HomeMy WebLinkAboutReg 2012-09-04 Public Hearing - Sound Transit UUP - Attachment B: Overall Project SiteUlf=
L �
BNSF RAILWAY
WEST VALLEY HIGHWAY
EXISTING UP SURFACE CROSSING (FUTURE
I/---STANDER BOULEVARD UNDERPASS)
STRANDER DRIVEWAY
CONNECTION
SPU CEDAR RIVER
PIPELINE ROW
UNION—MUHL RAIL
IIIA111�11111IIIII �III111III�IIIIIIII]
=111111111 ° IIIIIIII III III I-II 1III
SIDEWALK CONNECTION
TBD
PEDESTRIAN ACCESS
SIDEWALK
CITY OF TUKWILA • CITY LIMITS —
VIII II 11111111 11111111 11111 I
IIIIIIII° III III [will .IIIIIIII
;.:17-17-1-1-RMIIIIIIIIILJ11111III
VIII II IIIIIIII° 1111111 111111 11
J VIII
II H IIIIIIII
11111111°-J11111111
111111
111111 I
vtig
"`YsV7
°B►. CITY OF TUKWILA
LONGACRES WAY
UP UNDERCROSSING
LONGEACRES WAY
PEDESTRIAN UNDERPASS
TEMPORARY
CITY OF RENTON v EMERGENCY AND
CONSTRUCTION
ACCESS
STRANDER
CONNECTION
ad 0 CI 0 ,,Ia
CITY OF RENTON
CITY LIMITS—\•
Overall Project Site / Location
5O WDTEMISH
HEWITT INCA
WSP•FLACK+KURTZ TRES WEST
KAREN KI EST
NOT TO SCALE N
Tukwila Commuter Rail Station June 15, 2012