Loading...
HomeMy WebLinkAboutReg 2013-02-04 Item 5C - Final Acceptance - Tukwila Community Center Spray Park Sewer Connection with Goodfellow BrosCOUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared b 02/04/13 BG Ai review Council review ITEM INFORMATION ITEM No. 5.C. CAS NUMBER: STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 02/04/13 AGENDA ITEM TITLE Tukwila Community Center Spray Park Sewer Connection Project Completion and Acceptance CATEGORY ❑ Discussion Mtg Date Motion Date 02/04/13 ❑ Resolution Mtg Date ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date ❑ Public Hearing Mtg Date ❑ Other Mtg Date /1 Mtg SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P &R I Police /1 PW SPONSOR'S The contract with Goodfellow Bros., Inc. of Maple Valley, WA is complete for the Tukwila SUMMARY Community Center Spray Park Sewer Connection Project. This project installed an outside drop connection on the sewer manhole that serves the TCC Spray Park. Construction began July 19, 2012 and was completed on September 19, 2012. No change orders were issued. Council is being asked to accept and finalize the contract with Goodfellow Bros. in the amount of $63,126.75. RLVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ❑ Transportation Cmte Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. COMMITTEE CHAIR: JOE DUFFIE ■ Utilities DATE: 01/22/13 RECOMMENDATIONS: SPONSOR /ADMIN. COMMITTEE Public Works Unanimous Approval; Forward to Regular Consent Agenda. COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $63,126.75 $70,945.05 $0.00 Fund Source: 301 PARKS (PG 47, 2012 CIP) ents: Comments: MTG. DATE RECORD OF COUNCIL ACTION 02/04/13 MTG. DATE ATTACHMENTS 02/04/13 Informational Memorandum dated 01/18/13 State of WA Depart of Revenue Notice of Completion 12 -085 Minutes from the Utilities Committee meeting of 01/22/13 9 10 C J�.fJILA �4 A -'s: sz City of Tukwila J � 1908 Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, Senior Engineer DATE: January 18, 2013 SUBJECT: Tukwila Community Center Spray Park Sewer Connection City Project No. 91030101 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of the retainage. BACKGROUND On July 19, 2012, the City entered into Contract No 12 -085 with Goodfellow Bros., Inc., of Maple Valley, Washington for the installation of an outside drop connection on the existing sewer manhole serving the Tukwila Community Center Spray Park. Work began on September 11, 2012 and was completed on September 19, 2012. No change orders were issued to the contract. Contract Award Amount (without sales tax) Reduction in Quantities Sales Tax at 9.5% Total $58,900.00 (1,250.00) 5,476.75 $63,126.75 Retainage of $2,882.50 was held from the single payment to Goodfellow Bros., Inc. FINANCIAL IMPACT Funds for the installation of the sewer connection project were included in the 2012 Parks CIP Budget with a project budget was $70,945.05, including contingency. RECOMMENDATION The Council is being asked for formal acceptance and retainage bond release authorization, subject to standard claim and lien release procedures, for the contract with Goodfellow Bros., Inc., in the amount of $63,126.75 and to consider this item on the Consent Agenda of the February 4, 2013 Regular Meeting. Attachments: Dept. of Revenue Notice of Completion W: \PW Eng \PROJECTSW- PK Projects \TCC Spray Park Sewer Connection (91030101) \InfoMemo Completion Good Fellow BROS Spray Park Const - sb.doc 11 12 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Name & Address of Public Agency City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 UBI Number: 179-000-208 Contractor's UBI Number: 048 000 968 Date: 12/17/12 Department Use Only Assigned to: Date Assigned: Notice is hereby given relative to the completion of contract or project described below Project Name TCC Spray Park Sewer Connection (91030101) Contract Number 12-085 Job Order Contracting El Yes El No Description of Work Done/Include Jobsite Address(es) Install outside drop on existing manhole. Federally funded road transportation project? • Yes Vf No Contractor's Name Telephone Number Goodfellow Brothers, Inc. (509) 662-7111 Contractor Address PO Box 1419, Maple Valley, WA 98038 If Retainage is Bonded, List Surety's Name (or attach a copy) N/A Surety Agent's Address N/A Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted 7/19/12 9/11/12 9/19/12 10/26/12 Contract Amount Additions ( + ) Reductions ( - ) Sub-Total Amount of Sales Tax Paid at .095 (If various rates apply, please send a breakdown) 58,900.00 0.00 1,250.00 57,650.00 5,476.75 Liquidated Damages $ Amount Disbursed $ Amount Retained $ TOTAL $ 63,126.75 NOTE: These two totals must be equal Please List all Subcontractors Below: 0.00 60,244.25 2,882.50 TOTAL $ 63,126.75 Subcontractor's Name: UBI Number: Affidavit ID (if known) Terra Dynamics, Inc. 601 030 794 Del Mar Concrete Cutting 602 260 574 Drain-Pro Inc. 602 740 534 F215-038-000 08-2011 REV 31 0020e (08/25/11) Continued on page 2 13 14 UTILITIES COMMITTEE Meeting Minutes January 22, 2013 — 5:00 p.m. — Conference Room 1 PRESENT Councilmembers: Staff: Guests: City of Tukwila Utilities Committee * *TUESDAY due to holiday Joe Duffle, Chair; Allan Ekberg and Verna Seal Bob Giberson, Frank Iriarte, Robin Tischmak, Mike Cusick, Ryan Larsen, David Cline, Pat Brodin, Gail Labanara and Kimberly Matej Chuck Parrish, resident CALL TO ORDER: The meeting was called to order at 5:01 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. 2013 Utilities Committee Work Plan As information only, staff gave a brief overview of items that Committee during 2013. Specific project highlights are outlined Committee agenda packet. Staff added a project which was agreement with Valley View Sewer regarding the service area Southcenter Boulevard. INFORMATION ONLY. are expected to be brought to the Utilities in the informational memo provided in the not included in the memo, an interlocal in the location of 515t Avenue South and B. Project Completion and Acceptance: Tukwila Community Center Spray Park Sewer Connection Staff is seeking Council approval for project completion, closeout and release of retainage to Goodfellow Bros., Inc. in the amount of $63,126.75 for the installation of an outside drop connection (verses the original inside connection which was installed) on the existing sewer manhole which serves the Spray Park at the Tukwila Community Center. No change orders were issued during this project, and the project was completed under budget. FORWARD TO FEBRUARY 4 REGULAR MEETING CONSENT AGENDA. C. Project Status: East Marginal Way South 11/19/12 Storm Pipe Repair Staff provided a status update of the emergency storm pipe repair on East Marginal Way South (south of South 124th Street) after a sinkhole formed from a break in a 30 -inch storm water line on November 19, 2012. The memo included in the Committee agenda packet provides specific details. In summary, shortly after the initial temporary sinkhole repair, a blockage formed upstream of the original break. Significant debris was removed from the storm pipe, but it could not be completely cleared. Further inspection of the pipe determined that failure of the pipe is imminent and repair is needed. $61,992.94 has been spent to date on temporary repairs and permitting, not including the costs for design services as outlined in Item D below. Additional repair recommendations will be made after a complete video inspection has been performed. Final design and construction costs are unknown. INFORMATION ONLY. D. Consultant Agreement and Recommendation: East Marginal Way South 11/19/12 Storm Pipe Repair Staff is seeking Council approval to enter into a consultant agreement with KPG, Inc. in the amount of $39,403.95 for engineering design services for the East Marginal Way South Emergency Storm Pipe Repair. The funding for this project will be taken from the 2013 Annual Small Drainage Program budget. $80,000 has been budgeted for design services for the 2013 Small Drainage Program. 15