Loading...
HomeMy WebLinkAboutUtilities 2012-06-26 Item 2B - Bid Award - Removal of Temporary Flood Control Measures to Goodfellow Bros for $1,642,228.99City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton UTILITIES COMMITTEE FROM: Bob Giberson, Public Works Director 426 BY: Ryan Larson, Senior Engineer DATE: June 22, 2012 SUBJECT: Howard Hanson Dam Flood Resoonse/Tukwila Levee Repairs Maintenance Project No. 10901301 BID AWARD Removal of Temporary Flood Control Measures ISSUE Award the bid for construction of the Tukwila Levee Repair Maintenance project. BACKGROUND The City of Tukwila, King County, Kent, and Auburn installed temporary flood protection measures in 2009 in response to the damage sustained and subsequent reduced flood protection from the Howard Hanson Dam. These temporary measures included placement of Supersacks along the Tukwila 205 Levee and Hesco barriers along West Valley Highway. The Army Corps of Engineers (Corps) has notified the affected jurisdictions that all repairs have been completed to the Howard Hanson Dam and that the dam is operating at full protection level. Staff worked. with a consultant, the Corps, and the King County Flood Control Zone District (Flood District) to develop plans for removal of the temporary flood measures. In addition, the cities of Tukwila, Kent, and Auburn requested funding for this removal through the Flood District and they have agreed to pay 75% of the cost to remove temporary flood protection up to $1,611,152.00 for Tukwila's portion. The funding includes necessary property restoration to the levee trail, private property, and public rights -of -way. ANALYSIS The project was advertised for bids on May 22 and 29, 2012. Six bids were received and opened on June 12, 2012. The bids were checked, corrected, and tabulated. Goodfellow Bros., Inc. is the apparent low bidder with a bid of $1,642,228.99. The engineer's estimate was $1,997,872.40. Goodfellow Bros. successfully completed the installation of the temporary flood protection measures in 2009. BUDGET AND BID SUMMARY (All amounts include sales tax.) The Council is being asked to award the removal of temporary flood control measures for the Tukwila Levee Repair and Maintenance project to Goodfellows Bros., Inc. in the amount of $1,642,228.99 and consider this item at the July 9, 2012 Committee of the Whole meeting and subsequent July 16, 2012 Regular Meeting. Attachments: Bid Tabulations WIPW Eng \PROJECTS\A- DR Projects \Tukwila Levee Repair and Maintenance (10901301) \Design \Info Memo Bid Award B -22 -12 sb.docx 11 Bid Results Estimate Budget Bid Amount $1,642,228.99 $1,997,872.40 Levee Repair Budget (pg. 77) $1,600,000.00 Flood District (ILA) 75% of $1.8m 1,416,422.51 Contingency (15 246.334.35 299.680.86 0.00 Total $1.888.563.35 $2.297.553.26 $.3.016.422.51_ RECOMMENDATION The Council is being asked to award the removal of temporary flood control measures for the Tukwila Levee Repair and Maintenance project to Goodfellows Bros., Inc. in the amount of $1,642,228.99 and consider this item at the July 9, 2012 Committee of the Whole meeting and subsequent July 16, 2012 Regular Meeting. Attachments: Bid Tabulations WIPW Eng \PROJECTS\A- DR Projects \Tukwila Levee Repair and Maintenance (10901301) \Design \Info Memo Bid Award B -22 -12 sb.docx 11 tukwila levee repair and maintenance howard hanson dam flood response bid tabulation