Loading...
HomeMy WebLinkAboutUtilities 2012-10-09 COMPLETE AGENDA PACKETCity of Tukwila Utilities Committee Dennis Robertson, Chair Joe Duffie Kate Kruller Distribution G. Labanara D. Robertson S. Kerslake J. Duffle Clerk File Copy K. Kruller 2 Extra V. Seal Mayor Haggerton A. Le (e -mail pkt. pcl D. Cline e -mail cover to: K. Matej C. O'Flaherty, D. B. Giberson Almberg, B. Saxton, F. Iriarte S. Norris, M. Hart, R. Tischmak D. Robertson AGENDA TUESDAY, OCTOBER 9, 2012 Time: 5:00 PM Place: Conference Room #1 1. PRESENTATION(S) 2. BUSINESS AGENDA a) Proposed 2013 2018 CIP a) Information Only Review Water, Sewer and Surface Water CIP Projects Please bring your 2013-2014 Budget Binder b) Surface Water Comprehensive Plan Draft Comprehensive Plan for Review Chapters 1 4 Please bring your 2012 Surface Water Comprehensive Flan 3. ANNOUNCEMENTS 4. MISCELLANEOUS b) Information Only Future Agendas: Proposed 2013 Utility Rates Adoption of SWCP Next Scheduled Meeting: Tuesday, October 23, 2012 Pg. 1 Pg. 3 S The City of Tukwila strives to accommodate individuals with disabilities Please contact the Public Works Department at 206 433 -0179 for assistance. p City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM ISSUE Review Water, Sewer, and Surface Water projects in the Proposed 2013 2018 Capital Improvement Program. BACKGROUND The City annually approves the 6 -year Financial Planning Model and Capital Improvement Program. This year both the Proposed 2013 2014 Biennial Budget and Proposed 2013 2018 CIP will be presented to Council for adoption. Budget Workshops are being held October 9, 10, and 11, 2012 to review the two documents. Per Utilities Committee request, the Water, Sewer, and Surface Water CIP projects will also be reviewed in depth at the Committee level. DISCUSSION The Proposed 2013 2018 CIP includes some additions and deletions from last year. Some of the highlights that will be reviewed include: Water Added Water Reservoir, page 90 Added Pipeline Asset Management, page 91 Main Projects in next two years: Andover Park West (with TUC Transit Center) Andover Park East Water Main Replacement Surface Water Added 4 new projects, see page 137 Sewer Valley View West Hill Transfer Area, pg. 122 Sewer Repair at 14438 59 Ave S, pg. 134 Main Projects in next two years: CBD Sewer Rehabilitation Various smaller projects Main Projects in next two years: Storm Lift Station No, 15, Soils Reclamation Facility, and 42 Ave S Culvert RECOMMENDATION Information only, full Council will adopt the entire 2013 2018 CIP by Resolution. W.1PW Eng,OTHER'.Ga 1 Labanara %,Water Sewer Documents "%Info Memo Review 2013 -2018 Water, Sewer, SWM CIP projects gl.docx p City of Tukwila Jim Haggerton, Mayor TO: FROM: DATE: October 5, 2012 SUBJECT: Surface Water Comprehensive Plan Project No. 91041202 Draft Comprehensive Plan for Review Chapters 1 4 ISSUE Present Chapters 1 4 of the proposed 2012 Surface Water Comprehensive Plan. BACKGROUND The City hired CH2M Hill to update our Surface Water Comprehensive Plan (SWCP) to reflect changes in regulatory requirements and drainage needs within the City. The current SWCP was completed in 2003 and does not reflect changes in regulations required under the City's National Pollutant Discharge Elimination System Permit, our current GIS inventory, completed CIP projects, the Tukwila South annexation area, nor newly identified needs. DISCUSSION Staff intends to review the draft SWCP in a series of three Utilities Committee meetings. The first meeting reviewed the proposed changes to the CIP projects. This second review will concentrate on a page by page review of Chapters 1 4. The third meeting will review the remainder of the Surface Water Comprehensive Plan. Staff will then complete a final draft, obtain a SEPA determination, and bring the SWCP forward for final review and Council approval by resolution. RECOMMENDATION Information only. 3