Loading...
HomeMy WebLinkAboutCOW 2012-07-09 Item 4B.2 - Bid Award - Removal of Flood Control Measures to Goodfellows Bros for $1,642,228.99COUNCIL AGENDA SYNOPSIS Initials ITEMNO. Meeting Date Prepared by I Mayorrezv ,aua:cl review 07/09/12 BG, s A I 4. 07/16/12 BG ITEM INFORMATION CAS NUMBER: I STAFF SPONSOR: BOB GIBERSON I ORIGINAL AGENDA DATE: 7/09/12 AGENDA ITEM TITLE Howard Hanson Dam Flood Response/ Removal of Temporary Flood Measures Bid Award to Goodfellows Bros., Inc. CATEGORY Discussion Motion Resolution Ordinance Bid Award ❑Public Hearing Other Mt g Date 07/09/12 Mtg Date Mtg Date Mtg Date Mtg Date 07/16/12 Mtg Date Mtg Date SPONSOR Council Mayor HR DCD Finance Fire IT P&R Police PW SPONSOR'S The removal of the Howard Hanson Dam Flood Response Temporary Flood Control SUMMARY Measures was advertised for bid on May 22 and 29, 2012. Six bids were opened on June 12, 2012 with the low bid of $1,642,228.99 from Goodfellows Bros., Inc. Goodfellows successfully installed the flood control measures in 2009. Council is being asked to award the contract to Goodfellows Bros. in the amount of $1,642,228.99. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 06/26/12 COMMITTEE CHAIR: DENNIS ROBERTSON RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Committee of the Whole COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $1,642,228.99 $1,600,000.00 $42,228.99 Fund Source: 303 FUND (PAGE 77, 2012 CIP) CIP PAGE DOES NOT INCLUDE KING COUNTY FUNDING Comments: King County will fund 75% of Tukwila 'F costs up to $1,611,152.00, see funding spreadsheet MTG. DATE 07/09/12 07/16/12 MTG. DATE 07/09/12 07/16/12 RECORD OF COUNCIL ACTION ATTACHMENTS Informational Memorandum dated 06/22/12 Funding Spreadsheet Bid Tabulations Minutes from the Utilities Committee meeting of 06/26/12 53 54 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton UTILITIES COMMITTEE FROM: Bob Giberson, Public Works Director BY: Ryan Larson, Senior Engineer DATE: June 22, 2012 SUBJECT: Howard Hanson Dam Flood Response /Tukwila Levee Repairs Maintenance Project No. 10901301 BID AWARD Removal of Temporary Flood Control Measures ISSUE Award the bid for construction of the Tukwila Levee Repair Maintenance project. BACKGROUND The City of Tukwila, King County, Kent, and Auburn installed temporary flood protection measures in 2009 in response to the damage sustained and subsequent reduced flood protection from the Howard Hanson Dam. These temporary measures included placement of Supersacks along the Tukwila 205 Levee and Hesco barriers along West Valley Highway. The Army Corps of Engineers (Corps) has notified the affected jurisdictions that all repairs have been completed to the Howard Hanson Dam and that the dam is operating at full protection level. Staff worked with a consultant, the Corps, and the King County Flood Control Zone District (Flood District) to develop plans for removal of the temporary flood measures. In addition, the cities of Tukwila, Kent, and Auburn requested funding for this removal through the Flood District and they have agreed to pay 75% of the cost to remove temporary flood protection up to $1,611,152.00 for Tukwila's portion. The funding includes necessary property restoration to the levee trail, private property, and public rights -of -way. ANALYSIS The project was advertised for bids on May 22 and 29, 2012. Six bids were received and opened on June 12, 2012. The bids were checked, corrected, and tabulated. Goodfellow Bros., Inc. is the apparent low bidder with a bid of $1,642,228.99. The engineer's estimate was $1,997,872.40. Goodfellow Bros. successfully completed the installation of the temporary flood protection measures in 2009. BUDGET AND BID SUMMARY (All amounts include sales tax.) RECOMMENDATION The Council is being asked to award the removal of temporary flood control measures for the Tukwila Levee Repair and Maintenance project to Goodfellows Bros., Inc. in the amount of $1,642,228.99 and consider this item at the July 9, 2012 Committee of the Whole meeting and subsequent July 16, 2012 Regular Meeting. Attachments: Bid Tabulations W:\PW Eng \PROJECTS\A- DR Projects \Tukwila Levee Repair and Maintenance (10901301) \Design \Info Memo Bid Award 6 -22 -12 sb.docx 55 Bid Results Estimate Budqet Bid Amount $1,642,228.99 $1,997,872.40 Levee Repair Budget (pg. 77) $1,600,000.00 Flood District (ILA) 75% of $1.8m 1,416,422.51 Contingency (15 246.334.35 299.680.86 0.00 Total $1.888.563.35 $2.297.553.26 $.3.016.422.51 RECOMMENDATION The Council is being asked to award the removal of temporary flood control measures for the Tukwila Levee Repair and Maintenance project to Goodfellows Bros., Inc. in the amount of $1,642,228.99 and consider this item at the July 9, 2012 Committee of the Whole meeting and subsequent July 16, 2012 Regular Meeting. Attachments: Bid Tabulations W:\PW Eng \PROJECTS\A- DR Projects \Tukwila Levee Repair and Maintenance (10901301) \Design \Info Memo Bid Award 6 -22 -12 sb.docx 55 56 Howard Hanson Dam Flood Response Removal of Temporary Flood Control Measures Project No. 10901301 Expenditures and Funding Expenditures Design Construction Management In house Staff Construction Bid 15% Contingency Estimated Expenditures 190,351.75 184,927.96 50,000.00 Funding King County Flood City Funded Control District 303 Fund Funding at 75% (page 77, 2012 CIP) 142,763.81 47,587.94 51,965.68 132,962.28 50,000.00 R 1,642,228.99 1,231,671.74 246,334.35 184,750.76 410,557.25 61,583.59 2,313,843.05 1,611,151.99 702,691.06 2,313,843.05 57 PW61 MW IT u 0 rya 71 7 7 7 7 77 17. w 4 n :4 wt 1 4, 4 n :4 wt M-1 1 UTILITIES COMMITTEE Meeting Minutes June 26, 2012 5: 00 p.m. Conference Room I City Of Tukwila Utilities Committee PRESENT Councilmembers: Dennis Robertson, Chair; Joe Duffie and Kate Kruller Staff: Bob Giberson, Frank Iriarte, Greg Villanueva, Ryan Larson, Peter Lau, Gail Labanara and Kimberly Matej CALL TO ORDER: The meeting was called to order at 5:04 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA Items A, B, and C below are in response to the Army Corps of Engineers notification to affected jurisdictions that all repairs have been completed to the Howard Hanson Dam, and the Dam is operating at full potential. A. Howard Hanson Dam Flood Response: Cooperative Agreement Staff is seeking Council approval to enter into a cooperative agreement with King County Flood Control Zone District for completion of emergency flood control /protection measures from the Howard Hanson Dam, specifically for funding for the removal of such measures (Supersaks and Hesco barriers). This agreement sets forth terms and conditions for reimbursement to the City of Tukwila from the Flood Control District for 75% of costs (not to exceed $1,611,152) related to Tukwila's portion of the removal of barriers and necessary property restoration. UNANIMOUS APPROVAL. FORWARD TO JULY 9 COW FOR DISCUSSION. B. Howard Hanson Dam Flood Response: Bid Award Staff is seeking Council approval to award a bid to Goodfellows Bros., Inc. in the amount of $1,642,228.99 for the removal of temporary flood control /protection measures that were put in place in 2009 in response to the concerns with the Howard. Hanson Dam. The contract also includes property restoration to the levee trail, private property and public rights -of -way. In response to Committee Member inquiries regarding sand disposal, staff explained that all removal components will be the responsibility of the contractor, including sand disposal. City bid documents provided two locations where the sand could be disposed of at no cost. However, ultimately it is contractor choice for disposal. Committee Chair Robertson asked that staff add a table that illustrates the bid award and construction costs to better explain components of the project. UNANIMOUS APPROVAL. FORWARD TO JULY 9 COW FOR DISCUSSION. C. Howard Hanson Dam Flood Response: Construction Management Selection and Agreement Staff is seeking approval to enter into a consultant agreement with Kennedy /Jenks Consultants in the amount of $184,927.93 for construction management services related to the removal of flood control /protection measures. Kennedy /Jenks Consultants were chosen from three short- listed firms off of the MRSC Roster. The agreement calls for construction management services that include construction inspection, stormwater management, environmental and civil engineering, etc. Construction management services were originally included in a dual design /construction management consultant agreement with another vendor; however, construction management concerns resulted in termination of that contract. This agreement cost is within the construction management budget of $200,000. UNANIMOUS APPROVAL. FORWARD TO JULY 9 COW FOR DISUCSSION. 61