HomeMy WebLinkAboutReg 2012-07-02 Item 5E - Bid Award - 2012 Small Drainage Program to Green River Construction for $646,953.09COUNCIL AGENDA SYNOPSIS
Initials ITEMNO.
Meeting Date Prepared by', I Mayor's review Council review
07/02/12 I BG'
i 5.E.
CAS NUMBER:
AGENDA ITEM TITLE
ITEM INFORMATION
STAFF SPONSOR: BOB GIBERSON I ORIGINAL. AGENDA DATE: 07/02/12
2012 Annual Small Drainage Program Bid Award
CATEGORY Discussion Motion
Mtg Date Mtg Date
Resolution Ordinance
Mtg Date
Mtg Date
Bid Award ❑Public Hearing Other
Mtg Date 07102112 Mtg Date Alig Date
SPONSOR Council Mayor HR DCD Finance Fire IT P&R Police PW
SPONSOR'S The 2012 Annual Small Drainage Program was advertised for bid on June 5 and 12, 2012.
SUMMARY Four bids were opened June 19, 2012 with the low bid of $646,953.09 from Green River
Construction, Inc. Green River has successfully worked for the City in the past and their bid
is within budget. For 2012, eight locations will be improved. Council is being asked to
award the bid to Green River Construction in the amount of $646,953.09.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 6/26/12 COMMITTEE CHAIR: DENNIS ROBERTSON
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$646,953.09 $950,000.00 $0.00
Fund Source: 412 SURFACE WATER FUND (PAGE 138 139, 2012 CIP)
Comments: King County Flood Contra/ District will fund approximately $45,000.00.
MTG. DATE I RECORD OF COUNCIL ACTION
07/02/12
MTG. DATE I ATTACHMENTS
07/02/12 I Informational Memorandum dated 6/22/12
Vicinity Map
Bid Tabulation
Minutes from the Utilities Committee meeting of 06/26/12
29
30
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
UTILITIES COMMITTEE
FROM: Bob Giberson, Public Works Director 1
By: Ryan Larson, Senior Engineer
DATE: June 22, 2012
SUBJECT: 2012 Annual Small Drainaqe Proqram
Project No. 91041201
BID AWARD
ISSUE
Award the bid for construction of the 2012 Annual Small Drainage Program.
BACKGROUND
The Small Drainage Program constructs drainage projects throughout the City that are too large for
City staff to complete, but are smaller than a typical capital improvement project. The projects
originate from citizen complaints and from maintenance staff and are compiled on the Small
Drainage Project List. Each year the projects are prioritized based on need, expense, permitting
requirements, and length of time on the list. The highest priority projects are then designed and
constructed.
The 2012 Annual Small Drainage Program will provide drainage improvements at eight locations
listed on page 2 of this memo. Project #2 includes lining a pipe within private property as part of the
Private Storm System Adoption Program. Project #5 is for flood protection work at Fort Dent Park
and funding will be reimbursed through the King County Flood Control District Opportunity Fund.
ANALYSIS
The 2012 Annual Small Drainage Program was advertised for bids on June 5 and 12, 2012. Four
bids were received and opened on June 19, 2012. The bids were checked, corrected, and tabulated.
Green River Construction, Inc. is the apparent low bidder with a bid of $646,953.09. The engineer's
estimate was $724,361.00. Green River Construction successfully constructed the 2009 and 2011
Small Drainage Projects.
BUDGET AND BID SUMMARY (All amounts include sales tax.)
RECOMMENDATION
The Council is being asked to award the construction of the 2012 Annual Small Drainage Program to
Green River Construction, Inc. in the amount of $646,953.09 and consider this item at the July 2,
2012 Regular Consent Agenda.
W: \PW Eng \PROJECTSW- DR Projects\2012 SDP (91241201) \Design \Info Memo Bid Award 2012 sb.doc
31
Bid Results
Estimate
2012 Budaet
Bid Amount
$646,953.09
$724,361.00
SDP (2012) Budget (pg. 138)
$675,000.00
Private Storm Budget (pg. 139)
275,000.00
Contingency (15
97.042.96
108.654.15
0.00
Total
$743.996.05
$833.015.15
$950.000.00
RECOMMENDATION
The Council is being asked to award the construction of the 2012 Annual Small Drainage Program to
Green River Construction, Inc. in the amount of $646,953.09 and consider this item at the July 2,
2012 Regular Consent Agenda.
W: \PW Eng \PROJECTSW- DR Projects\2012 SDP (91241201) \Design \Info Memo Bid Award 2012 sb.doc
31
INFORMATIONAL MEMO
Page 2
The 2012 Annual Small Drainaae Proaram includes:
Site 1) Gilliam Creek, Southcenter Blvd Crossing Modify inlet structure and provide pipe liner
rehabilitation of existing pipe crossing of Southcenter Blvd.
Site 2) -S12 81h St 37 Ave S Pipe Repairs Provide replacement and /or pipe liner rehabilitation
on 6 pipe reaches in the vicinity of S 128 St intersection with 37 Ave S.
Site 3) Tukwila Parkway Outfall Provide realignment and replacement of the outfall pipe that
discharges north of the recent TUC Access (Klickitat) project.
Site 4) Ryan Hill Pipe Repairs Provide manhole and pipe replacement and /or liner rehabilitation on
3 pipe reaches in the vicinity of S 109 St intersection with 47 Ave S.
Site 5) *Fort Dent Outfall Improvements Install a new manhole in levee with a flap gate on the 15-
inch outfall pipe to provide backup flood protection and line outfall pipe.
Site 6) S 107 St Drainage Extension Extend drainage from S 107 St to Beacon Ave S and
eliminate ditch on the south side of S 107 St.
Site 7) 52 /53 r Ave S Drainage Extension Extend a 12" storm drain from the existing 53 Ave S
to a ponding area on the north end of 52 Ave S via S 142 St.
Site 8) S114 th St Drainage Crossings Provide drainage crossings at 3 existing catch basin
locations to stop roadway runoff from entering private property.
Private Storm System Adoption Rehabilitation Program Project for pipe along S. 128 St.
Funding will be provided through the opportunity funds from the King County Flood Control District
Attachments: Project Location Map
Bid Tabulations
32 WAPW Eng1PROJECTSW DR Projects12012 SDP (91241201)0esignllnfo Memo Bid Award 2012 sb.doc
fi, tltl
b
kC�
Y 4
((s
r
2012 Annual Neighborhood
Drainage Program
Revised
Site 6
r
,ru Site 4
�t s
t
Site 8
a
Site 2 n
Not to Scale
t
Site 7
a
s
e
s a
Site 5
a
A
Site 1 �N
Site 3
r
j
J E y11LA
°moo Gis
7ukWlia
?90B
Ik ate: May 9 2012
34
2012 small drainage program
bid tabulation
36
2012 small drainage program
bid tabulations
W.*
Li
June 26, 2012 Paae 2
Utilities Committee Minutes s
D. 2012 Annual Small Drainage Program: Bid Award
Staff is seeking Council approval to award a bid in the amount of $646,953.09 to Green River Construction,
Inc. for the 2012 Small Drainage Program.
This annual program constructs drainage projects throughout the City that are too large for completion by
City staff but smaller than the average capital improvement project. This year the Small Drainage Program
will construct eight drainage improvements at eight locations (specific locations outlined in memo included
in Committee agenda packet). Each year, projects considered for this program are reprioritized based on
such things as need, expense, time on the list, etc. Highest priority projects are designed and constructed
within annual budget limitations. 1
The City has worked successfully with Green River Constructio a roj 'ects including the 2010 -11
Program. Funding for this project is drawn from two budge ine i the S all�rainage Program and the
Private Storm System Adoption Rehabilitation, T�NANI O SAP OVA FORWARD TO JULY 2
CONSENT AGENDA.
E. GIS Inventory Area 8: Consult ei cdon Aaree)ne&
Staff is seekin nci pr va to to into c nos nt r e nt with Perteet Engineering, Inc. in the
amount of $1 0, oo he a pin of a tors i d -ainagela survey monuments within the public right -of-
ways for Area o the G -)g ap is In ma' i stems (GIS) Inventory.
As part of the\im lem it ion uirements of the National Pollution Discharge Elimination System
(NPDES), the Chy co cting a multi phased GIS inventory for public drainage systems (catch basins
and manholes). as- builts requirements will be met through the completion of this phase with the
exception of the new south area annexation.
Perteet Engineering, Inc. has conducted all seven previous phases of this inventory. Project funding is
budgeted in the 412 Surface Water Fund. UNANIMOUS APPROVAL. FORWARD TO JULY 2
CONSENT AGENDA.