HomeMy WebLinkAboutCOW 2012-07-09 Item 4B.2 - Color Bid Tabulation for Howard Hanson Dam Flood Response/RepairCITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS TUKWILA LEVEE REPAIR & MAINTENANCE HOWARD HANSON DAM FLOOD RESPONSE Project No. 10901301 Certified Bid Tabulation Determination of low bidder will be based solely on the 'Total Bid" Prepared By: Date: KPG .I \I I(.i •t N. Davis June 14,2012 Bid Schedule Goodfellow Bros., Inc. r Road Construction Northwest Westwater Construction Co. Spec No. No. Item Quantity Unit Unit Cost Total Cost Unk Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost SPECIAL PURPOSE PATHS ----- 0MEXE • 0 EQ. ADJ $75,000.00 $ 75,000.00 $75,000.00 $ 75,000.00 $ 75,000.00 $ 75.000.00 S 75,000.00 $ 75,000.00 5 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 MEM IMMII -- - • - - ' - 0® $1,500.00 $ 1,500.00 $500.00 $ 500.00 $ 650.00 $ 650.00 $ 1,245.00 $ 1245.00 $ 3,000.00 $ 3,000.00 $ 5,000.00 $ 5,000.00 S 1,500.00 $ 1,500.00 ©Site Cleanu• of Bio. And Ph sical Hazards MMMEM 512,000.00 $ 12,000.00 $12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 5 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 0®'' Mobilization 0® 5180,000.00 $ 180,000.00 $130,000.00 $ 130,000.00 $ 62,900.00 $ 62,900.00 $ 84,000.00 $ 84,000.00 $ 210,000.00 $ 210,000.00 $ 250,000.00 $ 250,000.00 $ 293,000.00 $ 293,000.00 EMMEN ProectTem•ora Traffic Control 0® $80,000.00 $ 80,000.00 $31,000.00 $ 31,000.00 $ 65,700.00 $ 65,700.00 $ 67,260,00 $ 67,260.00 $ 95,000.00 $ 95,000.00 S 23,000.00 $ 23,000.00 $ 180,000.00 $ 180,000.00 0®' Railroad Fla .. er MMMIEM $100.00 $ 2,400.00 $50.00 $ 1,200.00 r r $ 1,320.00 5 90.00 $ 2,160.00 $ 85.00 $ 2.040 00 S 100.00 $ 2,400.00 9 100.00 $ 2,400.00 O IClearin• andGrubbin• MMIIKEM $15,000.00 $ 15,000.00 $10,000.00 $ 10,000.00 $ 10,500.00 $ 10,500.00 9 25,970.00 $ 25,970.00 $ 7,000.00 $ 7,000.00 5 50,000.00 $ 50,000.00 $ 7,400.00 $ 7,400.00 0®' Removal of Structure and Obstruction =MIME= 535,000.00 $ 35,000.00 $20,000.00 $ 20,000.00 $ 10,800.00 $ 10,800.00 S 20,200.00 $ 20,200.00 5 30,000.00 $ 30,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 Om♦Ad'ust Existin• Utili to Grade 1i $500.00 $ 5,000.00 Itlan $ 4,750.00 $ 345.00 $ 3,450.00 $ 450.00 $ 4,500.00 $ 300.00 $ 3,000.00 S 50.00 $ 500.00 S 700.00 $ 7,000.00 NOMIELEMOnrronwvirmulE2- WASIIM® 11113E0Mm 58.50 $ 61,523.00 $50.00 $ 164,800.00 MIK= $ 7,238.00 Egin $ 16,480.00 111EKIr FREIE3 r $ 99,868.80 S 6.00 liMILEI $ 43,428.00 $ 16,480.00 $ 8.00 S 70.00 $ 57,904.00 $ 10.00 $ 230,720.00 r r $ 72,380.00 $ 49,440.00 IZEIC:1 Enimai $ 14,476.00 $ 115,360.00 MEM' Unsuitable Foundation Excavation Ind. Haul moon Swee•in•inPre •arationfor Pavement Assessment 0® $5.000.00 $ 5,000.00 $5,000.00 $ 5,000.00 EIMMlinEMIIERMilik=1 $ 11,000.00 $ 11,000.00 $ 20,000.00 $ 20,000.00 $ 10,000.00 $ 10,000.00 5 4,700.00 $ 4,700.00 ®® Construction Geotextile for Soil Stabilization IMEEMMEINimica $ 16,480.00 samo $ 3,296.00 IFLEII $ 8,240.00 ® $ 14,832.00 r r $ 19,776.00 EMIEMOil $ 32,960.00 Ellitil $ 6,592.00 m 4-04 Crushed Surfacin • To• Course IMECEM® $28.00 $ 55,244.00 mwm3 $ 23,676.00®'' $ 64,911.70 iiign $ 73,001.00 $ 29.00 IZSEDICI S 20.00 $ 39,460.00 $ 20.00 $ 39,460.00 ®IIMEI - IMIOMMUM $30.00 $ 27,300.00 Immo $ 31,850.00 Eiagu $ 37,992.50 Eari $ 31,850.00 riagn $ 40,950.00 $ 120.00 $ 109,200.00 $ 26.00 $ 23,660.00 wawa. Cold Mix As.halt I 1 $120.00 $ 12,000.00 $50.00 $ 5,000.00 $ 108.00 $ 10,800.00 $ 140.00 $ 14,000.00 $ 200.00 $ 20,000.00 $ 100.00 $ 10,000.00 $ 100.00 $ 10,000.00 MM.= Commercial HMA for Pavement Patch =EM® EM3HED $ 158,625.00 565.00 $ 82,485.00®i $ 143,523.90 $ 114.00 $ 144,666.00 $ 130.00 $ 164,970.00 $ 120.00 $ 152,280.00 '• r r $ 158,625.00 mEMIll HMA Cl. 1/2 PG 64-22 for Overla MIEMM® $100.00 $ 130,400.00 $88.00 $ 114,752.00 ®' $ 134,624.96 $ 104.00 $ 135,616.00 $ 100.00 $ 130,400.00 $ 120.00 $ 156,480.00 r $ 149,960.00 mKCI - 1,000 �•• $ 5,000.00 $ 2,000.00 $ 5,350.00 $ 2,500.00 • r $ 1,000.00• r $ 5,000.00 $ 2.00 $ 2,000.00 MEM EMI 21111= W $50.00 $ 11,500,00 $50.00 $ 11,500.00 l'eali $ 7,061.00 $ 48.00 $ 11,040.00 $ 100.00 $ 23,000.00 $ 50.00 $ 11,500.00 imma:i $ 12,650.00 ®m♦Erosion/WaterPollution 00 $15,000.00 $ 15,000.00 $15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15000.00 $ 15,000.00 $ 15,000.00 ®Elm Inlet Protection IMMEIMM figEO $ 1,500.00 ME1jjEr1:1 $ 2,500.00 $ 51.00 $ 1,020.00 $ 70.00 $ 1,400.00 $ 100.00 $ 2,000.00 $ 100.00 $ 2,000.00 $ 100.00 $ 2,000.00 IMEENEEINEIEMEI 5,000 MEM IMMEED $ 17,500.00 $4.00 $ 20,000.00®i $ 17,500.00 Eill $ 23,750.00 EMMIIIMITI $ 13,750.00 $ 10.00 $ 50,000.00 $ 6.00 $ 30,000.00 Kamm coin •ostSock 1,000 MEM $10.00 $ 10,000.00 54.00 $ 4,000.00 IZEizi $ 1,850.00 $ 6.00 $ 6,000.00 $ 4.00 $ 4,000.00 $ 10.00 $ 10,000.00 $ 3.00 $ 3,000.00 EmEnsors- .. "-•- 0MEMI 535,000.00 $ 35,000.00 $35 000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 mgm Remove Hesco Barrier- Sin.le Row MEIXIMMEM $18.00 $ 271,980.00 $18.00 $ 271,980.00 $ 21.00 $ 317,310.00 $ 25.00 $ 377,750.00 $ 16,00 $ 241,760.00 $ 30.00 $ 453,300.00 $ 44.00 $ 664,840.00 Kamm Remove Su •er Sacks - Sin t le Row ®' ' '• r r $ 160,440.00 $18.00 $ 412,560.00 ignagi $ 236,076.00 g $ 234,930.00 $ 20.00 $ 458,400.00 $ 30.00 $ 687,600.00 $ 38.00 $ 870,960.00 EMESEMIZIII 19,836 m♦ =WM $ 9,918.00®'. r $ 2,975.40 $ 0.68 $ 13,488.48 EZ,===rEl $ 12,893.40 1. $ 14,877.00 $ 1.00 $ 19,836.00 r r $ 13,885.20 ROADWAY ------ MIMEO. Cement Conc. Curb Removal M/MMEMIIIIMEMD $ 460.00 $10.00 $ 920.00 L=1135E1 $ 621.00 EMIZICCI $ 460.00 $ 18.00 $ 1,656.00 $ 20.00 $ 1,840.00 Emminaa $ 276.00 0®' Remove and Salva•e Concrete Zi• •er Barrier MIEMm $20.00 $ 44,600.00 . r r $ 8.40 $ 18,732.00 i§gEgi $ 20,627.50 $ 9.00 $ 20,070.00 $ 10.00 $ 22,300.00 IMINEEEEI $ 28,990.00 Em ins Remove Sin • le Face Concrete Barrier 490 MEM liEED $ 7,350.00 $9.00 $ 4,410.00 $ 6.60 EEMII L11.3gii $ 3,062.50 $ 7.00 $ 3,430.00 IEMEEEI $ 3,430.00 $ 10.00 $ 4,900.00 MEM= Gravel Borrow Incl. Haul ME=Mall. $18.00 $ 6,192.00®' . $ 2,580.00 lEggEgl $ 8,926.80 $ 20.00 $ 6,880.00 $ 29.00 $ 9 976.00 EMinill $ 5,160.00 $ 20.00 $ 6,880.00 ® 8-04 Cement Conc. Traffic Curb and Gutter MMI0 M=3011 $ 2,300.00. r r $ 3 220.00 $ 36.00 EIESEIM iligin $ 2,852.00 $ 30.00 $ 2,760.00 $ 20.00 $ 1,840.00 $ 50.00 $ 4,600.00 mNIM Beam Guardrail T •e 1 IMIEMIMEMIIIEREDEUMBEINCI320 $ 2,090.00 EMMMEEZIEZMIESEll $ 2,802.50 EMiRECIIIMEZEILIED $ 3,040.00 $ 40.00 $ 3,800.00 mm Beam Guardrail T •e 1 - 8 Ft. Lon • Post MakEm $40.00 $ 18,000.00 Immo $ 10,350.00 fErami $ 16,042.50 ®' $ 15,075.00 $ 39.00 $ 17,550.00 $ 36.00 $ 16,200.00 gingian $ 15,750.00 mU Beam Guardrail TL2 Terminal ©MYZEI $2,500.00 $ 7,500.00 $2 280.00 $ 6,840.00 $ 2,000.00 $ 6,000.00 $ 1,870.00 $ 5,610.00 $ 2,000.00 $ 6,000.00 $ 2,000.00 $ 6,000.00 $ 2,000.00 $ 6 000.00 mma. Removin• Existin• Guardrail Post INKEZEIMIE $60.00 $ 4,800.00 MM332g $ 500.00 Ellgapi $ 2,968.00 IMIZIEI $ 2,780.00 $ 40.00 $ 3,200.00 liMI $ 2,800.00 $ 40.00 $ 3,200.00 mma" W -Beam Rail MMMLM •=3M13 $ 625.00 $10.00 $ 250.00 $ 21.00 110111.aucti $ 20.00 $ 500.00 11E11:1 r r '. r r $ 625.00 IMSIIII $ 625.00 mm/ Remove Pavement Stri•in • 0® $5,000.00 $ 5,000.00 $3,500.00 $ 3,500.00 $ 10,165.00 $ 10,165.00 $ 9,500.00 $ 9,500.00 S 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 14,000.00 $ 14,000.00 SIDEWALK ------ m®' Cement Conc. Sidewalk Removal ®® r r $ 2,324.00 510.00 $ 3,320.00 11131 $ 1,660.00 $ 10.00 $ 3,320.00 iziga:i $ 4,980.00 LirrEll $ 4,980.00 r r $ 664.00 KIIIESEBEEMEMIEIEZE NEEEM i $40.00 $ 4,080.00 $50.00 $ 5,100.00 izsEgmi $ 3,570.00 $ 28.00 $ 2,856.00 S 85.00 $ 8,670.00 $ 50.00 $ 5,100.00 S 40.00 $ 4,080.00 TRAFFIC CONTROL DEVICES ------ 0 8-09 Pavement Marker T •e 1 ®II 0® $300.00 $ 9,300.00 5400.00 $ 2,800.00 r r $ 8,525.00 MEEMMEISMI $ 320.00 $ 615.00 $ 9,920.00 $ 300.00 $ 4,305.00 laILIZEI $ 9,300.00 $ 4,025.00 S 350.00 S 650.00 $ 10,850.00 $ 300.00 $ 4,550.00 ElfigEll $ 9,300.00 $ 4,025.00 $ 350.00 $ 675.00 $ 10,850.00 $ 4,725.00 EMI 8-09 rrR��aised LY-IF4:i_mmlIaWLILI 1•I�i' a��/•- mEM UMIEMI 0® 57,500.00 $ 7,500.00 $2,000.00 $ 2,000.00 $ 535.00 1:gisai $ 7,895.00 $ 7,895.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 ZIMMER 11121 3040 MEM MEM $ 4,560.00 MBE= $ 3,040.00 rill] $ 4,864.00 ®i $ 4,560.00 ®.r $ 5,472.00 i!gicci $ 6,080.00 12===j1/1 $ 5,168.00 Mal m/ ' . - 3114.11 r $ 270.00 =Nam $ 180.00 1.INIIIIEI®i LBECI r r - r r $ 360.00 11:117:1 r $ 450.00 IIIM $ 342.00 mm♦ Plastic Traffic Arrow E u $90.00 $ 1,710.00 $60.00 $ 1,140.00 $ 102.00 $ 1,938.00 $ 95.00 $ 1,805.00 $ 100.00 $ 1,900.00 $ 100.00 $ 1,900.00 $ 100.00 $ 1,900.00 MI� ' - � 5 550.00 $ 500.00 -. r r $ 250.00 ®i . r r $ 65.00 $ 650.00 EIMCILI $ 750.00 $ 100.00 $ 1,000.00 $ 80.00 $ 800.00 ROADSIDE DEVELOPMENT ------ mm♦To• soil T •eA MEE=m $50.00 $ 6,700.00 550.00 $ 6,700.00 11111RBEEI $ 6,887.60 $ 45.00 $ 6,030.00 S 50,00 $ 6,700.00 $ 50.00 $ 6,700.00 $ 40.00 $ 5,360.00 mrlaiew.itu!{- 16794 ®MEM= $ 41,985.00 • r • r $ 6,717.60 Emiliti $ 6,549.66 $ 0.40 $ 6,717.60 111:113 $ 8,397.00 Egi:11 $ 83,970.00 fit:i $ 8,397.00 ®m♦ Pro •e Restoration =EMMEN $50,000.00 $ 50,000.00 550,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 ®ily' Bark or Wood Chi. Mulch IMEMMEIN 550.00 $ 2,500.00 $50.00 $ 2,500.00 IMIIMIEMI lallRECI$ 2,250.00 $ 50.00 $ 2,500.00 111111111 $ 1,250.00 $ 50.00 $ 2,500.00 IIENCERBIZIZI - 0MEM 5350.00 $ 350.00 5300.00 $ 300.00 $ 308.00 $ 308.00 $ 280.00 $ 280,00 S 300.00 $ 300.00 $ 500.00 $ 500.00 $ 300.00 $ 300.00 EMNIESEEZEIE- - © MUM $500.00 $ 1,000.00 $150.00 $ 300.00 $ 134.00 $ 268.00 EMIIIMMEI $ 250.00 S 150.00 $ 300.00 S 150.00 $ 300.00 $ 150.00 $ 300.00 ®WIN IME - ME= MEM $45.00 $ 4,950.00 520.00 $ 2,200.00 Einign $ 1,870.00 glig2E3 $ 1,705.00 $ 18.00 $ 1,980.00 Eagill $ 1,870.00 IZNIII $ 1,870.00 mESER - - 4.1MIMME1111 $50.00 $ 1,250.00 550.00 $ 1,250.00 $ 50.00 $ 1,250.00 EIZEILAIMIO $ 50.00 $ 1,250.00 $ 50.00 $ 1,250.00 $ 50.00 $ 1,250.00 STORM DRAINAGE ------ MINIUM a - • • 5,000 m♦ ® $7,500.00 52,500.00 $ 3,950.00 $ 2.00 $ 10,000.00 $ 17,500.00 FEII $ 75,000.00 1• r r $ 15,000.00 SUBTOTAL $ 1,824,541.00 WSST 9.5% $ 173,331.40 $ 1,499,752.50 WSST 9.5% $ 142,476.49 $ 1,603,300.15 $ 1,680,748.25 - $ 2,197,765.00 $ 2,686,246.00 $ 2,966,995.20 WSST 9.5% $ 152,313.51 WSST 9.5% $ 159 671.08 WSST 9.5% $ 208,787.68 WSST 9.5% $ 255,193.37 WSST 9.5% $ 281,864.54 TOTAL BID $ 1,997,872.40 $ 1,642,228.99 $ 1,755,613.66 $ 1,840,419.33 $ 2,406,552.68 $ 2,941,439.37 $ 3,248,859.74 Note 1: Lloyd Enterprises had a mathematical error on Bid Item # 10 (difference of 5315). Also mathematical error in the total bid Note 2: MJ Hughs total tax was off by one cent Bid Proposal Total 51,761,433.59 Difference $5,819.93 1 of 1 Bid Proposal Total $ 2,406,552.67 Difference $ (0.01)