Loading...
HomeMy WebLinkAboutCAP 2012-11-26 Item 2A.2 - Bid Award - Tukwila Pool Parking Lot and Access Improvements1 City of Tukwila Rick Still, Parks and Recreation Director ••= INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Community Affairs and Parks Committee FROM Rick Still, Parks and Recreation Director DATE: November 20, 2012 SUBJECT: Bid Award for Tukwila Pool Parking Lot & Access Improvements Project ISSUE Award the bid for construction of the Tukwila Pool Parking Lot & Access Improvement Project. BACKGROUND This project will provide improved parking and access to the Tukwila Pool. The Metropolitan Park District (MPD) approved five Capital Projects that were not included in their Energy Savings Performance Contract with McKinstry Essention, Inc., (McKinstry). The MPD Board agreed that these projects were important but not financially feasible as proposed by McKinstry in the Energy Services Proposal (ESP), approved August 20, 2012. However, City Staff confirmed that the projects could be designed, managed and constructed using the City's processes while being completed within the allotments provided in Addendum #1 to the ESP (see Attachment 1), approved September 17, 2012. The Tukwila Pool Parking Lot & Access Improvement Project [or Item #19 —ADA Improvements (Parking Lot)] has an allowance of$90,000.00. Six contractors were selected through the Small Works Roster process. A pre-bid walk was conducted on November 9th to familiarize and clarify any issues the contractors may have with the plans and the existing site conditions. Two contractors provided bids that were opened on November 16, 2012; $74,950.00 and $128,925.00 (see Attachment 2 — Bid Opening results). The apparent low, with a lump sum base bid of $74,950.00, is Evergreen Asphalt and Concrete, Inc. The Architect's estimate was $65,154.00. The Parking Lot & Access Improvement Project construction is scheduled to be complete by January 15, 2013, depending upon the weather. The easier access for gaining entry to the pool will be greatly appreciated by the pool patrons. ANALYSIS The two bids were reviewed and no errors were discovered in the base bid for either bidder. Evergreen Asphalt has successfully worked for the city on past projects and references were contacted with positive feedback. 199 INFORMATIONAL MEMO Bid Award for Tukwila Pool Parking Lot & Access Improvements Project Page 2 -November 20, 2012 The available budget allotment for the Tukwila Pool Parking Lot &Access Project construction is $90,000.00. With Evergreen Asphalt and Concrete, Inc.'s bid, a 9.66% contingency would put the budget just under $90,000.00. This project has low risk of cost overruns and the contractor has found construction cost savings on projects in the past. BUDGET AND BID SUMMARY Bid Results Estimate Budget Total Bid Amount $ 74,950.00 $ 65,154.00 $90,000.00 Tax (9.5%) 7,120.25 6,189.63 Total Bid Amount $82,070.25 $ 71,343.63 Contingency 9.66% $ 7,927.99 $ 7,134.36 0.00 TOTAL $ 90,277.28 $ZI&69.4Q $90,000.00 RECOMMENDATION The Council is being asked award the construction bid for the Tukwila Pool — Parking Lot & Access Improvements Project to Evergreen Asphalt and Concrete, Inc. in the amount of $82,070.25 for consideration on the consent agenda at the December 3, 2012 Regular Meeting. ATTACHMENTS Attachment 1 —Addendum 1 to the ESP Attachment 2 — Bid Opening results— November 16, 2012 Attachment 3 — Evergreen Asphalt & Concrete, Inc. Bid Proposal Exhibit A—Tukwila Pool — Parking Lot &Access Improvements Concept Site Plan 20 C%T-PlC-1 Oulb CBK0060LACAP BH A—d%.i�Pod ADA Prq..11 2012- 110 012 1015 49 AM Attachment 1 Addendum 1 to the ESP: September 12, 2012 The MPD Board adopted the Energy Services Proposal (ESP)from McKinstry on August 20, 2012 at which time the Board requested additional information on Section 4.5 "Allowances" on page 25 of the ESP. Below is the additional information now forth called Section 4.5.1"Additional Information to the Allowances"that explains in greater detail the five items. The following five items were not included as part of the base bid by McKinstry,the ESCO. These items are included in the overall project and will be completed. They are not considered as part of the base bid because the ESCO would not guarantee the max cost of these items. This is for a couple different reasons as outlined below. Item#16—Bulkhead Renovation: Allowance:$4,500/Original Estimate: $14,683 This item did not get updated for the final ESP so it is not an apples to apples comparison. Also,the Allowance amount was determined before it was required by the Department of Commerce to have the ESCO complete all items on the project list. Therefore,the Allowance amount does not include the ESCO's markups. Original Scope: Repairing axles and wheels,and completely refinishing the surface. Reduced Scope: Includes simply painting the existing one. Item#17—Pool filter Conversion(Vac DE Option): Allowance: $15,000/Original Estimate:$149,089 This item did not get updated for the final ESP so the Original Estimate is not an apples to apples comparison with the reduced scope. Also the Allowance amount was determined before it was required by the Department of Commerce to have the ESCO complete all items on the project list therefore, it does not include the ESCO's markups. Original Scope: Reconfigure the existing Vacuum DE filter system to accommodate new filter grids that can be changed out separately as opposed to having to lift the entire filter grid out of the tank. This would have provided significant savings in staff time and improved filter capacity and reduced annual maintenance costs. However,the price to do this was high enough that it was more beneficial to reduce this scope to enable more items to be completed on the CIP List. Reduced Scope: Includes refinishing the existing filter tank, purchasing new filter grid covers, and all necessary equipment to change the filter covers in-house without having to contract this work out(which will save approximately$1,000 annually). M:\Aquatics\MPD BOARD Items\9.17.12 MPD Meeting Items\MPD 9.17.12-4.a Addendum Ito the ESP 9-12-12 Attachment Ldocx Page 1 21 Item#19—ADA Improvements(Parking Lot): Allowance: $90,000/Original Estimate: $101,700 This item is reduced in expense based upon having an estimate from a contractor that the City has used multiple times for this kind of work. One thing to note is that the scope of this project may increase dependent upon code requirements. Both the ESCO and the contractor's estimate were based off plans that were drawn up several years ago that has now become evident would not bring this up to today's code. A modification will need to be done and potentially some additional engineering. Original Scope: Relocate ADA Parking Stall from the existing location to the stalls closest to the lobby doors. Add an ADA Ramp from the parking lot to the main entrance way. Reduced Scope: N/A Item#21—New Roof: Allowance: $85,449/Original Estimate: $378,000 This item is not an apples to apples comparison between the Original Estimate and the Allowance. The Allowance is as ballpark price from a contractor for a different kind of roof product. After the contractor gave their ballpark estimate they conducted further research on their own for the next several weeks (including a core sample of the roof) and discovered that there is currently about seven inches of insulation on the roof. Good news in the way of energy efficiency but an added variable for re-roofing that neither the contractor nor the ESCO knew about. Therefore,the scope and estimate from the contractor will need to be modified to reflect this as the current estimate does not. Also the Allowance amount does not include the ESCO's markups because it was determined before the Department of Commerce's requirements to have the ESCO complete all items on the project list. Original Scope: Re-roof the facility(specific process and scope was not made known to staff). Reduced Scope: Use a TPO type product that can be laid over the top of the existing torch down roof. Item#23—Locker Room Floor Resurfacing: Allowance: $85,000/Original Estimate: $92,389 This item is reduced in expense based upon using a different product and methodology of prep and application as specified by an architect that the City has used in the past. The product simply costs less per square foot and is cheaper to install. Original Scope: Remove existing tile floor, grind down smooth and apply new flooring product. Modified Scope: Use a different product that does not require the existing flooring to be removed first. These allowances were made to enable additional items to be included and completed in the overall project. Had these efforts to reduce scope and find cost savings not been sought after many additional items on the overall project list would not be getting completed. M:\Aquatics\MPD BOARD Items\9.17.12 MPD Meeting Items\MPD 9.17.12-4.a Addendum Ito the ESP 9-12-12 Attachment Ldocx Page 2 22 Attachment 2 Tukwila Pool — Parking Lot & Access Project Bid Opening — November 16, 2012 Bid Security Adendum #1 Bidder Aknowledged Bid Yes/No Yes/No AA Asphalting, Inc $ 2518 East Valley Hwy Sumner,WA 98390 jeff@aaasphalting.com Coby Construction $ l PO Box 8589 Covington,WA 98042 micheledurkee@comcast.net db General Contractors, Inc. $ no b l 3320 West Valley Highway, D-106 Auburn, WA 98001 lake@db-gc.com Evergreen Asphalt and Concrete Inc. $ PO Box 1567 Kent, WA 98036 evergreen.shane @)comcast.net Gary Merlino Construction Co., Inc. $ V1 0 y2 1 Ul 9125 - 10th Ave. South Seattle, WA 98108 $arryl @gmccinc.com Rainier Asphalt and Concrete, LLC P.O. Box 1549 North Bend, WA 98046 mer rainieras halt.com Rick Still Kirstin Ma 23 24 Attachment 3 P-1 PROPOSAL (Lump Sum) CONTRACTOR'S NAME Contractor's State License No. C—V zl't t L 9-q 2- Contractor's Registration No. (uBi No.): U OZ Zy a 5"70 City of Tukwila Project No. TUKPOOL 2012-01 To the Mayor and City Council City of Tukwila, Washington The undersigned (Bidder) hereby certifies that he personally examined the location and construction details of Work outlined in the Contract Documents for the City of Tukwila (Owner) project titled TUKWILA POOL: PARKING LOT & ACCESS IMPROVEMENTS, Project No. TUKPOOL 2012-01 which includes but is not limited to Demolition of concrete and clearing and grubbing; and construction of concrete parking area walkways and seat wall; install"French drain", top soil and wood multch; and relocation of the flag pole. Contractors may obtain copies of the contract documents by contacting the Parks and Recreation Administration office and each bid shall be in accordance with the bid documents on file at the Parks and Recreation Department, 12424 42 d Avenue South, Tukwila, Washington 98168 (206-767-2342). Informational copies of any available maps, plans, and specifications, are on file for inspection and for any technical questions please contact the office of Chris Peterson, LPA of The LAstudio, 206-204-0507, 15200 52nd Ave. South, Tukwila, 98188; and has read and thoroughly understands these Documents which govern all Work embraced in this improvement and the methods by which payment will be made for said Work, and thoroughly understands the nature of said Work; and hereby proposes to undertake and complete all Work embraced in this improvement in accordance with these Contract Documents and at the following schedule of rates and prices. The Bidder understands that the quantities mentioned herein are approximate only and are subject to increase or decrease, and hereby proposes to perform all quantities of work as either increased or decreased in accordance with the Contract Documents. As evidence of good faith, (check one) ❑ bid bond or ❑ cash, ashier's check, ❑ certified check, or ❑ postal money order made payable to the City of Tuk it equal to five percent (5%) of the Total Bid Price is attached hereto. Bidder understands that, should this offer be accepted by Owner within ninety (90) calendar days after the day of Bid Opening and the Bidder fails or refuses to enter into an Agreement and furnish the required performance bond and liability insurance within ten (10) calendar days after Notice of Award, the Contract shall be null and void and the Bid Deposit or Bond accompanying this Proposal shall be forfeited and become the property of Owner as liquidated damages, all as provided for in the Bid Documents. Bidder shall complete the Physical Work in all respects within Thirty [30] calendar days from the date of written Notice to Proceed. If the work is not completed within this time period, Bidder shall pay liquidated damages to Owner as specified in Section 1-08.9 of the Standard Specifications for every calendar day work is not physically complete after the expiration of the Contract time stated above. In addition, Bidder shall compensate Owner for actual engineering inspection and supervision costs and any other legal fees incurred by Owner as a result of such delay. TUKWILA POOL PARKENG LOT&ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012-01 November 5,2012 25 Proposal P-2 TUKWILA POOL: PARKING LOT&ACCESS IMPROVEMENTS, Project No. TUKPOOL 2012-01 Note: Prices for all items,all extensions,and the total amount bid must be shown. Show prices in both words and figures (ink or typed), and where conflict occurs,the written or typed word shall prevail. Where conflict occurs between the item price and the total amount specified,the item price shall prevail;and totals shall be corrected to conform thereto. BASE BID: PARKING LOT&ACCESS IMPROVEMENTS including, the Demolition and Disposal; and Construction Price for supplying concrete and landscaping as specified without exception: IN WORDS: dp TOTAL BASE BID PRICE $ IN NUMBERS: !20 TOTAL BASE BID PRICE $ By signing below, Bidder acknowledges receipt and understanding of the following Addenda to the Bid Documents: Addendum Addendum No. Date o No. Date of Receipt 2 NOTE: Failure to acknowledge receipt of Addenda may be considered as an irregularity in the Bid Proposal and Owner reserves the right to determine whether the bid will be disqualified. By signing below, Bidder certifies that he has reviewed the insurance provisions of the Bid Documents and will provide the required coverage. It is understood that Owner may accept or reject all bids. Award will be based on Base Bid. The Surety Company which will furnish the required Performance Bond is N6 -a of roz) Sly 5!-41--200 (Name) (Address) Bidder: Signature of Authorized Official: Printed Name and Title: S�^ c.. 6r01 +,tAkr,.,._,. Address: G,-7 !- wA 98� Circle One: Individual/Partnership/Joint Venture/ f o oration: [,�J YCorporation Phone No.: Z 5-`3 Ir.s 301 ,37-7 Date: 12 This address and phone number is the one to which all communications regarding this proposal should be sent. NOTES: 1. If the Bidder is a co-partnership, give firm name under which business is transacted; proposal must be executed by a partner. If the Bidder is a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). 2. A bid must be received on all items. If any unit prices or extensions are left blank they will be entered as $0.00 no charge. TUKWILA POOL PARKING LOT&ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012-01 November 5,2012 26 P-3 BID SECURITY Bid Deposit: he undersigned Principal hereby deposits a Bid Deposit with the City of Tukwila in o a cash deposit, certified or ashier's check, or postal money order in the amount of dollars ($ 75J )• Bid Bond: The undersigned, t (Principal), and (Surety), are held and firmly bound unto the City of Tukwila (Owner) in the penal sum of dollars ($ ), which for the payment of which Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. The liability of Surety under this Bid Bond shall be limited to the penal sum of this Bid Bond. Conditions: The Bid Deposit or Bid Bond shall be an amount not less than five percent (5%) of the total bid, including sales tax and is submitted by Principal to Owner in connection with a Proposal for TUKWILA POOL: PARKING LOT & ACCESS IMPROVEMENTS, Project No. TUKPOOL 2012-01, according to the terms of the Proposal and Bid Documents. Now therefore, a. If the Proposal is rejected by Owner, or b. If the Proposal is accepted and Principal shall duly make and enter into an Agreement with Owner in accordance with the terms of the Proposal and shall furnish a bond for the faithful performance of said Project and for the payment of all persons performing labor or furnishing materials in connection therewith, with Surety or Sureties approved by Owner, and shall in all other respects perform the Contract created by the acceptance of said Proposal, then this Bid Security shall be released; otherwise it shall remain in full force and effect and Principal shall forfeit the Bid Deposit or Surety shall immediately pay and forfeit to Owner the amount of the Bid Bond, as penalty and liquidated damages, . The obligations of Surety and its Bid Bond shall be in no way impaired or affected by any extension of time within which Owner may accept bids; and Surety does hereby waive notice of any such extension. Signed and dated this day of , 20 Principal Surety By Signature of Authorized Official Attorney in Fact(Attach Power of Attorney) Title Name and address of local office of agent and/or Surety Company: Surety companies executing bonds must appear on the current Authorized Insurance List in the State of Washington per Section 1-02.7 of the Standard Specifications. TUKWILA POOL PARKING LOT 8 ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012-01 November 5,2012 27 P-4 NON-COLLUSION AFFIDAVIT STATE OF WASHINGTON ) ) ss. COUNTY OF KING ) The undersigned, being first duly sworn, on oath states that the person, firm, association, partnership,joint venture, or corporation named in the Bid Proposal has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the City of Tukwila project named TUKWILA POOL: PARKING LOT&ACCESS IMPROVEMENTS, Project No. TUKPOOL 2012-01 V v tr t C 3 A-.,p�A (^ Name of Firm Signa ure of Authorized Official Title Signed and sworn to before me on this day of , , 20 . S' ature of Nota I' in ` d for the State of Washington My appointment expires: p, J. O.•"ssjorr 9 �� C7 � � 9 �ZNOTAR y�N " _ . SEAL :.* PUBLIC OF WASYN TUKWILA POOL PARKING LOT&ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012-01 November 5,2012 28 P-5 RESPONSIBLE BIDDER DETERMINATION FORM Attach additional sheets as necessary to fully provide the information required. Name of Bidder: 6o­c4"— : '—c ' Address of Bidder: PO / City State Zip Code Contractor's License No. 91 erg,,tc_ 7yKZ Contractor's State Tax No. 60ZZ '44,5­710 Dept. of L&I Bond Registration No. 63 - 0 33g7ta Worker's Comp. Acct. No. Nz Z 76 -oo Bidder is a(n): ❑ Individual ❑ Partnership ❑Joint Venture Incorporated in the state of List business names used by Bidder during the past 5 years if different than above: Bidder has been in business continuously from Z Oo 'Z Year Bank Reference __LL^�\-j : U+y» - ►+� .fC�- r'K kb� zc;3 RgA 7� Bank Account Officer Officer's Phone No. No. of regular full-time employees: 7 Number of projects in the past 5 years completed: ahead of schedule /03 on schedule behind schedule Bidder has had experience in work comparable to that required for this Project: As a prime contractor for I years. As a subcontractor for years. List the supervisory personnel to be employed by the Bidder and available for work on this project (Project Manager, Principal Foreman, Superintendents, and Engineers): Name Title How Long With Bidder r w -_ Pt'-s ra, -- t ( V"5 ta; 1-kL- V 0,c.l+.k. nM► JML i o,c. yrs TUKWILA POOL PARKING LOT&ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 201201 November 5,2012 29 Responsible Bidder Determination Form P-6 List all those projects, of similar nature and size, completed by Bidder within the past 5 years. Include a reference for each. Any attached preprinted project listing must include all this information. Year Contract Project Name Completed Amount Owner/Reference Name and Phone 'GG rotes .. o I Z 1-7 y— Jr List all projects undertaken in the last 5 years which have resulted in partial or final settlement of the Contract by arbitration or litigation in the courts: /4 o N r, Total Claims Amount of Contract Arbitrated Settlement Name of Client and Proiect Amount or Litigated of Claims Has Bidder, or any representative or partner thereof, ever failed to complete a contract? *91 No ❑ Yes If yes, give details: Has Bidder ever had any Payment/Performance Bonds called as a result of its work? No ❑ Yes If yes, please state: Proiect Name Contracting Party Bond Amount Has Bidder ever been found guilty of violating any State or Federal employment laws? fNo ❑ Yes If yes, give details: TUKWILA POOL PARKING LOT&ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012-01 November 5,2012 30 Responsible Bidder Determination Form P-7 Has Bidder ever filed for protection under any provision of the federal bankruptcy laws or state insolvency laws? ;!fNo ❑ Yes If yes, give details: Has any adverse legal judgment been rendered against Bidder in the past 5 years? No ❑ Yes If yes, give details: Has Bidder or any of its employees filed any claims with Washington State Workman's Compensation or other insurance company for accidents resulting in fatal injury or dismemberment in the past 5 years? XNo ❑ Yes If yes, please state: Date Type of Injury Agency Receiving Claim The undersigned warrants under penalty of Perjury that the foregoing information is true and accurate to the best of his/her knowledge. The undersigned authorizes the City of Tukwila to verify all information contained herein. Signature of Bidder Title: r'°> x-.11- Date: I I '" ( Z TUKWILA POOL PARKING LOT$ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012.01 November 5,2012 31 P-8 PROPOSED EQUIPMENT AND LABOR SCHEDULE (Use additional sheets if required) Equipment to be used: DESCRIPTION/TYPE YEAR CONDITION OWN/RENT r- => Zvi C� /�.�rw �,�•^J a zC>C%> TD I Labor to be used: t+w�- Name of Bidder Signature of Authorized Official Title TUKWILA POOL PARKING LOT&ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012.01 November 5,2012 32 P-9 PROPOSED SUBCONTRACTORS Name of Bidder kr The following is a list of sub-contractors. The successful Bidder must have the written permission of the Owner to make any change to this list. Percent of total bid to be performed by Bidder % Schedule/Bid Item Numbers Name Subcontractor will perform %of Total Bid TUKWILA POOL PARKING LOT&ACCESS IMPROVEMENTS PROJECT Project No.TUKPOOL 2012-01 November 5,2012 33 REPAINTAO\,PAVEMENT\ MARKINGS \C,,,--. POOL BUILDING EXISTINGPlANTINGTOREMAIN NEWCONCRETE SEATWALL/PlANTER ConceptSitePlan Tukwila Pool Parking Lot and Access Improvements Tukwila,Washington Tukwila Parks and Recreation November16,2012 0'5'10'20'<:--Scale:1"=20' land plannIng landscape Brchlt&clur6 landentlUemenl 34