Loading...
HomeMy WebLinkAboutReg 2012-07-02 Item 5C - Bid Award - 2012 Overlay and Repair to ICON Materials for $974,259COUNCIL AGENDA SYNOPSIS Initials ITEMNO. Meeting Date Prepared by Mayors review Council review 07/02/12 BG 5.C. CAS NUMBER: AGENDA ITEM TITLE ITEM INFORMATION STAFF SPONSOR: BOB GIBERSON I ORIGINAL AGENDA DATE: 07/02/12 2012 Annual Overlay Repair Program Bid Award CATEGORY Discussion Motion Resolution Ordinance N Bid Award Public Hearing Other Mtg Date Mt Date Mt Date Mtg Date Mtg Date 07/02/12 Mtg Date Mtg Date SPONSOR Council Mayor HR DCD Finance Fire IT P&R Police N PW SPONSOR'S The 2012 Annual Overlay and Repair Program was advertised for bid on May 29 and SUMMARY June 5, 2012. Three bids were opened June 12, 2012 with the low bid of $974,259.00 from ICON Materials. ICON has successfully worked for the City in the past and their bid is within budget. Overlay for 2012 includes Tukwila Parkway and Andover Park West. Council is being asked to award the bid to ICON Materials in the amount of $974,259.00. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte N Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 6/18/12 COMMITTEE CHAIR: ALLAN EKBERG RECOMMENDATIONS: SPONSOR /ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $974,259.00 $1,100,000.00 $0.00 Fund Source: 104 ARTERIAL STREET FUND (PAGE 14, 2012 CIP) Comments: MTG. DATE I RECORD OF COUNCIL ACTION 07/02/12 MTG. DATE I ATTACHMENTS 07/02/12 I Informational Memorandum dated 6/15/12 vicinity Map Bid Tabulation Recommendation Letter Minutes from the Transportation Committee meeting of 06/18/12 I I 3 El City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Robin Tischmak, City Engineer DATE: June 15, 2012 SUBJECT: 2012 Overlav Repair Program Project No. 91210401 BID AWARD ISSUE Award the bid for construction of the 2012 Overlay Repair Program. BACKGROUND This project will provide roadway repairs and overlays at 2 locations. The project was advertised for bids on May 29 and June 5, 2012 and three bids were received and opened on June 12, 2012. The lowest bid of $974,259.00 was from ICON Materials. The Engineer's estimate was $988,610.00. ANALYSIS The bids were reviewed and tabulated. No errors were discovered in any of the three bids received. ICON Materials has successfully worked for the City on past projects and references were contacted with positive feedback (see attached bid tabulations recommendation letter). The 2012 Overlay Repair Program includes overlay for Tukwila Parkway and Andover Park West (see attached vicinity map). BUDGET AND BID SUMMARY Bid Results Estimate Budqet Construction (Base Bid) 974,259.00 988,610.00 $1,100,000.00 Contingency (10.0 97.425.90 98,861.00 0.00 Total $1.071.684.90 $1.087.471.00 $1.100.000.00 RECOMMENDATION The Council is being asked to award the construction bid for the 2012 Overlay Repair Program to ICON Materials in the amount of $974,259.00 and consider this item at the July 2, 2012 Regular Consent Agenda. Attachments: Vicinity Map Bid Tabulations Recommendation Letter W: \PW Eng \PROJECTS\A- RW RS Projects\2012 Overlay Repair Program (91210401) \Design \Info Memo Bid Award 2012 gl.docx 5 x S St r t '4U r m S 153 St r� S v O��hCP��Pr N v SR 403 8( 0 TWkw1(a Parkway i s F S 158 1 in 16� St s p �S Strande Blvd a IT o N ti C I Treck l Dr CJ S N 3 L ro ro R� Ln L 1 1 Z Corporate Pro 0- t Q Drive N lo oc a ons p Corporate Drive S z Minkter Blvd Upta Drive 3 A (/1 n D `0 C O 3 Q Midland ive o n! N N 1 P Z ro 3 S Tritand Driv r i m N ►rts LA S 180 St JS W 43 St w D Segate Pk Dr S 181 ro D Ri n ci d i lp D A. c it y o f Tukwila. 2012 Overlay Program Department of Public Works 6/13/2012 Vicinity Map 7 IS Fg 2 V, n E.Cls...- C OO SEE R ES S E Q 2 c 0 G, C O I 1E n P 11 V L l "I R Ur V !r vY 11 11 V, VY 11 nss C c 6 c� C� 4 In I- c 2, u': I, I C V, R S e e C R S P z V, 1 11 V, en V, It c w v If 1 L) in 1 uj l z �2 W 2 E F y L) tq Cf R y z ul W W �t r, j L u E E LL G N 2 or CL C, I W n w L, W K 'tC c. c RI 6 t u' 5 W r' W 'y 5j ri it, 0.. n E C. L 20- V) La R W 1 6 2: 1" W U) O 11 11 1 2 6 2 2 2 6 Z I I LL 0 W W p z 0 cI, cn, r,, -n. W If z 0 rf 0 ry 51 KF'G 753 91h Avenue North Seattle, WA 98109 P: 206.286.1640 F: 206.286.1639 www.kpg.com June 13, 2012 Mr. Robin Tischmak, P.E. Senior Transportation Engineer City of Tukwila, Department of Public Works 6300 Southcenter Blvd Tukwila, WA 98188 Re: 2012 Overlay Program Project No. 91210401 Recommendation for Contract Award Dear Robin, KPG has reviewed the projects and references submitted by ICON Materials for the Overlay Program. References including City of Maple Valley and City of Renton indicated that ICON Materials does a good job with paving, overlay, and repair projects. We are therefore recommending that the City award Project No. 91210401 entitled 2012 Overlay Program to ICON Materials. Please call me at (206) 284 -1640 if you should have any questions or require further information. Sincerely, 9�1n%ra �iwhnfi- Olivia Buban, P.E. Project Manager 9 10 TRANSPORTATION COMMITTEE Meeting Minutes June 18, 2012 5:15 p.m. Conference Room No. 1 Citv of Tukwila Transportation Committee PRESENT Councilmembers: Allan Ekberg, Chair; Kathy Hougardy and De' Sean Quinn Staff: David Cline, Bob Giberson, Frank Iriarte, Robin Tischmak, Jack Pace, Peter Lau, Moira Bradshaw, Gail Labanara and Kimberly Matej Guests: Dave Gering, Manufacturing and Industrial Council CALL TO ORDER: The meeting was called to order at 5:19 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Bid Award: 2012 Overlav and Repair Proaram Staff is seeking full Council approval to award a bid in the amount of $974,259 to ICON Materials for the construction of the 2012 Annual Overlay and Repair Program. The annual overlay and repair program will overlay Tukwila Parkway and Andover Park West. Due to budgeting constraints, these two projects were chosen from seven projects which were designed by KPG (see Transportation Committee minutes dated November 7, 2011). The remaining five projects were held at 60% design completion once budgeting constraints were identified. ICON's bid is slightly below the engineer's estimate of $988,610. ICON has provided satisfactory work on past City projects, is currently conducting the paving on the Southcenter Parkway Extension project, and reference checks were confirmed with positive feedback. UNANIMOUS APPROVAL. FORWARD TO JULY 2 CONSENT AGENDA. B. Construction Management Selection Agreement: 2012 Overlav and Repair Program Staff is seeking full Council approval to enter into a contract with Parametrix, Inc. in the amount of $96,996.32 for construction management services for the 2012 Overlay Program. Parametrix, Inc. was identified as the best selection of three firms considered from the Municipal Research and Services Center (MRSC) consultant roster. The 2012 Program will provide the overlay at the two locations identified above. The City has $150,000 budgeted for construction management services for the 2012 Overlay Program. UNANIMOUS APPROVAL. FORWARD TO JULY 2 CONSENT AGENDA. C. Duwamish Transportation Management Association Dave Gering, Executive Director, from the Manufacturing and Industrial Council, gave a presentation to the Committee regarding the results of the Street Smart study. The goal of the study is identify opportunities to reduce single occupant vehicle use in the manufacturing and industrial centers of Tukwila and Seattle. In summary, Mr. Gering's suggestions include key players, such as Boeing, Port of Seattle (airport), King County, City of Seattle, and City of Tukwila, working cooperatively to identify positive solutions along East Marginal Way, West Marginal Way, and Airport Way. INFORMATION ONLY. III. SCATBd The meeting minutes from May 2, 2012, and agenda for June 19, 2012 SCATBd meetings were included in the Committee's agenda packet. IV. MISCELLANEOUS Committee Chair Ekberg inquired about the recently placed stop sign at the intersection of 51" Avenue South (which turns into Klickitat Drive) and the State Route 518 exit ramp, and the possibility of a traffic signal. He 11