HomeMy WebLinkAboutRes 0208 - Municipal Water Pumping(1832. 40
RESOLUTION AUTHORIZING THE EXECUTION AND DELIVERY
OF A CONTRACT WITH PUGET SOUND POWER
LIGHT COMPANY FOR FURNISHING
offered to furnish for a period of
RESOLUTION NO. 208
MUNICIPAL WATER PUMPING
(Service Famished)
WHEREAS, PUGET SOUND POWER LIGHT COMPANY has
ten. 00) years,
upon the terms set forth in the following proposed form of contract, to -wit:
MUNICIPAL WATER PUMPING
Page 1 of Resolution
40 12 -44
NOW, THEREFORE, BE IT RESOLVED by the
of the CIty.... of Tukwila that a
(City or Town)
contract be entered into with Puget Sound Power Light Company for the furnishing of
Municipal Pumping Service
upon the terms above proposed, and that the Mayor be and he hereby is authorized
and directed to execute and deliver such contract on behalf and in the name of the
City of Tukwila
and the Clerk be and he hereby is authorized
(City or Town)
and directed to attest such contract and to affix thereto the seal of the Cl.ty...of
Tukwila
(City or Town)
Duly adopted this.........1.7tt day of June 19.68.
ATTEST:
Page... 2 ....of Resolution
Council
(Council or Commission)
Mayor. Pro Tem
9763
832.13
MUNICIPAL WATER PUMPING POWER CONTRACT
PUGET SOUND POWER LIGHT COMPANY, herein called "Company," and the...��jY.......
(Town or City)
of..1 1144 a municipal corporation of the State of Washington,
herein called "City," agree as follows:
FIRST; This contract only covers power used in connection with the operation
of water distribution systems.
SECOND: DELIVERY In consideration of the payments, and subject to the lim-
itations, herein stipulated, the Company agrees for a period off..IgN consecutive
years, be ginning...MU M ..r.., to reserve for and furnish to the City,
and City agrees during said period to buy exclusively from the Company, at the
rates herein fixed, all electric power required to operate the City's water pumping
plant or plants located and described as follows:
Sewage lift station on the northwest corner of 63rd Ave. S., and S. 164th Street
Transformer losses to be added: .6 kw and 438 kwh.
Transformer rental Yes Three 10 kva 7200/480 volt transformers.
Said e ectr c power shat be three phase, sixty cycle, alternating current
at approximately...1Z.M... volts. Company agrees to furnish not exceeding
..Q.. kilowatts but will furnish any additional amount required by the City if
it has the power available. The point of delivery shall be the primary side of
the transformer bank serving the above described pumping station.
THIRD: RATES The City agrees to pay the following rates, same being Schedule
No. 40 of the Company's Electric Tariff I, filed with the Washington Utilities
Transportation Commission: Schedules 80 81
Demand Charge
$1.67 per month per kilowatt, or major portion thereof, of maximum demand.
Energy Charge
0.66 per kilowatt hour for the first 25 „000 kilowatt hours used per month.
0.564 per kilowatt hour for the next 25,000 kilowatt hours used per month.
0.46c per kilowatt hour for the next 50,000 kilowatt hours used per month.
0.410 per kilowatt hour for all over 100„000 kilowatt hours used per month.
Said rates are subject to change in accordance with the laws of the State of
Washington and whenever a new schedule of rates for the same service is made of-/
fective the City shall thereafter pay the new rates; provided, if the new rates
are higher than those herein fixed, the City shall be entitled to cancel this
contract.
All bills shall be payable within ten days from their date.
FOURTH: MEASUREMENT Maximum demand, consumption and power factor shall be
measured by commercially accurate maximum demand, watt hour and power factor meters
furnished and installed by Company, suitable space for which shall be furnished by
the City; provided, maximum demand and power factor may at Company's opti:on'be
determined either by meters or by check of service.
The maximum demand for any month is understood to be the average kilowatt demand,
or average rate of use measured in kilowatts, during the fifteen minute interval in
which the consumption of electric energy Is greater than during any other fifteen
minute interval in the month.
9763
48 32.11
MUNICIPAL WATER PUMPING POWER CONTRACT PAGE 2
FIFTH: USE OF EQUIPMENT Tha City agrees to install and maintain in good con-
dition proper equipment for the use of such power and to save the Company harmless
from all liability for any loss or damage caused by such equipment to either party
hereto or to any person whomsoever; not to sell to others any electric power fur-
nished hereunder, nor use or permit others to use any of such power in any other
place or for any other purpose than to operate said plant.
City agrees to notify the Company before making any increase in the connected
load and to operate its electric equipment so as not to impair the general service
rendered by Company to its other customers. If the City's use shall impair such
service to other customers, the City will, upon demand, install the proper appa-
ratus to prevent City's power factor from falling below 85 per cent, and Company
shall have the right to discontinue service to the City until such apparatus is
installed.
The City agrees to use reasonable diligence to protect the Company's property
from injury and Company shall have free access to all parts of the premises where
its electricity is used, to inspect, repair, remove and replace its property.
SIXTH: SERVICE INTERRUPTIONS Company shall use reasonable diligence to furnish
uninterrupted service but shall not be liable for any interruptions caused by
strikes and /or other labor disputes, accidents or acts of God, or by any cause by-
yond the control of the Company, or by the necessity for making repairs or changes
in the Company's equipment and facilities, and the City waives and shall not assert
any claims against the Company for damages to the City caused by any suspension,
interruption, failure or curtailment of service by the Company under this agreement
attributable in any manner to national war emergency, including voluntary coopera-
tion by the Company in any method of operation or in any program recommended or
requested by civil or military authorities. No temporary interruption shall cancel
this contract.
SEVENTH: The Company shall have the right to cancel this contract if any part
of the Company's property used for the rendition of this service is taken by em-
inent domain, or if such service can no longer be rendered by reason of franchise
expiration and the inability of the Company to secure a renewal thereof.
Dated this day of....JUWe ,19.>5.•
Attest:
CITY OF TUKWILA
r ri /:e dg„ r.. {e- B
CStlerk Mayor Pro Tem
Witness: PUGET SOUND POWER S. LIGHT COMPANY
4 4 (vim Y,�l.44:1-7-
L./ J. 11, ABRAMSON flu PraeidAUt
#850. 15
This Agreement Witnesseth:
that certain
TRANSFORMER RENTAL CONTRACT
That PUGET SOUND POWER LIGHT COMPANY, as Lessor, has rented to
THE CITY OF TUKWILA
as Lessee, upon the terms hereinafter stated, the following electrical equipment, to -wit:
THREE 10 kva, 7200/480 volt transformers
1. Said equipment shall be installed by the Lessor upon the said premises of the Lessee described in
Municipal Water Pumping
Power Contract between the parties hereto effective
May 28, 1968 and shall at all times be and remain the property of the Lessor and
shall not be removed from said premises without the Lessor's written consent and the Lessee agrees to
use reasonable care to protect said equipment from injury while in its possession.
2. The Lessee agrees to pay to Lessor upon demand the sum of nil existing
to cover costs of installation and further agrees to pay to the Lessor as consideration for the use of said
equipment the sum of 9.
per month on the b 1111 n9 day of each month.
3. This rental contract shall run for the same time as, and terminate with, the power contract above
mentioned; provided a breach by the Lessee of any of the terms hereof will entitle the Lessor to terminate
this rental contract upon five (5) days' written notice to the Lessee. At the expiration or termination hereof
Lessor may remove its equipment from the premises.
DATED this 1 7lb, day of June 19 68
CITY OF PAW ILA
By C ,L d C
Lessee
11.4PO L/N/ayor Pro Tem
PUGET SOUND POWER LIGHT COMPANY, Lessor
By
Z. B. ABRA".SON Vice.; ?raeidgnt-