Loading...
HomeMy WebLinkAbout13-002 - WA State Department of Transportation (WSDOT) - Cascade View Elementary Safe Routes to School Grant . 13-002(c) A -0 Council N/A gENCY - • ouncll Approval ''N/ •I .Supplement Local Programs 401 Deparimert ci TiRanspertatron State Funding.Agreement Agency . Supplement.Number City of Tukwila Project Number ,- :: Agreement Number 3 ` HLP-SR12(005) LA-7887_ This supplemental agreement is made and entered into 03/03/2016, ' All provisions in the AGREEMENT identified above remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: ' Project Description ® No Change - Name Cascade View Elementary Safe Routes to School `. . , Location S 317th Street to 140th Street Description of Work ® No Change - Reason for Supplement , • -. , .,., , ,, ' -_s. , ., _ '- ,.., . . , . . to Constructio . Education and Enforcement completed;:,:Transfer remain t • Estimate'of Funding Type of Work- (1) -, (2) (3) (4) (5) Previous Estimated Total Estimated. Estimated Agreement/Suppl. Supplement _Project Funds Agency Funds State Funds PE a.Agency 5;100:00 5,100.00 5,100.00 b.Other Education/Enforcement` '29,138.00 -6,7'16.00 •. 22,422.00 22,422.00 c.Other Consultant 53,759.00 53,759.00 53,759.00 d.State .500.00 ,' • 500.00 500.00 e-Total PE Cost Estimate(a+b+c+d) 88,497.00 , - 6;716,00 81;781:00 81,781.00 Right of Way f.Agency •.,' � .: ''i,R95 00 •_ -:"; '..3;895 00 3,895 00. g-Other 57;710.00 --•-57,710:00 57,7.10.00 i.State j.Total R/W Cost Estimate(f+g+h+i) 61,605.00 61,605.00 61,605.00 Construction k.Contract 276,486.00 - 6,716.00 '• 283,202.00 283,202.00 I. Other Contract"Non-Participate" . 39,094.00 -6,716.00 32,378.00 . 32,378.00 . m.Other CE 31,558.00 , 31,558.00 31,558.00 -. n.Other o.Agency 1,000.00 1.000.00 1,000.00 p.State q.Total CN Cost Estimate(k+I+m+n+o±p) •348,138.00 0.00 _ 348,138.00 63,936.00 284,202.00 ' • r.Total Project Cost Estimate(e±j+q)',. 498,240.00 -.6,716.00 ,491,524.00 63,936.00 :427,588.00 , 'a AGENCY STATE - ;-- ;t: By: > �' i Pirecior Local Prger-Ams p P111cc& E•-x j, Neely _1_r Title; • Date:• 3 l I I /10 Date `'MAR ') n 76118 DOT Forth 140-087A Revised 03/2015 ■ % 'o/ o? /6/44,9-CS • 13-002(b) Council Approval 10/15/12 Y Washington state Supplement- Highways and Local Programs Department of Transportation State Funding Agreement Agency Supplement Number City of Tukwila Project Number Agreement Number 2 HLP-SR12(005) LA-7887 This supplemental agreement is made and entered into January 28,2013 All provisions in the AGREEMENT identified above remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description ® No Change Name Cascade View Elementary Safe Routes to School Location S 137th St to S 140th St Description of Work ® No Change • Reason for Supplement Transfer PE and Right of Way funds to Construction. Replace local funds in the Construction phase with remaining federal funds from the PE and Right of Way phases. Estimate of Funding T f Wk (1) z (3) (4) (5) Type o or Previous Supplement Estimated Total Estimated Estimated Agreement/Suppl. Project Funds Agency Funds State Funds PE a.Agency 5,100.00 5,100.00 0.00 5,100.00 b.Other Education/Encourage 29,138.00 29,138.00 0.00 29,138.00 c.Other Consultant 62,858.00 -9,099.00 53,759.00 0.00 53,759.00 d.State 500.00 500.00 0.00 500.00 e.Total PE Cost Estimate(a+b+c+d) 97,596.00 -9,099.00 88,497.00 0.00 88,497.00 Right of Way f.Agency 5,100 00 -1,105 00 `3,895 00 0 00 3,895 00 g.Other Consultant 57,710.00 57,710.00 0.00 57,710.00 h.Other i.State j.Total RAN Cost Estimate(f+g+h+i) 62,710.00 -1,105.00 61,605.00 0.00 61,605.00 Construction k.Contract 266,282.00 10.204.00 276.486.00 0.00 . 276,486.00 I. Other Contract(Agency) 49,298.00 -10,204.00 39,094.00 39,094.00 m.Other CE 31,558.00 31,558.00 31,558.00 n.Other o.Agency p.State 1,000.00 1,000.00 0.00 1,000.00 q.Total CN Cost Estimate(k+I+m+n+o+p) 348,138.00 0.00 348,138.00 70,652.00 277,486.00 r.Total Project Cost Estimate(e+j+q) 508,444.00 -10,204.00 49.8 240 00 70,652.00 427,588.00 AGENCY STATE � By: ,1---#112-...._ By: Director, ighways and Local Programs Title: May. . Date: 3 . c-, J Date: MAR L 2 5 DOT Form 140-087A EF Revised 6/02 / 37'a J dI-e cc/A/ S Washington State �� Department of Transportation Supplement - Highways and Local Programs State Funding Agreement Agency City of Tukwila Supplement Number 2 Project Number HLP- SR12(005) Agreement Number LA -7887 This supplemental agreement is made and entered into January 28, 2013 All provisions in the AGREEMENT identified above remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description ® No Change Name Cascade View Elementary Safe Routes to School Location S 137th St to S 140th St Description of Work ® No Change Reason for Supplement Transfer PE and Right of Way funds to Construction. Replace local funds in the Construction phase with remaining federal funds from the PE and Right of Way phases. Type of Work yp Estimate of Funding (1) Previous Agreement/Suppl. (2) Supplement pp (3) Estimated Total Project Funds (4) Estimated Agency Funds (5) Estimated State Funds PE a. Agency 5,100.00 5,100.00 0.00 5 100.00 b. Other Education/Encourage 29,138.00 29,138.00 0.00 29,138.00 c. Other Consultant 62,858.00 - 9,099.00 53,759.00 0.00 53,759.00 d. State 500.00 500.00 0.00 500.00 e. Total PE Cost Estimate(a +b +c +d) 97,596.00 - 9,099.00 88,497.00 0.00 88,497.00 3,895 00 Right of Way f. Agency 5,1100 00 -1,115 00 3,895 01) 0.00 g. Other Consultant 57,710.00 57,710.00 0.00 57,710.00 h. Other i. State j. Total RNV Cost Estimate (f +g +h +i) 62,710.00 - 1,105.00 61,605.00 0.00 61,605.00 Construction k. Contract 266,282.00 10,204.00 276,486.00 0.00 276,486.00 I. Other Contract (Agency) 49,298.00 - 10,204.00 39,094.00 39,094.00 m. Other CE 31,558.00 31,558.00 31,558.00 n. Other o. Agency p. State 1,000.00 1,000.00 0.00 1,000.00 q. Total CN Cost Estimate(k +I +m +n +o +p) 348,138.00 0.00 348,138.00 70,652.00 277,486.00 r. Total Project Cost Estimate (e +j +q) 508,444.00 -10,204.00 498,240.00 70,652.00 427,588.00 AGENCY By: Title: May Date: DOT Form 140 -087A EF Revised 6/02 STATE By: Date: Director, Highways and Local Programs Spa 7t i-0 4/‘i/c;7i -5 Washington State 1; Department of Transportation 13-002(a) Council Approval 10/15/12 orSupplement - Highways and Local Programs State Funding Agreement Agency City of Tukwila Supplement Number 1 Project Number HLP- SR12(005) Agreement Number LA -7887 This supplemental agreement is made and entered into January 28, 2013 All provisions in the AGREEMENT identified above remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description ® No Change Name Cascade View Elementary Safe Routes to School Location Description of Work ® No Change Reason for Supplement Authorize construction funds. Transfer CN & RW funds to PE. Estimated Ad date is 7/8/2014. T of Work Type o or Estimate of Funding (1) Previous Agreement/Suppl. 2 Supplement (3) Estimated Total Project Funds (4) Estimated Agency Funds (5) Estimated State Funds PE a. Agency 5,100.00 5,100.00 0.00 5,100.00 b. Other Education/Encourage 29,138.00 29,138.00 0.00 29,138.00 c. Other Consultant 20,000.00 42,858.00 62,858.00 0.00 62,858.00 d. State mow. SOO �d,,, e. Total PE Cost Estimate(a +b +c +d) 54 8.00 ti 42,858.00 97,096.00 0.00 97, 6.00 Right of Way f. Agency 5,000 00 i6 29e 1( 5 000 00 0 00 5;000 00 g. Other Consultant 73,000.00 -1.41r196,709— 5+0O7,7/6' 0.00 r.+ 5i2't6 -no h. Other 17, 7. i. State RAN j. Total R Cost Estimate (f +g +h +i) 78,000.00 — /5, et v -1417790V0 `27/o t Liu U0 0 0.00 0 Z/ / 18 b6' Construction k. Contract 266,282.00 266,282.00 0.00 266 282.00 I. Other Contract (Agency) 49,298.00 49,298.00 49,298.00 m. Other CE 31,558.00 31,558.00 31,558.00 n. Other o. Agency p. State 1,000.00 1,000.00 1,000.00 q. Total CN Cost Estimate(k +I +m +n +o +p) 348,138.00 348,138.00 80,856.00 267,282.00 r. Total Project Cost Estimate (e +j +q) 13238.00 _376;396:60 508,444.00 80,856.00 427,588.00 AGENCY By: Title: JI1/1 Date: DOT Form 140 -087A EF Revised 6/02 ST TE 3753 70" By: Date: Director, I4igFiwaye- erndkLocal Programs kaftileeo.e3r V/5 / 6J '/ GwVii1/4-S � Washington State VI/ Department of Transportation 13 -002 Council Approval 10/15/12 Highways and Local Programs State Funding Agreement Work by Public Agencies Agency and Address City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Agreement Number �v. 78 8? Maximum Amount Authorized $427,588.00 Location and Description of Work (See also Exhibit "A ") Construct an off - street, paved, shared use path for school access near 32nd Ave S between S 137th St and S 140th St. Project includes an education and enforcement component. Participating Percentage 100% Project Number/4(P % o This AGREEMENT is made and entered into this day of 4-0"`"'7 , 2Z , between the STATE OF WASHINGTON, Department of Transportation, acting by and througi the Secretary of Transportation, hereinafter called the "STATE," and the above named organization, hereinafter called the "AGENCY." WHEREAS, the AGENCY is planning the work shown above, and in connection therewith, the AGENCY has requested financial assistance for the project or program, and WHEREAS, the AGENCY has requested funds for the above shown project or program, which has been selected by the STATE for funding assistance. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: Type of Work Estimate of Funding (1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated State Funds PE a. Agency 5,100.00 5,100.00 b. Other Education/Encourage 29,138.00 0.00 29,138.00 C. Other Consultant 20,000.00 0.00 20,000.00 d. State 500.00 500.00 e. Total PE Cost Estimate (a+b+c+d) 54,738.00 0.00 54,738.00 Right of Way f. Agency 5,000.00 5,000.00 g. Other Consultant 73,000.00 73,000.00 h. Other i. State j. Total R/W Cost Estimate (f+g+h+i) 78,000.00 78,000.00 Construction k. Contract I. Other m. Other n. Other o. Agency p. State q. Total CN Cost Estimate (k+l+m+n+o+p) r. Total Project Cost Estimate (e+j+q) 132,738.00 0.00 132,738.00 DOT Form 140 -087 EF Revised 9/00 .01,-/s4) di a .i6i' &I✓d-e- General The AGENCY agrees to perform the above described work in accordance with the Project Application attached hereto as "Exhibit A" and made a part of this AGREEMENT. Plans, specifications, and cost estimates shall be prepared by the AGENCY in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction and adopted design standards, unless otherwise noted. The AGENCY will incorporate the plans and specifications into the AGENCY's project and thereafter advertise the resulting project for bid and, assuming bids are received and a contract is awarded, administer the contract, or if the project is of a size which the AGENCY is authorized to perform with its own forces under the laws of the State of Washington, the AGENCY may proceed with its own All work performed under this AGREEMENT shall comply with the applicable provisions of state law. II Payment The STATE, in consideration of the faithful performance of the work to be performed by the AGENCY, agrees to reimburse the AGENCY for the percentage of the actual direct and related indirect cost of the work shown above, up to the "MAXIMUM AMOUNT AUTHORIZED ". The agency will comply with Governmental Accounting Auditing and Financial Reporting Standards and applicable state law and local regulations, policies and procedures. No payment will be made for work done prior to execution of this AGREEMENT. Partial payments shall be made by the STATE, upon request of the AGENCY, to cover costs incurred. These payments are not to be more frequent than one (1) per month. It is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and that, at the time of the final audit, all required adjustments will be made and reflected in a final payment. The AGENCY agrees to submit a final bill to the STATE within forty -five (45) days after the AGENCY has The AGENCY agrees that all costs in excess of the amount authorized and the AGENCY's matching funds shall be the responsibility of the AGENCY. III Audit The AGENCY agrees that an audit may be conducted by the STATE. During the progress of the work and for a period not less than three (3) years from the date of final payment to the AGENCY, the records and accounts pertaining to the work and accounting thereof are to be kept available for inspection and audit by the STATE and copies of all records, accounts, documents, or other data pertaining to the project will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until all litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the three -year IV Legal Relations No liability shall attach to the AGENCY or the STATE by reason of entering into this AGREEMENT except as expressly provided herein. V Nondiscrimination The AGENCY agrees to comply with all applicable state and federal laws, rules, and regulations pertaining to nondiscrimination and agrees to require the same of all subcontractors providing services or performing any work using funds provided under this AGREEMENT. VI Venue For the convenience of the parties to this AGREEMENT, it is agreed that any claims and /or causes of action which the AGENCY has against the STATE, growing out of this AGREEMENT or the project or program with which it is concerned, shall be brought only in the Superior Court for VII Termination The Secretary of the Department of Transportation may terminate this AGREEMENT if the funding becomes unavailable or if the Secretary determines that it is in the best interest of the STATE. VIII Final Report and Final Inspection Within ninety (90) days following the completion of the project and submission of the final billing for the project, a final report and /or final inspection shall be submitted to the Assistant Secretary for Highways & Local Programs containing the following information: Non - Capital Projects 1. A description of the projector program. 2. A summary of actual costs of the project or program. 3. An evaluation of the project or program. This should address aspects such as transportation and /or other benefits to the public. Capital Projects 1. A final inspection is required. IX Supplement This agreement may be modified or supplemented only in writing by both parties. IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT on the day and year last written below. AGENCY By: Title: Date: DOT Form 140 -087 EF Revised 9/00 STATE By: Date: Assistant Secre ry for Highways and Local Programs JAN 2 82013 AIM Washington State Department of Transportation Local Agency Project Prospectus DOT Form 140 -101 EF Revised 11/10 Page 1 of 3 0 Previous Editions Obsolete • Date 12/27/2012 Prefix Route ( ) Central Contractor Registration Exp.Date Federal Aid Project Number Federal Employer Tax ID Number 91- 6001519 Local Agency Project Number 91210301 WSDOT (Use Only/ Agency City of Tukwila Federal Program Title ❑ 20.205 ❑ Other N/A Project Title Cascade View Elementary Safe Routes to School Start Latitude N 47.480509 Start Longitude W - 122.291865 End Longitude W - 122.291887 End Latitude N 47.477971 Project Termini From -- To S 137th St S 140th St Nearest City Name Tukwila Project Zip Code 98168 From: To: N/A N/A Length of Project 0.18 Miles Award Type J Local ❑ Local Forces ❑ State ❑ Railroad Federal Agency ❑ FHWA ❑ Others City Number 1320 County Number 17 County Name King WSDOT Region Northwest Region Congressional District 7 Legislative Districts 11 Urban Area Number 1 TMA / MPO / RTPO PSRC Phase Total Estimated Cost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E. $54,800 $0 $54,800 January 2013 R/W $78,000 $0 $78,000 January 2013 Const. $294,900 $0 $294,900 July 2013 Total $427,700 $0 $427,700 Description of Existing Facility (Existing Design and Present Condition) Roadway Width N/A Number of Lanes N/A The existing topographic conditions along the proposed trail alignment consist of undeveloped private properties with grass/bare dirt areas, gravel areas, and paved parking /driveway areas. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) This project proposes to construct a new paved asphalt trail for use by pedestrians/bicyclists to connect Cascade View Elementary School to S 140th St. The proposed trail width will be the City's standard of 12 feet, but is likely to vary to fit within topographic conditions. Local Agency Contact Person • Robin Tischmak Title City Engineer Phone 206 - 431 -2455 Mailing Address 6300 Southcenter Boulevard, Suite 100 City Tukwila State WA Zip Code 98188 By Project Prospectus Approval Approving Authority Title Public Works Director Date 12/27/2012 DOT Form 140 -101 EF Revised 11/10 Page 1 of 3 0 Previous Editions Obsolete • Agency City of Tukwila Project Title Cascade View Elementary Safe Routes to School Date 12/27/2012 Type of Proposed Work Project Type (Check all that Apply) Roadway Width N/A Number of Lanes N/A i4 New Construction Path / Trail ❑ 3 -R Preliminary Engineering Will Be Performed By Consultants ❑ Reconstruction ■ Pedestrian / Facilities ❑ 2 -R 90 ❑ Railroad ❑ Parking ❑ Other ❑ Bridge Geometric Design Data Description Preliminary Engineering Will Be Performed By Consultants Through Route 90 Crossroad Federal Functional Classification ❑ Urban % • Principal Arterial • Minor Arterial • Collector ❑ Urban • Principal Arterial • Minor Arterial • Collector 0 ❑ Rural • Major Collector • Minor Collector • Access Street/Road ❑ Rural • Major Collector • Minor Collector • Access Street/Road Terrain • Flat • Roll • Mountain • Flat • Roll • Mountain Posted Speed Design Speed Existing ADT Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Consultants Others 90 % Agency 10 % Construction Will Be Performed By Contractor Contract 100 % Agency 0 % Environmental Classification ® Final ❑ Preliminary ❑ Class I - Environmental Impact Statement (EIS) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ® Class II - Categorically Excluded (CE) ® Projects Requiring Documentation (Documented CE) Environmental Considerations This project proposes to construct a new, paved, non - pollution generating pedestrian/bicycle path. Environmental impacts are expected to be minimal. Anticipated documentation includes cultural/historical site evaluation, endangered species analysis, and stormwater quality/detention requirements. DOT Form 140 -101 EF Revised 11/10 Page 2 of 3 Agency City of Tukwila Project Title Cascade View Elementary Safe Routes to School Date 12/27/2012 Right of Way ❑ No Right of Way Required * All construction required by the contract can be accomplished within the existing right of way. ❑ Relocation Required FA Right of Way Required // No Relocation Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project None required. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ® Yes ❑ No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency City of Tukwila By Date (?)v %, ), DOT Form 140 -101 EF Page 3 of 3 Revised 11/10 •yor /Chairperson • Previous Editions Obsolete •