Loading...
HomeMy WebLinkAboutRes 0220 - Sanitary Sewer, Storm Drainage and Waterlines (River's Bend Development)WASHINGTON s RESOLUTION NO. 220 CITY OF UKWILA k. RESOLUTION accepting Sanitary Sewer, Storm Drain and Water Lines in the River's Bend Development, WHEREAS, the City of Tukwila and Sammamish Commercial Company have entered into a Developers Agreement whereby Sammamish Commercial will construct certain utilities at its own cost for confection with, delivery to and operation of the City, and WHEREAS, Sammamish Commercial has constructed Sanitary Sewer, Storm Drain and Water Lines in the River's Bend Development, and WHEREAS, Sammamish Commercial wishes to assign and convey said utilities to the City of Tukwila, and WHEREAS, Hill, Ingman, Chase Company, City Engineer Consultants, have inspected said utilities and recommend their acceptance subject to certain stipulations. NCW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tukwila to accept said utilities for maintenance and operation by the City subject to the following provisions: 1', The Sanitary Sewer line shall be flushed, balled and air tested. 2', The Water Line shall pass a purity t.est, 3. Developer to construct an emergency overflow into the Green River on the Sanitary Sewer System. 4, In the event that defects, due to faulty labor, workmanship or materials appear within one year from date of acceptance by the City, the Developer shall, at his own expense correct the same, LC The Developer shall deliver to the City a bond in the amount of 15% of construction costs that a reliable contractor will make and pay for repairs within one year from the date of acceptance of the utilities, arising from said faulty labor, workmanship or materials. 6. The form of the bond shall be approved by the City Attorney. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON this �i day of January, 1969. ATTEST: "Z.o! vu. ,0, Above provisions agreed to by: for SAI1MAAPGGSH CONNERCIAL COMPANY Honorable Mayor City Council City Hall Tukwila, Washington Gentlemen: KF /gs HILL, INGMAN, CHASE CO. e n e 2909 THIRD AVENUE SEATTLE, WASHINGTON 96121 December 2, 1968 Re: River's Bend Development Utilities Construction. We hereby recommend that the City of Tukwila accept the Sanitary Sewer, Storm Drain and Water Lines of the above refer- enced project with the following provisions: (1) The Sanitary Sewer line shall be flushed, balled, and air tested. (2) The water line shall pass a purity test. (3) Developer to construct an emergency overflow into the Green River on the Sanitary Sewer system. Very truly yours, K. Fuji] P.E. Project Director ESTABLISHED `1B9') MA 3 -6000 DEPARTMENT OF GAME 600 North Capitol Way Olympia, Washington Sewer Outfall (Type of Project) This approval is given to City of Tukwila to perform Laws of the State of Washington, Section 75.20. subject to the following provisions: 1. LOCATION: Work erformance is limited to the noted area, Government Lot 1, Section. 35, Township 23 North, Range 4 East, W.M., King County 2. TIME LIMITATION: Immediately to December 31, 1968 3. SPECIAL PROVISIONS: See Page 2 4. These operations are to be controlled to allow /a'/vk1' //l/ilikkk/rIi 16' siltation to the strearn. 5. Under no circumstance is there to be created a block to stream flow or fish passage. and overburden are 6. Debris/from this project /lto be removed and disposed of by burning or placing beyond high water flows. 7. This approval is to be available on the job site at all times. The Department of Fisheries and the Department of Game reserve the right to make further restrictions if deemed necessary for the protection of fish life. This approval is granted in the interest of fisheries protection only, and these departments cannot be held liable for any property damage which might occur as a result of this project. 4 Director z-e -e_, WASHIN TON DEPARTMENT OF GAA+YE WASHINGTON DEPARTMENT FISHERIES Failure to comply with the provisions of this approval shall be grounds for revocation of this approval and shall constitute a gross misdemeanor. TCT:BC:cm Fill out, remove and return to Washington Department of Fisheries. (Type of Project) Completed on Date STATE OF WASHINGTON II'Y:DRAULICS PROJECT APPROVAL October 28, 1968 (Date) 3 little or no DEPARTMENT OF FISHERIES General Admin. Building Olympia, Washington Green River Tributary Duwamish River City Hall, Tukwila, Washington 98.0.67 the requested project work which is covered by the 100 of Chapter 75.20. The work may be conducted Signature (Drainage System) (Drainage System) Director SUPPLEMENTAL INFORMATION October 28, 1968 Date Sewer Outfall Green River Trib Duwamish River Type of Project Approval given to City of Tukwila, City Hall, Tukwila, Washington 98067 SPECIAL PROVISIONS: a) No equipment is to work within the wetted perimeter of river except that necessary to excavate a toe. Drainage System b) Raw trenches are to be filled as soon as possible to prevent silt intrusion from associated excavation. c) Extreme care shall be taken to insure that no lime, wet concrete, petroleum products, silt or other deleterious material is allowed to fall, flow, leach or otherwise enter the flowing river. d) Concrete products are to have a minimum of seven (7) days curing time before contact with the flowing river. e) Scalping and sloping of the bank is to be conducted in a manner to prevent dirt or soil from entering the river. f) Riprap is to be composed of clean matetial placed from the bank in a manner to cause no undue restriction to normal stream flow. g) These provisions are to be observed by the contractor(s) and /or equipment operator(s). —2—