03679 06/18/12 06/18/12 1770 44 No Neighborhood Traffic Calming Program Various city street to Program to address neighborhood traffic concerns using striping, signage, roadway improvements, traffic calming, and education to reduce speeding and improve safety Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I ALL I 2013 I I O I I OI 11 1 Totalsl OI I OI 11 1 Expenditure Schedule Phase I 1st I 2nd I 3rd I 4th I 5th 6th ALL I OI OI OI OI 1 Totalsl OI OI OI OI 1 Report Date: June 20, 2012 Page 13 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 19 WA -03780 06/18/12 06/18/12 1770 05 0.110 CE No Nelsen Place Nelsen Place S 156th St to S 158th St Design and construct paving, curb gutter, sidewalks, drainage, and illumination Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 20,0001 20,000 P I CN 1 2018 1 1 0 1 1 01 180,0001 180,000 Totals) 01 1 01 200,0001 200,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 20,000 CN 1 01 01 01 01 180,000 Totals) 01 01 01 01 200,000 Report Date: June 20, 2012 Page 14 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE County: King I 01 I 01 20,0001 20,000 P I PE 1 2018 1 MPO /RTPO: PSRC Y Inside N Outside 1 01 60,0001 60,000 P 1 CN 1 2018 1 STP 1 460,0001 1 01 110,0001 570,000 m 460,0001 1 01 190,0001 650,000 v Phase 1 c 2nd 1 3rd 1 0 5th 6th -n A. PIN /Project No. B. STIP ID D o m 01 01 60,000 z C. Project Title D m 01 m 01 9 D. Road Name or Number 0 a 01 n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 16 WA -03769 06/18/12 06/18/12 1770 06 C G O P S 0.190 CE No TW S 133rd St /SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 20,0001 20,000 P I PE 1 2018 1 1 0 1 1 01 60,0001 60,000 P 1 CN 1 2018 1 STP 1 460,0001 1 01 110,0001 570,000 Totals 460,0001 1 01 190,0001 650,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 20,0001 01 01 01 60,000 CN 1 01 01 01 01 570,000 Totals 20,0001 01 01 01 630,000 Report Date: June 20, 2012 Page 15 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 17 WA -03782 06/18/12 06/18/12 1770 28 0.250 CE No S 144th St Bridge Sidewalks S 144th Street 51 st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51 st Ave S and 53rd Ave S Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 0 1 I 01 100,0001 100,000 Totals) 01 1 01 100,0001 100,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 100,000 Totals) 01 01 01 01 100,000 Report Date: June 20, 2012 Page 16 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila I Phase Start Year (YYYY) I Federal Fund Code I m State Fund Code I County: King Local Funds I Total Funds S I PE 1 2013 I MPO /RTPO: PSRC Y Inside N Outside I 01 68,0001 v C 0 o -n A. PIN /Project No. B. STIP ID 230,0001 D o z C. Project Title n D m m n D. Road Name or Number m c a o' U 0 a E. Begin End Termini m 1,000,0001 -'a z v, E F. Project Description G. Structure ID a M c 17 WA -03762 06/18/12 06/18/12 0.190 CE 1770 S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I m State Fund Code I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 68,0001 M C 0 o 0 1 1 01 230,0001 230,000 P I RW 1 2018 1 n 0 1 y m 40,0001 40,000 P I CN 1 2018 1 c -'a m 1,000,0001 -'a m M N 3 M G. 03 CGOPS 1,818,000 0.190 CE No TW Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 68,0001 68,000 P I PE 1 2018 1 1 0 1 1 01 230,0001 230,000 P I RW 1 2018 1 1 0 1 1 01 40,0001 40,000 P I CN 1 2018 1 1 01 TIB 1 1,000,0001 480,0001 1,480,000 Totals) 01 1 1,000,0001 818,0001 1,818,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 68,0001 01 01 01 230,000 RW 1 01 01 01 01 40,000 CN 1 01 01 01 01 1,480,000 Totals) 68,0001 01 01 01 1,750,000 Report Date: June 20, 2012 Page 17 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 00 WA -03778 06/18/12 06/18/12 1770 01 G O P W 0.800 CE Yes S 168th St S 168th St Southcenter Pkwy to Andover Park E Design and construct new roadway including curb gutter, sidewalk, drainiage, illumination, on- street parking, landscaping, and underground utilities. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 1,372,0001 1,372,000 P I RW 1 2018 1 1 0 1 1 01 7,500,0001 7,500,000 P I CN 1 2018 1 1 0 1 1 01 14,372,0001 14,372,000 Totals) 01 1 01 23,244,0001 23,244,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 1,372,000 RW 1 01 01 01 01 7,500,000 CN 1 01 01 01 01 14,372,000 Totals) 01 01 01 01 23,244,000 Report Date: June 20, 2012 Page 18 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 16 WA -03784 06/18/12 06/18/12 1770 01 0.400 No S 178th St Realignment S 178th St Southcenter Pkwy to W City Limits Realign S 178th St from current intersection of Southcenter Pkwy /S 180th St to intersect with Segale Park Dr C and add a new traffic signal at the new intersection. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I CN 1 2018 I I 01 OTHER 1 5,628,0001 3,754,0001 9,382,000 Totals) 01 1 5,628,0001 3,754,0001 9,382,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th ALL 1 01 01 01 01 9,382,000 Totals) 01 01 01 01 9,382,000 Report Date: June 20, 2012 Page 19 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 16 WA -03781 06/18/12 06/18/12 1770 03 0.200 CE No S 180th St /Andover Park W Intersection S 180th Street Andover Park W to Widen for north /south left turn pockets Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 35,0001 35,000 P I RW 1 2018 1 1 0 1 1 01 15,0001 15,000 P I CN 1 2018 1 1 0 1 1 01 160,0001 160,000 Totals) 01 1 01 210,0001 210,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 35,000 RW 1 01 01 01 01 15,000 CN 1 01 01 01 01 160,000 Totals) 01 01 01 01 210,000 Report Date: June 20, 2012 Page 20 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE County: King I 01 I 01 1,700,0001 1,700,000 P I RW 1 2018 1 MPO /RTPO: PSRC Y Inside N Outside 1 01 1,400,0001 1,400,000 P I CN 1 2018 1 1 0 1 1 01 16,900,0001 16,900,000 m 01 1 01 20,000,0001 20,000,000 v Phase 1 c 2nd 1 3rd 1 0 5th 6th -n A. PIN /Project No. B. STIP ID D o m 01 01 1,700,000 z C. Project Title D m 01 m 01 9 D. Road Name or Number 0 a 01 n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 14 WA -03776 06/18/12 06/18/12 1770 03 C G O P S CE Yes T Southcenter Blvd Widening Southcenter Blvd 1 -5 to 61 st Ave S Widen Southcenter Blvd and the 61st Avenue Bridge to add a lane for future traffic growth. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 1,700,0001 1,700,000 P I RW 1 2018 1 1 0 1 1 01 1,400,0001 1,400,000 P I CN 1 2018 1 1 0 1 1 01 16,900,0001 16,900,000 Totals) 01 1 01 20,000,0001 20,000,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 1,700,000 RW 1 01 01 01 01 1,400,000 CN 1 01 01 01 01 16,900,000 Totals) 01 01 01 01 20,000,000 Report Date: June 20, 2012 Page 21 vU Wai�hiin g t d h Y N T* Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside v Federal Fund Code T o' A. PIN /Project No. Local Funds I Total Funds z z C. Project Title I c D. Road Name or Number n sv 0 a E. Begin End Termini v, ELF. 1 Project Description 19 367,0001 255,0001 622,000 Thorndyke Safe Routes to School 01 1 S 150th St B. STIP ID Expenditure Schedule Tukwila International Blvd to 42nd Ave S c M Construction of roadway improvements including a new sidewalk on the north side of o S 150th St and a new crosswalk in front of Thorndyke Elementary School. Education, 1st 1 2nd 1 enforcement and encouragement elements are included after the construction as part c 5th 6th of the Safe Routes to Schools program. Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds m 1 2013 I I 01 WSDOT 1 90,0001 P I CN 1 2014 1 1 01 WSDOT 1 367,0001 255,0001 622,000 Totals) 01 1 457,0001 B. STIP ID Expenditure Schedule c M C o Phase 1 1st 1 2nd 1 3rd 1 c 5th 6th 9; 48,0001 28,0001 14,0001 01 0 CN 1 01 622,0001 01 01 G. Structure ID a Totals 1 c m vi 01 m a WA -03796 06/18/12 06/18/12 1770 28 CE No Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2013 I I 01 WSDOT 1 90,0001 01 90,000 P I CN 1 2014 1 1 01 WSDOT 1 367,0001 255,0001 622,000 Totals) 01 1 457,0001 255,0001 712,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 48,0001 28,0001 14,0001 01 0 CN 1 01 622,0001 01 01 0 Totals 1 48,0001 650,0001 14,0001 01 0 Report Date: June 20, 2012 Page 22 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside 3 v N 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m D. Road Name or Number M a 0 0 r U 0 a E. Begin End Termini 0 CL U) E F. Project Description G. Structure ID a m vi 16 WA -03775 06/18/12 06/18/12 1770 24 Traffic Signal Interconnect Program Various City Streets to Design and install hard wire interconnect system between traffic signals and the Traffic Operations Center Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 0 1 I 01 300,0001 300,000 P 1 CN 1 2018 1 STP 1 1,200,0001 1 01 1,500,0001 2,700,000 Totals 1,200,0001 1 01 1,800,0001 3,000,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 300,000 CN 1 01 01 01 01 2,700,000 Totals) 01 01 01 01 3,000,000 M 0 M M E m a 10 r Report Date: June 20, 2012 Page 23 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 17 WA -03772 06/18/12 06/18/12 1770 28 0.750 CE Yes TUC /TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station /TOD area. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 300,0001 300,000 P I RW 1 2018 1 1 0 1 1 01 100,0001 100,000 P 1 CN 1 2018 1 STP(E) 1 500,0001 1 01 200,0001 700,000 Totals 500,0001 1 01 600,0001 1,100,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 300,000 RW 1 01 01 01 01 100,000 CN 1 01 01 01 01 700,000 Totals 1 01 01 01 01 1,100,000 Report Date: June 20, 2012 Page 24 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 14 WA -03774 06/18/12 06/18/12 1770 03 O P S W 0.700 CE No Tukwila International Blvd (Phase 4) Tukwila International Blvd Boeing Access Road to S 116th St Design and construct widening including paving, curb gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding. Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 0 1 I 01 271,0001 271,000 P I CN 1 2018 1 1 01 TIB 1 3,500,0001 820,0001 4,320,000 Totals) 01 1 3,500,0001 1,091,0001 4,591,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 271,000 CN 1 01 01 01 01 4,320,000 Totals) 01 01 01 01 4,591,000 Report Date: June 20, 2012 Page 25 vU Wai�hiin g t d h Y N T* Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside v Federal Fund Code Federal Funds I o' State Funds I T m A. PIN /Project No. 1 2018 I z z C. Project Title I c D. Road Name or Number n sv 0 a E. Begin End Termini v, ELF. 1,200,0001 Project Description 14 1,825,0001 4,225,000 Tukwila International Blvd /S 116th St /SR 599 On -ramp B. STIP ID 1 Tukwila International Blvd c M S 116th St /SR 599 On -ramp to o Design and construct southbound left turn lane, pedestrian signalization and lighting Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I m P I PE 1 2018 I I 01 I 450,0001 450,000 P 1 CN 1 2018 1 STP 1 1,200,0001 TIB 1 1,200,0001 1,825,0001 4,225,000 Totals B. STIP ID 1 1,200,0001 c M C o c Phase 1 1st 1 9; 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 450,000 G. Structure ID a CN 1 c m vi 01 m a WA -03777 06/18/12 06/18/12 01 1770 03 P 4,675,000 0.400 CE No Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 450,0001 450,000 P 1 CN 1 2018 1 STP 1 1,200,0001 TIB 1 1,200,0001 1,825,0001 4,225,000 Totals 1,200,0001 1 1,200,0001 2,275,0001 4,675,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 450,000 CN 1 01 01 01 01 4,225,000 Totals) 01 01 01 01 4,675,000 Report Date: June 20, 2012 Page 26 vU Wai�hiin g t d h Y N T* Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside v Federal Fund Code T o' A. PIN /Project No. I Z z C. Project Title 1 2013 I c D. Road Name or Number n sv 0 a E. Begin End Termini v, ELF. P 1 ALL Project Description 14 536,0801 1 01 01 Tukwila Manufacturing Industrial Center "Street Smart' Non motorized Project Various City Streets B. STIP ID 1 to c M 1. Planning study of non motorized improvement options along Boeing Access Road, o to provide safe bicycle and pedestrian travel alternatives. 2. PE CN of bike facilities on E Marginal Way S between Boeing Access Road and SR 599. 3. PE CN of bike c Phase 1 lanes and shared use path on Airport Way from Boeing Access Road /E Marginal 9; 3rd 1 Way S to the northern City limit. Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I m P I PE 1 2013 I I 01 WSDOT 1 01 200,000 P 1 ALL 1 2013 1 CMAQ 1 536,0801 1 01 01 536,080 Totals B. STIP ID 1 200,0001 c M C o c Phase 1 1st 1 9; 3rd 1 4th 1 5th 6th °a m z 1< a 01 01 G. Structure ID �c a a ALL 1 c m vi 01 m CL WA -03798 06/18/12 06/18/12 736,0801 1770 28 01 0 CE No Status I Phase I Phase Start Year (YYYY) I Federal Fund Code Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2013 I I 01 WSDOT 1 200,0001 01 200,000 P 1 ALL 1 2013 1 CMAQ 1 536,0801 1 01 01 536,080 Totals 536,0801 1 200,0001 01 736,080 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 200,0001 01 01 01 0 ALL 1 536,0801 01 01 01 0 Totals 736,0801 01 01 01 0 Report Date: June 20, 2012 Page 27 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v -n A. PIN /Project No. B. STIP ID D c o m 0 z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 16 WA -03734 06/18/12 06/18/12 1770 23 C G O P S CE Yes T Tukwila Urban Center Transit Center Andover Park W Strander Blvd to Tukwila Pkwy Design and construct a transit center Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I CN 1 2013 1 5309(Bus) 1 1,400,0001 WSDOT 1 3,735,0001 79,0001 5,214,000 Totals) 1,400,0001 1 3,735,0001 79,0001 5,214,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th CN 1 4,952,0001 01 01 01 0 Totals 4,952,0001 01 01 01 0 Report Date: June 20, 2012 Page 28 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Funding Status Phase Agency: Tukwila Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I CMAQ 1 County: King I 01 102,0001 852,833 P I RW 1 2013 1 1 01 MPO /RTPO: PSRC Y Inside N Outside 230,0001 1,100,000 P 1 CN 1 2015 1 STP(E) 1 5,200,0001 1 01 2,285,0001 7,485,000 Totals 5,950,8331 1 m 2,617,0001 9,437,833 Expenditure Schedule Phase 1 1st 1 v 3rd 1 4th 1 5th 6th c PE 1 0 01 -n A. PIN /Project No. B. STIP ID D o m 01 1,100,0001 01 01 0 z C. Project Title D m 01 m 7,485,0001 9 0 D. Road Name or Number 0 a 7,485,0001 n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 00 /1320(002) TUK -50 06/18/12 06/18/12 1770 28 0.640 CE Yes Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Design and preliminary engineering of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit oriented development. Funding Status Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I CMAQ 1 750,8331 I 01 102,0001 852,833 P I RW 1 2013 1 1 01 WSDOT 1 870,0001 230,0001 1,100,000 P 1 CN 1 2015 1 STP(E) 1 5,200,0001 1 01 2,285,0001 7,485,000 Totals 5,950,8331 1 870,0001 2,617,0001 9,437,833 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 390,0001 01 01 01 0 RW 1 01 1,100,0001 01 01 0 CN 1 01 01 7,485,0001 01 0 Totals 390,0001 1,100,0001 7,485,0001 01 0 Report Date: June 20, 2012 Page 29 Report Date: June 20, 2012 Page 30 M v C 0 T A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m D. Road Name or Number M c a 0 r E 0 H a E. Begin &End Termini m Z m v, F. Project Description G. Structure ID �c a c m H m a 17 WA -03761 06/18/12 06/18/12 1770 28 No Walk Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non motorized projects including bike lanes, sidewalks and trails Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2015 I I 01 I 01 140,0001 140,000 Totals) 01 1 01 140,0001 140,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 140,0001 01 0 Totals) 01 01 140,0001 01 0 Report Date: June 20, 2012 Page 30 vU Wai�hiin g t d h Y N T* Six Year Transportation Improvement Program From 2013 to 2018 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside m v c 0 -n A. PIN /Project No. B. STIP ID D o m z C. Project Title D m m 9 D. Road Name or Number 0 a n m 0 H a E. Begin &End Termini m Z 14 m v, E F. Project Description G. Structure ID a c m H 3 m a 14 WA -03779 06/18/12 06/18/12 1770 03 0.500 CE No West Valley Highway SR 181 /West Valley Highway 1 -405 to Strander Blvd Design and costruct widening to 7 lanes including curb gutter, sidewalks, illumination, drainage, and traffic control Funding Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds P I PE 1 2018 I I 01 I 01 60,0001 60,000 P I CN 1 2018 1 1 0 1 1 01 570,0001 570,000 Totals) 01 1 01 630,0001 630,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 01 01 01 01 60,000 CN 1 01 01 01 01 570,000 Totals) 01 01 01 01 630,000 Report Date: June 20, 2012 Page 31 vU Wai�hiin g t d h Y N T* Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside v I Federal Fund Code I Federal Funds I o' State Funds I T m A. PIN /Project No. 1 2013 z z C. Project Title I c D. Road Name or Number n sv 0 a E. Begin End Termini v, ELF. 0 1 Project Description 14 50,0001 50,000 P 1 CN 1 2018 West Valley Highway /S 156th St B. STIP ID 1 SR181 /West Valley Highway c M Southcenter Blvd to S 158th St o Construct additional northbound left turn lanes at S 156th Street for northbound HOV 1 01 to northbound 1 -405 Funding Six Year Transportation Improvement Program From 2013 to 2018 N Outside Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I m S I PE 1 2013 I I 01 I 75,0001 75,000 P I PE 1 2018 1 1 0 1 1 01 50,0001 50,000 P 1 CN 1 2018 1 CMAQ 1 B. STIP ID 1 01 c M C o 440,0001 1 01 667,0001 c Expenditure Schedule 9; Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th G. Structure ID a PE 1 c m vi 01 m a WA -03765 06/18/12 06/18/12 01 1770 03 O P S T W 982,000 CE Yes Status I Phase I Phase Start Year (YYYY) I Federal Fund Code I Federal Funds I State Fund Code I State Funds I Local Funds I Total Funds S I PE 1 2013 I I 01 I 01 75,0001 75,000 P I PE 1 2018 1 1 0 1 1 01 50,0001 50,000 P 1 CN 1 2018 1 CMAQ 1 440,0001 1 01 542,0001 982,000 Totals 440,0001 1 01 667,0001 1,107,000 Expenditure Schedule Phase 1 1st 1 2nd 1 3rd 1 4th 1 5th 6th PE 1 75,0001 01 01 01 50,000 CN 1 01 01 01 01 982,000 Totals 75,0001 01 01 01 1,032,000 1 Federal Funds 1 I State Funds I Local Funds 1 Total Funds Grand Totals for Tukwila 1 27,986,9131 1 23,188,0001 80,209,001 1 131,383,914 Report Date: June 20, 2012 Page 32 Christy O'Flaherty From: Christy O'Flaherty Sent: Wednesday, June 20, 2012 12:22 PM To: HAMMONP @wsdot.wa.gov Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2013 -2018 Attachments: Res 1770 2013 -2018 Transportation Improvement Program.pdf June 20, 2012 PAULA J. HAMMOND, SECRETARY Washington State Department of Transportation PO BOX 47316 Olympia, WA 98504 -7316 RE: CITY OF TUKWILA 2013 -2018 TRANSPORTATION IMPROVEMENT PROGRAM Dear Ms. Hammond: Enclosed is City of Tukwila Resolution #1770 passed June 18, 2012, adopting the Transportation Improvement Program for 2013 -2018. Please contact me with any questions at 206 433 -1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director 1 Christy O'Flaherty From: Christy O'Flaherty Sent: Wednesday, June 20, 2012 12:13 PM To: GregA @TIB.wa.gov Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2013 -2018 Attachments: Res 1770 2013 -2018 Transportation Improvement Program.pdf June 20, 2012 TRANSPORTATION IMPROVEMENT BOARD CHAIR c/o Greg Armstrong, Tukwila Project Engineer Washington State Transportation Improvement Board PO BOX 40901 Olympia, WA 98504 -0901 RE: CITY OF TUKWILA 2013 -2018 TRANSPORTATION IMPROVEMENT PROGRAM Attached is City of Tukwila Resolution #1770 passed June 18, 2012, adopting the Transportation Improvement Program for 2013 -2018. Please contact me with any questions at 206 433 -1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director Christy O'Flaherty From: Christy O'Flaherty Sent: Wednesday, June 20, 2012 12:26 PM To: library@psrc.org Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2013 -2018 Attachments: Res 1770 2013 -2018 Transportation Improvement Program.pdf Attached is City of Tukwila Resolution #1770 passed June 18, 2012, adopting the Transportation Improvement Program for 2013 -2018. Please contact me with any questions at 206 433 -1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment Xc: Bob Giberson, Public Works Director i