HomeMy WebLinkAboutTrans 2012-10-01 Item 3F - SCATBd - Draft Regional and Local Project PrioritiesSCATBd Regional and Local Project Priorities DRAFT
SCATBd REGIONAL PRIORITIES
WSDOT
I -5 /SR 509 Corridor
Complete the SR 509 Corridor through the City of SeaTac to the Citv of Federal Wav
Completion and
Freight Improvement
Project
WSDOT
I- 405 /SR 167
Reconstruct interchange to connect HOV lanes and increase capacity in the I -405
Interchange Project
Corridor
WSDOT
1 -5 /SR 18 /SR 161
Complete the remaining phases of the Triangle Project
Triangle Project
WSDOT
SR 18 Widening
Complete the SR 18 widening from the Issaquah Hobart Road to I -90
Project
Other
Stampede Pass Rail
Expand the Stampede Pass rail line, and north south mainline improvements.
Line Improvements
SCATBd MEMBER PRIORITIES
Algona
West Valley Highway
This Project will reconstruct and widen the existing travel lanes to 12' and add 4'
Reconstruction from
shoulders in both directions. This project will also include retaining walls, curb and
north to south city
gutter on both sides, and sideNvalk, as well as a water main. The project will also
limits, four phases
require storm drainage facilities.
Auburn
Proposed Preseiiration
Rebuild, patch, overlay, and intersection rebuild at various locations in the City. City
Work
has an Arterial and Collector Street Pavement Preseilration Program dedicated to
preseii ing and rehabilitating of the pavement on these streets. The Arterial and
Collector Street Pavement Preseiiration Program implements projects each year that
preseiire and /or rehabilitate the pavement on Auburn's arterial and collector streets.
Black
Diamond
Burien SR 518: Eastbound A new east bound off -ramp at SR 518 and Des Moines Memorial Drive. This project
Off -ramp to Des will enable a heavily impacted and underused area in Burien to begin an economic
Moines Memorial revitalization that Neill benefit the City, the State, the Port of Seattle, and many others.
Drive Includes a new drainage facility to protect sensitive areas.
Covington SR 516 f r o m Jenkins T h e p roject will widen SR 516 to five lanes from the vicinity of Jenkins Creek to the
Creek to 185th Ave vicinity of 185th Ave SE. Total project length is approximately 2,000 feet. The
SE purpose of this project is to improve the level of seiirice of the substandard roadway
to accommodate current and fixture traffic volumes in the area. The project will
eliminate a critical pinch point in the system by the structure over the
Jenkins Creek crossing.
Des Moines Transportation The Transportation Gateway project improves two arterials: S. 216th Street and 24th
Gateway Project Avenue S., seiiring as the City's centerpiece for economic development. Three major
developments are proposed adjacent to the project: the Port of Seattle Des Moines
Creek Business Park, Wateii ievv Crossing and a location for big box retail
development.
Enumclav,
Federal Way Phase one of the project, which includes tvvo nevv flyover ramps, began in August
Improvements, 20 1 and will be completed in July 2012. Phase two has been broken up into five
Federal Way_ I -5 /SR parts, and finding has not vet been secured for any of phase tivo.
18 /SR 161
20
SCATBd Regional and Local Project Priorities DRAFT
Bent South 228th Street Construct a railroad overpass to separate the road from the Union Pacific railroad
Union Pacific tracks and eliminate the existing at -grade crossing. This project will construct a
Railroad Grade railroad overpass to separate the road from the Union Pacific (UP) railroad tracks and
Separation eliminate the existing at -grade crossing v, -hich causes significant freight delays due
the growing number of trains on UP mainline tracks.
Bing Count- RapidRide F Line RapidRide will seiire the Burien Transit Center, the Link Tuk vila International
Boulevard Station, Tukwila Sounder Station, South Renton Park and -Ride, and
Renton Transit Center. The RapidRide F Line will give riders streamlined seii ice to
destinations along the route, including major employers, stores, medical and other
seii ices, and residential areas. The F Line will also provide connections to Link light
rail and Sounder commuter rail.
Maple Valley SR 169 Improvement
Project (Witte Road t(
228th Ave SE)
Milton Interurban Regional
Tail Missing Link
Construct a second northbound lane on SR 169 from Witte Road to 228th Ave SE.
The SR 169 Safety and Freight Mobility Improvement Project 'krill construct a second
northbound lane on SR 169 from Witte Road to 228th Avenue SE, a distance of
approximately (_).6(_) miles. Other improvements include the construction of bike lane
and an ADA compliant sidevvalk and curb ramps, street illumination and landscaping.
The City of Milton's portion of the project is a tunnel or pedestrian bridge crossing of
SR161 (Meridian) in King County and a short surface connection link to the
Project Edge-,yood trail to the east. When the trail is completed, Interurban Trail users Nyill be
able to reach urban and transportation centers such as Seattle, Bent, Auburn, Milton,
EdgeNvood, Pacific and Sumner, and the foothills communities of Orting, South
Prairie, Wilkeson and Carbanado.
Normandy_ First Avenue South The First Avenue South Multi -modal Enhancement Project, Phase 3 adds sidewalks,
Park Multi -modal bicycle lanes, street pedestrian light and landscaping to the existing arterial, which
Enhancement Project is also designated as S.R. 509. The City of Normandy Park completed Phase 1 in
2004 and Phase 2 will be completed in early 2010. Phase 3 v ill connect
the previously completed phases as well as provide a safe pedestrian connection
between the two neighborhood commercial areas within the First Avenue South
corridor.
Pacific
Renton Rainier Avenue South The first phase of this project is under construction. Phase 1 will install BAT lanes,
Corridor medians, curb, gutter, sidewalk, illumination, on Rainier Ave S between S Grady
Improvements Way and S 3rd St (SR 900). Phase 2 will complete the improvements from S 3rd St
(SR 900) to Airport Wad-. It includes installation of landscaped medians, curb, gutter,
wider sidewalks, planted pedestrian buffer, street lighting including pedestrian scale
illumination.
SeaTac Connecting 28th/24th T h e p roject complete a five lane principal arterial corridor vvith bicycle lanes and
Avenue South sidewalks. The project provides a vital connection Nyithin and between the City of
SeaTac's Regional GroNyth Center, the City of Des Moines, the Port of Seattle's
SeaTac International Airport, Sound Transit's 2(_)(_)th St Link Light Rail Station park
and ride facility and adjacent developable properties.
TUklylla Interurban Ave South The project benefits include converting the center lane to a planted median, left and u-
(Fort Dent Way to turns Nyill be provided for at several locations along the roadNvay to maintain access to
South 143rd Street) abutting properties. The project Nyill also enhance the aesthetics of the roadNvay,
which is expected to increase development densities for both residential and
commercial uses along Interurban.
21