HomeMy WebLinkAboutTrans 2012-10-01 Item 2B - 42nd Avenue South Phase III Utility UndergroundingCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Cyndy Knighton, Senior Engineer DATE: September 28, 2012 SUBJECT: 42nd Ave S Phase III (Southcenter Blvd S 160 St) Project No. 99410303 Utility Undergrounding ISSUE Utility undergrounding as part of the 42nd Avenue S Phase III project. BACKGROUND In February 2012, CH2MHill was retained by the City to design the 42nd Avenue S Phase III project. Limits of this phase are Southcenter Boulevard south to S 160" Street (southern City limits) and the road project includes the design of a failing culvert over Gilliam Creek. The scope of work includes full design for both the roadway improvements and the culvert replacement, up to and including support during bidding. The current scope and budget do not include the costs to convert overhead power and phone lines to underground vaults. Optional tasks are included in the existing scope but additional budget will be needed to complete the underground engineering. The estimated cost for the additional design for undergrounding is estimated at $72,700.00. DISCUSSION One of the consultant's first order of work was to study the costs of the utility undergrounding so a decision could be made by the City on whether or not to pursue utility undergrounding or leave the utilities above ground on aerial lines. Approximately one -third of the project limits already have undergrounded utilities, which were completed by Sound Transit as part of the Light Rail line construction. Fiscal Impact: Design work for the roadway is budgeted in the draft 2013 CIP at $650,000.00 (pg. 2). Design for the overhead utility conversion will require additional budget. The road construction budget is currently $2.9 M (shown in 2014, including construction management). Undergrounding utilities will require additional funds. Options for funding the underground conversion include: (1) General fund; (2) Local Improvement District; (3) Citywide Utility Rate basing; and (4) Grants. If no undergrounding is pursued, the poles will still need to be relocated but at Seattle City Light's expense. Planning Level Cost Estimate Roadway Construction $2,790,000 Gilliam Creek Culvert 940,000 Sub -Total without $3,730,000 Undergrounding Utility Undergrounding $1,750,000 Total Including $5,480,000 Undergrounding An LID would affect approximately 25 parcels, whereas citywide utility rate basing would allocate the costs to all residents and businesses within Tukwila that are served by Seattle City Light. However, at this time utility rate basing is not available to Tukwila unless the current franchise agreement is amended, a new franchise is negotiated, or a project specific project agreement is negotiated. Many grant sources, such as the Transportation Improvement Board, disallow most or all of the cost of utility undergrounding. RECOMMENDATION The Council is being asked to authorize staff to negotiate a project specific agreement with Seattle City Light that stipulates that the utility undergrounding costs for the 42 Ave S Phase III project will be rate based, and consider this item at the October 8, 2012 Committee of the Whole meeting and subsequent October 15, 2012 Regular Meeting. Attachments: Draft 2013 CIP page 2 Overhead to Underground Relocation Cost Estimate Funding Fact Sheet W:1PW EnyiPROJECTSW- RW RS Projectst42nd Ave S Phase III (99410303 94- RS03)tINFORMATION MEMO Undergrounddng Decision 9- 18- 12.docx 9 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2013 2018 Capital Improvement Program 2. A 10 2013 to 2018 PROJECT: 40 -42 Ave South (S 160 St S 131 PL) Project No. 99410303 DESCRIPTION: Design and construct street improvements, drainage, undergrounding, and driveway adjustments. JUSTIFICATION: Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization. STATUS: Phase III (SIC Blvd (154th) S 160 St) $3m, Design in 2012, construction in 2014. Project No. 94 -RS03 Phase I (SIC Blvd (154) S 144 St) $3,796, Completed. Project No. 90 -RW15 Phase II (S 144 St S 139 St) $1,850, Completed. Project No. 94 -RS02 Phase IV (S 139 St S 131 PI) $1 m in beyond. Project No. 94 -RS01 MAINT. IMPACT: Reduce pavement, shoulder, and drainage work. COMMENT: Only Phase III is showing in active years. Design contract with CH2M Hill includes Surface Water's Gilliam Creek 42nd Ave S Culvert project (pg. 146). FINANCIAL Through Estimated (in $000's) 2011 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL EXPENSES Phase IV Design 9 391 250 650 Land(R/W) 100 100 Const Mgmt. 400 560 960 Construction 2,400 3,800 6,200 TOTAL EXPENSES 9 391 250 2,900 0 0 0 0 4,360 7,910 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Motor Vehicle Tax 160 262 265 687 Mitigation Expected 0 City Oper. Revenue 9 231 (12) 2,635 0 0 0 0 4,360 7,223 TOTAL SOURCES 9 391 250 2,900 0 0 0 0 4,360 7,910 2013 2018 Capital Improvement Program 2. A 10 42nd Avenue S Funding Fact Sheet General Fund The general fund would be responsible for the entire $1,750,000 undergrounding costs. Local Improvement District A local improvement district could be formed for all Specially Benefitted parcels. In this case, the assumption is approximately 25 parcels would receive special benefit by the undergrounding. All parcels are zoned either for single family (LDR) or multi family (HDR). Assumptions All parcels share in bL Undergrounding cost LID Formation cost LID Bondina cost irden equally $1,750,000.00 Interest Rate 5 $105,000.00 Amortization 15 years $140,000.00 Parcels 25 $1,995,000.00 LID Cost Per Parcel $115,321.72 (estimate) LID Cost Per Parcel Per Year $7,688.11 Citv -wide Rate basing If an LID is formed to underground the overhead utilities, a surcharge rate is added to all electrical bills w Assumptions Residential Meters Commercial Meters Industrial Meters Large General Service Meters Annual amoritized cost Cost per kilowatt hour Average residential Total residential Average non residential Total non residential Average Annual Costs Residential Commercial 4,748 804 16 64 $124,167 $0.00021556 Interest Rate Amortization 2013 MWH Average kWh cost 18,500 kWh per year 87,838 MWH per year 552,249 kWh per year 488,188 MWH per year Per Meter Total $3.99 $18,934 $119.04 $105,233 5 25 years 576,026 (projected) $0.06 6/11/12 11