HomeMy WebLinkAboutReg 2013-02-04 Item 5G - Grant Acceptance - Thorndyke Elementary Safe Routes to School for $457,000COUNCIL AGENDA SYNOPSIS
Initials
Meetin. Date
02/04/13
Council review
I! va
Ma ors review
ITEM INFORMATION
ITEM No.
5.G.
63
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 02/04/13
AGENDA ITEM TITLE Thorndyke
Acceptance
Safe Routes to School
of Washington State Department of Transportation (WSDOT) Grant
CATEGORY ❑ Discussion
Mtg Date
Motion
Date 02/04/13
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
I1
Mtg
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT U P&R ❑ Police i4 PW
SPONSOR'S The City was awarded $457,000 from the 2013 WSDOT grant with federal funds for the
SUMMARY Thorndyke Safe Routes to School Project. Construction costs for the street improvements,
which includes sidewalk on the north side of S 150th St, are estimated at $1,082,000 and
the City match would be the remaining balance of $682,000. Council is being asked to
accept the Washington State Department of Transportation grant with federal funds for
$457,000.
REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm.
DATE: 01/29/13 COMMITTEE CHAIR: KATE
// Transportation
Cmte
❑ Planning Comm.
KRULLER
RECOMMENDATIONS:
SPONSOR /ADMIN.
COMMITTEE
Public Works Department
Unanimous Approval; Forward to Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 103 RESIDENTIAL STREETS (PG 4, 2013 CIP), 104 ARTERIAL STREETS, AND 412 SURFACE WATER
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
02/04/13
MTG. DATE
ATTACHMENTS
02/04/13
Informational Memorandum dated 01/25/13
2013 CIP, page 4
Award Letter from WSDOT
Minutes from the Transportation Committee meeting of 01/29/13
63
64
TO:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director
BY: Robin Tischmak, City Engineer
DATE: January 25, 2013
SUBJECT: Thorndyke Safe Routes to School
Project No. 91210302
Acceptance of WSDOT Grant
ISSUE
Accept a Safe Routes to School Grant award of federal funds from the Washington State Department of Transportation
( WSDOT) in the amount of $457,000.
BACKGROUND
Walking routes for students to Thorndyke Elementary School use the narrow, 2 -lane South 150th Street between 42nd Ave S
and Tukwila International Blvd. South 150th St is a high priority street for repairs and upgrades within the City's Overlay
Program and Small Drainage Program. This segment of S 150th St is also identified in the Walk & Roll Plan as a high priority
candidate for sidewalks. Preliminary design work performed as part of the Overlay and Small Drainage Programs presented
an opportunity to broaden the scope of work to include the construction of a sidewalk on one side of the street and apply for
grant funds from the WSDOT Safe Routes to School Program. The City submitted an application in 2012 and was awarded a
federal grant in the amount of $457,000 to construct pedestrian improvements. The grant award also includes a component to
implement Education, Encouragement, and Enforcement efforts to improve pedestrian safety and awareness.
DISCUSSION
The successful acquisition of the Thorndyke Safe Routes to School grant will allow the City to construct a "mini" street
improvement project. The improvements will include: curb, gutter and sidewalk on one side of the street, storm drainage
improvements, street overlay, illumination improvements (using existing wooden utility poles), and traffic signal improvements
that include countdown pedestrian modules at the S 150th St/42nd Ave S signal.
FINANCIAL IMPACT
The total estimated project construction cost is $1,082,000.00. City required match funds total $682,000.00. The
Education /Encouragement/Enforcement components have a budget of $57,000 from the awarded grant funds.
Construction
Thomdyke Safe Routes to School Grant $ 400,000.00
Motor Vehicle Tax 265,000.00
City Funds - Overlay & Repair 2014 129,000.00
City Funds - Small Drainage 2014 288,000.00
Totals $1,082,000.00
Education /Enforcement
$57,000.00
0.00
$57,000.00
RECOMMENDATION
Council is being asked to accept the grant award from WSDOT in the amount of $457,00.00 for the Thorndyke Safe Routes
to School Project and consider this item on the Consent Agenda at the February 4, 2013 Regular Meeting.
Attachments: 2013 CIP, page 4
Award Letter from WSDOT
W:IPW EngIPROJECTS\A- RW 8 RS Projects\Safe Routes to SchoollThorndykelInfo Memo Grant Accept 01- 25- 13.docx
65
66
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2013 to 2018
PROJECT: Thorndyke Safe Routes to School Project No. 81210802
Construction of roadway improvements and new sidewalk on the north side of S 150th St between Tukwila
DESCRIPTION:
International Blvd and 42nd Ave S. Also a new crosswalk on S 150th St in front of Thorndyke Elementary.
Enhance safety for students walking and biking to Thorndyke Elementary and encourages alternate
JUSTIFICATION:
transportation choices.
This route is one of the high priority missing sidewalk areas prioritized as part of Walk and Roll Plan.
STATUS: WSDOT Safe Routes to School grant for $457K in May 2012 with results in June 2013.
MA|NT|MPACT: Negligible.
This will also include storm water components on S 150th St. Education, enforcement, and encouragement
COMMENT:
are also included in the project as part of the Safe Routes to School grant requirements.
FINANCIAL Through Estimated
2015
2016
2017
2018
BEYOND TOTAL
'.~...~' -_ ..
__ _
EXPENSES
Design
48
28
14
90
Lund(RyW)
0
Const Mgmt.
55
55
Construction
567
567
TOTAL EXPENSES
0
0
48
650
14
0
0
0
0
712
FUND SOURCES
Awarded Grant
0
Proposed Grant
48
395
14
457
Motor Vehicle Tax
265
265
Mitigation Expected
0
City Oper. Revenue
0
0
O
1 O}
0
O
0
0
0
<1O)
TOTAL SOURCES
0
0
48
650
14
0
0
0
0
712
Project Location
1$-��
_ ��St�
•
2013 2018 Capital Improvement Program
4
68
."*TWashington State
O Department of Transportation
Paula J. Hammond, P.E.
Secretary of Transportation
January 8, 2013
Mr. Bob Giberson
Public Works Director
City of Tukwila
6300 Southcenter Blvd.
Tukwila, WA 98188 -2545
Transportation Building
310 Maple Park Avenue S.E.
P.O. Box 47300
Olympia, WA 98504 -7300
360 - 705 -7000
TTY: 1- 800- 833 -638 j CE8VED
www.wsdot.wa.gov [�
2013 Safe Routes to School Program
Federal Funding
Dear Mr. Giberson:
JAN 11 2013
TUKWILA
PUBLIC WORKS
WSDOT is pleased to advise you that the following project was recently selected to
receive federal Highway Safety Improvement Program (HSIP(SR)) funding through the
Safe Routes to School program. The federal funding is limited to the amount shown
below, and is subject to approval by the 2013 State Legislature:
Thorndyke Elementary Safe Routes to School Application $457,000
Scope: See Project Summary (attached)
Note: These funds are contingent on the local commitment of $625,000 made in the
grant application.
In order to meet state and federal requirements, the following are required:
• Projects utilizing federal funds must be included in your current Transportation
Improvement Program (TIP) as a complete programmed project. Once your
regional TIP amendment is approved, WSDOT will amend the Statewide
Transportation Improvement Program (STIP).
• Project funding packages must include the following new federal mandatory
information or your project cannot be authorized:
Place of performance:
• Nearest (city)
• Nine digit Zip Code
• Preliminary Engineering (PE) must be obligated in accordance with the project
summary (attached) that reflects the timeline provided in the grant application.
■ This project has been scheduled to be awarded in accordance with the project
summary (attached). If the project does not meet the scheduled construction
award date, your agency can request an extension to the deadline through your
Region Local Programs Engineer via e -mail for H &LP to determine if the reason
or reasons for the delay is acceptable. See the Project Delivery Policy for more
information at: http://www.wsdot.wa.gov/NR/rdonlvres/82B45F5A-C262-403E-
ABF7- 7E4EFA8F01 ED /0/ProjectDeliveryPolicv.pdf
69
Bob Giberson
Public Works Director
2013 Safe Routes to School Program
Federal Funding
January 8, 2013
• Project expenditures incurred before receiving notice from H &LP of federal fund
obligation are not eligible for reimbursement.
• To maintain funding, a Quarterly Project Report form must be completed by the
end of March, June, September and December each year. The online database can
be found at: http:// www .wsdot.wa.gov /localprograms /. To access the database
you will need an account name and password. Your account name is Tukwila
and your password is Tukwi785. The password is case sensitive.
To obligate funding for the project, please refer to the information above and your Local
Agency Guidelines (LAG) manual for additional information. As a reminder, H &LP
encourages all agencies to submit monthly progress billings to ensure timely
reimbursement of eligible federal expenditures.
For assistance please contact Ed Conyers, your Region Local Programs Engineer, at
206- 440 -4734.
Sincerely,
Kathleen B. Davis
Director
Highways & Local Programs
Enclosure
KBD:sas
cc: Ed Conyers, Northwest Region Local Programs Engineer, MS NB82 -12I
70
Project Summary
Program: Safe Routes to School
Date: December 2012
Agency: City of Tukwila
Project Title: Thorndyke Elementary Safe Routes to School Application
Project Description: The project includes sidewalk, curb, gutter, drainage, crossing improvements,
illumination, walking school bus, educational materials, maps, events and enforcement.
Detailed Project Description:
1. 1500 linear ft. of 6 ft. wide sidewalk, curb, gutter, and drainage will be constructed on 150th
between Tukwila International Blvd and 42 "d Ave S.
2. Installation of pedestrian countdown modules at the signalized intersection of 42d Ave S and S
150th St.
3. Installation of illumination on existing wooden utility poles.
4. Implementation of a walking school bus, newsletter articles, website posting, handouts, walk
route map, walk to school /fun run event and enforcement efforts.
Project Schedule:
Education /Encouragement
06/2015
Enforcement
09/2014
Begin Design
07/2013
Environmental Documents Approved
12/2013
Right -of -Way Approved
N/A
Estimated Contract Ad
04/2014
Estimated Contract Award Date
07/2014
Open to Traffic
09/2014
Project Cost and Award Amount:
Phase
Total Project
Cost
Amount Requested
Amount Awarded
Preliminary Engineering
$40,000
$40,000
Right -of -Way
$0
$0
Construction
$360,000
$360,000
Education /Encouragement
$46,000
$46,000
Enforcement
$11,000
$11,000
Total
1,082,000
$457,000
$457,000
Page 1 of 1
71
72
TRANSPORTATION COMMITTEE
Meeting Minutes
January 29, 2013 — 5:02 p.m. — Conference Room #1
City of Tukwila
Transportation Committee
PRESENT
Councilmembers: Kate Kruller, Chair; Joe Duffle and Dennis Robertson
Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, David McPherson, David Cline, Peggy McCarthy
and Gail Labanara
Guest: Chuck Parrish
CALL TO ORDER: The meeting was called to order at 5:07 p.m.
I. PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. Thorndyke Safe Routes to School Acceptance of WSDOT Grant
Staff is seeking Council approval to enter into an agreement with Washington State Department of
Transportation (WSDOT) to receive 2013 Safe Routes to School federal funding in the amount of
$457,000 for a street project on S 150th St that serves Thorndyke Elementary School.
If the grant funds are accepted by the City, they would allow the City to build a "mini" street
improvement project on S 150t St that would include; curb, sidewalk, and gutter on the north side of
the street, storm drainage, asphalt overlay on both lanes, illumination improvements using the existing
wooden poles, and traffic signal improvements at the S 150`h St /42nd Ave S. The entire construction
project is estimated to cost $1,082,000 and the budget is funded in 103 Residential streets, 104
Arterial's 2014 Overlay & Repair, and 412 Surface Water. With the $400,000 WSDOT grant, the
remaining costs of $682,000 would act as the City's match.
This "mini' street improvement project does not warrant the use of the utility undergrounding policy.
Design contract will be forthcoming later this year with construction scheduled for 2014.
UNANIMOUS APPROVAL. FORWARD TO FEBRUARY 4 CONSENT AGENDA.
B. Turnover of Infrastructure and Deciation of ROW from Claim Jumper Restaurant
Staff is seeking Council approval to accept the turnover of street improvements that included; street
lighting, sidewalks, storm drainage, and dedication of right -of way from Schoenbachler Enterprises,
LLC for the Claim Jumper Restaurant located at 5901 S 180t St.
This project was constructed in 1999; however the final turnover documents were never completed by
the City. With the Southcenter Parkway Extension Project, right -of -way was examined and resolution
of the development file was discovered to be incomplete. With the delay, the City was able to negotiate
some easements pertaining to the Southcenter Pkwy Extension project at no additional cost.
UNANIMOUS APPROVAL. FORWARD TO FEBRUARY 4 CONSENT AGENDA.
III. MISCELLANEOUS
Chair Kruller's Transportation Committee Goals 2013
A lengthy discussion was held on the new draft of the Transportation Committee Goals that were submitted
at the meeting (attached). Ongoing work on the goals will continue and return to Committee.
73