Loading...
HomeMy WebLinkAboutUtilities 2012-10-23 Item 2D - Review - Surface Water Comprehensive Plan: Chapters 1-4gLty of Tukwila Jim Haggerton, Mayor TO f3tm M DATE: October 19, 2012 SUBJECT: Surface Water Comprehensive Plan Project No. 91041202 Draft Comprehensive Plan for Review Chapters 1 4 ISSUE Present Chapters 1 4 of the proposed 2012 Surface Water Comprehensive Plan. BACKGROUND The City hired CH21VI Hill to update our Surface Water Comprehensive Plan (SWCP) to reflect changes in regulatory requirements and drainage needs within the City. The current SWCP was completed in 2003 and does not reflect changes in regulations required under the City's National Pollutant Discharge Elimination System Permit, our current GIS inventory, completed CIP projects, the Tukwila South annexation area, nor newly identified needs. DISCUSSION Staff intends to review the draft SWCP in a series of three Utilities Committee meetings. The first meeting reviewed the proposed changes to the CIP projects. This second review will concentrate on a page by page review of Chapters 1 4. The third meeting will review the remainder of the Surface Water Comprehensive Plan. Staff will then complete a final draft, obtain a SEPA determination, and bring the SWCP forward for final review and Council approval by resolution. RECOMMENDATION Information only. 43