Loading...
HomeMy WebLinkAboutReg 2012-07-16 Item 4C - Bid Award - Spray Park Sewer Connection to Goodfellow Bros for $64,495.50COUNCIL AGENDA SYNOPSIS Meeting Date 07/16/12 Initials Prepared by I Mayor's review BG' I" I Council review ITEMNO. 4.C. ITEM INFORMATION CAS NUMBER: I STAFF SPONSOR: BOB GIBERSON ORIGINAL_ AGENDA DATE: 7/16/12 AGENDA ITEM TITLE Tukwila Community Center Spray Park Sewer Connection Bid Award to Goodfellows Bros., Inc. CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mt Date Mtg Date Mtg Date Mtg Date 07/16/12 Mtg Date Mtg Date SPONSOR Council Mayor HR DCD Finance Fire IT P&R Police PW SPONSOR'S An outside sewer drop connection is required by King County for the Tukwila Community SUMMARY Center Water Spray Park. The project was advertised for bid on May 24 and 31, 2012 and four bids were opened on June 14, 2012. Gary Harper Construction claimed an error on their low bid and the next low bid of $64,495.50 was from Goodfellows Bros., Inc. Council is being asked to award the contract to Goodfellows Bros. in the amount of $64,495.50. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 07/09/12 COMMITTEE CHAIR: KATHY HOUGARDY RECOMMENDATIONS: SPONSOR /ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT/ FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $64,495.50 $80,000.00 $0.00 Fund Source: 301 PARKS FUND (PAGE 47, 2012 CIP) Comments: MTG. DATE 1 RECORD OF COUNCIL ACTION 07/16/12 MTG. DATE I ATTACHMENTS 07/16/12 I Informational Memorandum dated 07/06/12 (revised after CAP) Page 47, 2012 CIP Manhole Specifications Bid Tabulation Letter from Gary Harper Construction Minutes from the Community Affairs Parks Committee meeting of 07/09/12 I 7 x City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Community Affairs Parks Committee FROM: Bob Giberson, Public Works Director il,0 BY: Mike Cusick, Senior Water /Sewer Engineer DATE: July 6, 2012 SUBJECT: Tukwila Communitv Center Sorav Park Sewer Connection Project No. 91030101 Bid Award ISSUE Award bid to Goodfellow Bros., Inc., for the installation of an outside drop connection on the existing King County sewer manhole that serves the Tukwila Community Center (TCC). BACKGROUND In 2008 the City installed a water spray park at the northwest corner of TCC. At that time it was decided to install a temporary inside drop connection to the King County Metro sewer manhole and, at a later date, install the outside drop connection required by King County. A sewer drop connection is required when the elevation change from the building to the sewer main is too extreme to gradually connect to the sewer main (which can be 14 feet deep). An outside drop for a sewer manhole connection is preferred as the pipe is then not in the manhole structure and will not interfere with maintenance. DISCUSSION The City advertised the project on May 24 and 31, 2012. Four bids were received and opened on June 14, 2012. The bids were checked and tabulated and one minor math error was found in the bids. The low bid was from Gary Harper Construction in the amount of $41,500.50 including sales tax. Mr. Harper was contacted and asked if he thought his bid numbers were correct. He returned a letter to the City stating that he had an error in Bid Item 10 and was requesting to withdrawal his bid (see attached letter from Gary Harper Construction). The City has accepted Gary Harper's bid withdrawal based on standard specifications. The second lowest bidder, Goodfellow Bros., Inc., submitted their bid with one minor math error in their grand total by $0.50. The bid tab reflects the corrected total. References were checked on similar projects and it was reported that Goodfellow Bros., Inc. performed quality work. FINANCIAL IMPACT Funds for this project are in the 301 Parks Fund: RECOMMENDATION Council is being asked to award the contract to Goodfellow Bros., Inc. in the amount of $64,495.50 for the Tukwila Community Center Spray Park Sewer Connection and consider this item at the July 16, 2012 Regular Consent Agenda. Attachments: Page 47, 2012 CIP Manhole Specifications (Inside and Outside Drop Connections) Bid tabulation Letter from Gary Harper Construction W: \PW Eng \PROJECTS\A- PK Projects \TCC Spray Park Sewer Connection (91030101) \Info Memo Bid Award Goodfellow Bros 070612.dock 9 Bid Results Enaineer's Estimate Budaet Construction (Includes Sales Tax) $64,495.50 $83,767.50 $70,000.00 Construction Mgmt Budget 10,000.00 Contingency 10% 6.449.55 0.00 Total $70,945.05 $83,767.50 $80,000.00 RECOMMENDATION Council is being asked to award the contract to Goodfellow Bros., Inc. in the amount of $64,495.50 for the Tukwila Community Center Spray Park Sewer Connection and consider this item at the July 16, 2012 Regular Consent Agenda. Attachments: Page 47, 2012 CIP Manhole Specifications (Inside and Outside Drop Connections) Bid tabulation Letter from Gary Harper Construction W: \PW Eng \PROJECTS\A- PK Projects \TCC Spray Park Sewer Connection (91030101) \Info Memo Bid Award Goodfellow Bros 070612.dock 9 10 CITY OF TUKWILA CAPITAL PROJECT SUMMARY Project Location 1 E GIS iia 2012 2017 Capital Improvement Program 47 11 2012 to 2017 PROJECT: TCC Spray Park Sewer Connection Project No. 91030101 The Tukwila Community Center Spray Park is using a temporary connection to the King County manhole DESCRIPTION: and King County is requiring a permanent sewer connection with an outside drop. JUSTIFICATION: The sewer connection is required by King County. The sewer connection and grease interceptor were required to be completed by 2010, but an extension STATUS: was received from King County allowing completion by 2012. MAINT. IMPACT: COMMENT: This project will be coordinated by Public Works and Parks Recreation. FINANCIAL Through Estimated (in $000's) 2010 2011 2012 2013 2014 2015 2016 2017 BEYOND TOTAL EXPENSES Design 7 7 Land (R/W) 0 Const. Mgmt. 10 10 Construction 70 70 TOTAL EXPENSES 0 0 87 0 0 0 0 0 0 87 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 REET 1 (1st Qtr Percent) 0 0 87 0 0 0 0 0 0 87 TOTAL SOURCES 0 0 87 0 0 0 0 0 0 87 Project Location 1 E GIS iia 2012 2017 Capital Improvement Program 47 11 A NOTES: 1. INSIDE DROPS REQUIRES CUT TOP SECTION OF 90° BEND DIRECTOR'S APPROVAL. 2. U INSIDE DROP ONLY ON PVC Tlrfi SYSTEM... 3. SEE SS -08 FOR ACCESS AND rS TAINLESIS CHANNELIZATION. STEEL PIPE CLAMP 4. SEE SS -12 AND SS -13 FOR LADDER I AND STEP DETAILS. I I,} DETAIL A ACCESS! II� i I I Manhole is I Lid d Tf 1 L I_ J KOR -N -SEAL BOOT, 54" MIN. DIA. PIPE CONNECTION OR EQUAL SEE DETAIL A (ABOVE) J D I I t li PVC PIPE SAME SIZE 12 A L R '4 a City of x VA. oy Tukwila MANHOLE INSIDE DROP SHEET: SS -09 REVISION #1: 08.03 APPROVAL: B. SHELTON LADDER VARIES, 2' MIN. n. STAINLESS STEEL BOLTS REMOVE GASKET I I STRAPS BOLTED TO MANHOLE WALL. FROM PVC ELBOW I I MAX. SPACING 6'. Sewer Main I a CHANNELIZATION a RUBBER BOOT FLAP TO PREVENT SPLASHING NOT TO SCALE L R '4 a City of x VA. oy Tukwila MANHOLE INSIDE DROP SHEET: SS -09 REVISION #1: 08.03 APPROVAL: B. SHELTON 4 NOTES: 1. DROP PIPING TO BE SAME SIZE AS INTERCEPTED SEWER. 2. BACKFILL WITH COMPACTED MATERIAL. 3. CLASS 50 DUCTILE IRON PIPE ONLY. 4. CONCRETE CLASS 5 (1 -1/2). CEMENT 5 SACK MIX WITH 1 -1/2" AGGREGATE. 5. SEE SS -08 FOR ACCESS AND CHANNELIZATION. 6. SEE SS -13 FOR STEP DETAIL ONE LENGTH TO SOLID BEARING MATERIAL WHEN SPAN IS MORE THAN 4'. MJ OR FL r FLEXIBLE JOINT Ill E PIPE SIZE DROP 8" 1.45' 10" 1.70' 12" 2.08' 6" MIN. L 1" MAX. j 90° BEND CONCRETE J �ogQ''a i City of Tukwila ACCESS r I I �I d d �a „2 KOR -N -SEAL s 1 12" Typ. STEP 1/2" BLIND FLANGE WITH STAINLESS STEEL BOLTS. —TEE J V NOT TO SCALE MANHOLE DROP CONNECTION SHEET: SS -10' REVISION #1: 08.03 I LAST REVISION: 04.08 APPROVAL: BOB GIBERSON, CITY ENGINEER a. C '13 tukwila community center spray park sewer connection 91030101 bid tabulations GARY HARPER L`aNS7RUC1'toN INC. 14831 223rd Street SE Snohomish, WA 98296 -3989 (360) 863 -1955 Fax (360) 863 -1966 June 18, 2012 Attn: Mike Cusick, PE City of Tukwila 6200 Southcenter Blvd Tukwila, WA 98188 Re: Tukwila Community Center (TCC) spray park manhole connection Dear Mike, After reviewing my bid, I discovered a mathematical error in bid Item #10. When I was adding it up I missed the 9 in the 9,500.00 figure. I have attached a copy of my tabulation sheet as evidence. Therefore, I am requesting relief from the responsibilities of Award. Under penalty of perjury, I declare the above statement to be true and I certify that the attached work sheets are the ones used to prepare the bid. f Gary A. Harper President Notary Dat �G ,'d� or. y y�ASH�N..• 15 —(Co -An 11 /,Oo J 2/00.00 16 t�QLL z-o-oo 111 -An 11 /,Oo J 2/00.00 16 t�QLL -/b f ��6 Ila /1 re, 6-�_ 4, r---& F -C /4 �On. cra S 6 f 66 Z2-,l 6 0 lc�4 "q C:? 17 ra 7 CP 4-0 5/0 00 eay 2 iD n Eg ii o-� 7 7-77 1?60,00- IT.*] City of Tukwila Community Affairs and Parks Committee COMMUNITY AFFAIRS AND PARKS COMMITTEE Meeting Minutes July 9, 2012 5: 00 p. m. PRESENT Councilmembers: Kathy Hougardy, Chair; Joe Duffie and Allan Ekberg Staff: Jack Pace, Minnie Dhaliwal, David Cline and Kimberly Matej Guests: Sharon Mann, resident; Sandra Kruize, resident; Gary Singh, resident CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:00 p.m.. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Bid Award: Tukwila Communitv Center Svrav Park Sewer Connection Staff is seeking Council approval to award a bid to Goodfellow Bros., Inc., for the installation of a sewer connection at the Tukwila Community Center Spray Park in the amount of $64,495.50. When first opened in 2008, a temporary inside drop connection was installed to the King County sewer manhole from the Spray Park, due to costs. As required by the County, the City is' now installing an outside drop connection to the sewer manhole. When compared to an inside connection, that outside connection is not in the manhole and will not interfere with maintenance. This project was bid under budget and will be funded through the 301 Parks Fund. The Committee inquired about the possibility of recycling the water used at the Spray Park. Public Works staff stated that they will pass on that inquiry to Parks and Recreation staff. UNANIMOUS APPROVAL. FORWARD TO JULY 16 CONSENT AGENDA. B. Low Densitv Residential Zone Height Standard /Single Familv Desien Standards This item was last discussed at the Community Affairs and Parks Committee in April. The Committee sent it forward to the COW later that month without a recommendation. At that time, the COW returned it back to Committee for further discussion and recommendation. No changes have been made to the information since it was last considered at COW and Committee. In summary, the TMC calls for building heights to be regulated by the Washington State Building Code. The Planning Commission recommends continuing to calculate the building height per the Washington State Building Code, except if property is zoned residential and the slope of the property is 15% or larger. If the slope is 15% or larger, the building height would be calculated in one of two ways: either establish the plane from the lowest finished or existing grade adjoining the building at any exterior wall; or establish grade planes at intervals of at least 15 feet for different sections of the structure. A diagram displaying a comparison of building height standards with surrounding cities, Tukwila's current calculation and the proposed calculation were included in the agenda packet. Sandra Kruize spoke in favor of the proposed changes and described the negative impacts that infill has had on her existing structure and privacy. She spoke to the importance of neighborhood compatibility. Sharon Mann spoke against the proposed changes, stating that they are restrictive and anti development. She noted the natural challenges involving the community's topography, and commented that if the community was fiat, this was not be an issue. 19