HomeMy WebLinkAboutUtilities 2012-10-23 Item 2D - Review - Surface Water Comprehensive Plan: Chapters 1-4gLty of Tukwila
Jim Haggerton, Mayor
TO
f3tm
M
DATE: October 19, 2012
SUBJECT: Surface Water Comprehensive Plan
Project No. 91041202
Draft Comprehensive Plan for Review Chapters 1 4
ISSUE
Present Chapters 1 4 of the proposed 2012 Surface Water Comprehensive Plan.
BACKGROUND
The City hired CH21VI Hill to update our Surface Water Comprehensive Plan (SWCP) to reflect
changes in regulatory requirements and drainage needs within the City. The current SWCP was
completed in 2003 and does not reflect changes in regulations required under the City's
National Pollutant Discharge Elimination System Permit, our current GIS inventory, completed
CIP projects, the Tukwila South annexation area, nor newly identified needs.
DISCUSSION
Staff intends to review the draft SWCP in a series of three Utilities Committee meetings. The
first meeting reviewed the proposed changes to the CIP projects. This second review will
concentrate on a page by page review of Chapters 1 4.
The third meeting will review the remainder of the Surface Water Comprehensive Plan. Staff will
then complete a final draft, obtain a SEPA determination, and bring the SWCP forward for final
review and Council approval by resolution.
RECOMMENDATION
Information only.
43